Loading...
HomeMy WebLinkAbout152_20260108_PJA26-0005_SOW AS 6 U I LT COVER Completed By: T. Buttel Completion Date: 12/8/2025 Address: 18725 SMOKEY POINT BLVD ARLINGTON WA 98223 Job Type: Forced Relocates Site Latitude: Tie-In Latitude: Job Subtype: Reimbursable Site Longitude: Tie-In Longitude: Survey Scope: Post-Sale Footages Entered On Right of Way,Private Exterior,and Private Interior tabs. Footages are COMICAST Project Manager: summarized on Survey Rollup tab. ` P2 ID: JB0002376209 Are Additional Pages Needed: No Legend Provide Clear Route Overview Construction Details Route STARTING WITH POLE 1,MOVE SPLICE CASE HERE,OVERLASH NEW CABLE 260'N TO POLE 2,MOVE POWER SUPPLY HERE.AT PED 1,PROOF AND PULL 90'SW TO VAULT 1.AT VAULT 1,BORE AND PULL NEW PATH 180'NW TO POLE 2.AT POLE 2,OVERLASH NEW Underground Route CABLE 280'NW TO POLE 3.AT POLE 3,OVERLASH 448'NW TO POLE 7,SPLICE PER DESIGN. Aerial Route Underground Overpull Aerial Overlash Footages Aerial UG Footage 150' Aerial Overlash 150'OL Overpull Conduit 150'oP Interior Footage 150' IN Conduit Tic Support Pedestal ❑ Vault v❑ Manhole MH Hand Hole HH Lockbox/Dmark Telco/Cable Pole Q Joint Use Pole ® u Joint Transformer Pole ® -----188th �t .NE ._.• ' Power Pole X Pole Tag PT-123 Riser RD Power Supply L2J Addresses Address Number 1234 Vacant Lot VL Fiber 'R41h PI PJF Splice Case Slack Callouts Callout Arrow Off. Bj`a Completed By: T. Buttel Route Overview Completion Date: 12/8/2025 Address: 18725 SMOKEY POINT BLVD ARLINGTON WA 98223 Job Type: Forced Relocates Site Latitude: 48.16677919 ie-In Latitude: 48.1682322 N IJob Subtype: Reimbursable Site Longitude: 122.1851328 Tien Longitude: 122.1866905 Survey Scope: Post-Sale Footages Entered On Right of Way,Private Exterior,and Private Interior tabs. Footages are — - COMICAST Project Manager: summarized on Survey Rollup tab. s P2 ID: JB0002376209 Are Additional Pages Needed: No Legend Provide Clear Route Overview Construction Details Route STARTING WITH POLE 1,MOVE SPLICE CASE HERE,OVERLASH NEW CABLE 260'N TO POLE 2,MOVE POWER SUPPLY HERE.AT PED 1,PROOF AND PULL 90'SW TO VAULT 1.AT VAULT 1,BORE AND PULL NEW PATH 180'NW TO POLE 2.AT POLE 2,OVERLASH NEW Underground Route CABLE 280'NW TO POLE 3.AT POLE 3,OVERLASH 448'NW TO POLE 7,SPLICE PER DESIGN. Aerial Route Underground Overpull Aerial Overlash "� Footages - R -,• Aerial UG Footage �8 831 m 150'OL Aerial Overlash Over pull Conduit 150 OP m Interior Footage + � '��� 224'OL Conduit Tic r Support - Pedestal 74'OL O r Vault ❑ 77 Manhole MH '�� 156'OL Wreckout as marked on Hand Hole HH —--. �� — map Lockbox/Dmark 18 t' St NE AIM 4' �— •� -FW vow N E Telco/Cable Pole 0 160'OL • - — , ,, _ A* Joint Use Pole � j ^� i„ 35os — � � o Joint Transformer Pole ® ,. Ps R -4 Power Pole X � — +1 351t7 1 '3525 .,__ate r l i Pole Tag PT-123 * E Riser 1" 258'OP _ g 7 t h P I N F R �� n 1 ,�;•'�^ �. 1 � - — Power Supply Ps � _ • _ � — u. ;. _."' _ �3� � —, •��.", t(1 AddressesLl Rif--;c,fl- ,, - ' ,� - , ` �. s - = ��_-•+. =+ ._ . _ Address Number 1234 Vacant Lot VL -''�-a W Fiber +E'r.!z - Splice Case 8y6th PI N ` Q _ ,fir w � �� Slack Callouts Callout Arrow LLJ •� .r t c /l i - _1 o ' u �i' a uNo. - A-�� M ' Completed By: T. Buttel Route Overview Completion Date: 12/8/2025 Address: 18725 SMOKEY POINT BLVD ARLINGTON WA 98223 Job Type: Forced Relocates Site Latitude: Tie-In Latitude: N ;db COMI Job Subtype: Reimbursable Site Longitude: Tie In Longitude: � Survey Scope: Post-Sale Footages Entered On Right of Way,Private Exterior,and Private Interior tabs. Footages are - - CAST Project Manager: summarized on Survey Rollup tab. s P2 ID: JB0002376209 Are Additional Pages Needed: No Legend Provide Clear Route Overview Construction Details Route STARTING WITH POLE 1,MOVE SPLICE CASE HERE,OVERLASH NEW CABLE 260'N TO POLE 2,MOVE POWER SUPPLY HERE.AT PED 1,PROOF AND PULL 90'SW TO VAULT 1.AT VAULT 1,BORE AND PULL NEW PATH 180'NW TO POLE 2.AT POLE 2,OVERLASH NEW Underground Route CABLE 280'NW TO POLE 3.AT POLE 3,OVERLASH 448'NW TO POLE 7,SPLICE PER DESIGN. Aerial Route Underground Overpull ( _ •:- 1f Aerial Overlash R!"�" 1 ^ • _ _ 1 ram"" Footages POLE 7Wit _ 1., �• ss Aerial UG Footage 150' 50'OL POLE 6 °q 18831 f Aerial Overlash Over pull Conduit 150'OP a 224'OLAA p Interior Footage = .- '�• � POLE Conduit Tic Support 74'oL POLE 4 Pedestal 100'0 L OO � Vault V I • ✓ i Zii r, Manhole MH - - C _C POLE - 1111 � `1 ini Hand Hole HH R aw• _ -F - + . $ t st NE r.�► 280' 188th, � Lockbox/Dmark St N E a < _ Telco/Cable Pole Q , `' t r3a044 08 � POLE 2 Joint Use Pole 1„7. (G •� -,,,,. _ c, _ _ - �o Joint Transformer Pole ® :41, —' , 180 J *A Power Pole X �., .¢}L t =..4 260' 1 3517 ZA 3575 q �... Pole Tag PT 123 n .a PED 1 - "�� __18_7M PI NE Riser s ( `�R. �. 1 ur, VAULT 1 `. ." Power Supply Ps o z.c5.l; 3514• 3530 Addresses u 1 Y .__ t� 3�0 Address Number 1234 _. _ � 1 � �elf�'•--� �''� s - ; Vacant Lot VL = ��M M - -" Fiber „ Ir. �+ s 'j ,� - ._ ,a�z=� ; Splice Case _ 18�6th PI N w • '� .� so Q - _ Slack �„ Z - ` vE Callouts " •M - . Callout Arrow �— LiJ ' •� 'a ;in \_ ��c,�_, �' ' 01 18601 Right of Way Completed By: T. Buttel Address: 18725 SMOKEY POINT BLVD ARLINGTON WA 98223 Completion Date: 12/8/2025 Right of Way Footages: Job Type: Forced Relocates New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 0 Job Subtype: Reimbursable New Aerial Fiber: 540 Overlash Fiber: 448 Existing UG Fiber: 0 Survey Scope: Post-Sale Empty Conduit Only: 0 New UG Coax: 180 Existing UG Coax: 90 COMICAST Project Manager: P2 ID: JB0002376209 Are Additional Pages Needed: No Legend Provide Clear Right of Way Construction Details Route STARTING WITH POLE 1,MOVE SPLICE CASE HERE,OVERLASH NEW CABLE 260'N TO POLE 2,MOVE POWER SUPPLY HERE.AT PED 1,PROOF AND PULL 90-SW TO VAULT 1.AT VAULT 1,BORE AND PULL NEW PATH 180'NW TO POLE 2.AT POLE 2,OVERLASH NEW CABLE 280'NW TO POLE 3.AT POLE 3, Underground Route OVERLASH 448'NW TO POLE 7,SPLICE PER DESIGN. Aerial Route Underground Overpull Aerial Overlash Footages Aerial UG Footage 150' x Aerial Overlash 150 OL • �, 150'OP � • � I� • �} F ��� J� � J 2 rJ cl -1 .-1 (J., JJ JJVJ Overpull Conduit 1) 1 Interior Footage 150'IN °�. A • • %�'.� • • -r . J(J 1 �J J J'1 J 2, J-1 1 �J�r J I Conduit Tic / w • • _ • �� JI r��J JjflJi��� �J�llr J�''I(J Support ' Pedestal I f �X z • �. rM. "'Ain J k)rj `l'lrL', J J J J J Vault v❑ • 4 �JllJr��� Manhole nH Hand Hole Lockbox/Dmark » Telco/Cable Pole Joint Use Pole Joint Transformer Pole Build new strand and Power Pole X y lash new cable Pole Tag PT-123 Move SP.WAMA.0157 here Riser Power Supply PS Build new strand and lash new cable Addresses Lash new fiber from SP.WAMA.0122 to Address Number 1234 SP.WAMA.0157 Wreckout aerial as 280' Transfer existing lines to marked on map 180' Vacant Lot VL �` new PUD pole Fiber 90'OP Splice Case y_ Bore new path from new Slack pole to new vault - '�T _ a: -, -�-;, - Callouts Dig P&Intercept and set 11•` _- - Callouts Proof and pull new cable Right of Way Completed By: T. Buttel Address: 18725 SMOKEY POINT BLVD ARLINGTON WA 98223 Completion Date: 12/8/2025 Right of Way Footages: Job Type: Forced Relocates New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 0 Job Subtype: Reimbursable New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0 Survey Scope: Post-Sale Empty Conduit Only: 0 New UG Coax: 0 Existing UG Coax: 0 COMICAST Project Manager: P2 ID: JB0002376209 Are Additional Pages Needed: No Legend Provide Clear Right of Way Construction Details Route STARTING WITH POLE 1,MOVE SPLICE CASE HERE,OVERLASH NEW CABLE 260'N TO POLE 2,MOVE POWER SUPPLY HERE.AT PED 1,PROOF AND PULL 90'SW TO VAULT 1.AT VAULT 1,BORE AND PULL NEW PATH 180'NW TO POLE 2.AT POLE 2,OVERLASH NEW CABLE 280'NW TO POLE 3.AT POLE 3, Underground Route OVERLASH 448'NW TO POLE 7,SPLICE PER DESIGN. Aerial Route Underground Overpull Aerial Overlash Footages Aerial UG Footage 150' Aerial Overlash 150 OL Der r� r r rat 1 7A 1 P1\A r, r r r✓ ( Overpull Conduit 150 OP _ l J Interior Footage 150 IN r—r�J• 1 J,--1 2 J, 1 �J:r J—r� —f(J (J(J J I ) - rJ J Conduit Tic / 1 i' f r/ -1 J f 2 J JItJ JI'_J P�JJIj �F Support '\r11 f 1 J JI j ./ .,` J Jr r J � / Pedestal � � r f� � � � � J J r':rl j 11�J f�Jlll `f�Jr. Vault v❑ r1j� �1rar i ljrjjt��1 Jr;l Manhole MH Hand Hole HH Lockbox/Dmark Telco/Cable Pole C - r�• __ \ 260' Joint Use Pole Joint Transformer Pole ® Pull new drop to existing Wreckout aerial as customer Power Pole X marked on map Pole Tag PT 123 Build new strand and Riser ® MM lash new cable Power Supply Ps — __ Addresses 280' Ps Address Number 1234 Vacant Lot VL Wreckout aerial as Fiber I - marked on map Move power supply here Splice Case Slack - y 180' Callouts - - Callouts �- r Bore new path from new '1Is 0 *-i"— pole to new vault .�'L. ,- Right of Way Completed By: T. Buttel Address: 18725 SMOKEY POINT BLVD ARLINGTON WA 98223 Completion Date: 12/8/2025 Right of Way Footages: Job Type: Forced Relocates New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 0 Job Subtype: Reimbursable New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0 Survey Scope: Post-Sale Empty Conduit Only: 0 New UG Coax: 0 Existing UG Coax: 0 COMICAST Project Manager: P2 ID: JB0002376209 Are Additional Pages Needed: No Legend Provide Clear Right of Way Construction Details Route STARTING WITH POLE 1,MOVE SPLICE CASE HERE,OVERLASH NEW CABLE 260'N TO POLE 2,MOVE POWER SUPPLY HERE.AT PED 1,PROOF AND PULL 90-SW TO VAULT 1.AT VAULT 1,BORE AND PULL NEW PATH 180'NW TO POLE 2.AT POLE 2,OVERLASH NEW CABLE 280'NW TO POLE 3.AT POLE 3, Underground Route OVERLASH 448'NW TO POLE 7,SPLICE PER DESIGN. Aerial Route Underground Overpull Aerial Overlash Footages Aerial UG Footage 150' Aerial Overlash 150'OL PjVJ J 2 0 2r t 'J :'J , Overpull Conduit 150 OP _/ _/ I —/ -J J I �I !� J-J 22�-1 ��r Interior Footage r— /� J J J J J J �J • Conduit Tic / ,I JJ SD �ltJ�Jl_ , PJJI1r �I �d -I )'72- JlfJUl��y PJj Support J ( r( i �'r�'J'' �` i - Pedestal r:I�lTI Jll J�J��J r'A111� b:)n ��11r., • J ' Build new strand and J Vault V❑ J j� R lash new Manhole MH Hand Hole HH 2g0' Lockbox/Dmark \ \, Telco/Cable Pole Joint Use Pole Joint Transformer Pole Power Pole X _�- Wreckout aerial as �•' Transfer existing lines to Pole Tag PT 123 marked on map LJ - new PUD pole Riser Power Supply Ps Addresses Wreckout aerial as Lash new fiber from SP.WAMA.0122 to - marked on map SP.WAMA.0157 Address Number 1234 100'OL Vacant Lot VIL �r■ � .i 74'OL " Fiber 224'oL Splice Case • ■° ■ tR - - - _ - = -:. is 1 _-- Slack Callouts Callouts - - - - - - - ; Right of Way Completed By: T. Buttel Address: 18725 SMOKEY POINT BLVD ARLINGTON WA 98223 Completion Date: 12/8/2025 Right of Way Footages: Job Type: Forced Relocates New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 0 Job Subtype: Reimbursable New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0 Survey Scope: Post-Sale Empty Conduit Only: 0 New UG Coax: 0 Existing UG Coax: 0 COMICAST Project Manager: P2 ID: JB0002376209 Are Additional Pages Needed: No Legend Provide Clear Right of Way Construction Details Route STARTING WITH POLE 1,MOVE SPLICE CASE HERE,OVERLASH NEW CABLE 260'N TO POLE 2,MOVE POWER SUPPLY HERE.AT FED 1,PROOF AND PULL 90'SW TO VAULT 1.AT VAULT 1,BORE AND PULL NEW PATH 180'NW TO POLE 2.AT POLE 2,OVERLASH NEW CABLE 280'NW TO POLE 3.AT POLE 3, Underground Route _,__ OVERLASH 448'NW TO POLE 7,SPLICE PER DESIGN. Aerial Route Underground Overpull Aerial Overlash Footages Aerial UG Footage 150' Aerial Overlash 150'OL �� r r r " ,r," r Overpull Conduit 150 OP J EJ', 2 02 J � J ."J J, J J rPJVJ Interior Footage 150'IN ` -r�fJ,"J JI -122,"J JJJ0rJ/ Conduit Tic Support �� �. • f\- L Pedestal j Vault v❑ , r�J Manhole HH Hand Hole Lockbox/Dmark = ri Telco/Cable Pole -- Joint Use Pole ® Lash new fiber from SP.WAMA.0122 to SP.WAMA.0157 Transfer existing lines to Joint Transformer Pole ® new PUD pole Power Pole X Pole Tag PT-123 100'OL 74'oL Riser ® 11 01 , Power Supply Ps - Y; Addresses Address Number 1234 Vacant Lot VL Fiber Splice Case Slack Callouts Callouts i