HomeMy WebLinkAbout20260116_PJA26-0017_SnoCo Traffic Offer Worksheet Traffic Mitigation Offer to Snohomish County
The applicant completes part one and submits it to the City with a completed county traffic worksheet. The City
completes part two and sends it to the County. The County completes part three and sends it back to the City.
Part One to be completed by Applicant
Basic Development Information
Name of City in which development is located Arlington
Name of Proposed Development Taco Bell
City Project File Number(if known) N/A
Name of Applicant Fletcher Boll, NW Restaurants Inc.
Address of Applicant 18815 139th Ave NE, Suite C, Woodinville, WA 98072
Proportionate Share Calculation: Choose Option A or B
❑ Option A: Based on a percentage of the County's adopted impact fee (attach traffic worksheet.)
1. The applicable percentage of the County's fee: %
2. Net New Average Daily Traffic: ADT
3. The adopted County impact fee for this development: $/ADT
4. Total Proportionate Share Amount: $
❑■ Option B: Based on a comprehensive traffic study (attach traffic worksheet and traffic study)
■ No road improvements are impacted. Hence, proportionate share amount is zero ($0).
The following road improvements are impacted. The calculation of proportionate shares is
summarized below.
List by Names/Description the Impacted County PHTs Capacity Proportionate Share
County Projects (attach other pages if Project Impacting Cost per Obligation per
necessary) ID# Project PHT Impacted Project
1.
2.
3.
4. Total Proportionate Share Amount (sum of obligations for each impacted project) $0
❑■ Trip Distribution and Assignment if required
If required, attach AM and PM peak-hour trip distribution and assignment. Attach traffic worksheet showing
whether or not it is required and traffic study.
❑ Mitigation of other impacts if required for developments generating more than 50 Peak-Hour Trips
Mitigation of Impacts on Level of Service
No impact or not applicable Mitigation as described in attached traffic study.
Mitigation of Impacts on Inadequate Road Conditions
No impact or not applicable Mitigation as described in attached traffic study.
Mitigation for Impacts on Access or Circulation
No impact or not applicable Mitigation as described in attached traffic study.
❑ Written Offer
The Applicant hereby voluntarily agrees to pay the total proportionate share amount shown above for
impacts of the proposed development on the capacity of Snohomish County roads and provide mitigation
of all other impacts as indicated above and described in attached documents.
BY: Date:
Signature by Authorized Official of Applicant or Authorized Representative
Print Name and Title
Instructions to Applicant. Submit this Offer, a completed county traffic worksheet, and any other attachments
to the City with your initial application or send directly to Contact.pwCMS(o)_snoco.org.
Taco Bell Arlington TIA
56
Part Two: To be completed by the City
Receipt of Written Offer and attachments by City and routing to County
Name of Proposed Development
City Project File Number
Date Received
City Staffer Assigned to Project
Address
Phone
Instructions to City. Send this offer and all attachments to Contact.pwCMS(aD-snoco.org
Received by:
Date:
Initialed by City Staffer Print Name and Title
Part Three: To be completed by Snohomish Count
Receipt of Offer and attachments by Snohomish County and routing back to City
Name of Proposed Development
City Project File Number
Received by:
Date:
Initialed by County Staffer Print Name and Title
Snohomish County Mitigation Request to City
Snohomish County has reviewed the traffic study worksheet and mitigation offer submitted by the applicant
and has determined as follows:
❑ Snohomish County requests that the City impose ❑ Snohomish County requests that the
the mitigation offered above as a condition of City require additional supplemental
approval for the Development. Snohomish County information to adequately evaluate the
agrees to accept changes in the mitigation proposed development's impacts.
payment amount shown above resulting from TDM ❑ The information requested is shown in
or lot-yield adjustments approved by the City. the notes below.
By:
Date:
Signature by Authorized County Staffer Print Name and Title
Routing Back to City
Instructions to County Send this offer and all attachments to the City Staffer shown in Part Two above.
Sent by:
Date:
Initialed by City Staffer Print Name and Title
Notes
Taco Bell Arlington TIA
57