ZONING PERMIT - SITE PLAN REVIEW
ADMINISTRATIVE DESIGN REVIEW
STAFF REPORT AND PERMIT DECISION
GENERAL INFORMATION
File Number: PJ26-0017/PJ26-0025
Project Title: Taco Bell
Owner: Dean A Jensen
Apple Rentals, LLC
Applicant/Contact: Fletcher Boll, Northwest Restaurants,Inc
Description: Drive-thru Restaurant
Location: North of 204th St NE between Olympic PI&79th Dr
Tax Parcel ID: 00847300000200
Lot Size: 0.63 acres /27,645sf
Topographical Description: Generally flat
Zoning Classification: General Commercial/Mixed-Use Overlay
Land Use Designation: General Commercial/ Mixed-Use Overlay
Proposed Use Classification: Restaurant; Drive-thru Service
City Approvals Required: Zoning Permit,Design Review, Civil Permit, Building Permits
Date of Decision: March 26, 2026
Decision: APPROVED,with Conditions
Zoning Permit-Site Plan Review
Administrative Design Review
Taco Bell-PJ26-00171PJ26-0025
Page 1 of 23
I. NATURE OF APPLICATION
A. Request
The applicant is proposing to construction a 2,240 square foot restaurant with a single drive-thru lane.
The site is located north of 204th St NE between Olympic PI NE&79th Dr,NE in the General Commercial
(GC) zone and in Airport Protection District C.The project site is located on one parcel located between
two existing commercial stores.
Grading will include site preparation for hardscapes, landscaping, the building, and retaining walls.
Approximate quantities of grading activities are 1,500 cubic yards of cut and fill, with a total affected
area of 0.66 acres.
Site improvements will include two (2) accessible parking stalls,and nineteen (19) parking stalls,along
with landscaping elements that include trees, shrubs, grasses, and groundcovers to increase plant
diversity and habitat throughout the entire site. The proposal will use the existing shared access
driveway to 2041h St NE as well as the shared access easement along the north side of the property.
The building will be primarily fiber cement siding with integral color. A parapet tower element with
panels designed to imitate wood will face the southwest corner of the site. Canopies are intended to
provide both articulation as well as a sense of pedestrian scale on all sides of the building while also
providing protection from the elements for both pedestrian access and vehicular service. The main
pedestrian access points to the building will face the parking lot with a pedestrian walkway to 2041h St
NE and the primary road along the south. Each pedestrian entrance provides large windows and
additional design features to provide a clear entrance.
B. Project Chronology/Background
A formal application for the Zoning Permit and Design Review was submitted to the Community &
Economic Development Department on January 16, 2026, and staff routed the material to City review
staff.Staff determined that the application was incomplete on January 23,2026.The applicant submitted
additional documents on January 26, 2026, and staff routed the material to City review staff. Staff
determined that the application was complete on January 28,2026.Additional submittals were received
on March 17,2026 and March 25,2026 and routed to city review staff.A Notice of Application and SEPA
Determination of Non-significance was issued on April 5, 2026.
Zoning Permit-Site Plan Review
Administrative Design Review
Taco Bell-PJ26-00171PJ26-0025
Page 2 of 23
C. Site Location/Description
'
14
The site is located north of F - •, i. - 1
204th St NE,west of 79th Dr
NE
204th:'St NE �.
. _ ; _ _
� L
2 I S Z
..A._ A.-
D. Site and Adjacent Zoning/Uses
20512 20511
20505 20503
GC
Subject
Site 76,
.7gr-�,,, ZS15 20330
20318 203r3 20312 20315
7530 20304
20 20305
20300
`0227 20301
GC-General Commercial CC-Commercial Corridor
MXD-Mixed Use Overlay RHC-Residential High Capacity
Area Zoning Existing Use
Subject Site General Commercial with Mixed-Use Overlay Vacant
North General Commercial with Mixed-Use Overlay Mixed Use
South General Commercial with Mixed-Use Overlay Retail
East General Commercial with Mixed-Use Overlay Retail Business
and Residential High Capacity
West General Commercial with Mixed-Use Overlay Commercial Business/Single
and Residential Low Capacity Family Residence
Zoning Permit-Site Plan Review
Administrative Design Review
Taco Bell-PJ26-00171PJ26-0025
Page 3 of 23
II. PROJECT CONSISTENCY WITH TITLE 20 AMC, ZONING
A. Applicable Review Criteria and Process
The Zoning Permit-Site Plan Review request is subject to review for conformity with the Arlington
Municipal Code (AMC),including but not limited to the following:
Regulation Analysis Meets
Chapter 20.16 AMC,Permits and Final Plat Approval
20.16.100 (b) Zoning Permits are issued under The applicant submitted a zoning
this title only when a review of the application permit for site plan review.The
submitted,including plans contained therein, Community&Economic Development
indicates that the development will comply with Department is responsible for the Yes
the provisions of this title if completed as permit decision and the decision is
proposed.All development shall occur strictly in appealable to the Hearing Examiner.
accordance with such approved plans and
applications.
20.16.110 Who May Submit Permit Applications. The owners of the property,Jensen
(a)Applications for zoning will be accepted only Dean,and Apple Builders,LLC
from persons having the legal authority to take approved the zoning permit application
action in accordance with the permit or the for site plan review that was submitted
subdivision plat approval.By way of illustration, to the city.
in general this means that applications should be Yes
made by the owners or lessees of property,or
their agents,or persons who have contracted to
purchase property contingent upon their ability
to acquire the necessary permits under this title.
20.16.120 Official Representative of the The owners,Dean Jensen and Apple
Applicant.The applicant for each land use permit Rentals,have designated Fletcher Boll
shall designate an official representative,which of Northwest Restaurants,LLC,as the Yes
may be himself,to receive all correspondence, official representative for the subject
determinations,and notices regarding the permit.
application.
20.16.130 Staff Consultation Before Formal The City held a General Information
Application.To minimize development planning Meeting with the project applicant on
costs,avoid misunderstanding or October 1,2025.
misinterpretation,and ensure compliance with Yes
the requirements of this title,a general
information meeting between the developer and
the planning staff is encouraged as provided in
this section.
20.16.140 Submittal of Application. The project applicant scheduled a
(a) To minimize development planning costs, submittal intake appointment with the
avoid misunderstanding or misinterpretations, Community and Economic
and ensure compliance with the requirements of Development Department and
this title,a submittal intake appointment is submitted the application on January Yes
required between the developer and the 16, 2026.
Community Development staff as provided in
this section.
Zoning Permit-Site Plan Review
Administrative Design Review
Taco Bell-PJ26-00171PJ26-0025
Page 4 of 23
Regulation Analysis Meets
20.16.150 Vesting of Permits. The proposed application for Taco Bell
(1) Land use permit applications shall be site plan review vested on January 28,
considered vested on the date that an application 2026 with the issuance of the complete
is deemed complete pursuant to 20.16.205 and application.The required impact fees
applications shall be processed under the land for the proposal do not vest with the
use regulations in effect on that date. However, project and the fee in place at the time
subsequent permits on the same property are of payment is the amount due. Yes
not vested on this date.
(2) Filing of a permit application does not vest
the payment of fees. Fees due,including impact
mitigation fees,application fees,or other
charges,shall be those fees in effect on the date
the fee is paid in accordance with the most
current city council fee resolution.
20.16.160 Processing Multiple Permits. The applicant has submitted a Zoning
(a)Whenever a proposed project requires more Permit and Design Review for Taco
than one permit,multiple permits,by this title, Bell. Both applications have gone
the entire application will be linked and through the entire process following Yes
processed simultaneously using the process the Zoning Permit requirements.
specified for the permit requiring the highest
degree of review and decision-making.
20.16.200 Applications to Be Complete. The applicant submitted a complete
(a)All applications for zoning,special use, application for Taco Bell zoning permit.
conditional use,or sign permits must be Yes
complete before the permit-issuing authority is
required to consider the application.
20.16.205 (c) Complete Application.Within 28 The application was submitted on
days of receiving the permit application,the January 16, 2026.The City issued a
Community Development Director shall mail or Notice of Incomplete Application on Yes
provide in person a written determination to the January 23, 2026.The Notice was
applicant. issued within the 28-day timeframe.
20.16.205 (g)Within fourteen (14) days after an The applicant submitted the required
applicant has submitted to the Community and documents and made payment on
Economic Development Director the additional January 26, 2026.The City issued a
information identified as being necessary for a Notice of Complete Application on Yes
complete application,the Community and January 28, 2026.The Notice was
Economic Development Director shall notify the issued within the 14-day timeline.
applicant whether the application is complete or
what additional information is necessary
20.16.215 Distribution of Application.Upon The application was routed to all
receipt of a zoning,special use or conditional use effected city departments on January
permit application,the Planning Official shall,in 16, 2026,January 26,2026, March 17,
addition to all interested City Department,send a 2026 and March 25,2026. Yes
copy of the application to the authorities and
agencies reviewing or furnishing water,fire,
school,and sanitary sewer service to the
proposed project.
20.16.220 Zoning Permits. (a)A completed The zoning permit was submitted to
application form for a zoning permit shall be city staff on January 16,2026.The
submitted to the community and economic project was reviewed for compliance Yes
development director by filing a copy of the with the Arlington Municipal Code.
application with the planning department.
Zoning Permit-Site Plan Review
Administrative Design Review
Taco Bell-PJ26-00171PJ26-0025
Page 5 of 23
Regulation Analysis Meets
20.16.270 Time Limitations for Permit The proposed zoning permit was
Processing. (a) The City shall issue its notice of reviewed and issued within the 65 day
final decision on a permit application within 120 timeframe per the following dates:
days after the Community and Economic
Development Director notifies the applicant that Action Date
the application is complete,as provided in Date of Application 1-16-2026
20.16.205.In determining the number of days
that have elapsed,the following periods shall be Notice of Incomplete 1-23-2026
Application
excluded: NOICA Resubmittal 1-26-2026 Yes
(1)Any period during which the applicant has Notice of Complete
been requested to correct plans,perform Application
1 28 2026
required studies,or provide additional required Review Comments 1-28-2026
information. 1st Resubmittal 3-17-2026
2°d Review Comments 3-24-2026
2°d Resubmittal 3-25-2026
Decision 3-26-2026
Total Process Days: 8 Days
Chapter 20.36 AMC,Zoning Districts and Zoning Ma
20.36.020 Commercial Districts Established. The subject property for the proposed
(e) The highway commercial (HC) zone is zoning permit is zoned General
established to accommodate the widest range of Commercial with Mixed-Use Overlay.
commercial activities.Uses allowed here include The proposal does not include Yes
those allowed in other commercial districts,but residential uses,the proposed
also those that require highway access or that restaurant is to follow the General
should be separated from residential uses. Commercial zone requirements.
Chapter 20.38 AMC,Airport Protection District
20.38.060 Airport Protection District The property is located under
Boundaries. Subdistrict C.
(a)Airport Protection Subdistrict A
(b)Airport Protection Subdistrict B Yes
(c)Airport Protection Subdistrict C
(d)Airport Protection Subdistrict D
20.38.090 Notice to Future Owners. In order to The applicant is required to submit and
mitigate impacts to the Arlington Airport,and to record an avigation easement with the
provide notice to future property owners,all Arlington Municipal Airport prior to
property owners within the Airport Protection final occupancy of the building permit.
Subdistricts A,B,and C seeking a land use or
building permit or undertaking substantial
reconstruction shall dedicate an avigation Yes
easement over their property to the City of
Arlington.The language of the easement and
notice shall be as provided by the airport,as
approved by the city attorney and recorded with
Snohomish County.
Zoning Permit-Site Plan Review
Administrative Design Review
Taco Bell-PJ26-00171PJ26-0025
Page 6 of 23
Regulation Analysis Meets
Chapter 20.40 AMC,Permissible Uses
20.40.010 Table of Permissible Uses.The Tables The proposed Drive-thru restaurant is
of Permissible Uses sets forth the permissible an allowed use per the permissible use
uses within the respective zoning classifications table within the General Commercial
in the city,subject to other applicable provisions zone, as shown below,with a zoning
in this title. It should be read in close conjunction permit. Yes
with the definitions of terms set forth in section
20.08 and the other interpretative provisions set
forth in this article.
Chapter 20.40.130 Commercial and Mixed-Use Zones Permissible Use Table
Use NC OTBD-1 OTBD-2 OTBD-3 GC CC HC
Carry-Out and Delivery Service;
Drive-Thru Service; Service or ZS ZS ZS ZS ZS
Consumption Outside Fully
Enclosed Building
Service or Consumption Inside
or Outside Fully Enclosed ZS ZS ZS ZS ZS ZS
Building
• ZS=Zoning or Special Use Permit(Zoning=Less than 4 acres and Special Use=4 acres or more)
Chapter 20.46 AMC,Design
20.46.010 (a) Conformance with Design Standards. The Design Review application was
Structures within the following zones are subject submitted to the city and is reviewed
to the relevant design standards adopted in this concurrently with the Zoning Permit.
chapter. No building or land use permit shall be The design of this structure is in
issued for structures or uses that do not conform compliance with the design Yes
to the applicable standards. regulations listed within the
(1) Zones Development Design Standards.
(e) General Commercial
20.46.060 Drive-Thru Windows The proposed configuration provides
(a)All drive-through windows and their driveways the maximum screening from the
shall be designed to not pose a hazard to public right-of-way with the drive-
pedestrians or other vehicles. In particular, thru ordering kiosk and queue on the
driveways and approaches to drive-through backside of the building.The drive-
windows shall be designed to minimize the thru window will not be visible from
crossing of pedestrian-ways or vehicular-ways, the street. Locating the drive through
except to cross a public sidewalk adjacent to a queue lane behind the building hides
public right-of-way.Where drive-through the cars from the street supporting
driveways and approaches cross pedestrian-ways, pedestrian connection to 204th NE.
the pedestrian-way shall be clearly demarcated.
(b)All drive-through windows and their driveways
shall be screened so as to minimize visual impacts
from public rights-of-way.
Development Design Standards
1.1 Street Character and Liveliness—Inhabited Landscaping, windows, lighting and Yes
Streets doors provided facing the primary road.
Zoning Permit-Site Plan Review
Administrative Design Review
Taco Bell-PJ26-00171PJ26-0025
Page 7 of 23
Regulation Analysis Meets
2.1 Pedestrian Environment-Access to Buildings Covered entry element at the east
from the Street entrance and storefront entrance on Yes
the south facade are clearly visible
from the street.
2.2 Pedestrian Environment-Screening Blank 60%of south facade is 7-foot-high
Walls and Retaining Walls storefront glazing. 2'x 7'-6" composite
wall panels in a stack bond pattern
enhance the north facade. Corporate Yes
murals with frames applied to both
east and west walls.Varying
materials are provided on all facades.
2.3 Pedestrian Environment-Service Element Landscaping provided in front of
Screening CMU screen wall around trash
enclosure and faces away from the
right-of-way.Utility meters to be Yes
oriented away from the frontage.
Gutters and downspouts to be
inte rated into the design.
2.4 Pedestrian Environment-Screening Parking Landscaping provided to screen
Lots parking,where located near the Yes
ublic ri ht-of-way.
2.5 Pedestrian Environment-Screening Parking Not applicable,no parking garages Yes
Garages are proposed.
2.6 Pedestrian Environment-Parking Garage Consolidated entry is utilized.An
Entries and Driveways easement is provided with the Yes
proper t owner to the west.
2.7 Pedestrian Environment-Lighting Design Architectural accent light applied to
all facades. Condition of pedestrian Yes
scale li tin to be added.
3.1 Landscape Design- Continuity Along the Street Landscaping proposed includes street
trees every 30'within the city right- Yes
of-way.
3.2 Landscape Design- Parking Lots Interior landscape areas provide
throughout the parking area. Yes
Irri ation is proposed as well.
4.1 Transition Between Occupied Spaces and Street This proposal does not include Yes
- Buffering Private Space residential units.
5.1 Neighborhood Character-Creating Streetscape The front fagade is approximately the
Capability same distance from the right-of-way Yes
as the neighboring buildings.
5.2 Neighborhood Character-Orienting the The main entrance to the building is
Building to the Street prominent and covered. Design
includes vertical tower element on
the southwest corner of the south
facade, covered pedestrian entry
element and varying materials on the Yes
east facade,varying materials and
corporate murals and frame on the
east and west facades. Horizontal
canopies are provided over all
storefronts.
Zoning Permit-Site Plan Review
Administrative Design Review
Taco Bell-PJ26-00171PJ26-0025
Page 8 of 23
Regulation Analysis Meets
5.3 Neighborhood Character-Compatibility within Not applicable,proposal is not within Yes
Emerging Centers an Emerging Center.
6.1 Adjacent Properties - Retaining Privacy and The proposed building's siting does
Solar Access not impact the use of adjacent Yes
ro erties.
6.2 Adjacent Properties -Parking Adjacent to The proposed building's siting does
Residences not impact the use of adjacent Yes
ro erties.
7.1 Siting-Creating Usable Open Space Not applicable,this proposal does not Yes
include multi-family residential units.
7.2 Siting-Siting Parking Areas The existing parcel shares a curb cut
with the neighbor to the west.The
new restaurant is being built to
maximize its prominence to 204th
Street NE and minimize the vehicle Yes
circulation required for parking on
the side and access to the drive
through at the rear. Parking is located
to the east and screened.
7.3 Siting-Siting Service Elements Trash enclosure faces away from the
right-of-way. Utility meters to be
oriented away from the frontage. Yes
Gutters and downspouts to be
inte rated into the design.
8.1 Transit Facilitation- Integrating Transit into Crosswalks and sidewalks are
Site Planning provided from the building entrance
to the nearest transit stop.No transit Yes
stops are located on adjacent right-of-
way.
8.2 Transit Facilitation-Pedestrian Circulation to Not applicable,no multi-family
Multi-Family Complexes complex is proposed with this Yes
development.
9.1 Architectural Character-Consideration of Site Ground level restaurant is proposed,
Conditions which provides easy access for Yes
pedestrians and is consistent with the
neighboring developments.
9.2 Architectural Character-Unifying Design Design elements from nearby newer Yes
Concept developments included.
9.3 Architectural Character-Compatibility with Architecture within this area is
Neighbors poorly defined,however the
proposed restaurant provides similar Yes
design concepts to other newer
developments nearby.
10.1 Character and Massing-Articulation and Total length on east and west facades
Modulation is 72 feet.The building is to human
scale without modulation,but we
have added a covered entry element
on the east facade to both define the Yes
main entry and provide building
modulation.The north and south
facade length is 28 feet. Building
height is 20 feet.
Zoning Permit-Site Plan Review
Administrative Design Review
Taco Bell-PJ26-00171PJ26-0025
Page 9 of 23
Regulation Analysis Meets
10.2 Character and Massing-Architectural Scale The proposed development is of a
similar height to the neighboring Yes
developments.
10.3 Character and Massing- Rooflines 8-inch cornice provided at the top of
walls. Building parapet walls screen Yes
roof top mechanical units.
11.1 Architectural Elements- Human Scale Covered entry that projects from the
facade over main pedestrian
walkway. Human scale storefronts, Yes
wall materials with human scale
patterns. Storefront glazing with
horizontal mullions over knee walls.
11.2 Architectural Elements- Building Features All facades have a combination of
composite wall panels with
proportioned reveals,horizontal Yes
siding with a rough sawn texture and
anodized aluminum storefronts with
horizontal canopies.
11.3 Architectural Elements- Entries The principal entrance is visible from
the street and directly connected
by sidewalk to the right of way. Yes
Covered entry that projects over the
main walkway.Wall sconce lighting
rovided.
12.1 Exterior Finish Materials-Appropriate All facades have a combination of
Materials composite wall panels with
proportioned reveals,horizontal
siding with a rough sawn texture and
anodized aluminum storefronts with Yes
horizontal canopies. Proposed siding
is 7 Inch wide with a rough sawn
texture.Trash enclosure walls to be
ainted s lit-face CMU.
13. Parking Garages No parking garages are proposed
Yes
with this development.
14. Mixed-Use Buildings This proposal does not include Yes
mixed-use.
15. Old Town Business District This proposal is not within the Old Yes
Town Business District.
Chapter 20.48 AMC,Density and Dimensional Re ulations
20.48.040 Building Setback Requirements. No The proposed project is within the
portion of any building or any freestanding sign general commercial zone and
may be located on any lot closer to any lot line than complies with the below regulations. Yes
is authorized in Table 20.48-1 Density and
Dimensional Standards for the general industrial
zone.
Zoning Permit-Site Plan Review
Administrative Design Review
Taco Bell-PJ26-00171PJ26-0025
Page 10 of 23
Regulation Analysis Meets
20.48.042 Sight Visibility Areas at Intersections.At The proposed project's main access
the intersection of two streets,either public or to the site is from 204th Street NE.
private,no structure,sign,vegetation,or anything There is also access to the site on the
else that obscures sight shall exceed 30 inches in southeast through a new shared Yes
height in the area described by a triangle having private access from 77th Avenue NE.
two 25-foot legs along the curb faces of the streets The site plan shows that the
from the streets'point of intersection,and a improvements will not obscure sight
diagonal line connecting the ends of these lines. at any entrance or exit from the site.
Table 20.48-1 Density and Dimensional Standards
Minimum Lot Size: 0 square feet 27,645 sf Yes
Minimum Lot Width: 70 feet 125+ft Yes
Front Lot Boundary Line: 25 feet 61 ft Yes
Rear Lot Boundary Line-Primary: 20 feet 59 ft
Accessory: 5 feet Yes
Side Lot Line or Alley Building Setback: 5 feet 17.5 ft- 72.1 ft Yes
Building Height Limitation: 45 feet 23 ft Yes
Maximum Lot Coverage: 100% 8%Total Impervious Yes
Chapter 20.56 AMC,Streets and Sidewalks
20.56.030 Access to Lots. Every lot shall have The proposed project provides one
access to it that is sufficient to afford a reasonable driveway access point 204th Street
means of ingress and egress for emergency NE.This driveway access provides a
vehicles as well as for all those likely to need or public means of ingress and egress
desire access to the property in its intended use. for emergency vehicles,passenger Yes
Access includes vehicular,pedestrian,bicycle,and vehicles,pedestrian,and bicycle
other common forms of transportation. transportation.There is also access to
north of the site through a new
shared rivate access.
20.56.050 Entrances to Streets. (a)All driveway The proposed project provides one
entrances and other openings onto streets within main driveway access point to the
the city's planning jurisdiction shall be constructed building lot,along with a secondary
so that: private drive access to the north and
1.Vehicles can enter and exit from the lot in internal private drive aisles that have
question without posing any substantial danger to access to the site.The proposed
themselves,pedestrians,or vehicles traveling in project complies with the following
abutting streets,and City of Arlington Standards and
2.Interference with the free and convenient flow of Specifications:
traffic in abutting or surrounding streets is . The driveway entrance provides Yes
minimized. safe access to the site and does
3.Driveway cuts shall be limited so the narrowest not propose to impede vehicle or
width necessary to provide safe ingress and egress pedestrian travel.
onto and from the property. • Access to the site is not proposed
4.Driveways shall not be located adjacent to one to interfere with 204th Street NE.
another in such a manner as to create a"double . The driveway width on both 204th
width"driveway without any landscaping between Street is 40 feet in width to
the driveways. provide two way vehicular
movement to and from the site.
Zoning Permit-Site Plan Review
Administrative Design Review
Taco Bell-PJ26-00171PJ26-0025
Page 11 of 23
Regulation Analysis Meets
20.56.120 Street Intersections. (a) Streets shall The proposed project provides 90'
intersect at 80°to 90°.Not more than two streets driveway intersections at all access
shall intersect at any one point or vary from the points. Yes
above angle of connections.
20.56.130 Construction Standards and The proposed project is subject to a
Specifications.Construction and design standards site civil construction permit.
and specifications for streets,sidewalks,and curbs
and gutters are contained in the"Public Works Yes
Construction Standards and Specifications,"and all
such facilities shall be completed in accordance
with these standards.
Chapter 20.60 AMC,Utilities
20.60.100 Sewage Disposal Facilities Required. The proposed project shall connect to
Every principal use and every lot within a the City of Arlington Sanitary Sewer.
subdivision shall be served by a sewage disposal The construction of utilities will take
system that is adequate to accommodate the place after Civil Permit approval and Yes
reasonable needs of such use or subdivision lot and shall meet all requirements of the
that complies with all applicable health Public Works Construction Standards
regulations. and Specifications.
20.60.300 Water Supply System Required. Every The proposed project shall connect to
principal use and every lot within a subdivision the City of Arlington water.The
shall be served by a water supply system that is construction of utilities will take
adequate to accommodate the reasonable needs of place after Civil Permit approval and Yes
such use or subdivision lot and that complies with shall meet all requirements of the
all applicable health regulations. Public Works Construction Standards
and Specifications.
20.60.400 Lighting Requirements. The proposed project provides
(a)All public streets,sidewalks,and other common adequate lighting throughout the site.
areas or facilities shall be sufficiently illuminated
to ensure security of property and the safety of Yes
persons using such streets,sidewalks and other
common areas or facilities.
(d)All outdoor lights shall be low sodium or The proposed project provides LED
similar lamp type and be down shielded to prevent lighting that is down shielded
light pollution. throughout the site. Yes
20.60.410 Excessive Illumination.Lighting within The proposed project provides
any lot that unnecessarily illuminates any other lot adequate lighting throughout the site
or public right-of-way and substantially interferes that does not unnecessarily
with the use or enjoyment of such other lot or illuminate to neighboring properties Yes
public right-of-way is prohibited. and final design shall be approved
with Civil.
Zoning Permit-Site Plan Review
Administrative Design Review
Taco Bell-PJ26-00171PJ26-0025
Page 12 of 23
Regulation Analysis Meets
20.60.450 Underground Utilities.All existing, All proposed utilities to and on the
extended,new electrical power lines,telephone, site shall be located underground.All
gas distribution,cable television,and other utility lines are required to be shown
communication and utility lines shall be placed on the site civil plans and shall be
underground in accordance with the specifications approved by the City of Arlington Yes
and policies of the respective utility service prior to construction activities on the
providers and located in accordance with the site.
Public Works Construction Standards and
Specifications.
20.60.490 Sites for and Screening of Dumpsters. Dumpster is located away from the
(a) Every development that,under the City's solid public right-of-way and properly
waste collection policies,is or will be required screened from the parking lot and
to provide one or more dumpsters for solid waste neighboring properties.Final location
collection shall provide sites for such shall be approved with the Civil
dumpsters that are: Permit.
(1) Located so as to facilitate collection and Yes
minimize any negative impact on persons
occupying the development site,neighboring
properties,or public rights-of-way,and
(2) Constructed according to specifications
established by the Public Works Director to
allow for collection without damage to the
development site or the collection vehicle.
Chapter 20.72 AMC,Parking
20.72.010 Number of Parking Spaces Required. The proposed project has shown on
(a)All developments in all zoning districts shall the approved site plan that it meets
provide a sufficient number of parking spaces to the required parking for the site.
accommodate the number of vehicles that Required Parking Spaces
ordinarily are likely to be attracted to the 1 per 200sq ft 13 Spaces
development in question.
Reservoir lane 5 Reservoir
Drive-Thru Restaurant: 1 space per 200 square capacity equal to 5 Spaces
feet of gross floor area plus reservoir lane capacity spaces per window Yes
equal to 5 spaces per drive-in window
Provided Parking Spaces
Parking Spaces 18 Spaces
Reservoir Spaces 7 Reservoir
Spaces
TOTAL 25 Spaces
20.72.030 Parking Space Dimensions. The site plan shows that the parking
(a) Except accessible parking spaces,each parking spaces proposed are 9 feet wide by
space shall contain a rectangular area of at least 19 19 feet long,meeting the dimension Yes
feet long and 9 feet wide. regulations.
Zoning Permit-Site Plan Review
Administrative Design Review
Taco Bell-PJ26-00171PJ26-0025
Page 13 of 23
Regulation Analysis Meets
20.72.060 Parking Area Surface. The proposed project has shown
(a)All parking areas shall be graded and surfaced asphalt for the parking and vehicle
with asphalt,concrete or other material that will drive aisle areas throughout the site.
provide equivalent protection against potholes, All parking spaces are painted with
erosion,and dust.Specifications for surfaces lines and other required markings.
meeting the standard set forth in this subsection Yes
are contained in the Public Works Construction
Standards and Specifications.
(b) Parking spaces shall be appropriately
demarcated with painted lines or other markings.
(c) Parking areas shall be properly maintained in
all respects.
20.72.064 Accessible Parking Spaces. The proposed project has provided
(b) The number of handicapped parking spaces to one accessible parking space on the
be provided in any lot or facility shall be in site that is sized to accommodate van
accordance with the current state standard and dimensions.
International Building Code.Accessible parking Total Standard Vehicle and ADA
spaces are to be calculated in addition to the Parking Requirements for the Site
required off-street parking spaces required and Required
not included in the parking calculations in Table Total Standard Vehicle 1 Yes
20.72-1. Total ADA Standard&Van 1
Table 20.72-3 Total Required On Site 2
Parking Facility Minimum Number of Accessible Spaces Proposed
Total Standard Van Total Total Standard Vehicle 1
26-50 1 1 2 Total ADA Standard&Van 1
Total Proposed On Site 2
20.72.110 Bicycle Parking Facilities. (13) parking spaces are required and
(b) all commercial and public uses shall provide (2)bike stalls have been added
"stalls"for bicycles at a ratio of ten percent of the within a bike rack. Yes
required automobile parking spaces required for a
business or group of businesses.
Chapter 20.76 AMC,Screening and Trees
20.76.020 General Screening Standard. The project is in the general
Developments shall provide sufficient screening so commercial zone surrounded by
that: commercial retail businesses,mixed-
1.Neighboring properties are shielded from any use apartments. Yes
adverse external effects of that development.
2.The development is shielded from the negative
impacts of adjacent uses such as streets and
railroads.
20.76.030 Compliance with Screening Standard. The proposed project has provided
The table set forth in 20.76.050,in conjunction Type A screening along the northern
with the explanations in 20.76.040 concerning the property line,abutting a residential
types of screens,establishes screening development.Type B landscaping is
requirements that presumptively satisfy the proposed on the east and west Yes
general standards established in 20.76.020.The property lines.A screening hedge is
table uses the permissible use designation to provided along the southern property
determine the type of screening that is required line to provide additional screening
between two uses. of the parking stalls.
Zoning Permit-Site Plan Review
Administrative Design Review
Taco Bell-PJ26-00171PJ26-0025
Page 14 of 23
Regulation I Analysis Meets
Table 20.76-1 Screening Requirements
Use Frontage Landscaping Side and Rear Property Lines
Restaurant Type C Type B-All Other Neighboring Properties
20.76.110 Required Trees Along Dedicated Streets. Street trees have been provided as
The developer shall either plant or retain sufficient required by this section.Final review
trees so that within the landscape strip there is for of the street trees will be completed
every 30 feet of street frontage at least an average with the Civil Permit.
of one deciduous tree of two inches dbh at the time
of planting and with a canopy that starts at least
eight feet above finished grade and has or will have Yes
when fully mature a trunk at least 8 inches in
diameter.Root barriers shall be provided for all
street trees and the landscape strip shall be
planted per the Department of Public Works
Standards and Specifications.
20.76.130 Shade Trees in Parking Areas. The project provides shading of the
(a)Vehicle accommodation areas that are required parking lot area on the site.
to be paved must be shaded by deciduous trees
that have or will have when fully mature a trunk at The total parking area is calculated at
least 8 inches in diameter. 6,955 square feet,requiring 1,391
(b) Landscaping within vehicle accommodation square feet of required shading at
areas shall meet the requirements of 20.46 and the 20%of the total.
Development Design Standards. Yes
(c) Each tree of the type described in subsection The applicant has provided 1,409
(a) shall be presumed to shade a circular area square feet,which equates to 20.3%.
having a radius of 15 feet with the trunk of the tree
as the center,and there must be sufficient trees so
that,using this standard,20 percent of the vehicle
accommodation area will be shaded.
20.76.140 Maintenance of Screening and Shading The property owner(s) shall maintain
Elements.All screening and shading elements the landscaping on the property and
required by this Chapter shall be maintained by the within the right-of-way per AMC
owner for the life of the project to the following 20.76.
standards:
1.All plant material shall be maintained with
respect to pruning,trimming,mowing,watering,
insect control,and fertilizing to maintain a healthy
growing condition,create an attractive
appearance,and to accomplish the purpose for Yes
which it was required.
2.Dead,diseased,stolen,vandalized,or damaged
plants shall be replaced within three months of the
plants indicated on the approved landscape plans.
3.All screening and shading elements shall be
maintained reasonably free of weeds and trash.
4.All screening and shading elements located
within the public right-of-way shall be maintained
by the abutting property owner.
Zoning Permit-Site Plan Review
Administrative Design Review
Taco Bell-PJ26-00171PJ26-0025
Page 15 of 23
Regulation I Analysis Meets
Chapter 20.90 AMC,Concurrency&Impact Fees
20.90.032 Interlocal Agreements Allowed.
Pursuant to state law,the council may enter No Snohomish County Traffic Impact
into an interlocal agreement with any Fees were requested or required.
jurisdiction that requires reciprocal traffic
mitigation for extraterritorial impacts to one
another's transportation systems. No WSDOT Traffic Impact Fees were
requested or required.
1. Snohomish County Yes
2. WSDOT
20.90.040 (a) Imposition of Impact Fees on The applicant provided a Traffic Impact
Development Activity.All development Analysis prepared by Heath&Associates
projects within the City shall be assessed a in October 2025.The traffic analysis
transportation impact fee,at the rate of concluded that the proposed use would
$3,355.00,based on peak p.m.trips,as produce 33 new PM peak-hour trips. Yes
computed in accordance with the most current
edition of the Institute of Transportation
Engineers Trip Generation Manual,as applied
to the City's transportation element of the
adopted Comprehensive Plan.
20.93.230 Compliance.All land uses or The City of Arlington concludes that the
development applications shall be reviewed to subject property does not contain
determine whether an environmentally critical environmentally critical areas and does
area exists on the property for which the not impact nearby critical areas.
application is filed,what the action's impact to Yes
any existing environmentally critical area
would be,and what actions are required for
compliance with this chapter.
Chapter 20.98 AMC,State Environmental Policy Act(SEPA)
20.98.110 (a) Environmental Checklist. A The applicant provided an environmental
completed environmental checklist in the form checklist with the application and a
provided in WAC 197-11-960, shall be filed at revised checklist with the resubmittal.
the same time as an application for a permit, The City of Arlington was determined to
license,certificate, or other approval not be the lead agency.A Mitigated
specifically exempted in this ordinance.The Determination of Non-Significance was Yes
City shall use the environmental checklist to issued for the proposal on February 5,
determine the lead agency and for determining 2026 The comment period for the MDNS
the responsible official and for making the was from February 5, 2026 to February
threshold determination. 19, 2026.
Zoning Permit-Site Plan Review
Administrative Design Review
Taco Bell-PJ26-00171PJ26-0025
Page 16 of 23
Regulation Analysis Meets
Chapter 13.28 AMC,Stormwater
13.28.070 Applicability of the Utility.The The proposed project is subject to
following actions or applications for the meeting the required stormwater
following permit and/or approvals will require regulations for the site.A Civil Permit
submittal for approval by the utility: site plans, shall be required for all site
design drawings,and operations and improvements.The approval of the
maintenance plans. Submittals shall be stormwater system takes place during Yes
consistent with the provisions of this Code,and this review process.All stormwater
shall comply with the stormwater manual and systems shall comply with the City of
engineering standards: Arlington Public Works Standards and
(3) New Development Specifications and the most recent
Department of Ecology Stormwater
Manual for Western Washington.
Chapter 20.114 Alternative Energy Systems and Technologies
20.114.445 Off-Street Electric Vehicle Charging a) The proposed project provides more
Station Spaces- than 10 percent of the parking spaces on
a) The number of electric vehicles charging the site as electric vehicle parking stalls
spaces shall be required per Table as required per Table 20.114.425T.
20.114.425T.
b) Location and Design Criteria.The provisions b) Location and Design Criteria Provided:
of electric vehicle parking will vary based on
the design and use of the primary parking lot.
The following required and additional
locational and design criteria are provided in
recognition of the various parking lot layout
options.
(1) Signage. Signage,as required under (1) The project narrative states EV
§20.114.455 for each charging station space, parking signage will be provided as
shall be posted indicating the space is only for required in AMC 20.114.455.
electric vehicle charging purposes. Days and
hours of operations shall be included if time
limits or tow away provisions are enforced. Yes
(2) Maintenance. Charging station equipment (2) Project narrative indicates charging
shall be maintained in all respects,including station equipment will be maintained
the functioning of the charging equipment.A on site with contact information
phone number or other contact information provided.
shall be provided on the charging station
equipment for reporting when the equipment
is not functioning,or other problems are
encountered.
(3)Accessibility.Where charging equipment is (3) EV charging equipment is proposed
provided within an adjacent pedestrian fronting the EV stalls.The ADA EV
circulation area,such as a sidewalk or charging equipment will be positioned to
accessible route to the interfere with accommodate the accessibility
accessibility requirements of WAC 51-50-005. requirements within the walkway.
(4.) Lighting.Where charging station
equipment is installed,adequate site lighting (4) The site plan shows lot lighting
shall exist,unless charging is for daytime proposed within the parking areas are
purposes only. adequate to provide lighting for the EV
stalls.
Zoning Permit-Site Plan Review
Administrative Design Review
Taco Bell-PJ26-00171PJ26-0025
Page 17 of 23
Regulation Analysis Meets
c) Parking for electric vehicles should also A condition has been added to this
consider the following: permit for compliance with signage,
(1) Notification. Information on the charging maintenance, accessibility and
station, identifying voltage and amperage lighting in compliance with
levels and any time of use,fees,or safety 20.114.445, accordingly. Yes
information.
(2) Signage. Installation of directional signs at
the parking lot for entrance and at appropriate
decision points to effectively guide motorists to
the charging stations aces .
III. PUBLIC COMMENTS
Public Comment Response
DAHP provided the following comment: Based A condition of archaeological permitting has been
on this review,an archaeological permit will added to the land use decision.
be required for the project.Archaeological site
45SN766 was encountered during the
archaeological survey of the project area.
The Stillaguamish Tribe requested Archeological A condition for monitoring has been added to the
monitoring. land use decision.
IV. CONCULUSIONS
(a) The applicant has applied for a Zoning Permit as required under AMC 20.16.
(b) Under AMC 20.16.220 (b),the community and economic development director shall issue the zoning
permit unless he finds,after reviewing the application and consulting with the applicant as provided
in section 20.16.130,that:
Regulation Analysis Meets
Chapter 20.16.220(b)
(1) The requested permit is not within its The requested site plan review is within
jurisdiction according to the table of the City of Arlington's jurisdiction per the Yes
permissible uses. above zoning map and permissible use
table.
(2) The application is incomplete. The application for the subject site plan
review was deemed complete on January Yes
28, 2026.
(3) If completed as proposed in the The proposed site plan review complies
application,the development will not comply with all required sections of AMC Title 20 Yes
with one or more of the requirements of this per the above staff analysis.
title.
(4) The proposed project has not complied The proposed project has complied with
with SEPA SEPA through the Determination of Non- Yes
Significance decision issued on January 5,
2026.
(5) The proposed project is not in The proposed site plan review complies
conformance with the Comprehensive Plan, with the Arlington Municipal Code, Yes
Transportation Plan,or other adopted plans, Comprehensive Plan, and Transportation
regulations,or policies. Plan.
Zoning Permit-Site Plan Review
Administrative Design Review
Taco Bell-PJ26-00171PJ26-0025
Page 18 of 23
IV. ADMINISTRATIVE DECISION
The proposed project was found to be consistent with and meets the intent of the Arlington Zoning Code,
Comprehensive Plan,and the Arlington Municipal Code,therefore the Zoning Permit-Site Plan Review
and Administrative Design Review for Taco Bell (PJ26-0017/PJ26-0025) is hereby APPROVED, subject
to the following conditions.
V. CONDITIONS
Zoning Permit:
1. All development shall be in substantial conformance with the approved Site Plans, Landscape
Plans, and Supplemental Drawings received on March 25, 2026, subject to any conditions or
modifications that may be required as part of the permit review.
2. The applicant shall meet all local, state, or federal code requirements. Please refer to the
Arlington Municipal Code for a complete list of code requirements for your project type.
3. The applicant shall comply with all permits and conditions thereof from the City of Arlington
and other government agencies with jurisdiction.
4. The applicant shall be in contact with Department of Archeology and Historic Preservation and
submit for any necessary archeological permitting.
5. The applicant shall contact the Stillaguamish Tribe of Indians prior to any ground disturbance
of the site for Tribal Monitoring.
6. The applicant shall submit and record an avigation easement with the Arlington Municipal
Airport prior to final occupancy of the building permit.
7. No permits and/or construction pursuant to the Zoning Permit shall begin or be authorized until
14 days from the date of the decision.
8. The applicant is required to maintain the electric vehicle charging equipment in a functioning
order.The applicant is required to provide contact information on the electric vehicle charging
equipment for reporting non-functioning equipment or for other issues that arise per AMC
20.114.445.
9. The property owner is required to maintain the landscaping on the property and within the
right-of-way per AMC 20.76.The final landscape plan shall be approved with the Site Civil
Permit.
10. Any future signage proposed shall comply with AMC 20.68,and a Sign Permit Application shall
be submitted for review.
Design Review:
11. The building permit elevations and constructed site shall be consistent with the design
elevations,materials,colors,and details submitted on January 20, 2026.
12. All service elements, electrical meters, and mechanical equipment shall be screened from the
public street and view per 2.3.3.1, 2.3.3.3, 2.3.3.4, 2.7.3.1., 2.7.3.2,2.7.3.3,2.7.3.4, 2.7.3.5, 7.3.3.1,
7.3.3.2, 7.3.3.4, 7.3.3.5, 7.3.3.6,and 10.3.3.2.
13. All service elements,electrical meters,and mechanical equipment shall be incorporated into the
overall design of the building per 7.3.3.E,11.1.4.2(g)
14. Lighting fixtures to be reviewed at the time of building permit and shall be consistent with the
Design Review Standards including 10'-12' pole heights throughout parking areas. Lighting
bollards 3-4' in height can illuminate paths and walkways and is required to be down shielded
per 2.7.3.2, 2.7.3.3, 2.7.3.5.
Zoning Permit-Site Plan Review
Administrative Design Review
Taco Bell-PJ26-00171PJ26-0025
Page 19 of 23
15. Any proposed electrical transformer on the site shall be sufficiently screened or wrapped per
the Development Design Standards and receive approval by the City of Arlington prior to
installation.
Civil Permit:
16. A Site Civil construction permit shall be applied for and approved prior to any land disturbance
on the subject property.
17. The project is subject to submit a Right-of-Way Permit for any work within public rights-of-way.
18. Prior to any construction activities, the applicant shall file and receive approval of site civil
construction plans, which comply with all requirements of the Arlington Municipal Code,
International Building Code(s), International Fire Code and Public Works Construction
Standards and Specifications. Said plans shall address all site improvements.
19. The applicant shall comply with AMC Chapter 13.28, Stormwater Management, and the most
current City-adopted edition of the Department of Ecology Stormwater Management Manual for
Western Washington.
20. The applicant shall construct all existing, extended, and new electrical power lines (not to
include transformers or enclosures containing electrical equipment including but not limited to,
switches, meters, or capacitors which may be pad mounted), telephone, gas distribution, cable
television, and other communication and utility lines in or adjacent to any land use or building
permit approved after the effective date of this chapter shall be placed underground in
accordance with the specifications and policies of the respective utility service providers and
located in accordance with the administrative guideline entitled "Public Works Construction
Standards and Specification." Even in the event the distribution line originates from a point
opposite any public roadway from the new construction the service lines shall be placed beneath
said roadway by means of boring or surface excavation across said roadway.
Building:
21. A building permit application shall be reviewed and approved prior to building construction on
the site.
22. All building permits shall meet the most current edition of the International Building Code.
23. The project is subject to applicable water and sewer utility fees. These fees are collected at the
time of building permit issuance.
24. Prior to issuance of building permits,traffic impact fees shall be paid for 33 trips.
Other:
25. All contractors working on the site are required to obtain a Washington State Business License
and a City of Arlington Endorsement.
VI. EXPIRATION
Per AMC 20.16.220,a Zoning Permit shall expire automatically if,within two (2)years after the issuance
of such permits:
Zoning Permit-Site Plan Review
Administrative Design Review
Taco Bell-PJ26-00171PJ26-0025
Page 20 of 23
1. The use authorized by such permits has not commenced,in circumstances where no substantial
construction, erection, alteration, excavation, demolition, or similar work is necessary before
commencement of such use,or
2. Less than 10 percent of the total cost of all construction, erection, alteration, excavation,
demolition,or similar work on any development authorized by such permits has been completed
on the site.
VII. APPEAL
This decision may be appealed pursuant to AMC 20.20.010,which provides for a hearing of the zoning
permit decision before the Hearing Examiner.Any aggrieved party of record may file an appeal within
14 days of the permit decision. An appeal shall be considered filed when a written notice of appeal,
specifying the grounds and arguments, therefore, is delivered to the Department of Community and
Economic Development by 5:00 PM on April 9, 2026,and the appeal fee as set by resolution is paid.
Prepared by:Ameresia Lawlis,Associate Planner
Date: March 26, 2026
ORDERED THIS ON THE 26t" DAY OF March , 2026
Amy Rusko, Community and Economic Development Department Director
Distributed to the Following Parties:
Fletcher Boll,Applicant
Pedro DeGuzman, Project Engineer
Zoning Permit-Site Plan Review
Administrative Design Review
Taco Bell-PJ26-00171PJ26-0025
Page 21 of 23
ATTACHMENT B
CODE REQUIREMENTS
NOTE: The following items are not conditions of permit approval but rather certain local,state,or
federal code requirements that the developer needs to be aware of.This is in no way intended to be a
complete list of code requirements but is a general checklist of major steps and issues. Please refer to
the Arlington Municipal Code for a complete list of code requirements for your particular project type.
1. Code Applicability. This permit is subject to the applicable requirements contained in
the Arlington Municipal Code, Land Use Code, Building Code, and COA Public Works
Design, Construction Standards and Specifications. It is the responsibility of the
developer to ensure compliance with the various provisions contained in these
ordinances.
2. Pre-Construction Phase. Prior to commencing any site work, including installing any
easement or right-of-way improvements,utility systems,drainage systems,streetlights,
mailbox structures, emergency facilities, storm water control systems, or any other
improvements,the developer shall submit site civil construction improvement plans for
review and approval by the Public Works Director. Said plans shall be in conformance
with applicable code and below listed conditions.
a. The developer shall survey and mark all property corners prior to review of any
submitted construction plans.
b. The developer shall design and install erosion control measures deemed
necessary by the City. These measures shall be implemented and inspected by
the City prior to the issuance of any permits.
C. The developer shall undertake no site preparation or other disturbances within
environmentally sensitive areas or their required buffers.
d. The developer shall submit to the Community & Economic Development Department
and receive approval of a storm-water run-off and detention plan in conformance with
the AMC Chapter 13.28, Stormwater Management, and the most current City-adopted
edition of the Department of Ecology's Stormwater Management Manual for the Puget
Sound Basin (The Technical Manual) for both the construction phase and a permanent
system.All site drainage must be directed through bio filtration swales prior to discharge
into wetlands.
e. The developer shall place all new utility lines underground.
f. The developer shall provide a temporary rock pad at all points of ingress and egress to
the site throughout the construction phase.
g. The developer shall show locations of all required streetlights on the construction plans
and install them as designed.
h. The developer shall obtain a right-of-way permit prior to any work done in a public right-
of-way. (NOTE: City departments are exempt from right-of-way permits.)
i. The developer shall install all low sodium or similar low intensity illumination lighting
and it shall be placed in a way as to not cause glare on an adjoining property or right-of-
way.
Zoning Permit-Site Plan Review
Administrative Design Review
Taco Bell-PJ26-00171PJ26-0025
Page 22 of 23
3. Construction Phase.The following conditions shall apply during construction.
a. The developer shall follow all applicable noise and other nuisance codes.
b. The developer shall not track mud and dirt onto public rights-of-way, but if tracked by
accident,the developer shall clean it up immediately.
C. During any site grading or clearing activity, the developer and contractor shall use all
available means of controlling air pollution (dust,ash,and smoke).
d. The restrictions of the AMC shall apply to any and all grading.
4. Installation of Improvements. Prior to receiving a Certificate of Occupancy, the developer
shall:
a. Install all rights-of-way and access easement improvements on all proposed
streets internal and existing streets adjacent to the project in accordance with
the requirements of AMC Chapter 20.56 and per COA Public Works Design,
Construction Standards and Specifications. The developer shall coordinate with
all adjacent developments the final design of the street improvements and/or
include the appropriate transition tapers for the street pavement from the
property.
b. Install a potable water system to serve the project per the COA Public Works
Design, Construction Standards and Specifications. Water is to be served by the
City of Arlington. This system cannot be deferred if a performance bond is
secured. Both water and sanitary sewer must be completely installed and
approved before either a temporary or permanent Certificate of Occupancy is
issued.
C. Relocate any existing water facilities and/or install water services/fire hydrants
at the expense of the developer.
d. Install a sanitary sewer system per COA Public Works Design, Construction
Standards and Specifications. This system cannot be deferred if a performance
bond is secured.Both water and sanitary sewer must be completely installed and
approved before either a temporary or permanent Certificate of Occupancy is
issued.
e. Install a permanent storm water control system per AMC Chapter 13.28.
f. Prior to issuance of a Certificate of Occupancy, the applicant shall complete all
required or voluntary improvements unless otherwise secured by the developer
and authorized by the City Engineer.
(NOTE: Code requirements for infrastructure improvements are based on conceptual information as
submitted by the applicant for the land use permit. Additional specific requirements may be required
upon review of the engineered construction drawings submitted by the developer. All improvements
are subject to review and approval by the City of Arlington Inspectors.All utilities shall be constructed
underground.)
Zoning Permit-Site Plan Review
Administrative Design Review
Taco Bell-PJ26-00171PJ26-0025
Page 23 of 23
Updated Taco Bell Decision
Final Audit Report 2026-03-26
Created: 2026-03-26
By: Ameresia Lawlis(alawlis@arlingtonwa.gov)
Status: Signed
Transaction ID: CBJCH BCAABAAB31 bag LDgoMOcd 1 V-JtrMrU EfN LDVThV
"Updated Taco Bell Decision" History
Document created by Ameresia Lawlis (alawlis@arlingtonwa.gov)
2026-03-26-10:25:28 PM GMT
Document emailed to Amy Rusko (arusko@arlingtonwa.gov)for signature
2026-03-26-10:25:35 PM GMT
Email viewed by Amy Rusko (arusko@arlingtonwa.gov)
2026-03-26-10:26:59 PM GMT
Document e-signed by Amy Rusko (arusko@arlingtonwa.gov)
Signature Date:2026-03-26-10:27:14 PM GMT-Time Source:server
Agreement completed.
2026-03-26-10:27:14 PM GMT
Q Adobe Acrobat Sign