HomeMy WebLinkAbout20260421_PJA26-0201_Utility Availability Cert WATER AND SEWER AVAILABILITY REQUEST
Community and Economic Development
City of Arlington• 18204 591h Avenue NE•Arlington,WA 98223 • Phone(360)403-3551
Submittal Requirements:
1 Complete Application
2 8-1/2"x 11"Site Plan/Sketch of the Proposal
Type of Request: ❑✓ Water Only ❑ Sewer Only ❑ Water and Sewer
Location/Legal Property Address: 5802 Cemetery Road, Arlin ton,Washin ton
Lot#: Parcel ID No(s): 31051500200700 Subdivision:
Project Scope of Work: Construct a new 33,075 S.F. open sided roofed structure that will protect materi
Owner Name: Andy Reece Office No.:
Email Address: admin@reece-construction.com Cell No.:
Mailina Address: Reece Construction Con city: Marysville State: WA Zip:98270
Owners Agent: Lydia Hansen -2812 architecture Office No.: 425-252-2153
Email Address: lydia@2812architecture.com Cell No.:
Mailing Address: 2812 Colby Ave city: Everett State: WA zip:98201
RESIDENTIAL INFORMATION
❑Proposed Single Family Residence ❑Existing Single Family Residence ❑Accessory Dwelling Unit
❑ Proposed Multi-Family Residence: #of Units #of Buildings ❑Residential Plat:#of Lots
COMMERCIAL INFORMATION
❑Binding Site Plan/Plat: #of Lots #of Phases #of Buildings Total Square Footage 33075
TYPE OF COMMERCIAL USE
❑Hotel/Motel ❑ Food Service ❑ Medical/Dental ❑Office ❑ Retail
❑Vehicle Service ❑Warehouse/Storage ❑✓ Industrial ❑ Other(specify):
Commercial Water Usage: Monthly Estimation: TBD Gallons
WATER,SEPTIC SYSTEM AND FIRE
Is there an existing Well on the property? Yes �No Is there an existing Septic System on-site? Yes Z✓ No
Water Meter Size Requested? ❑ 5/8" ❑✓ 1" ❑ 1.5" ❑ 2" ❑3" ❑4" ❑6"
Type of Fire Protection Requested? ❑✓ Fire Sprinkler System ❑ Fire Hydrant ❑r Unknown
1,the undersigned,request City of Arlington Utilities Division to certify willingness to provide water and/or sewer as indicated.
The above information is complete and accurate to the best of my knowledge. I understand that any changes to the above
information must be reported immediately to the City of Arlington Utilities Division as a condition of Utility Availability approval.
Lydia Hansen Lydia Hansen 3/30/26
°w X1ilY V Y•OCJp'.
Signature(owner/agent) Print Name Date
Page 1 of 2 REV02.2022
TO BE COMPLETED BY THE CITY OF ARLINGTON
CITY OF ARLINGTON UTILITIES DIVISION - PRELIMINARY INFORMATION / CERTIFICATION
This non-binding preliminary commitment is only valid for the above referenced property in accordance
with City of Arlington policies and for only 18 months.
NO A water main or other capital facility improvement ❑ is required; ® is not required
(If required, refer to below conditions)
Water is presently available from City of Arlington to service the above referenced property and
YES specified number of connections per the below conditions and upon payment of applicable
connection fees and charges.
Fire Flow Estimate: STATIC PRESSURE 94 PSI RESIDUAL PRESSURE 83 PSI FLOW 1,565 GPM
N/A A sanitary sewer main or other capital facility improvement ❑ is required; ❑ is not required
(If required, refer to attached conditions)
Sanitary sewer is presently available from City of Arlington to service the above referenced
N/A property and specified number of connections per the below conditions and upon payment of
applicable connection fees and charges.
Other: Water service is available at this location per the below conditions.
Approved By: _9Date: 20 26
0— EXPIRES 18 MONAS F OM DATE OF ISSUE
COMMENTS:
1. Water service is available for this project. Please coordinate with the Arlington City Engineer
for water service line connection, meter locations, backflow protection, utility easements, on-
site water main alignment, and any other City of Arlington water supply requirements.
2. Any wells on the development property are to be abandoned per Arlington Municipal Codes
13.04.140 and 13.08.160 as a condition of service.
3. Water and Sewer system improvements shall be designed and constructed in accordance with
City of Arlington Design and Construction Standards.
4. Fire flow data is from water model node 2025-J-591 located at the NE side of the Reece
Construction yard.