Loading...
HomeMy WebLinkAbout20260413_PJA26-0201_Drainage Report CONCEPTUAL DRAINAGE REPORT FOR REECE CONSTRUCTION DEBRIS SORTING FACILITY ARLINGTON, WASHINGTON APRIL 10, 2026 lob'i mill 4111 o 197 W ISTEg� ZONAL PCs 4/10/26 *tHARMSEN SNOHOMISH COUNTY SKAGIT COUNTY 2822 Colby Ave, Suite 300 603 South First Street Everett,Washington 98201 Mount Vernon,Washington 98273 PH:425-252-1884 www.Harmsenlic.com PH: 360-336-9199 CONCEPTUAL DRAINAGE REPORT APRIL 10 27,2026 REECE CONSTRUCTION DEBRIS SORTING FACILITY PAGE 1 TABLE OF CONTENTS MR 1: PROJECT OVERVIEW & EXECUTIVE SUMMARY 2 MR 2: SWPPP NARRATIVE 5 MR 3: WATER POLLUTION SOURCE CONTROL 5 MR 4: PRESERVATION OF NATURAL DRAINAGE 6 MR 5: ONSITE STORMWATER MANAGEMENT 6 MR 6: RUNOFF TREATMENT 7 MR 7: FLOW CONTROL 9 MR 8: WETLANDS PROTECTION 10 MR 9: OPERATION & MAINTENANCE 10 FIGURES & MAPS 11 APPENDIX A: SCS SOILS MAP 16 APPENDIX B: WWHM2012 OUTPUT 19 P:\Work\Projects\2025\25HRM0202 2812 Arch-Reece Const\CE\DOCS\DRAI NAG E REPORT 25-202.doc SRM/dwh CONCEPTUAL DRAINAGE REPORT APRIL 10 27,2026 REECE CONSTRUCTION DEBRIS SORTING FACILITY PAGE 2 MR 1: STORMWATER SITE PLAN REPORT PROJECT OVERVIEW & EXECUTIVE SUMMARY DRAINAGE PLAN DESCRIPTION This Conceptual Drainage Report has been prepared for the Land Use Phase for the Reece construction debris sorting facility project on their property in Arlington WA. The 13.86-acre site is located at 5802 Cemetery Road, Arlington, see Figure 1: Vicinity Map. Currently the site is used as a construction materials storage and aggregate sorting facility. There are also several buildings and parking areas on the site. The site is bounded by Cemetery Road to the north, the property to the west is also owned by Reece, and industrial developments to the east and south. The applicant is proposing to construct a 33,100 sf building to contain a construction debris sorting machine on the southern portion of the property. Access to the building will be from the internal paved accesses with a new paved looped access with semi truck backup and unloading area. The new paving covers an area of 85,310 sf, see Figure 3. METHODOLOGY The 2024 Department of Ecology Stormwater Manual as adopted by the City of Arlington was used as the basis of design. The site has the following characteristics: • Greater than 1 ac disturbed area. • Less than 35% existing impervious. A new development site. • The project will result in greater than 5,000 sf of new impervious. This requires the drainage system to meet Minimum Requirements 1-9. DRAINAGE BASIN This work area has been divided into 4 drainage basins consisting of the proposed roof and the access-circulation area. As the building is fairly large the roof area has been evaluated as two sub-basins, West and East Building basins. Likewise the paving is evaluated in two basins one for each of the West and East Paving areas. See MRS 6 and 7 for more information. DRAINAGE SYSTEM SKETCH Refer to Figure 3: Developed Conditions for a graphic representation of the proposed drainage system. DOWNSTREAM ANALYSIS See Downstream Analysis on page 4 of this report. UPSTREAM ANALYSIS See Upstream Analysis on page 4 of this report. CONVEYANCE CALCULATIONS P:\Work\Projects\2025\25HRM0202 2812 Arch-Reece Const\CE\DOCS\DRAI NAG E REPORT 25-202.doc SRM/dwh CONCEPTUAL DRAINAGE REPORT APRIL 10 27,2026 REECE CONSTRUCTION DEBRIS SORTING FACILITY PAGE 3 Conveyance calculations will be prepared for the project prior to final construction approval. WATER QUALITY With more than 1 acre of disturbance a DOE A Storm Water Pollution Prevention Plan (SWPPP) will be prepared for this project during the building permitting phase. The plan will include several of the following erosion control Best Management Practices: BMP C105, Construction Entrance BMP C120, Temporary & Permanent Seeding, BMP C121, Mulching, BMP C123, Plastic Covering, BMP C125, Top soiling, BMP C220, Storm Drain Inlet Protection BMP C233, Silt Fence. OPERATIONS AND MAINTENANCE An Operations and Maintenance Manual will be provided under separate cover. RUNOFF TREATMENT BMP'S With less than 5,000 sf of new/replaced impervious surface subject to vehicular traffic (0 sf) the project does not meet the threshold for requiring runoff treatment BMPs. STREAM BANK EROSION CONTROL BMP'S The proposed impervious surface is more than 10,000 sf (118,410 sf) therefore flow control is required. The following Flow Control BMPs are proposed to be used on this site. See MRS 5 and 7 for more information. Roof Infiltration Trenches, BMP T7.30, Bioretention Cells, BMP T5.13, Soil Quality and Depth. EXISTING CONDITIONS SUMMARY DESCRIPTION Currently the site is the home of the Reece Construction Company and contains an office building, aggregate sales building, construction materials storage and outside aggregate sorting facility, see Figure 2 Existing Site. Existing onsite infiltration trenches and an infiltration pond, located on the adjacent property to the west, serve the site. A storm collection and conveyance system consisting of catch basins and pipe routes existing site runoff to these facilities. The work area slopes gently to the north at about 2-4%. There is an existing infiltration pond to the west that the work area currently drains towards. The area has been used to sort and store aggregate stockpiles as part of the ongoing site operations. There are no wetlands, stream, steep slopes or other critical areas on the site. The site is bounded by Cemetery Road to the north, the property to the west is also owned by Reece and contains additional storage areas and the infiltration pond, and industrial developments lay to the east and the Arlington Airport to the south. P:\Work\Projects\2025\25HRM0202 2812 Arch-Reece Const\CE\DOCS\DRAI NAG E REPORT 25-202.doc SRM/dwh CONCEPTUAL DRAINAGE REPORT APRIL 10 27,2026 REECE CONSTRUCTION DEBRIS SORTING FACILITY PAGE 4 EXISTING BASIN As runoff from the proposed access and sorting building areas will be infiltrated there is no need to calculate the existing runoff rates. SOILS DESCRIPTION According to the Natural Resources Conservation Service Web Soil Survey Map the soils on-site are classified as Everett Gravelly Sandy Loam. This very deep, somewhat excessively drained soil is found on terraces and outwash plains and is formed in glacial outwash. Typically, the surface layer is dark brown gravelly sandy loam about 6 inches thick. The subsoil is dark brown very gravelly sandy loam about 12 inches thick. The upper part of the substratum is brown very gravelly loamy sand about 5 inches thick. The lower part to a depth of 60 inches or more is dark brown extremely gravelly sand. The DOE Manual defines Everett soil as a hydrologic group A soil. The NRCS Web Soil Survey map is included in Appendix A. Geotest recently prepared a geotechnical study for the site titled Geotechnical Evaluation Report- Construction Office and Scale Relocation dated November 25, 2020. Though this report was prepared for work on the northern portion of the site, the same subsurface conditions are expected to underlay the southern portion of the site. The report documented their subsurface findings and provided design recommendations. They evaluated the underlying soils for infiltration and recommended a design infiltration rate of 10"/hr. See their report for more information. UPSTREAM ANALYSIS There is no significant upstream area that flows onto the site. To the north lays Cemetery Road with roadside ditches that prevent runoff from entering the site. To the east are industrial sites with their own storm systems. To the south is the Arlington Airport and to the west is another property owned by Reece. DOWNSTREAM ANALYSIS Runoff from the southern portion of the site is collected and flows to an onsite storm system and then to the infiltration pond located on the adjacent property to the west. Runoff from the sorting building roof will be collected and infiltrated in two new infiltration trenches. Runoff from the new pavement will flow to two bioretention cells for treatment and infiltration. As such there is no surface flow discharge from the site. P:\Work\Projects\2025\25HRM0202 2812 Arch-Reece Const\CE\DOCS\DRAINAGE REPORT 25-202.doc SRM/dwh CONCEPTUAL DRAINAGE REPORT APRIL 10 27,2026 REECE CONSTRUCTION DEBRIS SORTING FACILITY PAGE 5 MR 2: SWPPP NARRATIVE This proposed project will result in greater than 1 acre of disturbed area and will require a Department of Ecology Construction Stormwater General Permit. A Full SWPPP Narrative using the DOE template will be provided under separate cover with the construction permit submittal. MR 3: WATER POLLUTION SOURCE CONTROL CONSTRUCTION STORMWATER BMPs A Stormwater Pollution Prevention Plan, SWPPP, is part of the construction drawings prepared for the project, and specifies many of the following erosion control Best Management Practices: BMP C102, Buffer Zones BMP C103, High Visibility Fence BMP C105, Construction Entrance BMP C107 Construction Road/Parking Area Stabilization BMP C120, Temporary and Permanent Seeding BMP C121, Mulching BMP C123, Plastic Covering BMP C125, Top soiling/Composting BMP C130, Surface Roughening BMP C140, Dust Control BMP C150, Materials on Hand BMP C153, Material Storage BMP C160, Certified Erosion and Sediment Control Lead BMP C200, Interceptor Dike and Swale BMP C207, Check Dams BMP C209, Outlet Protection BMP C220, Storm Inlet Protection BMP C233, Silt Fence PERMANENT SOURCE CONTROL BMPs The site is subject to ongoing Source Control BMPs as part of the current site operations DOE NPDES permitting. Implementation of additional BMPs as a result of the proposed site improvements will be accessed as part of the final drainage report to be prepared for construction approval. It should be noted that both the proposed debris sorting machinery and placement within a covered building are themselves components of applicable source control BMPS. P:\Work\Projects\2025\25HRM0202 2812 Arch-Reece Const\CE\DOCS\DRAI NAG E REPORT 25-202.doc SRM/dwh CONCEPTUAL DRAINAGE REPORT APRIL 10 27,2026 REECE CONSTRUCTION DEBRIS SORTING FACILITY PAGE 6 MR 4: PRESERVATION OF NATURAL DRAINAGE Runoff from the site sheet flows to the central lower area of the site, where several catch basins collect runoff and convey it to an existing infiltration pond located on the adjacent property to the west. In the developed condition runoff from the sorting building roof will be collected and infiltrated in two new infiltration trenches. Runoff from the new pavement will flow to two bioretention cells for treatment and infiltration. With infiltration being the existing and proposed methods of controlling stormwater runoff the existing drainage will be preserved. Note that with implementation of the new infiltration facilities that the total amount of runoff flowing to the existing infiltration pond will be reduced. MR 5: ON-SITE STORMWATER MANAGMENT As the site is located in the City of Arlington and will be required to meet MR #1-9, it can achieve MR 5 requirement either through the use of List #2 or by meeting the Low Impact Development Performance Standard. With infiltration of the site runoff, the site meets the Low Impact Development Performance Standard. Runoff from the different site areas will be managed as follows: LAWN AND LANDSCAPED AREAS: BMP T5.13 Post Construction Soil Quality and Depth will be implemented on disturbed and landscaped areas. It is expected that most disturbed soil will be covered with new impervious. Select site topsoil or imported topsoil will be used for those small areas where pervious surfaces need restoration. ROOF AREAS: Item #1: Full Dispersion or Downspout Full Infiltration The site is underlain by sands and gravels. As such the roof runoff will be collected and infiltrated in the trench to be located under the southwest corner of the parking lot. See MR 7 for the preliminary infiltration trench designs. PAVEMENT AREAS: Item #1: Full Dispersion or Full Infilration The site is underlain by sands and gravels. As such the parking lot runoff will be collected, treated and infiltrated in one of two Bioretention cells to be located near the existing scale house in the northern portion of the work area. See MR 6 for the preliminary bioretention cell designs. P:\Work\Projects\2025\25HRM0202 2812 Arch-Reece Const\CE\DOCS\DRAINAGE REPORT 25-202.doc SRM/dwh CONCEPTUAL DRAINAGE REPORT APRIL 10 27,2026 REECE CONSTRUCTION DEBRIS SORTING FACILITY PAGE 7 MR 6: RUNOFF TREATMENT The site redevelopment will result in more than 5,000 sf of new and new or replaced pollution generating impervious surfaces. Therefore runoff treatment is required. Runoff Treatment has been addressed through the design of two bioretention cells. Bioretention cells incorporate amended soils and vegetation that use the chemical, biological, and physical properties of plants, microbes, and soils to remove, or retain, pollutants from stormwater runoff prior to infiltration into the underlying soils. Geotest has evaluated the underlying soils for infiltration and recommended a design infiltration rate of 10"/hr. See their report for more information. As the native soils allow for infiltration no underdrains are not needed. The following items are common for all bioretention cells: Side slopes 3:1 Amended Soil Depth 18" Amended Soil Infiltration Rate 12"/hr per DOE Manual Ksat Factor of Safety 4 Maximum Surface Storage Depth 12" Infiltration Rate 10"/hr To meet treatment requirements, in excess of 91% of the runoff must filter through the amended soils. Both facilities have been designed to both treat and infiltrate 100% of the basin runoff. WEST PAVING BASIN In the developed condition, the basin has the following land uses and areas. Pavement 0.99 ac The proposed bioretention cell will be used to provide both runoff treatment and flow control. The bioretention cell will be located near the northwest end of the new access loop, west of the scale house. The bioretention cell will have the following parameters: Bioretention Cell Parameters Length 65 feet Width 12 feet Minimum bottom area 780 sf %Treated 100% % Infiltrated 100% EAST PAVING BASIN In the developed condition, the basin has the following land uses and areas. Pavement 0.97 ac P:\Work\Projects\2025\25HRM0202 2812 Arch-Reece Const\CE\DOCS\DRAINAGE REPORT 25-202.doc SRM/dwh CONCEPTUAL DRAINAGE REPORT APRIL 10 27,2026 REECE CONSTRUCTION DEBRIS SORTING FACILITY PAGE 8 The proposed bioretention cell will be used to provide both runoff treatment and flow control. The bioretention cell will be located north of the east wing of the proposed sorting building. The bioretention cell will have the following parameters: Bioretention Cell Parameters Length 60 feet Width 12 feet Minimum bottom area 720 sf %Treated 100% % Infiltrated 100% See WWHM2012 output in Appendix B for sizing calculations: BUILDING BASINS These basins consist of the building roof and are not subject to any vehicular traffic. Therefore they do not require treatment. Each basin and applicable infiltration facility is summarized in MR7: Flow Control. P:\Work\Projects\2025\25HRM0202 2812 Arch-Reece Const\CE\DOCS\DRAINAGE REPORT 25-202.doc SRM/dwh CONCEPTUAL DRAINAGE REPORT APRIL 10 27,2026 REECE CONSTRUCTION DEBRIS SORTING FACILITY PAGE 9 MR 7: FLOW CONTROL The site redevelopment will result in more than 10,000 sf of new and new or replaced impervious surface and will require construction of a flow control facility. PAVING BASINS The paved areas will be treated and infiltrated as detailed above in MR 6. WEST BUILDING BASIN The building roof has been evaluated as two basins, West Building and East Building. In the developed condition, the basin has the following land uses and areas. Roof 0.44 ac An infiltration trench will be used to provide flow control. The trench will be located near the southwest corner of the building. The infiltration trench will have the following parameters: Trench Parameters Length 90 feet Width 10 feet Depth 3.0 feet Infiltration Rate 10 inch/hour % Infiltrated 100% WEST BUILDING BASIN In the developed condition, the basin has the following land uses and areas. Roof 0.33 ac An infiltration trench will be used to provide flow control. The trench will be located at the north end of the eastern wing of the building. The infiltration trench will have the following parameters: Trench Parameters Length 65 feet Width 10 feet Depth 3.0 feet Infiltration Rate 10 inch/hour % Infiltrated 100% For drainage basin input parameters and flow frequency calculations, input parameters and flow duration analysis see WWHM2012 report in Appendix B. GROUNDWATER The geotechnical report includes several soil logs to a depth of about 8 feet. No groundwater was noted in the soil logs. The geotechnical report, see page 6, goes on to reference Department of Ecology and other information showing the regional groundwater is 60-70 feet below the ground surface. P:\Work\Projects\2025\25HRM0202 2812 Arch-Reece Const\CE\DOCS\DRAINAGE REPORT 25-202.doc SRM/dwh CONCEPTUAL DRAINAGE REPORT APRIL 10 27,2026 REECE CONSTRUCTION DEBRIS SORTING FACILITY PAGE 10 MR 8: WETLANDS PROTECTION There are no known wetlands, streams or other critical areas on the site. MR 9: OPERATION AND MAINTENANCE The specific requirements for the ongoing operation and maintenance of the proposed storm water systems will be detailed in a separate Operation and Maintenance Manual submitted with the construction drawings, under separate cover. P:\Work\Projects\2025\25HRM0202 2812 Arch-Reece Const\CE\DOCS\DRAINAGE REPORT 25-202.doc SRM/dwh FIGURES & BASIN MAPS m j Q u ii E >, �4 < O PJ2 a v, State Route 530 NE Fosters Market,u Z E O �c m O o t Z S p W Jensen St a+ 209th St NE v yF = <<e n Z c, �¢a / s � O Gro I/qk tAE �� n 3 P911E��ek—= . �Z s 1� d o a' Safeway •mot-1 P. Cemetery Rd 204th St NE - 2Q1th St NE W 2 U u Arlington Pedeltweezer's Cemetery Chinese&Pina a � a w .0 4 Q Arlington FFarnily `yF Q ?otstStNE z Chiropractic. 'Q!,,DI NE L n Q O� L S t99th St NE ^O d i QQth St NE io 01, 197th St NE SITE z� UPS Customer Center A a lJ.l O Z w, _� y �Pin7 ¢> O c FIGURE 1: VICINITY MAP i �y �♦ I !} 822 r 1T I 1 • r ( A - J 1� �y ri ,ow 1 4 ,, ,4pRK AREA "�4117 >s PROPOSED f 1 1 -BUILDING w ._ -. �. �_. f� ram,�{*.,,� r►—r`'—� r ,� �I ++4 FIGURE 2: EXISTING SITE MAP J -- 1 I �11 I I I EX CONNECTTO 3 / SCALE EXISTING ASPHALT / WES PAVING OUSE ! 1 BI0 ION CONNECT TO I iCE (85k12') EXISTINGASPHALT 1 ( i 11200 112.32 112m 113.50 JI{ 1 APPROXIMATE END OF EXISTING 8'WATERMAII / PER CITY GIS _ - EXISTING HYDRANT APPROXIMATE I \ _,113.88 ± -EXISTIN8 G 'WP 1 .19 \ ----- I I I Imo. / j10.69 / ) _ (, J EXTEND 8'WATERLINE STAB TO.EAST PROPERTY ! - ASPHALT -- J LINIFOR CONNECTION 0 ` 0� — , __ -- THICKENED BY dJ1'1ERS / ] — ` ( + - EDGE EAST PAVING, N BI CELL(Ba 102) 116.00- 110.50/ EASTBUILDING / N - _ INFILTRATION TRENCH(85k10) m 118.00 m 117DO EXISTING HYDRANT ROOF APPROXJIS / ST .TYP (——— I I EXISTING 8 119.00 J 119.00 / W EXTEND 8'WATEAINE \` STUB TO EAST PRObERT ASPHALTLINE FOR CONNEc-nb 113.17 112.67 THICKENED I p BY OTHERS ` I STORM EDGE TYP 118.07 118.30 NEW PAVING II I \ r CATCH - 11 j BASIN.TYP 118.00 / r PAVING TO _- 117.60 BE FLUSH I /CATCH BASIN,TYP _ WITH FFE ROOF DRAIN STUB.TVP 116 " 119.00 ` 117.69UR8 OR------------ --- 119.DD { ----- I THICKENED J EDGE WEST BUILDING INFILTRATION {I 117DD TRENCH(9(rk10') I 1 NEW CONSTRUCTION DEBRIS SORTING FACWTY sum". �( _FFE 119-0 — \ 119.00 118.80 117.5D 119.00 -- — — — -- ---------- EXTEND 6'WATERLINE TO SOUTH H-PROPERTY LINE av \\ FIGURE 3: DEVELOPED SITE MAP APPENDIX A SCS SOILS MAP & DESCRIPTION Aap Unit Legend !ijw J 0 J r' Scale Snohomish County Area,Washington (WA661) ,..�. ::.fk a Snohomish County Area, Washington O (WA661) Map Acres Unit Map Unit Name in percent Symbol AOI of AOI 4 Alderwood-Everett 1.6 6.3% +- 7 gravelly sandy 11 loams, 25 to 70 percent slopes i 17 Everett very 24.4 93.5% gravelly sandy loam, 0 to 8 percent slopes F t`34 Mukilteo muck 0.1 0.3% _ w Totals for Area of 26.1 100.0% Interest t4 1 ' t P3 _µ ram, \�� • ' ' `�_ A- )F A OFF SCS SOILS MAP 17—Everett very gravelly sandy loam, 0 to 8 percent slopes Map Unit Setting National map unit symbol: 2t629 Elevation: 30 to 900 feet Mean annual precipitation: 35 to 91 inches Mean annual air temperature: 48 to 52 degrees F Frost-free period: 180 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Everett and similar soils: 80 percent Minor components: 20 percent Estimates are based on observations, descriptions, and transects of the mapunft. Description of Everett Setting Landform: Eskers. moraines, kames Landform positron (two-dimensional): Summit, shoulder Landform positron (three-dimensional): Crest, interfluve Down-slope shape: Convex Across-slope shape: Convex Parent material: Sandy and gravelly glacial outwash Typical profile Oi -0 to 1 inches: slightly decomposed plant material A - 1 to 3 inches: very gravelly sandy loam Bw- 3 to 24 inches: very gravelly sandy loam C1 - 24 to 35 inches: very gravelly loamy sand C2- 35 to 60 inches. extremely cobbly coarse sand Properties and qualities Slope: 0 to 8 percent Depth to restrictive feature: More than 80 inches Drainage class: Somewhat excessively drained Capacity of the most limiting layer to transmit water(Ksat): High (1.98 to 5.95 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water capacity: Low (about 3.2 inches) SCS SOILS DESCRIPTION APPENDIX B WWHM2012 OUTPUT WWHM2012 PROJECT REPORT Project Name: Reece Sorting Building Site Name: Site Address: City Report Date: 3/11/2026 Gage : Everett Data Start : 1948/10/01 Data End : 2009/09/30 Precip Scale: 1.20 Version Date: 2024/06/28 Version : 4 .3.1 Low Flow Threshold for POC 1 50 Percent of the 2 Year High Flow Threshold for POC 1: 50 year PREDEVELOPED LAND USE Name : Basin 1 Bypass: No Groundwater: No Pervious Land Use acre Pervious Total 0 Impervious Land Use acre PARKING FLAT 2.74 Impervious Total 2.74 Basin Total 2.74 Element Flows To: Surface Interflow Groundwater MITIGATED LAND USE Name : West bldg Bypass: No Groundwater: No Pervious Land Use acre Pervious Total 0 Impervious Land Use acre ROOF TOPS FLAT 0.44 Impervious Total 0.44 Basin Total 0.44 Element Flows To: Surface Interflow Groundwater Gravel Trench Bed 1 Gravel Trench Bed 1 Name Gravel Trench Bed 1 Bottom Length: 90.00 ft. Bottom Width: 10.00 ft. Trench bottom slope 1: 0 To 1 Trench Left side slope 0: 0 To 1 Trench right side slope 2: 0 To 1 Material thickness of first layer: 3.5 Pour Space of material for first layer: 0.35 Material thickness of second layer: 0 Pour Space of material for second layer: 0 Material thickness of third layer: 0 Pour Space of material for third layer: 0 Infiltration On Infiltration rate: 10 Infiltration safety factor: 1 Total Volume Infiltrated (ac-ft. ) : 84 .845 Total Volume Through Riser (ac-ft. ) : 0.001 Total Volume Through Facility (ac-ft. ) : 84.845 Percent Infiltrated: 100 Total Precip Applied to Facility: 0 Total Evap From Facility: 0 Discharge Structure Riser Height: 2 . 9 ft. Riser Diameter: 12 in. Element Flows To: Outlet 1 Outlet 2 Gravel Trench Bed Hydraulic Table Stage feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) Infilt(cfs) 0.0000 0.020 0.000 0.000 0.000 0.0444 0.020 0.000 0.000 0.208 0.0889 0.020 0.000 0.000 0.208 0.1333 0.020 0.001 0.000 0.208 0.1778 0.020 0.001 0.000 0.208 0.2222 0.020 0.001 0.000 0.208 0.2667 0.020 0.001 0.000 0.208 0.3111 0.020 0.002 0.000 0.208 0.3556 0.020 0.002 0.000 0.208 0.4000 0.020 0.002 0.000 0.208 0.4444 0.020 0.003 0.000 0.208 0.4889 0.020 0.003 0.000 0.208 0.5333 0.020 0.003 0.000 0.208 0.5778 0.020 0.004 0.000 0.208 0.6222 0.020 0.004 0.000 0.208 0.6667 0.020 0.004 0.000 0.208 0.7111 0.020 0.005 0.000 0.208 0.7556 0.020 0.005 0.000 0.208 0.8000 0.020 0.005 0.000 0.208 0.8444 0.020 0.006 0.000 0.208 0.8889 0.020 0.006 0.000 0.208 0.9333 0.020 0.006 0.000 0.208 0.9778 0.020 0.007 0.000 0.208 1.0222 0.020 0.007 0.000 0.208 1.0667 0.020 0.007 0.000 0.208 1.1111 0.020 0.008 0.000 0.208 1.1556 0.020 0.008 0.000 0.208 1.2000 0.020 0.008 0.000 0.208 1.2444 0.020 0.009 0.000 0.208 1.2889 0.020 0.009 0.000 0.208 1.3333 0.020 0.009 0.000 0.208 1.3778 0.020 0.010 0.000 0.208 1.4222 0.020 0.010 0.000 0.208 1.4667 0.020 0.010 0.000 0.208 1.5111 0.020 0.010 0.000 0.208 1.5556 0.020 0.011 0.000 0.208 1.6000 0.020 0.011 0.000 0.208 1.6444 0.020 0.011 0.000 0.208 1.6889 0.020 0.012 0.000 0.208 1.7333 0.020 0.012 0.000 0.208 1.7778 0.020 0.012 0.000 0.208 1.8222 0.020 0.013 0.000 0.208 1.8667 0.020 0.013 0.000 0.208 1.9111 0.020 0.013 0.000 0.208 1.9556 0.020 0.014 0.000 0.208 2.0000 0.020 0.014 0.000 0.208 2.0444 0.020 0.014 0.000 0.208 2.0889 0.020 0.015 0.000 0.208 2.1333 0.020 0.015 0.000 0.208 2.1778 0.020 0.015 0.000 0.208 2.2222 0.020 0.016 0.000 0.208 2.2667 0.020 0.016 0.000 0.208 2.3111 0.020 0.016 0.000 0.208 2.3556 0.020 0.017 0.000 0.208 2.4000 0.020 0.017 0.000 0.208 2.4444 0.020 0.017 0.000 0.208 2.4889 0.020 0.018 0.000 0.208 2.5333 0.020 0.018 0.000 0.208 2.5778 0.020 0.018 0.000 0.208 2.6222 0.020 0.019 0.000 0.208 2.6667 0.020 0.019 0.000 0.208 2.7111 0.020 0.019 0.000 0.208 2.7556 0.020 0.019 0.000 0.208 2.8000 0.020 0.020 0.000 0.208 2.8444 0.020 0.020 0.000 0.208 2.8889 0.020 0.020 0.000 0.208 2.9333 0.020 0.021 0.064 0.208 2.9778 0.020 0.021 0.229 0.208 3.0222 0.020 0.021 0.448 0.208 3.0667 0.020 0.022 0.703 0.208 3.1111 0.020 0.022 0. 976 0.208 3.1556 0.020 0.022 1.251 0.208 3.2000 0.020 0.023 1.509 0.208 3.2444 0.020 0.023 1.736 0.208 3.2889 0.020 0.023 1. 921 0.208 3.3333 0.020 0.024 2.060 0.208 3.3778 0.020 0.024 2.160 0.208 3.4222 0.020 0.024 2.276 0.208 3.4667 0.020 0.025 2.371 0.208 3.5111 0.020 0.026 2.462 0.208 3.5556 0.020 0.026 2.550 0.208 3.6000 0.020 0.027 2. 635 0.208 3.6444 0.020 0.028 2.717 0.208 3.6889 0.020 0.029 2.797 0.208 3.7333 0.020 0.030 2.875 0.208 3.7778 0.020 0.031 2. 950 0.208 3.8222 0.020 0.032 3.024 0.208 3.8667 0.020 0.033 3.096 0.208 3.9111 0.020 0.034 3.167 0.208 3.9556 0.020 0.035 3.235 0.208 4.0000 0.020 0.036 3.303 0.208 Name : East bldg Bypass: No GroundWater: No Pervious Land Use acre Pervious Total 0 Impervious Land Use acre ROOF TOPS FLAT 0.33 Impervious Total 0.33 Basin Total 0.33 Element Flows To: Surface Interflow Groundwater Gravel Trench Bed 2 Gravel Trench Bed 2 Name Gravel Trench Bed 2 Bottom Length: 65.00 ft. Bottom Width: 10.00 ft. Trench bottom slope 1: 0 To 1 Trench Left side slope 0: 0 To 1 Trench right side slope 2: 0 To 1 Material thickness of first layer: 3.5 Pour Space of material for first layer: 0.35 Material thickness of second layer: 0 Pour Space of material for second layer: 0 Material thickness of third layer: 0 Pour Space of material for third layer: 0 Infiltration On Infiltration rate: 10 Infiltration safety factor: 1 Total Volume Infiltrated (ac-ft. ) : 63.556 Total Volume Through Riser (ac-ft. ) : 0.002 Total Volume Through Facility (ac-ft. ) : 63.558 Percent Infiltrated: 100 Total Precip Applied to Facility: 0 Total Evap From Facility: 0 Discharge Structure Riser Height: 2. 9 ft. Riser Diameter: 12 in. Element Flows To: Outlet 1 Outlet 2 Gravel Trench Bed Hydraulic Table Stage(feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) Infilt(cfs) 0.0000 0.014 0.000 0.000 0.000 0.0444 0.014 0.000 0.000 0.150 0.0889 0.014 0.000 0.000 0.150 0.1333 0.014 0.000 0.000 0.150 0.1778 0.014 0.000 0.000 0.150 0.2222 0.014 0.001 0.000 0.150 0.2667 0.014 0.001 0.000 0.150 0.3111 0.014 0.001 0.000 0.150 0.3556 0.014 0.001 0.000 0.150 0.4000 0.014 0.002 0.000 0.150 0.4444 0.014 0.002 0.000 0.150 0.4889 0.014 0.002 0.000 0.150 0.5333 0.014 0.002 0.000 0.150 0.5778 0.014 0.003 0.000 0.150 0.6222 0.014 0.003 0.000 0.150 0.6667 0.014 0.003 0.000 0.150 0.7111 0.014 0.003 0.000 0.150 0.7556 0.014 0.003 0.000 0.150 0.8000 0.014 0.004 0.000 0.150 0.8444 0.014 0.004 0.000 0.150 0.8889 0.014 0.004 0.000 0.150 0.9333 0.014 0.004 0.000 0.150 0.9778 0.014 0.005 0.000 0.150 1.0222 0.014 0.005 0.000 0.150 1.0667 0.014 0.005 0.000 0.150 1.1111 0.014 0.005 0.000 0.150 1.1556 0.014 0.006 0.000 0.150 1.2000 0.014 0.006 0.000 0.150 1.2444 0.014 0.006 0.000 0.150 1.2889 0.014 0.006 0.000 0.150 1.3333 0.014 0.007 0.000 0.150 1.3778 0.014 0.007 0.000 0.150 1.4222 0.014 0.007 0.000 0.150 1.4667 0.014 0.007 0.000 0.150 1.5111 0.014 0.007 0.000 0.150 1.5556 0.014 0.008 0.000 0.150 1.6000 0.014 0.008 0.000 0.150 1.6444 0.014 0.008 0.000 0.150 1.6889 0.014 0.008 0.000 0.150 1.7333 0.014 0.009 0.000 0.150 1.7778 0.014 0.009 0.000 0.150 1.8222 0.014 0.009 0.000 0.150 1.8667 0.014 0.009 0.000 0.150 1.9111 0.014 0.010 0.000 0.150 1.9556 0.014 0.010 0.000 0.150 2.0000 0.014 0.010 0.000 0.150 2.0444 0.014 0.010 0.000 0.150 2.0889 0.014 0.010 0.000 0.150 2.1333 0.014 0.011 0.000 0.150 2.1778 0.014 0.011 0.000 0.150 2.2222 0.014 0.011 0.000 0.150 2.2667 0.014 0.011 0.000 0.150 2.3111 0.014 0.012 0.000 0.150 2.3556 0.014 0.012 0.000 0.150 2.4000 0.014 0.012 0.000 0.150 2.4444 0.014 0.012 0.000 0.150 2.4889 0.014 0.013 0.000 0.150 2.5333 0.014 0.013 0.000 0.150 2.5778 0.014 0.013 0.000 0.150 2.6222 0.014 0.013 0.000 0.150 2.6667 0.014 0.013 0.000 0.150 2.7111 0.014 0.014 0.000 0.150 2.7556 0.014 0.014 0.000 0.150 2.8000 0.014 0.014 0.000 0.150 2.8444 0.014 0.014 0.000 0.150 2.8889 0.014 0.015 0.000 0.150 2.9333 0.014 0.015 0.064 0.150 2.9778 0.014 0.015 0.229 0.150 3.0222 0.014 0.015 0.448 0.150 3.0667 0.014 0.016 0.703 0.150 3.1111 0.014 0.016 0. 976 0.150 3.1556 0.014 0.016 1.251 0.150 3.2000 0.014 0.016 1.509 0.150 3.2444 0.014 0.016 1.736 0.150 3.2889 0.014 0.017 1. 921 0.150 3.3333 0.014 0.017 2.060 0.150 3.3778 0.014 0.017 2.160 0.150 3.4222 0.014 0.017 2.276 0.150 3.4667 0.014 0.018 2.371 0.150 3.5111 0.014 0.018 2.462 0.150 3.5556 0.014 0.019 2.550 0.150 3.6000 0.014 0.020 2. 635 0.150 3.6444 0.014 0.020 2.717 0.150 3.6889 0.014 0.021 2.797 0.150 3.7333 0.014 0.022 2.875 0.150 3.7778 0.014 0.022 2. 950 0.150 3.8222 0.014 0.023 3.024 0.150 3.8667 0.014 0.024 3.096 0.150 3.9111 0.014 0.024 3.167 0.150 3.9556 0.014 0.025 3.235 0.150 4.0000 0.014 0.026 3.303 0.150 Name : West paving Bypass: No Groundwater: No Pervious Land Use acre Pervious Total 0 Impervious Land Use acre PARKING FLAT 0.99 Impervious Total 0.99 Basin Total 0.99 Element Flows To: Surface Interflow Groundwater Surface Bioretention West Surface Bioretention West Name Bioretention West Bottom Length: 65.00 ft. Bottom Width: 12.00 ft. Material thickness of first layer: 1.5 Material type for first layer: SMMWW 12 in/hr Material thickness of second layer: 0 Material type for second layer: Sand Material thickness of third layer: 0 Material type for third layer: GRAVEL Infiltration On Infiltration rate: 10 Infiltration safety factor: 1 Wetted surface area On Total Volume Infiltrated (ac-ft. ) : 193.982 Total Volume Through Riser (ac-ft.) : 0.002 Total Volume Through Facility (ac-ft. ) : 193.984 Percent Infiltrated: 100 Total Precip Applied to Facility: 4.294 Total Evap From Facility: 2.136 Underdrain not used Discharge Structure Riser Height: 1 ft. Riser Diameter: 12 in. Element Flows To: Outlet 1 Outlet 2 BioretBioretention West Hydraulic Table Stage(feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) Infilt(cfs) 0.0000 0.0357 0.0000 0.0000 0.0000 0.0330 0.0355 0.0003 0.0000 0.0000 0.0659 0.0350 0.0006 0.0000 0.0000 0.0989 0.0346 0.0008 0.0000 0.0000 0.1319 0.0342 0.0011 0.0000 0.0000 0.1648 0.0338 0.0014 0.0000 0.0010 0.1978 0.0333 0.0017 0.0000 0.0016 0.2308 0.0329 0.0020 0.0000 0.0024 0.2637 0.0325 0.0023 0.0000 0.0034 0.2967 0.0321 0.0026 0.0000 0.0046 0.3297 0.0317 0.0030 0.0000 0.0061 0.3626 0.0312 0.0033 0.0000 0.0078 0.3956 0.0308 0.0036 0.0000 0.0098 0.4286 0.0304 0.0040 0.0000 0.0122 0.4615 0.0300 0.0043 0.0000 0.0149 0.4945 0.0296 0.0047 0.0000 0.0179 0.5275 0.0292 0.0050 0.0000 0.0214 0.5604 0.0288 0.0054 0.0000 0.0252 0.5934 0.0284 0.0057 0.0000 0.0295 0.6264 0.0280 0.0061 0.0000 0.0342 0.6593 0.0276 0.0065 0.0000 0.0395 0.6923 0.0272 0.0069 0.0000 0.0452 0.7253 0.0268 0.0073 0.0000 0.0515 0.7582 0.0264 0.0077 0.0000 0.0584 0.7912 0.0260 0.0081 0.0000 0.0658 0.8242 0.0256 0.0085 0.0000 0.0739 0.8571 0.0253 0.0089 0.0000 0.0826 0.8901 0.0249 0.0093 0.0000 0.0920 0.9231 0.0245 0.0097 0.0000 0.1022 0.9560 0.0241 0.0102 0.0000 0.1130 0.9890 0.0237 0.0106 0.0000 0.1247 1.0220 0.0234 0.0110 0.0000 0.1371 1.0549 0.0230 0.0115 0.0000 0.1504 1.0879 0.0226 0.0119 0.0000 0.1645 1.1209 0.0222 0.0124 0.0000 0.1796 1.1538 0.0219 0.0129 0.0000 0.1955 1.1868 0.0215 0.0133 0.0000 0.2125 1.2198 0.0211 0.0138 0.0000 0.2304 1.2527 0.0208 0.0143 0.0000 0.2494 1.2857 0.0204 0.0148 0.0000 0.2694 1.3187 0.0200 0.0153 0.0000 0.2905 1.3516 0.0197 0.0158 0.0000 0.3127 1.3846 0.0193 0.0163 0.0000 0.3361 1.4176 0.0190 0.0168 0.0000 0.3489 1.4505 0.0186 0.0174 0.0000 0.3532 1.4835 0.0183 0.0179 0.0000 0.3575 1.5000 0.0179 0.0182 0.0000 0.3597 Surface Bioretention West Hydraulic Table Stage(feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) To Amended(cfs) Wetted Surface 1.5000 0.0357 0.0182 0.0000 0.2167 0.0044 1.5330 0.0361 0.0193 0.0000 0.2167 0.0087 1.5659 0.0365 0.0205 0.0000 0.2262 0.0131 1.5989 0.0370 0.0218 0.0000 0.2310 0.0175 1.6319 0.0374 0.0230 0.0000 0.2357 0.0220 1.6648 0.0379 0.0242 0.0000 0.2405 0.0264 1.6978 0.0383 0.0255 0.0000 0.2452 0.0309 1.7308 0.0387 0.0267 0.0000 0.2500 0.0354 1.7637 0.0392 0.0280 0.0000 0.2548 0.0399 1.7967 0.0396 0.0293 0.0000 0.2595 0.0444 1.8297 0.0401 0.0306 0.0000 0.2643 0.0489 1.8626 0.0405 0.0320 0.0000 0.2690 0.0535 1.8956 0.0410 0.0333 0.0000 0.2738 0.0581 1.9286 0.0414 0.0347 0.0000 0.2786 0.0627 1.9615 0.0419 0.0361 0.0000 0.2833 0.0673 1.9945 0.0423 0.0374 0.0000 0.2881 0.0719 2.0275 0.0428 0.0388 0.0000 0.2929 0.0766 2.0604 0.0433 0.0403 0.0000 0.2976 0.0812 2.0934 0.0437 0.0417 0.0000 0.3024 0.0859 2.1264 0.0442 0.0431 0.0000 0.3071 0.0906 2.1593 0.0447 0.0446 0.0000 0.3119 0.0953 2.1923 0.0451 0.0461 0.0000 0.3167 0.1001 2.2253 0.0456 0.0476 0.0000 0.3214 0.1048 2.2582 0.0461 0.0491 0.0000 0.3262 0.1096 2.2912 0.0465 0.0506 0.0000 0.3310 0.1144 2.3242 0.0470 0.0522 0.0000 0.3357 0.1192 2.3571 0.0475 0.0537 0.0000 0.3405 0.1240 2.3901 0.0480 0.0553 0.0000 0.3452 0.1289 2.4231 0.0485 0.0569 0.0000 0.3500 0.1338 2.4560 0.0489 0.0585 0.0000 0.3548 0.1386 2.4890 0.0494 0.0601 0.0000 0.3595 0.1435 2.5220 0.0499 0.0618 0.0346 0.3611 0.1485 2.5549 0.0504 0.0634 0.1365 0.3611 0.1534 2.5879 0.0509 0.0651 0.2754 0.3611 0.1584 2.6209 0.0514 0.0668 0.4414 0.3611 0.1633 2.6538 0.0519 0.0685 0. 6273 0.3611 0.1683 2.6868 0.0524 0.0702 0.8261 0.3611 0.1733 2.7198 0.0529 0.0719 1.0308 0.3611 0.1784 2.7527 0.0534 0.0737 1.2343 0.3611 0.1834 2.7857 0.0539 0.0754 1.4294 0.3611 0.1885 2.8187 0.0544 0.0772 1. 6096 0.3611 0.1936 2.8516 0.0549 0.0790 1.7695 0.3611 0.1987 2.8846 0.0554 0.0808 1. 9054 0.3611 0.2038 2.9176 0.0559 0.0827 2.0158 0.3611 0.2089 2.9505 0.0564 0.0845 2.1028 0.3611 0.2141 2.9835 0.0569 0.0864 2.1721 0.3611 0.2167 3.0000 0.0572 0.0873 2.2635 0.3611 0.0000 Name Surface Bioretention West Element Flows To: Outlet 1 Outlet 2 BioretBioretention West Name : East paving Bypass: No GroundWater: No Pervious Land Use acre Pervious Total 0 Impervious Land Use acre PARKING FLAT 0.97 Impervious Total 0.97 Basin Total 0.97 Element Flows To: Surface Interflow Groundwater Surface Bioretention East Surface Bioretention East Name Bioretention East Bottom Length: 60.00 ft. Bottom Width: 12.00 ft. Material thickness of first layer: 1.5 Material type for first layer: SMMWW 12 in/hr Material thickness of second layer: 0 Material type for second layer: Sand Material thickness of third layer: 0 Material type for third layer: GRAVEL Infiltration On Infiltration rate: 10 Infiltration safety factor: 1 Wetted surface area On Total Volume Infiltrated (ac-ft. ) : 189.999 Total Volume Through Riser (ac-ft.) : 0.006 Total Volume Through Facility (ac-ft. ) : 190.005 Percent Infiltrated: 100 Total Precip Applied to Facility: 4.047 Total Evap From Facility: 1.988 Underdrain not used Discharge Structure Riser Height: 1 ft. Riser Diameter: 12 in. Element Flows To: Outlet 1 Outlet 2 BioretBioretention East Hydraulic Table Stage(feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) Infilt(cfs) 0.0000 0.0333 0.0000 0.0000 0.0000 0.0330 0.0331 0.0003 0.0000 0.0000 0.0659 0.0327 0.0005 0.0000 0.0000 0.0989 0.0322 0.0008 0.0000 0.0000 0.1319 0.0318 0.0010 0.0000 0.0000 0.1648 0.0314 0.0013 0.0000 0.0009 0.1978 0.0310 0.0016 0.0000 0.0015 0.2308 0.0306 0.0019 0.0000 0.0022 0.2637 0.0302 0.0022 0.0000 0.0031 0.2967 0.0299 0.0024 0.0000 0.0043 0.3297 0.0295 0.0027 0.0000 0.0056 0.3626 0.0291 0.0030 0.0000 0.0072 0.3956 0.0287 0.0034 0.0000 0.0091 0.4286 0.0283 0.0037 0.0000 0.0113 0.4615 0.0279 0.0040 0.0000 0.0138 0.4945 0.0275 0.0043 0.0000 0.0166 0.5275 0.0271 0.0046 0.0000 0.0198 0.5604 0.0268 0.0050 0.0000 0.0234 0.5934 0.0264 0.0053 0.0000 0.0273 0.6264 0.0260 0.0057 0.0000 0.0318 0.6593 0.0256 0.0060 0.0000 0.0366 0.6923 0.0253 0.0064 0.0000 0.0420 0.7253 0.0249 0.0067 0.0000 0.0478 0.7582 0.0245 0.0071 0.0000 0.0542 0.7912 0.0242 0.0075 0.0000 0.0611 0.8242 0.0238 0.0078 0.0000 0.0686 0.8571 0.0234 0.0082 0.0000 0.0767 0.8901 0.0231 0.0086 0.0000 0.0855 0.9231 0.0227 0.0090 0.0000 0.0949 0.9560 0.0223 0.0094 0.0000 0.1050 0.9890 0.0220 0.0098 0.0000 0.1159 1.0220 0.0216 0.0102 0.0000 0.1275 1.0549 0.0213 0.0106 0.0000 0.1398 1.0879 0.0209 0.0111 0.0000 0.1530 1.1209 0.0206 0.0115 0.0000 0.1670 1.1538 0.0202 0.0119 0.0000 0.1819 1.1868 0.0199 0.0124 0.0000 0.1977 1.2198 0.0195 0.0128 0.0000 0.2145 1.2527 0.0192 0.0133 0.0000 0.2322 1.2857 0.0189 0.0137 0.0000 0.2509 1.3187 0.0185 0.0142 0.0000 0.2706 1.3516 0.0182 0.0147 0.0000 0.2913 1.3846 0.0179 0.0151 0.0000 0.3132 1.4176 0.0175 0.0156 0.0000 0.3252 1.4505 0.0172 0.0161 0.0000 0.3293 1.4835 0.0169 0.0166 0.0000 0.3334 1.5000 0.0165 0.0169 0.0000 0.3354 Surface Bioretention East Hydraulic Table Stage feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) To Amended(cfs) Wetted Surface 1.5000 0.0333 0.0169 0.0000 0.2000 0.0041 1.5330 0.0337 0.0180 0.0000 0.2000 0.0083 1.5659 0.0341 0.0191 0.0000 0.2088 0.0124 1.5989 0.0345 0.0202 0.0000 0.2132 0.0166 1.6319 0.0349 0.0214 0.0000 0.2176 0.0208 1.6648 0.0353 0.0225 0.0000 0.2220 0.0251 1.6978 0.0357 0.0237 0.0000 0.2264 0.0293 1.7308 0.0362 0.0249 0.0000 0.2308 0.0335 1.7637 0.0366 0.0261 0.0000 0.2352 0.0378 1.7967 0.0370 0.0273 0.0000 0.2396 0.0421 1.8297 0.0374 0.0285 0.0000 0.2440 0.0464 1.8626 0.0379 0.0298 0.0000 0.2484 0.0508 1.8956 0.0383 0.0310 0.0000 0.2527 0.0551 1.9286 0.0387 0.0323 0.0000 0.2571 0.0595 1.9615 0.0392 0.0336 0.0000 0.2615 0.0639 1.9945 0.0396 0.0349 0.0000 0.2659 0.0683 2.0275 0.0400 0.0362 0.0000 0.2703 0.0727 2.0604 0.0405 0.0375 0.0000 0.2747 0.0771 2.0934 0.0409 0.0388 0.0000 0.2791 0.0816 2.1264 0.0414 0.0402 0.0000 0.2835 0.0860 2.1593 0.0418 0.0416 0.0000 0.2879 0.0905 2.1923 0.0422 0.0430 0.0000 0.2923 0.0950 2.2253 0.0427 0.0444 0.0000 0.2967 0.0996 2.2582 0.0431 0.0458 0.0000 0.3011 0.1041 2.2912 0.0436 0.0472 0.0000 0.3055 0.1087 2.3242 0.0440 0.0486 0.0000 0.3099 0.1133 2.3571 0.0445 0.0501 0.0000 0.3143 0.1179 2.3901 0.0450 0.0516 0.0000 0.3187 0.1225 2.4231 0.0454 0.0531 0.0000 0.3231 0.1271 2.4560 0.0459 0.0546 0.0000 0.3275 0.1318 2.4890 0.0463 0.0561 0.0000 0.3319 0.1365 2.5220 0.0468 0.0576 0.0346 0.3333 0.1411 2.5549 0.0473 0.0592 0.1365 0.3333 0.1459 2.5879 0.0477 0.0607 0.2754 0.3333 0.1506 2.6209 0.0482 0.0623 0.4414 0.3333 0.1553 2.6538 0.0487 0.0639 0. 6273 0.3333 0.1601 2.6868 0.0491 0.0655 0.8261 0.3333 0.1649 2.7198 0.0496 0.0672 1.0308 0.3333 0.1697 2.7527 0.0501 0.0688 1.2343 0.3333 0.1745 2.7857 0.0506 0.0705 1.4294 0.3333 0.1793 2.8187 0.0510 0.0721 1. 6096 0.3333 0.1842 2.8516 0.0515 0.0738 1.7695 0.3333 0.1891 2.8846 0.0520 0.0755 1. 9054 0.3333 0.1939 2.9176 0.0525 0.0773 2.0158 0.3333 0.1989 2.9505 0.0530 0.0790 2.1028 0.3333 0.2038 2.9835 0.0535 0.0808 2.1721 0.3333 0.2063 3.0000 0.0537 0.0816 2.2635 0.3333 0.0000 Name Surface Bioretention East Element Flows To: Outlet 1 Outlet 2 Bioretention East ANALYSIS RESULTS Stream Protection Duration Predeveloped Landuse Totals for POC #1 Total Pervious Area:O Total Impervious Area:2.74 Mitigated Landuse Totals for POC #1 Total Pervious Area:O Total Impervious Area:2.73 Flow Frequency Return Periods for Predeveloped. POC #1 Return Period Flow(cfs) 2 year 1.457201 5 year 1.965343 10 year 2.336019 25 year 2.844837 50 year 3.254261 100 year 3. 690588 Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 year 0 5 year 0 10 year 0 25 year 0 50 year 0 100 year 0 Stream Protection Duration Annual Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated 1949 1.561 0.000 1950 1. 676 0.000 1951 1.808 0.000 1952 1.386 0.000 1953 1.765 0.000 1954 2.208 0.000 1955 1.788 0.000 1956 0.773 0.000 1957 1.270 0.000 1958 3.282 0.000 1959 1.327 0.000 1960 1.326 0.000 1961 4.188 0.117 1962 1. 670 0.000 1963 1.805 0.000 1964 0. 998 0.000 1965 1.273 0.000 1966 1.275 0.000 1967 2.839 0.017 1968 1.500 0.000 1969 2. 913 0.000 1970 1.157 0.000 1971 1.583 0.000 1972 2.038 0.000 1973 1. 674 0.000 1974 2.043 0.000 1975 1. 605 0.000 1976 1.126 0.000 1977 1.148 0.000 1978 0.850 0.000 1979 1.840 0.000 1980 1.267 0.000 1981 1.147 0.000 1982 1.178 0.000 1983 1.540 0.000 1984 1.423 0.000 1985 2.001 0.000 1986 1.874 0.000 1987 1. 686 0.000 1988 1.376 0.000 1989 1.375 0.000 1990 1.100 0.000 1991 1.401 0.000 1992 1.351 0.000 1993 1.055 0.000 1994 1.231 0.000 1995 1.039 0.000 1996 1. 672 0.000 1997 1.589 0.000 1998 1.863 0.000 1999 0.831 0.000 2000 3.025 0.000 2001 1.018 0.000 2002 0. 989 0.000 2003 1.356 0.000 2004 2.558 0.000 2005 1.184 0.000 2006 1.445 0.000 2007 1.440 0.000 2008 1.184 0.000 2009 1.187 0.000 Stream Protection Duration Ranked Annual Peaks for Predeveloped and Mitigated. POC #1 Rank Predeveloped Mitigated 1 4.1882 0.1167 2 3.2822 0.0169 3 3.0252 0.0000 4 2.9130 0.0000 5 2.8388 0.0000 6 2.5576 0.0000 7 2.2085 0.0000 8 2.0427 0.0000 9 2.0377 0.0000 10 2.0014 0.0000 11 1.8739 0.0000 12 1.8635 0.0000 13 1.8396 0.0000 14 1.8080 0.0000 15 1.8049 0.0000 16 1.7882 0.0000 17 1.7653 0.0000 18 1.6864 0.0000 19 1.6756 0.0000 20 1.6743 0.0000 21 1.6720 0.0000 22 1.6703 0.0000 23 1.6048 0.0000 24 1.5894 0.0000 25 1.5834 0.0000 26 1.5607 0.0000 27 1.5401 0.0000 28 1.5001 0.0000 29 1.4451 0.0000 30 1.4399 0.0000 31 1.4231 0.0000 32 1.4011 0.0000 33 1.3856 0.0000 34 1.3758 0.0000 35 1.3755 0.0000 36 1.3559 0.0000 37 1.3514 0.0000 38 1.3266 0.0000 39 1.3256 0.0000 40 1.2753 0.0000 41 1.2734 0.0000 42 1.2698 0.0000 43 1.2674 0.0000 44 1.2307 0.0000 45 1.1868 0.0000 46 1.1842 0.0000 47 1.1836 0.0000 48 1.1779 0.0000 49 1.1568 0.0000 50 1.1476 0.0000 51 1.1471 0.0000 52 1.1259 0.0000 53 1.1002 0.0000 54 1.0546 0.0000 55 1.0392 0.0000 56 1.0182 0.0000 57 0.9981 0.0000 58 0.9892 0.0000 59 0.8498 0.0000 60 0.8311 0.0000 61 0.7730 0.0000 Stream Protection Duration POC #1 The Facility PASSED The Facility PASSED. Flow(cfs) Predev Mit Percentage Pass/Fail 0.7286 1098 0 0 Pass 0.7541 963 0 0 Pass 0.7796 855 0 0 Pass 0.8051 759 0 0 Pass 0.8306 682 0 0 Pass 0.8562 588 0 0 Pass 0.8817 537 0 0 Pass 0.9072 475 0 0 Pass 0.9327 431 0 0 Pass 0.9582 383 0 0 Pass 0.9837 338 0 0 Pass 1.0092 309 0 0 Pass 1.0347 288 0 0 Pass 1.0603 265 0 0 Pass 1.0858 247 0 0 Pass 1.1113 229 0 0 Pass 1.1368 207 0 0 Pass 1.1623 190 0 0 Pass 1.1878 170 0 0 Pass 1.2133 164 0 0 Pass 1.2388 148 0 0 Pass 1.2643 136 0 0 Pass 1.2899 124 0 0 Pass 1.3154 116 0 0 Pass 1.3409 110 0 0 Pass 1.3664 99 0 0 Pass 1.3919 89 0 0 Pass 1.4174 83 0 0 Pass 1.4429 80 0 0 Pass 1.4684 73 0 0 Pass 1.4940 71 0 0 Pass 1.5195 67 0 0 Pass 1.5450 62 0 0 Pass 1.5705 58 0 0 Pass 1.5960 53 0 0 Pass 1.6215 49 0 0 Pass 1. 6470 48 0 0 Pass 1.6725 45 0 0 Pass 1.6980 41 0 0 Pass 1.7236 39 0 0 Pass 1.7491 37 0 0 Pass 1.7746 33 0 0 Pass 1.8001 30 0 0 Pass 1.8256 28 0 0 Pass 1.8511 26 0 0 Pass 1.8766 22 0 0 Pass 1.9021 22 0 0 Pass 1.9277 19 0 0 Pass 1.9532 18 0 0 Pass 1.9787 17 0 0 Pass 2.0042 14 0 0 Pass 2.0297 14 0 0 Pass 2.0552 11 0 0 Pass 2.0807 11 0 0 Pass 2.1062 11 0 0 Pass 2.1317 11 0 0 Pass 2.1573 11 0 0 Pass 2.1828 11 0 0 Pass 2.2083 11 0 0 Pass 2.2338 10 0 0 Pass 2.2593 10 0 0 Pass 2.2848 9 0 0 Pass 2.3103 9 0 0 Pass 2.3358 9 0 0 Pass 2.3614 9 0 0 Pass 2.3869 8 0 0 Pass 2.4124 8 0 0 Pass 2.4379 8 0 0 Pass 2.4634 8 0 0 Pass 2.4889 8 0 0 Pass 2.5144 8 0 0 Pass 2.5399 8 0 0 Pass 2.5654 7 0 0 Pass 2.5910 7 0 0 Pass 2.6165 6 0 0 Pass 2.6420 6 0 0 Pass 2.6675 6 0 0 Pass 2.6930 6 0 0 Pass 2.7185 6 0 0 Pass 2.7440 6 0 0 Pass 2.7695 6 0 0 Pass 2.7951 6 0 0 Pass 2.8206 6 0 0 Pass 2.8461 5 0 0 Pass 2.8716 5 0 0 Pass 2.8971 5 0 0 Pass 2.9226 4 0 0 Pass 2.9481 4 0 0 Pass 2.9736 4 0 0 Pass 2.9991 4 0 0 Pass 3.0247 4 0 0 Pass 3.0502 3 0 0 Pass 3.0757 3 0 0 Pass 3.1012 3 0 0 Pass 3.1267 3 0 0 Pass 3.1522 3 0 0 Pass 3.1777 3 0 0 Pass 3.2032 3 0 0 Pass 3.2287 3 0 0 Pass 3.2543 3 0 0 Pass LID Duration LID Duration Annual Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated 1949 1.561 0.000 1950 1. 676 0.000 1951 1.808 0.000 1952 1.386 0.000 1953 1.765 0.000 1954 2.208 0.000 1955 1.788 0.000 1956 0.773 0.000 1957 1.270 0.000 1958 3.282 0.000 1959 1.327 0.000 1960 1.326 0.000 1961 4.188 0.117 1962 1. 670 0.000 1963 1.805 0.000 1964 0. 998 0.000 1965 1.273 0.000 1966 1.275 0.000 1967 2.839 0.017 1968 1.500 0.000 1969 2. 913 0.000 1970 1.157 0.000 1971 1.583 0.000 1972 2.038 0.000 1973 1. 674 0.000 1974 2.043 0.000 1975 1. 605 0.000 1976 1.126 0.000 1977 1.148 0.000 1978 0.850 0.000 1979 1.840 0.000 1980 1.267 0.000 1981 1.147 0.000 1982 1.178 0.000 1983 1.540 0.000 1984 1.423 0.000 1985 2.001 0.000 1986 1.874 0.000 1987 1. 686 0.000 1988 1.376 0.000 1989 1.375 0.000 1990 1.100 0.000 1991 1.401 0.000 1992 1.351 0.000 1993 1.055 0.000 1994 1.231 0.000 1995 1.039 0.000 1996 1. 672 0.000 1997 1.589 0.000 1998 1.863 0.000 1999 0.831 0.000 2000 3.025 0.000 2001 1.018 0.000 2002 0. 989 0.000 2003 1.356 0.000 2004 2.558 0.000 2005 1.184 0.000 2006 1.445 0.000 2007 1.440 0.000 2008 1.184 0.000 2009 1.187 0.000 LID Duration Ranked Annual Peaks for Predeveloped and Mitigated. POC #1 Rank Predeveloped Mitigated 1 4.1882 0.1167 2 3.2822 0.0169 3 3.0252 0.0000 4 2.9130 0.0000 5 2.8388 0.0000 6 2.5576 0.0000 7 2.2085 0.0000 8 2.0427 0.0000 9 2.0377 0.0000 10 2.0014 0.0000 11 1.8739 0.0000 12 1.8635 0.0000 13 1.8396 0.0000 14 1.8080 0.0000 15 1.8049 0.0000 16 1.7882 0.0000 17 1.7653 0.0000 18 1.6864 0.0000 19 1.6756 0.0000 20 1.6743 0.0000 21 1.6720 0.0000 22 1. 6703 0.0000 23 1.6048 0.0000 24 1.5894 0.0000 25 1.5834 0.0000 26 1.5607 0.0000 27 1.5401 0.0000 28 1.5001 0.0000 29 1.4451 0.0000 30 1.4399 0.0000 31 1.4231 0.0000 32 1.4011 0.0000 33 1.3856 0.0000 34 1.3758 0.0000 35 1.3755 0.0000 36 1.3559 0.0000 37 1.3514 0.0000 38 1.3266 0.0000 39 1.3256 0.0000 40 1.2753 0.0000 41 1.2734 0.0000 42 1.2698 0.0000 43 1.2674 0.0000 44 1.2307 0.0000 45 1.1868 0.0000 46 1.1842 0.0000 47 1.1836 0.0000 48 1.1779 0.0000 49 1.1568 0.0000 50 1.1476 0.0000 51 1.1471 0.0000 52 1.1259 0.0000 53 1.1002 0.0000 54 1.0546 0.0000 55 1.0392 0.0000 56 1.0182 0.0000 57 0.9981 0.0000 58 0.9892 0.0000 59 0.8498 0.0000 60 0.8311 0.0000 61 0.7730 0.0000 LID Duration POC #1 The Facility PASSED The Facility zHJJaL. Flow(cfs) Predev Mit Percentage Pass/Fail 0.1166 64829 1 0 Pass 0.1228 61471 0 0 Pass 0.1289 58306 0 0 Pass 0.1351 54841 0 0 Pass 0.1413 52060 0 0 Pass 0.1475 49515 0 0 Pass 0.1537 47077 0 0 Pass 0.1599 44767 0 0 Pass 0.1660 42264 0 0 Pass 0.1722 40232 0 0 Pass 0.1784 38286 0 0 Pass 0.1846 36468 0 0 Pass 0.1908 34735 0 0 Pass 0.1969 33131 0 0 Pass 0.2031 31356 0 0 Pass 0.2093 29923 0 0 Pass 0.2155 28533 0 0 Pass 0.2217 27228 0 0 Pass 0.2279 25966 0 0 Pass 0.2340 24533 0 0 Pass 0.2402 23378 0 0 Pass 0.2464 22309 0 0 Pass 0.2526 21271 0 0 Pass 0.2588 20281 0 0 Pass 0.2649 19348 0 0 Pass 0.2711 18373 0 0 Pass 0.2773 17597 0 0 Pass 0.2835 16848 0 0 Pass 0.2897 16080 0 0 Pass 0.2959 15353 0 0 Pass 0.3020 14532 0 0 Pass 0.3082 13866 0 0 Pass 0.3144 13248 0 0 Pass 0.3206 12684 0 0 Pass 0.3268 12166 0 0 Pass 0.3329 11642 0 0 Pass 0.3391 11041 0 0 Pass 0.3453 10579 0 0 Pass 0.3515 10100 0 0 Pass 0.3577 9648 0 0 Pass 0.3639 9289 0 0 Pass 0.3700 8823 0 0 Pass 0.3762 8438 0 0 Pass 0.3824 8079 0 0 Pass 0.3886 7745 0 0 Pass 0.3948 7428 0 0 Pass 0.4010 7125 0 0 Pass 0.4071 6793 0 0 Pass 0.4133 6504 0 0 Pass 0.4195 6237 0 0 Pass 0.4257 5976 0 0 Pass 0.4319 5739 0 0 Pass 0.4380 5461 0 0 Pass 0.4442 5245 0 0 Pass 0.4504 5041 0 0 Pass 0.4566 4851 0 0 Pass 0.4628 4641 0 0 Pass 0.4690 4481 0 0 Pass 0.4751 4293 0 0 Pass 0.4813 4143 0 0 Pass 0.4875 3993 0 0 Pass 0.4937 3863 0 0 Pass 0.4999 3734 0 0 Pass 0.5060 3583 0 0 Pass 0.5122 3439 0 0 Pass 0.5184 3330 0 0 Pass 0.5246 3240 0 0 Pass 0.5308 3136 0 0 Pass 0.5370 3024 0 0 Pass 0.5431 2896 0 0 Pass 0.5493 2787 0 0 Pass 0.5555 2704 0 0 Pass 0.5617 2620 0 0 Pass 0.5679 2532 0 0 Pass 0.5740 2415 0 0 Pass 0.5802 2319 0 0 Pass 0.5864 2254 0 0 Pass 0.5926 2197 0 0 Pass 0.5988 2112 0 0 Pass 0.6050 2042 0 0 Pass 0.6111 1965 0 0 Pass 0.6173 1894 0 0 Pass 0.6235 1840 0 0 Pass 0.6297 1789 0 0 Pass 0.6359 1720 0 0 Pass 0.6421 1677 0 0 Pass 0.6482 1622 0 0 Pass 0.6544 1574 0 0 Pass 0.6606 1523 0 0 Pass 0.6668 1483 0 0 Pass 0.6730 1441 0 0 Pass 0.6791 1399 0 0 Pass 0.6853 1359 0 0 Pass 0. 6915 1324 0 0 Pass 0. 6977 1284 0 0 Pass 0.7039 1239 0 0 Pass 0.7101 1191 0 0 Pass 0.7162 1167 0 0 Pass 0.7224 1134 0 0 Pass 0.7286 1098 0 0 Pass