HomeMy WebLinkAboutExhibit 25 - WSDOT Traffic Mitigation Offer Form Long Version Traffic Mitigation Offer to WSDOT
This three-page version is intended for developments required to submit a comprehensive traffic
study consistent with Section One and Section Two of the WSDOT Traffic Analysis Checklist.
Section One: Offer of Mitigation by Applicant for Proposed Snohomish County Development
This section to be completed by applicant
Name of Proposed Development Snohomish County
MJS Investors Parcels Project File Number
Name of Applicant (Only if this offer is not
submitted to PDS with
MJS Investors initial application)
Address of Applicant
SE 8th St. #200, Bellevue, WA 98004
PROPORTIONATE SHARE CALCULATION: Choee Option 1A or 1B Below
DOption 1A for Proportionate Share Mitigation Based on Impacts to Projects in Exhibit C of the
WSDOT/COUNTY Interlocal Agreement
WSDOT Title/Description of ADTs Impacting Improvement Proportionate
Improvement ID# WSDOT Project Improvement Cost per ADT Share Obligation
SR 531-43rd Ave.NE to 67th Ave.NE Widening $0 $0
Proportionate Share Sum $0
The APPLICANT hereby voluntarily agrees to pay the proportionate share sum amount shown above for
impacts of the DEVELOPMENT on the capacity of state highways, based on the "proportionate share"
method adopted in Section 5.2(a) of the applicable version of the WSDOT/COUNTY interlocal
agreement (ILA), the list of projects in Exhibit C of the ILA, and information provided in the
comprehensive Traffic Study attached hereto.
❑ Option 1 B for Proportionate Share Mitigation based on standard amount
1 New Average Daily Traffic (ADT) generated(from Line 5a of the WSDOT
Traffic Study Checklist Section One)
2 $36.00 The current "standard payment' rate per AD T in Section 5.2(b) of the
applicable version of the WSDOT/COUNTY interlocal agreement(ILA)
3 $ Proportionate share calculation (#1 x#2= #3).
The APPLICANT hereby voluntarily agrees to pay the amount shown on line #3 above for impacts of the
DEVELOPMENT on the capacity of state highways, based on the "standard payment' rate and method
adopted in Section 5.2(b) of the applicable version of the WSDOT/COUNTY interlocal agreement (ILA),
and based on information provided in the WSDOT Traffic Study Checklist Section One (attached
hereto).
HIGH ACCIDENT LOCATIONS (ILA SECTION 5.3.A)
✓❑No impact ❑Mitigation as described in attached document.
LEVEL OF SERVICE AT STATE HIGHWAY INTERSECTIONS (ILA SECTION 5.3.13)
❑No impact ❑Mitigation as described in attached document.
INSTALLATION OF TRAFFIC SIGNAL (ILA SECTION 5.4)
✓❑No impact or ❑Mitigation or other provisions as described in attached document.
not applicable
CHANNELIZATION REVISIONS (ILA SECTION 5.5)
✓❑No impact or ❑Mitigation or other provisions as described in attached document.
not applicable
FRONTAGE IMPROVEMENTS (ILA SECTION 5.6)
❑No impact or -1 Mitigation or other provisions as described in attached document.
not applicable
RIGHT-OF-WAY REQUIREMENTS (ILA SECTION 5.7)
❑No impact or not ✓❑Mitigation or other provisions as described in attached document.
applicable
SETBACK REQUIREMENTS (ILA SECTION 5.8)
❑No impact or not ✓❑Mitigation or other provisions as described in attached document.
applicable
ACCESS CONNECTIONS (ILA SECTION 5.9)
❑No impact or ✓❑Permitted Access to adjacent State Highway verified by DEVELOPER
not applicable or application made with WSDOT
SUBMITTAL OPTIONS
If this offer and all necessary attachments are submitted to Snohomish County PDS (COUNTY) with
the initial development application, then PDS will send all documents to WSDOT for review and
comment(s) and WSDOT will send the written offer back to PDS. Otherwise, the applicant is
responsible for working directly with WSDOT, submitting the required documents, obtaining WSDOT's
signature, and submitting the written offer to PDS
❑This offer, Sections One and Two of WSDOT Traffic Study Checklist, and all necessary
supporting documentation (one original plus two copies) are hereby submitted to PDS with
initial application
✓❑ Applicant is working directly with WSDOT
BY:
Rob Risingerpaieal2026n02.,,162256i0800' Date 2/5/26 Rob Risinger, VP
Signature of Applicant or Authorized Representative Print Name and Title
Page 2of3
Section Two: Processing by Snohomish County PDS if included with initial application.
Otherwise applicant works directly with WSDOT (Section 3).
This section to be completed by Snohomish County PDS
Date Received Name of PDS Planner Assigned to Project Phone Number of Planner
Instructions to PDS Send this three-page offer, Sections One and Two of WSDOT Traffic Study
Checklist, and all attachments to WSDOT and DPW as shown below:
1. Original mailed to WSDOT Snohomish Area Development Services, MS 240, WSDOT NW Region,
PO Box 330310, Seattle WA 98133-9710
2. Convenience copy mailed to Snohomish County Public Works Land Use Section
BY:
Date
Initiated by PDS Staff Person Print Name and Title
Section Three: Review and/or Approval by WSDOT
This section to be completed by WSDOT
WSDOT RECEIPT OF OFFER ATTACHMENT(S)
❑ Original offer, Sections One and Two of WSDOT Traffic Study Checklist, and all attachments
received from Snohomish County PDS.
❑ Original offer and attachment(s) received from
BY:
Date
Initiated by WSDOT Staff Person Print Name and Title
WSDOT REQUEST
WSDOT has reviewed the traffic study and this mitigation offer submitted by the Applicant and has
determined as follows:
❑WSDOT requests that the COUNTY impose ❑WSDOT requests that the COUNTY
the mitigation offered above as a condition of require additional supplemental
approval for the DEVELOPMENT. WSDOT information to adequately evaluate the
agrees to accept changes in the proportionate proposed development's impacts.
payment amount shown above resulting from
TDM or lot-yield adjustments approved by the ❑The information requested is shown in
COUNTY. the attached document.
ROUTING BY WSDOT
❑Original written offer with all applicable signatures has been mailed to the PDS Planner shown
in Section 2 above at Snohomish County PDS, 3000 Rockefeller, Everett WA 98201.
❑Copy of written offer with all signatures has been mailed to Snohomish County DPW Land Use
Division, 3000 Rockefeller, Everett, WA 98201.
Alternatively, in cases in which the form was not submitted to PDS with initial application
❑Original written offer has been mailed to the applicant shown above and a copy has been
mailed to Snohomish County DPW Land Use Division, 2930 Wetmore, Everett, WA 98201
BY:
Date
Signature of Authorized WSDOT Official Print Name and Title
Rev. 6/04
Page 3 of 3