Loading...
HomeMy WebLinkAboutExhibit 19 - Geotechnical Report Geotechnical Engineering,Construction Observation/Testing and Environmental Services GEOTECHNICAL ENGINEERING STUDY PROPOSED RESIDENTIAL DEVELOPMENT LINDSAY ANNEXATION 8014, 8118, 8210, AND 8326 — 172ND STREET NORTHEAST ARLINGTON, WASHINGTON ES-9786 15365 NE 90t" Street, Suite 100 • Redmond, WA 98052 • (425) 449-4704 3130 Varney Lane, Suite 105 • Pasco, WA 99301 • (509) 905-0275 esnw.com PREPARED FOR MJS INVESTORS June 28, 2024 Adam Z. Shier, L.G. Project Geologist �l T W q O 53803 is ER�� FsS10NALE�G 06/28/2024 Henry T. Wright, P.E. Associate Principal Engineer GEOTECHNICAL ENGINEERING STUDY PROPOSED RESIDENTIAL DEVELOPMENT LINDSAY ANNEXATION 8014, 8118, 8210, AND 8326 — 172ND STREET NORTHEAST ARLINGTON, WASHINGTON ES-9786 Earth Solutions NW, LLC 15365 NE 90t" Street, Suite 100 • Redmond, WA 98052 • (425) 449-4704 3130 Varney Lane, Suite 105 • Pasco, WA 99301 • (509) 905-0275 esnw.com IMPOPIOnt InfOPM81100 Rhout GeolechnicalmEngineeping SubWhile . . . following . . . . . _ . .cost overruns, claims, and help. The Geoprofessional Business Association (GBA) will not likely meet the needs of a civil-works constructor or even a has prepared this advisory to help you—assumedly different civil engineer.Because each geotechnical-engineering study a client representative—interpret and apply this is unique,each geotechnical-engineering report is unique,prepared geotechnical-engineering report as effectively as solely for the client. possible. In that way, you can benefit from a lowered Likewise,geotechnical-engineering services are performed for a specific exposure to problems associated with subsurface project and purpose.For example,it is unlikely that a geotechnical- conditions at project sites and development of engineering study for a refrigerated warehouse will be the same as them that,for decades, have been a principal cause one prepared for a parking garage;and a few borings drilled during of construction delays, cost overruns, claims, a preliminary study to evaluate site feasibility will not be adequate to and disputes. If you have questions or want more develop geotechnical design recommendations for the project. information about any of the issues discussed herein, contact your GBA-member geotechnical engineer. Do not rely on this report if your geotechnical engineer prepared it: Active engagement in GBA exposes geotechnical • for a different client; engineers to a wide array of risk-confrontation • for a different project or purpose; techniques that can be of genuine benefit for • for a different site(that may or may not include all or a portion of everyone involved with a construction project. the original site);or before important events occurred at the site or adjacent to it; e.g.,man-made events like construction or environmental Understand the Geotechnical-Engineering Services remediation,or natural events like floods,droughts,earthquakes, Provided for this Report or groundwater fluctuations. Geotechnical-engineering services typically include the planning, collection,interpretation,and analysis of exploratory data from Note,too,the reliability of a geotechnical-engineering report can widely spaced borings and/or test pits.Field data are combined be affected by the passage of time,because of factors like changed with results from laboratory tests of soil and rock samples obtained subsurface conditions;new or modified codes,standards,or from field exploration(if applicable),observations made during site regulations;or new techniques or tools.If you are the least bit uncertain reconnaissance,and historical information to form one or more models about the continued reliability of this report,contact your geotechnical of the expected subsurface conditions beneath the site.Local geology engineer before applying the recommendations in it.A minor amount and alterations of the site surface and subsurface by previous and of additional testing or analysis after the passage of time-if any is proposed construction are also important considerations.Geotechnical required at all-could prevent major problems. engineers apply their engineering training,experience,and judgment to adapt the requirements of the prospective project to the subsurface Read this Report in Full model(s). Estimates are made of the subsurface conditions that Costly problems have occurred because those relying on a geotechnical- will likely be exposed during construction as well as the expected engineering report did not read the report in its entirety.Do not rely on performance of foundations and other structures being planned and/or an executive summary.Do not read selective elements only.Read and affected by construction activities. refer to the report in full. The culmination of these geotechnical-engineering services is typically a You Need to Inform Your Geotechnical Engineer geotechnical-engineering report providing the data obtained,a discussion About Change of the subsurface model(s),the engineering and geologic engineering Your geotechnical engineer considered unique,project-specific factors assessments and analyses made,and the recommendations developed when developing the scope of study behind this report and developing to satisfy the given requirements of the project.These reports may be the confirmation-dependent recommendations the report conveys. titled investigations,explorations,studies,assessments,or evaluations. Typical changes that could erode the reliability of this report include Regardless of the title used,the geotechnical-engineering report is an those that affect: engineering interpretation of the subsurface conditions within the context - the site's size or shape; of the project and does not represent a close examination,systematic inquiry,or thorough investigation of all site and subsurface conditions. the elevation,configuration,location,orientation, function or weight of the proposed structure and Geotechnical-Engineering Services are Performed the desired performance criteria; the composition of the design team;or for Specific Purposes, Persons, and Projects, . project ownership. and At Specific Times Geotechnical engineers structure their services to meet the specific As a general rule,always inform your geotechnical engineer of project needs,goals,and risk management preferences of their clients.A or site changes-even minor ones-and request an assessment of their geotechnical-engineering study conducted for a given civil engineer impact.The geotechnical engineer who prepared this report cannot accept responsibility or liability for problems that arise because the geotechnical conspicuously that you've included the material for information purposes engineer was not informed about developments the engineer otherwise only.To avoid misunderstanding,you may also want to note that would have considered. "informational purposes"means constructors have no right to rely on the interpretations,opinions,conclusions,or recommendations in the Most of the "Findings" Related in This Report report.Be certain that constructors know they may learn about specific Are Professional Opinions project requirements,including options selected from the report,only Before construction begins,geotechnical engineers explore a site's from the design drawings and specifications.Remind constructors subsurface using various sampling and testing procedures.Geotechnical that they may perform their own studies if they want to,and be sure to engineers can observe actual subsurface conditions only at those specific allow enough time to permit them to do so.Only then might you be in locations where sampling and testing is performed.The data derived from a position to give constructors the information available to you,while that sampling and testing were reviewed by your geotechnical engineer, requiring them to at least share some of the financial responsibilities who then applied professional judgement to form opinions about stemming from unanticipated conditions.Conducting prebid and subsurface conditions throughout the site.Actual sitewide-subsurface preconstruction conferences can also be valuable in this respect. conditions may differ-maybe significantly-from those indicated in this report.Confront that risk by retaining your geotechnical engineer Read Responsibility Provisions Closely to serve on the design team through project completion to obtain Some client representatives,design professionals,and constructors do informed guidance quickly,whenever needed. not realize that geotechnical engineering is far less exact than other engineering disciplines.This happens in part because soil and rock on This Report's Recommendations Are project sites are typically heterogeneous and not manufactured materials Confirmation-Dependent with well-defined engineering properties like steel and concrete.That The recommendations included in this report-including any options or lack of understanding has nurtured unrealistic expectations that have alternatives-are confirmation-dependent.In other words,they are not resulted in disappointments,delays,cost overruns,claims,and disputes. final,because the geotechnical engineer who developed them relied heavily To confront that risk,geotechnical engineers commonly include on judgement and opinion to do so.Your geotechnical engineer can finalize explanatory provisions in their reports.Sometimes labeled"limitations,' the recommendations only after observing actual subsurface conditions many of these provisions indicate where geotechnical engineers' exposed during construction.If through observation your geotechnical responsibilities begin and end,to help others recognize their own engineer confirms that the conditions assumed to exist actually do exist, responsibilities and risks.Read these provisions closely.Ask questions. the recommendations can be relied upon,assuming no other changes have Your geotechnical engineer should respond fully and frankly. occurred.The geotechnical engineer who prepared this report cannot assume responsibility or liabilityfor confirmation-dependent recommendations fyou Geoenvironmental Concerns Are Not Covered fail to retain that engineer to perform construction observation. The personnel,equipment,and techniques used to perform an environmental study-e.g.,a"phase-one"or"phase-two"environmental This Report Could Be Misinterpreted site assessment-differ significantly from those used to perform a Other design professionals'misinterpretation of geotechnical- geotechnical-engineering study.For that reason,a geotechnical-engineering engineering reports has resulted in costly problems.Confront that risk report does not usually provide environmental findings,conclusions,or by having your geotechnical engineer serve as a continuing member of recommendations;e.g.,about the likelihood of encountering underground the design team,to: storage tanks or regulated contaminants.Unanticipated subsurface • confer with other design-team members; environmental problems have led to project failures.If you have not • help develop specifications; obtained your own environmental information about the project site, review pertinent elements of other design professionals'plans and ask your geotechnical consultant for a recommendation on how to find specifications;and environmental risk-management guidance. • be available whenever geotechnical-engineering guidance is needed. Obtain Professional Assistance to Deal with You should also confront the risk of constructors misinterpreting this Moisture Infiltration and Mold report.Do so by retaining your geotechnical engineer to participate in While your geotechnical engineer may have addressed groundwater, prebid and preconstruction conferences and to perform construction- water infiltration,or similar issues in this report,the engineer's phase observations. services were not designed,conducted,or intended to prevent migration of moisture-including water vapor-from the soil Give Constructors a Complete Report and Guidance through building slabs and walls and into the building interior,where Some owners and design professionals mistakenly believe they can shift it can cause mold growth and material-performance deficiencies. unanticipated-subsurface-conditions liability to constructors by limiting Accordingly,proper implementation of the geotechnical engineer's the information they provide for bid preparation.To help prevent recommendations will not of itself be sufficient to prevent the costly,contentious problems this practice has caused,include the moisture infiltration.Confront the risk of moisture infiltration by complete geotechnical-engineering report,along with any attachments including building-envelope or mold specialists on the design team. or appendices,with your contract documents,but be certain to note Geotechnical engineers are not building-envelope or mold specialists. GEOPROFESSIONAL BUSINESS SEA ASSOCIATION Telephone:301/565-2733 e-mail:info@geoprofessional.org www.geoprofessional.org Copyright 2019 by Geoprofessional Business Association(GBA).Duplication,reproduction,or copying of this document,in whole or in part,by any means whatsoever,is strictly prohibited,except with GBAs specific written permission.Excerpting,quoting,or otherwise extracting wording from this document is permitted only with the express written permission of GBA,and only for purposes of scholarly research or book review.Only members of GBA may use this document or its wording as a complement to or as an element of a report of any kind. Any other firm,individual,or other entity that so uses this document without being a GBA member could be committing negligent or intentional(fraudulent)misrepresentation. v June 28, 2024 Earth Solutions NW LLC ES-9786 Geotechnical Engineering,Construction Observation/Testing and Environmental Services MJS Investors 11201 Southeast 8th Street, Suite 116 Bellevue, Washington 98004 Attention: Rob Risinger Dear Rob: Earth Solutions NW, LLC (ESNW) is pleased to present this geotechnical report to support the proposed residential construction. Based on the results of our investigation, the proposed construction is feasible from a geotechnical standpoint. Our field observations indicate the site is underlain primarily by dense to very dense glacial till deposits. The proposed residential structures may be supported on conventional continuous and spread footing foundations bearing on competent native soil, compacted native soil, or new structural fill placed directly on a competent subgrade. In general, we expect competent native soil suitable for support of foundations will likely be encountered about two to four feet bgs. Where loose or unsuitable soil conditions are exposed at foundation subgrade elevations, compaction of the soil to the specifications of structural fill, or overexcavation and replacement with suitable structural fill will likely be necessary. The existing fill is generally underlain by topsoil and is not suitable for structural support as is and should be removed and replaced with suitable structural backfill. Where encountered, fill intended for reuse as structural fill must be primarily free of organic and deleterious material and should be evaluated by ESNW at the time of construction. Based on our review of the referenced topographic data, a portion of the site meets or exceeds 15 percent gradient, with isolated areas in the southern portion of the site meeting or exceeding 33 percent. As such, City of Arlington regulations regarding disturbance area will likely apply. The development will likely need to be designed to accommodate the existing topography. The native glacial till deposits exhibit very poor infiltration characteristics, including high relative density, high fines content, and weak cementation. In our opinion, full infiltration should be considered infeasible from a geotechnical standpoint. 15365 NE 901h Street,Suite 100 • Redmond,WA 98052 • (425)449-4704 3130 Varney Lane,Suite 105 Pasco,WA 99301 • (509)905-0275 esnw.com MJS Investors ES-9786 June 28, 2024 Executive Summary — Page 2 This report provides geotechnical analyses and recommendations for the proposed residential development. The opportunity to be of service to you is appreciated. If you have any questions regarding the content of this geotechnical engineering study, please call. Sincerely, EARTH SOLUTIONS NW, LLC Adam Z. Shier, L.G. Project Geologist Earth Solutions NW, LLC Table of Contents ES-9786 PAGE INTRODUCTION ................................................................................. 1 General .................................................................................... 1 Project Description ................................................................. 1 SITE CONDITIONS ............................................................................. 2 Surface..................................................................................... 2 Subsurface .............................................................................. 2 Topsoil and Fill............................................................. 2 NativeSoil..................................................................... 3 Geologic Setting........................................................... 3 Groundwater................................................................. 3 Geologic Hazard Areas Assessment..................................... 4 Landslide Hazard Areas............................................... 4 Slopes ........................................................................... 4 Discussion .................................................................... 5 DISCUSSION AND RECOMMENDATIONS ....................................... 5 General .................................................................................... 5 Site Preparation and Earthwork............................................. 6 Temporary Erosion Control......................................... 6 Excavations and Slopes .............................................. 7 StructuralFill ................................................................ 7 In-situ and Imported Soil ............................................. 8 Wet-Season Grading.................................................... 8 Existing Fill Removal and Replacement..................... 9 Foundations ............................................................................ 9 RetainingWalls ....................................................................... 10 SeismicDesign ....................................................................... 11 Liquefaction.................................................................. 11 Slab-on-Grade Floors ............................................................. 12 Utility Support and Trench Backfill ....................................... 12 Preliminary Pavement Sections............................................. 12 Drainage................................................................................... 13 Infiltration Feasibility ................................................... 14 Detention Pond Recommendations............................ 14 LIMITATIONS...................................................................................... 14 Additional Services................................................................. 14 REFERENCES .................................................................................... 15 Earth Solutions NW, LLC Table of Contents Cont'd ES-9786 GRAPHICS Plate 1 Vicinity Map Plate 2 Test Pit Location Plan Plate 3 Retaining Wall Drainage Detail Plate 4 Footing Drain Detail APPENDICES Appendix A Subsurface Exploration Logs Appendix B Laboratory Test Results Earth Solutions NW, LLC GEOTECHNICAL ENGINEERING STUDY PROPOSED RESIDENTIAL DEVELOPMENT LINDSAY ANNEXATION 8014, 8118, 8210, AND 8326 — 172ND STREET NORTHEAST ARLINGTON, WASHINGTON ES-9786 INTRODUCTION General This geotechnical engineering study (study) was prepared for the proposed residential construction to be located on the south side of 172nd Street Northeast at 8014, 8118, 8210, & 8326 — 172nd Street Northeast in Arlington, Washington. To fulfill our scope of services, the following were completed: • Subsurface exploration to characterize the soil and groundwater conditions. • Laboratory testing of representative soil samples collected on site. • Infiltration feasibility evaluation based on field observations and laboratory analyses. • Engineering analyses and recommendations for the proposed residential construction. • Preparation of this report. Project Description Based on review of the referenced feasibility exhibit, the site will be redeveloped with a series of new residential lots, access roads, stormwater management facilities, and associated improvements. At the time of report submission, specific grading and building plans were not available for review. We anticipate grading for the project will include cuts and fills on the order of 10 to 15 feet or less to achieve design subgrade and finish grade elevations for the access drives and building areas. Based on our experience with similar projects, the proposed residential structures will likely be two to three stories in height and constructed using relatively lightly loaded wood framing. We anticipate perimeter footing loads will likely be 1 to 2 kips per linear foot, isolated footing loads will be less than 20 kips, and slab-on-grade loading of 150 pounds per square foot (psf). If the above design assumptions either change or are incorrect, ESNW should be contacted to review the recommendations provided in this report. ESNW should be contacted to review the final design to confirm that our geotechnical recommendations have been incorporated into the final plans. Earth Solutions NW, LLC MJS Investors ES-9786 June 28, 2024 Page 2 SITE CONDITIONS Surface The subject site is located on the south side of 17211 Street Northeast at 8014, 8118, 8210, & 8326 — 172nd Street Northeast in Arlington, Washington, as illustrated on the Vicinity Map (Plate 1). The site consists of five tax parcels (Snohomish County parcel nos. 310525-002-006-00, 310526-100-100, 31052600-100-200, 31052600-102-200, and 31052600-102-300) totaling 32.28 acres. The property is currently developed with a series of single-family residences, outbuildings, and associated improvements. Undeveloped portions of the property are primarily surfaced with lawn grass, landscaping areas, access driveways, and forested conditions. In general, terrain across the subject site descends to the west with approximately 80 feet of elevation change. Per the PDS Map Portal, an area containing a steep slope (i.e., greater than 33 percent gradient) is present in the western portion of the site. The site is bordered to the north by 172nd Street Northeast, to the east and south by undeveloped parcels, and to the west by 79th Avenue Northeast. Subsurface A representative of ESNW observed, logged, and sampled 25 test pits on April 2, 2024, advanced at accessible locations within the property boundaries, using a mini-trackhoe and operator retained by our firm. The test pits were completed to assess and classify the site soils, to characterize the groundwater conditions within areas proposed for new development. The maximum exploration depth was approximately 11 feet below the existing ground surface (bgs), and all test pits were terminated in undisturbed native soil deposits. The approximate locations of the test pits are depicted on Plate 2 (Test Pit Location Plan). Please refer to the test pit logs provided in Appendix A for a more detailed description of subsurface conditions. Representative soil samples collected at our exploration sites were analyzed in general accordance with Unified Soil Classification System (USCS) and United States Department of Agriculture (USDA) methods and procedures. Topsoil and Fill Topsoil was generally observed within the upper 4 to 18 inches of existing grades at the test locations where historic grade modifications have not been made, characterized by its dark brown color, the presence of fine organic material, and small root intrusions. Furthermore, an approximately 24 to 36-inch-thick relic topsoil horizon was encountered at TP-6, TP-7, and TP-9 beginning at depths of about one to two feet bgs underlying reworked native material. Earth Solutions NW, LLC MJS Investors ES-9786 June 28, 2024 Page 3 Fills were encountered at seven of the test locations (primarily within Snohomish County parcel number 31052600-102-200), extending up to three and one-half feet bgs. The fill generally consisted of silty sand or dark brown topsoil (USCS: SM and TPSL, respectively). Where topsoil fill was observed, the locations had been stripped of their upper weathered soil horizons during past grading activities and topsoil fill had been placed atop unweathered glacial till. Native Soil Underlying the topsoil and fill, native soil consisting primarily of silty sand with gravel (USCS:SM) was observed. The native silty sand soil was interpreted to be representative of glacial till deposits, which were widely encountered across the site. The native glacial till deposits were generally in a medium dense and weathered condition near surface, becoming very dense, unweathered, and weakly to moderately cemented beginning at depths between roughly one and one-half to four feet bgs. Some exploration locations appeared to have been stripped of the upper weathered soil horizons during past grading activities. Laboratory analyses of representative glacial till soil samples indicate the till deposits contain roughly 20 to 32 percent fines. All native soil samples were primarily in a moist to wet condition at the time of exploration. Geologic Setting Geologic mapping of the area identifies Vashon till (Qvt) as the primary geologic unit underlying the site. As reported on the geologic map, glacial till is a non-sorted mixture of silt, sand, and gravel (diamicton), resembling a low strength concrete mix. The glacial till was deposited directly beneath the glacier as it advanced over bedrock and older Quaternary deposits. The referenced Web Soil Survey (WSS) identifies Tokul gravelly medial loam (0 to 8 percent slopes) as the primary soil unit underlying the subject site. Tokul series soils were formed over glacial till and volcanic ash. The referenced USDA soil survey characterizes this soil unit with slow to medium surface water runoff, and slight to moderate hazard of water erosion. In general, runoff and erosivity increase with slope gradient. In our opinion, the soils observed during our subsurface exploration are generally consistent with the geologic and soils mapping resources outlined in this section. Groundwater Groundwater seepage was observed at 14 of the test pit locations during the fieldwork (April 2024) at depths of about two to three and one-half feet bgs. Groundwater seepage is common within glacial deposits, and the elevations and/or flow volumes of seepage can fluctuate depending on many factors, including precipitation duration and intensity, the time of year, and soil conditions. In general, groundwater elevations and flow rates are higher during the winter, spring, and early summer months. Earth Solutions NW, LLC MJS Investors ES-9786 June 28, 2024 Page 4 Based on the observed groundwater condition, it is our opinion that the contractor should be prepared to manage and respond to areas of heavy groundwater seepage. Temporary dewatering and surface and groundwater controls may be necessary during construction, and in our opinion, a contingency should be provided in the budget to account for groundwater management. Geologically Hazardous Areas Assessment The presence of geologically hazardous areas at or near the subject site was evaluated by reviewing Part VI of AMC Chapter 20.93 (Geologically Hazardous Areas) along with the referenced county-wide hazard mapping resources. Geologically hazardous areas in the City of Arlington include areas susceptible to erosion, sliding, seismicity, or other geological events. The following sections provide a summary of on-site landslide hazards and slopes. Specific regulations regarding development on sites with geologically hazardous areas can be found in AMC 20.93.630. Landslide Hazard Areas Section 20.93.600.b.2 of the AMC provides classification criteria for landslide hazard areas. Utilizing topographic data available through PDS Map Portal, ESNW determined that criterion E—any area with a slope of 33 percent or greater and with a vertical relief of 10 or more feet (except areas composed of consolidated rock)—is met in some sloped areas of the western portion of the site. In our opinion, all other landslide hazard designation criteria are not applicable to the site. Unless alteration of the steep slope landslide hazard area is approved, minimum buffer of 50 feet is required from all edges of a landslide hazard area, per AMC 20.93.630.b.2, and buildings are required to be set back 15 feet from the nearest buffer edge per AMC 20.93.630.b.3. It is our opinion that the relatively limited areas that appear to be sloped 33 percent or steeper can be regraded in an engineered manner to effectively eliminate the potential landslide hazard. If alteration of these areas is pursued, ESNW should be consulted during the development of grading plans to provide additional recommendations. Slopes Slopes are categorized in AMC section 20.93.600.b.3 into moderate and steep slope categories. Moderate slopes shall include any slope greater than or equal to 15 percent and less than 33 percent, while steep slopes shall include any slope greater than or equal to 33 percent. This section of the AMC does not require a minimum height of vertical relief to be classified as a moderate or steep slope. Based on review of the referenced topographic data, a portion of the site meets or exceeds 15 percent gradient, with isolated areas in the western portion of the site meeting or exceeding 33 percent. Earth Solutions NW, LLC MJS Investors ES-9786 June 28, 2024 Page 5 AMC section 20.93.630.c provides regulation criteria for development on sites with moderate and steep slopes. Per table 20.93-2, allowable disturbance area is limited depending on slope gradient. Table 20.93-2 is provided below for reference. AMC Table 20.93-2: Slope Disturbance Allowed Slope Disturbance Allowed 1-14% 100% 15-24% 60% 25-32% 45% 33% or greater 0% Discussion Certain exceptions to the regulations described above are permitted in the AMC regarding development on landslide hazard areas and/or moderate and steep slopes. Several of these exceptions require geotechnical analysis to demonstrate that the proposed development will not adversely affect adjacent properties and/or that the proposal is designed to mitigate or essentially eliminate the risk associated with the geologically hazardous area. ESNW recommends the project team review the development proposal with respect to the requirements provided in the AMC. As project plans progress, ESNW can provide additional consulting services pertaining to geologically hazardous areas. DISCUSSION AND RECOMMENDATIONS General In our opinion, the proposed construction is feasible from a geotechnical standpoint. The primary geotechnical considerations associated with the proposed project include temporary excavations, structural fill requirements, subgrade preparation, existing fill removal and replacement, utility support and trench backfill, drainage, and stormwater management. The proposed residential structures may be supported on conventional continuous and spread footing foundations bearing on competent native soil, compacted native soil, or new structural fill placed directly on a competent subgrade. In general, we expect competent native soil suitable for support of foundations will likely be encountered about two to four feet bgs. Where loose or unsuitable soil conditions are exposed at foundation subgrade elevations, compaction of the soil to the specifications of structural fill, or overexcavation and replacement with suitable structural fill will likely be necessary. The existing fill is generally underlain by topsoil and is not suitable for structural support as is and should be removed and replaced with suitable structural backfill. Where encountered, fill intended for reuse as structural fill must be primarily free of organic and deleterious material and should be evaluated by ESNW at the time of construction. Earth Solutions NW, LLC MJS Investors ES-9786 June 28, 2024 Page 6 Based on our review of the referenced topographic data, a portion of the site meets or exceeds 15 percent gradient, with isolated areas in the southern portion of the site meeting or exceeding 33 percent. As such, City of Arlington regulations regarding disturbance area will likely apply. The development will likely need to be designed to accommodate the existing topography. The native glacial till deposits exhibit very poor infiltration characteristics, including high relative density, high fines content, and weak cementation. In our opinion, full infiltration should be considered infeasible from a geotechnical standpoint. Site Preparation and Earthwork Site preparation activities should consist of installing temporary erosion control measures and performing site stripping within the designated clearing limits. Subsequent earthwork activities will likely involve additional mass grading and infrastructure and utility installations. Temporary Erosion Control The following temporary erosion and sediment control (TESC) Best Management Practices (BMPs) should be considered: • Temporary construction entrances and drive lanes, consisting of at least six inches of quarry spalls, should be considered to both minimize off-site soil tracking and provide stable surfaces at site entrances. Placing geotextile fabric underneath the quarry spalls will provide greater stability, if needed. • Silt fencing should be placed around the appropriate portions of the site perimeter. • When not in use, soil stockpiles should be covered or otherwise protected to reduce the potential for soil erosion, especially during periods of wet weather. • Temporary measures for controlling surface water runoff, such as interceptor trenches, sumps, or interceptor swales, should be installed prior to beginning earthwork activities. • Dry soils disturbed during construction should be wetted to reduce dust and airborne soil erosion. Additional TESC BMPs, as specified by the project civil engineer and indicated on the plans, should be incorporated into construction activities. TESC BMPs may be modified during construction as site conditions require and as approved by the site erosion control lead. Earth Solutions NW, LLC MJS Investors ES-9786 June 28, 2024 Page 7 Excavations and Slopes Based on the soil conditions observed at the exploration locations, excavation activities are likely to expose loose to medium dense native soils within the upper two to four feet of existing grades, becoming dense to very dense at depth. The following Federal Occupation Safety and Health Administration and Washington Industrial Safety and Health Act soil classifications and maximum allowable temporary slope inclinations may be used: • Areas exposing groundwater seepage 1.5H:1 V (Type C) • Loose soil 1.51-1:1 V (Type C) • Medium dense to dense soil 1 H:1 V (Type B) • Very dense "hardpan" native soil 0.751-1:1 V (Type A) Groundwater seepage should be anticipated during excavation activities, especially if excavations take place during the wet season. An ESNW representative should be requested observe temporary excavations to evaluate the presence of groundwater seepage. If seepage is not observed, steeper temporary slope inclinations may be feasible pending evaluation by the geotechnical engineer. An ESNW representative should be requested to observe temporary and permanent slopes to confirm the slope inclinations are suitable for the exposed soil conditions and to provide additional excavation and slope recommendations, as necessary. If the recommended temporary slope inclinations cannot be achieved, temporary shoring may be necessary to support excavations Permanent slopes should be planted with vegetation to both enhance stability and minimize erosion and should maintain a gradient of 2H:1 V or flatter. Structural Fill Structural fill is defined as compacted soil placed in foundation, slab-on-grade, roadway, permanent slope, retaining wall, and utility trench backfill areas. Structural fill placed and compacted during site grading activities should meet the following specifications and guidelines: • Structural fill material Granular soil • Moisture content At or slightly above optimum • Relative compaction (minimum) 95 percent (Modified Proctor) • Loose lift thickness (maximum) 12 inches Earth Solutions NW, LLC MJS Investors ES-9786 June 28, 2024 Page 8 The existing soil may not be suitable for use as structural fill unless the soil is at (or slightly above) the optimum moisture content at the time of placement and compaction. Soil shall not be placed dry of the optimum moisture content and should be evaluated by ESNW during construction. With respect to underground utility installations and backfill, local jurisdictions may dictate the soil type(s) and compaction requirements. Areas of unsuitable material (such as peat, organic-rich soil, and other debris) should be removed from structural areas and replaced with structural fill. In-situ and Imported Soil The in-situ soils encountered at the subject site have a high sensitivity to moisture and were generally in a moist to wet condition at the time of exploration. Soils anticipated to be exposed on site will degrade rapidly if exposed to wet weather and construction traffic. Compaction of the soils to the levels necessary for use as structural fill may be difficult to impossible during wet weather conditions. Soils encountered during site excavations that are excessively over the optimum moisture content will likely require aeration or treatment prior to placement and compaction. Conversely, soils that are substantially below the optimum moisture content will require moisture conditioning through the addition of water prior to use as structural fill. An ESNW representative should be requested to determine the suitability of in-situ soils for use as structural fill at the time of construction. Imported soil intended for use as structural fill should be evaluated by ESNW during construction. The imported soil must be workable to the optimum moisture content, as determined by the Modified Proctor Method (ASTM D1557), at the time of placement and compaction. During wet weather conditions, imported soil intended for use as structural fill should consist of a well-graded, granular soil with a fines content of 5 percent or less (where the fines content is defined as the percent passing the Number 200 sieve, based on the minus three-quarter-inch fraction). Wet-Season Grading The site soils are highly moisture sensitive; therefore, earthwork activities that occur during the wet season may require additional measures to protect both structural subgrades and soil intended for use as structural fill. Site-specific recommendations can be provided at the time of construction and may include leaving cut areas several inches above design subgrade elevations, covering working surfaces with crushed rock, protecting structural fill soil from adverse moisture conditions, and additional TESC recommendations. ESNW can assist in obtaining a wet season grading permit if required by the governing jurisdiction. Earth Solutions NW, LLC MJS Investors ES-9786 June 28, 2024 Page 9 Existing Fill Removal and Replacement At several of the test locations, loose existing fill containing variable amounts of organic debris was observed. The existing silty sand fill was encountered to depths of up to two feet bgs and the buried relic organic soils was observed to depths of up to three and one-half feet bgs. The existing fill is not suitable for structural support as is and should be removed and replaced with suitable structural backfill. The following is recommended for fill removal and replacement in structural areas. • Remove existing fill soil, segregate organic and deleterious material from mineral soil, stockpile, and protect from moisture; ESNW can evaluate suitability of remaining mineral soil for reuse as structural fill, if requested. • If moderate to heavy groundwater seepage is present following removal, place a layer of quarry spalls on the exposed subgrade and cover with filter fabric to establish a stable surface. • Begin mass grading with structural fill, utilizing the stockpiled existing fill if deemed suitable by ESNW. Aeration or cement treatment of existing fill may be necessary to meet the specifications for structural fill. Foundations The proposed residential structures constructed on this site can be supported on conventional spread and continuous footings bearing on competent (undisturbed) native soil, compacted native soil, or new structural fill placed directly on a competent subgrade. Due to the high moisture sensitivity of the site soils, foundation subgrade areas should be protected from wet weather or areas of remediation should be anticipated; a layer of crushed rock can be considered to protect foundation subgrade areas. If structural building pads are disturbed during wet weather, remediation measures such as overexcavation and replacement with rock may be necessary in some areas. An ESNW representative should be requested to confirm suitability of foundation subgrades at the time of construction. Provided the structure(s) will be supported as described above, the following parameters may be used for design of the new foundations: • Allowable soil bearing capacity 2,500 psf • Passive earth pressure 300 pcf • Coefficient of friction 0.40 Earth Solutions NW, LLC MJS Investors ES-9786 June 28, 2024 Page 10 A one-third increase in the allowable soil bearing capacity can be assumed for short-term wind and seismic loading conditions. The passive earth pressure and coefficient of friction values include a safety factor of 1.5. With structural loading as expected, total settlement in the range of one inch is anticipated, with differential settlement of about one-half inch. Most of the anticipated settlement should occur during construction as dead loads are applied. Retaining Walls Retaining walls must be designed to resist earth pressures and applicable surcharge loads. The following parameters may be used for retaining wall design: • Active earth pressure (unrestrained condition) 35 pcf • At-rest earth pressure (restrained condition) 55 pcf • Traffic surcharge (passenger vehicles) 70 psf (rectangular distribution) • Passive earth pressure 300 pcf • Coefficient of friction 0.40 • Seismic surcharge 8H psf* Where H equals the retained height(in feet). The passive earth pressure and coefficient of friction values include a safety factor of 1.5. Additional surcharge loading from adjacent foundations, sloped backfill, or other loads should be included in the retaining wall design. Retaining walls should be backfilled with free-draining material that extends along the height of the wall and a distance of at least 18 inches behind the wall. The upper 12 inches of the wall backfill may consist of a less permeable soil, if desired. Drainage should be provided behind retaining walls such that hydrostatic pressures do not develop. If drainage is not provided, hydrostatic pressures should be included in the wall design. A perforated drainpipe should be placed along the base of the wall and connected to an approved discharge location. A typical retaining wall drainage detail is provided on Plate 3. Earth Solutions NW, LLC MJS Investors ES-9786 June 28, 2024 Page 11 Seismic Design The 2021 International Building Code (2021 IBC) recognizes ASCE 7-16 (formally known as the Minimum Design Loads and Associated Criteria for Buildings and Other Structures manual) for seismic design, specifically with respect to earthquake loads. Based on the soil conditions encountered at the test pit and boring locations, the parameters and values provided below are recommended for seismic design per the 2021 IBC. Parameter Value Site Class C* Mapped short period spectral response acceleration, Ss (g) 1.044 Mapped 1-second period spectral response acceleration, Si (g) 0.372 Short period site coefficient, Fa 1.200 Long period site coefficient, F„ 1.500 Adjusted short period spectral response acceleration, SMs (g) 1.253 Adjusted 1-second period spectral response acceleration, SM1 (g) 0.559 Design short period spectral response acceleration, SIDS (g) 0.835 Design 1-second period spectral response acceleration, SD1 (g) 0.372 * Assumes very dense soil conditions, encountered to a maximum depth of 11 feet bgs during the April 2024 field exploration, remain very dense to at least 100 feet bgs. Based on our experience with the project geologic setting (glacial till) across the Puget Sound region, soil conditions are likely consistent with this assumption. Liquefaction Liquefaction is a phenomenon that can occur within a soil profile as a result of an intense ground shaking or loading condition. Most commonly, liquefaction is caused by ground shaking during an earthquake. Fine sand or silt soil profiles that are loose, cohesionless, and inundated with groundwater are most susceptible to liquefaction. During the ground shaking, the soil contracts, and porewater pressure increases. The increased porewater pressure occurs quickly and without sufficient time to dissipate, resulting in water flowing upward to the ground surface and a liquefied soil condition. Soil in a liquefied condition possesses very little shear strength in comparison to the drained condition, which can result in a loss of foundation support for structures. In our opinion, and consistent with the depiction on the referenced liquefaction susceptibility map, the native soils are characterized with a very low or negligible susceptibility to liquefaction. The composition and relatively high density of the native soil were the primary bases for this opinion. Earth Solutions NW, LLC MJS Investors ES-9786 June 28, 2024 Page 12 Slab-on-Grade Floors Slab-on-grade floors should be supported on a firm and unyielding subgrade consisting of competent native soil or at least 12 inches of new structural fill. Unstable or yielding areas of the subgrade should be recompacted or overexcavated and replaced with suitable structural fill prior to slab construction. A capillary break consisting of a minimum of four inches of free-draining crushed rock or gravel should be placed below the slab. The free-draining material should have a fines content of 5 percent or less defined as the percent passing the number 200 sieve, based on the minus three- quarter-inch fraction. In areas where slab moisture is undesirable, installation of a vapor barrier below the slab should be considered. If used, the vapor barrier should consist of a material specifically designed to function as a vapor barrier and should be installed in accordance with the manufacturer's specifications. Utility Support and Trench Backfill The soils observed at the subsurface exploration locations are generally suitable for support of utilities. Use of the native soil as structural backfill in the utility trench excavations will depend on the in-situ moisture content at the time of placement and compaction. If native soil is placed below the optimum moisture content, settlement will likely occur once wet weather impacts the trenches. As such, backfill soils should be properly moisture conditioned, as necessary, to ensure acceptability of the soil moisture content at the time of placement and compaction. Native soil will be difficult or impossible to use as utility trench backfill during extended wet weather conditions. In this respect, aeration or treatment of the soils may be necessary prior to use as structural fill. Utility trench backfill should be placed and compacted to the specifications of structural fill provided in this report or to the applicable requirements of the presiding jurisdiction. Preliminary Pavement Sections The performance of site pavements is largely related to the condition of the underlying subgrade. To ensure adequate pavement performance, the subgrade should be in a firm and unyielding condition when subjected to proof rolling with a loaded dump truck. Structural fill in pavement areas should be compacted to the specifications previously detailed in this report. Soft, wet, or otherwise unsuitable or yielding subgrade conditions will require remedial measures, such as overexcavation and/or placement of thick crushed rock or structural fill sections, prior to paving. Where applicable, we anticipate new pavement sections will be subjected primarily to passenger vehicle traffic. For lightly loaded pavement areas subjected primarily to passenger vehicles, the following preliminary pavement sections may be considered: • Two inches of hot-mix asphalt (HMA) placed over four inches of crushed rock base (CRIB), or; • Two inches of HMA placed over three inches of asphalt-treated base (ATB). Earth Solutions NW, LLC MJS Investors ES-9786 June 28, 2024 Page 13 Heavier traffic areas generally require thicker pavement sections depending on site usage, pavement life expectancy, and site traffic. For preliminary design purposes, the following pavement sections for occasional truck traffic and access roadways areas may be considered: • Three inches of HMA placed over six inches of CRIB, or; • Three inches of HMA placed over four-and-one-half inches of ATB. A representative of ESNW should be requested to observe subgrade conditions prior to placement of CRIB or ATB. As necessary, supplemental recommendations for achieving subgrade stability and drainage can be provided. Final pavement design recommendations, including recommendations for heavy traffic areas, access roads, and frontage improvement areas, can be provided once final traffic loading has been determined, upon request. Road standards utilized by the governing jurisdiction may supersede the recommendations provided in this report. The HMA, ATB, and CRIB materials should conform to WSDOT specifications. All soil base material should be compacted to a relative compaction of 95 percent, based on the laboratory maximum dry density as determined by ASTM D 1557. If on-site roads will be constructed with an inverted crown, additional drainage measures must be included in the road design to assist in maintaining road subgrade and pavement stability. ESNW can provide further consultation and design considerations regarding roadway drainage if inverted crowns will be included in the project design, upon request. Drainage Groundwater seepage will likely be encountered within site excavations depending on the time of year grading operations take place. Temporary measures to control surface water runoff and groundwater during construction would likely involve passive elements such as interceptor trenches, interceptor swales, and sumps. ESNW should be consulted during preliminary grading to identify areas of seepage and provide recommendations to reduce the potential for seepage- related instability. Finish grades must be designed to direct surface drain water away from structures and slopes. Water must not be allowed to pond adjacent to structures or slopes. In our opinion, a foundation drain should be installed along building perimeter footings. A typical foundation drain detail is provided on Plate 4. If buildings will incorporate crawl spaces rather than slab-on-grade, in our opinion, a crawl space drain system will provide adequate drainage in lieu of perimeter footing drains. The crawl space drain must provide positive drainage to an appropriate outlet. Earth Solutions NW, LLC MJS Investors ES-9786 June 28, 2024 Page 14 Infiltration Feasibility The City of Arlington adopts the Washington State Department of Ecology Stormwater Management Manual for Western Washington (2019 SWMMWW)for design and implementation of new stormwater facilities. Based on our review of the 2019 SWMMWW, limiting factors for on- site infiltration can be found in Volume V, Chapter 5, Section 5.6 "Site Suitability Criteria" (SSC); specifically, SSC-1 and SSC-5. The dense, cemented, and unweathered glacial till soils (hardpan) observed at depths beginning at about two to four feet bgs generally exhibit very poor soil infiltration characteristics, which is exhibited by the zones of perched groundwater seepage and iron oxide staining. In our opinion, the unweathered glacial soils should be considered impermeable for stormwater design purposes. The use of full infiltration systems for stormwater control is not recommended for this site. Detention Pond Recommendations ESNW understands a detention pond will be constructed near the western property boundary on parcel no. 31052600-100-200. ESNW should have the opportunity to review the proposed detention pond plans. Of particular concern is detention pond berm construction and preventing hydraulic communication with surrounding perched groundwater. Pond berms should include a keyway and material should be consistent with applicable governing jurisdiction specifications. Pond berm construction should be observed by ESNW representatives on a nearly full-time basis to ensure that the material placed is within specifications, geometry is consistent with the plans and to provide additional recommendations, where applicable. LIMITATIONS This study has been prepared for the exclusive use of MJS Investors and its representatives. The recommendations and conclusions provided in this study are professional opinions consistent with the level of care and skill that is typical of other members in the profession currently practicing under similar conditions in this area. A warranty is neither expressed nor implied. Variations in the soil and groundwater conditions observed at the exploration locations may exist and may not become evident until construction. ESNW should reevaluate the conclusions provided in this study if variations are encountered. Additional Services ESNW should have an opportunity to review final project plans with respect to the geotechnical recommendations provided in this report. ESNW should also be retained to provide testing and consultation services as needed during design and construction phases of the project. Earth Solutions NW, LLC MJS Investors ES-9786 June 28, 2024 Page 15 REFERENCES • Feasibly Exhibit, prepared by ESM Consulting Engineers, LLC, dated November 14, 2023 • Geologic Map of the Arlington West 7.5-minute Quadrangle, Snohomish County, Washington, by James P. Minard, dated 1985 • WSS, maintained by the Natural Resources Conservation Service under the USDA • Soil Survey of Snohomish County Area, Washington, by Debose and Klungland, United States Department of Agriculture, Soil Conservation Service, issued July, 1983 • Snohomish County Geologic Hazards Seismic Hazard Areas Map, dated February 1, 2016 • Snohomish County Geologic Hazards Mine Hazard Areas Map, dated February 1, 2016 • Liquefaction Susceptibility Map of Snohomish County, Washington, prepared by Palmer, S.P. et al., endorsed by the Washington State Department of Natural Resources, dated September 2004 • AMC Earth Solutions NW, LLC X LCalp x =� ❑ aQ'. e eAd v gI uxno 0 3tP Qaw-- o a po C3 x �Q � 182nd Street No ,. g rtheast_ oA g mmoo m�S o. � o gym❑°g °� `�£ e—e cane a A ° iol. �o❑op qo O. o Arlingto l p a DNbg =t�b aaa000Q O '�40 // g oo° rN. 21 °' Q7 a ❑ °$°Orio a '� ¢' e . �I le s -1 0 _ �_° g _ E_ P �f n Z • P 1751h Street UR c Nor[hea � QSP a r-- 3,v0t -�WA 531 —4 A 172nd ington _ ^ Po WA9 S[reet_Nor[heast_Ed ecomb� — —9 —172ndStreet NorfheasS•••—•-• -- r¢a SITE j�v o 168th Street Northeast 71 s`p�e L 'rheas[ I s ' McPherson m o :- l0 S O O C �? �762nd Street IV. j P sf n s 16Ith Street Northeast J ^ 158th Street Northeast I ISS[h Street Northeast -= WA9 Middle Fork Qui/ceda Creeks Marysville' Q ................../� �I r7Earth NORTHJut] ffioeering,Construction Reference: Snohomish County, Washington OpenStreetMap.org Vicinity Map Lindsay Annexation Arlington, Washington NOTE:This plate may contain areas ofcolor.ESNW cannot be Drawn MRS Date 06/13/2024 PrOj. No. 9786 responsible for any subsequent misinterpretation ofthe information resulting from black&White reproductions ofthis plate. Checked AZS Date June 2024 Plate 1 c � ------- ro- ----L__--- _ 0 N cn LEGEND c co 340, 380 ------------- -------- U � 390 T72ND STREET � NE. _ o Q ' P�1 —- TP-1 Approximate Location of �o ESNW Test Pit, Proj. No. , , ES-9786, April 2024 n �21 TP-1,8 1 r, i H ITP.75 Subject Site I'',j 4 0 ___- TP-I�� Existing Building W I 340' -"��_��-4i.y`-:.:;�i� 'J-��_� ,� � p I I�1 ------- 350 360 370 ' r- W 380'[', Pj�16 TP-171 — TP-4_1 ' _ -- NORTH �t ---------T -2 ` ■ 410 x 380,r, .�� I TI'-15 TP-6 I - • -1-4 TP �_- A 4 li ' 1 380 �390 �100 ' -1-2�� — ' ,`I P 0 150 300 -�� • TP-11 �"— y, ■ —, i i i I E I 1"=300' Scale in Feet 1 Y,P-7 1 1 r TP-9 1 TO 10'I — ■ — ,I I NOTE:The graphics shown on this plate are not intended for design purposes or precise scale measurements,but only to illustrate the • ' approximate test locations relative to the approximate locations of 400 existing and/or proposed site features.The information illustrated TP-S1� ' is largely based on data provided by the client at the time of our study.ESNWcannotbe responsible forsubsequent des changes ______ '� I `, i or interpretation ofthe data by others. Drawn 400 '�---- --=---- ----- ---- MRS 410 NOTE:This plate may contain areas of color.ESNW cannot be Checked responsible for any subsequent misinterpretation of the infomration AZS resulting from black&white reproductions of this plate. Date 06/12/2024 Proj. No. 9786 Plate 2 18" Min. o 0 o 0 o o 0 0o o o �O- 0 - .0o 0 0� ° o ��� ° B 0 00 P. ° oo o 0 0`0o oo �o 0 o o o 0 0 0�0oo o 0 o 0 0 6 a 0 0 0 0 0 0 0 � 0 oo % Oo0oo oo o o �0 ° 00 oo o o o 0 00 00000 o ° o o 0 o Structural o °o o o o 0 o 0 00000 ° ��� Fill 00 0o o o g 8 o oo o oo 00000 o o o po 0oo0 ° o o0 o 0 0 o O o 0 00 0 0 00 0 0 8 o0 a o 0 0 Ooo. 0 0 �o o o 0 o 0 •r.f• •r .r ti• .ti.ti. Perforated Rigid Drain Pipe NOTES: (Surround in Drain Rock) • Free-draining Backfill should consist of soil having less than 5 percent fines. Percent passing No. 4 sieve should be 25 to 75 percent. • Sheet Drain may be feasible in lieu SCHEMATIC ONLY- NOT TO SCALE of Free-draining Backfill, per ESNW NOT A CONSTRUCTION DRAWING recommendations. • Drain Pipe should consist of perforated, rigid PVC Pipe surrounded with 1-inch Drain Rock. LEGEND: Y po Solutions oo O 0 00 0o Free-draining Structural Backfill eotechnicaIFngineering,Construction �. servation/Testing and Fnvironmental Services •s•r•r•r• .r:}}0202 1-inch Drain Rock Retaining Wall Drainage Detail ti•ti•ti•ti Lindsay Annexation Arlington, Washington Drawn MRS Date 06/13/2024 Proj. No. 9786 Checked AZS Date June 2024 Plate 3 Slope ► 18" Miri. f•R f•f•f•f•f•. rtirti}ti}tirtirti} rti•ti•t•ti•ti•ti• •r•r•r•r•r• rti1�• ~•tiJ� •tif of Perforated Rigid Drain Pipe (Surround in Drain Rock) NOTES: • Do NOT tie roof downspouts to Footing Drain. SCHEMATIC ONLY- NOT TO SCALE • Surface Seal to consist of NOT A CONSTRUCTION DRAWING 12" of less permeable, suitable soil. Slope away from building. LEGEND: V Surface Seal: native soil or other low-permeability material. • ' • I J _ a ti 1.tif~r. 1-inch Drain Rock Footing Drain Detail Lindsay Annexation Arlington, Washington Drawn MRS Date 06/13/2022 Proj. No. 9786 Checked AZS Date June 2024 Plate 4 Appendix A Subsurface Exploration Logs ES-9786 Subsurface conditions on site were explored on April 2, 2024, by advancing 25 test pits using a machine and an operator retained by ESNW. The approximate locations of the test pits are illustrated on Plate 2 of this study. The test pit logs are provided in this Appendix. The test pits were advanced to a maximum depth of about 11 feet bgs. The final logs represent the interpretations of the field logs and the results of laboratory analyses. The stratification lines on the logs represent the approximate boundaries between soil types. In actuality, the transitions may be more gradual. Earth Solutions NW, LLC I a) Well-graded gravel with Moisture Content Symbols ��, GW or without sand, little to o .� O Dry Absence of moisture,dusty,d to Cement grout c 4 no fines y dry U j L 11 the touch ATD=At time surface seal of drilling O c 0 Bentonite 0 0 Lo oo° uoan Poorly graded gravel with Damp-Perceptible moisture,likely below chips Z Static water �o o v o O GP or without sand, little to optimum MC 1 no fines level(date) Grout > 0 Moist-Damp but no visible water, likely seal (D a) U at/near optimum MC - Filter pack with 0o ao o blank casing Silty gravel with or without section 0 0 a) o o GM Sand Wet-Water visible but not free draining, N �_ likely above optimum MC Screened casing or Hydrotip with U) O � o SaturatedNVater Bearing-Visible free filter pack - Z U) > Clayey gravel with or water,typically below groundwater table End cap O to GC LL ^ without sand a) a) 0 Terms Describing Relative Density and Consistency _ c Coarse-Grained Soils: Test Symbols&Units Well-graded sand with o a) $W Or without gravel, little to Density SPT blows/foot Fines=Fines Content rn o " a) a�°°°°°°°°°°° ( ) 0 0 M > c no fines Very Loose <4 UO o Loose 4 to 9 MC=Moisture Content(%) U (A a:•.::..:•.:.: M -- "t LO::,•;::::;.•. Poorly graded sand with DD-D Density cf a) o v :.:::;;.• $p or without gravel, little to Medium Dense 10 to 29 -Dry y(P ) (3) 0 Z no fines Dense 30 to 49 Str=Shear Strength(tsf) O a) Very Dense >_50 O Silty sand with or without PID=Photoionization Detector(ppm) M cn`.,.' 0 ":'`' SM Fine-Grained Soils: OC=Organic Content(%) c c::: ::•..:. gravel o Consistency. SPT blows/foot CEC=Cation Exchange Capacity(meq/100 g) C - NN Very Soft <2 M LL — Clayey sand with or LL=Liquid LimitU) ^ SC without gravel Soft 2 to 3 Medium Stiff 4 to 7 PL=Plastic Limit(%) o Silt with or without sand Stiff 8 to 14 PI=Plasticity Index(%) LO Very Stiff 15 to 29 C: ML or gravel; sandy or U gravelly silt Hard >_30 a� Clay of low to medium (3) U u, Component Definitions a>i � IS CL plasticity; lean clay with U) N .- or without sand or gravel; Descriptive Term Size Range and Sieve Number 00 E _ _ sandy or gravelly lean clay Boulders Larger than 12" — J Cn N U) Cobbles 3"to 12" �o zo _= GL Organic clay or silt of low plasticity Gravel 3"to No.4(4.75 mm) o (n J Coarse Gravel 3"to 3/4" c U — Fine Gravel 3/4"to No.4(4.75 mm) O Elastic silt with or without Sand No.4(4.75 mm)to No.200(0.075 mm) O 0 MH sand or gravel; sandy or Coarse Sand No.4(4.75 mm)to No. 10(2.00 mm) c O U) g gravelly elastic silt Medium Sand No. 10(2.00 mm)to No.40(0.425 mm) E 2 N 0 Fine Sand No.40(0.425 mm)to No.200(0.075 mm) 0 U o Clay of high plasticity; Silt and Clay Smaller than No.200(0.075 mm) CH fat clay with or without sand or gravel; sandy or Modifier Definitions U gravelly fat clay —_ Percentage by U) Weight(Approx.) Modifier _� Organic clay or silt of J OH medium to high plasticity <5 Trace(sand,silt,clay,gravel) I'llI'll5 to 14 Slightly(sandy,silty,clayey,gravelly) U rn C .o PT Peat, muck, and other 15 to 29 Sandy,silty,clayey,gravelly 2)U) — highly organic soils Q >_30 Very(sandy,silty,clayey,gravelly) Classifications of soils in this geotechnical report and as shown on the exploration logs are based on visual field and/or laboratory observations,which include density/consistency,moisture condition,grain size,and ii FILL Made Ground plasticity estimates,and should not be construed to imply field or laboratory testing unless presented herein. Visual-manual and/or laboratory classification methods of ASTM D2487 and D2488 were used as an identification guide for the Unified Soil Classification System. Y Earth Solutions NWuc Geoteehnieat Engineering,Construction EXPLORATION LOG KEY qWEObservatioa/Testing and Environmental Services .. 15365 NE 90th Street,Suite 100 TEST PIT NUMBER TP-1 Redmond,WA 98052 PAGE 1 OF 1 Office(425)449-4704 1 esnw.com Branch Office:Pasco, WA PROJECT NUMBER ES-9786 PROJECT NAME Lindsay Annexation DATE STARTED 4/2/24 COMPLETED 4/2/24 GROUND ELEVATION 402 ft EXCAVATION CONTRACTOR NW Excavating LATITUDE 48.15081 LONGITUDE -122.11826 LOGGED BY AZS CHECKED BY RAC GROUND WATER LEVEL: NOTES SZ AT TIME OF EXCAVATION SURFACE CONDITIONS Field grass AFTER EXCAVATION w _ ~w _ wv J TESTS Q O MATERIAL DESCRIPTION ❑ a-Z o Q O U) 0.0 Dark brown TOPSOIL TPSL ..\a 0.6 -roots,probed 9"-12" 401.4 Brown silty SAND with gravel,medium dense, moist to wet GB MC=39.1 SM 2.0 400.0 Gray silty SAND with gravel, medium dense to dense,moist 2.5 GB MC=16.7 -heavy iron oxide staining,probed 4" -weakly cemented,becomes dense to very dense SM -probed 1"-2" 5.0 GB MC=11.9 7.0 395.0 Test pit terminated at 7.0 feet below existing grade.No groundwater encountered during excavation. No caving observed. LIMITATIONS:Ground elevation(if listed)is approximate;the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum.Do not rely on this test log as a standalone document.Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. a N W N H N 7 H Z_ a c7 r rn J J W a x m J W Z W .. 15365 NE 90th Street,Suite 100 TEST PIT NUMBER TP-2 Redmond,WA 98052 PAGE 1 OF 1 Office(425)449-4704 1 esnw.com Branch Office:Pasco, WA PROJECT NUMBER ES-9786 PROJECT NAME Lindsay Annexation DATE STARTED 4/2/24 COMPLETED 4/2/24 GROUND ELEVATION 405 ft EXCAVATION CONTRACTOR NW Excavating LATITUDE 48.15008 LONGITUDE -122.11920 LOGGED BY AZS CHECKED BY RAC GROUND WATER LEVEL: NOTES SZ AT TIME OF EXCAVATION SURFACE CONDITIONS Field grass AFTER EXCAVATION w _ ~w _ wv J TESTS Q O MATERIAL DESCRIPTION ❑ a-Z o Q O U) 0.0 TPSL Dark brown TOPSOIL 0.5 -roots 404.5 Brown silty SAND with gravel,medium dense, moist SM 1.5 403.5 Gray silty SAND with gravel,dense to very dense, moist GB MC=19.5 -light groundwater seepage,probed 0"-1" 2.5 moderately cemented GB MC=10.3 5.0 SM 7.5 GB MC=11.0 8.0 397.0 Test pit terminated at 8.0 feet below existing grade.Groundwater seepage encountered at 2.0 feet during excavation. No caving observed. LIMITATIONS:Ground elevation(if listed)is approximate;the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum.Do not rely on this test log as a standalone document.Refer to the text of the geotechnical report for a N complete understanding of subsurface conditions. N H N 7 H Z_ a c7 r rn J J W a x m J W Z W .. 15365 NE 90th Street,Suite 100 TEST PIT NUMBER TP-3 Redmond,WA 98052 PAGE 1 OF 1 Office(425)449-4704 1 esnw.com Branch Office:Pasco, WA PROJECT NUMBER ES-9786 PROJECT NAME Lindsay Annexation DATE STARTED 4/2/24 COMPLETED 4/2/24 GROUND ELEVATION 412 ft EXCAVATION CONTRACTOR NW Excavating LATITUDE 48.14937 LONGITUDE -122.11820 LOGGED BY AZS CHECKED BY RAC GROUND WATER LEVEL: NOTES SZ AT TIME OF EXCAVATION SURFACE CONDITIONS Field grass AFTER EXCAVATION w _ ~w _ wv J TESTS Q O MATERIAL DESCRIPTION ❑ a-Z o Q O U) 0.0 Dark brown TOPSOIL TPSL i o 7 -roots,probed 18" 411.3 Brown silty SAND with gravel,loose to medium dense, moist to wet GB MC=47.0 SM 2.0 410.0 Gray silty SAND with gravel,dense,moist 2.5 -moderate groundwater seepage GB MC=17.3 -weakly cemented,light iron oxide staining probed 6" SM -probed 0"-1" 5.0 GB MC=11.1 7.0 405.0 Test pit terminated at 7.0 feet below existing grade.Groundwater seepage encountered at 2.0 feet during excavation. No caving observed. LIMITATIONS:Ground elevation(if listed)is approximate;the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum.Do not rely on this test log as a standalone document.Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. a N W N H N 7 H Z_ a c7 r rn J J W a x m J W Z W .. 15365 NE 90th Street,Suite 100 TEST PIT NUMBER TP-4 Redmond,WA 98052 PAGE 1 OF 1 Office(425)449-4704 1 esnw.com Branch Office:Pasco, WA PROJECT NUMBER ES-9786 PROJECT NAME Lindsay Annexation DATE STARTED 4/2/24 COMPLETED 4/2/24 GROUND ELEVATION 206 ft EXCAVATION CONTRACTOR NW Excavating LATITUDE 48.15034 LONGITUDE -122.11812 LOGGED BY AZS CHECKED BY RAC GROUND WATER LEVEL: NOTES SZ AT TIME OF EXCAVATION SURFACE CONDITIONS Field grass AFTER EXCAVATION w _ ~w _ wv J TESTS Q O MATERIAL DESCRIPTION ❑ a-Z o Q O U) 0.0 Dark brown TOPSOIL -probed 9"-12" 1.0 205.0 Brown silty SAND with gravel,loose to medium dense, moist to wet GB MC=34.1 [USDA Classification:very gravelly sandy LOAM] Fines=29.1 SM 2.5 3.0 203.0 Gray silty SAND with gravel,dense,moist to wet -probed 1"-2" GB MC=24.2 moderate iron oxide staining 5.0 SM moderately cemented, becomes very dense 7.5 M1 GB MC=12.2 7.5 198.5 Test pit terminated at 7.5 feet below existing grade.No groundwater encountered during excavation. No caving observed. LIMITATIONS:Ground elevation(if listed)is approximate;the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum.Do not rely on this test log as a standalone document.Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. a N W N H N 7 H Z_ a c7 r rn J J W a x m J W Z W .. 15365 NE 90th Street,Suite 100 TEST PIT NUMBER TP-5 Redmond,WA 98052 PAGE 1 OF 1 Office(425)449-4704 1 esnw.com Branch Office:Pasco, WA PROJECT NUMBER ES-9786 PROJECT NAME Lindsay Annexation DATE STARTED 4/2/24 COMPLETED 4/2/24 GROUND ELEVATION 402 ft EXCAVATION CONTRACTOR NW Excavating LATITUDE 48.15099 LONGITUDE -122.11931 LOGGED BY AZS CHECKED BY RAC GROUND WATER LEVEL: NOTES SZ AT TIME OF EXCAVATION SURFACE CONDITIONS Field grass AFTER EXCAVATION w _ ~w _ wv J TESTS Q O MATERIAL DESCRIPTION ❑ a-Z o Q O U) 0.0 Dark brown TOPSOIL TPSL:\"r . -probed 12"-16" -. 1.5 400.5 Brown silty SAND,loose to medium dense,moist GB MC=13.6 2.5 SM 3.5 398.5 Gray silty SAND with gravel,dense to very dense, moist -probed 0" tj GB MC=18.2 -moderately cemented 5.0 SM C'B MC=13.5 6.5 395.5 Test pit terminated at 6.5 feet below existing grade.No groundwater encountered during excavation. No caving observed. LIMITATIONS:Ground elevation(if listed)is approximate;the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum.Do not rely on this test log as a standalone document.Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. a N W N H N 7 H Z_ a c7 r rn J J W a x m J W Z W .. 15365 NE 90th Street,Suite 100 TEST PIT NUMBER TP-6 Redmond,WA 98052 PAGE 1 OF 1 Office(425)449-4704 1 esnw.com Branch Office:Pasco, WA PROJECT NUMBER ES-9786 PROJECT NAME Lindsay Annexation DATE STARTED 4/2/24 COMPLETED 4/2/24 GROUND ELEVATION 406 ft EXCAVATION CONTRACTOR NW Excavating LATITUDE 48.14958 LONGITUDE -122.11970 LOGGED BY AZS CHECKED BY RAC GROUND WATER LEVEL: NOTES SZ AT TIME OF EXCAVATION SURFACE CONDITIONS Field grass AFTER EXCAVATION w _ ~w _ wv J TESTS Q O MATERIAL DESCRIPTION ❑ a-Z o Q O U) 0.0 Brown silty SAND,loose,moist(Fill) SM -probed 16" 1.0 405.0 Dark brown TOPSOIL(Fill) TPSL 12.0 404.0 GB MC=25.0 Gray silty SAND with gravel,dense to very dense, moist to wet 2.5 -probed 0" -moderate iron oxide staining SM 5.0 GB MC=10.6 7.0 399.0 Test pit terminated at 7.0 feet below existing grade.No groundwater encountered during excavation. No caving observed. LIMITATIONS:Ground elevation(if listed)is approximate;the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum.Do not rely on this test log as a standalone document.Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. a N W N H N 7 H Z_ a c7 r rn J J W a x m J W Z W .. 15365 NE 90th Street,Suite 100 TEST PIT NUMBER TP-7 Redmond,WA 98052 PAGE 1 OF 1 Office(425)449-4704 1 esnw.com Branch Office:Pasco, WA PROJECT NUMBER ES-9786 PROJECT NAME Lindsay Annexation DATE STARTED 4/2/24 COMPLETED 4/2/24 GROUND ELEVATION 407 ft EXCAVATION CONTRACTOR NW Excavating LATITUDE 48.14899 LONGITUDE -122.12014 LOGGED BY AZS CHECKED BY RAC GROUND WATER LEVEL: NOTES SZ AT TIME OF EXCAVATION SURFACE CONDITIONS Field grass AFTER EXCAVATION w _ ~w _ wv J TESTS Q O MATERIAL DESCRIPTION ❑ a-Z o Q O U) 0.0 Brown silty SAND,loose,moist(Fill) SM -probed 12"-16" 1.5 405.5 Dark brown TOPSOIL(Fill) 2 5 TPSL 13.0 404.0 Gray silty SAND with gravel,dense to very dense, moist GB MC=19.3 -light groundwater seepage,probed 0" -heavy iron oxide staining 5.0 SM -strongly cemented GB MC=12.3 7.0 400.0 Test pit terminated at 7.0 feet below existing grade.Groundwater seepage encountered at 3.0 feet during excavation. No caving observed. LIMITATIONS:Ground elevation(if listed)is approximate;the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum.Do not rely on this test log as a standalone document.Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. a N W N H N 7 H Z_ a c7 r rn J J W a x m J W Z W .. 15365 NE 90th Street,Suite 100 TEST PIT NUMBER TP-8 Redmond,WA 98052 PAGE 1 OF 1 Office(425)449-4704 1 esnw.com Branch Office:Pasco, WA PROJECT NUMBER ES-9786 PROJECT NAME Lindsay Annexation DATE STARTED 4/2/24 COMPLETED 4/2/24 GROUND ELEVATION 407 ft EXCAVATION CONTRACTOR NW Excavating LATITUDE 48.14831 LONGITUDE -122.12005 LOGGED BY AZS CHECKED BY RAC GROUND WATER LEVEL: NOTES SZ AT TIME OF EXCAVATION SURFACE CONDITIONS Field grass AFTER EXCAVATION w _ ~w _ wv J TESTS Q O MATERIAL DESCRIPTION ❑ a-Z o Q O U) 0.0 Brown silty SAND,loose,moist -probed 12"-16" SM 1.5 405.5 Gray silty SAND with gravel,dense,moist GB MC=15.5 2.5 -heavy iron oxide staining,weakly cemented SM 5.0 GB MC=11.0 6.5 400.5 Test pit terminated at 6.5 feet below existing grade.No groundwater encountered during excavation. No caving observed. LIMITATIONS:Ground elevation(if listed)is approximate;the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum.Do not rely on this test log as a standalone document.Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. a N W N H N 7 H Z_ a c7 r rn J J W a x m J W Z W .. 15365 NE 90th Street,Suite 100 TEST PIT NUMBER TP-9 Redmond,WA 98052 PAGE 1 OF 1 Office(425)449-4704 1 esnw.com Branch Office:Pasco, WA PROJECT NUMBER ES-9786 PROJECT NAME Lindsay Annexation DATE STARTED 4/2/24 COMPLETED 4/2/24 GROUND ELEVATION 409 ft EXCAVATION CONTRACTOR NW Excavating LATITUDE 48.14870 LONGITUDE -122.11976 LOGGED BY AZS CHECKED BY RAC GROUND WATER LEVEL: NOTES SZ AT TIME OF EXCAVATION SURFACE CONDITIONS Field grass AFTER EXCAVATION w _ ~w _ wv J TESTS Q O MATERIAL DESCRIPTION ❑ a-Z o Q O U) 0.0 Brown silty SAND,very loose to loose,moist(Fill) -probed 24" GB MC=26.0 SM [USDA Classification:gravelly LOAM] Fines=41.5 -cobbles 2.0 407.0 Dark brown TOPSOIL(Fill) 2.5 TPSL -roots,probed 12" 3.0 406.0 Gray silty SAND with gravel,dense,moist -light groundwater seepage GB MC=19.7 -weakly cemented -probed 0" 5.0 SM GB MC=12.2 7.0 402.0 Test pit terminated at 7.0 feet below existing grade.Groundwater seepage encountered at 3.0 feet during excavation. No caving observed. LIMITATIONS:Ground elevation(if listed)is approximate;the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum.Do not rely on this test log as a standalone document.Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. a N W N H N 7 H Z_ a c7 r rn J J W a x m J W Z W .. 15365 NE 90th Street,Suite 100 TEST PIT NUMBER TP-10 Redmond,WA 98052 PAGE 1 OF 1 Office(425)449-4704 1 esnw.com Branch Office:Pasco, WA PROJECT NUMBER ES-9786 PROJECT NAME Lindsay Annexation DATE STARTED 4/2/24 COMPLETED 4/2/24 GROUND ELEVATION 404 ft EXCAVATION CONTRACTOR NW Excavating LATITUDE 48.14864 LONGITUDE -122.12066 LOGGED BY AZS CHECKED BY RAC GROUND WATER LEVEL: NOTES SZ AT TIME OF EXCAVATION SURFACE CONDITIONS Field grass AFTER EXCAVATION w _ ~w _ wv J TESTS Q O MATERIAL DESCRIPTION ❑ a-Z o Q O U) 0.0 Dark brown TOPSOIL TPSL i -probed 12" 0.7 403.3 Brown silty SAND,loose to medium dense,moist SM -light groundwater seepage 2.0 402.0 Gray silty SAND with gravel,dense,moist 2.5 -light groundwater seepage GB MC= 16.4 -iron oxide staining SM -moderately cemented, probed 0" 5.0 GB MC=10.4 6.5 397.5 Test pit terminated at 6.5 feet below existing grade.Groundwater seepage encountered at 2.0 feet during excavation. No caving observed. LIMITATIONS:Ground elevation(if listed)is approximate;the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum.Do not rely on this test log as a standalone document.Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. N W N H N 7 H Z_ a c7 r rn J J W a x m J W Z W .. 15365 NE 90th Street,Suite 100 TEST PIT NUMBER TP-11 Redmond,WA 98052 PAGE 1 OF 1 Office(425)449-4704 1 esnw.com Branch Office:Pasco, WA PROJECT NUMBER ES-9786 PROJECT NAME Lindsay Annexation DATE STARTED 4/2/24 COMPLETED 4/2/24 GROUND ELEVATION 404 ft EXCAVATION CONTRACTOR NW Excavating LATITUDE 48.14923 LONGITUDE -122.12054 LOGGED BY AZS CHECKED BY RAC GROUND WATER LEVEL: NOTES SZ AT TIME OF EXCAVATION SURFACE CONDITIONS Field grass AFTER EXCAVATION w _ ~w _ wv J TESTS Q O MATERIAL DESCRIPTION ❑ a-Z o Q O U) 0.0 Dark brown TOPSOIL(Fill) TPSL light groundwater seepage 1.5 402.5 Gray silty SAND with gravel,dense,moist GB MC=19.8 2.5 moderate iron oxide staining SM 5.0 GB MC=9.9 J 1.� 7.0 397.0 Test pit terminated at 7.0 feet below existing grade.Groundwater seepage encountered at 2.0 feet during excavation. No caving observed. LIMITATIONS:Ground elevation(if listed)is approximate;the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum.Do not rely on this test log as a standalone document.Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. N W N H N 7 H Z_ a c7 r rn J J W a x m J W Z W .. 15365 NE 90th Street,Suite 100 TEST PIT NUMBER TP-12 Redmond,WA 98052 PAGE 1 OF 1 Office(425)449-4704 1 esnw.com Branch Office:Pasco, WA PROJECT NUMBER ES-9786 PROJECT NAME Lindsay Annexation DATE STARTED 4/2/24 COMPLETED 4/2/24 GROUND ELEVATION 407 ft EXCAVATION CONTRACTOR NW Excavating LATITUDE 48.14930 LONGITUDE -122.12000 LOGGED BY AZS CHECKED BY RAC GROUND WATER LEVEL: NOTES SZ AT TIME OF EXCAVATION SURFACE CONDITIONS Field grass AFTER EXCAVATION w _ ~w _ wv J TESTS Q O MATERIAL DESCRIPTION ❑ a-Z o Q O U) 0.0 Dark brown TOPSOIL(Fill) -probed 12" TPSL 12.0 405.0 Gray silty SAND with gravel,dense,moist 2.5 GB MC=41.7 -light groundwater seepage -moderate iron oxide staining SM -weakly cemented 5.0 GB MC=11.7 7.0 400.0 Test pit terminated at 7.0 feet below existing grade.Groundwater seepage encountered at 2.0 feet during excavation. No caving observed. LIMITATIONS:Ground elevation(if listed)is approximate;the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum.Do not rely on this test log as a standalone document.Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. N W N H N 7 H Z_ a c7 r rn J J W a x m J W Z W .. 15365 NE 90th Street,Suite 100 TEST PIT NUMBER TP-13 Redmond,WA 98052 PAGE 1 OF 1 Office(425)449-4704 1 esnw.com Branch Office:Pasco, WA PROJECT NUMBER ES-9786 PROJECT NAME Lindsay Annexation DATE STARTED 4/2/24 COMPLETED 4/2/24 GROUND ELEVATION 403 ft EXCAVATION CONTRACTOR NW Excavating LATITUDE 48.14996 LONGITUDE -122.12029 LOGGED BY AZS CHECKED BY RAC GROUND WATER LEVEL: NOTES SZ AT TIME OF EXCAVATION SURFACE CONDITIONS Exposed soil AFTER EXCAVATION w _ ~w _ wv J TESTS Q O MATERIAL DESCRIPTION ❑ a-Z o Q O U) 0.0 TPSL Dark brown TOPSOIL, roots 0.5 -probed 12" 402.5 Brown silty SAND with gravel,loose,wet GB MC=78.5 SM 2.0 401.0 GB MC=24.0 Gray silty SAND with gravel,dense,moist 2.5 probed 0" -iron oxide staining SM 5.0 -becomes very dense,moderately cemented GB MC=8.5 7.0 396.0 Test pit terminated at 7.0 feet below existing grade.Groundwater seepage encountered at 2.0 feet during excavation. LIMITATIONS:Ground elevation(if listed)is approximate;the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum.Do not rely on this test log as a standalone document.Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. N W N H N 7 H Z_ a c7 r rn J J W a x m J W Z W .. 15365 NE 90th Street,Suite 100 TEST PIT NUMBER TP-14 Redmond,WA 98052 PAGE 1 OF 1 Office(425)449-4704 1 esnw.com Branch Office:Pasco, WA PROJECT NUMBER ES-9786 PROJECT NAME Lindsay Annexation DATE STARTED 4/2/24 COMPLETED 4/2/24 GROUND ELEVATION 389 ft EXCAVATION CONTRACTOR NW Excavating LATITUDE 48.14959 LONGITUDE -122.12214 LOGGED BY AZS CHECKED BY RAC GROUND WATER LEVEL: NOTES SZ AT TIME OF EXCAVATION SURFACE CONDITIONS Field grass AFTER EXCAVATION w _ ~w _ wv J TESTS Q O MATERIAL DESCRIPTION ❑ a-Z o Q O U) 0.0 TPSL . Dark brown TOPSOIL, roots b 0.6 388.4 Brown silty SAND,medium dense,wet GB MC=39.6 SM -probed 10" 2.5 3.0 386.0 Gray silty SAND with gravel,very dense,moist GB MC=12.7 -probed 0" 5.0 SM -strongly cemented GB MC=7.4 6.5 382.5 Test pit terminated at 6.5 feet below existing grade.No groundwater encountered during excavation. No caving observed. LIMITATIONS:Ground elevation(if listed)is approximate;the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum.Do not rely on this test log as a standalone document.Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. N W N H N 7 H Z_ a c7 r rn J J W a x m J W Z W .. 15365 NE 90th Street,Suite 100 TEST PIT NUMBER TP-15 Redmond,WA 98052 PAGE 1 OF 1 Office(425)449-4704 1 esnw.com Branch Office:Pasco, WA PROJECT NUMBER ES-9786 PROJECT NAME Lindsay Annexation DATE STARTED 4/2/24 COMPLETED 4/2/24 GROUND ELEVATION 400 ft EXCAVATION CONTRACTOR NW Excavating LATITUDE 48.14963 LONGITUDE -122.12124 LOGGED BY AZS CHECKED BY RAC GROUND WATER LEVEL: NOTES SZ AT TIME OF EXCAVATION SURFACE CONDITIONS Field grass AFTER EXCAVATION w _ w~ _ wv J TESTS 0-O MATERIAL DESCRIPTION ❑ �Z o Q O U) 0.0 Dark brown TOPSOIL(Fill) TPSL 1.6 398.4 Gray silty SAND with gravel,dense to very dense, moist GB MC=17.7 2.5 SM 5.0 GB MC=7.6 6.0 394.0 Test pit terminated at 6.0 feet below existing grade.No groundwater encountered during excavation. No caving observed. LIMITATIONS:Ground elevation(if listed)is approximate;the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum.Do not rely on this test log as a standalone document.Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. N W N H N 7 H Z_ a c7 r rn J J W a x m J W Z W .. 15365 NE 90th Street,Suite 100 TEST PIT NUMBER TP-16 Redmond,WA 98052 PAGE 1 OF 1 Office(425)449-4704 1 esnw.com Branch Office:Pasco, WA PROJECT NUMBER ES-9786 PROJECT NAME Lindsay Annexation DATE STARTED 4/2/24 COMPLETED 4/2/24 GROUND ELEVATION 400 ft EXCAVATION CONTRACTOR NW Excavating LATITUDE 48.15040 LONGITUDE -122.12091 LOGGED BY AZS CHECKED BY RAC GROUND WATER LEVEL: NOTES SZ AT TIME OF EXCAVATION SURFACE CONDITIONS Field grass AFTER EXCAVATION w _ ~w _ wv J TESTS Q O MATERIAL DESCRIPTION ❑ a-Z o Q O U) 0.0 Dark brown TOPSOIL TPSL N'. 0.7 399.3 Brown silty SAND with gravel,medium dense,wet GB MC=53.7 SM -probed 2" 2.5 2.5 397.5 Gray silty SAND with gravel,dense,moist -heavy groundwater seepage GB MC=14.0 -probed 0"-1" SM 5.0 6.5 393.5 Test pit terminated at 6.5 feet below existing grade.Groundwater seepage encountered at 2.5 feet during excavation. No caving observed. LIMITATIONS:Ground elevation(if listed)is approximate;the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum.Do not rely on this test log as a standalone document.Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. N W N H N 7 H Z_ a c7 r rn J J W a x m J W Z W .. 15365 NE 90th Street,Suite 100 TEST PIT NUMBER TP-17 Redmond,WA 98052 PAGE 1 OF 1 Office(425)449-4704 1 esnw.com Branch Office:Pasco, WA PROJECT NUMBER ES-9786 PROJECT NAME Lindsay Annexation DATE STARTED 4/2/24 COMPLETED 4/2/24 GROUND ELEVATION 403 ft EXCAVATION CONTRACTOR NW Excavating LATITUDE 48.15044 LONGITUDE -122.11984 LOGGED BY AZS CHECKED BY RAC GROUND WATER LEVEL: NOTES SZ AT TIME OF EXCAVATION SURFACE CONDITIONS Field grass AFTER EXCAVATION w _ ~w _ wv J TESTS Q O MATERIAL DESCRIPTION ❑ a-Z o Q O U) 0.0 Dark brown TOPSOIL TPSL i,.,i i; -probed 8"-10" 0.8 402.2 Brown silty SAND,loose to medium,moist to wet SM GB MC=43.7 2.0 401.0 Gray silty SAND with gravel,dense,moist 2.5 -moderate groundwater seepage -moderate iron oxide staining GB MC=11.5 [USDA Classification:very gravelly sandy LOAM] Fines=20.2 -moderately cemented SM 5.0 GB MC=8.3 7.0 396.0 Test pit terminated at 7.0 feet below existing grade.Groundwater seepage encountered at 2.0 feet during excavation. No caving observed. LIMITATIONS:Ground elevation(if listed)is approximate;the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum.Do not rely on this test log as a standalone document.Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. N W N H N 7 H Z_ a c7 r rn J J W a x m J W Z W .. 15365 NE 90th Street,Suite 100 TEST PIT NUMBER TP-18 Redmond,WA 98052 PAGE 1 OF 1 Office(425)449-4704 1 esnw.com Branch Office:Pasco, WA PROJECT NUMBER ES-9786 PROJECT NAME Lindsay Annexation DATE STARTED 4/2/24 COMPLETED 4/2/24 GROUND ELEVATION 400 ft EXCAVATION CONTRACTOR NW Excavating LATITUDE 48.15102 LONGITUDE -122.11972 LOGGED BY AZS CHECKED BY RAC GROUND WATER LEVEL: NOTES SZ AT TIME OF EXCAVATION SURFACE CONDITIONS Field grass AFTER EXCAVATION w _ ~w _ wv J TESTS Q O MATERIAL DESCRIPTION ❑ a-Z o Q O U) 0.0 Dark brown TOPSOIL probed 18" 1.0 399.0 Brown silty SAND with gravel,loose,wet GB MC=42.7 SM 2.5 3.0 397.0 Gray silty SAND with gravel,dense,moist to wet GB MC=17.7 -probed 0" 5.0 SM 7.5 IN GB I MC=11.6 8.0 392.0 Test pit terminated at 8.0 feet below existing grade.No groundwater encountered during excavation. No caving observed. LIMITATIONS:Ground elevation(if listed)is approximate;the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum.Do not rely on this test log as a standalone document.Refer to the text of the geotechnical report for a N complete understanding of subsurface conditions. N H N 7 H Z_ a c7 r rn J J W a x m J W Z W .. 15365 NE 90th Street,Suite 100 TEST PIT NUMBER TP-19 Redmond,WA 98052 PAGE 1 OF 1 Office(425)449-4704 1 esnw.com Branch Office:Pasco, WA PROJECT NUMBER ES-9786 PROJECT NAME Lindsay Annexation DATE STARTED 4/2/24 COMPLETED 4/2/24 GROUND ELEVATION 391 ft EXCAVATION CONTRACTOR NW Excavating LATITUDE 48.15143 LONGITUDE -122.12137 LOGGED BY AZS CHECKED BY RAC GROUND WATER LEVEL: NOTES SZ AT TIME OF EXCAVATION SURFACE CONDITIONS Field grass AFTER EXCAVATION w _ ~w _ wv J TESTS Q O MATERIAL DESCRIPTION ❑ a-Z o Q O U) 0.0 Dark brown TOPSOIL TPSL ..a robed 4" 0.6 p 390.4 Brown silty SAND,loose to medium dense,wet GB MC=40.8 SM 2.5 2.5 388.5 Gray silty SAND with gravel,dense to very dense, moist -light groundwater seepage GB MC=17.4 -probed 0" 5.0 SM -weakly cemented GB MC=9.0 7.0 384.0 Test pit terminated at 7.0 feet below existing grade.Groundwater encountered at 2.5 feet during excavation. No caving observed. LIMITATIONS:Ground elevation(if listed)is approximate;the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum.Do not rely on this test log as a standalone document.Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. N W N H N 7 H Z_ a c7 r rn J J W a x m J W Z W .. 15365 NE 90th Street,Suite 100 TEST PIT NUMBER TP-20 Redmond,WA 98052 PAGE 1 OF 1 Office(425)449-4704 1 esnw.com Branch Office:Pasco, WA PROJECT NUMBER ES-9786 PROJECT NAME Lindsay Annexation DATE STARTED 4/2/24 COMPLETED 4/2/24 GROUND ELEVATION 394 ft EXCAVATION CONTRACTOR NW Excavating LATITUDE 48.15067 LONGITUDE -122.12156 LOGGED BY AZS CHECKED BY RAC GROUND WATER LEVEL: NOTES SZ AT TIME OF EXCAVATION SURFACE CONDITIONS Field grass AFTER EXCAVATION w _ ~w _ wv J TESTS Q O MATERIAL DESCRIPTION ❑ a-Z o Q O U) 0.0 Dark brown TOPSOIL TPSL i,. a i; -probed 10" 0.8 393.2 Brown silty SAND,medium dense,wet SM GB MC=41.8 2.0 392.0 Gray silty SAND with gravel,dense,moist 2.5 -light groundwater seepage GB MC=16.8 -moderately cemented, probed 0" iron oxide staining SM 5.0 GB I MC=8.7 7.0 387.0 Test pit terminated at 7.0 feet below existing grade.Groundwater seepage encountered at 2.0 feet during excavation. No caving observed. LIMITATIONS:Ground elevation(if listed)is approximate;the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum.Do not rely on this test log as a standalone document.Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. N W N H N 7 H Z_ a c7 r rn J J W a x m J W Z W .. 15365 NE 90th Street,Suite 100 TEST PIT NUMBER TP-21 Redmond,WA 98052 PAGE 1 OF 1 Office(425)449-4704 1 esnw.com Branch Office:Pasco, WA PROJECT NUMBER ES-9786 PROJECT NAME Lindsay Annexation DATE STARTED 4/2/24 COMPLETED 4/2/24 GROUND ELEVATION 384 ft EXCAVATION CONTRACTOR NW Excavating LATITUDE 48.15110 LONGITUDE -122.12206 LOGGED BY AZS CHECKED BY RAC GROUND WATER LEVEL: NOTES SZ AT TIME OF EXCAVATION SURFACE CONDITIONS Field grass AFTER EXCAVATION w _ ~w _ wv J TESTS Q O MATERIAL DESCRIPTION ❑ a-Z o Q O U) 0.0 Dark brown TOPSOIL probed 12" 1.0 383.0 Brown silty SAND,medium dense,moist to wet GB MC=39.0 SM 2.0 382.0 Gray silty SAND,dense, moist 2•5 -probed 0" GB MC=19.5 -moderate iron oxide staining -weakly cemented SM 5.0 GB MC=8.7 7.0 377.0 Test pit terminated at 7.0 feet below existing grade.No groundwater encountered during excavation. No caving observed. LIMITATIONS:Ground elevation(if listed)is approximate;the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum.Do not rely on this test log as a standalone document.Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. N W N H N 7 H Z_ a c7 r rn J J W a x m J W Z W .. 15365 NE 90th Street,Suite 100 TEST PIT NUMBER TP-22 Redmond,WA 98052 PAGE 1 OF 1 Office(425)449-4704 1 esnw.com Branch Office:Pasco, WA PROJECT NUMBER ES-9786 PROJECT NAME Lindsay Annexation DATE STARTED 4/2/24 COMPLETED 4/2/24 GROUND ELEVATION 336 ft EXCAVATION CONTRACTOR NW Excavating LATITUDE 48.15084 LONGITUDE -122.12432 LOGGED BY AZS CHECKED BY RAC GROUND WATER LEVEL: NOTES SZ AT TIME OF EXCAVATION SURFACE CONDITIONS Field grass AFTER EXCAVATION w _ ~w _ wv J TESTS Q O MATERIAL DESCRIPTION ❑ a-Z o Q O U) 0.0 Brown silty SAND,loose,wet(Fill) SM -probed 18" 1.5 334.5 Dark brown TOPSOIL(Fill) 2.5 TPSL 13.5 332.5 Gray silty SAND with gravel,dense,moist -heavy groundwater seepage GB MC= 18.9 -probed 1" -light iron oxide staining 5.0 becomes medium dense to dense GB MC= 13.6 7.5 SM N 10.0 W N H [USDA Classification:gravelly sandy LOAM] GB MC=15.5 11.0 325.0 Fines=31.9 Test pit terminated at 11.0 feet below existing grade.Groundwater seepage encountered at 3.5 feet during excavation. No caving observed. LIMITATIONS:Ground elevation(if listed)is approximate;the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum.Do not rely on this test log as a standalone document.Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. J W a x m J W Z W .. 15365 NE 90th Street,Suite 100 TEST PIT NUMBER TP-23 Redmond,WA 98052 PAGE 1 OF 1 Office(425)449-4704 1 esnw.com Branch Office:Pasco, WA PROJECT NUMBER ES-9786 PROJECT NAME Lindsay Annexation DATE STARTED 4/2/24 COMPLETED 4/2/24 GROUND ELEVATION 347 ft EXCAVATION CONTRACTOR NW Excavating LATITUDE 48.15152 LONGITUDE -122.12423 LOGGED BY AZS CHECKED BY RAC GROUND WATER LEVEL: NOTES SZ AT TIME OF EXCAVATION SURFACE CONDITIONS Field grass AFTER EXCAVATION w _ ~w _ wv J TESTS Q O MATERIAL DESCRIPTION ❑ a-Z o Q O U) 0.0 Dark brown TOPSOIL TPSL ..a robed 10" 0.6 p 346.4 Brown silty SAND,loose to medium dense,moist GB MC=22.0 SM 2.5 3.0 344.0 Gray silty SAND with gravel,very dense,moist -light groundwater seepage GB MC=12.1 5.0 SM GB MC=19.2 7.0 340.0 Test pit terminated at 7.0 feet below existing grade.Groundwater seepage encountered at 3.0 feet during excavation. No caving observed. LIMITATIONS:Ground elevation(if listed)is approximate;the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum.Do not rely on this test log as a standalone document.Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. N W N H N 7 H Z_ a c7 r rn J J W a x m J W Z W .. 15365 NE 90th Street,Suite 100 TEST PIT NUMBER TP-24 Redmond,WA 98052 PAGE 1 OF 1 Office(425)449-4704 1 esnw.com Branch Office:Pasco, WA PROJECT NUMBER ES-9786 PROJECT NAME Lindsay Annexation DATE STARTED 4/2/24 COMPLETED 4/2/24 GROUND ELEVATION 368 ft EXCAVATION CONTRACTOR NW Excavating LATITUDE 48.15077 LONGITUDE -122.12301 LOGGED BY AZS CHECKED BY RAC GROUND WATER LEVEL: NOTES SZ AT TIME OF EXCAVATION SURFACE CONDITIONS Field grass AFTER EXCAVATION w _ ~w _ wv J TESTS Q O MATERIAL DESCRIPTION ❑ a-Z o Q O U) 0.0 Dark brown TOPSOIL probed 10" 1.0 367.0 Brown silty SAND with gravel,loose to medium dense, moist to wet GB MC=16.4 SM 2.5 -probed 6" 3.5 364.5 Gray silty SAND with gravel,dense,moist GB MC=15.8 -probed 0" 5.0 -moderately cemented SM 7.5 GB MC=14.7 8.0 360.0 Test pit terminated at 8.0 feet below existing grade.No groundwater encountered during excavation. No caving observed. LIMITATIONS:Ground elevation(if listed)is approximate;the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum.Do not rely on this test log as a standalone document.Refer to the text of the geotechnical report for a N complete understanding of subsurface conditions. N H N 7 H Z_ a c7 r rn J J W a x m J W Z W .. 15365 NE 90th Street,Suite 100 TEST PIT NUMBER TP-25 Redmond,WA 98052 PAGE 1 OF 1 Office(425)449-4704 1 esnw.com Branch Office:Pasco, WA PROJECT NUMBER ES-9786 PROJECT NAME Lindsay Annexation DATE STARTED 4/2/24 COMPLETED 4/2/24 GROUND ELEVATION 358 ft EXCAVATION CONTRACTOR NW Excavating LATITUDE 48.15139 LONGITUDE -122.12363 LOGGED BY AZS CHECKED BY RAC GROUND WATER LEVEL: NOTES SZ AT TIME OF EXCAVATION SURFACE CONDITIONS Field grass AFTER EXCAVATION w _ w~ _ wv J TESTS 0-O MATERIAL DESCRIPTION ❑ �Z o Q O U) 0.0 Dark brown TOPSOIL probed 8" 1.0 357.0 Brown silty SAND with gravel,medium dense, moist 2.5 SM GB MC= 15.0 4.0 354.0 Gray silty SAND with gravel,dense,moist 5.0 SM GB MC=11.1 6.0 352.0 Test pit terminated at 6.0 feet below existing grade. No groundwater encountered during excavation. No caving observed. LIMITATIONS:Ground elevation(if listed)is approximate;the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum.Do not rely on this test log as a standalone document.Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. N W N H N 7 H Z_ a c7 r rn J J W a x m J W Z W Appendix B Laboratory Test Results ES-9786 Earth Solutions NW, LLC ,. 15365 NE 90th Street,Suite 100 GRAIN SIZE DISTRIBUTION Redmond,WA 98052 NoOffice(425)449-4704 1 esnw.com Branch Office:Pasco, WA PROJECT NUMBER ES-9786 PROJECT NAME Lindsay Annexation U.S.SIEVE OPENING IN INCHES U.S.SIEVE NUMBERS I HYDROMETER 6 4 3 2 1 1/23/8 3 4 6 810 14 16 20 30 40 50 60 100 140 200 100 95 90 85 80 75 70 65 Lu 6 w 0 � 55 m w 50 z LL H 45 z w 40 w a 35 30 25 20 15 10 5- 0- 100 10 1 0.1 0.01 0.001 o GRAIN SIZE IN MILLIMETERS COBBLES GRAVEL SAND SILT OR CLAY coarse fine coarse medium fine z Specimen Identification Classification Cc CU a z • TP-04 1.50ft. USDA: Brown Very Gravelly Sandy Loam. USCS: SM with Gravel. m TP-09 1.00ft. USDA: Brown Gravelly Loam. USCS: SM with Gravel. z A TP-17 3.00ft. USDA: Gray Very Gravelly Sandy Loam. USCS: SM with Gravel. z a * TP-22 11.00ft. USDA: Gray Gravelly Sandy Loam. USCS: SM with Gravel. z z Specimen Identification D100 D60 D30 D10 LL PL PI %Silt F %Clay 6 • TP-04 1.5ft. 37.5 1.246 0.081 29.1 w o m TP-09 1.0ft. 19 0.287 41.4 w A TP-17 3.Oft. 37.5 2.37 0.164 20.2 N z * TP-22 11.0ft. 19 0.359 31.9 a