Loading...
HomeMy WebLinkAboutExhibit 1 - Lindsay Project 1 City Staff Report i Community and Economic Development Planning Division 18204 59th Avenue NE,Arlington,WA 98223 STAFF REPORT & RECOMMENDATION Lindsay Project 1 Preliminary Major Subdivision Conditional Use Permit - PJ 26-0104 --L J. --------------- — — L a` • - t \ - — --- _ _.. i }. ---_--A,-_--_ - �'' w T• Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 1 of 43 A. PROJECT DESCRIPTION AND REQUEST The applicant is proposing to construct a residential subdivision known as Lindsay Project 1 on 32.26 acres of the 80-acre Lindsay Subarea, on five existing parcels located at 8014, 8118, 8210 and 8326 172nd Street NE,Arlington,Washington, on parcel numbers 31052500200600, 31052600100100, 31052600100200, 31052600102200, and 31052600102300. The project will be constructed in conformance with the Lindsay Subarea Plan, Lindsay Subarea FEIS, Lindsay Subarea Planned Action Ordinance, MJS Investors Acquisition, LLC Development Agreement and vested Title 20 Zoning of the Arlington Municipal Code, as set forth in the Development Agreement. The Lindsay Project 1 community consists of 171 residential, small lot detached single-family homes on 3,600 to 4,500 square foot lots. The project improvements include a total of 342 parking stalls, located in garages and driveways of each home. Additional improvements and amenities include 124,320 square feet of Active Open Space,40,855 square feet of Passive Open Space, swing set, gazebo, picnic tables, benches, BBQ grills, trash receptacle, 335,374 square feet of critical area protection within a Native Growth Protection Area including direct and indirect wetland, stream and buffer impacts, as well as creation, restoration and enhancement of stream, wetlands and buffers, landscaping, stormwater combination system that includes full dispersion, bioretention, downspout dispersion, sidewalks, trail, new street system, street trees, right-of-way improvements and dedication, installation of a roundabout at the 80tb Avenue NE and 172nd Street intersection, and the project will be served by City of Arlington utilities improvements extended to the site. The existing project site consists of four residential single-family residential homes on five parcels that are zoned Residential Ultra Low Capacity (RULC) with Master Planned Neighborhood (MPN) Overlay.The development is proposing a Preliminary Major Subdivision that splits the property into 171 residential lots and 27 Tracts for residential useable space, open space, landscaping, NGPA, public and private streets, and dedication areas listed under Tracts 973 to 999 as shown on the subdivision maps. Development of this project area is subject to the City of Arlington Comprehensive Plan and Zoning Code that requires a subarea plan to be adopted prior to development, meeting the requirements of AMC 20.44.032. The proposed development shall meet the requirements and regulations approved within the Lindsay Subarea Plan, Lindsay Subarea FEIS and Planned Action Ordinance that were adopted by the Arlington City Council on February 2, 2026, under Ordinance No. 2026-004.The development is also subject to compliance with the Development Agreement between the City of Arlington and MJS Investors Acquisition, LLC approved by Arlington City Council on December 1, 2025, and recorded under AFN 202512110493. The proposed residential uses are allowed in the subject zone with the adopted Subarea Plan documents and Development Agreement. As such, the site and buildings will be reviewed utilizing AMC Title 20 Zoning, the Lindsay Subarea Plan, Lindsay Subarea FEIS, Lindsay Planned Action Ordinance and Development Agreement. This ensures that the building form, position, and site configuration are designed to integrate the elements of Subarea Plan to ensure a predictable outcome for future development. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 2 of 43 B. PROJECT HISTORY The application for a Preliminary Major Subdivision Conditional Use Permit was received on February 10, 2026. The application was deemed complete on February 11, 2026. The City issued a review comment letter on March 3, 2026. The applicant submitted revised plans and documents on March 17, 2026. The Notice of Application was issued on February 12, 2026, and was published in the City's official newspaper (The Herald), posted on site, emailed to required agencies, mailed to required parties, and posted on the City's website on February 17, 2026. A Neighborhood Meeting was held on March 4,2026. Notice for the Neighborhood Meeting was published in The Herald, posted on site, emailed to required agencies, mailed to required parties, and posted on the City's website on February 17, 2026. The City issued a Modified SEPA Decision confirming the project is within the scope of the Lindsay Subarea Plan and Planned Action EIS Ordinance on February 17, 2026, such that additional SEPA review was not warranted. The Modified SEPA Decision was posted on the City's website and emailed to required agencies on February 17, 2026. A Public Hearing is scheduled before the Hearing Examiner on April 28, 2026. The Notice of Public Hearing was posted on the site, emailed and mailed to required parties, posted on the City's website, and published in The Herald on April 10, 2026. C. GENERAL INFORMATION 1. Property Owners: John &Kelly Markenzinis,Joe & Patricia Matthias, Diana Basim and Cris Ewell 2. Applicant: MJS Investors 3. Contact: Land Technologies, Inc. 4. General Location: Southeast of the 79th Avenue NE and 172nd Street Intersection S. Address of Property: 8014, 8118, 8210 and 8326 172nd Street NE,Arlington,WA 6. Property Legal Description (Abbreviated): LOTS 1, 5, 6, AND 7, LARGE TRACT SEGRECATION NO. LTS (14-86) RECORDED UNDER RECORDING NO. 9003160385, BEING A PORTION OF THE NORTHEAST QUARTER OF THE NORTHEAST QUARTER OF SECTION 26,TOWNSHIP 31 NORTH, RANGE 5 EAST,W.M., IN SNOHOMISH COUNTY,WASHINGTON. TOGETHER WITH THE WEST HALF OF THE WEST HALF OF THE NORTHWEST QUARTER OF THE NORTHWEST QUARTER OF SECTION 25, TOWNSHIP 31 NORTH, RANGE 5 EAST, W.M., IN SNOHOMISH COUNTY,WASHINGTON EXCEPT THEREFROM ANY PORTION WITHIN 172ND STREET NE (SISCO HEIGHTS ROAD). 7. Property Tax ID Numbers: 31052500200600, 31052600100100, 310526001002000, 31052600102200, 31052600102300 8. Topographical Description: The existing site is relatively flat. 9. Soil Type: Tokul gravelly medial loam, 0 to 8 percent slopes. 10. Acreage: 32.26 acres Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 3 of 43 11. Comprehensive Plan Land Use Designations, Zoning Designation and Existing Land Uses of the Site and Surrounding Area: Area Land Use Designation Zoning Existing Use Residential Ultra Low Single-Family Project Site Capacity and Master Planned RULC & MPN Residential Neighborhood Overlay North of Site Residential Low Capacity RLC Single-Family Residential South of Site Snohomish County R 5 Commercial Use Rural 5-Acres and Vacant Residential Ultra Low East of Site Capacity and Master Planned RULC & MPN Vacant Neighborhood Overlay Residential Ultra Low Single-Family West of Site Capacity and Master Planned RULC & MPN Residential Neighborhood Overlay 12. Public Utilities and Services: Water: City of Arlington Gas: Cascade Natural Gas Sewer: City of Arlington supplies to Puget Sound Police: City of Arlington Energy service area Fire: North County Regional Storm On-Site Infiltration & Fire Authority Water: Dispersion Electricity: Snohomish County PUD #1 Cable: Xfinity/ Comcast School: Arlington School District Telephone: Xfinity/ Comcast Hospital: Cascade Valley Garbage: Waste Management NW 13.Applicable Land Use Code Regulations: ■ AMC Chapter 20.16 Permits and Land Division Approval ■ AMC Chapter 20.24 Hearing and Pre-Hearing Procedures for Appeals and Applications ■ AMC Chapter 20.36 Zoning Districts and Zoning Map ■ AMC Chapter 20.38 Airport Protection District ■ AMC Chapter 20.40 Permissible Uses ■ AMC Chapter 20.44 Supplemental Uses ■ AMC Chapter 20.46 Design ■ AMC Chapter 20.56 Streets and Sidewalks ■ AMC Chapter 20.60 Utilities ■ AMC Chapter 20.72 Parking ■ AMC Chapter 20.76 Screening and Trees ■ AMC Chapter 20.90 Concurrency and Impact Fees ■ AMC Chapter 20.93 Critical Areas Ordinance ■ AMC Chapter 20.98 State Environmental Policy Act ■ AMC Chapter 13.28 Stormwater Utility ■ Lindsay Subarea Plan ■ Lindsay Subarea Final Environmental Impact Statement ■ Lindsay Subarea Planned Action Ordinance ■ MJS Investors Development Agreement Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 4 of 43 14.Proposed Use:The proposed project is a preliminary major subdivision for residential,small lot detached single-family homes following the Lindsay Subarea Plan and Planned Action EIS adopted under Ordinance No. 2026-004. The property is zoned Residential Ultra Low Capacity with Master Planned Neighborhood Overlay. A Conditional Use Permit is required for this project per AMC 20.40.120 Residential Zones Permissible Use Table. 15.Surrounding Land Uses and Land Use Permits: Surrounding properties of the subject parcel are zoned Residential Ultra Low Capacity with Master Planned Neighborhood to the east and west, Residential Low Capacity to the north, and Snohomish County Rural - 5 to the south. The property abuts 172nd Street/SR531 to the north and 79th Avenue to the west. Vr 414 --------------------------------------- ------- --------------------------------------- ------- / ------------------------------- --------------------------- ------- ---------------------—-------------------- ------------------------- -------- ----------------------------------------- ------------------------ �- --------------------------------------�------ ---— - --------- -------- Subject Site 1 f RLC=Residential Low Capacity RULC=Residential Ultra Low Capacity r___ Master Planned Neighborhood hk GC=General Commercial / Mixed Use Overlay Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 5 of 43 16.Compatibility and Impacts on Existing Development: The proposed development meets the required densities for the City of Arlington as required by the Comprehensive Plan and the Washington State Growth Management Act.The Neighboring properties to the west, east and portion of the south within the city limits are zoned Residential Ultra Low Capacity with Master Planned Neighborhood Overlay and are part of the overall Lindsay Subarea Plan, except for the east property that is vacant Tribal Land. The properties to the north of the site consist of single-family residences zoned Residential Low Capacity. These properties are separated by 172nd Street/SR531. The properties to the south consist of a commercial use and vacant property within Snohomish County's jurisdiction zoned Rural 5-acres. A stream and wetland buffer encompasses the southern property line and off-site along the western edge of the proposed project that will be enhanced and protected. The proposed development will add additional vehicular trips to the local roads; however, the applicant constructing a new roundabout at 801h Avenue NE and 172nd Street/SR530 and improving a portion of 791h Avenue to public road standards on the east side of the street. Pedestrian and bicycle access will be provided to the site from new public road connections for non- motorized travel options that provide connection points to a future public trail on the north side of 172nd Street/SR531 connects that will connect to the Centennial Trail to the west and SR9 to the east. Minor light pollution may be visible from adjacent properties. 17. Compatibility with Lindsay Subarea Plan 2.3 Goals and Policies: Development and Goal/Objectives Description Summary Design Objectives Goal 1 Accommodate planned housing growth within the subarea that aligns with citywide goals. Goal 2 Encourage high-quality, pedestrian-oriented design that prioritizes walkability,safety,accessibility, and opportunities for social connection. Goal 3 Advance Arlington's tree canopy goals and climate resilience strategies. Objectives 1 Update development and design standards to support a mix of housing types that meet the evolving needs of Arlington's households. Objectives 2 Protect the privacy of individual properties while encouraging shared spaces that promote social interaction. Integrate parks and common open spaces into neighborhoods to create Objectives 3 accessible areas for informal gathering, recreation,and neighborly interaction. Objectives 4 Preserve existing mature trees where feasible and require tree retention and tree planting. Objectives 5 Require landscaping to minimize impervious surface area,increase green space, and enhance aesthetics. Transportation Goal/Objectives Description Summary Develop a safe,comfortable,and accessible transportation network for Goal 1 people of all ages and abilities-whether walking,biking,rolling (e.g., wheelchairs and mobility devices),or driving. Goal 2 Design the transportation network with the capacity and flexibility to support future growth and evolving travel needs. Goal 3 Use complete street design to improve connectivity,support multimodal travel,and strengthen neighborhood identity. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 6 of 43 Transportation Goal/Objectives Description Summary Goal 4 Reduce reliance on single-occupancy vehicles by promoting active transportation. Goal 5 Integrate sustainable design in transportation infrastructure to minimize environmental impacts. Coordinate with WSDOT to improve SR531 (172nd Street NE)to enhance Objectives 1 safety,expand capacity for increased traffic volumes,and provide safe access for all users. Develop a cohesive network of sidewalks,shared paths,and trails to Objectives 2 ensure safe and comfortable multimodal connections throughout the neighborhood. Prioritize safety of children and other vulnerable people by separating Objectives 3 paths for people from fast-moving vehicles- encouraging play and independent neighborhood travel. Objectives 4 Connect to regional trail systems,expanding recreational access and mobility options. Objectives 5 Implement traffic calming measures on internal roadways to slow traffic and enhance pedestrian comfort. Parks and Trails Goal/Objectives Description Summary Goal 1 Create a cohesive green space and trail network Goal 2 Improve access to nature and promote opportunities for both active and passive recreation. Goal 3 Encourage environmental stewardship and habitat preservation through thoughtful park and trail design. Goal 4 Design parks and trails as community gathering spaces that foster social interaction and inclusion. Objectives 1 Dedicate at least 10% or more of the total land area (minus NGPA)to recreation facilities,parks,and trails. Objectives 2 Integrate the trails with the broader green space system to provide continuous,accessible pathways throughout the neighborhood. Objectives 3 Create flexible,multi-functional active green spaces that accommodate a variety of activities such as play,events,and quiet reflection. Objectives 4 Design parks to respond to the site's natural features,incorporating native vegetation,stormwater features,and topography. Natural Goal/Objectives Description Summary Environment Goal 1 Protect and enhance wetlands,critical areas,and their buffers to maintain ecosystem services. Goal 2 Restore the health of Edgecomb Creek and its tributaries. Goal 3 Protect fish and wildlife habitat in the subarea. Objectives 1 Preserve the Native Growth Protection Area (NGPA) and critical areas and their associated buffers. Objectives 2 Implement wetland mitigation plan and protect the wooded wetland. Objectives 3 Partner with the Tulalip Tribes to restore fish passage and ecological functions of Edgecomb Creek. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 7 of 43 Utilities Goal/Objectives Description Summary Goal 1 Manage stormwater through integrated systems that support healthy natural environment. Goal 2 Serve the area with adequate infrastructure. Objectives 1 Manage stormwater with green stormwater infrastructure where feasible to filter and reduce runoff and support wetland health. Objectives 2 Coordinate with utilities to meet future capacity needs and support long-term development. Objectives 3 Integrate utility corridors with multifunctional uses (e.g.,trails,habitat corridors,or greenways) where appropriate. 18. Compatibility with the Comprehensive Plan: Goal/Policy Goal/Policy Description Summary E-1 Preserve and enhance open space,natural,and cultural resources and strive for equitable geographic and demographic distribution. E-1.1 Protect and enhance the natural environment while planning for and accommodating growth. Locate development in a manner that minimizes impacts to natural features. E-1.5 Promote the use of innovative environmentally sensitive development practices, including design,materials,construction,and on-going maintenance. E 2 Promote environmental justice by not creating or worsening environmental health disparities and ensuring equal access to environmental resources. E-2.1 Ensure that all residents,regardless of race,social,or economic status,have clean air,clean water,and other elements of a healthy environment. E-5 Identify,protect,and enhance natural areas to foster resiliency to climate impacts,as well as areas of vital habitat for safe passage and species migration. Designate and protect fish and wildlife habitat corridors and restrict the E-5.1 fragmentation of large natural plant communities that provide essential and significant wildlife habitat. Manage open space lands comprised of critical areas as native growth areas and E-5.3 kept in a natural state to maintain existing habitat value. In the case of degraded or impacted lands,these areas may be enhanced to provide a higher value. E-5.4 Preserve existing and native vegetation as much as possible to support wildlife systems,increase groundwater infiltration,and prevent stormwater runoff. E-5.9 Use the best information available at all levels of planning,especially scientific information,when establishing and implementing environmental standards. Reduce stormwater impacts from transportation and development through E-5.13 watershed planning,redevelopment and retrofit projects,and low impact development. Protect and restore wetlands and corridors between wetlands to provide E-5.16 biological and hydrological connectivity that fosters resilience to climate impacts. Ensure no net loss of ecosystem composition,structure,and functions,especially E-5.21 in Priority Habitats and Critical Areas,and strive for net ecological gain to enhance climate resilience. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 8 of 43 Goal/Policy Goal/Policy Description Summary E-10 Work towards and maintain an aesthetically pleasing environment that enhances livability for residents. E-10.1 Incorporate and preserve street trees in the streetscape where they don't adversely affect roadway capacity,safety,or structural integrity. LU-1 Provide unique places and context for growth of social capital and community resiliency. LU-1.4 Encourage development patterns that provide safe and welcoming environments for walking and bicycling. Identify,protect,and enhance community resiliency to climate change impacts, LU-6 including social,economic,and built environment factors,that support adaptation to climate impacts consistent with environmental justice. Development patterns shall be responsive to critical areas and other LU-6.3 environmental factors,while minimizing the fragmentation of the built environment. Promote energy conservation by developing incentives and/or requirements for LU-7 energy saving transportation,land development patterns and practices,and building construction and operation methods and materials. Use innovative development standards,design guidelines,regulatory incentives, LU-7.3 and applicable low-impact development measures to provide compact,high- quality communities. LU-9 Encourage a mix of residential densities throughout the city. All recommended changes in residential densities shall be evaluated on the following: a) The overall impact to surrounding properties; LU-9.1 b) The general impact to the existing transportation network; c) The availability and capacity of urban services and utilities in the area; d) Consistency with Growth Management Act's growth targets and buildable land supply. LU-9.2 Develop design standards and land use regulations to ensure compatibility of residential densities and surrounding non-residential uses. H-1 Encourage quality and diverse housing stock within the city. H-1.1 Maintain a supply of land zoned to accommodate a variety of housing types and densities. H-1.2 Allow and encourage the development of moderate density and middle housing in single-family residential zones to increase the variety in housing types. H-10 Work towards ensuring all Arlington residents have access to a healthy active lifestyle. H-10.1 Encourage new residential development to include community gardens and green spaces to promote outdoor recreation. H-10.2 Encourage new residential developments to include fitness and recreational amenities,such as gyms,pools,and sports facilities,for residents'use. P-3 Thoroughly mitigate impacts to the parks,recreation,and open space system. Require new residential development to mitigate impacts through payment of P-3.1 GMA parks impact fees,dedication of properties,and improvements for public use to serve the growing demand on the parks,recreation,and open space system citywide. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 9 of 43 Goal/Policy Goal/Policy Description Summary Utilize the parks and recreation system to protect unique environmental P-5 qualities,natural amenities,wildlife habitats, forest lands,and scenic areas within the city. P 5 2 Locate,plan,and manage parks and recreation facilities so they enhance wildlife habitat,minimize erosion impacts,and complement the natural site features. P-5.3 Encourage passive recreation activities on non-critical area (usable) open space lands. Ensure the equity and availability of potential funding streams and provide transportation improvements consistent with the Capital Improvement Plan in T-2 prioritizing and financing.Prioritize programs and projects that provide access to opportunities while preventing or mitigating negative impacts to people of color,people with low incomes,and people with special transportation needs. Require developers to construct those streets directly serving new development T-2.3 and to pay a proportionate share of the costs for specific off-site improvements necessary to mitigate any adverse impacts determined through the review to be created by the development. T-6 Implement Travel Demand Management and Transit Oriented Design to create a more walkable city. T-6.5 Encourage and plan for"pedestrian-scale"neighborhoods and centers to enhance access and mobility for active transportation users. Create a resilient transportation system,minimize environmental impacts caused by the transportation system,and promote energy conservation by T-7 development incentives and/or requirements for energy saving transportation, land development patterns and practices,and building construction and operation methods and materials. Provide for the efficient movement of traffic through advanced traffic control measures,intelligent transportation systems (ITS)technologies,speed management,access management,channelization improvements and T-7.9 multimodal design features.Use advanced technologies to better manage traffic volumes on major arterials and improve the efficiency and coordination of traffic signals.Aggressively pursue improvements to the state highways through or near Arlington. Plan,develop,and maintain a balanced multimodal transportation system for T-8 the efficient movement of people,goods,and services within the city and between the community and other activity centers in the region. Ensure that safe,convenient,and efficient multimodal transportation facilities T-8.1 are provided for all residents and visitors to the city,including accessibility improvements to existing facilities as well as improvements to serve growth areas. Implement the adopted Complete Streets Program to ensure that all T-8.4 transportation projects include safe and appropriate facilities for pedestrians, bicyclists,transit users accommodating persons of all ages and abilities. Ensure concurrency by providing an effective multimodal transportation T-9 network with adequate capacity to meet the demand for travel within the city at the adopted Level of Service (LOS) standard. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 10 of 43 Goal/Policy Goal/Policy Description Summary Ensure that all development permits require transportation improvements in accordance with Arlington's ability to provide and/or maintain the adopted levels of service. Transportation dedications and improvements for projects that exceed the T-9.1 existing level of service shall be in place with the final approval of a subdivision or short plat or at the time of final building inspection for non-subdivision projects. In lieu of immediate installation of such improvements,and as a condition of permit approval by the city,a performance bond or other security mechanism may be provided by the developer guaranteeing installation within six years of final approval. T-13 Consider the special needs of subarea transportation facilities including appearance and safety. Improving the appearance of existing corridors shall be a priority and primary T-13.2 objective in designing and maintaining the street system in Arlington. Appropriate design standards,including landscape requirements,for the construction of new streets shall be maintained. Ensure capital facilities and utilities are provided consistent with Growth CFU-3 Management Act provisions and the concurrency management system provides public facilities through public and private development activities in a manner that is compatible with the fiscal resources of the city. Condition development permits on facilities being in place as the impacts of the development occur,or within six years (or sooner, depending on the facility), CFU-3.1 whichever is to the greatest benefit to the city.A development permit includes any official city action that affects the permitting of land and the city is not obligated to approve per city regulations.The city should consider the variation in the different types of development permits and be flexible in adherence. CFU-3.2 Any infrastructure improvements needed to serve a proposed development should be installed prior to the issuance of the related building permit. The City of Arlington should not issue any development permits that result in a CFU-3.3 reduction of the transportation level-of-service standards for the public facilities identified in the Capital Facilities Book without mitigation. Require that new developments mitigate traffic impacts through at least two of the following methods as deemed acceptable by the city or as many as are CFU-3.4 deemed necessary through the permitting process and supporting traffic analysis: dedication of right-of-way,frontage improvements,or traffic mitigation fees. Plan for growth and development to be consistent with the city's most recently CFU-3.5 adopted Capital Facilities Plan for providing public facilities including streets, sidewalks,lighting systems,traffic signals,water,storm and sanitary sewer,and parks and recreation facilities. CFU-3.12 Any costs associated with water extensions or system requirements necessary to provide that water,shall be borne by the person(s) requesting such service. Manage stormwater pursuant to the Stormwater Management Manual for CFU-7 Western Washington as adopted by Arlington,preserving and supplementing,as necessary,the natural drainage ways and other natural hydraulic systems to minimize runoff impacts from development. CFU-7.5 Utilize Low Impact Development standards that provide stormwater benefits and support naturally occurring functions simultaneously. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 11 of 43 19.Public Notification: Issuance Meeting Notice Type Date Date Distribution Notice of Complete 2/11/2026 N/A Property Owner/Applicant Application Property Owner/Applicant Notice of Application Property Owners (within 500ft) &Neighborhood Meeting 2/17/2026 3/4/2026 On-Site&Website Affected Agencies The Herald-published- 12/4/2025 Modified SEPA Property Owner/Applicant 2/17/2026 N/A Affected Agencies Decision Website Property Owner/Applicant Property Owners (within 500ft) Notice of Public Hearing 4/10/2026 4/28/2026 On-Site&Website Party of Record The Herald-published-4/10/2026 20.Public Comments: The City received one (1) comment during the Notice of Application and Modified SEPA Decision public comment period for the subject project. After reviewing the comments, City staff forwarded the comments to the applicant for their review. The public comment received was from Washington State Department of Transportation (WSDOT) and stated that their department has been working with the City of Arlington and the project applicant on this project. See Exhibit32. D. ENVIRONMENTAL REVIEW The City issued a Modified SEPA Decision per the Lindsay Subarea Plan and Planned Action EIS Ordinance on February 17, 2026, confirming the project is within the scope of the Planned Action EIS Ordinance such that no further SEPA review is warranted. The Modified SEPA Decision was posted on the City's website and emailed to required agencies on February 17, 2026. E. FINDINGS OF FACT Sections "A"through"D" are incorporated into the Findings of Fact.Applicable Review Criteria and Process for the Preliminary Major Subdivision Conditional Use Permit request is subject to review for conformity with the Arlington Municipal Code (AMC), including but not limited to the following: Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 12 of 43 Regulation I Analysis Meets Chapter 20.16 AMC,Permits and Final Plat Approval 20.16.100 (b) Conditional Use Permits are issued The applicant submitted a preliminary under this title only when a review of the major subdivision conditional use permit. application submitted,including plans contained The city provides a staff report to the therein,indicates that the development will Hearing Examiner,and the Hearing comply with the provisions of this title if Examiner is responsible for the permit Yes completed as proposed.All developments shall decision.The decision is appealable to occur strictly in accordance with such approved Snohomish County Superior Court. plans and applications. 20.16.110 Who May Submit Permit Applications. The project applicant and contract (a)Applications for zoning,special use, purchaser,MJS Investors,and the owners conditional use,or sign permits or subdivision of the subject parcels:John&Kelly plat approval will be accepted only from persons Markenzinis,Joe&Patricia Matthias, having the legal authority to act in accordance Diana Basim and Cris Ewell each signed with the permit or the subdivision plat approval. the permit application submitted to the By way of illustration,in general this means that city. Yes applications should be made by the owners or lessees of property,or their agents,or persons who have contracted to purchase property contingent upon their ability to acquire the necessary permits under this title. 20.16.120 Official Representative of the The project applicant, MJS Investors,has Applicant.The applicant for each land use permit designated Merle Ash of Land shall designate an official representative,which Technologies,as the official may be himself,to receive all correspondence, representative for the subject permits. Yes determinations,and notices regarding the application. 20.16.140 Submittal of Application. The project applicant scheduled a (a) To minimize development planning costs, submittal intake appointment with the avoid misunderstanding or misinterpretations, Community and Economic Development and ensure compliance with the requirements of Department and submitted the this title,a submittal intake appointment is applications on February 10, 2026. Yes required between the developer and the Community Development staff as provided in this section. 20.16.150 Vesting of Permits. The project is vested to the specific (1) Land use permit applications shall be provisions of the Development considered vested on the date that an application Agreement and the Code in effect as of is deemed complete pursuant to 20.16.205 and the date of the Development Agreement, applications shall be processed under the land December 15,2025,per Section II(C) of use regulations in effect on that date. However, the Development Agreement recorded subsequent permits on the same property are under AFN202512110493. not vested on this date. The required impact fees for the proposal Yes (2) Filing of a permit application does not vest do not vest with the project and the fee in the payment of fees. Fees due,including impact place at the time of payment is the mitigation fees,application fees,or other amount due. charges,shall be those fees in effect on the date the fee is paid in accordance with the most current city council fee resolution. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 13 of 43 Regulation Analysis Meets 20.16.170 Completing Developments in Phases The applicant provides subdivision plans (a) If a development is constructed in phases,the that show Project 1 (lots 1-167) split into provisions of 20.16.320 and 20.16.340 shall Phase 1 and Phase 2,along with the apply to each phase as if it were the entire infrastructure required to complete this development. project in two phases.The Developer (b)As a prerequisite to subsection (a),the Agreement under 11. L.addresses Yes developer shall submit plans that clearly show Development in Multiple Phases. the various phases or stages of the proposed development and the requirements of this title that will be satisfied with respect to each phase or stage. 20.16.200 Applications to Be Complete. The applicant submitted a complete (a)All applications for zoning,special use, application for the Lindsay Project 1 conditional use,or sign permits must be preliminary major subdivision Yes complete before the permit-issuing authority is conditional use permit. required to consider the application. 20.16.205 (c) Complete Application.Within 28 The application was submitted on days of receiving the permit application,the February 10, 2026.The City issued a Community Development Director shall mail or Notice of Complete Applications on Yes provide in person a written determination to the February 11, 2026.The Notice was issued applicant. within the 28-day timeframe. 20.16.210 Burden of Presenting Evidence. The submittal materials prepared and (c) The burden of persuasion on the issue of provided by the applicant have whether the development,if completed as adequately demonstrated compliance Yes proposed,will comply with the requirements of with applicable zoning regulations and this title remains at all times on the applicant. the Lindsay Subarea Plan. 20.16.215 Distribution of Application.Upon The applications were routed to all receipt of a conditional use permit application, effected city departments on February the Planning Official shall,in addition to all 10,2026 and the resubmittal on March interested City Department,send a copy of the 17,2026. Yes application to the authorities and agencies reviewing or furnishing water,fire,school,and sanitary sewer service to the proposed project. 20.16.225 Conditional Use Permits. (a)An The preliminary major subdivision application for a conditional use permit shall be conditional use permit was submitted to submitted to the Hearing Examiner by filing a city staff and reviewed for compliance copy of the application with the Community and with the Arlington Municipal Code.The Economic Development Director in the planning project application documents were sent Yes department. to the Hearing Examiner on April 10, 2026,for review prior to the public hearing. 20.16.230 Notice of Application Filed.The The city issued a Notice of Application on Community and Economic Development Director February 12, 2026.The notice was shall give public notice of any application filed published in the Everett Herald,posted for a conditional use permit by issuing, on the site,city website,post office,city distributing,and advertising a"Notice of hall,Arlington library,and mailed to all Yes Application Filed". property owners within 500 feet of the property on February 17, 2026.The comment period ran until March 3, 2026. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 14 of 43 Regulation Analysis Meets 20.16.235 Neighborhood Meetings for The city issued a Notice of Neighborhood Conditional Use Permits Required.All Meeting on February 12, 2026.The notice applications for conditional use permits shall be was advertised in the Everett Herald, publicly scoped through a public neighborhood posted on the site,city website,post meeting. office,city hall,Arlington library,and Yes mailed to all property owners within 500 feet of the property on February 17, 2026.The Neighborhood Meeting was held on March 4, 2026. 20.16.265 Fire Code Official Approval Prior to The proposed project provides Issuance of Permits.No zoning,special use,or compliance with AMC Title 15.The conditional use permit shall receive final proposed single-family residences are approval until the Fire Code Official has verified required to comply with Section that the provisions of AMC Title 15 are satisfied. 15.24.040(7) with the installation of Yes automatic fire sprinkler systems per the International Residential Code and International Fire Code at the time of Building Permit submittal. 20.16.270 Time Limitations for Permit The proposed Lindsay Project 1 Processing. Preliminary Major Subdivision (a)(3)A notice of final decision for conditional Conditional Use Permit followed the use permits,major (ten lots or more) timeline below: plats/subdivisions,binding site plans,and unit lot subdivisions (permits that require public Action Date notice and public hearings) shall be issued within Application Submitted 2-10-2026 170 days of the determination of complete application. Notice of Complete 2-11-2026 (b) The number of days an application is in Application review with the city shall be calculated from the 1st Comments Issued 3-3-2026 day completeness is determined under RCW 36.70B.070 to the date a final decision is issued 2nd Submittal 3-17-2026 on the project permit application.The number of Yes days shall be calculated by counting every Public Hearing 4-28-2026 calendar day and excluding the following time periods: The public hearing is scheduled on day (1)Any period between the day that the city has 62 of the project review timeline. notified the application that additional information is required and the day when information is resubmitted by the applicant. (2)Any period after the applicant would like to suspend the project permit application. (3)Any period after an administrative appeal. (4)Any period during an EIS is being prepared following a DS. (5)Any extension of time mutually agreed upon. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 15 of 43 Regulation Analysis Meets 20.16.320 No Occupancy,Use,or Sale of Lots The proposed project is required to Until Requirements Fulfilled.Issuance of a complete Civil improvements,As-Builts, conditional use permit authorizes the recipient and Final Subdivision prior to lots within to commence the activity resulting in a change in the subdivision sold and buildings are use of the land or to commence work designed to occupied with the following exceptions: construct,erect,move,or substantially alter (a) The applicant may construct and buildings or other substantial structures or to occupy residential homes for the first make necessary improvements to a subdivision. 55 lots prior to completion of the However,except as provided in§20.16.330, roundabout at 80th Avenue and 172nd §20.16.340,§20.16.170,the intended use may Street/SR531 and the frontage not be commenced,no building may be occupied, improvements along 172nd and in the case of subdivisions,no lots may be Street/SR531 per the analysis sold until all of the requirements of this title and completed by Transpo,dated March all additional requirements imposed pursuant to 7, 2026,showing the project's traffic the issuance of a conditional use permit have impact to the existing intersection. been complied with. (b) The applicant may bond certain Yes improvements within the project, such as Landscaping,Streetlights,and Final Lift. (c) Five Model homes,representing the five original parcels,are allowed to be constructed at the sole risk of the applicant within Phase 1 or Phase 2 of the Lindsay Project 1 Subdivision. Model home construction may commence with the following completed improvements: roads constructed to final subgrade,fire protection via charged hydrant serving models and storm facilities serving model lots in place. 20.16.400 Regulation of Major,Minor and Unit The proposed major unit lot subdivision Lot Subdivisions. Major and minor subdivisions conditional use permit is the first step in are subject to a two-step approval process. the subdivision process.After the civil Physical improvements to the land to be construction permit is issued and all subdivided are authorized by a conditional use correlating improvements have been Yes permit or zoning permit,respectively as made the site,the applicant may apply for provided in Part I through Part III of 20.16 of this final major unit lot subdivision. article,and sale of lots is permitted after final plat approval as provided in 20.16.425. 20.16.410 No Subdivision without Plat Approval. The proposed project is required to (a) No person may subdivide his land except in receive Final Subdivision approval per accordance with all the provisions of this §20.16.425 prior to recording.A Final Title.No person may subdivide his land Subdivision may be recorded for Phase I unless and until a final plat of the subdivision and Phase 2 separately,if all required has been approved in accordance with the improvements for each of the phases provisions of§20.16.425 and recorded with have been completed. Yes Snohomish County Auditor. (b)The Snohomish County Auditor may not record a plat of any subdivision within the city's planning jurisdiction unless the plat has been approved in accordance with the provisions of this Title. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 16 of 43 Regulation Analysis Meets Chapter 20.24 AMC,Hearing and Pre-Hearing Procedures for Appeals and Applications 20.24.010 Hearing Required on Appeals and The proposed Lindsay Project 1 Applications. (a) Before making a decision on an Preliminary Major Subdivision is subject application for a conditional use permit,a to a Public Hearing before the Hearing Yes hearing shall be held on the matter by the Examiner for the proposed permit. appropriate hearing body. 20.24.020 Public Notice.The Community and The city issued a Notice of Public Hearing Economic Development Director shall give public on April 10, 2026.The notice was notice of any hearing required by§20.24.010 or advertised in the Everett Herald,posted §20.16.230 for special use permits,conditional on the site,city website,post office,city use permits or variances,or any other required hall,Arlington library,mailed to all Yes public notices. property owners within 500 feet of the property,and emailed Party's of Record on April 10, 2026.The Public Hearing is scheduled for April 28, 2026. Chapter 20.36 AMC,Zoning Districts and Zoning Map 20.36.010 Residential Districts Established. The subject property for the proposed (b) The Residential Ultra Low Capacity(RULC) preliminary major subdivision district is established primarily to accommodate conditional use permit is zone Residential detached single-family residential development Ultra Low Capacity.The project is located in areas not currently serviced by public sewer within the Lindsay Subarea Plan adopted Yes and water facilities. Larger lots are required to by City Council under Ordinance No. accommodate a septic system and reserve area 2026-004,which allows for the proposed as required by the Snohomish Health District. residential housing types and density. 23.36.054 Master Planned Neighborhood The subject property for the proposed Overlay District Established. preliminary major subdivision The Master Planned Neighborhood (MPN) conditional use permit is under the district is hereby established as an"overlay" Master Planned Neighborhood,which district,meaning that this district is overlaid requires all development to follow upon other districts and the land so encumbered §20.44.032,which requires a subarea may be used in a planner permitting in the plan to be approved prior to project Yes underlying district only if and to the extent such permits.The project is subject to the use complies with the requirements of Lindsay Subarea Plan and Planned Action §20.44.032 Subarea Plan.Thereafter,this overlay EIS adopted by City Council under district shall be removed from the property for Ordinance No. 2026-004. which the master plan is approved by the City Council. Chapter 20.38 AMC,Airport Protection District 20.38.060 Airport Protection District The property is located under Airport Boundaries. Protection District-Subdistrict C. (a)Airport Protection Subdistrict A (b)Airport Protection Subdistrict B Yes (c)Airport Protection Subdistrict C (d)Airport Protection Subdistrict D Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 17 of 43 Regulation Analysis Meets 20.38.090 Notice to Future Owners.To mitigate The applicant is required to place the impacts to the Arlington Airport,and to provide Arlington Municipal Airport Avigation notice to future property owners,all property Easement on the face of the Final owners within the Airport Protection Subdivision.A separate avigation Subdistricts A, B,and C seeking a land use or easement is not required to be recorded building permit or undertaking substantial for the subject development proposal. reconstruction shall dedicate an avigation Yes easement over their property to the City of Arlington.The language of the easement and notice shall be provided by the airport,as approved by the city attorney,and recorded with Snohomish County. Chapter 20.40 AMC,Permissible Uses 20.40.010 Table of Permissible Uses.The Tables The proposed major subdivision is of Permissible Uses sets forth the permissible allowed use per the permissible use table uses within the respective zoning classifications within the Residential Ultra Low Capacity in the city,subject to other applicable provisions (RULC) zone,as shown below,with a in this title. It should be read in close conjunction conditional use permit. Yes with the definitions of terms set forth in section 20.08 and the other interpretative provisions set forth in this article. Chapter 20.40.120 AMC,Residential Zones Permissible Use Table Use RULC RLC RMOD RMC RHC OTR1 Subdivision Major C C C C C C Single-Family Residence,Detached ZV ZV ZV ZV • C=Conditional Use Permit per requirements of 20.40.020. • ZV=Zoning Verification per requirements of 20.40.020. • 1=Subject to the old town residential design standards. Chapter 20.46 AMC,Design 20.46.010 Conformance with Design Standards. The preliminary major subdivision shall (a) Structures within the following zones are meet the requirements of the subject to the relevant design standards adopted Development Design Standards and the in this chapter. No building or land use permit deviations approved in Lindsay Subarea shall be issued for structures or uses that do not Plan in Chapter 3 Development and conform to the applicable standards. Design Standards at the time of Yes (1) Zones Administrative Design Review (M) Residential Ultra Low Capacity application.The design is required to be approved prior to the submittal of building permit applications. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 18 of 43 Regulation Analysis Meets Chapter 20.56 AMC,Streets and Sidewalks 20.56.015 Complete Streets. The applicant submitted a Complete (a) The city will,to the maximum extent Streets Checklist.The checklist was practical,implement complete streets.For this reviewed,and city staff agrees that the section,"complete streets"means streets that intent of the complete streets policy has provide appropriate facilities to meet the been met. mobility needs of people of all ages and abilities The proposed development includes the who are walking,bicycling,riding transit, following improvements: driving,and transporting goods. . Construction of an interim (b) The application of complete streets may roundabout at the 80th Avenue and require the property owner or developer to 172nd Street/SR531 intersection. install additional improvements for the • Curb,gutter,sidewalk,and installation of certain street types or provide landscape planter strip along the additional right-of-way dedication depending on south side of 172nd Street/SR531. the location of a proposed project and the . Curb,gutter,sidewalk,and Yes surrounding areas level of street improvements. landscape planter strip along the The applicant is required to work with the east side of 79th Avenue. community and economic development . New public right-of-way and private department regarding the specific type of street streets within the subdivision are required. proposed to have curb,gutter, (c) Complete streets will be implemented sidewalk and planter strips where through the scoping,planning, designing, applicable per the type of street building,operating,and maintaining an constructed. integrated and connected transportation system. • The proposed project includes both public roads listed on the site plans (d)All development projects shall submit a as 1715Y Street NE, Road A, Road B, complete streets checklist with permit Road C,and subdivision entrances application and follow the complete streets from 172nd Street and a private road policy. listed as Road D. 20.56.020 Costs of Right-of-Way Installation and The applicant or developer of the Improvements Borne by Applicant.When rights- proposed project is financially of-way improvements are required or volunteer responsible for the construction of all in conjunction with permit approval,all costs, improvements on 172nd Street/SR531,a and expenses incident to the installation of the section of 79th Avenue per the Yes improvement to be dedicated to the public shall Development Agreement,and all roads be borne by the applicant. within the proposed subdivision.These improvements are required to be approved and constructed through a Civil Permit. 20.56.030 Access to Lots. Every lot shall have The proposed project provides vehicular, access to it that is sufficient to afford a pedestrian,and bicycle access to the reasonable means of ingress and egress for property from the existing public street emergency vehicles as well as for all those likely of 172nd Street/SR531 to 79th Avenue NE to need or desire access to the property in its and to new public and private internal intended use.Access includes vehicular, street system throughout the site. Yes pedestrian,bicycle,and other common forms of transportation. The proposed project is constructing infrastructure that will connect to a future trail system on the north side of 172nd Street/SR531. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 19 of 43 Regulation Analysis Meets 20.56.050 Entrances to Streets. (a)All driveway The proposed preliminary major entrances and other openings onto streets within the subdivision provides driveway access city's planning jurisdiction shall be constructed so to each building lot from the new that: public road system or the internal 1.Vehicles can enter and exit from the lot in question private drive aisle.The proposed without posing any substantial danger to themselves, project complies with the following pedestrians,or vehicles traveling in abutting streets, City of Arlington Standards and and Specifications: 2. Interference with the free and convenient flow of . The vehicles entry/exit from each traffic in abutting or surrounding streets is individual lot does not pose a minimized. danger to themselves, Yes 3. Driveway cuts shall be limited so the narrowest pedestrians,or vehicles. width necessary to provide safe ingress and egress . The proposed driveways will not onto and from the property. interfere with the flow of traffic. 4. Driveways shall not be located adjacent to one . The proposed entrances are another in such a manner as to create a"double within the required width and width"driveway without any landscaping between provide safe access to the site. the driveways. . The driveways shall not be located adjacent to one another to create a double driveway width, unless landscaping is provided. 20.56.060 Neighborhood Access and Coordination The development consists of 171 with Surrounding Streets. small lot single-family residences and (a)All developments which shall create or cause to is required to have a minimum of two exist more than forty-nine dwelling units or more or access points that do not result in a non-residential developments that may attract one dead-end. The proposal includes hundred fifty or more people shall have more than three access points from 172nd one point of access to the surrounding public streets. Street/SR 530. For the purposes of this section,an emergency access (crash gate) shall not be considered a The applicant has provided a future vehicular access point,and a boulevard shall be access point at the northeast portion considered one access point. of the property to connect to the (c) The street system of a subdivision shall be property to the east. coordinated with existing,proposed,and anticipated streets outside the subdivision or outside the portion The internal street layout of the of a single tract that is being divided into lots as subdivision provides multiple access provided in this section. points from all homes. Yes (d) Collector streets shall intersect with surrounding collector or arterial streets at safe and convenient locations. (e) Local collectors and local access streets shall connect with surrounding streets where necessary to permit the convenient movement of traffic between residential neighborhoods or to facilitate access to neighborhoods by emergency service vehicles or for other sufficient reasons. (0 Whenever connections to anticipated or proposed surrounding streets are required by this section,the street right-of-way shall be extended and the street developed to the far property line of the subdivided property at the point where the connection to the anticipated or proposed street is expected. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 20 of 43 Regulation Analysis Meets 20.56.080 Street Width,Sidewalk,and Drainage The proposed project is located on Requirements in Subdivisions. the south side of a minor arterial (a) Street rights-of-way are designed and developed known as 172nd Street/SR531.The to serve several functions: (i)to carry motor vehicle applicant is constructing a traffic,and in come cases,allow on-street parking; roundabout at the 80th Avenue and (ii)to provide a safe and convenient passageway for 172nd Street/SR531 intersection. pedestrian traffic; and (iii) to serve as an important link in the City's drainage system. The project has complied with the (b)All existing and planned arterial or larger streets Transportation Plan and is dedicating which the city deems necessary for the completion of all public streets after construction is the City's transportation system are shown and completed. classified in the City's Transportation Plan. However, that list is non-exhaustive,and a permit applicant The proposed improvements to may propose other streets. existing and new public streets (c)Any permit application shall be reviewed for include curb,gutter,sidewalk, conformance with the Transportation Plan.If a landscape strips and street trees. planned street is shown to run through or adjacent to a property proposed for development,the The proposed improvements to new proposal must include a roadway system in general private streets include a sidewalk on conformance to this plan,including the dedication of one side and no planter strips. appropriate full or half-street right of way for the street. All proposed sidewalks are shown as (d)All public streets shall be constructed with curb, 5 feet in width. Yes gutter,sidewalk,landscape strips and street trees. Only standard vertical curb may be used. Street pavement width shall be measured from curb face to curb face. (e) Private roads may construct sidewalks through one of the following options and at the discretion of the community and economic development director: (1) Vertical curb,sidewalk,and gutter; or (2) Rolled curb to sidewalk; or (3) At grade concrete sidewalk abutting asphalt drive aisle for visual separation; or (4) At grade asphalt sidewalk with painted line for separation; or (5) At grade alternative sidewalk treatment approved by the Community and Economic Development Director. (f) Sidewalks required by this section shall be at least 5 feet in width,on both sides of streets,and constructed according to the specifications set forth in the"Public Works Construction Standards and Specifications." 20.56.100 Dead End Streets/Cul-De-Sacs. The proposed project shows two (a) Dead-end streets shall be avoided.Cul-de-sacs dead-end streets.The one at the may be used only when conditions warrant their use. northeast corner is a temporary Maximizing the number of lots in a project does not dead-end that provides for a future Yes warrant their use.Where roads have a potential for connection to the property on the extending to adjacent properties and creating east and one at the southeast portion connections (either current or future) they should do of the lot that ends in a cul-de-sac. SO. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 21 of 43 Regulation Analysis Meets 20.56.100 Dead End Streets/Cul-De-Sacs. The cul-de-sac could potentially (b)When allowed under subsection (a),all connect to the property on the east if permanent dead-end streets shall be developed as feasible in the future. cul-de-sacs in accordance with the standards set The cul-de-sac dimensions as shown forth in subsection (d). on the preliminary civil plans meet (c) Except for where no other practicable alternative the requirements of Table 20.56-1 is available, such street may not extend more than but only provides a sidewalk on a 600 feet(measured to the center of the turnaround). portion of the south side of the cul- (d) The right of way of a cul-de-sac shall be that identified in Table 20.56-1 and shown below. de-sac that terminates at Lot 41.The Yes remaining sides of the cul-de-sac • ROW Width: 60' borders residential open space and • Pavement Width: 49' NGPA. • Inside Radius: 27.8' • Number of Lanes: 2 • Vertical Curb/Gutter: 6" • Planting Strip: 5' • Sidewalk: 5' 20.56.120 Street Intersections. (a) Streets shall The proposed preliminary major unit intersect at 80'to 90°.Not more than two streets lot subdivision provides 90' shall intersect at any one point or vary from the intersections at all access points. Yes above angle of connections. 20.56.130 Construction Standards and The proposed project is subject to a Specifications. Construction and design standards Civil permit prior to the installation and specifications for streets,sidewalks,and curbs of improvements on the site and a and gutters are contained in the"Public Works Right-of-Way permit prior to the Yes Construction Standards and Specifications,"and all installation of improvement within such facilities shall be completed in accordance with the public right-of-way. these standards. 20.56.155 Private Roads. The proposed preliminary major (a) Private Roads shall be contained in an easement subdivision provides a private road or tract and will be allowed when: on the site and shown on the site (1)A covenant that provides for maintenance and plans as Road D. repair of the private road by property owners has been approved by the city and recorded with All maintenance of the private road Snohomish County; and system is the responsibility of the (2) The covenant includes a condition that the property owner and/or Homeowners private road will remain open at all times for Association. emergency and public service vehicles; and (3) The private road would not hinder public street The private roads within the circulation; and development do not hinder public (4)All of the following conditions must be met: street circulation. Yes (A) The Community and Economic Development Director determines that due to physical site constraints or preexisting development no other reasonable access is available.The proposed private road would be adequate for transportation and fire access needs,and the private road would be compatible with the surrounding neighborhood character; and (C)Adequate looped road is proposed. (5)Absent any of the above conditions,public streets are required. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 22 of 43 Regulation Analysis Meets 20.56.160 Public Streets and Private Roads in The project proposes one private Subdivisions. road,shown as Road D within the (a)All lots created after the effective date of this subdivision.The private road meets section shall abut a public street at least to the extent all requirements of§20.56.155 as necessary to comply with the access requirements described under the regulation above. set forth in§20.56.030.For purposes of this subsection,the term"public street"includes a preexisting public street as well as a striate created Yes by the subdivider that meets the public street standards of this title and is dedicated for public use. The recordation of a plat shall constitute an offer of dedication of such street. (b) Private roads shall not be allowed in subdivided residential developments unless the requirements of §20.56.155 are met. 20.56.200 Attention to Disabled Persons in Street The applicant shall ensure that all and Sidewalk Construction. wheelchair ramps on all streets and Whenever curb and gutter construction is used on intersections are ADA compliant and public streets,wheelchair ramps for disabled shown on the Civil Plans. persons shall be provided at intersections and other major points of pedestrian flow. Yes (a) Wheelchair ramps and depressed curbs shall be constructed in accordance with the standards of the"Public Works Construction Standards and Specifications"addressing accessibility. 20.56.260 Street Assessment Reimbursement The proposed project may be eligible Agreements. for a street assessment Street assessment reimbursement agreements reimbursement agreement for the (latecomer's agreements) are governed by AMC roundabout at the intersection of 80tn 12.32,Street Assessment Reimbursement Avenue and 172nd Street/SR531. If Agreements. the applicant would like to pursue this potential option,the criteria and regulations within AMC 12.32 are Yes required to be followed and completed prior to final sign off for the completion of the Civil and/or ROW improvements.The amount received in traffic impact fee credit shall be subtracted from the amount eligible for reimbursement. Chapter 20.60 AMC,Utilities 20.60.100 Sewage Disposal Facilities Required. The proposed project shall connect to Every principal use and every lot within a the City of Arlington Sanitary Sewer subdivision shall be served by a sewage disposal at the cost of the applicant.The system that is adequate to accommodate the construction of utilities shall take reasonable needs of such use or subdivision lot and place after Civil Permit approval and that complies with all applicable health regulations. meet all requirements of the Public Yes Works Construction Standards and Specifications and comply with the sewer availability approved by the Public Works Director on April 2, 2026. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 23 of 43 Regulation Analysis Meets 20.60.300 Water Supply System Required. Every The proposed project shall connect to principal use and every lot within a subdivision shall the City of Arlington Water at the cost be served by a water supply system that is adequate of the applicant.The construction of to accommodate the reasonable needs of such use or utilities shall take place after Civil subdivision lot and that complies with all applicable Permit approval and meet all health regulations. requirements of the Public Works Yes Construction Standards and Specifications and comply with the sewer availability approved by the Public Works Director on April 2, 2026. 20.60.400 Lighting Requirements. The proposed project shall provide (a)All public streets,sidewalks,and other common sufficient lighting throughout the site areas or facilities shall be sufficiently illuminated to that will illuminate the public streets, ensure security of property and the safety of persons private drives,parking areas,and using such streets,sidewalks and other common residences.The street lighting is areas or facilities. required to comply with the (d)All outdoor lights shall be low sodium or similar Complete Streets Lighting Guide. Yes lamp type and be down shielded to prevent light The final lighting plan shall include pollution. proposed lighting on all public streets and provide specification details for approval with the Civil permit. 20.60.410 Excessive Illumination.Lighting within The proposed project is required to any lot that unnecessarily illuminates any other lot provide building lighting that is or public right-of-way and substantially interferes down-shielded lighting and with the use or enjoyment of such other lot or public illuminates the site but does not shine Yes right-of-way is prohibited. onto neighboring properties or public rights-of-way 20.60.450 Underground Utilities.All existing, All proposed utilities to and on the extended,new electrical power lines,telephone,gas site shall be located underground.All distribution,cable television,and other utility lines are required to be shown communication and utility lines shall be placed on the Civil plans and shall be underground in accordance with the specifications approved by the City of Arlington Yes and policies of the respective utility service prior to construction activities on the providers and located in accordance with the Public site. Works Construction Standards and Specifications. 20.60.455 Utility Transformer Boxes. The applicant is required to receive (a)All above ground utility transformer boxes approval of transformer box locations abutting or seen form the public right of way shall be and the design of the vinyl wrap prior vinyl wrapped.The vinyl wrap shall meet the to installation on the site. Yes correlating subarea design theme and be approved by the community and economic development director. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 24 of 43 Regulation Analysis Meets Chapter 20.72 AMC,Parking 20.72.010 Number of Parking Spaces Required. The proposed project provides two (a)All developments in all zoning districts shall off-street parking spaces for each provide a sufficient number of parking spaces to dwelling unit as shown within the site accommodate the number of vehicles that plans for a total of 342 parking spaces ordinarily are likely to be attracted to the throughout the subdivision. Yes development in question. (f)Table of Parking Requirements-Table 20.72-1 Single-Family Residence,Detached: 2 spaces for each dwelling unit. 20.72.030 Parking Space Dimensions. The proposed off-street parking (a) Subject to subsection (b),each parking space spaces are located within the shall contain a rectangular area at least nineteen feet driveway of each single-family long and nine feet wide. residence and meet the required (b)Wherever parking areas consist of spaces set parking space dimensions. Yes aside for parallel parking,the dimensions of such parking spaces shall not be less than twenty-two feet long and eight feet wide. 20.72.060 Parking Area Surface. The project site plan shows paving (a)All parking areas shall be graded and surfaced throughout all drive aisles and all with asphalt,concrete or other material that will driveways are required to have one of provide equivalent protection against potholes, the approved surfaces.These erosion,and dust. Specifications for surfaces meeting requirements shall be reviewed and the standard set forth in this subsection are approved through the Building contained in the Public Works Construction permit. Yes Standards and Specifications. (b) Parking spaces shall be appropriately demarcated with painted lines or other markings. (c) Parking areas shall be properly maintained in all respects. 20.72.082 Tandem Parking. Shall be interpreted to The applicant may utilize tandem mean having two or more vehicles,one in front of or parking for the single-family behind the others with a single means of ingress and residences,if they choose.If this egress. route is chosen then the applicant (a)All residential uses may utilize tandem parking. will need to provide this information Tandem parking may use a driveway,garage, or prior to the submittal of the final Yes carport to accomplish the required parking. subdivision and be listed within the (b) Residential tandem parking counts towards conditions on the face of the final meeting minimum parking requirements at a rate of subdivision and be included in the one space for every twenty linear feet with any CC&Rs. necessary provision for turning radius. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 25 of 43 Regulation Analysis Meets Chapter 20.76 AMC,Screening and Trees 20.76.120 Retention and Protection of Significant The proposed project removes the Trees. majority of the trees on the site in (a) Every development shall retain all existing order to obtain the required density significant trees and significant stands of trees,with on the site as approved through the a diameter at breast height(dbh) of at least eight Lindsay Subarea and expected through inches for deciduous trees and at least twelve the 2024 Comprehensive Plan.The inches dbh for evergreen trees,unless the retention impacts to the site were identified in of such trees would unreasonably burden the the Lindsay Subarea Final EIS.The development or in the opinion of the permit-issuing project plans to remove 309 trees authority cause a significant safety problem. from the site.The applicant proposes (d)When significant trees or significant stands of 512 trees to be planted within the trees are present on a site for which a land use development area and 1,289 trees to permit is submitted,the applicant shall provide a be planted in the NGPA for mitigation Yes tree survey,showing size,type,and location of all of the wetland/stream areas. significant trees and stands of trees.Any significant trees removed because their retention would Mitigation Total unreasonably burden the development shall be Removed Amount Required replaced with five-gallon-sized native species at a Replacement ratio of three to one. If the replacement trees are to 309 X 3 927 be planned on building lots,the developer shall provide adequate protection from damage during construction,or planting shall occur after Proposed Tree Replacement construction,in which case a planting plan and Development NGPA Total security shall be provided to ensure their planting. 512 1,289 1,801 20.76.140 Maintenance of Screening and Shading The maintenance of all screening and Elements.All screening and shading elements shading elements required for required by this Chapter shall be maintained by the approval of the subdivision shall be owner for the life of the project to the following maintained by the property owner standards: and/or Homeowners Association.This 1.All plant material shall be maintained with includes all common spaces withing respect to pruning,trimming,mowing,watering, the development and within the right- insect control,and fertilizing to maintain a healthy of-way.This requirement shall be growing condition, create an attractive appearance, added to the face of the final and to accomplish the purpose for which it was subdivision and written into the required. CC&Rs. Yes 2. Dead,diseased,stolen,vandalized,or damaged plants shall be replaced within three months with the plants indicated on the approved landscape plan. 3.All screening and shading elements shall be maintained reasonably free of weeds and trash. 4.All screening and shading elements located within public rights of way shall be maintained by the abutting property owner. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 26 of 43 Regulation Analysis Meets Chapter 20.90 AMC,Concurrency&Impact Fees 20.90.032 Interlocal Agreements Allowed. The applicant has provided Snohomish Pursuant to state law,the council may enter into an County and WSDOT traffic offers with interlocal agreement with any jurisdiction that the project application submittal. requires reciprocal traffic mitigation for Snohomish County fees are listed extraterritorial impacts to one another's below and no WSDOT fees are transportation systems. proposed.The applicant is required to 1. Snohomish County show proof of payment to Snohomish 2. WSDOT County prior to building permit Yes issuance. Snohomish #Of ADT Total County Trips Amount Traffic Fee $242.00 1,654 $280,187.60 20.90.040 (a) Imposition of Impact Fees on The applicant provided a Traffic Development Activity.All development projects Impact Analysis prepared by Transpo. within the City shall be assessed a transportation The city evaluates 1 PM Peak Hour impact fee,at the rate of$3,355.00,based on peak Trip to each single-family residence, p.m.trips,as computed in accordance with the most therefore the proposal would produce current edition of the Institute of Transportation 171 new PM Peak Hour Trips. Yes Engineers Trip Generation Manual,as applied to the #Of PM Total City's transportation element of the adopted Traffic Fee Trips Amount Comprehensive Plan and per Ordinance No. 1469. $3,355.00 171 $573,705.00 20.90.230 School Impact Fees. Each development The applicant is required to pay the activity,as a condition of approval,shall be subject following Arlington School District to the school impact fee of$544 for each single- Impact Fees. family dwelling unit for the Arlington School Yes District per Ordinance No.2024-025. School Single-Family Total Fee Dwelling Unit Amount $544.00 171 $93,024.00 20.90.400 Community Parks Impact Fee. The applicant is required to pay the (a) Residential developments shall pay a following Community Parks Impact community park impact fee of$2,536.16 for each Fees. single-family dwelling unit prior to the issuance of a Community #of Total Yes building permit per Ordinance No.2025-023 Park Fee units Amount $2,536.16 171 $433,683.36 20.90.410 Credit of Impact Fee Amount. The applicant is eligible to receive City (a) Impact fees shall be credited for the value of of Arlington traffic impact fee credit dedicated land,and for improvement to or new through the construction of the construction of facilities provided by the developer roundabout at the 80th Avenue and if such facilities area listed in the City's current 172nd Street/SR531 intersection, adopted Capital Facilities or Comprehensive Plan frontage improvements and Yes and required as a condition of the development dedication along 172nd Street/SR531 approval,all in accordance with RCW 82.02.060(3). and improvements and dedication of The determination of the value of the dedicated 79th Avenue NE. land and/or improvements will be made by the Public Works Director. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 27 of 43 Regulation Analysis Meets Chapter 20.93 AMC,Critical Area Ordinance Part I-Purpose and Intent 20.93.010 Purpose and Intent. The Wetland and Fish and Wildlife Habitat This chapter establishes regulations for the Assessment Report,Revised June 2025 protection of environmentally critical areas completed by Soundview Consultants including critical areas,natural resource provides documentation that the subject site lands,and protective buffers. contains two Type III Wetlands,two Type IV Wetlands,an off-site Type III Wetland,and an on-and-off site Type Ns Stream.The critical areas within the Lindsay Subarea were fully Yes analyzed for impacts and mitigation during the Subarea Plan and Final EIS that was approved by City Council.The Stream and Wetland buffers consistent with these approvals were further documented and approved in the Development Agreement. -- . — — 172ND STREET NE- I 1 - I 5T�M�z— 11 77' ' 5K'f91FER � Idt i Z ,. rk 1�. ❑ \ —^I L WETLAND D 13 \I �nAwow-1—l �. . 0 100 200 00 i�- GRePHICoSrw*a PLAN IEGEIGD w - --6T.E6x OFDHYSY yq.WAiEFL.E iOVK �Y HVtY x1311 N.TEq: .IIG LOGYDM1� Part III-General Provisions 20.93.200 Applicability. The proposed project is required to This chapter applies to environmentally critical follow Part III -General Provisions,Part areas within the city's jurisdiction.No action VI-Streams, Creeks,Rivers,Lakes,and shall be taken by any person that results in any Other Surface Waters,and Part VII- Yes alteration of any environmentally critical area or Wetlands of the Critical Area Ordinance. their buffers except as consistent with the purposes,objectives,and goals of this chapter. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 28 of 43 Regulation Analysis Meets 20.93.230 Compliance. The City of Arlington concludes that the All land uses or development applications shall subject property does contain two be reviewed to determine whether an Category III Wetlands,two Category IV environmentally critical area exists on the Wetlands,on-site and off-site Stream, property for which the application is filed,what along with associated Buffers and an off- Yes the action's impact to any existing site Category III Wetland Buffer. environmentally critical area would be,and what actions are required for compliance with this chapter. 20.93.250 Procedures. The City has determined that the The City of Arlington shall not grant any approval applicant has provided a critical area or permission to conduct development or use in report and mitigation plan following best an environmentally critical area prior to the available science while working closely applicant's fulfillment of the requirements of this with the Tulalip Tribes on impacts and Yes chapter. mitigation for the proposed project.The project has met all applicable regulations of the Critical Area Ordinance. 20.93.260 Submittal Requirements. The applicant submitted a Modified SEPA To enable the city to determine compliance with Checklist,critical area report,mitigation this chapter,at the time of application submittal plan,geotechnical report,and site plans the applicant shall file a SEPA environmental that provide the information needed to checklist,site/resource specific reports as review the wetlands and stream that Yes specified in 20.93.270,and any other pertinent impact the subject property.The project information requested by the department of complies with the adopted Lindsay community development. Subarea Plan, Lindsay Subarea Planned Action and Lindsay Subarea FEIS. 20.93.270 Site/Resource Specific Reports. The applicant submitted a Wetland and All applications for land use or development Fish and Wildlife Habitat Assessment permits proposed on properties containing or Report and Final Mitigation Plan adjacent to environmentally critical areas or completed by Soundview Consultants Yes their defined buffers shall include site/resource that provides the information required to specific reports prepared to describe the assess the site. environmental limitations of the site. 20.93.340 Building Setbacks from Buffers.A The proposed site plan layout shows a building setback of fifteen feet is required from building setback of 15 feet or more from the edge of any critical area buffer,as defined in all paved areas and/or buffers from the Yes subsequent sections of this chapter. critical areas. 20.93.390 Mitigation Plan Requirements. In the The applicant has submitted a Final event that mitigation is required,the applicant Mitigation Plan prepared by Soundview shall be required to provide a mitigation plan for Consultants that provides the required approval by the community development information for construction, director.The plan shall provide information on maintenance and monitoring of the land acquisition,construction,maintenance and critical areas affected by the project. monitoring of the replaced critical area. The applicant shall provide performance Yes security to assure that all actions approved under the mitigation plan are satisfactorily completed in accordance with the mitigation plan,performance standards,and regulatory conditions of approval.Prior to final inspection,a maintenance bond shall be obtained. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 29 of 43 Regulation I Analysis Meets Part VI-Streams,Creeks,Rivers,Lakes,and Other Surface Water 20.93.700 Classifications. The Wetland and Fish and Wildlife (d) Type Ns water shall be segments of natural Habitat Assessment Report provide waters within the bankfull width of the defined analysis of determining the stream on- channels that are not Type S, F,or Np waters. site and off-site being classified as Type These are seasonal,nonfish habitat streams in Ns.Stream Z is a seasonal,non-fish which surface flow is not present for at least bearing stream. some portion of a year of normal rainfall and are Yes not located downstream from any stream reach that is a Type Np water. Ns waters must be physically connected by an above-ground channel system to Type S, F,or Np waters. 20.93.710 Determination of Boundary. The Wetland and Fish and Wildlife The Community and Economic Development Habitat Assessment Report provide maps Director,relying on delineation by a licensed of the site showing the location of the engineer or other comparable expert,shall stream and established buffers.Stream Z determine the boundary of the creek,stream, is a tributary to Edgecomb Creek,which river,lake,or other surface water.Where there is connects into Middle Fork Quilceda Yes no ravine or the bank is less than ten feet in Creek,a tributary to the main stem of depth,the boundary shall be contiguous with the Quilceda Creek which directly outlets ordinary high-water mark. directly to the Puget Sound,a regulated Water of the United States. 20.93.730 Requirements. The proposed project site plans show and (a) To retain the natural functions of streams and the Wetland and Fish and Wildlife Habitat stream corridors,the streamside buffers listed in Assessment Report shows the standard Table 20.93-3: Stream Buffer Widths shall be 50-foot buffer on the south and maintained on both sides of the environmentally northwest portion of the site where the critical area.All existing native vegetation within stream is located on the site. Yes these buffers shall be preserved. Table 20.93-3: Stream Buffer Widths Stream Type Standard Buffer Z Ns 50 feet 20.93.740 Mitigation. The proposed project requires necessary, (a) In order to avoid significant environmental unavoidable permanent impacts to the impacts for those activities not regulated by the buffer of Stream Z to support the Shoreline Master Program and allowed pursuant construction of a pedestrian trail and to Section 20.93.720,the applicant for a land use stormwater dispersion outfalls/trenches or development permit will select one or more of at a location that will maintain existing the following mitigation actions,listed in order of site drainage patterns and hydrology. preference. Additionally temporary impacts are also (1) On-site environmentally critical area necessary for site grading and the restoration/improvement(2:1 ratio). construction of these facilities.The Yes (2) On-site ECA/Creation (2:1 ratio). portions of the Stream Z buffer proposed (3) On-site ECA buffer restoration (6:1 ratio). to be impacted consist entirely of (b)All ECA restoration,creation and/or herbaceous areas degraded by moving enhancement projects required pursuant to this and the encroachment of non-native chapter shall follow a mitigation plan prepared invasive species. Overall,approximately in conformance to the requirements of Section 2,467 sf of buffer impacts are anticipated, 20.93.390. which will be offset through 9,164 sf of buffer creation,exceeding a 2:1 ratio. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 30 of 43 Regulation Analysis Meets i i i � r r ' r 0 T Z 1 Z-Q �, so 1#-ae zee+ Z-7A SDP_15 _78 Z_dA Z-5A Z-4A Z-2A Z-4 DO- Z- y Z-2B -s- t f STREAM Z . TYPE NS 50-FT BUFFER Part VII-Wetlands 20.93.800 Classifications. The Wetland and Fish and Wildlife (b)(3) Category I1I.Category III wetlands are Habitat Assessment Report provide (1)Wetlands with a moderate level of functions, analysis of determining Category III and (2) Can often be adequately replaced with a well- Category IV Wetlands on the subject planned mitigation project,and property.The property is incumbered by (3) interdunal wetlands between one-tenth and two Category III Wetlands and two one acre in size. Category IV Wetlands on the site and one Category III wetlands generally have been Category III Wetland that is off site with a disturbed in some ways and are often less portion of the buffer on this site. diverse or more isolated from other natural resources in the landscape than Category II wetlands. Yes (b)(4) Category IV.Category IV wetlands have the lowest levels of functions and are often heavily disturbed.These are wetlands that should be able to replace,and in some cases be able to improve.However,experience has shown that replacement cannot be guaranteed in any specific case.These wetlands may provide some important functions and also need to be protected. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 31 of 43 Regulation Analysis Meets 20.93.810 Determination of Boundary. The proposed project site plans and the The Community and Economic Development Wetland and Fish and Wildlife Habitat Director,relying on a field investigation supplied Assessment Report provide maps of the by the applicant,and applying the wetland site showing the location of the wetlands. delineation provided in this chapter shall The site plans for the project show the Yes determine the location of the wetland boundary. wetland areas,along with the buffers Qualified professionals and technical scientists associated with each of the wetlands. shall perform wetland delineations. 20.93.830 Buffer Requirements. The Wetland and Fish and Wildlife (a) The following buffer widths have been Habitat Assessment Report delineates the established in accordance with the best available Wetland with Habitat Scores and science.They are based on the category of required buffers. wetland and the habitat score as determined by a Habitat Buffer qualified wetland professional using the Wetland Category Score Width Washington State Wetland Rating System for A IV 6 40 Western Washington.The adjacent land use intensity is assumed to be high. B III 7 110 (1) For wetlands that score 6 points or more for C III 0 5 4 D IV 0 5 4 habitat function,the buffers in Table 20.93-4. (A)A relatively undisturbed,vegetated corridor 1 1II 6 110 at least 100 feet wide is protected. The applicant was allowed to utilize (B) The corridor is permanently protected for Table 20.93-4 because the measures of the entire distance between the wetland and the Table 20.93-5 have been implemented on legally protected are by a conservation easement, the site. deed restriction,or other legal site protection • Lights: Due to the location of the mechanisms. wetlands,lights from cars/streets will (C) Presence or absence of the shoreline or not reach the wetland areas. priority habitat must be confirmed by a qualified . Noise: The wetland areas are proposed biologist or shoreline administer. to be vegetated and are located beyond the property lines of the Buffer Width (in feet) individual residences. Yes Based on Habitat Score • Toxic Runoff:All stormwater is treated Wetland Category 3-5 6-7 8-9 through filtering prior to being exposed to the wetland areas. Category III:All 60 110 225 • Stormwater Runoff:All stormwater is Category IV:All 40 40 40 treated through filtering prior to being exposed to the wetland areas. (D) The measures in Table 20.93-5 are • Change in Water Regime: On-site implemented,as applicable,to minimize the water will be substantially infiltrated impact of the adjacent land uses. as in the existing condition. Required Measures to Minimize Impacts: • Pets and Human Disturbance: The • Lights wetlands and associated buffers • Noise require NGPA fencing and plantings • Toxic Runoff are proposed in the buffer between the • Stormwater Runoff pedestrian trail and the wetland. • Change in Water Regime • Dust: Best Management Practice • Pets and Human Disturbance during construction are required and • Dust will be monitored through the Civil • Disruption of Corridors or Connections permit. • Disruption of Corridors or Connections:A stream and wetland corridor is being created on the site. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 32 of 43 Regulation Analysis Meets 20.93.840 Mitigation The Final Mitigation Plan provides (a) In order to avoid significant environmental information and a site plan that shows impacts,the applicant for a land use or the proposed mitigation on the site for development permit shall compensate for the wetlands and buffers. unavoidable wetland impacts,listed in order of preference.What is considered adequate Impact Type Total Impact Area Direct Permanent 11,399 sf mitigation will depend on the nature and Wetland Fill magnitude of the potential impact. Indirect Permanent (1) On-site wetlands restoration/improvements Wetland Impacts 12,003 sf (2) On-site wetlands creation Permanent Buffer 2,467 sf (3) On-site wetlands restoration Impacts Temporary Buffer 61,374 sf (4) Off-site wetlands protection Impacts o Mitigation Type Mitigation Area c •° Wetland Mitigation o �" Categoryu Wetland Creation 47,347 sf .4.1 wWetland Restoration 20,455 sf Category III 2:1 4:1 8:1 15:1 Wetland Enhancement 8,626 sf Wetland as Buffer 12,003 sf Yes Category IV 1.5:1 3:1 6:1 10:1 Enhancement Buffer Mitigation Buffer Creation 9,164 sf Buffer Enhancement 61,329 sf Buffer Restoration 63,216 sf Impact Creation Area Wetland Area Ratio (acre) acre A-IV 0.034 1.5:1 0.051 A-IV 0.016 0.75:1 0.012 C-III 0.225 2:1 0.450 C-III j 0.260 1:1 0.260 D-III 0.003 1.5:1 0.004 Total Required 0.777 Total Proposed 1.087 The proposed project meets the code requirements of mitigation for the wetlands located on the site. 20.93.850 Monitoring. The applicant has proposed monitoring (a) For projects that include native vegetation,a and Final Mitigation Plan to ensure the detailed five-year or ten-year vegetation mitigation actions are successful for a maintenance and monitoring program is period of ten years with formal required. inspections by a qualified Project Scientist. Monitoring events will be Yes scheduled at the time of construction, 30 days after planting,and minimally on an annual basis during Years 1, 2, 3, 5, 7 and 10. Closeout of monitoring occurs in Year 10. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 33 of 43 Wetland and Buffer Impacts --�- -1 � i t x x x e • • • a • a o • • • a ■ a .1 R R R R ■ • • • i ■ i • ■ h• d 1 7 t 7 i f i f r i 7 e e a a ■ : aTRaRYz— '�." ..., .._! t I � ► t i —/ rl , f i f ■ / V VATU C v� GRAPFOC State — --_. 7 -- :'�:.�/.'.t•,� I .7 1 -- aan gas DVAM IEGFAID C.'- �vsr.•n aaalrRr VRiTWC YPaCTe _ — Im iluiOauaM. �ru IaaYai Ka ranc.iq . .a1p1K PM aam.ee �..—.. u.Sb••K D.laiGf illaaD•••C• .SaO•aa 1"FETR Il P1 M L--- M CaN�aa:Ita.aG.�wLTa wahs O 4�r•wras e'n i<aC Wetland and Buffer Mitigation R x R R a • • • • ' R R R R ■ • ■ • i ■ i • ■ • e a e e '���•. i t t r 1 i t i f t 7 - r • ■ a a e i - T STTR."z - t t i 7 i 7 t f 7 • t _ � I 1 •\.I - �I i .. I _ o.aa.•01""1.•� wtrwcc GRAFRIC WALE 1 � PLAN F[•FA't1 . . WrIGA'naviEGuv G_ =;.3••.o.a.a. 1EEIIdtQJLLEa1!➢OE a ees a aws �xa•,1 o— oa.aP _.._.._aa. •�d•„a a• L •. •aa.s was a•a.•s �lul•nac.raw _� •laas Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 34 of 43 Regulation I Analysis Meets Chapter 20.98 AMC,State Environmental Policy Act(SEPA) 20.98.110 (d) Environmental Checklist. For The applicant completed a modified projects submitted as planned actions under environmental checklist with the project WAC 197-11-164,the City shall use its application and the city approved the existing environmental checklist form or may proposed project per the requirements of modify the environmental checklist form as Lindsay Subarea Planned Action Yes provided in WAC 197-11-315.The modified Ordinance and Lindsay Subarea Plan FEIS checklist form may be prepared and adopted on February 17,2026. along with or as part of a planned action ordinance. Chapter 13.28 AMC,Stormwater 13.28.070 Applicability of the Utility. The The proposed project is subject to following actions or applications for the following meeting the required stormwater permit and/or approvals will require submittal regulations for the site.The project has for approval by the utility: site plans,design received conceptual approval for the drawings,and operations and maintenance plans. stormwater design.A Civil Permit shall Submittals shall be consistent with the provisions be required for all site improvements. of this Code,and shall comply with the All stormwater systems shall comply Yes stormwater manual and engineering standards: with the City of Arlington Public Works (3) New Development Standards and Specifications and the most recent Department of Ecology Stormwater Manual for Western Washington. Lindsay Subarea Plan- Chapter 3 Development and Design Standards DS-2: Residential Density. The proposed project is for 171 Residential density shall not exceed 436 units per residential units on 32.26 acres and as Yes 87.5 acres. the first project in the Lindsay Subarea it does not exceed the proposed density. DS-3: Dimensional Standards: Single-Family Minimum Lot Size: 3,600 sf All lots a minimum of 3,600 sf Yes Maximum Lot Size: 4,500 sf No lots exceed 4,500 sf Yes Minimum Lot Width: 30 ft All lots provide a minimum 30 ft width Yes Maximum Height: 35 ft No structure may be taller than 35 ft Yes Building Setbacks: The setbacks for the residential homes • Front- Minimum: 10 ft shall be evaluated with the building • Front- Maximum: 15 ft permit applications for each lot.The • Front Porches: 5ft applicant is required to submit a site • Side-Minimum: 5 ft plan with the building permit showing • Rear Loaded Rear Setback from sidewalk or how the required setbacks have been drive aisle paving edge if no sidewalk: met. Yes o Garage: 2-5 ft or 20-22 ft o Surface Parking Only Minimum: ■ Perpendicular: 20 ft ■ Parallel: 10 ft • Front Loaded Rear Setback: 10 ft Projections: Roof overhangs,fireplace projections, All proposed projections on the homes and bay and box windows are allowed to project shall be evaluated with the building Yes up to 18 inches into the setback. permit applications for each lot. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 35 of 43 Regulation Analysis Meets DS-7: Lighting Design. The applicant is required to provide Provide appropriate exterior lighting: lighting meeting the details and expectations of the Lindsay Subarea 7.1 Provide appropriate average lighting levels for Plan,Lindsay Subarea Planned Action all publicly accessible paths: Ordinance,and the Lindsay Subarea 7.1.1 Low or non-pedestrian and vehicular traffic FEIS. areas,which include drive aisles and trails- The applicant shall provide lighting minimum 0.2 foot-candles average,maximum 4 plans and details meeting these foot-candles average, except when adjacent to requirements for approval with the Civil natural areas,trails may be unlit. Permit. 7.1.2 Moderate-or high-volume pedestrian areas, The applicant is required to provide which include access and neighborhood streets lighting meeting the details and and building entries-minimum 0.9 foot-candle expectations of the Lindsay Subarea average,maximum 5 foot-candles average, Plan, Lindsay Subarea Planned Action preferred average 2 foot-candles Ordinance,and the Lindsay Subarea 7.1.3 Parking lot lighting.Use fully shielded FEIS. parking lighting fixtures; dark sky rated and The applicant shall provide lighting mounted no more than 20 feet above the ground, plans and details meeting these with lower fixtures preferable so as to maintain a requirements for approval with the Civil human scale. Public parking lots-minimum 0.5 Permit. foot-candle average,maximum 4 foot-candles Yes average. 7.2 Maintain consistent lighting levels with a minimum lighting level uniformity ratio no greater than 4:1 to create gradual transitions between varying levels of lighting between lit areas and unlit areas.Avoid highly contrasting pools of light and dark areas. 7.3 Pedestrian lighting maximum height: 15 feet, or 3-4-foot bollards. 7.4 Parking area lighting maximum height: 20 feet,with lower fixtures preferred to maintain a human scale. 7.5 Use only fully shielded, dark sky-rated lighting fixtures. 7.6 Steady,non-flashing lighting of building features,artwork,and special landscaping elements may be allowed,subject to the finding of the Director that the light causes no significant adverse impact. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 36 of 43 Regulation Analysis Meets DS-8:Trees. The applicant is removing most of the Provide trees along streets and paths and in trees on the site and replanting more parking lots,and preserve existing trees,in the trees than the required 3:1 ratio. See following manner: section 20.76.120 for the required tree mitigation and replacement numbers. 8.1 Preserve existing trees in the Native Growth Protection Area and designated open spaces.To The applicant shall select and plant tree the extent possible,preserve existing trees in the species provided on the city's approved designated parks. species list. 8.2 Select tree species per Arlington's approved species list. The applicant is required to plant street trees in landscape strips for every 40 8.3 Along all streets,plant or preserve street trees feet of street frontage.The street trees in landscape strips at least every 40 feet on shall be deciduous trees 2-inch diameter average.Note,trees are encouraged but not at breast height(dbh) at time of planting required in the landscape areas along drive aisles. with a canopy that starts at least eight 8.4 Where development faces parks or common feet above finished grade and will have a Yes open spaces,plant or preserve trees at least every fully mature trunk at least 8 inches in 40 feet on average along the path running roughly diameter. parallel with the front lot lines. (Trees may be on Non-street trees required per this either side of the path and may alternate sides). section shall be a native species,have a minimum 1.5-inch (dbh),and attain a 8.6 Phased development must meet tree minimum height of 25 feet at maturity. requirements for the portion of the site being developed,including conditions of approval. Root barriers shall be provided for all 8.7 See root barrier requirements in City of street trees,all trees planted adjacent to Arlington Tree List. sidewalks,paved driving areas,and paved parking areas. Root barrier shall be 18 inches deep and 6 feet wide. The landscape strips shall be planted per the Department of Public Works Standards and Specifications. F. CONCLUSION&RECOMMENDATION (a) The applicant has applied for a Conditional Use Permit as required under AMC 20.16. (b) Under AMC 20.16.225(c), subject to Subsection (d) the designated decision-maker shall issue the requested permit unless it concludes,based upon the information submitted at a hearing if there is a hearing or by signed letter if there is not,that: Regulation Analysis Meets Chapter 20.16.225(c) (1) The requested permit is not within its The property is within the city limits and the jurisdiction according to the table of City of Arlington Zoning Map identifies the permissible uses. subject property as Residential Ultra Low Capacity with Master Plan Neighborhood Overlay.The proposed subdivision is allowed Yes by meeting the regulations of the Lindsay Subarea Plan,Lindsay Subarea Planned Action Ordinance,Lindsay Subarea Final EIS,and MJS Investors Developer Agreement. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 37 of 43 Regulation Analysis Meets (2)The application is incomplete. The City determined the subject application yes complete on February 11, 2026. (3) If completed as proposed in the The proposed preliminary major subdivision application,the development will not project complies with all required sections of yes comply with one or more of the AMC Title 20 per the staff analysis. requirements of this title. (4)The proposed project had not complied The City issued a Modified SEPA Decision with SEPA. meeting the Lindsay Subarea requirements on February 17, 2026. No parties appealed the original Lindsay Subarea Plan Final EIS,which Yes established the regulations and requirements set forth in the Lindsay Subarea Planned Action Ordinance. (5) The proposed project is not in The requested Conditional Use Permit,as conformance with the Comprehensive conditioned,is consistent with all AMC Title Plan,Transportation Plan,or other 20 requirements:permit processing Yes adopted plans,regulations,or policies. procedures,and all other applicable plans, regulations,and policies. Chapter 2O.16.225(d) Even if the permit-issuing authority finds that the application complies with all other provisions of this title, it may still deny the permit if it concludes, based upon the information submitted at the hearing, that if completed as proposed,the development more probably than not: (1) Will materially endanger the public The project will not materially endanger the health or safety. public health or safety of the existing and No future residents. (2)Will materially harm adjoining or abutting The project will not materially harm adjoining No property. or abutting property. (3) In terms of design and use will be The use is compatible in terms of design and compatible with the area in which it is use with the Lindsay Subarea Plan and Yes located. Planned Action Ordinance and the area in which it is located. (c) Under AMC 20.16.260(a),subject to Subsection (b),in granting a zoning,special use,conditional use, or administrative conditional use permit, the Community and Economic Development Director or Hearing Examiner, respectively, may attach to the permit such reasonable requirements in addition to those specified in this title as will ensure that the development in its proposed location: Regulation Analysis Meets Chapter 2O.16.26O(a) (1) Will not materially endanger the public The City concludes that the proposed health or safety. development will not materially endanger the public health or safety of the City of Arlington. yes The proposed development has met the intent of the zoning,and Lindsay Subarea regulations. (2) Will not materially harm adjoining or The City concludes that the proposed abutting property. development,as mitigated and conditioned, yes will not materially harm adjoining or abutting property. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 38 of 43 Regulation Analysis Meets (3) In terms of design and use will be The City concludes that,in terms of the site compatible with the area in which it is design/layout and proposed residential use, located. the proposed development will be compatible yes with the surrounding land uses in the area in which it is located in accordance with the Lindsay Subarea Plan. (4)Will be in conformity with the land-use The City concludes that the proposed plan,transportation plan,or other plan development is in conformity with the land- officially adopted by the council. use plan,transportation plan, Lindsay yes Subarea Plan,Lindsay Subarea Planned Action Ordinance,Lindsay Subarea Final EIS,and MJS Investors Developer Agreement. (d) The City of Arlington recommends approval of the Conditional Use Permit, subject to conditions specified in Section G below. G. CONDITIONS Preliminary Major Subdivision Approval 1. All development shall be in substantial conformance with the Subdivision Site Plans,Planning Plans, Landscape Plans,and Preliminary Civil Plans received on March 17,2026,subject to any conditions or modifications that may be required as part of the permit and construction plan review. 2. All development shall be in substantial conformance with all Exhibits of the Hearing Examiner Public Hearing held on April 28, 2026. 3. The development shall be in conformance with the Lindsay Subarea Plan,Lindsay Subarea Planned Action Ordinance,Lindsay Subarea Final EIS and MJS Investors Development Agreement. 4. No permits and/or construction pursuant to the Conditional Use Permit shall begin or be authorized until 21 days from the date of the decision. S. The developer shall clear any outstanding Planning Division permit-processing accounts with the City within 60 days of issuance of this permit. 6. The preliminary subdivision is split into two phases. All infrastructure to support Phase 1 of the project is required to be completed prior to final subdivision approval and recordation. Phase 2 may be completed in a separate final subdivision after infrastructure is completed. 7. All public improvements along 172nd Street/SR 531, 791h Avenue,and proposed new public streets within the subdivision shall be dedicated to the City of Arlington upon completion and acceptance of the improvements with the recording of the Final Subdivision. 8. All proposed stream and wetland buffer mitigation and monitoring requirements from the Final Mitigation Plan completed by Soundview Consultants shall be implemented. 9. The construction and final development shall meet all Title 20 AMC regulation requirements,along with all local,state,or federal code requirements. Civil Construction: 10. Prior to any construction activities,the applicant shall file and receive approval of civil construction plans which comply with all requirements of the Land Use Code, International Building Code, International Fire Code and Public Works Construction Standards and Specifications. Said plans shall address all site improvements,either required or voluntarily provided. 11. All stormwater is required to meet the most current adopted version of the Department of Ecology Stormwater Management Manual for Western Washington. The final drainage plan shall be approved with the Civil permit. 12. The applicant is required to provide sufficient lighting throughout the site that will illuminate the public streets, private drives, parking areas, and residences. The street lighting is required to comply with the Complete Streets Lighting Guide.A final lighting plan is required to be submitted for review and approval with the Civil Permit. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 39 of 43 13. The Applicant is required to obtain utility permits from the City of Arlington for water and sanitary sewer connections. 14. The Applicant shall construct all existing, extended, and new electrical power lines (not to include transformers or enclosures containing electrical equipment including but not limited to, switches, meters,or capacitors which may be pad mounted),telephone,gas distribution,cable television,and other communication and utility lines in or adjacent to any land use or building permit approved after the effective date of this chapter shall be placed underground in accordance with the specifications and policies of the respective utility service providers and located in accordance with the administrative guideline entitled "Public Works Construction Standards and Specification." Even in the event the distribution line originates from a point opposite any public roadway from the new construction the service lines shall be placed beneath said roadway by means of boring or surface excavation across said roadway. 15. The placement of Snohomish County PUD transformer cases shall be reviewed and approved by the city.All cases that abut public right-of-way are required to be decoratively wrapped. 16. The Applicant shall follow the Unanticipated Discovery Plan submitted on February 10, 2026.The Unanticipated Discovery Plan is required to be on-site and followed should archaeological resources or human remains be encountered. 17. The applicant is eligible to receive City of Arlington traffic impact fee credit through the construction of the roundabout at the 80th Avenue and 172nd Street/SR 531 intersection, frontage improvement and dedication along 172nd Street/SR 531 and improvements and dedication of 79th Avenue NE. 18. The applicant may be eligible for a street assessment reimbursement agreement for the roundabout at the intersection of 80th Avenue NE and 172nd Street/SR 531. If this is pursued the criteria and regulations within AMC 12.32 are required to be followed and completed prior to the final sign-off for the completion of the Civil and/or ROW improvements. The amount received in traffic impact fee credit shall be subtracted from the amount eligible for reimbursement. Prior to Final Subdivision: 19. The applicant shall complete all required Civil Construction improvements on the subject site; however,the applicant may bond certain improvements,such as Landscaping, Streetlights,and Final Lift of Asphalt. 20. The preliminary subdivision is split into two phases. All infrastructure to support Phase 1 of the project is required to be completed prior to final subdivision approval and recordation. Phase 2 may be completed in a separate final subdivision after infrastructure is completed. 21. The applicant shall receive all street names and addresses from the city prior to submittal for incorporation within the Final Subdivision documents. 22. The applicant shall submit a copy of the incorporation of the Homeowner's Association and the proposed Covenants, Conditions,and Restrictions with the final subdivision application.The CC&Rs shall include the maintenance of the private road system and the maintenance of private lots,buildings,and abutting right-of-way for the site. Recording Final Subdivision: 23. The applicant shall submit as-builts,acquire all required bonds,and complete the civil construction punch list for the project. 24. The applicant shall provide language to be placed on the final subdivision that notifies future property owners of possible effects from aviation activities and the proximity of the Arlington Municipal Airport. 25. The applicant shall record the Final Subdivision within 30 days of city signature with the Snohomish County Auditor's Office and provide the City of Arlington with an electronic copy. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 40 of 43 Building: 26. Prior to issuance of the building permit, excluding model home permits, the applicant shall complete all required or voluntary improvements approved with the Civil Permit,unless otherwise secured and authorized by the City Engineer. 27. The applicant shall meet the requirements of the International Residential Code for all structures proposed within the subdivision. 28. The applicant is required to obtain Design Review approval for all structures proposed on the site prior to the submittal of building permits.The applicant shall meet the requirements of the City Development Design Standards, Lindsay Subarea Plan,and Lindsay Subarea Planned Action Ordinance. 29. The applicant shall meet the required lot size,lot width,building height,building setbacks,and building projections as regulated by the Lindsay Subarea Plan and Lindsay Subarea Planned Action Ordinance. 30. The proposed single-family residences are required to comply with AMC 15.24.040(7) with the installation of automatic fire sprinkler systems per the International Residential Code and the International Fire Code at the time of Building Permit submittal. 31. Issuance of Certificate of Occupancy shall be limited to 55 residential housing units prior to the completion of the roundabout located at the 80th Avenue and 172nd Street/SR 531 intersection and required 172nd Street/SR 531 frontage improvements. 32. The Final Subdivision shall be recorded at Snohomish County Auditor's Office and the recorded document returned to the City of Arlington prior to issuance of any Building Permits, with the exception of up to 5 model homes that may be constructed prior to final subdivision. 33. The project is subject to applicable water and sewer utility fees.These fees are collected at the time of building permit issuance. 34. The project is subject to applicable impact fees, such as Traffic, Parks, Schools. These fees are collected at the time of building permit issuance. 35. Building signage for the subdivision is required to be permitted through a sign permit application. All signage requires city approval prior to installation. Other: 36. Business Licenses for all contractors working on the site shall be required to obtain a City of Arlington Business License. H. DECISION (a) The decision whether to approve or deny this proposal shall be made by the Hearing Examiner. (b) Per AMC 20.16.280 (c),Conditional Use Permits for major plats shall expire automatically if,within five (5)years after the issuance of such permits: 1. The plat has not been submitted for final plat, or 2. A one-year extension has not been granted. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 41 of 43 I. RECONSIDERATION OF PERMIT-ISSUING AUTHORITY'S ACTION Reconsideration of permits shall follow the requirements of AMC 20.16.300. (a) Except as pursuant to Subsection (b),whenever (i) the hearing examiner disapproves a conditional use permit application, or (ii) the community and economic development director or hearing examiner disapproves an application for a special use permit or a variance, on any basis other than the failure of the application to submit a complete application, such action may not be reconsidered by the respective permit-issuing authority at a later time unless the applicant clearly demonstrates that: (1) Circumstances affecting the property that is the subject of the application have substantially changed, or (2) New information is available that could not with reasonable diligence have been presented at a previous hearing. (b) Whenever the permit-issuing authority approves or disapproves a permit application or variance the respective permit-issuing authority may reconsider such action if either the applicant or a party of record clearly demonstrates that in the written decision for the permit or variance either a finding of fact or testimony has been incorrectly recorded. (c) A request to be heard for reconsideration on this basis must be filed with the Community and Economic Development Director within the time period for an appeal to superior court(see section 20.28.060, judicial review). However, such a request does not extend the period within which an appeal must be taken. (d) Notwithstanding Subsection (a), the hearing examiner or community and economic development director may at any time consider a new application affecting the same property as an application previously denied. A new application is one that differs in some substantial way from the one previously considered. J. APPEALS Per AMC 20.20.020, the Hearing Examiner's decision is appealable to Snohomish County Superior Court within twenty-one (21) days of the Hearing Examiner's final decision. AMC 20.16.310 Appeals of Permits and Final Plats. (b) The action of the hearing examiner in granting or denying a special use or conditional use permit may be reviewed for unlawful,arbitrary,capricious,or corrupt action to Snohomish County Superior Court. The petition for review must be filed within twenty-one calendar days of the notice of final decision issued by the city. AMC 20.20.020 Appeals of Hearing Examiner Decisions. (a) Appeals from the final decision of the hearing examiner, or other city board or body involving the city's land use code and for which all other appeals specifically authorized have been timely exhausted,shall be made to Snohomish County Superior Court pursuant to the Land Use Petition Act, Chapter 36.70C RCW,within twenty-one days of the date the decision or action became final,unless another applicable appeal process or time period is established by state law or local ordinance. (b) Upon motion for reconsideration,the date of the decision is the date of entry of the decision on the reconsideration motion by the hearing examiner and not the original decision date by the city. (c) Notice of the appeal and any other pleadings required to be filed with the court shall be served as required by law within the applicable time period.This requirement is jurisdictional. (d) The cost of transcribing and preparing all records ordered certified by the court or desired by the appellant for such appeal shall be borne by the appellant. The record of proceedings shall be prepared by the city or such qualified person as it selects.Prior to the preparation of any records the appellant shall post with the city community and economic development department an advance fee deposit in the amount specified by the city's planning division. Any overage will be promptly returned to the appellant. Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 42 of 43 K. EXHIBITS Lindsay Project 1 Hearing Examiner documents are on file at the Community Development Office under Preliminary Major Subdivision Conditional Use Permit- PJ 26-0104 and are available online on the City of Arlington's public notice webpage. Distributed to the Following Parties: • Peregrin Sorter, Hearing Examiner • Yoshi Kumara,Attorney • Rob Risinger,Applicant • Merle Ash,Contact • Nicole DeLeon,Applicant Attorney • Emily Romanenko,City Attorney • James Kelly,PW Director • Thad Newport,Development Services Engineering Manager • Ameresia Lawlis,Associate Planner Staff Report&Recommendation Lindsay Project 1-Preliminary Major Subdivision Conditional Use Permit-PJ 26-0104 Page 43 of 43