Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Modified SEPA Checklist
MODIFIED SEPA CHECKLIST Exhibit B-1 A. Proposal Description Date: Applicant: Qy` Property Owner: Property Street: City,State,Zip Code: Address 1 iZ10,4- Parcel Assessor Parcel Number: Property Size in Acres: Information p0 D /• / it G Give a brief, complete description of your proposal. Property District Name: Building Type: Zoning A R Land Use: Engineering: Building: Other: All Applications Deemed Complete?Yes❑No❑ Permits Explain: Requested(list all that apply) Are there pending governmental approvals of other proposals directly affecting the property covered by your proposal?Yes❑Nogg Explain: Existing Land Describe Existing Uses on the Site: Use Proposed Land Industrial/Manufacturing Commercial Use-Check ion Flightline Open Space,Recreation and Circle All viat That Apply Other Existing: —40-- Proposed: Non-residential Uses: Building Employment in Ordinance: 13,813 Job Remainder as of/ QL20�.S"' Square Feet a'r.SD square feet City of Arlington CIC Planned Action Page 3 � #Existing Dwellings: #Proposed Proposed Density(du/ac): ry/A #_Dwelling Type Dwellings Units: #_Type Dwellings #_Dwelling Type #_Type Dwelling Threshold Total in Dwelling Bank Remainder as of 20_ Ordinance: 848 dwellings Existing Stories: A14 Proposed Stories: / Building Height Existing Height in feet: Proposed Height in feet: go— Parking Spaces Existing: Proposed: Impervious Existing Square Feet: Proposed Square Feet: Surfaces —v 00 Existing Estimated Trips Future Estimated Trips Net New Trips: Total: Total: PM Peak Hour Weekday Vehicle Trips Source of Trip Rate: ITE Manual❑ Transportation Impacts Determined Consistent Other❑ with AMC 20.04.120 and Chapter 20.56. Yes❑ No Q Proposed timing or �171v��JlCGLiO71/ D�� schedule (including phasing). Describe for future �DSS L 6 additions, expansion,or further activity related to this proposal. List any available or pending environmental information directly related to this proposal. City of Arlington CIC Planned Action Page 4 B. Environmental Checklist and Mitigation Measures NATURAL ENVIRONMENT CHECKLIST AND MITIGATION MEASURES Geology/Soils Checklist and Mitigation Measures 1. Description of Conditions _ Staff Comments: A. General description of the site (circle one): lot, oiling,hilly,steep slopes, mountainous,other B. What is the steepest slope on the site(approximate percent slope)? O 7e C. What general types of soils are found on the site (for example,clay,sand,gravel, eat,muck)? 2. Describe the purpose,type,and approximate quantities of any filling or grading proposed.Indicate source of fill. ,%4 A t C, of r06le - Y"• n•�•4 3. Has any part of the site been classified as a"geologically hazardous"area?(Check all that apply) ❑ Landslide Hazards ❑ Erosion Hazards ❑ Seismic Hazards ❑ Liquefaction Hazards ❑ Other: Describe: 4. Proposed Measures to control impacts including Exhibit B-2 and B-4 regarding Mitigation Document and Applicable Regulations and Advisory Notes, respectively: ©/ Temporary erosion and sediment controls ❑ Compliance with grading and Fill standards ❑ Compliance with Critical Area Regulations Expiain: Water Resources/Stormwater Checklist and Mitigation Measures S. Will the proposal require or result in(check all that apply and describe below): Staff Comments: ❑ any work over,in,or adjacent to (within 200 feet) of Edgecomb Creek or Portage Creek? ❑ fill and dredge ma,erial that would be placed in or removed from surface water or wetlands? ❑ surface water withdrawals or diversions? ❑ ischarges of waste materials to surface waters? groundwater withdrawal or discharge? site s withm a well head protection area ❑ waste materials entering ground or surtace waters! 6. Describe the source of runoff(including Stormwater) and method of collection, treatment,and disposal,if any(include quantities,if known).Where will this water flow?Will this water flow into other waters?if so,describe. Storm water onsite will be infiltrated'below parking area and wT not flow into other waters. 7. Is the area designated a critical aquifer recharge area?If so,please describe: No 8. About what percent of the site will be covered with impervious surfaces after project construction �1 — (for e?mple, sp allgr�,uildi gss) 2o'6met�albleg 31"Gasp�halt and 3xnnrfalu yam"' ( Reviewed I PERCO Engineering Preliminary 12!09/2025 6:40:01 PM Water Resources/Stormwater Checklist and Mitigation Measures 9. What measures are proposed to reduce or control water resources/stormwater impacts? Proposed Measures to control impacts including Exhibit B-2 and B-4 regarding Mitigation Document and Applicable Regulations and Advisory Notes, respectively (check all that apply): Compliance with construction-related stormwater requirements,including temporary erosion and sediment control,and development and implementation of a stormwater pollution and spill prevention plan. ❑ Determination of necessary permanent,long-term water quality treatment requirements. ❑ Low Impact Development(LID) techniques employed,consistent with AMC 13.28? ❑ Adequate erosion protection at outfalls. ❑ Other: Explain: Plants and Animals Checklist and Mitigation Measures 10. Check or circle types of vegetation found on the site: Staff Comments: ❑ Deciduous tree:Alder,maple,aspen,other [g/ Evergreen tree: Fir,cedar,pine,other ❑ Shrubs 52""Grass ❑ Pasture ❑ Crop or grain ❑ Wet soil plants: Cattail,buttercup,bullrush,skunk cabbage,other ❑ Water plants:Water lily,eelgrass,milfoil,other Other types of vegetation: 11. Are there wetlands on the property?Please describe their acreage and classification. 12. Is there riparian habitat on the property? 13. What kind and amount of vegetation will be removed or altered? rass 14. LisT threatened or endangered species known to be on or near the site Noyes 15. Are there plants or habitats subject to Critical Areas and/or Shoreline Master Program? 16. Is the proposal consistent with critical area regulations,shoreline regulations, and requirements of the AMMIC Subarea Plan(now retitled Cascade Industrial Center)?Please describe. /V/-} 17. Proposed landscaping,use of native plants,buffers,or other measures to preserve or enhance vegetation on the site,if any: ,Sew sLtie ��i�/li City of Arlington CIC Planned Action Page 6 Plants and Animals Checklist and Mitigation Measures 18. Proposed Measures to control impacts including Exhibit B-2 and B-4 regarding Mitigation Document and Applicable Regulations and Notes, respectively(check all that apply): ❑ Compliance with Critical Areas Ordinance ❑ Compliance with Shoreline Master Program ❑ Implementation of on-site or street frontage green infrastructure ❑ Implementation of Chapter 20.76-Screening and Trees Other: Explain: CULTURAL RESOURCES CHECKLIST AND MITIGATION MEASURES Cultural Resources Checklist and Mitigation Measures 19. Are there any buildings,structures,or sites,located on or near the site that are Staff Comments: over 45 years old listed in or eligible for listing in national or state preservation registers?If so,specifically describe. 20. Are there any landmarks,features,or other evidence of Indian or historic use or occupation?This may include human burials or old cemeteries.Are there any material evidence,artifacts,or areas of cultural importance on or near the site?Please list any professional studies conducted at the site to identify such resources. Ad 21. Are there any buildings,structures,or sites,located on or near the site that are over 45 years old listed in or eligible for listing in national or state preservation registers? If so,specifically describe. A/Q 22. Are there any landmarks,features,or other evidence of Indian or historic use or occupation?This may include human burials or old cemeteries.Are there any material evidence,artifacts,or areas of cultural importance on or near the site?Please list any professional studies conducted at the site to identify such resources. 4/0 23.Proposed Measures to control impacts including Exhibit B-2 and B-4 regarding Mitigation Document and Applicable Regulations and Notes, respectively (check all that apply): compliance with AMMIC (now renamed Cascade Industrial Center) Subarea Plan. ❑ Compliance with other applicable land use and shoreline policies and development regulations. ❑ Tribal,federal,or state consultations for cultural or eligible historic resources. ❑ Evaluation per Exhibit B-2 and implementation of associated recommended conditions. ❑ Inadvertent discovery plan. ❑ Other Explain: City of Arlington CIC Planned Action Page 7 TRANSPORTATION CHECKLIST AND GREENHOUSE GAS MITIGATION MEASURES Transportation Checklist and Mitigation Measures 24. Identify public streets and highways serving the site and describe proposed Staff Comments: access to the existing street system.Show on site plans,if any. 25. Is site currently served by public transit?If not,what is the approximate distance to the nearest transit stop? A/Q 26. How many parking spaces would the completed project have?How many would the project eliminate? 27. Will the proposal require any new roads or streets,or improvements to existing roads or streets,not including driveways?If so,generally describe (indicate whether public or private). /✓D 28. How many PM peak hour vehicular trips per day would be generated by the completed project? 29. Is the land use addressed by the EIS Greenhouse Gas Analysis? A11-4 30.Measures to control impacts including Exhibit B-2, Exhibit B-3,and B-4 regarding Mitigation Document,Additional Mitigation Requirements and Procedures,and Applicable Regulations and Notes,respectively(check all that apply): ❑ Evaluate and mitigate roadways consistent with Planned Action Ordinance Section 4.1)(3). ❑ Commute Trip Reduction (AMC Chapter 10.80) ❑ Transportation Demand Management(TDM) Programs ❑ Street frontage standards ❑ Impact fee and SEPA mitigation fee for fair share of capital improvements ❑ Other: Explain: LAND USE AND AESTHETICS CHECKLIST AND MITIGATION MEASURES Land Use and Aesthetics Checklist and Mitigation Measures 31. What is the current use of the site and adjacent properties? Staff Comments: 32. Describe any structures on the site.Will any structures be demolished?If so, what type,dwelling units,square feet? /r0/YG 33. What is the current zoning classification of the site? ,¢R 34. What is the current Comprehensive Plan designation and zoning classification of adjacent sites? +R R. / �Z luL G 35. If applicable,what is the current shoreline master program designation of the site? IV/A- City of Arlington CIC Planned Action Page 8 Land Use and Aesthetics Checklist and Mitigation Measures 36. What is the planned use of the site?List type of use,number of dwelling units and building square feet. 37. Approximately how many people Would reside or work in the completed project? 38. Approximately how many units would be provided,if any?Indicate whether high,middle,or low-income housing. N/ 39. Approximately how many units,if any,would be eliminated?Indicate whether high,middle,or low-income housing. 40. Approximately how many people would the completed project displace? 100411 41. What is the tallest height of any proposed structure(s)? 42. Would any views in the immediate vicinity be altered or obstructed? Na 43. Would the proposal produce light or glare?What time of day would it mainly occur? AG 44. Could light or glare from the finished project be a safety hazard or interfere with views? /D 45. What existing offsite sources of light or glare may affect your proposal? 4114 46. Would shade or shadow affect public parks,recreation,open space,or gathering spaces? /✓O 47.Proposed Measures to control impacts including Exhibit B-2 and B-4 regarding Mitigation Document and Applicable Regulations and Notes, respectively (check all that apply): ❑ Compliance with AMMIC Subarea Plan. ❑ Compliance with other applicable land use and shoreline policies and development regulations. ❑ Other Explain: UTILITIES AND PUBLIC SERVICES CHECKLIST AND MITIGATION MEASURES Public Services and Utilities Checklist 48. Water Supply:Would the project result in an increased need for water supply Staff Comments: or fire flow pressure?Can City levels of service be met? 49. Wastewater:Would the project result in an increased need for wastewater services?Can City levels of service be met? City of Arlington CIC Planned Action Page 9 Public Services and Utilities Checklist 50. Police Protection:Would the project increase demand for police services?Can City levels of service be met? 51. Fire and Emergency Services:Would the project increase demand for fire and/or emergency services?Can levels of services be met? 52. Schools:Would the project result in an increase in demand for school services?Can levels of services be met?Is an impact fee required? 53. Parks and Recreation:Would the project require an increase in demand for parks and recreation?Can levels of services be met? 54. Other Public Services and Utilities:Would the project require an increase in demand for other services and utilities?Can levels of services be met? 55.Proposed Measures to control impacts including Exhibit B-1 and B-4 regarding Mitigation Required for Development Applications and Exhibit B-3 Applicable Regulations (check all that apply): ❑ Capital Facility Plan has been considered,and development provides its fair share of the cost of improvements consistent with applicable local government plans and codes. ❑ Law enforcement agency has been consulted,and development reflects applicable code requirements. ❑ Fire protection agency has been consulted,and development complies with Uniform Fire Code. ❑ School impact fee,if applicable. ❑ Parks impact fee,if applicable. ❑ Developer has coordinated with City to ensure that sewer lines,water lines,or stormwater facilities will be extended to provide service to proposed development site where required. ❑ General facility charges have been determined to ensure cumulative impacts to utilities are addressed. ❑ Other Measures to reduce or control public services and utilities impacts: Explain: C. Applicant Signature The above answers are true and complete to the best of my knowledge.I understand that the lead agency is relying on them to make its decision. Signature: Date: I2— 1p - 2S City of Arlington CIC Planned Action Page 10