Loading...
HomeMy WebLinkAbout20260209_PJ25-0059_PJ25-0060_Decision Community and Economic Development Planning Division 18204 59th Avenue NE,Arlington, WA 98223 ZONING PERMIT - SITE PLAN REVIEW ADMINISTRATIVE DESIGN REVIEW STAFF REPORT AND PERMIT DECISION GENERAL INFORMATION File Number: PJ25-0059/PJ25-0060 Project Title: Thunderbird Hangar Owner: City of Arlington (Airport) Applicant/Contact: Steve Hansen Thunderbird Hangar,LLC Description: Construction of a new 11,250 square foot metal hangar Location: West of 591h Drive NE Address: 18210 59th Ave NE Tax Parcel ID: 00448200002301 Lot Size: 48,805 sq ft(1.1204 acres) Topographical Description: Generally flat Zoning Classification: Aviation Flightline Land Use Designation: Aviation Flightline Proposed Use Classification: Aircraft Storage City Approvals Required: Zoning Permit,Design Review,Civil Permit,Building Permit Date of Decision: February 9, 2026 Decision: APPROVED,with Conditions Zoning Permit-Site Plan Review Administrative Design Review Thunderbird Hangar PJ25-0059-PJ25-0060 Page 1 of 21 I. NATURE OF APPLICATION A. Request The applicant is proposing the construction of a new 11,250sf aircraft hangar.The project site is a 1.1- acre lease lot on Airport Property currently zoned Aviation Flightline within the Cascade Industrial Center.The parcel is located to the west of 59th Drive.The hangar is intended for Aircraft Storage. There will be a driveway off 591h Drive NE as well as access from the property to the north. B. Project Chronology/Background A formal application for the Zoning Permit- Site Plan Review and Design Review was submitted to the Community & Economic Development Department on November 5, 2025, and routed for review. The applicant was deemed incomplete on November 13, 2025.After payment was received,the application was deemed complete on November 19, 2025. Resubmittals were received and routed for review on December 11, 2025,and January 15, 2026. C. Site Location/Description Ft The site is r 01 located west of 591h Drive NE and North of the t' �F Airport Office r Zoning Permit-Site Plan Review Administrative Design Review Thunderbird HangarPJ25-0059-PJ25-0060 Page 2 of 21 D. Site and Adjacent Zoning/ Uses 18 18228 The site is located 18218 west of 591h Drive NE and North of the Airport Office 18204 LI=Light Industrial AF=Aviation Flightline GI=General Industrial Area Zoning Existing Use Subject Site Aviation Flightline Vacant North Aviation Flightline Aircraft Hangars South Aviation Flightline Airport Office East General Industrial Warehouse West Aviation Flightline Airport Zoning Permit-Site Plan Review Administrative Design Review Thunderbird HangarPJ25-0059-PJ25-0060 Page 3 of 21 II. PROJECT CONSISTENCY WITH TITLE 20 AMC, ZONING A. Applicable Review Criteria and Process The Zoning Permit-Site Plan Review request is subject to review for conformity with the Arlington Municipal Code (AMC),including but not limited to the following: Regulation I Analysis Meets Chapter 20.16 AMC,Permits and Final Plat Approval 20.16.100 (b) Zoning Permits are issued under The applicant submitted a zoning this title only when a review of the application permit for site plan review and design submitted, including plans contained therein, review.The Community&Economic indicates that the development will comply with Development Department is the provisions of this title if completed as responsible for the permit decision, Yes proposed.All development shall occur strictly in and the decision is appealable to the accordance with such approved plans and Hearing Examiner. applications. 20.16.110 Who May Submit Permit The lessee of the property, Applications. (a)Applications for zoning will be Thunderbird Hangar, LLC signed the accepted only from persons having the legal zoning application for site plan review authority to take action in accordance with the and design review that was submitted permit or the subdivision plat approval. By way to the city. of illustration,in general this means that Yes applications should be made by the owners or lessees of property, or their agents, or persons who have contracted to purchase property contingent upon their ability to acquire the necessary permits under this title. 20.16.120 Official Representative of the The lessee of the property, Applicant.The applicant for each land use Thunderbird Hangar, LLC,have permit shall designate an official representative, designated Steve Hansen with JSH which may be himself,to receive all Properties as the official Yes correspondence, determinations,and notices representative for the subject permit. regarding the application. 20.16.130 Staff Consultation Before Formal The City held a General Information Application.To minimize development planning Meeting with the project applicant on costs, avoid misunderstanding or May 28, 2025. misinterpretation,and ensure compliance with the requirements of this title,a general Yes information meeting between the developer and the planning staff is encouraged as provided in this section. 20.16.140 Submittal of Application. The project applicant scheduled a (a) To minimize development planning costs, submittal intake appointment with the avoid misunderstanding or misinterpretations, Community and Economic and ensure compliance with the requirements Development Department and of this title,a submittal intake appointment is submitted the application on Yes required between the developer and the November 5, 2 02 5. Community Development staff as provided in this section. Zoning Permit-Site Plan Review Administrative Design Review Thunderbird HangarPJ25-0059-PJ25-0060 Page 4 of 21 Regulation Analysis Meets 20.16.150 Vesting of Permits. The proposed application for (1) Land use permit applications shall be Thunderbird Hangar site plan considered vested on the date that an review vested on November 19, 2025, application is deemed complete pursuant to with the issuance of the complete 20.16.205 and applications shall be processed application.The required impact fees under the land use regulations in effect on that for the proposal do not vest with the date.However,subsequent permits on the same project and the fee in place at the time Yes property are not vested on this date. Filing of a of payment is the amount due. permit application does not vest the payment of fees. Fees due,including impact mitigation fees, application fees,or other charges,shall be those fees in effect on the date the fee is paid. 20.16.200 Applications to Be Complete. The applicant submitted a complete (a)All applications for zoning,special use, application for the Thunderbird Hangar conditional use,or sign permits must be Zoning Permit and Design Review. Yes complete before the permit-issuing authority is required to consider the application. 20.16.205 (c) Complete Application. The application was submitted on Within 28 days of receiving the permit November 5, 2025.The City issued a application,the Community Development Notice of Incomplete Application on Yes Director shall mail or provide in person a November 13, 2025.The Notice was written determination to the applicant. issued within the 28-day timeframe. 20.16.205 (g)Within fourteen (14) days after an The applicant provided payment,and applicant has submitted to the Community and the application was deemed completed Economic Development Director the additional on November 19, 2025,within the 14- information identified as being necessary for a day timeline. complete application,the Community and Economic Development Director shall notify the applicant whether the application is complete or what additional information is necessary. 20.16.215 Distribution of Application. The application was routed to all Upon receipt of a zoning,special use or effected city departments on November conditional use permit application,the Planning 5, 2025,December 11, 2025,and Official shall,in addition to all interested City January 15, 2026. Yes Departments,send a copy of the application to the authorities and agencies reviewing or furnishing water,fire,school,and sanitary sewer service to the proposed project. 20.16.220 Zoning Permits. The Zoning Permit was submitted to city (a)A completed application form for a zoning staff on November 5, 2025,The permit shall be submitted to the community and project was reviewed for compliance Yes economic development director by filing a copy with the Arlington Municipal Code. of the application with the planning department. Zoning Permit-Site Plan Review Administrative Design Review Thunderbird HangarPJ25-0059-PJ25-0060 Page 5 of 21 Regulation Analysis Meets 20.16.270 Time Limitations for Permit The proposed Zoning Permit was Processing. (a) The City shall issue its notice of reviewed and issued within the 65 day final decision on a permit application within timeframe per the following dates: 120 days after the Community and Economic Action Date Development Director notifies the applicant that Date of Application 11/5/2025 the application is complete,as provided in Notice of Incomplete Application 11/13/2025 20.16.205.In determining the number of days Resubmittal 11/14/2025 that have elapsed,the following periods shall be Notice of Complete Application 11/19/2025 Yes Review Comments 11/19/2025 excluded: Resubmittal 12/11/2025 (1)Any period during which the applicant has Review Comments 12/11/2025 been requested to correct plans,perform 2nd Resubmittal 1/15/2025 required studies,or provide additional required Permit Decision 2/9/2025 information. 25/65 Days Used Chapter 20.36 AMC,Zoning Districts and Zoning Map 20.36.034 Aviation Flightline District The subject property for the proposed Established.This district is created to allow Zoning Permit is zoned Aviation only aviation related uses proximate to airport Flightline and is for aviation related runways and taxiways.Aviation related uses use.The proposal is also located within Yes include any uses related to supporting aviation the Cascade Industrial Center. that require direct taxiway access as a necessary part of their business operations,such as aviation services,manufacturing of aviation- related goods,general services whose primary customers would be those engaged in aviation- related activities (e.g.,restaurants primarily catering to pilots,employees,or passengers),or other uses that are clearly related to aviation. Chapter 20.38 AMC,Airport Protection District 20.38.060 Airport Protection District The property is located under Boundaries. Subdistrict A,within Sideline Safety (a)Airport Protection Subdistrict A Zone (SSZ) Zone 5. (b)Airport Protection Subdistrict B Yes (c)Airport Protection Subdistrict C (d)Airport Protection Subdistrict D 20.38.070 Restrictions on Certain Use The proposed use of Aircraft Hangars Classifications of Arlington Airport Property. is an appropriate use within this Certain uses,though allowed in particular location due to direct access to the zoning districts as identified in§20.40, runway and approved by Arlington Yes Permissible Uses,are herein deemed non- Airport. permissible within that zoning district where applied to property owned by the Arlington Airport,even when leased to private parties. These use classifications are denoted by footnote conditions. Zoning Permit-Site Plan Review Administrative Design Review Thunderbird HangarPJ25-0059-PJ25-0060 Page 6 of 21 Regulation Analysis Meets 20.38.080 Performance Standards and All proposed lighting is down shielded. Miscellaneous Restrictions (a) Subdistrict A-The following rules shall be applied within the boundaries of the AP Yes Subdistrict A: (1) No structures, devices or other objects shall be placed or erected that makes it difficult for pilots to distinguish between airport lights and other lights,results in glare in the eyes of pilots using the airport,impair visibility in the vicinity of the airport,or otherwise endanger the landing,take off, or maneuvering of aircraft. 20.38.080 (a)(2) No bulk above ground storage Storage is not proposed with this greater than 6,000 gallons of flammable or development. Yes hazardous substance will be permitted unless it is associated with an aviation business. 20.38.080 (a)(3) Except for aeronautical events No events are proposed at this site nor such as the Arlington Fly-In,the public an expected result from the assembly of people and other uses or activities, development of an airport hangar. whether permanent(such as multi-family, Yes hospitals,schools,churches,etc.) or temporary (such as circuses,carnivals or other outdoor entertainment events or religious assembly not exceeding five days in duration),that allow public concentrations of people shall be prohibited within Subdistrict A,but allowed in all other parts of the AP District so long as such uses do not adversely affect airport operations, safety in air navigation or penetrate the FAR Part 77 Surfaces. 20.38.080 (a)(5) Densities,both residential and Zone 5 allows for 80 average people non-residential,shall not exceed those listed in per gross acre. No more than (3) Table 20.38-1: Density Limits within the APD, employees are expected to work at this Yes location at any given time. 20.38.080(b) The following rules shall be No special functions are proposed. applied within the boundaries of the AP Subdistrict A and B: (1) Special function uses Yes shall be prohibited under the airport traffic pattern. 20.38.080(c) The following rules shall be This proposal is not expected to applied within the boundaries of the AP increase the bird population or Subdistricts A, B,and C: (1) No use shall be increase the bird impact problem. Yes permitted that would foster an increase in bird population and thereby increase the likelihood of a bird impact problem. Zoning Permit-Site Plan Review Administrative Design Review Thunderbird HangarPJ25-0059-PJ25-0060 Page 7 of 21 Regulation -Analysis Meets Chapter 20.40 AMC,Permissible Uses 20.40.010 Table of Permissible Uses.The Tables The proposed project is an allowed use of Permissible Uses sets forth the permissible per the permissible use table within the uses within the respective zoning classifications Aviation Flightline Zone,as shown in the city,subject to other applicable provisions below,with a Zoning Permit. in this title. It should be read in close Yes conjunction with the definitions of terms set forth in section 20.08 and the other interpretative provisions set forth in this article. Chapter 20.40.150 Special Zones Permissible Use Table Use BP AF123 MS Parking or storage of aircraft,either inside or outside Z completely enclosed structures Z=Zoning Permit 1 Such uses allowed only for aviation related uses in compliance with the intent of the zone as established by Section 20.36.034 Aviation Flightline District Established and at the discretion of the Arlington Municipal Airport. 2 Subject to Section 20.38.070-Restrictions on Certain Use Classifications on Arlington Airport Property 3 Subject to Section 20.38.080-Performance Standards and Miscellaneous Restrictions Chapter 20.46 AMC,Design 20.46.010 (a) Conformance with Design The Design Review application was Standards. Structures within the following submitted to the city and is reviewed zones are subject to the relevant design concurrently with the Zoning Permit. standards adopted in this chapter. No building The design of this structure is in or land use permit shall be issued for structures compliance with the design regulations Yes or uses that do not conform to the applicable listed within the Development Design standards. Standards for the Aviation Flightline (1) Zones zone. i Aviation Flightline 20.46.030(a) The following developments or Ordinance 2026-003 repealed the projects that are over 12 units or more,new Design Review Board.As a result, mixed-use although the project would previously developments (not part of the mixed-use have been subject to Design Review development regulations),new commercial,or Board review, design review is now Yes new industrial structures are subject to design processed as an administrative review board: (6) Industrial decision as the provisions enabling the Board have been repealed. Development Design Standards 1.0 Street Character and Liveliness Landscaping,windows,lighting and doors provided facing the primary Yes road. 2.0 Pedestrian Environment Entry canopies,doors,windows and clear walkways provided.Large areas of blank walls are broken up with the Yes use of murals and color changes. Conditions added to ensure proper screening of service elements. Zoning Permit-Site Plan Review Administrative Design Review Thunderbird HangarPJ25-0059-PJ25-0060 Page 8 of 21 Regulation Analysis Meets 3.0 Landscape Design Landscape screening is provided along the frontage as well as plantings throughout the site. Yes 4.0 Transition Between Occupied This proposal does not include residential units. Spaces and Street Yes 5.0 Neighborhood Character The design of this building is common for this area and similar uses nearby. Landscaping and design are provided to provide focus towards the Yes public road. 6.0 Adjacent Properties The proposed building's siting does not impact the use of adjacent properties. Yes 7.0 Siting The primary use of this building is to utilize the airport to the west.Additional landscaping is provided to screen the parking.Conditions have Yes been added to ensure proper screening of service elements. 8.0 Transit Facilitation Transit is not accessible from this location. Yes 9.Architectural Character The proposed building keeps within the industrial look of the surrounding area but provide for character and detail through the use Yes of different colors of metal siding and the use of art to breakup the design. 10. Character and Massing In keeping with the look of the neighborhood character in this industrial area,the proposed building has the main facades broken up by Yes awnings,colors,art and landscaping.A condition for roof mounted equipment has been included. 11.Architectural Elements Elements such as windows and awnings have been provided to give a pedestrian scale, Yes however,this is not primary as the intended use does not have access for the general public. 12. Exterior Finish Materials Metal cladding is proposed in colors common to the area. Concrete block used for the trash Yes enclosure have been enhanced with color and texture. 13. Parking Garages No parking garages are proposed with this development. Yes 14. Mixed-Use Buildings This proposal does not include mixed-use. Yes 15. Old Town Business District This proposal is not within the Old Town Yes Business District. Zoning Permit-Site Plan Review Administrative Design Review Thunderbird HangarPJ25-0059-PJ25-0060 Page 9 of 21 Regulation I Analysis Meets Chapter 20.48 AMC,Density and Dimensional Regulations 20.48.040 Building Setback Requirements. No The proposed project is within the portion of any building or any freestanding sign aviation flightline zone and complies may be located on any lot closer to any lot line with the below regulations. than is authorized in Table 20.48-1 Density and Yes Dimensional Standards for the Aviation Flightline zone. 20.48.042 Sight Visibility Areas at Intersections. The proposed project takes access to At the intersection of two streets, either public or the site from 59th Drive NE.The site private,no structure,sign,vegetation, or anything plan shows there are no else that obscures sight shall exceed 30 inches in improvements that will obscure sight height in the area described by a triangle having at the entrance or exit from the site. Yes two 25-foot legs along the curb faces of the streets from the streets'point of intersection,and a diagonal line connecting the ends of these lines. Table 20.48-1 Density and Dimensional Standards Minimum Lot Size: 10,000 square feet 48,805sf Yes Minimum Lot Width: 70 feet 161' Yes Front Lot Boundary Line: 25 feet 158'4.5" Yes Rear Lot Boundary Line-Primary: 20 feet 20' Yes Side Lot Line or Alley Building Setback: 5 feet 8'6" &35'2.5" Yes Building Height Limitation: 50 feet > 50' Yes Maximum Lot Coverage: 100% 64.8% Yes Chapter 20.56 AMC,Streets and Sidewalks 20.56.030 Access to Lots.Every lot shall have The proposed project provides a access to it that is sufficient to afford a reasonable driveway access point from means of ingress and egress for emergency 59th Drive NE.This driveway access vehicles as well as for all those likely to need or provides a public means of ingress desire access to the property in its intended use. and egress for emergency vehicles, Access includes vehicular,pedestrian,bicycle,and passenger vehicles,pedestrian,and Yes other common forms of transportation. bicycle transportation. 20.56.050 Entrances to Streets. (a)All driveway The proposed project complies entrances and other openings onto streets within with the following City of the city's planning jurisdiction shall be Arlington Standards and constructed so that: Specifications: 1.Vehicles can enter and exit from the lot in 1.The proposed driveway question without posing any substantial danger entrance provides safe access to to themselves,pedestrians,or vehicles traveling the site and do not impede in abutting streets,and vehicle or pedestrian travel. 2. Interference with the free and convenient flow 2.Access to the site does not of traffic in abutting or surrounding streets is interfere with the flow of minimized. traffic on 59th Drive NE. 3. Driveway cuts shall be limited so the 3.The driveway cut is 38 feet in Yes narrowest width necessary to provide safe width to provide two way vehicular ingress and egress onto and from the property. and truck movement to and from. Zoning Permit-Site Plan Review Administrative Design Review Thunderbird HangarPJ25-0059-PJ25-0060 Page 10 of 21 Regulation Analysis Meets 4.Driveways shall not be located adjacent to one 4.There is only one driveway proposed. Yes another in such a manner as to create a"double width" driveway without any landscaping between the driveways. 20.56.120 Street Intersections. (a) Streets shall The proposed project provides 90' intersect at 80'to 90'.Not more than two driveway intersection. Yes streets shall intersect at any one point or vary from the above angle of connections. 20.56.130 Construction Standards and The proposed project is subject to a Specifications. Construction and design Site Civil Construction Permit. standards and specifications for streets, sidewalks,and curbs and gutters are contained Yes in the "Public Works Construction Standards and Specifications,"and all such facilities shall be completed in accordance with these standards. Chapter 20.60 AMC,Utilities 20.60.100 Sewage Disposal Facilities Required. The proposed project shall connect to Every principal use and every lot within a the City of Arlington Sanitary Sewer as subdivision shall be served by a sewage disposal approved in the Water/Sewer system that is adequate to accommodate the Availability Letter on January 30, 2026. reasonable needs of such use or subdivision lot The construction of utilities will take Yes and that complies with all applicable health place after Civil Permit approval and regulations. shall meet all requirements of the Public Works Construction Standards and Specifications. 20.60.300 Water Supply System Required.Every The proposed project shall connect to principal use and every lot within a subdivision the City of Arlington water as approved shall be served by a water supply system that is in the Water/Sewer Availability Letter adequate to accommodate the reasonable needs on January 30, 2026.The construction of such use or subdivision lot and that complies of utilities will take place after Civil Yes with all applicable health regulations. Permit approval and shall meet all requirements of the Public Works Construction Standards and Specifications. 20.60.400 Lighting Requirements. Lighting on the building is provided. (a)All public streets,sidewalks,and other Final lighting plans to be reviewed and common areas or facilities shall be sufficiently approved with the Civil permit. illuminated to ensure security of property and Yes the safety of persons using such streets, sidewalks and other common areas or facilities. (d)All outdoor lights shall be low sodium or The proposed project provides LED similar lamp type and be down shielded to lighting that is down shielded. Final Yes prevent light pollution. lighting plans to be reviewed and approved with the Civil permit. Zoning Permit-Site Plan Review Administrative Design Review Thunderbird HangarPJ25-0059-PJ25-0060 Page 11 of 21 Regulation Analysis Meets 20.60.410 Excessive Illumination.Lighting within The proposed project provides any lot that unnecessarily illuminates any other lot adequate lighting throughout the site or public right-of-way and substantially interferes that does not unnecessarily illuminate with the use or enjoyment of such other lot or to neighboring properties. Final Yes public right-of-way is prohibited. lighting plans to be reviewed and approved with the Civil permit. 20.60.450 Underground Utilities.All existing, All proposed utilities to and on the site extended,new electrical power lines,telephone, shall be located underground.All gas distribution,cable television,and other utility lines are required to be shown communication and utility lines shall be placed on the site civil plans and shall be underground in accordance with the specifications approved by the City of Arlington prior Yesconstruction activities on the site. Yes and policies of the respective utility service providers and located in accordance with the Public Works Construction Standards and Specifications. Chapter 20.72 AMC,Parking 20.72.010 Number of Parking Spaces Required. The proposed project has shown on (a)All developments in all zoning districts shall the approved site plan that it meets provide a sufficient number of parking spaces to the required parking for the site with accommodate the number of vehicles that (14) stalls proposed. Yes ordinarily are likely to be attracted to the development in question. Aircraft Storage: 1 space for every two hangars 20.72.030 Parking Space Dimensions. The site plan shows that the parking (a) Except accessible parking spaces,each spaces proposed are 9 feet wide by 19 Yes parking space shall contain a rectangular area of at feet long,meeting the dimensional least 19 feet long and 9 feet wide. regulations. 20.72.060 Parking Area Surface. The proposed project has shown (a)All parking areas shall be graded and surfaced concrete for the parking and vehicle with asphalt, concrete or other material that will drive aisle areas throughout the site. provide equivalent protection against potholes, All parking spaces are painted with erosion,and dust.Specifications for surfaces lines and other required markings. meeting the standard set forth in this subsection Yes are contained in the Public Works Construction Standards and Specifications. (b) Parking spaces shall be appropriately demarcated with painted lines or other markings. (c) Parking areas shall be properly maintained in all respects. 20.72.064 Accessible Parking Spaces. The proposed project has provided (b)The number of handicapped parking spaces to one accessible parking spaces on the be provided in any lot or facility shall be in site that is sized to accommodate van accordance with the current state standard and dimensions. International Building Code.Accessible parking spaces are to be calculated in addition to the required off-street parking spaces required and not included in the parking calculations in Table Yes 20.72-1. Zoning Permit-Site Plan Review Administrative Design Review Thunderbird HangarPJ25-0059-PJ25-0060 Page 12 of 21 Regulation Analysis Meets Chapter 20.76 AMC,Screening and Trees 20.76.020 General Screening Standard. The project is in the general aviation Developments shall provide sufficient screening so flightline zone surrounded by other that: aviation uses 1. Neighboring properties are shielded from any Yes adverse external effects of that development. 2.The development is shielded from the negative impacts of adjacent uses such as streets and railroads. 20.76.030 Compliance with Screening Standard. The proposed project has provided a The table set forth in 20.76.050,in conjunction type B screening along 591h Ave NE with the explanations in 20.76.040 concerning the with additional landscape screening types of screens,establishes screening between the property line and the requirements that presumptively satisfy the parking lot. Yes general standards established in 20.76.020.The table uses the permissible use designation to determine the type of screening that is required between two uses. 20.76.060(b) Without limiting the generality of No screening is proposed on the Subsection (a),the permit-issuing authority may sides as the only uses allowed within modify the presumptive requirements for: (2) this area are aviation related uses, Non-residential uses located adjacent to other primarily as hangars. similar uses within the same zoning Yes district Table 20.76-1 Screening Requirements Use Frontage Landscaping Side and Rear Property Lines Aircraft Storage Type A Type B -All Other Neighboring Properties 20.76.110 Required Trees Along Dedicated Streets. The proposed project is not required The developer shall either plant or retain sufficient to plant additional trees within the trees so that within the landscape strip there is for public right-of-way of 59th Drive NE. every 30 feet of street frontage at least an average Trees are proposed along the of one deciduous tree of two inches dbh at the time frontage of this site on private of planting and with a canopy that starts at least property and part of the Yes eight feet above finished grade and has or will have Type B landscaping. when fully mature a trunk at least 8 inches in diameter. Root barriers shall be provided for all street trees and the landscape strip shall be planted per the Department of Public Works Standards and Specifications. Zoning Permit-Site Plan Review Administrative Design Review Thunderbird HangarPJ25-0059-PJ25-0060 Page 13 of 21 Regulation Analysis Meets 20.76.130 Shade Trees in Parking Areas. The project provides shading of the (a)Vehicle accommodation areas that are required parking lot area on the site. to be paved must be shaded by deciduous trees that have or will have when fully mature a trunk at The total parking area is calculated at least 8 inches in diameter. 10,618 square feet,requiring (b) Landscaping within vehicle accommodation 2,123.60 square feet of required areas shall meet the requirements of 20.46 and the shading at 20% of the total. Development Design Standards. Yes (c) Each tree of the type described in subsection The applicant has provided 2,457 (a) shall be presumed to shade a circular area square feet,which equates to 23%. having a radius of 15 feet with the trunk of the tree as the center,and there must be sufficient trees so that,using this standard, 20 percent of the vehicle accommodation area will be shaded. 20.76.140 Maintenance of Screening and Shading The property owner(s) shall Elements.All screening and shading elements maintain the landscaping on the required by this Chapter shall be maintained by the property and within the right-of-way owner for the life of the project to the following per AMC 20.76. standards: 1.All plant material shall be maintained with respect to pruning,trimming,mowing,watering, insect control,and fertilizing to maintain a healthy growing condition,create an attractive appearance, and to accomplish the purpose for Yes which it was required. 2. Dead,diseased,stolen,vandalized,or damaged plants shall be replaced within three months of the plants indicated on the approved landscape plans. 3.All screening and shading elements shall be maintained reasonably free of weeds and trash. 4.All screening and shading elements located within the public right-of-way shall be maintained by the abutting property owner. Chapter 20.90 AMC,Concurrency&Impact Fees 20.90.040 (a) Imposition of Impact Fees on The applicant provided a Traffic Development Activity.All development projects Impact Analysis Memo prepared by within the City shall be assessed a transportation lake Traffic Engineering with traffic impact fee,at the rate of$3,355.00,based on peak counts updated in October 2025.The p.m.trips,as computed in accordance with the most traffic memo concluded that the Yes current edition of the Institute of Transportation proposal would produce less than (1) Engineers Trip Generation Manual,as applied to the PM peak-hour-trips to the site.A traffic City's transportation element of the adopted impact fee shall be for paid with the Comprehensive Plan. building permit for (1) trip. Zoning Permit-Site Plan Review Administrative Design Review Thunderbird HangarPJ25-0059-PJ25-0060 Page 14 of 21 Regulation Analysis Meets 20.90.045 (a) All development projects within the The applicant provided a Traffic Cascade Industrial Center shall be assessed an Impact Analysis Memo prepared by additional transportation impact fee,at the rate of Jake Traffic Engineering with traffic $5,841.39,based on peak p.m.trips,as computed in counts updated in October 2025.The Yes accordance with the most current edition of the traffic memo concluded that the Institute of Transportation Engineers Trip proposal would produce less than (1) Generation Manual. PM peak-hour-trips to the site.A traffic impact fee for the CIC shall be for paid ,with the building permit for (1) trip. Chapter 20.98 AMC,State Environmental Policy Act(SEPA) 20.98.110 (d) Environmental Checklist. For The applicant provided a modified projects submitted as planned actions under WAC environmental checklist with the 197-11-164,the City shall use its existing application and the city has environmental checklist form or may modify the approved the proposed project per Yes environmental checklist form as provided in WAC the requirements of the checklist. 197-11-315.The modified checklist form may be prepared and adopted along with or as part of a planned action ordinance. Chapter 13.28 AMC,Stormwater 13.28.070 Applicability of the Utility.The following The proposed project is subject to actions or applications for the following permit meeting the required stormwater and/or approvals will require submittal for regulations for the site.A Site Civil approval by the utility: site plans,design drawings, Permit shall be required for all site and operations and maintenance plans. Submittals improvements.The approval of the shall be consistent with the provisions of this Code, stormwater system takes place and shall comply with the stormwater manual and during engineering standards: this review process.All stormwater Yes (3) New Development systems shall comply with the City of Arlington Public Works Standards and Specifications and the most recent Department of Ecology Stormwater Manual for Western Washington. This has been added as a permit condition. Zoning Permit-Site Plan Review Administrative Design Review Thunderbird HangarPJ25-0059-PJ25-0060 Page 15 of 21 III. CONCULUSIONS (a) The applicant has applied for a Zoning Permit as required under AMC 20.16. (b) Under AMC 20.16.220 (b),the community and economic development director shall issue the zoning permit unless he finds,after reviewing the application and consulting with the applicant as provided in section 20.16.130,that: Regulation Analysis Meets Chapter 20.16.220(b) (1) The requested permit is not within its The requested site plan review is within jurisdiction according to the table of the City of Arlington's jurisdiction per the Yes permissible uses. above zoning map and permissible use table. (2)The application is incomplete. The application for the subject site plan review was deemed complete on Yes November 19, 2024. (3) If completed as proposed in the The proposed site plan review complies application,the development will not comply with all required sections of AMC Title 20 Yes with one or more of the requirements of this per the above staff analysis. title. (4)The proposed project has not complied The proposed project has complied with with SEPA SEPA through the modified environmental checklist and complies with the Yes regulations of the Cascade Industrial Center Planned Action EIS. (5) The proposed project is not in The proposed site plan review complies conformance with the Comprehensive Plan, with the Arlington Municipal Code, Yes Transportation Plan,or other adopted plans, Comprehensive Plan,and Transportation regulations, or policies. Plan. IV. ADMINISTRATIVE DECISION The proposed project was found to be consistent with and meets the intent of the Arlington Zoning Code, Comprehensive Plan,and the Arlington Municipal Code,therefore the Zoning Permit- Site Plan Review for Thunderbird Hangars (PJ25-0059) and Administrative Design Review (PJ25-0060) for Thunderbird Hangars is hereby APPROVED,subject to the following conditions. Zoning Permit-Site Plan Review Administrative Design Review Thunderbird Hangar PJ25-0059-PJ25-0060 Page 16 of 21 V. CONDITIONS Zoning Permit: 1. All development shall be in substantial conformance with the approved Site Plans, Landscape Plans, and Supplemental Drawings received on January 15, 2026, subject to any conditions or modifications that may be required as part of the permit review. 2. The building shall be constructed per the design review elevations received on January 15, 2026. 3. The applicant shall comply with the approved Modified SEPA Decision and Complete Streets Checklist. 4. The applicant shall meet all local, state, or federal code requirements. Please refer to the Arlington Municipal Code for a complete list of code requirements for your project type. S. The applicant shall comply with all permits and conditions thereof from the City of Arlington and other government agencies with jurisdiction. Design Review: 1. The building permit elevations and constructed site shall be consistent with the design elevations, materials,colors,and details provided on January 15, 2026. 2. All service elements, electrical meters, and mechanical equipment shall be screened from the public street and view per 2.3.3.1, 2.3.3.3, 2.3.3.4, 2.7.3.1., 2.7.3.2, 2.7.3.3, 2.7.3.4, 2.7.3.5, 7.3.3.1, 7.3.3.2, 7.3.3.4, 7.3.3.5, 7.3.3.6,and 10.3.3.2. 3. All service elements, electrical meters, and mechanical equipment shall be incorporated into the overall design of the building per 7.3.3.E,11.1.4.2(g) 4. Lighting fixtures to be reviewed at the time of building permit and shall be consistent with the Design Review Standards including 10'-12'pole heights throughout parking areas. Lighting bollards 3-4'in height can illuminate paths and walkways and is required to be down shielded per 2.7.3.2, 2.7.3.3, 2.7.3.5. 5. The design review decision shall be approved for a maximum of two years with a valid land use permit or shall expire at the time of the land use permit, if not extended. Civil Permit: 6. A Site Civil construction permit shall be applied for and approved prior to any land disturbance on the subject property. 7. The project is subject to submit a Right-of-Way Permit for all work with public rights-of-way. 8. Prior to any construction activities, the applicant shall file and receive approval of site civil construction plans, which comply with all requirements of the Arlington Municipal Code, International Building Code(s), International Fire Code and Public Works Construction Standards and Specifications. Said plans shall address all site improvements. 9. The applicant shall comply with AMC Chapter 13.28, Stormwater Management, and the most current City-adopted edition of the Department of Ecology Stormwater Management Manual for Western Washington. 10. The applicant shall construct all existing, extended, and new electrical power lines (not to include transformers or enclosures containing electrical equipment including but not limited to, switches, meters, or capacitors which may be pad mounted), telephone, gas distribution, cable Zoning Permit-Site Plan Review Administrative Design Review Thunderbird HangarPJ25-0059-PJ25-0060 Page 17 of 21 television, and other communication and utility lines in or adjacent to any land use or building permit approved after the effective date of this chapter shall be placed underground in accordance with the specifications and policies of the respective utility service providers and located in accordance with the administrative guideline entitled "Public Works Construction Standards and Specification." Even in the event the distribution line originates from a point opposite any public roadway from the new construction the service lines shall be placed beneath said roadway by means of boring or surface excavation across said roadway. Building: 11. A building permit application shall be reviewed and approved prior to building construction on the site. 12. All building permits shall meet the most current edition of the International Building Code. 13. The project is subject to applicable water and sewer utility fees.These fees are collected at the time of building permit issuance. 14. City of Arlington traffic Impact fee&CIC Traffic Impact Fee shall be paid prior to issuance of the building permit for(1) PM Peak Hour Trip. Other: 15. All contractors working on the site are required to obtain a Washington State Business License and a City of Arlington Endorsement. Zoning Permit-Site Plan Review Administrative Design Review Thunderbird HangarPJ25-0059-PJ25-0060 Page 18 of 21 VI. EXPIRATION Per AMC 20.16.220,a Zoning Permit shall expire automatically if,within two(2)years after the issuance of such permits: 1. The use authorized by such permits has not commenced,in circumstances where no substantial construction, erection, alteration, excavation, demolition, or similar work is necessary before commencement of such use,or 2. Less than 10 percent of the total cost of all construction, erection, alteration, excavation, demolition,or similar work on any development authorized by such permits has been completed on the site. VII. APPEAL This decision may be appealed pursuant to AMC 20.20.010,which provides for a hearing of the zoning permit decision before the Hearing Examiner.Any aggrieved party of record may file an appeal within 14 days of the permit decision. An appeal shall be considered filed when a written notice of appeal, specifying the grounds and arguments, therefore, is delivered to the Department of Community and Economic Development by 5:00 PM on February 24, 2026, and the appeal fee as set by resolution is paid. Prepared By:Ameresia Lawlis Date: February 9,2026 ORDERED THIS ON THE 9th DAY OF February , 2026 Amy Rusko, Community&Economic Development Director Distributed to the Following Parties: Steve Hansen Zoning Permit-Site Plan Review Administrative Design Review Thunderbird HangarPJ25-0059-PJ25-0060 Page 19 of 21 ATTACHMENT B CODE REQUIREMENTS NOTE: The following items are not conditions of permit approval but rather certain local,state,or federal code requirements that the developer needs to be aware of.This is in no way intended to be a complete list of code requirements but is a general checklist of major steps and issues. Please refer to the Arlington Municipal Code for a complete list of code requirements for your particular project type. 1. Code Applicability.This permit is subject to the applicable requirements contained in the Arlington Municipal Code, Land Use Code, Building Code, and COA Public Works Design, Construction Standards and Specifications. It is the responsibility of the developer to ensure compliance with the various provisions contained in these ordinances. 2. Pre-Construction Phase. Prior to commencing any site work, including installing any easement or right-of-way improvements,utility systems,drainage systems,streetlights, mailbox structures, emergency facilities, storm water control systems, or any other improvements,the developer shall submit site civil construction improvement plans for review and approval by the Public Works Director. Said plans shall be in conformance with applicable code and below listed conditions. a. The developer shall survey and mark all property corners prior to review of any submitted construction plans. b. The developer shall design and install erosion control measures deemed necessary by the City. These measures shall be implemented and inspected by the City prior to the issuance of any permits. C. The developer shall undertake no site preparation or other disturbances within environmentally sensitive areas or their required buffers. d. The developer shall submit to the Community & Economic Development Department and receive approval of a storm-water run-off and detention plan in conformance with the AMC Chapter 13.28, Stormwater Management, and the most current City-adopted edition of the Department of Ecology's Stormwater Management Manual for the Puget Sound Basin (The Technical Manual) for both the construction phase and a permanent system.All site drainage must be directed through bio filtration swales prior to discharge into wetlands. e. The developer shall place all new utility lines underground. f. The developer shall provide a temporary rock pad at all points of ingress and egress to the site throughout the construction phase. g. The developer shall show locations of all required streetlights on the construction plans and install them as designed. h. The developer shall obtain a right-of-way permit prior to any work done in a public right- of-way. (NOTE: City departments are exempt from right-of-way permits.) i. The developer shall install all low sodium or similar low intensity illumination lighting and it shall be placed in a way as to not cause glare on an adjoining property or right-of- way. Zoning Permit-Site Plan Review Administrative Design Review Thunderbird HangarPJ25-0059-PJ25-0060 Page 20 of 21 3. Construction Phase.The following conditions shall apply during construction. a. The developer shall follow all applicable noise and other nuisance codes. b. The developer shall not track mud and dirt onto public rights-of-way,but if tracked by accident,the developer shall clean it up immediately. C. During any site grading or clearing activity,the developer and contractor shall use all available means of controlling air pollution (dust,ash,and smoke). d. The restrictions of the AMC shall apply to any and all grading. 4. Installation of Improvements. Prior to receiving a Certificate of Occupancy, the developer shall: a. Install all rights-of-way and access easement improvements on all proposed streets internal and existing streets adjacent to the project in accordance with the requirements of AMC Chapter 20.56 and per COA Public Works Design, Construction Standards and Specifications. The developer shall coordinate with all adjacent developments the final design of the street improvements and/or include the appropriate transition tapers for the street pavement from the property. b. Install a potable water system to serve the project per the COA Public Works Design, Construction Standards and Specifications. Water is to be served by the City of Arlington. This system cannot be deferred if a performance bond is secured. Both water and sanitary sewer must be completely installed and approved before either a temporary or permanent Certificate of Occupancy is issued. C. Relocate any existing water facilities and/or install water services/fire hydrants at the expense of the developer. d. Install a sanitary sewer system per COA Public Works Design, Construction Standards and Specifications. This system cannot be deferred if a performance bond is secured.Both water and sanitary sewer must be completely installed and approved before either a temporary or permanent Certificate of Occupancy is issued. e. Install a permanent storm water control system per AMC Chapter 13.28. f. Prior to issuance of a Certificate of Occupancy, the applicant shall complete all required or voluntary improvements unless otherwise secured by the developer and authorized by the City Engineer. (NOTE: Code requirements for infrastructure improvements are based on conceptual information as submitted by the applicant for the land use permit. Additional specific requirements may be required upon review of the engineered construction drawings submitted by the developer. All improvements are subject to review and approval by the City of Arlington Inspectors.All utilities shall be constructed underground. Zoning Permit-Site Plan Review Administrative Design Review Thunderbird HangarPJ25-0059-PJ25-0060 Page 21 of 21 I