HomeMy WebLinkAbout20251211_PJ25-0059_PJ25-0060_ReviewComments 18204 591h Avenue NE
REVIEW COMMENT FORM Arlington,WA98223
360-403-3551
Project Name:Thunderbird Hangar Permit No.: PJ25-0059/PJ25-0060 Review Date: 12/11/2025
Contact: Steve Hansen Phone No.:206-396-7962 Land Use Review Phase: 2nd Comments Report Date:
Email:steveh@jshproperties.com Reviewing Dept.:CED Applicant:Steve Hansen DWG Issue Date:
# Rev. Dwg.or Add'1 Comment Response/Resolution City
S ec.Ref. Ref. Approved
1. AL Payment Payment of the application fee has not been made and is 12/11/2025
required prior to review of any resubmittals.
2. AL Application Property Owner's signature is required.Please reach out to 12/11/2025
the Airport Office.
3. AL Complete 1. Please provide Average Daily Trips and current image or 12/11/2025
Streets typical existing cross section of street in project area.
Checklist
4. AL Complete 8. This is located within the Cascade Industrial Center.
Streets Please update this section to reflect that and any relevant
Checklist information.
This was not addressed.It may not be applicable
information but at least identify that you are in the
Cascade Industrial Center.
5. AL Modified 6. Describe source runoff. 12/11/2025
SEPA
Checklist
6. AL Modified 7. This site is located within a wellhead protection area and 12/11/2025
SEPA located near an aquifer.Please update information
Checklist accordingly.
7. AL Modified 24. Identify public streets serving the site—please update Complete 12/12/2025
SEPA This was not addressed.Please add 591 Ave&591 Dr
Checklist
8. AL Modified 48—55 This section was not filled out.Please complete. 1/21/2026
SEPA This was not addressed.The entire Utilities and Public
Checklist Service Checklist is blank&needs to be filled out.
9. AL Site Plan Use Please clarify use type as listed in AMC 20.40 Permissible 12/11/2025
Cover Page Classification Uses
10. AL Site Plan A1.0 Please show bike stalls 12/11/2025
11. AL Landscape AL 1 2.4.3.1 All parking lots and storage,loading,or 12/12/2025
Plan maintenance areas within visual proximity of the public
Page 1 of 3
18204 591h Avenue NE
REVIEW COMMENT FORM Arlington,WA98223
360-403-3551
Project Name:Thunderbird Hangar Permit No.: PJ25-0059/PJ25-0060 Review Date: 12/11/2025
Contact: Steve Hansen Phone No.:206-396-7962 Land Use Review Phase: 2nd Comments Report Date:
Email:steveh@jshproperties.com Reviewing Dept.:CED Applicant:Steve Hansen DWG Issue Date:
# Rev. Dwg.or Add'1 Comment Response/Resolution City
Spec.Ref. Ref. Approved
sidewalk shall be screened from the sidewalk by one of
these two methods:
2.4.3.1(a)Provide a screen wall at least 2-1/2 feet high,of
durable and attractive materials.Incorporate a continuous
trellis of grillwork with climbing plants.
2.4.3.1(b)Provide an opaque landscaped perimeter bed or
hedge at least 2-1/2 feet high,as shown.
In addition to frontage screening,heavier screening is
required due to the location of the parking lot.
Please show on plans how this is met.
12. AL It appears some of the plants shown on the plans are not
properly indicated on the plant schedule such as:
13. Please label screening area as such and type of screening
proposed.
14. AL In order to meet the Development Design Standards,a 12/11/2025
break in materials/color is required on the side facing the
public road.It does not need to match this,however,
Page 2 of 3
18204 591h Avenue NE
REVIEW COMMENT FORM Arlington,WA98223
360-403-3551
Project Name:Thunderbird Hangar Permit No.: PJ25-0059/PJ25-0060 Review Date: 12/11/2025
Contact: Steve Hansen Phone No.:206-396-7962 Land Use Review Phase: 2nd Comments Report Date:
Email:steveh@jshproperties.com Reviewing Dept.:CED Applicant:Steve Hansen DWG Issue Date:
# Rev. Dwg.or Add'1 Comment Response/Resolution City
Spec.Ref. Ref. Approved
below is an example of this change:
15. AL FYI Any chain-link fencing shall be black vinyl. 12/11/2025
16. AL FYI With the number of requested updates and changes to
documents and site plans,there may be additional
comments after the resubmittal.
17. AL Resubmittal Please submit all requested updated documents and plans
by the 60-day resubmittal deadline of February 9,2025
ced@arlingtonwa.gov.
18. AL FYI Per AMC 20.16.270(d),if the applicant informs the city,
in writing,that the applicant would like to temporarily
suspend the review of the project for more than 60 days,or
if an applicant is nonresponsive for more than 60
consecutive days after the city has notified the applicant,
an additional 30 days may be added to the time periods for
the city to issue a final decision for each type of permit
that is subject to this chapter.
19. AL FYI Any written notice from the city to the applicant that
additional information is required to further process the
application must include a notice that nonresponsiveness
for 60 consecutive days may result in 30 days being added
to the time for review.
Page 3 of 3