HomeMy WebLinkAbout20251105_PJA25-0059_Infiltration Rate Report PanGE0
C O R P O R A T E D
Geotechnica/&Earthquake
Engineering Consultants
July 301h 2025
File No. 25-253
Steve Hansen stevehgishproperties.com
Thunderbird Hangar,LLC
8383 158th Avenue North, Suite#200
Redmond, WA 98052
Subject: Infiltration Test
Vacant Lot North of Airport Office
Arlington Municipal Airport, Washington
Dear Steve:
As requested, we have completed a Small Pilot Infiltration Test(PIT) designated as PIT-1
at the vacant lot located immediately north of the airport office at the Arlington Municipal
Airport in Arlington, Washington. The approximate location of the site is shown in Figure
1 attached at the end of this report, and the approximate location of the infiltration test is
shown in Figure 2. The site is an open field that is practically level. Plate 1,below, shows
the site conditions after the infiltration test was completed.
Details of our testing are discussed
below.
J"
Plate 1. Site of the infiltration test location
3213 Eastlake Ave E,Ste B
Seattle,WA 98102
Tel(206)262-0370
www.pangeoinc.com
Infiltration Test
Vacant Lot North of Airport Office, Arlington Municipal Airport, Washington
July 30, 2025
SUBSURFACE EXPLORATION
We observed and logged the excavation of one test pit (PIT-1) on July 24, 2025, at the
approximate location shown in Figure 2. The field exploration was overseen by an
engineer with our firm who logged and sampled the soil encountered in the test pits.
The test pit was initially completed at a depth of approximately 4 feet for infiltration testing.
After the infiltration test was completed, PIT-1 was over-excavated to about 8 feet deep to
check for possible groundwater mounding.
The soils exposed in the test pit were logged in general accordance with the system
summarized on Figure A-1 of Appendix A, Terms and Symbols for Boring and Test Pit
Logs. The summary test pit log is included in Appendix A of this report provides
descriptions of the materials encountered, depths to soil contacts, and depths of seepage or
caving, if present. The relative in-situ density of cohesionless soils, or the relative
consistency of fine-grained soils, was estimated from the excavating action of the
excavator, and the stability of the test pit sidewalls. Where soil contacts were gradual or
undulating, the average depth of the contact was recorded on the logs.
The test pit excavated for this study was backfilled with the excavated soils. The backfill
was tamped with the backhoe bucket and the ground surface leveled. The backfill was not
compacted to a dense condition for the structural support. During construction of the
project, the earthwork contractor should locate the test pits, remove the loose backfill and
replace it with properly compacted structural fill if the tests are located in the load-bearing
structural areas.
SUBSURFACE CONDITIONS
SITE SOIL CONDITIONS
The following is a summary description of the soil conditions encountered in the test pit.
For a detailed description of the subsurface conditions encountered, please refer to the
attached test pit log. The stratigraphic contacts indicated on the test pit log represent the
approximate depth to boundaries between soil units. Actual transitions between soil units
may be more gradual or occur at different elevations. The descriptions of groundwater
conditions and depths are likewise approximate.
25-253 Arlington Airport Infiltration Rpt.docx 2 PanGEO, Inc.
Infiltration Test
Vacant Lot North of Airport Office, Arlington Municipal Airport, Washington
July 30, 2025
In summary, the test pit encountered several inches of topsoil at the surface, in turn
underlain by loose to medium dense,fine to medium dense sand with silt to the termination
depth of the test pit at about 9 feet deep.
Groundwater was not encountered in the test pit at the time of testing. The designers and
contractors should be aware there will be fluctuations in groundwater conditions depending
on the season, amount of rainfall, surface water runoff, and other factors. Generally, the
water level is higher and seepage rates are greater in the wetter, winter months (typically
October through May).
INFILTRATION TESTING
The field infiltration tests were conducted in general accordance with the procedure for the
small PIT as outlined in the Washington Department of Ecology Stormwater Management
Manual for Western Washington (WDOE, 2019). In general, the test consisted of the
following procedure:
• Excavate a pit to the approximate design bottom of the proposed infiltration facility
with a minimum bottom area of at least 12 square feet.
• Pre-soak the bottom of the pit by maintaining a water level of at least 6 inches above
the bottom of the pit for at least 6 hours.
• At the end of the pre-soak period, a flow meter was used to monitor the amount of
water needed to maintain a constant head of 6 inches for at least one hour and until
at least a point at which a constant volume of water per time unit was achieved.
• At the end of the constant head test, we measured the falling head infiltration rate
by shutting off the water flow and recording the drop in water level over regular
time intervals for one hour or until all the water has infiltrated.
25-253 Arlington Airport Infiltration Rpt.docx 3 PanGEO, Inc.
Infiltration Test
Vacant Lot North of Airport Office, Arlington Municipal Airport, Washington
July 30, 2025
UNCORRECTED FIELD INFILTRATION RATE
The field infiltration rate is then calculated based on the final measured volume per time
unit and the surface area of the pit. In summary, our test results yield an uncorrected
infiltration rate of 20 and 18 inches per hour for the constant head and falling head
conditions, respectively.
DESIGN INFILTRATION RATE
The small pilot infiltration test provides an uncorrected, saturated hydraulic conductivity
(Ksat) of the soil. To provide a long-term design infiltration rate, the Ksat value is factored
by applying a series of correction factors (CF) outlined in the WDOE Manual. As
discussed below, the correction factors account for the test method (CFt), influent control
(CF,n)and site variability(CFI). The value of each of these correction factors are discussed
below.
Test Method
The correction factor for the test method (CFt) is used to account for differences
between the test method and in-situ infiltration testing. WDOE Manual specifies a
CFt value of 0.5 based on the use of the small PIT method. This value was
incorporated in our calculation.
Influent Control
The influent control correction factor (CFm) is intended to account for a reduction in
infiltration capacity due to clogging from siltation and the build-up of biological
material. An influent control factor of 0.9 was used in our calculation, assuming that
when the infiltration systems lose 10 percent of their infiltration capacity due to
clogging, the system will be maintained or cleaned.
Site Variability
The correction factor for site variability(CFI) is intended to correct for the number of
locations sampled and the consistency of the underlying soil conditions. The value
for CFI ranges from 0.33 to 1.0. Based on the number of exploration locations,
relatively uniform soil conditions encountered at our exploration locations and our
25-253 Arlington Airport Infiltration Rpt.docx 4 PanGEO, Inc.
Infiltration Test
Vacant Lot North of Airport Office, Arlington Municipal Airport, Washington
July 30, 2025
experience and engineering judgment, we assigned a correction factor of 0.75 for site
variability.
Total Correction Factor
The total correction factor (CF = CFv x CFt x Um = 0.33) is then applied to the
infiltration rate summarized in Table 2 to obtain a corrected infiltration rate
appropriate for long term design purposes.
The total correction factor of 0.33 is then applied to the field rate to estimate a long-term
design infiltration rate. In summary, we recommend that a design infiltration rate of 6
inches per hour to size he infiltration facility.
TEST PIT BACKFILL
The test pit was backfilled with the excavated soils. The backfill was tamped with the
excavator bucket and the ground surface leveled. The backfill was not compacted to the
requirements of structural fill. During construction of the project, the earthwork contractor
should locate the test pits,remove the loose backfill and replace it with properly compacted
structural fill.
LIMITATIONS
We have prepared this report for use by Thunderbird Hangar, LLC and the project team.
Recommendations contained in this report are based on a site reconnaissance, a subsurface
exploration program,review of pertinent subsurface information, and our understanding of
the project. The study was performed using a mutually agreed-upon scope of work.
This report may be used only by the client and for the purposes stated,within a reasonable
time from its issuance. Land use, site conditions (both off and on-site), or other factors
including advances in our understanding of applied science, may change over time and
could materially affect our findings. Therefore, this report should not be relied upon after
24 months from its issuance. PanGEO should be notified if the project is delayed by more
than 24 months from the date of this report so that we may review the applicability of our
conclusions considering the time lapse.
25-253 Arlington Airport Infiltration Rpt.docx 5 PanGEO, Inc.
Infiltration Test
Vacant Lot North of Airport Office, Arlington Municipal Airport, Washington
July 30, 2025
Within the limitation of scope, schedule, and budget, PanGEO engages in the practice of
geotechnical engineering and endeavors to perform its services in accordance with
generally accepted professional principles and practices at the time the Report or its
contents were prepared. No warranty, express or implied, is made.
We trust that the information outlined in this letter meets your need at this time.Please call
if you have any questions.
Sincerely,
LAN T
�;ygti
ti
:-. o
30342
0 FG/s
ss/
ONA1.�NG`a July 30, 2025
Siew L. Tan, P.E.
Principal Geotechnical Engineer
Enclosures:
Figure 1 Vicinity Map
Figure 2 Site and Exploration Plan
Figure A-1 Terms and Symbols for Boring and Test Pit Logs
Figure A-2 Log of Test Pit PIT-1
25-253 Arlington Airport Infiltration Rpt.docx 6 PanGEO, Inc.
Creek i Z
�997hSt NE Cemetery Rd Q
- —- - CD
w
_ z
>
I Q z
1 V
- - I v
CD
Project Site
vans
188th St NE Field 118th St NE
Quake
Pa rk
Arlington z
Municipal p
Airport L
u�
LU
York 4- z
Park ��� w
rry >
L_
y LL
M z
0
C y
o Q
a
5 x Weston �
High
331 'E 1 72nd St NE School
(n 171s7 St NE
169th S/NE
ro„
w �
Not to Scale
Base Map:ESRI Topographic
PanGEO Proposed Hangar VICINITY MAP
18204 59th Ave NE,
I N C O R P O R A T E D Arlington, WA 98233
Project No. 25-253 Figure No. 1
46
MK PAID 22�
• exam n .
s
141 75 a7= I
;1
�i [D
3 `
a PIT-1 ;y:_ _- Z
� � � - � � •�-=�••-••-•PROPOSED LEASE•AR EA•�•••+••• / •� �y
.'±48,805 Sq. Feet. 8 1
W NEW PEMB - LU
.f1.1204 Acres.• •�.- ,�/ice
18M" 4i Z /r
t11,250"Sq. Feet
LO
h ❑z - — LO
I : : : : : : : : : : : : : : : : : ::• • • • • • • • • • • • • • • • •; .;.
4 . • • • • - • - • •: : : : : : : : : : : : : : : : : : : : : : : : : : : : . .
a
Approx. Scale
NB9'460/T 2N.50'
0 20' 40'
n
Legend: QwR LINE W CONNECNNG hi4NNOES
Note: Base map modified Site Plan by Magellan Architects.
Approx. Infiltration Test Pit Locations
(PanGEO, July 2025)
PmGE&
Proposed Hangar SITE AND EXPLORATION PLAN
Approx. Building Footprint 18204 59th Ave NE,
INCORPORATED Arlington, WA98233
r1
J Approx. Site Boundary Project No. 25-253 Figure No. 2
APPENDIX A
SUMMARY TEST PIT LOG
RELATIVE DENSITY/CONSISTENCY TEST SYMBOLS
for In Situ and Laboratory Tests
SAND/GRAVEL SILT/CLAY listed in"Other Tests"column.
Density SPT Approx.Relative Consistency SPT Approx.Undrained Shear ATT Atterberg Limit Test
N-values : Density(/o) N-values Strength(psf)
Comp Compaction Tests
Very Loose <4 <15 Very Soft <2 <250 Con Consolidation
Loose 4 to 10 15-35 : Soft 2 to 4 250-500 DID Dry Density
Med.Dense 10 to 30 35-65 Med.Stiff 4 to 8 500-1000 DS Direct Shear
Dense 30 to 50 65-85 : Stiff 8 to 15 1000-2000 %F Fines Content
Very Dense >50 85-100 Very Stiff 15 to 30 2000-4000 GS Grain Size
Hard >30 >4000 Perm Permeability
PP Pocket Penetrometer
UNIFIED SOIL CLASSIFICATION SYSTEM R R-value
MAJOR DIVISIONS GROUP DESCRIPTIONS SG Specific Gravity
•�' GW: Well-graded GRAVEL TV Torvane
Gravel GRAVEL <5%fines •' .....:...................... ...............................
( ) GP : Poorl raded GRAVEL TXC Triaxial Compression
50%or more of the coarse o o Y-g
fraction retained on the#4 "' """............""""""" UCC Unconfined Compression
sieve.Use dual symbols(eg. GM: Silty GRAVEL
GRAVEL(>1 2%fines) oo . ..........................................................
GP•GM)for5%to12%fines. ; GC: Clayey GRAVEL SYMBOLS
..................................... ............................. ......:....................................................... Samplelin Situ test types and intervals
SW: Well-graded SAND
Sand SAND(<5/°fines) :'r 2-inch OD Split Spoon,SPT
SP; Poorly-graded raded SAND
50%or more of the coarse Y-g (140-lb.hammer,30"drop)
fraction passing the#4 sieve.
Use dual symbols e .SP-SM ": SM: Silty SAND
Y 1 9 ) SAND(>12%fines) .........................................................
for 5%to 12%fines. B 3.25 inch OD Spilt Spoon
SC : Clayey SAND P P
.................................:.................................. ....:....................................................... (300-lb hammer,30"drop)
ML : SILT
Liquid Limit<50 CL Lean CLAY Non-standard penetration
......................................................
Silt and Clay —= OL : Organic SILT or CLAY test(see boring log for details)
50%or more passing#200 sieve
MH: Elastic SILT...................................... , Thin wall(Shelby)tube
Liquid Limit>50 CH Fat CLAY
.
OH : Organic SILT or CLAY
......................g..y.. ....:................................. ....:....................................................... Grab
Highly Organic Soils — PT : PEAT
Notes: 1. Soil exploration to s contain material descriptions based on visual observation and field tests using a system
modified from the Uniform Soil Classification System(USCS).Where necessary laboratory tests have been Rock core
conducted(as noted in the"Other Tests"column),unit descriptions may include a classification.Please refer to the
discussions in the report text for a more complete description of the subsurface conditions.
2. The graphic symbols given above are not inclusive of all symbols that may appear on the borehole logs. M
Vane Shear
Other symbols may be used where field observations indicated mixed soil constituents or dual constituent materials.
DESCRIPTIONS OF SOIL STRUCTURES
Layered: Units of material distinguished by color and/or Fissured: Breaks along defined planes MONITORING WELL
composition from material units above and below Slickensided: Fracture planes that are polished or glossy SZ Groundwater Level at
Laminated: Layers of soil typically 0.05 to 1 mm thick,max.1 cm Blocky: Angular soil lumps that resist breakdown time of drilling(ATD)
Y 9 P 1 time
Groundwater Level
Lens: Layer of soil that pinches out laterally Disrupted: Soil that is broken and mixed Cement/Concrete Seal
Interlayered: Alternating layers of differing soil material Scattered: Less than one per foot
Pocket: Erratic,discontinuous deposit of limited extent Numerous: More than one per foot Bentonite grout/seal
Homogeneous: Soil with uniform color and composition throughout BCN: Angle between bedding plane and a plane Silica sand backfill
normal to core axis
COMPONENT DEFINITIONS Slotted tip
a
COMPONENT SIZE/SIEVE RANGE COMPONENT SIZE/SIEVE RANGE Slough
Boulder: >12 inches Sand Bottom of Boring
Cobbles: 3 to 12 inches Coarse Sand: #4 to#10 sieve(4.5 to 2.0 mm) MOISTURE CONTENT
O Gravel Medium Sand: #10 to#40 sieve(2.0 to 0.42 mm) Dry Dusty,dry to the touch
w
c�
Q Coarse Gravel: 3 to 3/4 inches Fine Sand: #40 to#200 sieve(0.42 to 0.074 mm) Moist Damp but no visible water
Fine Gravel: 3/4 inches to#4 sieve Silt 0.074 to 0.002 mm Wet Visible free water
Clay <0.002 mm
0
0
J
W
Y
PanGEO Terms and Symbols for
0N C O R P O R A T E D Boring and Test Pit Logs Figure A-1
2 Phone: 206.262.0370
Test Pit Logs
Project No: 25-253
Project Name: Proposed Hangar
Project Location: 18204 591h Ave NE,Arlington,WA
Excavated: 7/24/2025
Test Pit No. TP-1
Location: 48.161275, -122.151633 (WGS84)
Approximate ground surface elevation:N/A
Depth ft Material Description
0_1�4 [Topsoil]
Loose,brown, silty SAND with gravel,moist,roots and rootlets
[Marysville Sand Member-Qvrm]
1/4-4 Loose to medium dense,reddish brown to brown,fine to medium SAND with
silt,moist; some gravel and cobbles
---------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
4- 9 Medium dense,grayish brown to gray, SAND with silt,moist; some gravel
y
j
Image of soils encountered approximately 9 feet below the existing ground surface.PIT-1 was terminated
approximately 9 feet below grade. Groundwater was not encountered at the time of exploration.
Logged by: R. Cooter
PanGEO Figure A-2
I N C O R P O R A T E O
Geofxh mM B E-hQ-*1 EWo—fing Consu/hots