NOTICE and Inspection Report
Permit No. 496 Legal (:;:4L
Date Called 1—' Addr•ss-C�etiJe
Time Called Contractor/Owner coz
By Requested by �!'!
TYPE OF • REQUESTED
❑ Setback ❑ Roof Diaphragm ❑ Insulation
❑ Plumb GW ❑ Framing ❑ Gas Piping
Footing ❑ Drywall Nailing ❑ Final
❑ Foundation ❑ Rough4n Plumbing ❑ Reinspection
❑ Shear Wall ❑ Mechanical ❑ Other
PPROVAL ❑ CORRECTION REQUIRED
❑�Corrections listed below MUST BE MADE b/ur
n be approved.
>:�YVork listed below has b an inspected and
❑ CALL 435-07 FO INSPECTION—2tic. required.
i
Inspector Date
City of Arl ngton
,� _)
NOTICE and Inspection Report
rPritNo. Legal
Date Called Address ����
TiAame Called ��. Contractor/Owner
By Requested by
TYPE OF •
❑ Setback ❑ Roof Diaphragm ❑ Insulation
❑ Plumb GW ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall Nailing ❑ Final
*Foundation Rough4n Plumbing ❑ Reinspection
❑ Shear Wall ❑ Mechanical ❑ Other
�I APPROVAL ❑ CORRECTION REQUIRED
rrections listed below MUST BE MADE before work can be approved.
W rk listed below has been inspected and approved.
❑ CALL 435-0724 FOR R INSPECTION—24 hour notice required.
Inspector - Data
City of Arlington
NOTICE and Inspection Report
Permit No. Legal
Date Called '��'(�' Address
Time Called /�E � Contractor/Owner
''
By Requested by
TYPE OF • REQUESTED
❑ Setback ❑ Roof Diaphragm /❑ P�Insulation
❑ Plumb GW ❑ Framing (,EQ'JGm Piping
`1 9
❑ Footing ❑ Drywall Nailing ❑ Final
❑ Foundation ugh-in Plumbing ❑ Reinspection
❑ Shear Wall echanical ❑ Other
❑ APPROVAL ❑ CORRECTION REQUIRED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Work listed below has been inspected and approved.
❑ CALL 435-0724 FOR REINSPECTION—24 hour notice ulrod. yy/'
Inspector � Date
City of Arlington
NOTICE and Inspection Report
Permit No. Legal 65G, //
Date Called — j Address CMW7
Time Called Contractor/Owner�lii�
By _a8 Requested by
TYPE OF • REQUESTED
❑ Setback ❑ Roof Diaphragm ❑ Insulation
❑ Plumb GW ❑ Framing
❑ Gas Piping
❑ Footing ❑ Drywall Nailing ❑ Final
❑ Foundation a Rough-in Plumbing A.Reinspection
❑ Shear Wall ❑ Mechanical
❑_Other
APPROVAL ❑ CORRECTION REQUIRED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Work listed below has been inspected and approved.
❑ CALL 435-0724 FOR REINSPECTION—24 hour notice required.
Inspector Date
City of Arlington
NOTICE and Inspection Report
Permit No. (l/ Legal ('0 7— 11
Date Called �." r Address�,_2<:;) / TA
Time Called l V„1 Contractor/Owner
By Requested by r Ad
TYPE OF • REQUESTED
❑ Setback ❑ Roof Diaphragm
❑ Insulation
❑ Plumb GW ❑ Framing
❑ Gas Piping
❑ Footing ❑ Drywall Nailing ❑ Final
❑ Foundation ')�Iough-in Plumbing ❑ Reinspection
❑ Shear Wall ❑ Mechanical ❑ Other
❑ APPROVAL ❑ CORRECTION REQUIRED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Work listed below has been inspected and approved.
❑ CALL 435-0724 FOR REINSPECTION—24 hour notice required.
S
Inspector Date
City of Arlington
NOTICE and Inspection Report
•
Permit No. O Legal //
Date Called Address /J 7f'l (L A
Time Called _ ff/� Contractor/Owner
By Requested by
TYPE OF • REQUESTED
❑ Setback ❑ Roof Diaphragm ❑ Insulation
❑ Plumb GW Framing
❑ Gas Piping
❑ Footing 3 wall Nailing ❑ Final
❑ Foundation Lj Rough-in Plumbing Cl Reinspection
❑ Shear Wall ❑ Mechanical ❑ Other
Da�PPROVAL ❑ CORRECTION REQUIRED
❑ Corrections listed below MUST BE MADE before work can be approved.
[j Work listed below has been inspected and approved.
❑ CALL 435-0724 FOR REINSPECTION—24 hour notice required.
AY
Inspector Date _� '
City of Arlington
NOTICE and Inspection Report
Permit No. Lagw
Date Called Address
Torre Caged comac6or/Ownar r
RequesW by
REQUESTEDTYPE OF INSPECTION
❑ setback ❑ Plod D.4Ar.Tn arirron
❑ Pkafnb GW ❑ Framing ❑ Gm
❑ Fou" ❑ Drywall WWmg ❑ Final
❑ Forardaion ❑ Pwugh-in Piu w*m ❑
❑ shear Wad ❑ Mechanical ❑ Odrer
PFtovAL ❑ MRREC110N REQURM
Correcdons isW below MUST BE MADE before work can be approved.
.-�Watk listed below has beats impacted and approved.
❑ CALL 435.0724 FoR wmspEanON—24 how lrofk.rtrgri.d.
Inspector Dole ( )
City of Arlington
NOTICE and Inspection Report
Permit No. Leg
Date Called ` k� /�� Address S2e4e, te
��j �►�
Time Called 9' Contractor/Ow
By Requested by
TYPE OF •N REQUESTED
❑ Setback _Roof Diaphragm ❑ Insulation
❑ Plumb GW raming ❑ Gas Piping
❑ Footing ❑ Drywall Nailing ❑ Final
❑ Foundation ❑ Rough-in Plumbing ❑ Reinspection
❑ Shear Wall ❑ Mechanical
❑_Other
�] APPROVAL ❑ CORRECTION REQUIRED
❑ Corrections listed below MUST BE MADE before work can be approved.
Work listed below has been inspected and approved.
❑ CALL 435-0724 FOR REINSPECTION J
hour notice required.
Inspector Date — vU
�sitc . AWWW
City of Arlington
NOTICE and Inspection Report---
Permit No. 'j;'.73 Legal 2044W
Date Called I`IS Address
Time Called •�i Contractor/Owner ?
By Requested by �
TYPE OF • REQUESTED
❑ Setback ❑ Roof Diaphragm ❑ Insulation
❑ Plumb GW ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall Nailing Final
❑ Foundation ❑ Rough-in Plumbing ❑ Reinspection
❑ Shear Wall ❑ Mechanical ❑ Other
❑ APPROVAL CORRECTION REQUIRED
Corrections listed below MUST BE MADE before work can be approved.
❑�CALL14315-0724
ed below has been inspected and approved,
FOR REINSPECTION—24 hour notice required.
rl
— u
s , ,
Inspector Date ��`S
City of Arlington
NOTICE and Inspection Report
Permit No. Legal Z®/ //
Date Called Address VQ 120 77 " 4e. NE_
Time Called Contractor/Owner
By Requested by
TYPE OF • REQUESTED
❑ Setback ❑ Roof Diaphragm ❑ Insulation
❑ Plumb GW ❑ Framing
❑ Footing ❑ Drywall NailingJ!0ther
l
❑ Foundation ❑ Rough-in Plumbingspection
❑ Shear Wall ❑ Mechanical
APPROVAL ❑ CORRECTION REQUIRED
❑ Correctio aced below MUST BE MADE before work can be approved.
ork listed below has been inspected and approved.
CALL 435-0724 FOR REINSPECTION—24 hour notice required.
Inspector Date