Civil Use - Right of Way Permit
Parcel:31051400302400 Permit#:26-0103
Permit Address:19405 68TH DR NE Permit Expiration: May 20, 2026
Description of Work:STARTING WITH VAULT 1,
BORE AND PULL 1,040'NW TO VAULT 3.
CONTINUE WORK ONTO PRIVATE PROPERTY.
OWNER APPLICANT CONTRACTOR
JANE BAIN LEAH IHLENFELDT
3023 80TH AVE SE STE 201 MERCER ISLAND,WA, 1429 AVENUE D#339
98040 4253865535
206 999 0684 snohomish.permitting@cablecomllc.net
eric@weisscollc.com registration_number:
PERMIT APPROVAL
The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this
Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance
advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to
allow construction activity during any period of time when such construction is prohibited or restricted by any state or
federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not
authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a
structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or
executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or decision of
the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in
error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation
or order, state or federal law, or any order, proclamation, guidance or decision of the Governor.
It is unlawful to use or occupy a building or structure until a final inspection has been made and approval or a
Certificate of Occupancy has been granted. This permit authorizes only the work noted and covers work to be done on
private property only. Any construction on public domain (curbs, sidewalks, driveways, marquees, etc.) will require a
separate permit. The property owner shall ensure that the construction project complies with all applicable zoning
codes and regulations.
The property owner shall also ensure that the construction project does not cause any adverse impact on the
surrounding environment or community. The property owner shall be responsible for obtaining all necessary permits
and approvals from the relevant authorities before commencing construction. The property owner shall ensure that the
construction project complies with all applicable design review requirements.
CONDITIONS
Traffic Control must comply with the current version of MUTCD. Work Hours are 7 am to 7 pm Monday-
Saturday (no work on Sundays or City Recognized Holidays). Inspections are not available on Saturday or
1.) Sunday. Non-motorized traffic control must be provided if any part of the work impacts existing non-motorized
facilities. Non-motorized traffic control measures shall provide a level of accessibility that are, at minimum, equal
to the existing conditions of the site.
Two days before starting work, the applicant must have all utilities located. One Call, is a public utility locating
2 ) service (#811 or 1-800-424-5555). Privately installed facilities must also be located using a private utility locating
service. Private property owners which may be affected by the proposed work must be notified in advance of
potential disruptions in access or utility services.
INSPECTIONS
Inspection Line: 360-403-3417 Call for inspections by 3:30 pm for next day inspection. Please allow 48 hours for Fire
Inspections. Please provide the following information when leaving a message: Permit Number, Type of Inspection, and
provide preference of morning or afternoon inspection.
Inspection Portal: Please login to customer portal and submit for the desired inspection type for the permit.
APPROVED BY
Admin - Thad Newport
Development Services Engineering Manager
ASSOCIATED FEES
Date Description Paid Date Amount Paid Balance
February 12, Processing/Technology Fee(320.341.43.00.02) $25.00
2026
February 12, Right of Way(006.322.40.00.02) $300.00
2026
TOTAL: Project Fees $325.00 $325.00
Credit/Debit Card 315 Payment Successful February 12, 2026 $325.00 $0.00