HomeMy WebLinkAbout17622 85TH AVE NE_035673_2026 A INS' WCTION REPORT )
i-tN
N GTOPermit No.: 03-6&7-3 Lot #:Address:Contractor:
Owner:I
C'� Date: c2 o)&
PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid Struct. Slab
❑ Wood Stove ❑ Rough-in Final
❑ Masonry ❑ Drainage Au Insulation
❑ Other:
PW
INSPECTION REPORT- )
G1T Y �� Permit No: 3 Date:
Address/Lot No: 1-1 (4L2 Aale W
• • r
Contractor: L1� &3_ I
'PlING,s� Owner:
Supervisor: n w- vin g2-5 - S 07- ®1
❑ Approval Correction Required
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector
❑ Was not able to perform inspection
❑ Call 360.435.0674 for re-inspection -24-hour notice required
c/C va& -Fri,e-
_rK{e s d b a k U_ l r 6 m free iv-e//r.
Inspector: Date: _2-1 3' 6 7
TYPE OF INSPECTION REQUIRED
TESC STORM DRAIN ROAD LANDSCAPING
❑Slit Fence ❑Pipe ❑Sub-grade ❑Irrigation
❑Check Dam ❑Catch Basin(s) ❑Rock ❑Soil
❑Inlet Protection ❑Manhole(s) ❑Curb&Gutter ❑Fertilizer
❑Temp.Sed ❑Oil Seperator(s) ❑Sidewalk ❑Bark
❑Sheeting ❑Down Spouts ❑Approach(s) ❑Plants
❑Straw ❑Trash Rack/Overflow ❑ATB ❑Trees
❑Seeding ❑Restrictor ❑Cl.B Asphalt ❑Root Barriers
❑Final ❑Level Spreader ❑Striping ❑Play Equipment
❑Treatment ❑Signing Final
❑Infiltration ❑Final
�M INSPECTION REPORT
ii
?'O Permit No.: 5i,.7s Lot#:Address: 171v 2Z P 5
Contractor: �,�O Owner:
Date: /- Z ai- o 17,
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
bg!!�l
Inspector: Date: 29 -ay
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing >(Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
sae
'INSPECTION REPORT
¢titN GTO Permit No.: 5 to 13 Lot#: 63
4" Address: 1'7 6 2-7- b 5
� z
Contractor: "N 6-,K-
Owner:IN
Date: /- Z7-0�/
'`APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
/'�L Jul if J.'U S h Laj�-T7 e/tJ
AA t A J / X Z L/ G/2.J4r.j 1...
S S k Js o 6j%mu 4,7-Lno
3v "PLu.,Mb1 ^J c.,
Inspector: S Date: y
TYPE OF INSPECTION REQUESTED
❑ Under-floor JL 0,Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid 0 Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage - Insulation
❑ Other:
All�
INSPECTION REPORT
. 1
ii
?' Permit No. S ��j Lot#:
Address:Contractor:
GAO Owner: J
Date:
al APPROVAL 10<PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
Cl Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 ur notice required.
77
A
Inspector: 4Le, y Date:
Ll�y-
/TYPE INSPECTION REQUESTED
❑ Under-floor /C ' a Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage Insulation
❑ Other:
INSPECTION REPORT
¢ti1N G TD Permit No.: Lot #:
Address:
� Z Contractor: �� T
O Owner:
�`r�I N G� Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Ji!14 I L T7t�S S �'-�'•�-'l� c•arc_;
T'S T'b{ r1"e,.j
uS-7>` - ,v f' ' C i . �P-T ST6f l
x ZY",,d I A-/
Gd A4-r-Zr7 d,/J /Ltd
Inspector: ScAm— Date: Zi 0
TYPE OF INSPECTION REQUESTED
❑ Under-floor Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT 3 a
JIN
NG?' Permit No.: 5"40 3 Lot #: b3
Address: t 7 IP Z� 8Contractor: �Owner:
O Date:
X APPROVAL EllPARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
,44
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
,Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
PP*'- INSPECTION REPORT yt Iy
¢ti1N G T� Permit No.: Flo -7-3 Lot #:' G 3)
Address: ! -7 to z2 e 5
Z Contractor:
9s, Owner:
�I N
iG Date: 12-1-4 0 3
XAPPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
U.S,0/ 7�LyrnG�in1G, fMP/Lo h
Inspector: Date: / L-V-03
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
r \ 1
INSPECTION REPORT '�'°`"�
Permit No.: Lot#:
62
Address:
• � .�
Contractor: �
9s, 4 Owner:
4IN G
Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR R NSPECTION - 24 hour notice required.
Inspector: Date: v�T
Ti/PE OF INSPECTION REQUESTIfD
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation near Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
1"\ INSPECTION REPORT
¢ti1N G. Permit No.: SIB 7-3 Lot #: ' 3
Q Address: I "1 1 Z.'L g 5
Z Contractor:
p6�
IN G,�O Owner: _
Date:
; APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: c.0jf Date:
TYPE OF INSPECTION REQUESTED
�- - Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
305
INSPECTION REPORT
N G?'O Permit No.: 56 73 Lot
Address: 1 Z-2- S 5
Contractor:
4 Owner:
I N C'� Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
1
Corrections listed below MUST BE MADE before work can be approved.
Please contact inspector.
❑ Was not able to perform inspection.
CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
A NGN•T-tt- 6:n�u-5 "a r r/-7 cj
Got►°?L'G� tj Xb t-.5 oydt- AI vex/
aT A " D,C
Inspector: L — Date:
TYPE OF INSPECTION REQUESTED
Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
p� INSPECTION REPORT
1 �• &Permit No.: 73 Lot #:iiIN
'5 Address: -We;4?> it-fiContractor:Owner:Date:
)96-APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
142n!20/v.S 4WPZ-ywl-y
Inspector: "t4_ Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry >e�Dr inage ❑ Insulation
0 Other:
"VSPECTION REPORT ems.
2 tp3
¢tiLN Gr0 Permit No.: 7d Lot#:
Address: / 71_vaa oc7'51_r1 �9
Z Contractor:
Owner:
TING Date:
&-APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspector: Date: //—(0
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
AFoundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
a
) INSPECTIC £PORT
j
NGOPermit No.: S(V 7S Lot #:Address: i 7 � Z_Z_Contractor: DB srNG,�O Owner:
Date: �_� r 3/-Os
r,APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
SL
Inspector: Date: /0 11-0.7
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
D.B. Johnson Construction, Inc. Scale: 1" = 20' N
1801 Grove St., Unit B
Marysville, WA 98270 w E
(360) 659-1579
,
Contact: Stacy Smith S 00
,
DBJ Job #: 2400
DBJ Plan #: 1512 -2 car
m �
Site Information:
g3, S
Lot 63, of Eagle Heights ��
,
Site Address: 17622 85th Avenue
Arlington, WA '+ N
,
o
4 Tax I.D. # 009585-000-063-00 23'`
'tot Area: 7,311 S.F. C-A ,a
N ,
Lot Coverage/Impervious Surfaces: '
,
House w/O.H.: 2,328 S.F.
Driveway/Parking: 500 S.F. +
Total: 2,828 S.F. N
L-at Size X 40% = 2,925 Sq. Ft. Max.
,
Notes: ,
1. Downspouts to Plat System
2. Stockpile to be covered within 24 hours.
3. Entire lot to be disturbed.
4. Silt Fence as needed.
5. Denuded soils to be straw covered. RECEIVED
6. Armored Construction Entrance. OCT 2 3 2003
7. 2 lot trees required - 1 credit for Street
Tree - 1 tree to be planted near rear lot line. EVi . 11
CITY OF ARLINGTON
8. Building Height = Approx. 18'.
`o Q w LO Z LL p Of
c m � 4U p z 0 U _
N � � OLU O ¢ Z O
zd
n � _ LU � w Q a � J � Og w - ' z LIJ
w
W > � w > � i I LL a
J Q Q' J 2 U] 0Y2p6LLLL F o \ W w w
m m CQ (`nn 2 0. ~ r~ O p 0 1 ` y LL W \. W
0 JJJ ❑ G V ❑LLJ J �j F: F J W (� F Q
O O OD LO w ZF- 0Z00z ❑ ® S /� ❑
Z LO CoLn LO co �QQ W a 0 0 0 � Z Z a
(O .— LO ti w � ZQ � p � g O om
0) O Ln 'i 000ww0LU -i w 0.
wLn W N w LOW c'Mw O zU = w > Ww6Q � a w Q M
00 O O O Op Op O ❑ ZCDa0Hw } a W Q U Q Q � U ~
W = (O = (o = (O = (o Z (o ¢ ¢ z — ~ OF- W ¢ } m F w Ln
0 0. 0. 0. 0. W W — LLW cq w > (� W w
d. M M M M M ❑ ZU � } mow N IL a zF= z a u) a � ` � � a
0 > F- > cL LLZEL i '� M.
cn U = LLw
Z ¢ = m0wmppw lui NV) w U QZ (D
U O N O M N UO HpcOi� = � ZV ~ o lu. Z W m � 0 gt w w � cr zU
(n o N a N a No Nn- N w ¢ � wFO0 � w = �i � U mpg ZOz U U1 w
NOD N N OON O N o0 H LU� Z W ZfAH W WF� } cA fnU W U W Z > m L � W p ¢ J
C� � 0) C7 }} ¢ ¢ cn > cA 0 v Z — d U cA W } z ❑ U 0. H S W o ¢
z lL cn Z w O Z S ~ S ¢ w w W > m 0 z W Q ~ U) LL H 7 U }
ZZ � Wp = 0w0z Z JF- ❑ QQ~ � � ❑ p0 � � Zw � z z Jw p > lia
C J 0. S � F- ❑ 0. UO Q ❑ LLl (n LLl ¢ Q In S O S J Z Y > LLD
O 0. C� a) a) v ~ off ~ i z v LL c) Zp c� f m CLU,ui w a w a (r w 1v) w v Q � 0 a W uvi
/�^ LL Z C m ❑ ❑ � W LL UJ d i H U = > ¢ O S lL U U U > a C7
y r � ❑ m Z ¢ J W J g a C Q 0 W O ¢ p ¢ z > OJ W z 0. O� W ¢ Q W F U S Z Z Z CO } a H z
Z r ' C � O LU aU ❑ v~i Q cn C7 N Y Z Z 0cc 2 � � Q H Q Wiz ❑ DO
tir '- Ya < 2 Q � mC7LL 5wc> >
ca c � w ❑ � ¢ z0Z z U g Jw ¢ W z ¢ ~ w = ¢ � w
m � — 0 z SZ pLLQLuo C7 w 6 � S :_,I F- Z w o d � 0. mx
E c� � U Q U O — < C-) 0 I: c� Z a m a cn wCL
J
LaL W U 0 w Q L
ova Q o o pZ ❑ � 0
Z m m m Lu ❑ w z � o � Z ? `� z
O Z p Z o w ❑� I- ❑ J z ❑ '- c�a aC
U) d (n M < } z cn o o (n cn l.) Lw �
wu) N cn >' cn N U) LO Un ,C w < q — - Q�Q J LU p H XX w } W C� ® w
w > w E w > w W w L" Q - rr> W ¢ OZ Q y�
❑Ur O Q ❑ D ❑ ❑ o = C
0 O Z 0 Q - ❑¢ W m - 0.
� O W J w m
U' J 0c) Q � Q OOD Q c'`) Q O O uJ J ¢ F- LL Lu U w cn w
z � � rn � � � g LO F- _ Q�Q `R w i� � JQ cal W T
Z � W U Z) w � � Sa u❑i
F W � iy t f- y LO d � 0 zz u�
m Z a p qR �\ LL ;= z H LU Q a- INMO
LLO
❑ ++ 0. +� 0. ❑ O Z w 0. u �J Q 0. J W O U� l p F
c z c � c_ f- o a I \ ^. O o m cn Q ? a J o
cY U LL Y LLI F- S ❑ m U
Z (� (j 0 Y m p () 'n J }a IF- co a3 } 2 � z Y Y a
0 C ❑ cf) Cz D o p (O � o Jp VJ Z F- vwi ZwH p ? � _z � Q
~ 0 ca O o ❑ y ❑ y F- � � m N O o } cn T u� LL � m > m
¢ cn r N � � z - � ¢ LL � � (nw a � w � m � cn } U) 2 c7 � � v,
Z o O Z (d � Q (Y LLl o R Z ¢ X W J Z ❑ ❑ w w� Z o U) 0
� F- of CJ Q) op � O 0 � ZU LLU m cn cn XF W ❑ _ wWg m � �. H
m tz U -C _ 3 z O 0o � �wg = z � = z �- F Lz0 U- �o or z
O U J - > 0 = LL 0 0 w w W w � w _ > O ❑ 0 Z O U O z U w� U m w w
� w ,, -� z z p m U �, � ❑ z ❑ m ¢ ¢ l � J ¢ o � Jao _ a z LL l M
O w C � ¢ cnm (/� < O — ❑ � C) � mgcnx ❑ 10 n0LL > wcn ¢ o I o LL
® m U o z m U cu � CO z Q w W 0 Z LL o '� p w ? O o o ¢
o � O Uw � � � a C7U � > tts ❑ Za (/) J J 0 0 z in ❑�W � �n Y 0
C I T1r QF 6:4F2L I r4CGTQhI
CONSTFtUCT" I Qh! PEFtM I T
FEE Ft I T h!O 3—ts6 73
Ovner: DB JOHNSON CONSTRUCTION 1801 GROVE ST MARYSVILLE 98270
Value of Work: . $112, 000. 00 Tax ID: 009585-000-063-00 Phone: 360-659-1579
Describe Work: NEW SINGLE FAMILY RESIDENCE
Proposed Use: SFR
Legal Description: EAGLE HEIGHTS LOT 63
Job Address: 17622 85TH AVE HE
Contractor's Name Type Address License#
DB JOHNSON CONSTRUCTION GEN 1801 GROVE ST DBJOHCI044BA
G & S HEATING MEC 506 E MAIN ST GSHEAC1147JD
MARYSVILLE PLUMBING INC. PLB 13318 SR530 NE MARYSP101JE
P E R M I T F E E S
Equipment and Fixtures Number Fee Total Charge
-------------------------------- --------
PLUMBING FIXTURES 12 $10. 00 - $120. 00
FURNACE/UNIT HEATER 1 $15. 00 $15. 00
VENTILATION FANS 4 $7. 00 $28. 00
DRYER 1 $11. 00 $11. 00
METAL FIREPLACE & CHIMNEY 1 $11. 00 $11. 00
WATER HEATER 1 $15. 00 $15. 00
GAS PIPING 1-4 OUTLETS 1 $6. 00 $6. 00
S U B T O T A L. . . . . . $206.00
TOTALS Fee
Permit Fee $1, 148. 70
School Mitigation $0. 00
Equipment $86. 00
Fixture $120.00
Mech Permit $24. 00
Plan Fee $746. 65 7
Park Mitigation $454. 28 /
Plumb Permit $25. 00 t
State fee $4. 50
SIGN URE: 7
TOTAL FEE. . . . . . . . . . . . . . . . . $2, 669. 13 I H •REBY CERTIFY THAT I HAVE READ
AND KA AND
PAYMENTS. . . . . . . . . . . . . . . . . . $756. 00 KNO11G
INEMETTOSBEP TRUE AAMDNCOR-
REC OVIS NS OF LAWS AND
It
144q
TOTAL DUE. . . . . . . . . . . . . . . . . $1, 859. 13 O DE OVE NIN THIS TYPE OF
W RL PL D WITH WHETHER
DATE RECEIPT +� E O j7POT.
IOFFItprl