HomeMy WebLinkAbout17523 74TH DR NE_077453_2026 INSPECTION REPORT • Permit No.: D 7 7 y Sj Lot #: T Address: ��� �•- 7 y rti ,�r /t'/,C Contractor: • , Owner: Date: APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. �n r Ze c/o s e -ZVet Inspector: Date: 1 TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in 4 Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: 14001 INSPECTION REPORT • Permit No.: 0 7 7! S__F Lot #: Address: /SoZ 3 — 7 s/5,1!5�e Contractor: A vim, AcJ4,AS • Owner: l Date: S '7 - ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION CORRECTION REQUESTED Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. L ,�rt c cfi�� C4 e'­ 4i Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in 4 Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: cp:44Z INSPECTION REPORT • Permit No.: o —��S3Lot#: Address: 7 �`�69- Contractor: � a/ti�T_ �r,..� S: • Owner: Date: ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ULCORRECTION REQUESTED ,zAMNCorrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. A47— -SO lziFi SC1�i-� }�C'`NYlycibA—��L t1 AT 7'0 � L ..i Fri. Inspector: 1 Date: 2-I-a 8 TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in JKFinal ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: �35 INSPECTION REPORT Permit No.: o7 74s-3 Lot #: Address: 7 5 13 7 y 0 1/L_ Contractor: 1 fir,,4-!dw a • Owner: Date: 2--Zo e is APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. Inspector: Date: 2--.2-0—0 a TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: PM INSPECTION REPORT a � ii T PermitNo.: 07,7`fS? Lot #:Address: / 7 5-d 3 7�14 Contractor:GAO Owner:_ Date: - " A APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. VL— C� Inspector: 10 40� Date:4? TYPE OF INSPECTION REQUESTED ❑ Under-floor 9 Framing ❑ Gas Piping ❑ Footing J Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ' Insulation ❑ Other: 1z3� INSPECTION REPORT Permit No.: o-7 '7� 5 3 Lot#: ''_( Address: 1 '7 5 z3 -7 4 ro w Contractor: LEI %M a • Owner: Date: i z-)y-o 8 ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ILCORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. air Go,�ta M 0�%�1�.,i t'-�; z__ 4 t�l�yr� Cl-'-j DI ��T 121,44 3&N-V'7ru`Z7 KN 2 O:C-. r Inspector: -� — Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage R_Insulation ❑ Other: 450 INSPECTION REPORT • Permit No.: 07 '1 Li s'3 Lot#: Address: S z 3 -741 Contractor: • Owner: Date: 2-8-ob ❑ APPROVAL :PARTIAL APPROVAL ❑ VIOLATION c6?(CORRECTION REQUESTED MCorrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Z7XU-4iP e-4 7- P L-a A--r- /-I A-STCv� 6r -TW Hl u+-V aIr-G S 77" e ,�y3- �Z.�✓rfz c� t?1L /11� 514 "_A-r Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor 0 Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT Q • Permit No.: 0-1 7Y53 Lot #: Address: 7543 75 n,z Contractor: (-h"',f2i ue • • Owner: Date: 1 Z Z -J T, ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. q A F� C11-14-v, I J !�7 FA rLTi ,R-L- /1U,S'T7at_ 7 CS L A 1-In to 17 d L A n]S R-&A'YL- &4 L. TO Inspector: Date: 1•2-Z--08 TYPE OF INSPECTION REQUESTED ❑ Under-floor A Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork AK Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT • Permit No.: 01 '7 V S-3 Lot #: `{ Address: Contractor: f h m A-t r+v, ei, • Owner: Date: % It,—o8 APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. Inspector: Date: L16 TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing a Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove a Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: 25 z 'SPECTION REPORT • Permit No.: fli -7 y53 Lot #: �f Address: 1-7 s Z3 7 Y o,� Contractor: Fh.� • • Owner: Date: ,_Ea�APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. Inspector: Date: I— 7—()S TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation C2KShear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: 3�Ib �- INSPECTION REPORT • Permit No.: o7 7 Y53 Lot #: Address: / 7 S'z3 -7 kY o/L- Contractor: 17'7 M ,a • Owner: Date: /z -/q-0 7 APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. Lt ,.r Inspector: , Date: / z- -i 7-07 TYPE OF INSPECTION REQUESTED §rUnder-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: �3L INSPECTION REPORT Permit No.: of -7 y 53 _y Address: / 7 5 Z-3 7 Y O z Contractor: rr-L��e/q Owner: Date: I z--/ 3 -c)"7 NLAAPPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. Inspector: Date: 17_ 1 -C� TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry Or Drainage ❑ Insulation ❑ Other: INSPECTION REPORT • Permit No.: o-7 -74s'�_ Lot#: Address: l '1 5 2-3 -7 Y rn n� Contractor: 1--b rwra-y A ♦ Owner: Date: t 2.-5-0-7 Ot APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. F=,4 rJ�t--� , Nol iAPPrL -� Inspector: ;S-t- =�%C— Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation A Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT • Permit No.: d �- S' Lot #: 7 Address: 7 S 3_ Contractor: �f�w� •t • Owner: Date: Gl APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. vy Inspector: 42:/— Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping 'CgCFooting ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: CITY OF ARLINGTON 238 N.OLYMPIC AVE,-ARLINGTON,WA.98223 ♦ PHONE:(360)403-3421 STATUS: READY TO ISSUE Permit#: 07-7453 BUILDING PERMIT Project Address: 17523 NE 74TH DR, ARLINGTON Parcel No: 01069900000400 PROPERTY OWNER APPLICANT CONTRACTOR -0-HIMALAYA HOMES -0-HIMALAYA HOMES 9633 MARKET PL#201 9633 MARKET PL#201 -0- -0- LAKE STEVENS,WA 98258 LAKE STEVENS,WA 98258 LICENSE#:HIMALHI 16 1 DE EXP: PLUMBING CONTRACTOR 1 1 JOB DESCRIPTION NEW SFR 2170 sq.ft living space Description Fee Amount Paid Balance Due Permit Fee $1,000.00 ($1,000.00) $0.00 C-Building Permit Fee $1,976.75 $0.00 $1,976.75 Plumbing Fixtures- 14 $140.00 $0.00 $140.00 C-Plumbing Permit Fee $25.00 $0.00 $25.00 Furnace/Unit Heater- 1 $15.00 $0.00 $15.00 Ventilation Fans-4 $28.00 $0.00 $28.00 Dryer- 1 $11.00 $0.00 $11.00 Metal Fireplace&Chimney- 1 $11.00 $0.00 $11.00 Water Heater- 1 $15.00 $0.00 $15.00 Gas Piping- 1 $6.00 $0.00 $6.00 C-Mechanical Permit Fee $24.00 $0.00 $24.00 C-Building Plan Review Fee $204.61 $0.00 $204.61 NEW PLAN CHECK FEE $1,284.89 $0.00 $1,284.89 C-State Building Code Surcharge $4.50 $0.00 $4.50 Total Due: $4,745.75 ($1,000.00) $3,745.75 PERMIT APPROVAL I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY,NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. -�tea JIS107 DateSignature Print Name Released-By Date ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED.UBCI09/IBC110/IRCI 10, ARCHIVE APPLICANT = ASSESSOR OTHER -. ti:;. I ~ a R o 0 F �. C. co o'vaa �' a •"_� o� � n rn DRIVE NE rn t� n n C ° 4 ti o o w I r LN m �� \ tia o o cp!W a .. G 6�Z I r*i a r � 0 0 � ti IOI,Lyd OIXS Maaolm o \ I I i c.n O I�`" m , 0 oa RZ� a z 10' ETA AON RE1FN ON BUT �yo N y o 62.31' o .qq 40 mly Permit Review Details �l PERMIT �� Permit: 07-7453 2000 - REVISION PLANS to APPROVED PLANS Complete? Y 10/23/2007 bfecht 0 OK per building K.W.approved stamp 10/23/07 N 11/05/2007 bfecht 60 Y Total Time: 60 2002 -3RD PLAN SET REVISED&NEW SITE PLAN Complete? N Total Time: 0 2008 - REVISION PLANS to APPROVED PLANS Complete? Y 11/05/2007 bfecht 0 2ND Revised plans from original submittals.-10/19/07 re-routed. N 11/05/07 b.f. Emailed for status from reviewers. 11/05/2007 bfecht 0 Himilayla called and they may be changing out this plan set again.In pending file drawer, N 11/05/2007 bfecht 60 Y Total Time: 60 2010 -3RD PLAN SET REVISED&NEW SITE PLAN Complete? N Total Time: 0 2012 -C-Natural Resources Complete? Y 10/29/2007 bblake 2 No Comments Y Total Time: 2 2014- REVISION PLANS to APPROVED PLANS Complete? Y 11/06/2007 nhudson 15 2ND REVIEW Minimum driveway length has not been met. Minimum of 22'required. Y Approximately 21'shown according to scale. Total Time: 15 2016 - 3RD PLAN SET REVISED&NEW SITE PLAN Complete? N Total Time: 0 Total Reviews: 10 Total Time: 137 11/13/2007 9:30:32 AM Page 1 of 1 I ifecht-Microsoft Internet Explorer provided by City of BLD - Build ng Permit Ver:FEW 1 , applicant: HIMALAYA HOMES,-0- status: IREADY TO ISSU address: 117523 75TH DRIVE NE, ARLINGTON post date: 6/20/2007 PERMITS 6iii� : data screens- Select Screen... functions: Select Permit Function... Reviews _\ ADD NEW REMOVE PRINT tLOSE ® Description ®®®® 2000 REVISION PLANS to APPRO... SBLACK 11/5/2007 0 Y N ASSIGN 2008 REVISION PLANS to APPRO . BFECHT 11&2007 0 Y N ASSIGN 2012 C-Natural Resources BBLAKE 1115I2007 0 Y N ASSIGN 2014 REVISION PLANS to APPRO. PdHUDSON 11/5/2007 0 le. N ASSIGN Done I f I Local inkranet V G1� Y O l.� City of Arlington ., > Community Development �r'lIN�' o Permit Center REQUEST FOR REVIEW NAME: J—� I o, BP #: G 7- 7 1 s3 DATE: -z I - u -1 RETURN THIS FORM BY'. G - z 8 -0 1 _ PROJECT SUMMARY:_,-�. . S F Q - F:ESPCNDING DEPAR I ivi JTS TOM C., FIRE DAVE A., BUILDING UTILITIES KERRY W., BUILDINQ' BILL B., NATURAL RESOURCES SCOTT B., BUILDING ENGINEERING YVONNE P., PLANNING SHERRI PHELPS, BUS LIC CWA., CONSULTANT DERYL T., MARYSVILLE UTIL JIM T., CONSULTANT SUBMITTAL INFORMATION IS ATTACHED. Please review the information and return this form and your comments in memo form to the Permit Center. If you have no comments, please return the form with the "Okay to Issue" box checked. PLEASE MARK ONE BOX, SIGN, DATE, AND RETURN THIS FORM TO THE PERMIT CENTER._ ❑ COMMENTS FOR THIS REVIEW ARE IN THE ATTACHED MEMO NO COMMENT FOR THIS REVIEW, OKAY TO ISSUE PERMIT ❑ COMMENTS REVIEWED BY / I �� DATE ��7 City of Arlington .� Community Development �11NG"�° Permit Center REQUEST FOR REVIEW NAME: f�,rv.�. l o�.a �� o,-,ties BP #: C I- 7150 DATE: U -z ► -7 - RETURN THIS FORM BY: PROJECT SUMMARY: �, S F Q RESPCt•.DING DEPART"VIENTS TOM C., FIRE DAVE A., BUILDING UTILITIES KERRY W., BUILDING BILL B., NATURAL RESOURCES SCOTT B., BUILDING ENGINEERINC-4 YVONNE P., PLANNING SHERRI PHELPS, BUS LIC CWA., CONSULTANT DERYL T., MARYSVILLE UTIL JIM T., CONSULTANT SUBMITTAL INFORMATION IS ATTACHED. Please review the information and return this form and your comments in memo form to the Permit Center. If you have no comments, please return the form with the "Okay to Issue" box checked. PLEASE MARK ONE BOX, SIGN, DATE, AND RETURN THIS FORM TO THE PERMIT CENTER. ❑ COMMENTS FOR THIS REVIEW ARE IN THE ATTACHED MEMO ❑ NO COMMENT FOR THIS REVIEW, OKAY TO ISSUE PERMIT �-- COMMENTS — REVIEWED BY �/ ��-d DATE 2� ONG'� Q 0 P7,-v ,,,-V Y 'y City of Arlington JUN 21 2007 Community Development Utilities j)iv, Permit Center REQUEST FOR REVIEW NAME: BP #: C 1- 71,53 DATE: to -2 1 - u -7 RETURN THIS FORM BY: G — Z 3 -y 7 PROJECT SUMMARY:--,,,,_,--,—,—,, _ SF Q _ RESPCt•dDING DEPART1',.1E.NTS TOM C., FIRE DAVE A., BUILDING UTILITIES KERRY W., BUILDING BILL B., NATURAL RESOURCES SCOTT B., BUILDING ENGINEERING YVONNE P., PLANNING SHERRI PHELPS, BUS LIC CWA., CONSULTANT DERYL T., MARYSVILLE UTIL JIM T., CONSULTANT SUBMITTAL INFORMATION IS ATTACHED. Please review the information and return this form and your comments in memo form to the Permit Center. If you have no comments, please return the form with the "Okay to Issue" box checked. PLEASE MARK ONE BOX, SIGN, DATE, AND RETURN THIS FORM TO THE PERMIT CENTER. ❑ COMMENTS FOR THIS REVIEW ARE IN THE ATTACHED MEMO NO COMMENT FOR THIS REVIEW, OKAY TO ISSUE PERMIT ❑ COMMENTS REVIEWED BY DATE • a C-X Y f, City of Arlington -, Community Development ��rN�11 o Permit Center REQUEST FOR REVIEW NAME: 1—�� r�,�, � o,,� r� ��` 5 BP #: c 1- 7153 DATE: RETURN THIS FORM BY: G - PROJECT SUMMARY: �4 , 4 S F V - - 1:ESPC�.DI��G LEPAP.T°t,ENTS TOM C., FIRE DAVE A., BUILDING UTILITIES KERRY W., BUILDING BILL B., NATURAL RESOURCES SCOTT B., BUILDING ENGINEERING YVONNE P., PLANNING SHERRI PHELPS, BUS LIC CWA., CONSULTANT DERYL T., MARYSVILLE UTIL JIM T., CONSULTANT SUBMITTAL INFORMATION IS ATTACHED. Please review the information and return this form and your comments in memo form to the Permit Center. If you have no comments, please return the form with the "Okay to Issue" box checked. PLEASE MARK ONE BOX, SIGN, DATE, AND RETURN THIS FORM TO THE PERMIT CENTER. ❑ COMMENTS FOR THIS REVIEW ARE IN THE ATTACHED MEMO NO COMMENT FOR THIS REVIEW, OKAY TO ISSUE PERMIT ❑ COMMENTS REVIEWED BY DATE v Z City of Arlington • Community Development Permit Center REQUEST FOR SFR REVIEW RESPONDING DEPARTMENT: PLANNING BP #: o l--7y 5_� NAME: ADDRESS: 1 -152O 75t" p,. N E- PLEASE RETURN FORM WITHIN 3-5 WORKING DAYS FROM L Mitigation Fees Verified: I School Mitigation Fees: � Community Park Impact Fee: Mini-Neighborhood Park Impact Fee- Trip Impact Fees: r' l�1 Set Backs Verified Required/Proposed: Zoning: Front Yard/ ZZ S _s S Street Setback�.' Rear Yard Setback >!5 Side Yard Setbackst Z- i ® Lot Coverage Verified Shade Trees Verified on Site plan [� Height Verified (Called out on Site plan) SUBMITTAL INFORMATION IS ATTACHED. Please review the information and return this form and your comments, either on the drawings or in memo form, to the Permit Center. If you have no comments, please return the form with the "Okay to Issue" box checked. PLEASE MARK ONE BOX, SIGN, DATE, AND RETURN THIS FORM TO PERMIT CENTER. [� IN COMPLIANCE WITH LAND USE CODE - OKAY TO ISSUE ❑ NOT APPROVED - ADDITIONAL INFORMATION REQUIRED o (SEE ATTACHED REDLINES OR MEMO FOR COMMENTS) P J REVIEWED BY DATE (o ' / - O 7