Loading...
HomeMy WebLinkAbout712 Portage St_PJ26-0241_2026 City of Arlington 18204 59th Avenue NE, Arlington, • • Washington 98223 Phone: 360-403-3551 jNG� WASHINGTON C Invoice Number: 26-0470 INVOICE Invoice Date: May 8, 2026 Account Number: 3148292788 Bill To: Invoice Questions? ATCO Telecommunications Phone: 360-403-3551 708 First St. Email: ced@arlingtonwa.gov Invoice Due Date: May 8, 2026 Record Number: Project A26-0241 Parcel Number: 00806800000400 Location: 712 PORTAGE ST Date Description Paid Date Amount Paid Balance May 8, 2026 Processing/Technology Fee (320.341.43.00.02) $25.00 May 8, 2026 Right of Way(006.322.40.00.02) $125.00 TOTAL: Project Fees $150.00 $150.00 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------- REMITTANCE INFORMATION If you are paying by check, please include this portion with your payment and remit to the address listed on this invoice. Remittance Information Invoice Account Total Due Your payment is due by May 8, 2026 Number Number This Invoice 26-0470 3148292788 $150.00 ATCO Telecommunications 708 First St. 18204 59th Avenue NE • op ' • 14 Arlington, Washington 98223 to tt Phone: 360-403-3551 jNG� WASHINGTON C Civil Use - Right of Way Permit Parcel:00806800000400 Permit#:26-0241 Permit Address:712 PORTAGE ST Permit Expiration: July 11, 2026 Description of Work: OWNER APPLICANT CONTRACTOR ATCO Telecommunications Pacific Cable Construction Ziply Fiber Northwest LLC 708 First St. PO Box 573,Woodinville,WA 98072 13222 252ND ST NE ARLINGTON,WA,98223 4026708384 permits@atcotelecom.com luke@paccab.com P CI registration number:PACIFCC954PJ PERMIT APPROVAL The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor. It is unlawful to use or occupy a building or structure until a final inspection has been made and approval or a Certificate of Occupancy has been granted. This permit authorizes only the work noted and covers work to be done on private property only. Any construction on public domain (curbs, sidewalks, driveways, marquees, etc.) will require a separate permit. The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations. The property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or community. The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities before commencing construction. The property owner shall ensure that the construction project complies with all applicable design review requirements. CONDITIONS The applicant is required to notify the City for inspections. Failure to give notice will result in violation of AMC 1 ) Chapter 12.40.240 and may result in additional inspection fees. To request an inspection call 360-403-3417 by 3:30 for next day inspection. Applicant must comply with all applicable City of Arlington, state and federal laws, ordinances, code and regulation in performing the work authorized by this permit. Traffic Control must comply with the current version of MUTCD. Work Hours are 7 am to 7 pm Monday- Saturday (no work on Sundays or City Recognized Holidays). Inspections are not available on Saturday or 2.) Sunday. Non-motorized traffic control must be provided if any part of the work impacts existing non-motorized facilities. Non-motorized traffic control measures shall provide a level of accessibility that are, at minimum, equal to the existing conditions of the site. Two days before starting work, the applicant must have all utilities located. One Call, is a public utility locating 3 ) service (#811 or 1-800-424-5555). Privately installed facilities must also be located using a private utility locating service. Private property owners which may be affected by the proposed work must be notified in advance of potential disruptions in access or utility services. Please be advised Ziply is responsible for ensuring the placement of new and updated structures. Do not restrict 4.) existing use of right of way. Please take special note of secondary accesses that are used for RVA€"s, boats, or other special uses. Restoration of any infrastructure affected by the installation shall be per City of Arlington Standards & 5•) Specifications within a period not to exceed 7 days from completion of the installation. Trench Restoration shall be per Standard Detail R-140; Contact the City Engineer for Roadway Restoration requirements, 360-403-3512. INSPECTIONS Inspection Line: 360-403-3417 Call for inspections by 3:30 pm for next day inspection. Please allow 48 hours for Fire Inspections. Please provide the following information when leaving a message: Permit Number, Type of Inspection, and provide preference of morning or afternoon inspection. Inspection Portal: Please login to customer portal and submit for the desired inspection type for the permit. APPROVED BY Thad Newport Development Services Engineering Manager ASSOCIATED FEES Date Description Paid Date Amount Paid Balance May 8, 2026 ProcessingfIechnology Fee(320.341.43.00.02) $25.00 May 8, 2026 Right of Way(006.322.40.00.02) $125.00 TOTAL: Project Fees $150.00 $150.00 Credit/Debit Card 639 Payment Successful May 11, 2026 $150.00 $0.00 LEGEND: City of Arhngton N EXISTING PEDESTAL PROPOSED PEDESTAL O TM EXISTING TERMINAL ATCO COMMUNICATIONS SERVICES.LLC www.alcotelecom.com • 360.563.9000 OR PROPOSED TERMINAL LU 708 First Street EXISTING UTILITY POLE p �r Snohomish,WA 98290 w I ® PROPOSED NEW POLE Hfiber I H EXISTING HANDHOLE zip y Everett,WA 98208 H 71 PROPOSED NEW HANDHOLE[2'x3'] O w ( EXISTING MANHOLE _ O EOP EOP EOP EOP ROW q z 3 eCL EOP- -a N MH PROPOSED NEW MANHOLE r - - _ 0' EOP - 00 o EXISTING FLOWER POT EOP Q Q EOP in EOP—EOP � TARO EOP— EOP m o 7 v ® PROPOSED NEW FLOWER POT ROW . d Z N w —————— EXISTING UNDERGROUND UTILITY � II�V' PROPOSED UNDERGROUND ` Cl— CONSTRUCTION[HAND DIG,BORE] ~ EXISTING AERIAL SPAN ^�// EOP I� PROPOSED AERIAL SPAN O CENTER LINE �� •� — - - PARCEL LIMITS[PROPERTY LINE] �Oo t , " t'• EOP EDGE OF PAVEMENT D Q A ROW RIGHT OF WAY WORK DETAILS- C LU Access Terminal ped and pull 240' : p of cable through existing conduit. o From existing flowerpot bore 35' Ilk Z Q z 6i under driveway and place new F y1. v I-_ o flowerpot, Hand dig 64' to w w Q Z customer on to private property, �' -. _ LU a a O LL MINIMUM STANDARDS FOR DIRECTIONAL BORING~ STREET CROSSINGS 2026 EX.GRADE DATE: 5.6. - - ik ,._ _ i _! DESIGNED BY: M. Robertson 48"MIN ATCO CONTACT: 832.758.0094 12"MIN SOREP FROM EX.UTILITIES RECEIVE PIT mork.robertson@atcotelecom.com i Krarn►what's belOW' SCALE: SHEET: ® -PLACE END MARKER WITH UTILITY OWNER'S NAME DESCRIBING CONDUIT Call before you dig. -BORE PIT TO BE BACKFILL AND COMPACTED IN NLIFTS WITH MATERIAL REMOVED N 0 T TO O -FLOW OF ANY NEARBY DRAINAGE MUST BE MAINTAINED AT ALL TIMES -PROTECT ROOTS AT ALL TREE LOCATIONS,FIELD ADJUST AS NECESSARY SCALE TYPICAL SOREDETA/LS NO: 1 OF CONSTRUCTION PERMIT APPLICATION Community&Economic Development City of Arlington • 18204 591h Avenue NE Arlington,WA 98223 • Phone (360) 403-3551 CIVIL (TYPE I) ❑ GRADING/PAVING/DRAINAGE (TYPE II) ❑ RIGHT OF WAY(TYPE III) TYPE I&II ONLY NEW DEVELOPMENT ❑ REDEVELOPMENT ❑ Project Name: 214190 Snohomish County Tax Parcel I.D. A 00806800000400 ,Project Address/Location: 712 Portage St Arlington WA 98223 Description of Project:Access terminal;,pull cable through existing conduit, place new flowerpot, hand-dig-Jo customer. OWNER Name: Address: City: State: Zip: Phone: Email: APPLICANT Name: Ziply Fiber Northwest, L L C Address: 426 E Casino Rd. City: Everett State: WA Zip: 98208 Phone: 402-670-8384 Email: grpatcopermits(@ziply.com ENGINEER _ Name: Address: City: State: Zip: Phone: Email: License#: Expiration: CONTRACTOR Name: Pacific Cable Construction, Inc. Address:P.O. Box 573 Citv: Woodinville State: WA Zi :98072 Phone: 425-348-7735 Email: Luke-@-.oaccab.com License#: P A C I F C C 9 5 4 P Expiration: I hereby certify that I have read and examined this application, City of Arlington Municipal Code, Standard Plan & Specifications. Performance of the proposed work shall follow all applicable laws and regulations.The owner/applicant shall assume full and complete responsibility for said work and shall be responsible for the acquisition and compliance of all applicable pemlits and/or authorizations which may include, but not limited to, Right of Why Penuit,WSOW Hydraulic Project Approval (HPA),WSDOE Notice of Intent(NOi),National Pollutant Discharge Elimination System (NPDES),Anny Corp. of Engineers Permits,the requirements oft1le Endangered Species Act;and the Forest Practices Application(FPA). Signature_ L -------------------- - Print Name: Mark- -------------Robertson Date: 5/08/2026 ----- ---------- ---------- - Page 1 of2 REVII/2018 .Complete package constitutes all items. Only complete submittals will be accepted._ Civil -Submittal Requirements,Type I: D Complete Application; D Construction Plans including cut/fill quantities; . 2 full size plan sets 22"x 34" • PDF file of the complete plan set . 2 full size set of landscape plans 22"x 34" D Marysville Utility plans, ifapplicable (2 sets); D Drainage Analysis including calculations and downstream analysis (2 sets) and (PDF file); refer to Stormwater Drainage Requirements; D Geotechnical Report (2 sets) and (PDF file); D SEPA is required if 500 or more cubic yards of cut/ fill is proposed (not required if included with a Land Use Permit); D Grading cut/ fill quantity: -------- D Design Vehicle - demonstrate turning radius include 45' Fire truck, dual axle, 256 inch wheel base; D Complete Streets Checklist D Drafts of easement(s) dedication(s), and/or CAPE(s) for review; D Flood Hazard Permit Application and required documentation if project is within 100 year flood plain; refer to Flood Hazard guidance documents; D Construction Calculation Worksheet; D NPDES Permit (if required); See Storm Water Drainage Report, New or Redevelopment Flowcharts, D Assurance Device will be required prior to Permitlssuance (Bond or Assignment of Funds); D Permit Fee due at time of permit submittal. Grading/Paving/Drainage Submittal Requirements,Type I1: D Complete Application; D Construction Plans including import/export quantities; . 2 full size plan sets 22"x 34" . PDF file of the complete plan set D Drainage Analysis including calculations and downstream analysis (2 sets) and (PDF file); refer to Stormwater Drainage Requirements; D Geotechnical Report (2 sets) and (PDF file); D SEPA is required if 500 or more cubic yards of cut/fill is proposed (not required if included with a Land Use Permit); D Grading cut/ fill quantity: --------- D Construction Calculation Worksheet; D NPDES Permit (ifrequired); See Storm Water Drainage Report, New or Redevelopment Flowcharts, D Permit fee due at time of permit submittal. Right of Way Submittal Requirements,Type III: Complete Application; 5Q Construction Plans; Traffic Control Plan; ❑ Road dosure Request; ❑ Temporary Erosion &Sediment Control (TESC) Plan; ❑ Certificate oflnsurance with the City ofArlington named as Additional Insured; ❑ Assurance Device will be required prior to Permit Issuance (Bond or Assignment of Funds); Engineers Estimated Cost of Construction; $2000_00_____ QI Permit fee due at time of permit issuance. Page 2 of2 Right-of-Way Permit Application For submittal checklist, see below. *denotes required fields Project Information *Project Name: 214190 *Description of Project: Access terminal and pull cable through conduit. Bore under driveway and place new hand hole. Hand dig to customer. Engineers Estimated Cost of Construction; $ 12000.00 Contact Information Owner Information *Owner Name: IZiply Fiber Northwest LL *Office No.: 1426 Casino Rd *Email Address: arianne.mommsen@zip *Cell No.: 14026708384 *Mailing Address: 1426 Casino Rd Everett V *City: lEverett, WA, 98208 *State: WA *Zip: 98258 Engineer Information Engineer Name: Office No.: Email Address: Juke@paccab.com Cell No.: Mailing Address: IP O Box 573 City: lWoodinville State: IWA Zip: 198072 Professional License Number: Expiration Date: Contractor Details Primary Contractor: IPacific Cable Office No.: Email Address: Juke@paccab.com Cell No.: 426-348-7735 Mailing Address: IP O Box 573 WoodinvillE City: Everett, WA, 98208 State: Washington Zip: 198258 L&I Contractor IPACIFCC954PJ License Number: Expiration Date: 2026-05-21 Acknowledgement I, hereby certify that I have read and examined this application, City of Arlington Municipal Code, Standard Plan & Specifications. Performance of the proposed work shall follow all applicable laws and regulations. The owner/applicant shall assume full and complete responsibility for said work and shall be responsible for the acquisition and compliance of all applicable permits and/or authorizations which may include, but not limited to, Right of Way Permit, WSDW Hydraulic Project Approval(HPA), WSDOE Notice of Intent(NOI), National Pollutant Discharge Elimination System (NPDES),Army Corp. of Engineers Permits, the requirements of the Endangered Species Act, and the Forest Practices Application (FPA). *Print Name: Mark Robertson *Date: 2026-05-08 Submittal Checklist Complete package constitutes all items. Only complete submittals will be accel t� ed. Electronic files shall be PDF and submitted through this portal, email or downloadable link to file server. • Construction Plans; refer to Design Requirements and Chapter 1 of the City of Arlington's Design and Construction Standards and Specifications Manual for required sheets. • Traffic Control Plan. • Road Closure Request. • Temporary Erosion & Sediment Control (TESC) Plan if new or replaced hard surfacing is being constructed. • Certificate of Insurance with the City of Arlington named as Additional Insured. Permit fee and any assurarnce device (Bond or Assignment of Funds) due at time of permit issuance. An invoice with link for payment will be sent to the applicant email address once permit is reviewed and approved. 4rtk( tot( WASHINGTON Project Information - ' 'nformat;^ Project # 26-0241 Parcel # 00806800000400 Building ID Location 712 PORTAGE ST Project Type Civil Use Project Use Right of Way Parent Project# Subdivision Applicant Name ATCO Telecommunications Address 708 First St. Applicant Email permits@atcotelecom.co Phone 4026708384 Cell m Owner Name Ziply Fiber Northwest LLC Address 13222 252ND ST NE ARLINGTON, WA, 98223 Owner Email Phone Cell Contractor Pacific Cable Construction Address PO Box 573, Woodinville, WA 98072 Contractor Email Iuke@paccab.com Phone Cell Type/Improveme Accessory/Struct nt ure Current Use Proposed Use Current Zoning Proposed Zoning Project Cost 2000 Project Value 2000 Current Use And Proposed Changes Lot Width Lot Depth Map Number Total Area of Building &Accessory Total Area of All Man-made Improvements Structures (Sq Ft) (Sq Ft) General Notes Restrictions/ Variances ©Community Development Online Portal Page 1 of 6 June 5, 2026 10:08AM WASHINGTON Structure Information Structure Type # of Stories Usable Floor Area (Sq Ft) Structure Height # of Units Load per Floor (Lbs) Sign Dimensions # of Bedrooms # of Bathrooms Occupancy With Chairs Tables & Chairs Empty Room Foundation Foundation Type Footing Depth Material Foundation Information Setbacks Front& 0 0 Setbacks Right & 0 0 Rear Left Sides Setbacks Information Water Utility Sewage Utility Gas Utility Electric Utility Driveway Width # of Off Street # of Off Street Parking Loading Miscellaneous Information ©Community Development Online Portal Page 2 of 6 June 5, 2026 10:08AM 4rtk( tot( WASHINGTON Contractors License# Business Name Type Contact ZIPLYF*8001-5 Ziply General Contractor Mason Nunn PACIFCC954PJ Pacific Cable Construction Out of City Timothy Jones ©Community Development Online Portal Page 3 of 6 June 5, 2026 10:08AM WASHINGTON Inspections Inspection # Inspection Type Status Date Inspector 26-0333 Civil- Right of Way Incomplete May 19, 2026 Brian Grieve Inspections 26-0373 Civil- Right of Way Final Pass June 3, 2026 Brian Grieve ©Community Development Online Portal Page 4 of 6 June 5,2026 10:08AM 4rtk( tot( WASHINGTON Contacts Contact Name Type Project Address Phone ATCO Applicant 708 First St. 402-670-8384 Telecommunications Ziply Contractor 135 Lake St S Ste 155, 000-000-0000 Kirkland, WA 98033 Pacific Cable Construction Contractor PO Box 573, Woodinville, WA 98072 Ziply Fiber Northwest LLC Owner 13222 252ND ST NE ARLINGTON, WA, 98223 ATCO Others 708 First St. 402-670-8384 Telecommunications ©Community Development Online Portal Page 5 of 6 June 5, 2026 10:08AM 4rtk( tot( WASHINGTON Fees Fee Type Date Debit Credit Balance Project Fees May 8, 2026 $150.00 $150.00 $150.00 $0.00 T O T A L $150.00 $150.00 $0.00 ©Community Development Online Portal Page 6 of 6 June 5, 2026 10:08AM WASHINGTON Project #PJ 26-0241 214190 Routing Details ✓ Department: Permit Tech Intake Review - Approved: May 11, 2026 - Status: Approved Project Application #26-0241 214190- by LaNay Hendrick- Permit Technician at May 8, 2026 02:20PM Status: In Progress Activity Type: Application Sent Hello, Your invoice is now ready for payment.You can access and process the payment through our portal. Please visit the following link to view and pay your invoice: https://www.civicgov4.com/wa_arlington/portal/index.php?r=site/dashboard LaNay Hendrick City of Arlington Permit Technician Ihendrick@arlingtonwa.gov 360-403-3437 Project #PJ 26-0241 214190- by LaNay Hendrick- Permit Technician at May 11, 2026 01:34PM Status: Approved Activity Type: Application Sent Hello, Attached you'll find the issued right-of-way permit. Please review the conditions of the permit and inspections instructions and reach out should you have any questions. Regards, LaNay Hendrick City of Arlington Permit Technician Ihendrick@arlingtonwa.gov 360-403-3437 ✓ Department: Permit Tech Final Approval - Approved: June 5, 2026 - Status: Closed Manual Approval - Project#PJ 26-0178 214190- by LaNay Hendrick- Permit Technician at May 11, 2026 01:32PM Status: Approved Activity Type: Documents Review The following project has been approved manually. Project#PJ 26-0178 214190 @ Community Development Online Portal Page 1 of 4 June 5, 2026 10:09AM WASHINGTON Manual Closure - Project #Pj 26-0241 214190- by Admin - Hannah Hardwick- Fire Permit Technician II at June 5, 2026 10:07AM Status: Closed Activity Type: Documents Review The following project has been closed manually. Project#PJ 26-0241 214190 ✓ Department: 1st Review CED Inpsector - Approved: May 11, 2026 - Status: Approved Project Application #26-0241 214190- by Brian Grieve- Development Services Inspector at May 11, 2026 01:23PM Status: Approved Activity Type: Application Sent Dear Team, Just completed the CED review. No comments. Thanks, Brian Grieve City of Arlington Development Services Inspector bgrieve@arlingtonwa.gov 13609131396 ✓ Department: 1st Review Civil - Approved: May 11, 2026 - Status: Approved Project Application #26-0241 214190- by Thad Newport- Development Services Engineering Manager at May 11, 2026 08:10AM Status: Approved Activity Type: Documents Review No civil comments. Thad Newport City of Arlington Development Services Engineering Manager tnewport@arlingtonwa.gov (360) 403-3434 @ Community Development Online Portal Page 2 of 4 June 5, 2026 10:09AM WASHINGTON Record Actions New Project Application #A26-0241 214190 By LaNay Hendrick- Permit Technician at May 8, 2026 01:35PM Hello, A new project application has been submitted for review. Please login to your CIVICGov Web Application account and visit the link below to view the project details. https://www.civicgov4.com/wa_arlington/projects/details/388 If you cannot click on the link above, please copy and paste the entire link in the browser address bar. Sincerely, CIVICGov Team. Condition #1 Added By LaNay Hendrick- Permit Technician at May 11, 2026 01:29PM Condition:The applicant is required to notify the City for checklists. Failure to give notice will result in violation of AMC Chapter 12.40.240 and may result in additional checklist fees.To request an checklist call 360-403-3417 by 3:30 for next day checklist. Applicant must comply with all applicable City of Arlington, state and federal laws, ordinances, code and regulation in performing the work authorized by this permit. Condition #2 Added By LaNay Hendrick- Permit Technician at May 11, 2026 01:29PM Condition:Traffic Control must comply with the current version of MUTCD. Work Hours are 7 am to 7 pm Monday-Saturday (no work on Sundays or City Recognized Holidays). Checklists are not available on Saturday or Sunday. Non-motorized traffic control must be provided if any part of the work impacts existing non-motorized facilities. Non-motorized traffic control measures shall provide a level of accessibility that are, at minimum, equal to the existing conditions of the site. Condition #3 Added By LaNay Hendrick- Permit Technician at May 11, 2026 01:29PM Condition:Two days before starting work, the applicant must have all utilities located. One Call, is a public utility locating service (#811 or 1-800-424-5555). Privately installed facilities must also be located using a private utility locating service. Private property owners which may be affected by the proposed work must be notified in advance of potential disruptions in access or utility services. Condition #4 Added By LaNay Hendrick- Permit Technician at May 11, 2026 01:30PM Condition: Please be advised Ziply is responsible for ensuring the placement of new and updated structures. Do not restrict existing use of right of way. Please take special note of secondary accesses that are used for RV's, boats, or other special uses. Condition #5 Added By LaNay Hendrick- Permit Technician at May 11, 2026 01:30PM Condition: Restoration of any infrastructure affected by the installation shall be per City of Arlington Standards &Specifications within a period not to exceed 7 days from completion of the installation.Trench Restoration shall be per Standard Detail R-140; Contact the City Engineer for Roadway Restoration requirements, 360-403-3512. Manual Approval - Project#PJ 26-0178 214190 By LaNay Hendrick- Permit Technician at May 11, 2026 01:32PM The following project has been approved manually. Project#PJ 26-0178 214190 Checklist #26-0333: Result- Incomplete By Brian Grieve- Development Services Inspector at May 21, 2026 03:37PM Civil - Right of Way Checklists Checklist#26-0333: Result- Incomplete ©Community Development Online Portal Page 3 of 4 June 5, 2026 10:09AM 4rtk( tot( WASHINGTON Job Start- Nobody was on site. Checklist #26-0373: Result- Pass By Brian Grieve- Development Services Inspector at June 4, 2026 04:23PM Civil - Right of Way Final Checklist#26-0373: Result- Pass Manual Closure - Project #Pj 26-0241 214190 By Admin - Hannah Hardwick- Fire Permit Technician II at June 5, 2026 10:07AM The following project has been closed manually. Project#PJ 26-0241 214190 ©Community Development Online Portal Page 4 of 4 June 5, 2026 10:09AM ATCO COMMUNICATIONS SERVICES,LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION.UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL.REF.MUTCD 2009 6A-01(10) 41" a City of Arlington ATCOwww.at otelec SERVICES.LLC www.atcotelecom.com 360.563.9000 708 First Street Snohomish,WA 98290 J zilfibr a' py e r Everett,WA 98206 M tr rn Olympic Place Prairie View Apartments a 0 a L by Bonaverture z 0 Portage Creek co v Apartments N 0, a- .c H 06 w Ellco i5 o Q a Work Area 0 a) w m r 0 skyline Construction O �, r t N a W N and Remodel °' 2 co v. Portage t portage st _ _ — Portage st H Uj Jensen Park O U z Q� Kent Prairie � z w g Elementary School w w o z IS O O U w �ryMO. d d O U-- fi DATE: 5.6.2026 REVIEWED BY: M. LUNA WTCS#001040 c ti DESIGNED BY: M. Robertson ATCO CONTACT: 832.758.0094 mark.robertson@atcotelecom.com SCALE: SHEET: VICINITY MAP NOT TO SCALE NO: 1 OF 3 LEGEND: ,--tA ;; ATCO COMMUNICATIONS SERVICES,LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, O SIGNALIZED INTERSECTION MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. PHASE APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY O 4 ENFORCEMENT AUTHORITY IN THE JURISDICTION.UTILIZATION AND IMPLEMENTATION OF THIS PLAN CONE(CANDLESTICK) SHALL BE A RESULT OF THE APPROVAL.REF.MUTCD 2009 6A-01(10) TYPE III BARRICADE ATCO COMMUNICATIONS SERVICES,LLC SIGN LEGEND: www.alcotelecom.com WORK TRUCK 360.563.9000 WORK DETAILS: 708 First Street WORK ZONE LIMITS Snohomish,WA 98290 Access terminal and pull 240'cable through existing ROAD SHOULDER conduit to existing flowerpot. From flowerpot bore WORK PORTABLE SIGN d23'ig under driveway and place new flowerpot.Hand AHEAD WORK rz IPlyfi b dig 64'to customer property. Q EXISTING SIGN ® DRIVEWAY NO PARKING 72 HR NOTE W20-1 W21-5 R8-3a Everett,WA98206 ARROW BOARD (WHERE REQUIRED) CONTRACTOR TO PLACE NO Q Lu PARKING SIGNS 72 HOURS CD PRIOR TO START WORK Z DIRECTION OF TRAFFIC(NOT PAVEMENT MARKINGS) (25 MPH)Dr NE N o SIDEWALK CLOSED (25 z FLAGGER-SPOTTER U 11 FLAGGERS WILL HAVE WORK STOP TO ¢ Q ESCORT PEDESTRIANS THROUGH WORKZONE p N co rn co FLAGGER STATION j oaPortage St Portage St I� O (25 MPH) W2 (25 MPH) 40'DOWN 40' TAPER SHOULDER X X Terminal Ped TAPER R9-9 Z SIDEw ~�—i Ped W21-5\ W20-1� R9-9 O y ♦� _� 0000 O O ° { SIDEWALK F y 0 0000 f4moo° 0 00000 Q00000 �� o ♦- ' ` f SIDEWALK W20-1 - SIDEWALK LL SIDEWALK SIDEWALK � 712 x LL LU w IY z Q z ui I— g NOTE: w w 0 Z MON.-FRI.=7:00am TO 4:00pm O p U LU d a O LL CHANNELIZATION DEVICE SPACING(feet) MPH TAPER TANGENT 50/70 40 80 DATE: 5.6.2026 35/45 30 60 25/30 20 40 REVIEWED BY: M.LUNA WTCS#001040 SIGN SPACING=X(1) FREEWAY&EXPRESSWAYS 55/70MPH 1500'± DESIGNED BY: M.Robertson RURAL HIGHWAYS 60/65 MPH 800'± ATCO CONTACT: 832.7580094 / MINIMUM SHOULDER TAPER LENGTH=L/3(feet) RURAL ROADS 45 55 MPH 500'± mark.robertson@atcotelecom.com RURAL ROADS&URBAN ARTERIALS 35/40 MPH 350'± SHOULDER POSTED SPEED(MPH) RURAL ROADS&URBAN ARTERIALS 25/30 MPH 200'± (2) SCALE: SHEET: WIDTH RESIDENTIAL&BUSINESS DISTRICTS (feet) 25 30 35 40 45 50 55 60 65 70 URBAN STREETS 25 MPH OR LESS 100'± (2) 0 8 40 40 60 90 120 130 150 160 170 190 1"=60' L (1)ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, 10 40 60 90 90 150 170 190 220 220 240 AT-GRADE INTERSECTIONS AND DRIVEWAYS USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8' (2)THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. NO:2 OF 3 LEGEND: ,--tA ;; ATCO COMMUNICATIONS SERVICES,LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, ^/ O SIGNALIZED INTERSECTION MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. PHASE L APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY O 4 ENFORCEMENT AUTHORITY IN THE JURISDICTION.UTILIZATION AND IMPLEMENTATION OF THIS PLAN CONE(CANDLESTICK) SHALL BE A RESULT OF THE APPROVAL.REF.MUTCD 2009 6A-01(10) TYPE III BARRICADE ATCO COMMUNICATIONS SERVICES,LLC SIGN LEGEND: www.alcotelecom.com WORK TRUCK 360.563.9000 WORK DETAILS: 708 First Street WORK ZONE LIMITS Snohomish,WA 98290 Access terminal and pull 240'cable through existing ROAD SHOULDER conduit to existing flowerpot. From flowerpot bore WORK PORTABLE SIGN d23'ig under driveway and place new flowerpot.Hand AHEAD WORK rz IPlyfi b dig 64'to customer property. Q EXISTING SIGN ® DRIVEWAY NO PARKING 72 HR NOTE W20-1 W21-5 R8-3a Everett,WA98206 ARROW BOARD (WHERE REQUIRED) CONTRACTOR TO PLACE NO Q uJ PARKING SIGNS 72 HOURS CD PRIOR TO START WORK Z DIRECTION OF TRAFFIC I L (NOT PAVEMENT MARKINGS) 81st Dr NE cal o SIDEWALK CLOSED (25 MPH) 2 z ffTFLAGGER-SPOTTER o FLAGGERS WILL HAVE WORK STOP TO ESCORT PEDESTRIANS THROUGH WORKZONE J p N (D co N I..L • FLAGGER STATION o N CL a J N_ O Portage St Portage St 0 (25 MPH) 1 (25 MPH) N x W20_, t j X z SIDEWA O � y W20-1 ' ` �� ♦_ y y SIDEWALK V F � y " F ~����• :0: 0 00000000000000v ~ F 0EWALK f ♦� U_ W21-5 W20-1 SIDEWALK R9 9 SIDEWALK SIDEWALK i X X LLI W 40' Flowerpot R9-9 m SHOULDER � New Flowerpot 40' � � TAPER / Flowerpot 712 SHOULDER p TAPER Z Q Z 6i U U O 2 NOTE: Q Bore Path LU LU Q Z MON.-FRI.=7:00am TO 4:00pm O O U UJ Of lr_ J CL d O LL CHANNELIZATION DEVICE SPACING(feet) MPH TAPER TANGENT 50/70 40 80 DATE: 5.6.2026 35/45 30 60 25/30 20 40 REVIEWED BY: M.LUNA WTCS#001040 SIGN SPACING=X(1) FREEWAY&EXPRESSWAYS 55/70MPH 1500'± DESIGNED BY: M.Robertson RURAL HIGHWAYS 60/65 MPH 800'± ATCO CONTACT: 832.7580094 / MINIMUM SHOULDER TAPER LENGTH=L/3(feet) RURAL ROADS 45 55 MPH 500'± mark.robertson@atcotelecom.com RURAL ROADS&URBAN ARTERIALS 35/40 MPH 350'± SHOULDER POSTED SPEED(MPH) RURAL ROADS&URBAN ARTERIALS 25/30 MPH 200'± (2) SCALE: SHEET: WIDTH RESIDENTIAL&BUSINESS DISTRICTS (feet) 25 30 35 40 45 50 55 60 65 70 URBAN STREETS 25 MPH OR LESS 100'± (2) It 601 8 40 40 60 90 120 130 150 160 170 190 (1)ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, 0.1- 10 40 60 90 90 150 170 190 220 220 240 AT-GRADE INTERSECTIONS AND DRIVEWAYS USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8' (2)THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. NO:3 OF 3