Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1311 Park Hill Dr_PJ26-0198_2026
CONSTRUCTION PERMIT APPLICATION Community&Economic Development City of Arlington • 18204 591h Avenue NE • Arlington,WA 98223 • Phone (360) 403-3551 CIVIL (TYPE I) ❑ GRADING/PAVING/DRAINAGE (TYPE II) ❑ RIGHT OF WAY(TYPE III) TYPE I&II ONLY NEW DEVELOPMENT ❑ REDEVELOPMENT ❑ Project Name: 211988 Snohomish County Tax Parcel I.D. A 00562700002800 ,Project Address/Location: 1311 Park Hill Dr, Arlington, WA 98223 Description of Project: FROM TERMINAL PED # DOFTP FT-1-12O01001 BORE — 60' UNDER DRIVEWAYS. PLACE NEW FP & HAND DIG REST TO PRIVATE PROPERTY OWNER Name: Address: City: State: Zip: Phone: Email: APPLICANT Name: Ziply Fiber Northwest, L L C Address: 426 E Casino Rd. City: Everett State: WA Zip: 98208 Phone: 402-670-8384 Email: grpatcopermits(@ziply.com ENGINEER _ Name: Address: City: State: Zip: Phone: Email: License#: Expiration: CONTRACTOR Name: Pacific Cable Construction, Inc. Address:P.O. Box 573 Citv: Woodinville State: WA Zi :98072 Phone: 425-348-7735 Email: Luke-@-.oaccab.com License#: P A C I F C C 9 5 4 P Expiration: I hereby certify that I have read and examined this application, City of Arlington Municipal Code, Standard Plan & Specifications. Performance of the proposed work shall follow all applicable laws and regulations.The owner/applicant shall assume full and complete responsibility for said work and shall be responsible for the acquisition and compliance of all applicable pemlits and/or authorizations which may include, but not limited to, Right of Why Penuit,WSOW Hydraulic Project Approval (HPA),WSDOE Notice of Intent(NOi),National Pollutant Discharge Elimination System (NPDES),Anny Corp. of Engineers Permits,the requirements oft1le Endangered Species Act;and the Forest Practices Application(FPA). Signature----r� �Z� a ------------------------------ Print Name:--Caleigh-13-el---------------- Date: 4/9/2026 Page 1 of2 REVII/2018 .Complete package constitutes all items. Only complete submittals will be accepted._ Civil -Submittal Requirements,Type I: D Complete Application; D Construction Plans including cut/fill quantities; . 2 full size plan sets 22"x 34" • PDF file of the complete plan set . 2 full size set of landscape plans 22"x 34" D Marysville Utility plans, ifapplicable (2 sets); D Drainage Analysis including calculations and downstream analysis (2 sets) and (PDF file); refer to Stormwater Drainage Requirements; D Geotechnical Report (2 sets) and (PDF file); D SEPA is required if 500 or more cubic yards of cut/ fill is proposed (not required if included with a Land Use Permit); D Grading cut/ fill quantity: -------- D Design Vehicle - demonstrate turning radius include 45' Fire truck, dual axle, 256 inch wheel base; D Complete Streets Checklist D Drafts of easement(s) dedication(s), and/or CAPE(s) for review; D Flood Hazard Permit Application and required documentation if project is within 100 year flood plain; refer to Flood Hazard guidance documents; D Construction Calculation Worksheet; D NPDES Permit (if required); See Storm Water Drainage Report, New or Redevelopment Flowcharts, D Assurance Device will be required prior to Permitlssuance (Bond or Assignment of Funds); D Permit Fee due at time of permit submittal. Grading/Paving/Drainage Submittal Requirements,Type I1: D Complete Application; D Construction Plans including import/export quantities; . 2 full size plan sets 22"x 34" . PDF file of the complete plan set D Drainage Analysis including calculations and downstream analysis (2 sets) and (PDF file); refer to Stormwater Drainage Requirements; D Geotechnical Report (2 sets) and (PDF file); D SEPA is required if 500 or more cubic yards of cut/fill is proposed (not required if included with a Land Use Permit); D Grading cut/ fill quantity: --------- D Construction Calculation Worksheet; D NPDES Permit (ifrequired); See Storm Water Drainage Report, New or Redevelopment Flowcharts, D Permit fee due at time of permit submittal. Right of Way Submittal Requirements,Type III: Complete Application; 5Q Construction Plans; Traffic Control Plan; ❑ Road dosure Request; ❑ Temporary Erosion &Sediment Control (TESC) Plan; ❑ Certificate oflnsurance with the City ofArlington named as Additional Insured; ❑ Assurance Device will be required prior to Permit Issuance (Bond or Assignment of Funds); Engineers Estimated Cost of Construction; $____________ QI Permit fee due at time of permit issuance. Page 2 of2 Right-of-Way Permit Application For submittal checklist, see below. *denotes required fields Project Information *Project Name: 211988 *Description of Project: Engineers Estimated Cost of Construction; $ 2,000 Contact Information Owner Information *Owner Name: IZiply Fiber *Office No.: INorthwest LLC. *Email Address: Igrpatcopermits@ziplyfit *Cell No.: 402-670-8384 *Mailing Address: 1426 E Casino Rd, Everet *City: lEverett *State: WA *Zip: 98208 Engineer Information Engineer Name: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: Professional License Number: Expiration Date: Contractor Details Primary Contractor: IPacific Cable Office No.: Email Address: Juke@paccab.com Cell No.: 425-348-7735 Mailing Address: IP.O. Box 573 City: Woodinville State: WA Zip: 198270 L&I Contractor IPACIFCC954PJ License Number: Expiration Date: 2026-05-21 Acknowledgement I, hereby certify that I have read and examined this application, City of Arlington Municipal Code, Standard Plan & Specifications. Performance of the proposed work shall follow all applicable laws and regulations. The owner/applicant shall assume full and complete responsibility for said work and shall be responsible for the acquisition and compliance of all applicable permits and/or authorizations which may include, but not limited to, Right of Way Permit, WSDW Hydraulic Project Approval(HPA), WSDOE Notice of Intent(NOI), National Pollutant Discharge Elimination System (NPDES), Army Corp. of Engineers Permits, the requirements of the Endangered Species Act, and the Forest Practices Application (FPA). *Print Name: ICaleigh Bell *Date: 2026-04-09 Submittal Checklist Complete package constitutes all items. Only complete submittals will be acce12 Electronic files shall be PDF and submitted through this portal, email or downloadable link to file server. • Construction Plans; refer to Design Recluirements and Chanter 1 of the City of Arlington's Design and Construction Standards and Specifications Manual for required sheets. • Traffic Control Plan. • Road Closure Request. • Temporary Erosion & Sediment Control (TESC) Plan if new or replaced hard surfacing is being constructed. • Certificate of Insurance with the City of Arlington named as Additional Insured. Permit fee and any assurarnce device (Bond or Assignment of Funds) due at time of permit issuance. An invoice with link for payment will be sent to the applicant email address once permit is reviewed and approved. LEGEND: El 7711 EXISTING TERMINAL CITY OF ARLINGTON FTM-1 PROPOSED TERMINAL � ATCO COMMUNICATIONS SERVICES,LLC ilkf 4 www.alcotelecom.com EXISTING UTILITY POLE I;_ti 360.563.9000 708 First Street ® PROPOSED NEW POLE T t, Snohomish,WA 98290 H H EXISTING HANDHOLE I H zifiber H PROPOSED NEW HANDHOLE[2'x3'] +' p y _ a �-a Everett,WA 98206 M H EXISTING MANHOLE _ _ t -%) 00 Z w EH PROPOSED NEW MANHOLE f i 00 O Q 3 H a r N Z Q EXISTING FLOWER POT �:L I' y � _ Q O ® + _ J^ �l ti Z 00 PROPOSED NEW FLOWER POT M. j 4 • J ej$ 00 EXISTING UNDERGROUND UTILITY fF * � = p yy _ Opt PROPOSED UNDERGROUND 5 — ^^// a CONSTRUCTION[HAND DIG,BORE] � �'r �` *� cl- EXISTING AERIAL SPAN wM. *, _ a r _ ItA L PROPOSED AERIAL SPAN - P— CENTER LINE �' � , — — PARCEL LIMITS[PROPERTY LINE] EOP EOP EDGE OF PAVEMENT MCA `\ �• Ip ROW RIGHT OF WAY 4O 1, 1 Z - O WORK DETAILS: ,t_ OR m w FROM TERMINAL PED# DRIVEWAYS. WAYS.01001 BORE-60' / `?9 Z Q Z_ Lij UNDER DRIVEWAYS. EOP ..a� U U PLACE NEW FP&HAND DIG REST TO PRIVATE PROPERTY Oe y r LLI LLI LLI Z �pP ♦ _ 1 O O Q w d d z LL MINIMUM STANDARDS FOR DIRECTIONAL BORING STREET CROSSINGS *_ DATE: 4.8.2026 EX.GRADEOPT#• OF DESIGNED BY: C.BELL , ' ATCO CONTACT: 910.231.7156 12"MIN 48"MIN caleigh.bellOatcotelecom.com BORE PIT FROM EX.UTILITIES RECEIVE PIT SCALE: SHEET: Know what's below PLACE ND MARKER- DESCRIBING BORE PET TO BE BAC FIILLED AND CUTILITYO MPACTED NE12"LIFTS WITH MATDER AL REMOVED ® M Y�v ' Call before ym Yi% N 0 T T 0 O -FL OW OF ANY NEARBY DRAINAGE MUST BE MAINTAINED AT ALL TIMES -PROTECT ROOTS AT ALL TREE LOCATIONS,FIELD ADJUST AS NECESSARY SCALE TYPICAL BOREDETA/LS NO: 1 OF ATCO COMMUNICATIONS SERVICES,LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION.UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL.REF.MUTCD 2009 6A-01(10) lAl" O CITY OF A R L I N G T O N ATCO COMMUNICATIONS SERVICES,llC www.atcotelecom.com 360.563.9000 708 First Street Snohomish,WA 98290 z i fi bQr pYI Everett,WA 98206 1 00 Z u. o, rn OF Q a N (D a z Q J N H Q co 0 Z J 06 I I I 00 1 1 1 � Y w N Q J a 1301 � a v, . N LL W PHASE 1 1221 O Lv U w w m a zQz w U U O LU LU H Q Z w � U LU a a O LL 1302 DATE: 4.8.2026 _-- REVIEWED BY: M. LUNA -- WTCS#001040 DESIGNED BY: C.BELL ATCO CONTACT: 910.231.7156 caleigh.bell@atcotelecom.com SCALE: SHEET: VICINITY MAP NOT TO SCALE NO: 1 OF 2 LEGEND: ,--tA ;; ATCO COMMUNICATIONS SERVICES,LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, O SIGNALIZED INTERSECTION MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. PHASE APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY O 4 ENFORCEMENT AUTHORITY IN THE JURISDICTION.UTILIZATION AND IMPLEMENTATION OF THIS PLAN CONE(CANDLESTICK) SHALL BE A RESULT OF THE APPROVAL.REF.MUTCD 2009 6A-01(10) TYPE III BARRICADE O WORK DE IT pILC+. ATCO COMMUNICATIONS r�r� /`1 �7 www.alcotelecom.com WORK TRUCK FROM TERMINAL PED#DOFTP FT-H2O01001 360.563.9000 BORE-60' UNDER DRIVEWAYS. 708 First Street WORK ZONE LIMITS PLACE NEW FP&HAND DIG REST TO PRIVATE Snohomish,WA 98290 PROPERTY PORTABLE SIGN ZI lyfib p r CONTRACTOR TO PLACE NO PARKING SIGNS 472 HOURS PRIOR TO START OF WORK p EXISTING SIGN ® DRIVEWAY Everett,WA 98206 ARROW BOARD 1,311 (WHERE REQUIRED) co Z >Q cm a DIRECTION OF TRAFFIC FP � � � Q U (NOT PAVEMENT MARKINGS) cal do Q, � Q Q z ■-� Q O FLAGGER-SPOTTER �9AG�O Q J o Z ■ ' O� J 0 00 00 FLAGGER STATION Y � _1�2 J J N a = PED#DOFTP FT-H2001001 Z a� '00w �e O U U ot L.L w w Q M Z Q Z w NOTE: w w Z MON.-FRI.=7:00am TO 4:00pm O p O LU J D- a- J LL CHANNELIZATION DEVICE SPACING(feet) MPH TAPER TANGENT 50/70 40 80 DATE: 4.8.2026 35/45 30 60 SIGN LEGEND: 25/30 20 40 REVIEWED BY: M.LUNA WTCS#001040 SIGN SPACING=X(1) MINIMUM SHOULDER TAPER LENGTH=L/3(feet) FREEWAY&EXPRESSWAYS 55/70MPH 1500'± DESIGNED BY: C.BELL ROAD WORK WORK SHOULDER SHOUDLDER POSTED SPEED(MPH) RURAL HIGHWAYS 60/65 MPH 8001± ATCO CONTACT: 910.231.7156 TH RURAL ROADS 45/55 MPH 500'± AHEAD (feet) 25 30 35 40 45 50 55 60 65 70 RURAL ROADS&URBAN ARTERIALS 35/40 MPH 350'± caleigh.bell@atcotelecom.com 8 40 40 60 90 120 130 150 160 170 190 RURAL ROADS&URBAN ARTERIALS 25/30 MPH 200'± (2) SCALE: SHEET: RESIDENTIAL&BUSINESS DISTRICTS W20-1 W21-5 R8-3a 10 40 60 90 90 150 170 190 220 220 240 URBAN STREETS 25 MPH OR LESS 100'± (2) 0 USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8' (1)ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, 1 I'=401 L AT-GRADE INTERSECTIONS AND DRIVEWAYS (2)THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. NO:2 OF 2 City of Arlington 18204 59th Avenue NE, Arlington, • • Washington 98223 Phone: 360-403-3551 jNG� WASHINGTON C Invoice Number: 26-0362 INVOICE Invoice Date: April 10, 2026 Account Number: 3148292788 Bill To: Invoice Questions? ATCO Telecommunications Phone: 360-403-3551 708 First St. Email: ced@arlingtonwa.gov Invoice Due Date: April 10, 2026 Record Number: Project 26-0198 Parcel Number: 00562700002800 Location: 1311 PARK HILL DR Date Description Paid Date Amount Paid Balance April 9, 2026 Processing/Technology Fee (320.341.43.00.02) $25.00 April 9, 2026 Right of Way(006.322.40.00.02) $125.00 TOTAL: Project Fees $150.00 $150.00 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------- REMITTANCE INFORMATION If you are paying by check, please include this portion with your payment and remit to the address listed on this invoice. Remittance Information Invoice Account Total Due Your payment is due by April 10, 2026 Number Number This Invoice 26-0362 3148292788 $150.00 ATCO Telecommunications 708 First St. 18204 59th Avenue NE • op ' • 14 Arlington, Washington 98223 to tt Phone: 360-403-3551 jNG� WASHINGTON C Civil Use - Right of Way Permit Parcel:00562700002800 Permit#:26-0198 Permit Address:1311 PARK HILL DR Permit Expiration: July 22, 2026 Description of Work:FROM TERMINAL PED# DOFTP FT-H2O01001 BORE--60'UNDER DRIVEWAYS. PLACE NEW FP&HAND DIG REST TO PRIVATE PROPERTY OWNER APPLICANT CONTRACTOR ATCO Telecommunications Pacific Cable Construction Ziply Fiber 708 First St. PO Box 573,Woodinville,WA 98072 1311 PARK HILL DR ARLINGTON,WA,98223-1139 4026708384 permits@atcotelecom.com luke@paccab.com P CI registration number:PACIFCC954PJ PERMIT APPROVAL The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor. It is unlawful to use or occupy a building or structure until a final inspection has been made and approval or a Certificate of Occupancy has been granted. This permit authorizes only the work noted and covers work to be done on private property only. Any construction on public domain (curbs, sidewalks, driveways, marquees, etc.) will require a separate permit. The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations. The property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or community. The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities before commencing construction. The property owner shall ensure that the construction project complies with all applicable design review requirements. CONDITIONS Traffic Control must comply with the current version of MUTCD. Work Hours are 7 am to 7 pm Monday- Saturday (no work on Sundays or City Recognized Holidays). Inspections are not available on Saturday or 1.) Sunday. Non-motorized traffic control must be provided if any part of the work impacts existing non-motorized facilities. Non-motorized traffic control measures shall provide a level of accessibility that are, at minimum, equal to the existing conditions of the site. Two days before starting work, the applicant must have all utilities located. One Call, is a public utility locating 2.) service (#811 or 1-800-424-5555). Privately installed facilities must also be located using a private utility locating service. 3 ) Private property owners which may be affected by the proposed work must be notified in advance of potential disruptions in access or utility services Restoration of any infrastructure affected by the installation shall be per City of Arlington Standards & 4.) Specifications within a period not to exceed 7 days from completion of the installation. Trench Restoration shall be per Standard Detail R-140; Contact the City Engineer for Roadway Restoration requirements, 360-403-3512. Please be advised Ziply is responsible for ensuring the placement of new and updated structures. Do not restrict 5.) existing use of right of way. Please take special note of secondary accesses that are used for RVa€"s, boats, or other special uses. INSPECTIONS Inspection Line: 360-403-3417 Call for inspections by 3:30 pm for next day inspection. Please allow 48 hours for Fire Inspections. Please provide the following information when leaving a message: Permit Number, Type of Inspection, and provide preference of morning or afternoon inspection. Inspection Portal: Please login to customer portal and submit for the desired inspection type for the permit. APPROVED BY Admin - Thad Newport Development Services Engineering Manager ASSOCIATED FEES Date Description Paid Date Amount Paid Balance April 9, 2026 Processing/Technology Fee(320.341.43.00.02) $25.00 April 9, 2026 Right of Way(006.322.40.00.02) $125.00 TOTAL: Project Fees $150.00 $150.00 Credit/Debit Card 531 Payment Successful April 22, 2026 $150.00 $0.00 WASHINGTON Project #PJ 26-0198 211988 Routing Details ✓ Department: Permit Tech Intake Review - Approved: April 9, 2026 - Status: Approved Project Application #26-0198 211988- by Admin - Hannah Hardwick- Fire Permit Technician II at April 9, 2026 11:25AM Status: Approved Activity Type: Application Sent Application is ready for review. Admin - Hannah Hardwick City of Arlington Fire Permit Technician II hhardwick@arlingtonwa.gov 360-403-3549 ✓ Department: Permit Tech Final Approval - Approved: June 5, 2026 - Status: Closed Manual Update- Project Application #26-0198 211988- by Admin - Hannah Hardwick- Fire Permit Technician II at April 9, 2026 11:22AM Status: In Progress Activity Type: Documents Review The following project has been updated manually. Project Application #26-0198 211988 Project Application #26-0198 211988- by Admin- Hannah Hardwick- Fire Permit Technician II at April 10, 2026 08:38AM Status: Pending Activity Type: Pending Payment Hello, Your invoice is now ready for payment.You can access and process the payment through our portal. Please visit the following link to view and pay your invoice: https://www.civicgov4.com/wa_arlington/portal/index.php?r=site/dashboard Admin - Hannah Hardwick City of Arlington Fire Permit Technician II hhardwick@arlingtonwa.gov 360-403-3549 Project Application #26-0198 211988- by Admin- Hannah Hardwick- Fire Permit Technician II at April 21, 2026 10:16AM Status: Pending ©Community Development Online Portal Page 1 of 5 June 5, 2026 10:04AM liptiot tot( WASHINGTON Activity Type: Pending Payment Hello, Your invoice is now ready for payment.You can access and process the payment through our portal. Please visit the following link to view and pay your invoice: https://www.civicgov4.com/wa_arlington/portal/index.php?r=site/dashboard Admin - Hannah Hardwick City of Arlington Fire Permit Technician II hhardwick@arlingtonwa.gov 360-403-3549 Project Application #26-0198 211988- by Admin - Hannah Hardwick- Fire Permit Technician II at April 22, 2026 10:39AM Status: Approved Activity Type: Application Sent Admin - Hannah Hardwick City of Arlington Fire Permit Technician II hhardwick@arlingtonwa.gov 360-403-3549 Project #PJ 26-0198 211988- by Admin - Hannah Hardwick- Fire Permit Technician II at April 22, 2026 10:41AM Status: Approved Activity Type: Permit Issued Hello, Attached you'll find the issued right-of-way permit. Please review the conditions of the permit and inspections instructions and reach out should you have any questions. Regards, Admin - Hannah Hardwick City of Arlington Fire Permit Technician II hhardwick@arlingtonwa.gov 360-403-3549 Manual Closure - Project #PJ 26-0198 211988- by Admin - Hannah Hardwick- Fire Permit Technician II at June 5, 2026 10:02AM Status: Closed Activity Type: Documents Review The following project has been closed manually. @ Community Development Online Portal Page 2 of 5 June 5, 2026 10:04AM lirttf tot( Project#PJ 26-0198 211988 ✓ Department: 1st Review CED Inpsector - Approved: April 9, 2026 - Status: Approved Project Application #26-0198 211988- by Brian Grieve- Development Services Inspector at April 9, 2026 04:46PM Status: Approved Activity Type: Application Sent Dear Team, Just completed the CED review. No comments. Thanks, Brian Grieve City of Arlington Development Services Inspector bgrieve@arlingtonwa.gov 13609131396 ✓ Department: 1st Review Civil - Approved: April 10, 2026 - Status: Approved Project Application #26-0198 211988- by Thad Newport- Development Services Engineering Manager at April 10, 2026 08:OOAM Status: Approved Activity Type: Documents Review No civil comments Thad Newport City of Arlington Development Services Engineering Manager tnewport@arlingtonwa.gov (360) 403-3434 @ Community Development Online Portal Page 3 of 5 June 5, 2026 10:04AM 4rtk( tot( WASHINGTON Record Actions New Project Application #A26-0198 211988 By Admin - Hannah Hardwick- Fire Permit Technician II at April 9, 2026 11:18AM Hello, A new project application has been submitted for review. Please login to your CIVICGov Web Application account and visit the link below to view the project details. https://www.civicgov4.com/wa_arlington/projects/details/345 If you cannot click on the link above, please copy and paste the entire link in the browser address bar. Sincerely, CIVICGov Team. Manual Update- Project Application #26-0198 211988 By Admin - Hannah Hardwick- Fire Permit Technician II at April 9, 2026 11:22AM The following project has been updated manually. Project Application #26-0198 211988 Condition #1 Added By Admin - Hannah Hardwick- Fire Permit Technician II at April 10, 2026 08:39AM Condition:Traffic Control must comply with the current version of MUTCD. Work Hours are 7 am to 7 pm Monday-Saturday (no work on Sundays or City Recognized Holidays). Checklists are not available on Saturday or Sunday. Non-motorized traffic control must be provided if any part of the work impacts existing non-motorized facilities. Non-motorized traffic control measures shall provide a level of accessibility that are, at minimum, equal to the existing conditions of the site. Condition #2 Added By Admin - Hannah Hardwick- Fire Permit Technician II at April 10, 2026 08:39AM Condition:Two days before starting work, the applicant must have all utilities located. One Call, is a public utility locating service (#811 or 1-800-424-5555). Privately installed facilities must also be located using a private utility locating service. Condition #3 Added By Admin - Hannah Hardwick- Fire Permit Technician II at April 10, 2026 08:39AM Condition: Private property owners which may be affected by the proposed work must be notified in advance of potential disruptions in access or utility services Condition #4 Added By Admin - Hannah Hardwick- Fire Permit Technician II at April 10, 2026 08:39AM Condition: Restoration of any infrastructure affected by the installation shall be per City of Arlington Standards &Specifications within a period not to exceed 7 days from completion of the installation.Trench Restoration shall be per Standard Detail R-140; Contact the City Engineer for Roadway Restoration requirements, 360-403-3512. Condition #5 Added By Admin - Hannah Hardwick- Fire Permit Technician II at April 10, 2026 08:39AM Condition: Please be advised Ziply is responsible for ensuring the placement of new and updated structures. Do not restrict existing use of right of way. Please take special note of secondary accesses that are used for RV's, boats, or other special uses. Checklist #26-0286: Result- Incomplete By Brian Grieve- Development Services Inspector at May 19, 2026 12:48PM Civil - Right of Way Checklists Checklist#26-0286: Result- Incomplete job start checklist- New line was installed. Waiting on a permanent pavement patch to close out the permit. Checklist #26-0371: Result- Pass ©Community Development Online Portal Page 4 of 5 June 5, 2026 10:04AM to" WASHINGTON By Brian Grieve- Development Services Inspector at June 4, 2026 04:24PM Civil - Right of Way Final Checklist#26-0371: Result- Pass Manual Closure - Project #PJ 26-0198 211988 By Admin - Hannah Hardwick- Fire Permit Technician II at June 5, 2026 10:02AM The following project has been closed manually. Project#PJ 26-0198 211988 ©Community Development Online Portal Page 5 of 5 June 5, 2026 10:04AM 4rtk( tot( WASHINGTON Project Information - ' 'nforrnat;^- Project # 26-0198 Parcel # 00562700002800 Building ID Location 1311 PARK HILL DR Project Type Civil Use Project Use Right of Way Parent Project# Subdivision Applicant Name ATCO Telecommunications Address 708 First St. Applicant Email permits@atcotelecom.co Phone 4026708384 Cell m Owner Name Ziply Fiber Address 1311 PARK HILL DR ARLINGTON, WA, 98223-1139 Owner Email Phone Cell Contractor Pacific Cable Construction Address PO Box 573, Woodinville, WA 98072 Contractor Email luke@paccab.com Phone Cell Pr—--, 1-f -v,.,atlon Type/Improveme Accessory/Struct nt ure Current Use Proposed Use Current Zoning Proposed Zoning Project Cost 2000 Project Value 2000 Current Use And FROM TERMINAL PED # DOFTP FT-H2001001 BORE -- 60, UNDER DRIVEWAYS. Proposed Changes PLACE NEW FP& HAND DIG REST TO PRIVATE PROPERTY Lot Width Lot Depth Map Number Total Area of Building &Accessory Total Area of All Man-made Improvements Structures (Sq Ft) (Sq Ft) General Notes Restrictions/ Variances @ Community Development Online Portal Page 1 of 6 June 5, 2026 10:04AM WASHINGTON Structure Information Structure Type # of Stories Usable Floor Area (Sq Ft) Structure Height # of Units Load per Floor (Lbs) Sign Dimensions # of Bedrooms # of Bathrooms Occupancy With Chairs Tables & Chairs Empty Room Foundation Foundation Type Footing Depth Material Foundation Information Setbacks Front& 0 0 Setbacks Right & 0 0 Rear Left Sides Setbacks Information Water Utility Sewage Utility Gas Utility Electric Utility Driveway Width # of Off Street # of Off Street Parking Loading Miscellaneous Information ©Community Development Online Portal Page 2 of 6 June 5, 2026 10:04AM 4rtk( tot( WASHINGTON Contractors License# Business Name Type Contact PACIFCC954PJ Pacific Cable Construction Out of City Timothy Jones ©Community Development Online Portal Page 3 of 6 June 5, 2026 10:04AM WASHINGTON Inspections Inspection # Inspection Type Status Date Inspector 26-0286 Civil- Right of Way Incomplete May 4, 2026 Brian Grieve Inspections 26-0371 Civil- Right of Way Final Pass June 3, 2026 Brian Grieve ©Community Development Online Portal Page 4 of 6 June 5,2026 10:04AM 4rtk( tot( WASHINGTON Contacts Contact Name Type Project Address Phone ATCO Applicant 708 First St. 402-670-8384 Telecommunications Ziply Fiber Owner 1311 PARK HILL DR ARLINGTON, WA, 98223-1139 ATCO Others 708 First St. 402-670-8384 Telecommunications Pacific Cable Construction Contractor PO Box 573, Woodinville, WA 98072 ©Community Development Online Portal Page 5 of 6 June 5, 2026 10:04AM 4rtk( tot( WASHINGTON Fees Fee Type Date Debit Credit Balance Project Fees April 9, 2026 $150.00 $150.00 $150.00 $0.00 T O T A L $150.00 $150.00 $0.00 ©Community Development Online Portal Page 6 of 6 June 5, 2026 10:04AM