Loading...
HomeMy WebLinkAbout2014-018X MIN 63=05161011k M BENI 1K91N2L4K1Wb1PA4WAW0, I. 0M WA LIMA I V ILAN 1, a it THE CITY COUNCIL OF THE CITY OF ARLINGTON, WASHINGTON, DO RESOLVE: SECTION 1. That certain comprehensive Transportation Improvement Plan for the six years commencing July 1, 2015 as detailed in the attached "Exhibit A" is hereby adopted as the Official Six Year Transportation Improvement Plan for the City of Arlington. PASSED at a regular meeting of the City of Arlington, Washington held on the day of September, 2014. Barbara Tolbert, Mayor St I St- e en i. )61, fle, City Attorney I' imumfffflli 1� 1� mi1111115121111pill�11 qll�� Jill i 11 Q 11 111: Ili:•11 111111 IMMMIT, li ITransportation Capital Project Funding 1 2015 2016j 2017 2018 I_ 2019 2020 Fund Total 1 Pavement Preservation Program Arifington TIF Funds , $0 PE $569,040 Ti Funds $675,000 $675,000 $675,000 $675,000 $675,000 $675,000 $4,050,000 ROW $0 WSDOT Funds $0 CN ��,17�;960_ -TIB Grant -Funding- $0 TOTAL $4,742,000 PSRC/STP Funding $132,000 $185,000 $150,000 $125,000 $100,000 $0 $692,000 Comments: Program to preserve and Oso Slide Funds $0 maintain existing transportation Developer Funded $o infrastructure and systems, funding from Other Funds $0 Arlin on Ti SUBTOTAL THIS PROJECT $807,000 $86E,000 $825,000 $800,000 $775.000 $675.000 $4742,000 2 Arlington Trail Construction Program Arilington TIF Funds $25,000 $25,000 $25,000 $25,000 $25,000 $150,000 $275,000 PE $51,000 TBD Funds $o ROW $0 WSDOT Funds $75,000 $75,000 $151000 CN 374.000 TIB Grant Funding $0 TOTAL $425,000 PSR STP Funding $0 Comments: Design and construct pedestrian Oso Slide Funds $0 trails per the City's Trail Plan (non -motorized,- $0____ transportation facilities). Other Funds $0 SUBTOTAL THIS PROJECT $25,000 $25,000 $100,000 $100,000 $25,000 $150,000 $425,000 3 173rd St, Phase 3 Arilington TIF Funds $229,500 $229,500 PE $0 TJ Funds $0 -- -------- ROW $0 WSDOT Funds $0 CN �000_ TIB Grant Funding, $10- _$,1700 TOTAL $1,700,000 PSRC/STP Funding $1,470,500 $1,470,500 Comments: Construction of a new road, Oso Slide Funds $0 173rd Ave, Phase 3. Developer Funded $0 Other Funds $0 SUBTOTAL THIS PROJECT $0 $0 $1.700.000 $o $0 $0 $1.700.000 4 173rd St, Phase I Arilington TIF Funds $195,750 $195,750 PE $0 TJ Funds $o ROW $0 WSDOT Funds $0 CN !�1.450.000, TIB Grant Funding $1,254,250 $1.254,250 TOTAL $1,450,000 PSRC/STP Funding - - ---- ----- - $0 Comments: Construction I 11 of a 1- new road, Oso Slide Fund - s $o 173rd Ave, Phase 1. Developer Funded $0 Other Funds $0 SUBTOTAL THIS PROJECT $1,450,000 $0 $0 $0 $0 $0 $1,450,000 5 173rd Sit, Phase 2 Arilington TIF Funds $150,000 $101,250 $101,250 $352500 PE $74,000 TJ Funds $o ROW 5333,000 WSDOT Funds $o CN 1 443 000 TIB Grant Funding- $200,000 $648,750 $648,750 $1,497,500 TOTAL $1,850,000 PSRC/STP - F unding $0 Comments: Procurement of ROW and Oso Slide Funds --- -------- $0 construction of 173rd Ave, Phase 2. Developer Funded $0 Other Funds $0 SUBTOTAL THIS PROJECT $0 $o $350.000 $750.000 $750,000 $o $1.850,000 Adinglion 6-year TIP (20152020) Page 1 of 4 City of Arlington Six Year Transportation Improvement Plan (2015 - 202-'T 'it No. Transportation Capital Project Funding 2015 2016 2017 2018 2019 2020 FunTT_o_taT_ 6 Smky Pt Blvd/188th St Intersection Arilington TIF Funds $123,500 $30,000 $153,500 PE $7 8,400 TBD Funds ROW $0 WSDOT Funds $0- CN 5901.600 TIB Grant Funding $0 TOTAL $_980,00q, PSRUSTf!"undina- $826,500 $826,500 Comments: Install traffic signal, sidewalks, Oso Slide Funds $o ADA ramps and widen Smokey Point Blvd to Developer Funded $0 meet ultimate channelization plan. Other Funds $o SUBTOTAL THIS PROJECT $0 $0 $0 $0 $950,000 $30,000 $980,000 7 '211th PI NE - 67th Ave NE to SR530-59th 121 Arilington TIF Funds $50,000 $23,625 $113,400 $104,625 $291,650 PE S220,800 TBD Funds $0 ROW $331,200 WSDOT Funds $125,000 - CN 1288 0�00. TIB Grant Funding $0 TOTAL $1,840,000 PSRC/STP Funding $151,375 $726,600 $545,375 $1,423,350 ,Comments: Develop alignment to reroute Oso Slide Funds $0 211th to SR530 via 59th, design road and Developer Funded $o trail, construct frontage road and right- Other Funds $0 inlrighl-out at SR-530 SUBTOTAL THIS PROJECT $0 $50,000 $175,000 $840,000 $775,000 $0 $1,840,000 8 WSDOT - SR531; 43rd Ave to 67th Ave Arilington TIF Funds $500,000 $500,000 PE $-3,,300,000- TBD Funds 7- $0 ROW S5,280,000 WSDOT Funds $1,500,000 $3,000,000 $7,500,000 $53,500,000 $65,500,000 CN 57 420 000 TIB Grant Funding $0 TOTAL $66,000,000 PSRC/STP Funding -------_---- $0 Comments: Project to widen SR-531 (172nd Oso Slide Funds $0 St) between 43rd Ave and 67th Ave. The Developer Funded " $0 project will entail 5-lane construction with Other Funds $0 signalized intersections. SUBTOTAL THIS PROJECT $1,500,000 $3,000.000 $7,500,000 $54.000.000 $0 $0 $66.000,000 9 WSDOT - SR530/Burke Signalization Arilington TIF Funds $o PE $132,000 TBD Funds $0 ROW $0 WSDOT Funds $100,000 $100,000 ON $968,000---- TIB Grant Funding_ - - so, - TOTAL $1,100,000 PSRC/STP Funding $800,000 $800,000 Comments: installation of Signal and Oso Slide Funds $200,000 $200,000 improvements at SR9/SR530 and Division as Developer Funded $0 described in the WSDOT SR9 Route Other Funds $0 DeveloomMt Plan SUBTOTAL THIS PROJECT $0 $1,100,000 $0 $0 $0 $0 $1,100,000 10 WSDOT - SR530/SR9/Division Signal Arilington TIF Funds $0 PE $294,000 TBD Funds $0 ROW $0 WSDOT Funds $100,000 $100,000 CN S2,156.000 TIB Grant Funding $0 TOTAL $2,450,000 PSRC/STP Funding $2,150,000 $2,150,000 Comments: Installation of Signal at Burke Oso Slide Funds $200,000 $200,000 and SR9 as described in the WSDOT SR9 Developer Funded $0 Route Development Plan Other Funds. ~ $0 SUBTOTAL THIS PROJECT $0 $0 $2,450,000 $0 $0 $0 $2,450,000 Arlington 6-year TIP (20152020) Page 2 of 4 rffH9-,tWHMn imp rolemenrF7177-77-TS --777777, No., Itrin-sportation Capital Project I Funding 2619 2016 2017_ 2018 2019 2020 MM To—ta I 11 Arlington Valley Rd - 67th Ave to 204th St Arilington TIF Funds $0 PE $171,500 TBD Funds -ROW- $61,250 WSDOT Funds $0 CN- _52.217 250 TIB Grant Funding $0 TOTAL $2,450,000 F`SRC/STP Funding $1,900,000 $1,900,000 Comments: mments Design & construct a new 3 lane Oso Slide Funds $100,000 $450,000 $55Q 000 industrial standard road connecting 67th Ave Developer Funded $0 NE to 204th St NE. Low impact design Other Funds- $0 SUBTOTAL THIS PROJECT $100,000 $2,350.000 $0 $0 $0 $0 $2,450,000 12 204th St Improvements Arilington TIF Funds $75,000 $75,000 PE $93,750 TBD Funds $62,500- WSDOT Funds- $0 $LO93,750� TIB Grant Funding $875,000 $875,000 TOTAL $1,250,000 PSRC/STP Funding $0 Comments: Construct a trail along the north Oso Slide Funds $50,000 $50,000 side of 204th St, install signal at 74th St and Developer Funded $0 reconfigure channelization at 204th St/SR-9 Other Funds $250,000 $250,000 intersection SUBTOTAL THIS PROJECT $0 $0 $1,250,000 $0 $0 $0 $1,250,000 13 186th St NE - SR9 to City Limits Arilington TIF Funds $495,000 $495,000 PE $240,000 TBD Funds $0 ----ROW,,-,--- so. -WSDOT Funds - $0 CN S1.760.000 TIB Grant Funding $o TOTAL $2,000,000 PSRC/STP Funding $0 Comments: New 2 lane road with SW both Oso Slide Funds $0 sides. Joint developer & City funded project Developer Funded $1,505,000 4 $1.505.000 using ASO traffic mit funds. Other Funds $0 SUBTOTAL THIS PROJECT $0 $0 $0 $0 $0 $2,000,000 $2,000.000 14 Smokey Point Blvd 175th PL to 200th St Arilington TIF Funds $35,000 $81,000 $465,750 $581,750 PE $490,200 --TBD Funds, $0 ROW $408.500 WSDOT Funds $0 CN $3,186,300 TIB Grant Funding $0 TOTAL S4.085,000 PSRC/STP Funding $519,000 $2,984,250 $3,503,250 Comments: Widen Smokey Point Blvd to Oso Slide Funds $0 four lanes and construct frontage Developer Funded. -- --------- ----- --- $0 improvements to meet ultimate West Other Funds, $0 Arlin design stds- SUBTOTAL THIS PROJECT $0 $0 $0 $35,000 $600,000 $3,450,000 $4,085,000 15 Smokey Point Blvd 200th St NE to SR530 Arilington TIF Funds $350,000 $350.000 PE S420.000 TBD Funds $o ROW $0 WSDOT Funds $0 CIN 53.080.000 TIB Grant Funding $650,000 $650,000 TOTAL --�3,500,000 PSRC/S;TP Funding $0 Comments: . Widen Sm Pt Blvd to 3-lane road Oso Slide Funds $0 with improvements (rain garden/trail). Developer Funded-- $ 2,5-0-0-, -0-0 0 ---- - --- $Z 500, 000 Planning and Coord with Isl Crossing Other - Funds $0 Dtvelogm2nt LIQ. SUBTOTAL THIS PROJECT $0 $0 $0 $0 $3,500,000 $0 $3,500,000 Arlington 6year TIP (2015-2020) Page 3 of 4 No. Transportation Capital Project Funding 2015. 20172018 2019 2020 Fu na Tota I PE $979,200 TBD Funds Comments: Design and construction of a Oso Slide Funds so roundabout at the SR530/SPB intersection Developer Funded $3,410,000 $3,410,000 This will be designed in coordination with Other Funds, --- SO xnUng-tonnpFunds $ZZUJSU $75,000 $503,125 $1,024650 $785,375 $1,1407SU $3J49650 Teopunds g675,000 $675,000 $675.000 $675,000 ge75'000 $Griouo $4,050,000 WSoOrpvnds $1,500,000 $3,100,000 $7,675,000 $56,575,000 $zas'000 $o $68.975,000 noGrant Funding $1'254,250 $u $1,075,000 $648750 $1,2e8,750 $O $4,276,750 psnVSTppundino $zaa'ouo $2,885,000 $3^921,875 $u'asz.snn $1,990,875 $2'984,250 $14,265'600 $zMil o,oSlide Funds $100,000 g650,000 $250,000 $o $n go $z'onnoou Developer Funded $o $n $o g3'410,000 $2,500\000 $1,505'000 $7,415,000 Other Funding $O $O $250,000 $O $U $O $250'000 NOTES �