Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
19417 45th Dr Ne_BLD5579_2026
CITY OF ARLINGTON ` 18204 59th Avenue NE,Arlington,WA98223 INSPECTIONS: 360-403-3417-Perm i Center: 360-403-3551 BUILDING PERMIT 19417 45TH DR NE Perm t#: 5579 PERMIT EXPIRES 180 DAYS AFTER Parcel#: 00928200007300 DATE O FSSUANCE. Scope of Wcrk: 11.48kW grid tied roof m amted solar system V aluation: 37961.76 O W PER APPLICANT C O NTRACTO R RECCHhJOSEPH P JR M dison Martinez,Blossom Solar 19417 45TH DR NE 3 609 168th St NE#3507 ARLINGTON,WA98223-4758 A rlington,WA98223 , 425-610-7067 MECH ANICAL CO NIRACTO R ]LUMBING CO NIRACTO R LIC#: EXP: L IC#: E XP: JO BDESCRIPTIO N PERMIT TYPE: S OLAR INSTALLATION C ODE YEAR: 2 018 STORIES: 1 C ONST.TYPE: V B DWELLING UNITS: O CC GROUP: R -3;Residential BUILDINGS: O CC LOAD: PERMIT APPROVAL The issuance or granting of this perm i shall not be construed to be a perm i for,or approval of,any violation of this Code or any other ordinance or order of the City,of any state or federal law,or of any order,proclam aion,guidance advice or decision of the Governor of this State.To the extent the issuance or granting of this perm i is interpreted to allow construction activity during any period of tim ewhen such construction is prohibited or restricted by any state or federal law,or order,proclam Etion,guidance advice or decision of the Governor of this State,this perm i shall not authorize such work and shall not be valid.The building official is authorized to prevent occupancy or use of a structure where in violation of this Code,any other City ordinances of this jurisdiction or any other ordinance or executive order of the City,or of any state or federal law,or of any order,proclam Etion, guidance advice or decision of the Governor.The building official is authorized to suspend or revoke this perm i if it is determ ned to be issued in error or on the basis of incorrect,inaccurate or incom Bete inform Etion,or in violation of any City ordinance,regulation or order,state or federal law,or any order,proclam Etion,guidance or decision of the Governor. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY,NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. THIS APPLICATION IS NOT A PERM IT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED.IBC 110/IRC110. SALES TAX NO TICE: Sales tax relating to construction and construction m aerials in the City of Arlington m u;t be reported on your sales tax return form and coded City of Arlington#3101. 10/13/2023 Applicant Signature D ate B uilding Official D ate CO MITIO M Approved job copy shall be onsite for inspections.Adhere to approved plans.Call for inspections. THIS PERM IT AUTHORIZES ONLY THE WORK NOTED.THIS PERM IT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY.ANY CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS, SIDEWALKS,DRIVEWAYS, MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION. PERMIT FEES Date D escription F ee Am aunt e 10/13/2023 W b O dy-Building Plan Review $509.46 10/13/2023 C redit Card Service $15.28 10/13/2023 P rocessing/Technology $25.00 10/13/2023 B uilding Perm t $783.78 Total Due: $1,333.52 Total Paym eat: $524.74 Balance Due: $808.78 CALL FO RINSPECTIO M Call by 3:30 pm for next day inspection,allow 48 hours for Fire Inspections When calling for an inspection please leave the following information: Perm it Num her,Type of Inspection being requested,and whether you prefer m arning or afternoon INSPECTIO NINFO RNIATIO N I Pass/Fail CITY OF ARLINGTON 18204 59th Avenue NE,Arlington,WA 98223 INSPECTIONS: 360-403-3417-Permit Center: 360-403-3551 BUILDING PERMIT 19417 45TH DR NE Permit#: 5579 Parcel#: 00928200007300 PERMIT EXPIRES 180 DAYS AFTER DATE OF ISSUANCE. Scope of Work: 11.48kW grid tied roof mounted solar system Valuation: 37961.76 OWNER APPLICANT CONTRACTOR RECCHI JOSEPH P JR Madison Martinez,Blossom Solar 19417 45TH DR NE 3609 168th St NE#3507 ARLINGTON,WA 98223-4758 Arlington,WA 98223 425-610-7067 MECHANICAL CONTRACTOR PLUMBING CONTRACTOR LIC#: EXP: LIC#: EXP: JOB DESCRIPTION PERMIT TYPE: SOLAR INSTALLATION CODE YEAR: 2018 STORIES: 1 CONST.TYPE: VB DWELLING UNITS: OCC GROUP: R-3;Residential BUILDINGS: OCC LOAD: PERMIT APPROVAL The issuance or granting of this permit shall not be construed to be a permit for,or approval of,any violation of this Code or any other ordinance or order of the City,of any state or federal law,or of any order,proclamation,guidance advice or decision of the Governor of this State.To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law,or order,proclamation,guidance advice or decision of the Governor of this State,this permit shall not authorize such work and shall not be valid.The building official is authorized to prevent occupancy or use of a structure where in violation of this Code,any other City ordinances of this jurisdiction or any other ordinance or executive order of the City, or of any state or federal law,or of any order,proclamation, guidance advice or decision of the Governor.The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect,inaccurate or incomplete information,or in violation of any City ordinance,regulation or order, state or federal law,or any order,proclamation,guidance or decision of the Governor. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED.IBC I I O/IRCI 10. SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on your sales tax return form and coded City of Arlington#3101. MR,o(�f1f1� [-, &L1r<Wt&Z 10/13/23 "� 10/13/2023 V Applicant Signature Date Building Official Date CONDITIONS Approved job copy shall be onsite for inspections.Adhere to approved plans. Call for inspections. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY.ANY CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS, SIDEWALKS,DRIVEWAYS, MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION. PERMIT FEES Date Description Fee Amount 10/13/2023 Web Only-Building Plan Review $509.46 10/13/2023 Credit Card Service $15.28 10/13/2023 Processing/Technology $25.00 10/13/2023 Building Permit $783.78 Total Due: $1,333.52 Total Payment: $1,333.52 Balance Due: $0.00 CALL FOR INSPECTIONS Call by 3:30 pm for next day inspection,allow 48 hours for Fire Inspections When calling for an inspection please leave the following information: Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon INSPECTION INFORMATION I Pass/Fail RON RI DGE AIRE LOCK M I D (CLEAR AND BLACK) 1 ITEM NO. DESCRIPTION AE-MID-01-Al AIRE LOCK MID, CLEAR AE-MID-01-B1 AIRE LOCK MID, BLACK 1) AIRE LOCK MID 0.30 QUJ 1 1/2" Head U) E � 0.44 4 01 18 0- o � 2i 'T O o 1.16 0.95 2 0 Item No. Material Finish 1 300 Series Stainless Steel Clear and Black 2 Polypropelene Black v1.0 IRONRIDGE AIRE LUG 1 4 2 3 ITEM NO. DESCRIPTION QTY IN KIT 1 CAP SCREW, 5/16 X 3/4, HEX HEAD 1 2 TOP PLATE GROUNDING LUG 1 3 RETAINING CLIP, GROUNDING LUG 1 4 T-NUT, SHEET METAL 1 PART NUMBER DESCRIPTION WIRE SIZE RANGE (AWG) AE-LUG-01-M1 AIRE LUG 6-10 1) CAP SCREW, 5/16 X 3/4 3) RETAINING CLIP 1.00 1.12 0.75 0.28 1.10 000 0.50 1/2" HEAD �—k-5/16-118 THD Property Value Property Value Material 300 Series Stainless Steel Material Polypropylene Finish Clear Finish Black 2) TOP PLATE 4) T-NUT, SHEET METAL 1.50 1.18 0.26 1.40 0.45 0.75If + Property Value Property Value Material Tin Plated Aluminum Material 300 Series Stainless Steel Finish Clear Matte Finish Clear v1.0 IRONRIDGE AIRE RAIL Al 1 ITEM NO DESCRIPTION QTY IN KIT 1 Aire Rail, Al , Black(or Clear), 170 1 Part Number Description AE-Al-170B AIRE RAIL, Al , BLACK, 170 AE-Al-170M AIRE RAIL, Al , MILL, 170 1 ) Aire Al 1.40 �1.17� 170 1.38 1.70 1.04 i U� � 0.22 Part Number Material Value AE-Al-170B 6000-Series Aluminum Black AE-Al-170M 6000-Series Aluminum Clear v1.0 RON RI DGE FlashVue 1 2 3 4 d ITEM NO DESCRIPTION QTY IN KIT 1 BOLT, LAG 5/16 X 4.25" 1 2 WASHER, EPDM BACKED 1 3 FM FLASHING, MILL OR BLACK 1 4 GRIP CAP, MILL OR BLACK 1 FLASHVUE PART NUMBER DESCRIPTION FV-01-M1 FLASHING, FLASHFOOT, MILL FV-01-B1 FLASHING, FLASHFOOT, BLACK 1) BOLT, LAG 5/16 x 4.25" 0.61 .26 5/16 THD 4.25 7/16" Head Property Value Material 300 Series Stainless Steel Finish Clear v1.0 ■ 2) Washer, EPDM Backed .14 0.35 Property Value kO.75 Material 300 Series Stainless Steel Finish Clear 3) Grip Cap .40� .36� �- 1.00 i + 2.74 Property Value Material Aluminum Finish Mill/Black 4) FM Flashing 8.0 32 12.0 O Property Value Material Aluminum Finish Mill/Black v1.0 IRONRIDGE QuickMount° Halo UltraGrip RD STRUCTURAL SCREW PIN RD-1430-01-M1 SOLD SEPARATELY SHOWN FOR REFERENCE Release Liner shown for reference O O O ITEM NO DESCRIPTION QTY IN KIT 1 QM Halo UltraGrip(Mill or Black) 1 PART NUMBER DESCRIPTION QM-HUG-01-M1 Halo UltraGrip-Mill QM-HUG-01-B1 Halo UltraGrip- Black ©2022 IronRidge,Inc.All rights reserved.Visit www.ir-patents.com for patent information. QM-HUG-01-B1 or QM-HUG-01-M1 Cut Sheet Rev 1.0 1. Halo UltraGrip .38 3.35 3.83 .40 �— 0.26 1 .63 1 .56 TT O .34 3.00 Property Value Material 300 Series Aluminium Finish Mill or Black ©2022 IronRidge,Inc.All rights reserved.Visit www.ir-patents.com for patent information. QM-HUG-01-B1 or QM-HUG-01-M1 Cut Sheet Rev 1.0 ENPHASE ��l" M--MM, "MIT 4 .naoraElm MEW IQ8 Series Microinverters Our newest IQ8 Microinverters are the industry's first microgrid-forming,software- defined microinverters with split-phase power conversion capability to convert DC power to AC power efficiently.The brain of the semiconductor-based microinverter Easy to install is our proprietary application-specific integrated circuit(ASIC)which enables the Lightweight and compact with microinverter to operate in grid-tied or off-grid modes.This chip is built in advanced plug-n-play connectors 55nm technology with high speed digital logic and has super-fast response times Power Line Communication to changing loads and grid events,alleviating constraints on battery sizing for home (PLC)between components energy systems. • Faster installation with simple two-wire cabling Enphase •_ "" High productivity and reliability A5 • Produce power even when the year limited grid is down • More than one million cumulative Part of the Enphase Energy System,IQ8 Series IQ8 Series Microinverters redefine reliability hours of testing Microinverters integrate with the Enphase IQ standards with more than one million Battery,Enphase IQ Gateway,and the Enphase cumulative hours of power-on testing, Class II double-insulated App monitoring and analysis software. enabling an industry-leading limited warranty enclosure of up to 25 years. • Optimized for the latest high- powered PV modules ar:=r CERTIFIED Microgrid-forming Complies with the latest L SAFETY -A advanced grid support Connect PV modules quickly and easily to IQ8 Series Microinverters are UL Listed as Remote automatic updates for IQ8 Series Microinverters using the included PV Rapid Shut Down Equipment and conform the latest grid requirements Q-DCC-2 adapter cable with plug-n-play MC4 with various regulations,when installed connectors. according to manufacturer's instructions. Configurable to support a wide range of grid profiles ©2021 Enphase Energy.All rights reserved.Enphase,the Enphase logo,IQ8 microinverters, Meets CA Rule 21(UL 1741-SA) and other names are trademarks of Enphase Energy,Inc.Data subject to change. requirements IQBS E-DS-0001-01-EN-U S-2021-10-19 1,08 Series Microinverters INPUT I 1 A: .I A: A: A: A: I A: 1: Commonly used module pairings' W 235-350 235-440 260-460 295-500 320-540+ 295-500+ Module compatibility 60-cell/120 half-cell 60-cell/120 half-cell and 72-cell/144 half-cell MPPT voltage range V 27-37 29-45 33-45 36-45 38-45 38-45 Operating range V 25-48 25-58 Min/max start voltage V 30/48 30/58 Max input DC voltage V 50 60 Max DC current'[module Isc] A 15 Overvoltage class DC port II DC port backfeed current mA 0 PV array configuration 1x1 Ungrounded array;No additional DC side protection required;AC side protection requires max 20A per branch circuit OUTPUT 1 A: .1 A: A: A: A: 1 A: 1: Peak output power VA 245 300 330 366 384 366 Max continuous output power VA 240 290 325 349 380 360 Nominal(L-L)voltage/range4 V 240/211-264 208/183-250 Max continuous output current A 1.0 1.21 1.35 1.45 1.58 1.73 Nominal frequency Hz 60 Extended frequency range Hz 50-68 Max units per 20 A(L-L)branch circuits 16 13 11 11 10 9 Total harmonic distortion <5% Overvoltage class AC port III AC port backfeed current mA 30 Power factor setting 1.0 Grid-tied power factor(adjustable) 0.85 leading-0.85 lagging Peak efficiency % 97.5 97.6 97.6 97.6 97.6 97.4 CEC weighted efficiency % 97 97 97 97.5 97 97 Night-time power consumption mW 60 MECHANICAL DATA Ambient temperature range -400C to+60°C(-40°F to+140°F) Relative humidity range 4%to 100%(condensing) DC Connector type MC4 Dimensions(HxWxD) 212 mm MY)x 175 mm(6.9")x 30.2 mm(1.2") Weight 1.08 kg(2.38 Ibs) Cooling Natural convection-no fans Approved for wet locations Yes Acoustic noise at 1 m <60 dBA Pollution degree PD3 Enclosure Class II double-insulated,corrosion resistant polymeric enclosure Environ.category/UV exposure rating NEMA Type 6/outdoor 1 CA Rule 21(UL 1741-SA),UL 62109-1,UL1741/IEEE1547,FCC Part 15 Class B,ICES-0003 Class B,CAN/CSA-C22.2 NO.107.1-01 Certifications This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC 2014,NEC 2017,and NEC 2020 section 690.12 and C22.1-2018 Rule 64-218 Rapid Shutdown of PV Systems,for AC and DC conductors,when installed according to manufacturer's instructions. (1)The I08H-208 variant will be operating in grid-tied mode only at 208V AC.(2)No enforced DC/AC ratio.See the compatibility calculator at https://Iink.enphase.com/module-compatibility(3)Maximum continuous input DC current is 10.6A(4)Nominal voltage range can be extended beyond nominal if required by the utility.(5) Limits may vary.Refer to local requirements to define the number of microinverters per branch in your area. IQ8SE-DS-0001-01-EN-US-2021-10-19 SOLAR'S MOST TRUSTED REC inter solar award 2022 WINNER m . (COMPACT PANEL SIZE EXPERIENCE 410 wP REC 25 YEAR 19.E N WARRA T2 NT WARRANTY 22.270 EFFICIENCY LEAD-FREE ELIGIBLE ROHS COMPLIANT PERFORMANCE RE[ ALPHA PURE 5ERIE5 REC ZA PRODUET SPEEIREATIDN5 GENERAL DATA N& 1821 2.5[71.7 0.11 132 half-cutRECheterojunctionbifacialcellswith _ 28[1.11 901[35.51 460[18.11 Cell type: lead-free,gapless technology,6 strings of22 cells in series 153.7[6.05] _- Glass: 0.13 in(3.2 mm)solarglass with anti-reflective surface treatment ❑ 1100[43.31+ in accordance with EN 12150 Backsheet: Highly resistant polymer(black) Lj 6.0 0.2 Frame: Anodized aluminum(black) [0.24 0.011 0 Junction box: 3-part,3 bypass diodes,lead-free $ IP68 rated,in accordance with IEC 62790 N StaubliMC4PV-KBT4/KST4(4mm2) o 11 0.2 Connectors: in accordance with IEC 62852,IP68onlywhenconnected °[0.43 0.011 Cable: 12AWG(4 mm2)PVwire,43+47 in(1.1+1.2 m) in accordancewith EN 50618 zos os 1200[47 21 ^ [0.8 0.021 Dimensions: 71.7x40x1.2in(19.91ft2)/1821x1016x30mm(1.85m2) 153.7[6.051 1 Weight: 45 Ibs(20.5 kg) 1, Origin: Made in Singapore 45[1.81 22.5[0.91 671 3[26.4 0.121 _30 Measurements in mm[in] I♦ ELECTRICAL DA Product Code*:RECxxxAA Pure bCERTIFICATIONS Power Output-PMAx(Wp) 390 395 400 405 410 IEC61215:2016,IEC61730:2016,UL61730 Watt Class Sorting-(W) 0/+5 0/+5 0/+5 0/+5 0/+5 IEC62804 PID IEC61701 Salt Mist Nominal Power Voltage-VMPP(V) 40.6 41.0 41.4 41.8 42.2 IEC62716 Ammonia Resistance Nominal Power Current-IMpp(A) 9.61 9.64 9.67 9.69 9.72 UL61730 Fire Type Class 2 [n Open Circuit Voltage-Voc(V) 48.4 48.6 48.8 49.1 49.4 IEC62782 Dynamic Mechanical Load IEC 61215-2:2016 Hailstone(35mm) Short Circuit Current Isc(A) 10.38 10.39 10.40 10.41 10.42 IEC62321 Lead-freeacc.to RoHS EU 863/2015 Power Density(W/ftz) 19.6 19.8 20.1 20.3 20.6 ISO 14001,ISO 9001,IEC 45001,IEC 62941 Panel Efficiency(%) 21.1 21.4 21.6 21.9 22.2 & Power output-PWA (WP) 297 301 305 308 312 DVE read-Free Nominal Power Voltage VMPP(V) 38.3 38.6 39.0 39.4 39.8 TEMPERATURE RATINGS` o C) Nominal Power Current-IMpp(A) 7.77 7.79 7.82 7.83 7.85 Nominal Mod ule Operating Temperature: 44°C( 2°C) Z Open Circuit Voltage-Voc(V) 45.6 45.8 46.0 46.3 46.6 Temperature coefficient ofPMAx: -0.24%/°K t Short Circuit Current-I,(A) 8.38 8.39 8.40 8.41 8.42 Temperature coefficient ofVoc: -0.24%/°K d0 Values at standard test conditions(STC:air mass AM1.5,irradiance 10.75W/scift(1000W/m2),temperature 777(25*C),based ona production spread Temperature coefficient oflsc: 0.04%/°K o withatoleranceofPMAx,Voc&Isc 3/within one watt dass.Nominal module operatingtemperature(NMOT:air mass AMl.S,ircadiance800W/m', temperature 68'F(20'C),windspeed 3.3 ft/s(I m/s).*Where xxx indicates the nominal power class(P..)at STC above. 'The temperature coefficients stated are linear values a, MAXIMUM RATINGS )WARRANTY kir DELIVERY INFORMATION '� N Operational temperature: -40...+185°F Standard REC ProTrust Panels per pallet: 33 y Maximum system voltage: 1000V Installed by an REC No Yes Yes Panelsper40ftGP/high cube container: 792(24pallets) Certified Solar Professional a Maximum test load(front): +7000 Pa(1461bs/ft2)' System Size All e�25 kW 25-500 kW Panels per 53fttruck: 891(27 pallets) v'1 Maximum test load(rear): -4000Pa(83.51bs/ft2)* Product Warranty(yrs) 20 25 25 Max series f use rating: 25A Power Warranty(yrs) 25 25 25 LOW LIGHT BEHAVIOUR Max reverse current: 25A Labor Warranty(yrs) 0 25 10 Typical low irradiance performance of module at STC: rn See installation manual for mounting instructions. Power in Year 1 98% 98% 98% o Design load-Test load/1.5(safety factor) Annual Degradation 0.25% 0.25% 0.25% R N Power in Year 25 92% 92% 92% 90--------------------------- TheJ REC ProTrust Warranty is onlyavailable on panels purchased `a' ' through an REC Certified Solar Professional installer.Warranty ¢ a conditions apply.See www.recgroup.com for more details. - -Irradiance(W/m=) ° o Available from: Founded in 1996,REC Group is an international pioneering solar energy company dedicated to empowering consumers REC Solar PTE.LTD. ® ^� with clean,affordable solar power.As Solar's Most Trusted,REC is committed to high quality,innovation,and a low 20 Tuas South Ave.14 1` carbon footprint in the solar materials and solar panels it manufactures.Headquartered in Norway with operational Singapore 637312 headquarters in Singapore,REC also has regional hubs in North America,Europe,and Asia-Pacific. post@recgroup.com www.recgroup.com I RON RI DGE Aire' Racking System Breathe easy with accelerated installations The AireTm racking system has been carefully crafted to streamline every part of the installation process, taking out all of the tiresome hassles—so that you get off the roof and on to your next project faster than ever. AireTm retains the strength and reliability that IronRidge installers have come to depend on. Whether you're a seasoned installer with years under your belt or just getting started in solar, breathe easy with open Aire TM. Strength Tested PE Certified All components have been evaluated ® Pre-stamped engineering letters are for superior structural performance. available online for most states. Class A Fire Rating Design Assistant Certified to maintain the fire resistance ® Free online software makes it simple rating of the existing roof structure. to create, share, and price projects. UL 2703 Listed System 25-Year Warranty ® Entire system and components meet Products are guaranteed to arrive the latest effective UL 2703 standards. without any impairing defects. • • • • • • • • Aire"' Al Rail AireT" A2 Rail AireT" Rail Ties AireT" Dock The lighter, open AireT"^ The tougher, open AireT"' Structurally connect and Connects AireT"" Rails to rail for standard conditions. rail for higher load capacity. bond AireT"" Rails together. attachments with ease. • 6'spanning capability 8'spanning capability Reinstallable, up to 5x Clicks on, slides easily • Wire management tray Wire management tray Internal splice design Drops into open slots • Mill or anodized black Mill or anodized black No more splice rules Anodized assembly Clamps & Grounding — AireT1 Lock Mids AireT" Lock Ends AireT"" Lock Stealth AireTm Lug i i .+. Securely bond between Securely bond modules to Securely bonds modules to Bonds AireTm Rails to modules to AireT"" Rails. AireTm Rails along ends. rail ends, entirely hidden. grounding conductors. • Fits 30-40mm modules Fits 30-40mm modules Angled for easy install Simplified with single bolt • Utilizes UFO°design Easy rail engagement Robust tether leash Low-profile form factor • Minimal 1/2"gap Clean aesthetics Fits most modules Works with 10-6 AWG Accessories AireTI Caps Aire TM Clip Aire TM MLPE Mount AireTm All Tile Hook 01111111111% 4wm�� Block entry and provide a Keeps wiring contained in Securely bonds MLPE and Attaches rails to tile roofs, finished look to AireTm Rails. open AireTm Rail channels. accessories to AireTm Rails. with AireT"" Dock included. • Stay secure on rail ends No module interference Glove-friendly installation Works on flat, S, &W tiles • Symmetrical, with drain Simple press-in design Lays flush in rail channel Single-socket installation • Cover rough-cut ends Slot for easy removal Low profile form factor Optional deck flashing Resources Design Assistant ���ec 01VIS oti�ii�� g Approved for FL Hurricane Zones Quickly go from rough layout *.Q°� 9 *% AireT"1 has Florida Product Approval. - to fully engineered system. * 2_ Additional details can be found on the _ �` STATE OF ; Florida Building Code website. Go to IronRidge.com/design ' �o����1aP\\;;`� Learn swore at bit.ly/florida-sire 0 2023 IronRidge,Inc.All rights reserved.U.S.Patents Pending.Version 1.01 AML� RESIDENTIAL PHOTOVOLTAIC SOLAR PANEL REQUIREMENTS & APPLICATION , Community and Economic Development City of Arlington• 18204 59th Ave NE•Arlington,WA 98223 • Phone(360) 403-3551 The City of Arlington requires a building permit to install Photovoltaic (PV) Solar Panel(s) for residential and commercial uses.This policy governs Residential uses only. Other permits may be required per Washington State Labor and Industries or Utility Providers. SUBMIT ELECTRONIC FILES AND THE NUMBER COPIES REQUIRED FOR EACH OF THE FOLLOWING: QTY REQUIRED DOCUMENTS 1 City of Arlington Solar Panel Application ® 2 Roof Plan and Construction Documents ® 2 Manufacturer's installation specifications © 2 Engineering(if required,see below) © 1 USB Flash Drive or email a link to ced0arlingtonwa.gov ROOF PLAN AND CONSTRUCTION DOCUMENTS Documents shall include the following: • Panel layout with spaces as required per IFC 611; Include emergency disconnect location and identification • The dead load of the rooftop-mounted photovoltaic panel systems,including rack support systems,shall be indicated on the construction documents • Engineering shall consist of the following: a. The ability of the roof to support the additional weight of the panels combined with how it affects the rooflive load and; b. If panels do not extend to the ridge or the eave, engineering to address the probability of ice damming and specify methods of preventing or modifying the roof to eliminate damage and; c. If there are other roofs,obstructions or structures below, engineering to address impact loading, drifting snow and other snow load issues as deemed necessary by the engineer. CODE REQUREMENTS The codes sections below are not all encompassing; it is the responsibility of the homeowner or contractor to adhere to the International Fire Code (IFC), International Residential Code (IRC), International Building Code (IBC), Revised Code of Washington (RCW),Washington Administrative Code (WAC) and additional codes as may be required. Solar Panels 64.38.055 RCW • Solar Panel visibility is prohibited from any part of a roof-mounted solar energy panel above the roofline • Solar Panels shall not be visible from the street directly in front of the structure • A solar energy panel frame,a support bracket, or any visible piping or wiring to be painted to coordinate with the roofing material R324.3 Photovoltaic Systems.Installation,modification, or alteration of solar photovoltaic power systems shall comply with this section and the International Fire Code Section. • Section R104.11 alternate materials and methods of this code shall be considered when approving the installation of solar photovoltaic power systems. • Photovoltaic systems shall be designed and installed in accordance with International Residential Code, Sections R324.3.1 through R324.6, 51-51-03240 WAC and chapter 19.28 RCW. RESIDENTIAL PHOTOVOLTAIC SOLAR PANEL • Inverters shall be listed and labeled in accordance with UL 1741. Systems connected to the utility grid shall use inverters listed for utility interaction. EXCEPTION: Detached, non-habitable Group U structures shall not be subject to the requirements of this section for structural and fire safety.A residential ground mounted system shall be deemed a Group U structure per IBC 312. R324.3.1 Equipment Listing. Photovoltaic panels and modules shall be listed and labeled in accordance with UL 1703. R324.4 Rooftop-mounted Photovoltaic Systems.Rooftop-mounted photovoltaic panel systems installed on or above the roof covering shall be designed and installed in accordance with IRC R907, 51-51-03240 WAC and 19.28 RCW. EXCEPTION: The roof structure shall be deemed adequate to support the load of the rooftop solar photovoltaic system if all of the following requirements are met: 1. The solar photovoltaic panel system shall be designed for the wind speed per the Residential Design Requirements,and shall be installed per the manufacturer's specifications. 2. The ground snow load does not exceed 70 pounds per square foot. 3. The total dead load of modules,supports,mountings,raceways,and all other appurtenances weigh no more than 4 pounds per square foot. 4. Photovoltaic modules are not mounted higher than 18 inches above the surface of the roofing to which they are affixed. 5. Supports for solar modules are to be installed to spread the dead load across as many roof- framing members as needed,so that no point load exceeds 50 pounds. R324.4.1 Roof Load. Portions of roof structures not covered with photovoltaic panel systems shall be designed for dead loads and roof loads in accordance with Sections R301.4 and R301.6. Portions of roof structures covered by photovoltaic panel systems shall be designed for the following load cases: 1. Dead load (including photovoltaic panel weight) plus snow load in accordance with Table R301.2(1). 2. Dead load (excluding photovoltaic panel weight),plus roof live load or snow load,whichever is greater,in accordance with Section R301.6. R324.4.1.2 Wind Resistance. Rooftop-mounted photovoltaic panel or module systems and their supports shall be designed to resist the component and cladding loads specified in Table R301.2(2),adjusted for height and exposure in accordance with Table R301.2(3). R324.5 Building-integrated Photovoltaic Systems. Building-integrated photovoltaic systems that serve as roof coverings shall be designed and installed in accordance with Section R905. R324.5.1 Photovoltaic Shingles. Photovoltaic shingles shall comply with Section R905.16. R324.7 Ground-mounted Photovoltaic Systems.Ground-mounted photovoltaic systems shall be designed and installed in accordance with Section R301. Fire separation distance requirements apply. REV03.2022 Page 2 of 3 RESIDENTIAL PHOTOVOLTAIC SOLAR PANEL Property Address: 19417 45th Dr NE, Arlington, WA 98223 Project Valuation: $37,961.76 Lot#: Parcel ID No.: 00928200007300 Subdivision: Project scope of work: 11.48kW grid tied roof mounted solar system installation Primary Contact: ❑ Owner ® Contractor Owner Name: Joe Recchi Office No.: N/A Email Address: joerecchi@yahoo.com Cell No.: 425-232-8185 Mailin Address: 19417 45th Dr NE City: Arlington State: WA Zip: 98223 Contractor Name: Blossom Solar Office No.: Email Address: office@blossomsolar.com Cell No.: Mailing Address: 3609 168th St NE#3507 city: Arlington State: WA Zip: 98223 L&I Contractor License Number: BLOSSSL823M7 Expiration Date: 07/27/24 Existing Roof Structure: Yes Existing Roof Material: Comp Shingle Building Square Footage: 1,100 Number of Stories: 1 INSPECTION REQUIREMENTS Roof mount panels require two (2) inspections minimum 1. The first inspection is for the roof mount racking hardware to verify compliance and attachment. (You may schedule this inspection for the day the panels are being installed. You may begin mounting panels over the racking prior to inspection but there must be enough racking exposed for the inspector to verify compliance.) 2. The final inspection shall be scheduled when the project is complete and after Labor and Industries has approved the electrical. I hereby certify that I am the ❑ Owner ❑ Contractor and authorized to sign this application and that the above information is correct and construction on,and the occupancy and the use of the above-described property will be in accordance with the laws,rules and regulation of the State of Washington,and the City of Arlington. Mat)49� &. M"ft;k L Madison E. Martinez 8/30/23 Signature Print Name Date FOR STAFF USE ONLY PERMIT# ACCEPTED BY: DATE STAMP REV03.2022 Page 3 of 3 ci:� BLOSSOM SOLAR 11 .48 kW Photovoltaic Solar System 18" From Ridge ®® � ®® 36" Pathway to Ridge Net Meter,MSP Solar Combiner Panel & & Joe Recchi Main Disconnects Solar Service 19417 45th Dr NE Disconnect Line Side Connection Location Arlington, WA 98223 Rapid Shutdown Switch Connector Part Number IPCS4002 (Adjacent to Net Meter&Main Disconnects) YOU , GOI TO LOVE IT '. We know you'll be spreading the good word about Blue Raven Solar for years to come. To say thanks, we take $500 off the total cost of your solar system up front - no conditions, no obligations, and no commitments. When your friends get their own system you will get an additional ,P506 for the first friend , $1,0rd for the second, and "o1 ,50" for any additional friends ! Share the benefits of solar at bluera n50LdVecom/ referral See website for terms and conditions. We rely on customers like you putting in a good word for Blue Raven. If you liked our work, please leave us a review and follow us on you ocial platforms! Welcome to the Blue Raven Family! BLUE RAVEN SOLAR BLUE RAVEN SOLAR Homeowner's Insurance Addendum Third Party Authorization to Release Information Homeowner Name Mark valley Property Address 6223 209th St Ne,Arlington,Washington,98223 Phone +14259031555 Email photome1224@gmail.com With my signature below, I authorize the following contractor to contact my homeowner's insurance provider and to request and receive a copy of the declarations page of my homeowner's insurance policy and any other relevant information for the purpose of contractor submitting on my behalf for residential solar interconnection through my utility company. The contractor submitting my interconnection application and performing the installation of my rooftop photovoltaic solar system is: Contractor Name: BRS Field Ops, LLC Address: 1403 N. Research Way Orem, UT 84097 F E I N: 81-4452370 Phone: 800-377-4480 Fax: 385-265-5041 (Send ATTENTION to "Support") Email: support@blueravensolar.com Homeowner Signature: 1 a' " v a Date: 08 i 01 i 2023 Document Ref:J54L6-QKSTK-Q67FR-JUWK6 Page 1 of 1 Signature Certificate Reference numb, J54L6-QKSTK-Q67FR-JUWK6 Signer Timestamp Signature Mark Valley Email:photome1224@gmail.com Sent: 01 Aug 2023 20:30:19 UTC Ua Viewed: 01 Aug 2023 20:34:55 UTC ff�?j Signed: 01 Aug 2023 20:35:32 UTC Recipient Verification: IP address:73.169.146.77 .,Email verified 01 Aug 2023 20:34:55 UTC Location:Marysville,United States Document completed by all parties on: 01 Aug 2023 20:35:32 UTC Page 1 of 1 Signed with PandaDoc E1,12 PandaDoc is a document workflow and certified eSignature &I " solution trusted by 40,000+companies worldwide. BLUE RAVEN SOLAR Homeowner Permission for Inspection Access Homeowner Name Mark Valley Property Address 6223 209th St Ne,Arlington,Washington,98223 Phone +14259031555 Email photome1224@gmail.com With my signature below, I grant the following contractor and any municipal or utility inspecting authority having jurisdiction over my property, and each of its respective employees, agents, independent contractors, and subcontractors, the right to access and be on all of my property as necessary for permit and inspection-related activities concerning the inspection, design and engineering, construction and installation, interconnection, and energization of my photovoltaic solar system at the property address first stated above. The contractor performing the inspection, design and engineering, construction and installation, interconnection, and energization of my photovoltaic solar system is: Contractor Name: BRS Field ops, LLC Address: 1403 N. Research Way Orem, UT 84097 F E I N: 81-4452370 Phone: 800-377-4480 Fax: 385-265-5041 (Send ATTENTION to "Support") Email: support@blueravensolar.com Homeowner Signature: Napk OF Date: 08 i 01 i 2023 Document Ref:J54L6-QKSTK-Q67FR-JUWK6 Page 1 of 1 Signature Certificate Reference numb, J54L6-QKSTK-Q67FR-JUWK6 Signer Timestamp Signature Mark Valley Email:photome1224@gmail.com Sent: 01 Aug 2023 20:30:19 UTC Ua Viewed: 01 Aug 2023 20:34:55 UTC ff�?j Signed: 01 Aug 2023 20:35:32 UTC Recipient Verification: IP address:73.169.146.77 .,Email verified 01 Aug 2023 20:34:55 UTC Location:Marysville,United States Document completed by all parties on: 01 Aug 2023 20:35:32 UTC Page 1 of 1 Signed with PandaDoc E1,12 PandaDoc is a document workflow and certified eSignature &I " solution trusted by 40,000+companies worldwide. BRS FIELD OPS, LLC 1403 N. Research Way Orem, UT 84097 800-377-4480 BLUERAVEN support@blueravensolar.com License# BRSFIF0820N3 SOLAR SOLAR SYSTEM HOME IMPROVEMENT CONTRACT Customer Name Mark valley Address 6223 209th St Ne,Arlington,Washington,98223 Phone +14259031555 Email photome1224@gmail.com THIS SOLAR SYSTEM HOME IMPROVEMENT CONTRACT (the "Agreement') is entered into by and between BRS FIELD OPS, LLC, a Utah limited liability company doing business as Blue Raven Solar("Company"or"Blue Raven"), and the customer(s) identified above ("you" or the "Customer") (collectively, the "Parties")for the purchase and installation of a solar photovoltaic system together with a solar energy storage device, if any: NOW THEREFORE, for and in consideration of the mutual covenants and agreements contained herein and each act done pursuant hereto, the Parties, intending to be legally bound, agree as follows: 1. Definitions. Unless the context otherwise requires, when used herein the following terms shall have the meaning indicated: 1.1. Agreement Documents means all documents, exhibits, attachments, and addenda identified herein and those delivered as a part hereof or incident hereto, including but not limited to the Investment Tax Credit Addendum. The Agreement Documents are incorporated as part of this Agreement by reference. If and to the extent this Agreement and the Agreement Documents conflict, the Agreement Documents control. 1.2. Battery means the energy storage device and components, if any, [to be] installed at the Site. 1.3. Battery Storage Capacity means the total electrical storage capacity of the Battery in kilowatt-hours. 1.4. Day means, unless otherwise indicated, a calendar day. 1.5. Effective Date means the date this Agreement shall be effective; that is, when all Parties hereto have executed the same and delivered counterparts of such signatures to the other Parties. 1.6. Final Design means the proposal of the System Size, PV module layout, inverter(s), and estimated yearly production prepared following the Site Survey. 1.7. Property or Site means the physical location of the [to be] installed System. 1.8. Proposal means the non-binding initial estimates of the System. 1.9. PV means solar photovoltaic. 1.10. Site Survey means the on-site inspection of the Property for the installation of the System. The Site Survey is necessary for the preparation of the Final Design. 1.11. Substantial Completion means the state of completion of the Work in a good and workmanlike manner in accordance with this Agreement waiting only on final regulatory inspection and interconnection. 1.12. System means all PV, Battery, if any, and other electrical and structural devices and components [to be] installed at the Site for the generation or generation and storage of solar energy. References in this Agreement to System(s), PV or PV module(s), Batter(ies), inverter(s), device(s), component(s), equipment, or other terms of similar import shall be construed to be of such number, identification, and composition as the context or the Agreement Documents require or permit. 1.13. System Size means the estimated total size of the System array in kilowatts. 1.14. System Cost means the total cost of the System, as set forth in the Agreement Documents, including labor, PV modules, Battery, if any, and electrical and structural devices and components. If sales tax is charged on Systems in your area, then such sales taxes are included in the System Cost. 1.15. Work means the marketing, sales, electrical and structural review; System design and engineering; procurement of equipment, materials, and authorizations; permitting and licensing; electrical service panel maintenance and upgrades; structural maintenance and upgrades; trenching;A/C relocation; installation of PV modules and inverters, Batteries, and/or other electrical devices and components; System interconnection; and together with all associated labor, equipment, and fees that are reasonable and necessary for System Completion as may be more fully set forth in the Agreement Documents. The Parties v.25.01 Document Ref:J54L6-QKSTK-Q67FR-JUWK6 Page 1 of 14 BLUE RAVEN SOLAR agree that the Work is necessary and reasonable for the installation, production, maintenance, durability, and full use and enjoyment of the System. 2. Scope of Work. Company shall perform the services, advance fees, costs, and expenses, and furnish the goods to the extent necessary for the proper completion of the Work as may be more fully set forth in the Agreement Documents. Company may contract with third parties, and Customer agrees to accept the Work performed by such third parties. If Company contracts with another party for any of the Work, such contract and performance thereunder satisfy Company's obligations under this Agreement. Where indicated below, Company shall perform the Work using the following equipment or its equivalent: REC Enphase IQ7X Microinverters 3. Proposal. Customer acknowledges that the proposal(s) provided by Company to Customer for the purchase and installation of PV or PV plus Battery, if any, (each, a "Proposal") does not represent a binding agreement, obligation, warranty, guaranty, or representation. Nevertheless, Company will make a good faith effort to follow the Proposal to the extent possible. Notwithstanding the foregoing, if Customer qualifies for, and fully participates in the Company's BLUEPOWER PLUSXTM program, Company agrees to make payments to Customer in accordance with the terms and conditions set forth in the corresponding BLUEPOWER PLUSXTM Proposal provided that Company receives purchase money loan proceeds from the participating lender. The proposed design and installation assumptions of the System are as follows: SYSTEM COST ASSUMPTIONS Total System Cost: $ 65328 IF APPLICABLE, SALES TAX IS INCLUDED IN THE Solar Rebate: $ o COST Referral Promotion: $500 Down Payment (if applicable): $o PAYMENT AMOUNT: $ 64828 REBATES, CREDITS & INCENTIVES ASSUME SUCCESSFUL APPLICATION TO A GOVERNMENT Federal Tax Credit(30%): $ 19448 OR UTILITY INCENTIVE PROGRAM, EXECUTION AND DELIVERY OF ALL REQUIRED State Incentive: $ o INSTRUMENTS, AND SYSTEM ENERGIZATION Other Incentive $ - NET SYSTEM COST: $ 45380 PV ASSUMPTIONS BATTERY ASSUMPTIONS Total System Size (kW): 11.34 Number of Batteries: o Yearly Solar Production (kWh): 12498 Battery Storage Capacity (kWh): 0 Annual System Degradation: 0.5% Estimated Backup Duration (days): - 4. Final Design. Company will perform a Site Survey of the Property, and Customer grants Company permission to access, photograph, evaluate, and inspect the Property for various qualifying structural and electrical factors. After the Site Survey, Company design team will prepare and deliver the Final Design to Customer. The Parties understand that the Final Design may be different from the Proposal due to factors and conditions discovered or re-assessed at the Site Survey. The Final Design also sets forth the plans for location of PV modules, Batteries, and other details related to your System. v.25.01 -2- Document Ref:J54L6-QKSTK-Q67FR-JUWK6 Page 2 of 14 BLUE RAVEN SOLAR 5. Payment. If Customer elects to pay for the System in cash, half of the System Cost shall be due upon delivery of the Final Design,with the remaining balance due at Substantial Completion. If Customer will finance the cost of the System, Customer agrees that they will either: 1) obtain financing from Company's preferred lender and make payments to lender in accordance with its terms and conditions; or 2) enter into a Retail Installment Sales Contract and Security Agreement ("RIC Agreement") with Company to obtain financing directly from Company and make payments in accordance with such terms and conditions. Notwithstanding anything to the contrary, payment of the System Cost is due at Substantial Completion. 6. Credit Card Charges. Where Customer elects to pay the Total System Cost, or any part thereof, through a credit card or other charge card, 1.25%of the transaction value will be charged to the Customer as a surcharge towards Company's credit card processing fees. 7. Title and Risk of Loss. Transfer of title in the System, including all PV, Battery, if any, and electrical devices and components, and all risk of loss, damage, or destruction to the System shall occur upon the first instance of the PV module equipment being secured to Customer's roof, or in the case of a Battery, installed in or around the Customer's home. 8. Security Interest. Customer acknowledges that the lender, if Customer finances the Total System Cost, Company, or other tradesman or supplier may take a security interest in the System, or the real property the Work improves, as collateral for Customer's full payment (or repayment) of any amount financed or for Work performed as provided under applicable mechanic's lien statute or in accordance with that separate agreement between Customer and lender or Customer and Company. 9. Termination. This Agreement may be terminated under the following terms and conditions: 9.1. 0-3 Days After Signing: Customer may cancel this Agreement, pursuant to the Notice of Cancellation attached herewith, within three days of signing this Agreement with no penalty or obligation. 9.2. 0-10 Days After Delivery of the Final Design: Customer has ten days after delivery of the initial Final Design following the Site Survey to cancel this Agreement without any penalty or obligation. Customer may cancel under this scenario by mail or electronic delivering (e-mail) of written notice of cancellation to Company. 9.3. After 10 Days of Delivery of the Final Design but Before Installation: Customer recognizes that by signing this Agreement, Company begins expending efforts and resources to add value to Customer by commissioning and paying for a Site Survey, creating permit-quality designs for the System, and otherwise doing the work required to obtain regulatory approval. Accordingly, if Customer cancels this Agreement without cause outside of the cancellation period allowed by law and more than ten days after delivery of the initial Final Design following the Site Survey but before commencement of System installation, Customer shall pay Company a reimbursement fee equal to one thousand two hundred fifteen dollars ($1,215) as compensation for the work, value, and efforts provided by Company to Customer("Reimbursement Fee"). Notwithstanding the foregoing, Company reserves all available legal and equitable remedies for any breach by Customer including the termination of this Agreement on or after commencement of System installation. 9.4. Cancellation by Company: Company may terminate this Agreement, in whole or in part, for convenience, with or without cause. If Company cancels the Agreement without cause, Customer is under no further obligations under this Agreement. 9.5. Effect of Termination: In the event of any termination of this Agreement as provided in Sections 9.3 or 9.4 above or Customer breach of this Agreement, Customer shall pay Company for all costs, time, materials, and fees reasonably incurred by Company in the performance of the Work that improves or adds value to the Property, which shall be in addition to the Reimbursement Fee and any other amounts due under the Agreement. 10. Change Request. Customer shall pay Company one hundred thirty-seven dollars($137)for each change to the System that is requested more than ten days after delivery of the initial Final Design following the Site Survey. The requested change (the "Change Order"), if any, constitutes an amendment to this Agreement and performance thereunder is v.25.01 -3 - Document Ref:J54L6-QKSTK-Q67FR-JUWK6 Page 3 of 14 BLUE RAVEN SOLAR subject to mutual acceptance by the Parties. Customer shall make no changes to the Work required to be performed under this Agreement, nor shall Company be under obligation to perform any extra or modified work without a Change Order signed by the Parties describing the changes, the additional compensation, and the extended time, if any. Customer acknowledges that additional features, non-standard work, extra work, more PV modules, greater PV production, etc. may result in a higher contract price. 11. Provision of Goods. Company may offer to provide certain goods in advance of the final installation of the System, which may include: new thermostat, LED lights, or other various hardware (collectively, the "Goods"). In the event Customer accepts and receives the Goods and later cancels the Agreement, Customer agrees to the following in addition to the terms and conditions stated in the Termination Section above: 11.1. In accordance with this Agreement, if cancellation is within the statutory cancellation period or within ten days after delivery of the initial Final Design following the Site Survey, Customer agrees to return the Goods to Company in substantially the same condition in which they were received by Customer. Customer shall pay three hundred fifty dollars ($350) to Company if Customer elects to retain the Goods after previously mentioned cancellation period. All Goods returned or payment for retained Goods shall be made within seven (7) business days of cancellation. If the Goods are not returned and the payment not made, then Company reserves all rights to seek full performance of the Agreement. 12. Work Schedule. Company will attempt to keep Customer apprised of estimated timelines associated with installing the System. Customer acknowledges that due to required waiting periods associated with some localities, Customer may not hear from Company for an extended amount of time as there will be no updates to report, and inspectors from the governing jurisdiction may show up without advance warning to Customer, even with Company's best efforts as Company cannot control how governing jurisdictions treat Customer. Company makes no representations regarding the length of time required to begin or complete the System, as regulatory entities, HOAs, and other governing bodies can cause delays in the amount of time necessary. If a sales representative discussed a timeline with Customer, Customer acknowledges such timeline and the timeline provided below is only an estimate that can vary significantly based on factors outside of Company's control, and that Customer will not rely on a timeline estimate. Customer acknowledges and agrees that Company does not control loan interest rates or loan terms and that work schedule and delays may require Customer to reapply for financing, which increase the cost to finance the System. 1-2 weeks for initial Site Survey; 1-2 weeks for design and approval; 1-6 weeks (or longer)for permit submission and approval; and 1-6 weeks for installation, final inspection, and interconnection (depending on inspection). 13. Damages Caused by Delay. To the extent that Customer should commit or omit an act within its control that causes delay to the Work. Customer shall pay Company for its actual costs and expenses, including but not limited to mobilization and labor expenses and loss of business or profit, incurred as a result of such delay. 14. Previous Work and Unforeseen Conditions. Customer hereby warrants that all previous improvements, construction, and installations conducted on the Site, including any HVAC, electrical, and structural work, were properly permitted and inspected (collectively, "Previous Work"). Customer agrees to promptly pay any charges, fines, penalties, or other fees reasonably incurred by Company under this Section or levied by a regulatory entity and make any corrections resulting from the discovery of any unpermitted improvements or alterations during the work conducted by Company or any inspections conducted by a government entity. Customer acknowledges that Company cannot reasonably identify or discover all possible inspection or code concerns, and that it is relying on Customer to have properly had all previous work and improvements performed and the Site otherwise up to applicable code. If previous work, concealed, or unknown physical conditions are encountered at the site of the performance of the Work that differ materially from those disclosed by Customer or from those conditions immediately apparent from Site Survey, Company may elect to undertake necessary corrective work and, regardless of whether Company undertakes such work, terms concerning price and schedule shall be subject to equitable adjustment, which corrective work and adjustments shall not require the consent of Customer. Customer acknowledges and agrees that under no circumstance shall Company be liable to Customer, a member of Customer's household, or an invitee of Customer for any loss, damage, injury, or death arising v.25.01 -4- Document Ref:J54L6-QKSTK-Q67FR-JUWK6 Page 4 of 14 BLUE RAVEN SOLAR from any Previous Work. If at any time a home construction service requires extra costs above the cost specified or estimated in the Agreement that were reasonably unforeseen, but necessary, and the total of all extra costs to date exceeds five thousand dollars over the course of the entire home construction contract, Customer has a right to an estimate of those excess costs before Company begins work related to those costs. Company will provide this estimate in written form. 15. Community Association.Customer agrees to notify Company if there are any CC&Rs, HOAs,or other local restrictions present on the Site. Company relies on Customer for this information and does not do a title search to determine if there are applicable restrictions. Customer accepts all responsibility for working and complying with Customer's HOA, Architectural Control Committee, or other community association body(collectively,the"HOX), and agrees to be solely responsible for all costs associated with any of these governing bodies, including fines for non-compliance with their requirements. To the extent necessary, Customer hereby authorizes Company to represent Customer before the HOA in connection with Customer's application for System approval. Customer further authorizes and gives permission to the HOA to send, correspond, or communicate with Company concerning Customer's application for System approval. Customer specifically waives any and all claims against the HOA in association with its release of information to Company as authorized herein. 16. Tree Shade. Trees on the Property or adjacent property may cast shade on the System thereby lowering System production. Company will use reasonably commercial efforts to identify and take into account tree shade when designing the System. To the extent Company provides a Final Design with production estimates based on material assumptions of certain undertakings of tree relocation, removal, or trimming, Customer hereby releases Company from any claim, complaint, duty, or obligation in any way related to the loss of System production caused by shade from such trees. Further, Customer expressly acknowledges and agrees that any such tree work, whether undertaken by Customer or at Company's direction, shall not be a reason to suspend or delay the scheduling or commencement of System installation or Customer's payment obligations hereunder. 17. Intended Use and No Obligation to Remove System. 17.1. The System and the Work performed hereunder is intended for the sole use of Customer. No other person or entity shall be entitled to rely on the services, plans, recommendations, or specifications provided as part of the Work without the written authorization of Company. The System is intended to be installed, and nothing contained in this Agreement obligates Company to remove and replace any part of the System, even to accommodate roof repair or replacement. Customer bears all responsibility, obligation, liabilities, and fair market costs associated with the removal and replacement of the System, even where it is determined that Customer's roof would need to be replaced at some point in the future prior to the installation of the System. For purposes of this Section,fair market cost means the amount charged by the contractor performing the removal or replacement. 17.2. In the event Company installs permanent roof anchors as part of its fall protection measures, Customer consents to such installation and acknowledges that it will (i) not be removed at the conclusion of the Work; and (ii) is intended for the sole use of Company in the performance of the Work. Customer acknowledges and agrees that no other person or entity, including Customer, may use or rely on such permanent roof anchors for fall protection or related purposes. Customer, for himself or herself, and for Customer's successors, agents, and assigns, hereby releases Company from any claim or demand relating to any prohibited use or reliance on such permanent roof anchors, if applicable. 18. System Access. Customer grants Company and their respective employees, agents, independent contractors, and contractors the right to reasonably access all of the Property as necessary performance of the Work and the operation, maintenance, removal, or repair of the System. Following the completion of the Work, Company shall provide Customer with reasonable notice of its need to access the property whenever commercially reasonable. Customer hereby agrees that Company is not responsible for any damage resulting from reasonable entry necessary for the performance of the Work, including but not limited to: sheetrock, paint, wallpaper, flooring, ceilings, walls, cabinetry, etc. v.25.01 -5 - Document Ref:J54L6-QKSTK-Q67FR-JUWK6 Page 5 of 14 BLUE RAVEN SOLAR 19. Matching. Customer acknowledges and agrees that the performance of the Work may result in mismatches between existing material and new or reconfigured material used to repair, replace, or relocate damaged or unwanted material because of (i)texture; (ii) color fading, oxidation, and weathering; (iii)wear and tear, marring, scratching, or deterioration; or (iv)obsolescence or discontinuation. Company will make a good faith effort to match new or reconfigured materials with existing materials; however, under no circumstances shall Company be liable for the loss in value to any property due to mismatch between existing and new or reconfigured materials. 20. Standard of Work. Company shall perform its work in a manner consistent with the level of care and skill ordinarily exercised by other members of the profession currently working under similar circumstances and shall only engage others who perform work at the same level of care and skill. Except as expressly provided in Exhibit 1 to this Agreement, Company hereby disclaims, and Customer unconditionally and irrevocably waives and releases, any and all actual or potential rights Customer might have against Company regarding any form of warranty, express or implied, of any kind or type, relating to and concerning the installation, maintenance, and repair of the System or in connection with Customer's eligibility or participation in a government or utility energy credit, rebate, or incentive program. SUCH WAIVER AND RELEASE INCLUDES TO THE FULLEST EXTENT PERMITTED BY LAW, A WAIVER AND RELEASE OF EXPRESS WARRANTIES (EXCEPT THOSE REPRESENTATIONS AND WARRANTIES OTHERWISE EXPRESSLY SET FORTH IN EXHIBIT 1), IMPLIED WARRANTIES, WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE, WARRANTIES OF MERCHANTABILITY, WARRANTIES OF HABITABILITY, STRICT LIABILITY, RIGHTS AND CLAIMS OF EVERY KIND AND TYPE. Customer acknowledges that Company does not provide a warranty as to the amount the System will offset Customer's utility usage or bill. The System will provide an amount of power that will not increase beyond its manufactured capacity; whereas Customer's usage can increase and decrease depending on factors outside of Company's control. Accordingly, the warranties and guaranties expressly stated in Exhibit 1 only relate to what the System produces and not to Customer's offset. 21. Remedies. If Customer does not timely pay the Reimbursement Fee, Total System Cost, or other amounts Customer is responsible for which are necessary to complete the Work, then Company is released from any further obligations to Customer hereunder, including those warranties and guaranties expressly stated in Exhibit 1. Further, Company may take all steps necessary to collect the amount(s)owing, including, but not limited to: initiating collection attempts, hiring an attorney or collection agency, shutting off the System, reporting the amounts owing to a credit reporting agency, and pursuing all lawful remedies to obtain payment. 22. Waiver of Subrogation. Except where prohibited, Company and Customer agree that with respect to any injury or property loss which is covered by insurance then being carried by Company or Customer, respectively, the party carrying such insurance and suffering said loss releases the other, and against the partners, members, officers, employees, agents, and representatives of the other, of and from any and all claims with respect to such loss, and they further agree that their respective insurance companies shall have no right of subrogation against the other on account thereof. 23. Miscellaneous. 23.1. Notices. All notices required or permitted under this Agreement shall be in writing and shall be deemed delivered when delivered in person or on the third day after being deposited in the United States mail, postage paid addressed to Company's address or sent by electronic delivery (e-mail) to the address specified most recently by Customer. 23.2. Further Assurances. Each party agrees to execute and deliver such instruments and take such further action as the other party may,from time to time, reasonably request in order to effectuate the purposes and to carry out the terms of this Agreement. 23.3. Waiver. The failure of either party to enforce any provision of this Agreement shall not be construed as a waiver of limitation of that party's right to subsequently enforce and compel strict compliance with every provision of this Agreement. 23.4. Non-Reliance. NO EMPLOYEE OR REPRESENTATIVE OF COMPANY IS AUTHORIZED TO MAKE ANY PROMISE TO CUSTOMER THAT IS NOT CONTAINED IN THIS AGREEMENT CONCERNING COST SAVINGS, SYSTEM PERFORMANCE, TAX BENEFITS, OR GOVERNMENT OR UTILITY INCENTIVES. v.25.01 -6- Document Ref:J54L6-QKSTK-Q67FR-JUWK6 Page 6 of 14 BLUE RAVEN SOLAR CUSTOMER AGREES NOT TO RELY UPON ANY PROMISE OR ESTIMATE THAT IS NOT INCLUDED IN THIS AGREEMENT. Customer acknowledges, confirms, and agrees that in entering this Agreement he or she has not relied on any statement, representation, promise, warranty, guaranty, estimate, or proposal made by Company, or any of its respective officers, employees, sales representatives, contractors, agents, or suppliers except as set forth herein. 23.5. Predominant Language. The English-language version of this Agreement controls and prevails in all aspects in case of inconsistency with the translated version, if any. A copy of the English version of this Agreement is available upon written request. 23.6. Assignment. Company may sell, assign, transfer, convey, or collateralize, by the operation of law or otherwise, any portion of its obligations herein. Company may delegate or subcontract to any person or entity at its sole discretion. Customer shall not assign or delegate any rights or claims under this Agreement without the prior written consent of Company, and any such assignment or delegation shall be null and void. 23.7. Amendment.This Agreement may only be modified or amended if amendment is made in writing and signed by both Parties. 23.8. Severability. If any provisions of this Agreement shall be held to be invalid or unenforceable for any reason, the remaining provisions shall continue to be valid and enforceable. If a court finds that any provision of this Agreement is invalid or unenforceable, but that by limiting such provision it would become valid or enforceable, then such provision shall be deemed to be written, construed, and enforced as so limited. 23.9. Applicable Law. This Agreement shall be governed and construed in accordance with the laws of the State of Utah without regard to conflicts of laws. 23.10. Jurisdiction. BOTH PARTIES AGREE THAT ANY SUIT, ACTION, OR PROCEEDING SEEKING TO ENFORCE ANY PROVISION OF, OR BASED ON ANY MATTER ARISING OUT OF OR IN CONNECTION WITH,THIS AGREEMENT OR THE TRANSACTIONS CONTEMPLATED HEREBY SHALL BE BROUGHT IN THE FEDERAL OR STATE COURTS OF UTAH, SO LONG AS ONE OF SUCH COURTS SHALL HAVE SUBJECT MATTER JURISDICTION OVER SUCH SUIT, ACTION, OR PROCEEDING, AND THAT ANY CAUSE OF ACTION ARISING OUT OF THIS AGREEMENT SHALL BE DEEMED TO HAVE ARISEN FROM A TRANSACTION OF BUSINESS IN THE STATE OF UTAH, AND EACH OF THE PARTIES HEREBY IRREVOCABLY CONSENTS AND SUBMITS, FOR ITSELF AND ITS PROPERTY, TO THE EXCLUSIVE JURISDICTION OF SUCH COURTS IN ANY SUCH SUIT, ACTION, OR PROCEEDINGS. 23.11. Waiver of Class Action Lawsuits. YOU AND COMPANY AGREE THAT EACH MAY BRING CLAIMS AGAINST THE OTHER ONLY IN YOUR OR ITS INDIVIDUAL CAPACITY AND NOT AS A PLAINTIFF OR CLASS MEMBER IN ANY PURPORTED CLASS OR REPRESENTATIVE ACTION. UNLESS YOU BOTH AGREE OTHERWISE, NEITHER PARTY MAY CONSOLIDATE MORE THAN ONE PERSON'S CLAIMS AGAINST THE OTHER. 23.12. Entire Agreement. This Agreement and all Agreement Documents contain the entire agreement of the Parties and there are no other promises or conditions in any other agreement whether oral or written. This Agreement and each and every term and condition hereof, shall inure to the benefit of, and shall be binding upon, the Parties hereto and their respective permitted successors and assigns. 23.13. Counterparts. This Agreement may be executed in any number of counterparts, each of which when executed and delivered shall be deemed to be an original, and all of which when taken together constitute one and the same Agreement. 24. Licenses. BRS Field Ops, LLC and its subcontractors, suppliers, and independent contractors may be licensed and regulated by the authority in which your System is located. 25. Signatures. Execution of this Agreement may be in the form of an electronic or similar signature, and such signature shall be treated as an original signature for all purposes. 26. Assignment of Renewable Energy Credits. If applicable, Customer hereby absolutely assigns,transfers,and conveys to Company(or its designee), without recourse to Customer, all Customer's rights, title, interest, and duties in and to all proceeds generated by the sale of solar renewable energy credits and certificates generated by the System ("Solar Proceeds"), including all general environmental benefits and attributes of the System, whether currently existing or v.25.01 -7- Document Ref:J54L6-QKSTK-Q67FR-JUWK6 Page 7 of 14 BLUE RAVEN SOLAR existing in the future, and regardless of how the Solar Proceeds is registered, on what registry it is listed, or to whom the Solar Proceeds is sold. Where Solar Proceeds are sold or traded separately from the electricity generated by the System for household consumption or exported back to the utility in a process ordinarily referred to as "net metering," the assignment of Solar Proceeds under this Section does not assign net metering credits. Customer hereby covenants that it will transfer any and all proceeds generated by the sale of the Solar Proceeds to Company. Consideration for the Assignment of the Solar Proceeds may be used to offset the purchase price or financing cost of the System. Company hereby accepts and assumes the Assignment and the transfer of proceeds as previously described. Except as expressly provided above, the rights, titles, interests, or duties of Customer in and to Solar Proceeds or any proceeds thereof, shall not be assigned, registered, or otherwise transferred by Customer without the prior written consent of Company. 27. Limitation of Liability. Except as expressly stated in Exhibit 1, Customer hereby agrees that Company's total liability for any and all injuries, claims, liabilities, losses, costs, expenses, or damages whatsoever, including without limitation, attorneys' fees and costs to Customer and any third party arising out of or in any way related to Company's Work, System installation, or this Agreement, from any cause or causes, including but not limited to, Company's negligence, errors, omissions, breach of contract or any duty, is limited to the lowest amount required by applicable law. Customer agrees that Company and any contracted parties are not liable to Customer for consequential, incidental, punitive, nominal, exemplary, or special damages. In no event shall Company be liable for any difference between estimated savings or payments and actual savings or payments received, or for Customer's failure to achieve a specified amount of savings or payments, in connection with Customer's eligibility or participation in any government or utility energy credit, rebate, or incentive program. COMPANY PROVIDES NO GUARANTY OR WARRANTY THAT ANY BATTERY INSTALLED PURSUANT TO THIS AGREEMENT WILL BE ABLE TO PROVIDE BACKUP POWER IN WHOLE OR IN PART DURING ANY POWER OUTAGES. BACKUP AVAILABILITY IS SUBJECT TO NUMEROUS FACTORS BEYOND COMPANY'S CONTROL, SUCH AS BATTERY CHARGE CAPACITY OR LOAD DEMAND. AS SUCH, COMPANY DISCLAIMS LIABILITY FOR ANY DAMAGES RESULTING FROM THE UNAVAILABILITY OF BATTERY POWER DURING A POWER OUTAGE, INCLUDING BUT NOT LIMITED TO DAMAGES RELATED TO THE FAILURE OF THE BATTERY TO POWER LIFE SUPPORT OR OTHER MEDICAL DEVICES DURING A POWER OUTAGE. COMPANY PROVIDES NO GUARANTEE THAT THE SYSTEM INSTALLED PURSUANT TO THIS AGREEMENT CAN BE UPGRADED IN THE FUTURE. 28. Customer Acknowledgement. Customer hereby acknowledges and agrees that: 28.1. Actual utility rates may go up or down and actual savings, if any, may vary. Historical data are not necessarily representative of future results. For further information regarding rates, contact your local utility or the State Commerce Commission or Public Utilities Commission. 28.2. The offset amount is not guaranteed; only the estimated System production used for administering the production guaranties expressly stated in Exhibit 1 is guaranteed. 28.3. Battery backup of electric appliances and length of backup duration is not guaranteed. Where applicable, Customer's own Battery backup and length duration is subject to numerous factors beyond Company's control, such as Battery charge capacity, previous work and unforeseen conditions, Site and Battery location, ambient temperature, household energy consumption, and System production. Some electric appliances may not be compatible with Battery backup. 28.4. Actual savings or payments under government or utility incentive programs are based on estimated and/or actual System size and/or production as calculated by the program administrator in its sole and absolute discretion. 28.5. The System production and size estimates used in this Agreement and the Agreement Documents to anticipate your estimated incentive program savings or payments are not guaranteed. Actual System production may go up and down, those administering the program may calculate System size and/or production differently from Company, and actual savings or payments under the program, if any, may vary. 28.6. Except as may be required, savings or payments under government or utility incentive programs are issued directly to Customer. Company will never issue you any such program savings or payments and will never compensate you for any difference between estimated program savings or payments and actual savings or payments received. v.25.01 -8- Document Ref:J54L6-QKSTK-Q67FR-JUWK6 Page 8 of 14 BLUE RAVEN SOLAR 28.7. Except as may be required, Customer is solely responsible for ensuring that all required information, documentation, and paperwork for tax and other government or utility energy credits, rebates,or incentives, is obtained and submitted correctly and on-time. 28.8. [Reserved] 28.9. If you are in a state that allows you to select an electrical supplier, switching suppliers will cancel your net metering and require you to set up new net metering. Depending on the supplier, this can be a lengthy process, and Company is not obligated to assist during such transition. Further, any production guaranties offered in Exhibit 1 are suspended during the time your System is not approved for net metering. 28.10. Tax and other government or utility incentives vary as to eligibility, participation, and refundability and are subject to change or termination by executive, legislative, or regulatory action, which may impact savings and payments estimates. 28.11. Approval of your application to any government or utility incentive programs is not guaranteed. 28.12. You agree to review all tax credits with a tax professional to determine what is actually available to you, and you will not rely on any information from sources other than a tax professional. 28.13. You will still receive a monthly utility bill. 29. Customer Data.Your privacy is important to Blue Raven. For a copy of our Privacy Policy,which covers how we collect, use, disclose, transfer, and store your information, please visit our website at //blueravensolar.com/privacy-policy/ or call 800-377-4480. By initialing below, you acknowledge your receipt of and opportunity to review such Privacy Policy: Customer Initials: M. U. YOU, THE BUYER, MAY CANCEL THIS TRANSACTION AT ANY TIME PRIOR TO MIDNIGHT OF THE THIRD BUSINESS DAY AFTER THE DATE OF THIS TRANSACTION. SEE THE ATTACHED NOTICE OF CANCELLATION FORM FOR AN EXPLANATION OF THIS RIGHT. IN ADDITION TO THE STATUTORY RIGHT TO CANCEL PROVIDED ABOVE,CUSTOMER HAS TEN (10)DAYS AFTER DELIVERY OF THE INITIAL FINAL DESIGN FOLLOWING THE SITE SURVEY TO CANCEL THIS AGREEMENT WITHOUT ANY PENALTY OR OBLIGATION. IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be executed as of the Effective Date. BRS FIELD OPS, LLC CUSTOMER V116?4 L16?94?41 �tignature Signature Name: Reed Farnsworth Name: Mark valley Title: President Date: 08/01 /2023 Date: 08/01 /2023 v.25.01 -9- Document Ref:J54L6-QKSTK-Q67FR-JUWK6 Page 9 of 14 NOTICE OF CANCELLATION Transaction Date: 08/01 /2023 YOU MAY CANCEL THIS TRANSACTION, WITHOUT ANY PENALTY OR OBLIGATION, WITHIN THREE (3) BUSINESS DAYS FROM THE ABOVE DATE. IF YOU CANCEL, ANY PROPERTY TRADED IN, ANY PAYMENTS MADE BY YOU UNDER THE CONTRACT OR SALE, AND ANY NEGOTIABLE INSTRUMENT EXECUTED BY YOU WILL BE RETURNED WITHIN 10 BUSINESS DAYS FOLLOWING RECEIPT BY THE SELLER OF YOUR CANCELLATION NOTICE, AND ANY SECURITY INTEREST ARISING OUT OF THE TRANSACTION WILL BE CANCELLED. IF YOU CANCEL, YOU MUST MAKE AVAILABLE TO THE SELLER AT YOUR RESIDENCE, IN SUBSTANTIALLY AS GOOD CONDITION AS WHEN RECEIVED, ANY GOODS DELIVERED TO YOU UNDER THIS CONTRACT OR SALE; OR YOU MAY IF YOU WISH, COMPLY WITH THE INSTRUCTIONS OF THE SELLER REGARDING THE RETURN SHIPMENT OF THE GOODS AT THE SELLER'S EXPENSE AND RISK. IF YOU DO MAKE THE GOODS AVAILABLE TO THE SELLER AND THE SELLER DOES NOT PICK THEM UP WITHIN 20 DAYS OF THE DATE OF YOUR NOTICE OF CANCELLATION, YOU MAY RETAIN OR DISPOSE OF THE GOODS WITHOUT ANY FURTHER OBLIGATION. IF YOU FAIL TO MAKE THE GOODS AVAILABLE TO THE SELLER, OR IF YOU AGREE TO RETURN THE GOODS TO THE SELLER AND FAIL TO DO SO, THEN YOU REMAIN LIABLE FOR PERFORMANCE OF ALL OBLIGATIONS UNDER THE CONTRACT. TO CANCEL THIS TRANSACTION, MAIL OR DELIVER A SIGNED AND DATED COPY OF THIS CANCELLATION NOTICE OR ANY OTHER WRITTEN NOTICE, OR SEND A TELEGRAM, TO: BRS FIELD OPS, LLC 1403 N. Research Way Orem, UT 84097 NOT LATER THAN MIDNIGHT OF 08/04/2023 [Transaction Date plus 3 days]. I, (print name), hereby elect to cancel this Agreement, and affirm that this cancellation was sent within three (3) business days from the Transaction Date above. Customer Signature Date: IN ADDITION TO THE STATUTORY RIGHT TO CANCEL PROVIDED ABOVE, CUSTOMER HAS TEN (10) DAYS AFTER DELIVERY OF THE INITIAL FINAL DESIGN FOLLOWING THE SITE SURVEY TO CANCEL THIS AGREEMENT WITHOUT ANY PENALTY OR OBLIGATION. Document Ref:J54L6-QKSTK-Q67FR-JUWK6 Page 10 of 14 NOTICE OF CANCELLATION Transaction Date: 08/01 /2023 YOU MAY CANCEL THIS TRANSACTION, WITHOUT ANY PENALTY OR OBLIGATION, WITHIN THREE (3) BUSINESS DAYS FROM THE ABOVE DATE. IF YOU CANCEL, ANY PROPERTY TRADED IN, ANY PAYMENTS MADE BY YOU UNDER THE CONTRACT OR SALE, AND ANY NEGOTIABLE INSTRUMENT EXECUTED BY YOU WILL BE RETURNED WITHIN 10 BUSINESS DAYS FOLLOWING RECEIPT BY THE SELLER OF YOUR CANCELLATION NOTICE, AND ANY SECURITY INTEREST ARISING OUT OF THE TRANSACTION WILL BE CANCELLED. IF YOU CANCEL, YOU MUST MAKE AVAILABLE TO THE SELLER AT YOUR RESIDENCE, IN SUBSTANTIALLY AS GOOD CONDITION AS WHEN RECEIVED, ANY GOODS DELIVERED TO YOU UNDER THIS CONTRACT OR SALE; OR YOU MAY IF YOU WISH, COMPLY WITH THE INSTRUCTIONS OF THE SELLER REGARDING THE RETURN SHIPMENT OF THE GOODS AT THE SELLER'S EXPENSE AND RISK. IF YOU DO MAKE THE GOODS AVAILABLE TO THE SELLER AND THE SELLER DOES NOT PICK THEM UP WITHIN 20 DAYS OF THE DATE OF YOUR NOTICE OF CANCELLATION, YOU MAY RETAIN OR DISPOSE OF THE GOODS WITHOUT ANY FURTHER OBLIGATION. IF YOU FAIL TO MAKE THE GOODS AVAILABLE TO THE SELLER, OR IF YOU AGREE TO RETURN THE GOODS TO THE SELLER AND FAIL TO DO SO, THEN YOU REMAIN LIABLE FOR PERFORMANCE OF ALL OBLIGATIONS UNDER THE CONTRACT. TO CANCEL THIS TRANSACTION, MAIL OR DELIVER A SIGNED AND DATED COPY OF THIS CANCELLATION NOTICE OR ANY OTHER WRITTEN NOTICE, OR SEND A TELEGRAM, TO: BRS FIELD OPS, LLC 1403 N. Research Way Orem, UT 84097 NOT LATER THAN MIDNIGHT OF 08/04/2023 [Transaction Date plus 3 days]. I, (print name), hereby elect to cancel this Agreement, and affirm that this cancellation was sent within three (3) business days from the Transaction Date above. Customer Signature Date: IN ADDITION TO THE STATUTORY RIGHT TO CANCEL PROVIDED ABOVE, CUSTOMER HAS TEN (10) DAYS AFTER DELIVERY OF THE INITIAL FINAL DESIGN FOLLOWING THE SITE SURVEY TO CANCEL THIS AGREEMENT WITHOUT ANY PENALTY OR OBLIGATION. Document Ref:J54L6-QKSTK-Q67FR-JUWK6 Page 11 of 14 Exhibit 1 : Limited Warranty and Guaranty BRS FIELD OPS, LLC is the solar company installing the System and the company responsible for administering the warranties and guaranties under this Limited Warranty and Guaranty. BRS FIELD OPS, LLC 1403 N. Research Way Orem, UT 84097 800-377-4480 support@blueravensolar.com License# BRSFIF0820N3 SYSTEM COST ASSUMPTIONS Total System Cost: $ 65328 IF APPLICABLE, SALES TAXIS INCLUDED IN THE Solar Rebate: $ ° COST Referral Promotion: $500 Down Payment (if applicable): $ ° PAYMENT AMOUNT: $ 64828 REBATES, CREDITS & INCENTIVES ASSUME SUCCESSFUL APPLICATION TO A GOVERNMENT Federal Tax Credit(30%): $ 19448 OR UTILITY INCENTIVE PROGRAM, EXECUTION AND DELIVERY OF ALL REQUIRED State Incentive: $ ° INSTRUMENTS, AND SYSTEM ENERGIZATION Other Incentive: $ -- NET SYSTEM COST: $ 45380 PV ASSUMPTIONS BATTERY ASSUMPTIONS Total System Size (kW): 11.34 Number of Batteries: ° Yearly Solar Production (kWh): 12498 Battery Storage Capacity (kWh): ° Annual System Degradation: 0.5% Estimated Backup Duration (days): ADDITIONAL DISCLOSURES: �X If this box is selected, Customer agrees to the assignment of renewable energy credits according to the terms and conditions of the Agreement. X] If this box is selected, the pricing terms above will not change if the System is not selected for a government or utility incentive program. Company will not perform regular maintenance and repairs on the System. COMPANY WARRANTS AS FOLLOWS: 1. Limited Warranty. (a) Workmanship. Company, for a period of ten (10) years from installation, warrants that the System will be designed, engineered, and constructed to meet the requirements of this Agreement and is capable of operating free of major defects and in accordance with all System manufacturer specifications. Company further warrants that the System, and each device and component of the System incorporated therein, will be new or equivalent to new, will be of suitable grade of their respective kinds for their intended use as specified herein, and shall conform in all respects to all applicable requirements of applicable laws, all governmental approvals, the plans and specifications prepared in accordance with this v.25.01 Document Ref:J54L6-QKSTK-Q67FR-JUWK6 Page 12 of 14 Agreement and all descriptions set forth herein, applicable engineering and construction codes and standards, and all other requirements of this Agreement. (b) Roof. Company, for a period of ten (10) years from installation, warrants that, with respect to all roof penetrations made by Company, such roof penetrations, limited to three(3) inch radius of the roof penetration, shall be free from material defects in workmanship and shall be sealed or flashed to eliminate any liquid or vapor penetration, and that such roof penetrations shall not affect or otherwise diminish the strength, integrity, water-proofing, or balance of any underlying roof structure. (c) Equipment. Company warrants that the PV and Battery, if any, devices and components (the "Equipment") installed under this Agreement will be made from new or equivalent to new parts with industry standard warranties. The Equipment will carry the manufacturer's warranty as specified in the Proposal. Company shall assign all Equipment warranties to Customer. Subject to and on condition that notice of defect was given to Company within two (2) years from installation and manufacturer actually repairs and/or replaces the Equipment, Company shall furnish all reasonable labor and materials necessary to accomplish the required repair and/or replacement of the defective item. To the extent that manufacturer repairs and/or replaces the Equipment after two (2) years from installation, Customer acknowledges and agrees to furnish and bear the cost of all labor and materials necessary to accomplish the required repair and/or replacement of the defective item, unless otherwise provided by manufacturer warranty. Company makes no warranty, express or implied, concerning the Equipment except as provided herein. 2. PV Guaranty. (a) For purposes hereof, the term "Guaranty Period" shall mean a period of two (2) years from the final completion of Customer's System. (b) If, for any consecutive three (3) month period during the Guaranty Period, the actual System output, as measured in kWh by the System's monitoring system ("Actual System Output"), is more than fifty percent (50%) below the projected total in kWh of the"Estimated System Output"for the same three (3)month period, as set forth in the Final Design related to the System, Company shall be obligated to cure any shortfall such that Actual System Output is within ten percent (10%) of Estimated System Output going forward. If your residence is not able to support additional panels for any reason, Company shall pay you the present value of the difference in what the utility cost should have been to you versus what it was to you due to the shortfall less ten percent as projected over a two (2) year period. Company is not obligated to compensate for any additional usage beyond the amounts set forth in the Final Design. (c) If, for any continuous eighteen (18) month period during the Guaranty Period, the Actual System Output is more than fifteen percent (15%)below the projected total in kWh of the Estimated System Output for the same eighteen (18) month period, as set forth in the Final Design, Company shall be obligated to cure any shortfall such that Actual System Output is within ten percent(10%) of Estimated System Output going forward. If your residence is not able to support additional panels for any reason, Company shall pay you the difference in what the utility cost should have been versus what it was to you due to the shortfall, less ten percent, over the Guaranty Period. Company is not obligated to compensate for any additional usage beyond the amounts set forth in the Final Design. (d) Notwithstanding the foregoing, Company shall have no obligation with respect to the Guaranty provided herein to the extent Customer does not have adequate cellular or internet coverage as required by the approved monitoring platform or Company is otherwise unable to monitor Actual System Output. Further, Company shall have no obligation with respect to the foregoing Guaranty for any loss of System production relating to tree shade where the relocation, removal, or trimming of such trees was a material assumption of the Estimated System Output. For the avoidance of doubt, Company is not responsible for keeping the System free of dirt, snow, debris, and/or critter infestation. 3. Warranty and Guaranty Administration. (a) Unless otherwise provided, Company's warranty and guaranty obligation stated herein are limited to those defects or deficiencies which become apparent within the applicable warranty or Guaranty Period set forth above. (b) If Company's warranty or guaranty obligations stated herein are breached, or a defect or deficiency covered by Company is discovered during the applicable warranty or Guaranty Period set forth above, upon notice to Company, Company shall promptly repair, replace, correct the deficiency, and/or agree to an equitable price adjustment. (c) All reasonable labor and material costs necessary to Company's performance of its warranty and guaranty obligations shall be borne by Company. 4. Warranty and Guaranty Exclusions. The warranty and guaranty obligations stated herein do not extend to: v.25.01 - 2 - Document Ref:J54L6-QKSTK-Q67FR-JUWK6 Page 13 of 14 (a) Eligibility or participation in a government or utility energy credit, rebate, or incentive program. (b) Damage, malfunction, or degradation of electrical output or System performance caused by or resulting from: i. Customer's failure to properly operate or maintain the System, and system components, in accordance with manufacturer's published instructions available online; ii. Any repair, replacement, modification, enhancement, or reinstallation of the System or any part thereof using a part or service not provided or authorized; iii. An accident, alteration, negligence, vandalism, or other misconduct by Customer, subsequent owner or any third party, including, but not limited to, damage from golf balls, objects from others, or other impacts caused by persons; earthquake, fire, flood, or other acts of God; excessive heat or excessive cold where Battery is located; or snow covering or a snow load damaging the System; and iv. A power or voltage surge caused by someone other than Company including, without limitation a grid supply voltage outside of standard rage specified by your local utility or the System specifications or as a result of a local power outage or curtailment. (c) Except when installed by Company under agreement, electricity storage equipment such as batteries, battery cables, charge controllers, and battery management electronics, and any damage, malfunction, or reduced production in any way caused by or associated with the failure or non-performance, for any reason, of such electricity storage equipment. (d) Any roof performance issues: i. not related to roof penetration made as part of the installation of the System; or ii. otherwise covered by Customer's homeowner's insurance. (e) Loss of System production from tree shade where the relocation, removal, or trimming of such trees was a material assumption of the Estimated System Output. (f) Use of a Battery installed pursuant to this Agreement as the primary or backup source for medical equipment. (g) Any pre-existing conditions existing any time prior to installation. Company is not obligated to warranty or guaranty any pre-existing conditions of Customer and is fully released from all liability associated with such pre-existing conditions, including, but not limited to, poor roof conditions. (h) Company's warranty and guaranty obligations cease if the System is removed and replaced for roof work or other purposes, or if the System is serviced by unauthorized service providers. The warranty and guaranty obligations also do not transfer to new properties purchased by Customer, even if Customer takes the System to the new property. (i) Any Company and/or manufacturer warranty and guaranty obligations concerning Batteries installed pursuant to this Agreement shall cease if such Battery is charged from any source other than your PV modules. 0) COMPANY PROVIDES NO GUARANTY OR WARRANTY THAT ANY BATTERY INSTALLED PURSUANT TO THIS AGREEMENT WILL BE ABLE TO PROVIDE BACKUP POWER IN WHOLE OR IN PART DURING ANY POWER OUTAGES. COMPANY PROVIDES NO GUARANTEE THAT ANY BATTERY INSTALLED PURSUANT TO THIS AGREEMENT CAN BE UPGRADED IN THE FUTURE. 5. Transfer of Warranties/Guarantees. Company will accept and honor any valid and properly submitted claim under this Limited Warranty and Guaranty made during the applicable warranty or guarantee period by any person to whom Customer properly transfers ownership to the System by way of conveyance of the underlying real property. [Remainder of Page Intentionally Left Blank] v.25.01 - 3- Document Ref:J54L6-QKSTK-Q67FR-JUWK6 Page 14 of 14 Signature Certificate Reference numb, J54L6-QKSTK-Q67FR-JUWK6 Signer Timestamp Signature Mark Valley Email:photome1224@gmail.com Sent: 01 Aug 2023 20:30:19 UTC Ua Viewed: 01 Aug 2023 20:34:55 UTC ff�?j Signed: 01 Aug 2023 20:35:32 UTC Recipient Verification: IP address:73.169.146.77 .,Email verified 01 Aug 2023 20:34:55 UTC Location:Marysville,United States Document completed by all parties on: 01 Aug 2023 20:35:32 UTC Page 1 of 1 Signed with PandaDoc E1,12 PandaDoc is a document workflow and certified eSignature &I " solution trusted by 40,000+companies worldwide. Now- BLUE RAVEN SOLAR What is the Renewable Energy Investment Tax Credit Program? The federal residential renewable energy tax credit (RRETC) program, authorized under 26 USC § 25D, encourages the residential use of renewable energy by providing a federal tax credit to owners of solar energy generators that meet certain performance and quality standards. The RRETC tax credit is a non-refundable, dollar-for-dollar reduction in the federal income taxes you may owe. Think of it like an IRS coupon that reduces the amount you pay the federal government. For example, claiming a $1,000 RRETC federal tax credit would reduce your federal income tax liability by $1,000. This is a non- refundable tax credit, which means you will not get a tax refund for the amount of the tax credit that exceeds your tax liability. It is important to understand that you can carry over any unused portion of the RRETC tax credit to the next tax year for up to four years. You must have sufficient tax liability in order to take advantage of the full federal RRETC. The only way you would get a refund from the government is if the amount of taxes withheld from you exceeded the amount that you owed, less the RRETC credit amount. In other words, this incentive is a credit towards taxes that are paid or owed to the government. While most customers who qualify for BLUEPOWER° have a large enough tax liability to take full advantage of the RRETC tax credit, you should consult your tax advisor for advice on your specific situation. Tax and Legal Advice Disclaimer THIS MATERIAL HAS BEEN PREPARED FOR INFORMATIONAL PURPOSES ONLY. IT DOES NOT CONSTITUTE PROFESSIONAL TAX OR LEGAL ADVICE AND SHOULD NOT BE RELIED ON AS THE ONLY SOURCE OF INFORMATION WHEN MAKING PURCHASING, INVESTMENT, OR TAX DECISIONS OR WHEN EXECUTING THIS OR OTHER BINDING DOCUMENTS. TAX AND OTHER FEDERAL, STATE, AND LOCAL INCENTIVES VARY AS TO REFUNDABILITY AND ARE SUBJECT TO CHANGE OR TERMINATION BY LEGISLATIVE OR REGULATORY ACTION, WHICH MAY IMPACT SSAVINGS ESTIMATES. CONSULT A TAX AND LEGAL PROFESSIONAL FOR MORE INFORMATION. The information contained herein is general in nature and is based on information estimates provided you, demographic, regional, and industry assumptions, and from other sources that are subject to change. The Company guarantees neither the accuracy nor completeness of any information obtained from outside sources and is not responsible for any errors or omissions or for results obtained by you or others in reliance upon such information. The Company assumes no obligation to inform you of any changes in tax laws or other factors that could affect information contained herein. This information does not, and is not intended to, provide legal, tax, or accounting advice. You should consult your tax advisor concerning the application of tax laws to your particular situation. Customer Initials: CONTRACTOR NEW PHOTOVOLTAIC ROOF MOUNTED SYSTEM - 11 .480 KW DC/9.772 KW AC 19417 45TH DR NE, ARLINGTON , WA 98223 BLOSSOM SOLAR NEW PV SYSTEM SPECIFICATIONS SHEET INDEX BLOSSOM SOLAR SYSTEM SIZE: DC SIZE: 11.480 KW DC-(STC) AC SIZE:9.772 KW AC PV-01 COVER PAGE 1706 LOMBARD AVE, MODULE: (28)REC SOLAR REC410AA PURE(410W) �GUSTIN PV-02 SITE PLAN EVERETT, WA 98201 INVERTER: (28)ENPHASE IQ8A-72-2-US(240V) WAS PV-03 ATTACHMENT PLAN&DETAILS h�H PV-04 ELECTRICAL DIAGRAM ( ) PHONE- 425 610-7067 CEO cG PV-05 NOTES PV-06 WARNING LABELS APPLICABLE CODES , t17 PV-07 INSTALLATION RESOURCE ALL WORK SHALL CONFORM TO THE FOLLOWING CODES: 1 r EQUIPMENT DATASHEETS ATTACHED 2018 INTERNATIONAL BUILDING CODE 48721 2018 INTERNATIONAL RESIDENTIAL CODE 2018 INTERNATIONAL EXISTING BUILDING CODE s�pNAL 45TH DR NE LEGEND 2018 INTERNATIONAL FIRE CODE 2020 NATIONAL ELECTRICAL CODE sealed 07sep2023 mike@h2dc.com ---------- PROPERTY LINE AS ADOPTED BY CITY OF ARLINGTON (WA) H2DC PLLC WA UBI#: 604 476 076 6-3" 0 0 0 FENCE LINE ELECTRICAL ONLY — — — DigitMy signed by Rke McGuire.PE DN.C=US,S=New Hampshire.--- MikeD=Hm,ica°e Hi11 D—Ilp—t C°mpe°y P LC,EE°k.@h,d�°�,CN=Mike MCGuh,. DRIVEWAY DESIGN CRITERIA PE E'mike@-2 h 1 McGuire. PEL"." y�r gnig�o�'1�o�nee°me ROOF SURFACE TYPE: INTERLOCK METAL TILE °e`e'2°23°g°'153433-°°'DO' F°xii PDF Editor Version:11.2.6 ROOF FRAMING: 2"X8" RAFTER @ 24"OC BUILDING STORY: ONE STORY I FRONT OF HOUSE PROJECT NAME &ADDRESS zo GROUND SNOW LOAD:25 PSF c� JOE RECCHI WIND SPEED:98 MPH WIND EXPOSURE: B 19417 45TH DR NE, RISK CATEGORY: II ARLINGTON, WA 98223 APN#: 009-282-000-073-00 PROJECT NOTES I I AHJ: CITY OF ARLINGTON (WA) 1.1.1 THIS PHOTOVOLTAIC(PV)SYSTEM SHALL COMPLY WITH THE UTILITY: PUGET SOUND ENERGY RELEVANT YEAR OF THE NATIONAL ELECTRIC CODE(NEC),ALL MANUFACTURER'S LISTING AND INSTALLATION INSTRUCTIONS, - SYSTEM DETAILS AND THE RELEVANT CODES AS SPECIFIED BY THE AUTHORITY ° VICINITY MAP DC SIZE:HAVING JURISDICTION'S(AHJ)APPLICABLE CODES. < N AC SIZE:91772 KW AC .480 KW C-(STC) 1.1.2 THE UTILITY INTERCONNECTION APPLICATION MUST BE (28)REC SOLAR REC410AA PURE(41OW) APPROVED AND THE PV SYSTEM MUST BE INSPECTED PRIOR TO (28)ENPHASE IQ8A-72-2-US(240V) OPERATION 1.1.3 ALL PV SYSTEM COMPONENTS; MODULES, o REVISIONS UTILITY-INTERACTIVE INVERTERS,AND SOURCE CIRCUIT ° ° o COMBINER BOXES ARE IDENTIFIED AND LISTED FOR USE IN ° • REV DESCRIPTION DATE PHOTOVOLTAIC SYSTEMS AS REQUIRED BY NEC AND OTHER GOVERNING CODES ° 1.1.4 ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE. IF EXPOSED TO SUNLIGHT, IT SHALL BE UV RESISTANT.ALL PLAQUES AND SIGNAGE WILL BE INSTALLED AS REQUIRED BY THE NEC AND AHJ. L4'-2'!- SCOPE OF WORK SATELLITE MAP SHEET TITLE 1.2.1 CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND SPECIFICATIONS OF THE GRID-TIED PHOTOVOLTAIC SYSTEM. THE CONTRACTOR WILL BE RESPONSIBLE FOR COLLECTION OF — — COVER PAGE EXISTING ONSITE CONDITIONS TO DESIGN, SPECIFY,AND 6'-3" •• INSTALL THE ROOF-MOUNTED PHOTOVOLTAIC SYSTEM '"_ DETAILED IN THIS DOCUMENT ] DRAWN DATE 9/1/2023 a ... DRAWN BY CS � PROPERTY PLAN - - -- - = SHEET NUMBER �� Z PV-01 SCALE:1/16" = V-0" I PV-01 NOTES: VISIBLE, LOCKABLE & LABELED AC PLAN VIEW TOTAL ROOF AREA: 1851 FT LEGEND CONTRACTOR 1. ROOF ACCESS POINT SHALL NOT BE LOCATED IN AREAS THAT REQUIRE THE DISCONNECT LOCATED WITHIN TOTAL PV ARRAY AREA: 557.67 FT PLACEMENT OF GROUND LADDERS OVER 1 OFT OF THE UTILITY METER TOTAL%OF ROOF COVERED BY PV: 30.13% L OPENINGS SUCH AS WINDOWS OR DOORS, M _ FIRE SETBACKS AND LOCATED AT STRONG POINTS OF BLOSSOM SOLAR BUILDING CONSTRUCTION IN LOCATIONS WHERE THE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD =MECHANICAL VENT OBSTRUCTIONS SUCH AS TREE LIMBS, BLOSSOM SOLAR WIRES OR SIGNS. O =FLUE/PLUMBING VENT 2. STRUCTURES,PATIO COVERS,AND/OR =FENCE LINE 1706 LOMBARD AVE, ADDITIONS BUILT WITHOUT PERMITS TO BE O MICROINVERTER(1 PER MODULE) EVERETT, WA 98201 RESOLVED BY A SEPARATE PERMIT. FRONT OF HOUSE O (28)REC SOLAR REC410AA PURE(410W)MODULES PHONE- (425)610-7067 2 WITH ENPHASE IQ8A-72-2-US(240V)UNDER EACH MODULE OJUNCTION BOX;SIZE DETERMINED IN FIELD O CONDUIT RUN;SURFACE MOUNTED(ACTUAL 8 CONDUIT RUNS TO BE DETERMINED IN FIELD) 7 O (E)UTILITY METER(UNDERGROUND SERVICE) 5 O MAIN SERVICE PANEL 6 O AC DISCONNECT ROOF 1 O (N)ENPHASE IQ COMBINER BOX 4 PROJECT NAME &ADDRESS O JOE RECCHI 3 19417 45TH DR NE, A�OUSTj ARLINGTON, WA 98223 O 4 OF W���tic�o APN#: 009-282-000-073-00 O AHJ: CITY OF ARLINGTON (WA) UTILITY: PUGET SOUND ENERGY .� 48721 SYSTEM DETAILS DC SIZE:11.480 KW DC-(STC) slQN AC SIZE:9.772 KW AC 1 O 0 (28)REC SOLAR REC410AA PURE(410W) sealed 07sep2023 mike@h2dc.com SLOPE -18° (28)ENPHASE IQ8A-72-2-US(240V) H2DC PLLC WA UBI#: 604 476 076 AZIMUTH -270° 2 O O ELECTRICAL ONLY ROOF 1 MODULE QTY -13 REVISIONS _ RAFTER -2"X8" @ 24"O.C. SURFACE TYPE -INTERLOCK METAL TILE REV DESCRIPTION DATE SLOPE 18° AZIMUTH -90° ROOF 2 MODULE QTY -15 _ RAFTER -2"X8" @ 24"O.C. ROOF 2 SURFACE TYPE -INTERLOCK METAL TILE LLLLL] 40" SHEET TITLE SITE PLAN DRAWN DATE 9/1/2023 ~ DRAWN BY CS ~SITE PLAN SHEET NUMBER �➢Z PV-02 SCALE:1/8"=V-0" PV-02 DISTRIBUTED LOAD CALCULATIONS NOTE: LEGEND CONTRACTOR MODULE REC SOLAR REC410AA PURE(410W) 1. CONTRACTOR/INSTALLER TO VERIFY COMPATIBILITY OF MODULE WEIGHT 45 LBS ANY BRANDS OR PRODUCTS SUBSTITUTED OR USED AS -ATTACHMENT POINTS MODULE DIMENSIONS(L"x W") 71.7"x 40" ALTERNATES WITHIN ANY BRAND-SPECIFIC SYSTEMS. TOTAL QTY.OF MODULES 28 CONTRACTOR SHALL SUPPLY AND PRESENT -RAIL TOTAL WEIGHT OF MODULES 1260.00 LBS CERTIFICATES OF COMPATIBILITY TO THE BUILDING BLOSSOM SOLAR TYPE OF RACKING IRONRIDGE AIRE RAIL OFFICIAL UPON INSPECTION AS NEEDED. -STRUCTURAL MEMBER TYPE OF ATTACHMENT ABASE METAL SHAKE&SLATE MOUNT AATACHMENT 2. REFER TO PV MODULE MANUFACTURER'S INSTALLATION DISTRIBUTED WEIGHT OF RACKING 0.5 PSF INSTRUCTIONS FOR RAIL SPACING SPECIFICATIONS I BLOSSOM SOLAR TOTAL WEIGHT OF ARRAY 1538.83 LBS AREA OF MODULE 19.92 SOFT. 1706 LOMBARD AVE, TOTAL ARRAY AREA 1557.67 SOFT. DISTRIBUTED LOAD 2.76 PSF EVERETT, WA 98201 PHONE-(425)610-7067 4'-0"OC ATTACHMENT SPACING 4'-0"OC ATTACHMENT SPACING • • • • PROJECT NAME &ADDRESS JOE RECCHI 19417 45TH DR NE, STRUCTURAL MEMBER @ 24"OC STRUCTURAL MEMBER @ 24"OC ARLINGTON,WA 98223 1 .0 TYPICAL ATTACHMENT PLAN PORTRAIT 1 . 1 TYPICAL ATTACHMENT PLAN LANDSCAPE APN#: 009-282-000-073-00 PV-03 SCALE: NTS PV-03 SCALE: NTS AHJ: CITY OF ARLINGTON (WA) UTILITY: PUGET SOUND ENERGY SYSTEM DETAILS DC SIZE: 11.480 KW DC-(STC) AC SIZE:9.772 KW AC (28)REC SOLAR REC410AA PURE(410W) (28)ENPHASE IQ8A-72-2-US(240V) IRONRIDGE END/ REVISIONS END MID PV MODULE C AMP REV DESCRIPTION DATE PV MODULE IRONRIDGE AIRE RAIL SEE ENLARGED VIEW POST,1-1/4"OD X (E)METAL SLATE/TILE ROOF VARIED HEIGHT(3.25", 4.5",6.5",8.5",11.5", \ ABASE, 1-114"ID,FOR SHEET TITLE 5/16"HARDWARE,A360 MIN.(2)5/16"x 3"SS LAG SCREWS ATTACHMENT PLAN I CAST AL WITH MIN.OF 2"EMBEDMENT INTO (E)STRUCTURAL MEMBER STRUCTURAL MEMBER AS & DETAILS SPECIFIED BY MANUFACTURER / DRAWN DATE 9/1/2023 DRAWN BY CS (E)STRUCTURAL MEMBER 2 ATTACHMENT DETAIL 3 ENLARGED VIEW SHEET NUMBER PV-03 Scale: NTS PV-03 Scale: NTS PV-03 MICROINVERTER SPECIFICATIONS SOLAR MODULE SPECIFICATIONS VISIBLE, LOCKABLE & LABELED AC AMBIENT TEMPERATURE SPECIFICATIONS CONTRACTOR MANUFACTURER/MODEL# ENPHASE IQ8A-72-2-US(240V) MANUFACTURER/MODEL# REC SOLAR REC410AA PURE(410W) DISCONNECT LOCATED WITHIN RECORD LOW TEMP -9°C INPUT POWER RANGE 295W-500W VMP 42.20V 10FT OF THE UTILITY METER AMBIENT TEMP(HIGH TEMP 2%AVG.) 27°C MIN/MAX START VOLTAGE 22V/58V IMP 9.72A NOMINAL AC VOLTAGE 240V VOC 49.40V MINIMUM CONDUIT HEIGHT ABOVE ROOF SURFACE 7/8" MAX CONT.OUTPUT CURRENT 1.45A ISC 10.42A BLOSSOM SOLAR MAX CONT.OUTPUT POWER 1349W ITEMP.COEFF.VOC -0.24%/°C ,3GUSTIN� MAX MODULES PER STRING 111 (11 MICROINVERTERS) y OF WASyj� BLOSSOM SOLAR 1706 LOMBARD AVE, f► EVERETT, WA 98201 '448� TO UTILITY GRID PHONE- (425)610-7067 ROMEX CAN BE USED IN LIEU OF CONDUIT FOR INTERIOR BUILDING AND ATTIC StpNpL L1 L2 N RUNS ONLY. DO NOT USE ROMEX IN CONDUIT OR OUTDOOR ENVIRONMENTS. sealed 07sep2023 mike@h2dc.com LINE (N) ENPHASE COMBINER PANEL H2DC PLLC WA UBI#: 604 476 076 (E) BI-DIRECTIONAL ELECTRICAL ONLY UTILITY METER NEMA 3R, UL LISTED,125A RATED (N) SERVICE RATED M > 1-PHASE, 3-W, REC SOLAR REC410AA PURE (410W) (ENPHASE X-IQ-AM1-240-4/4C) AC DISCONNECT: 120V/240V VISIBLE, LOCKABLE, LOAD 10 MICROINVERTERS IN STRING 1 10A OR 15A BREAKER IS IQ GATEWAY LABELED 60 A FUSED, SUITABLE FOR USE (2) 60A FUSES, 240V, • CELL WIRELESS NEMA 3R, UL LISTED SUPPLY SIDE ENPHASE Q MODEM cOMMS L1 L1 CONNECTION CABLE(S) L2 L2 N N 15A/2P (E) 200A/2P MAIN 10 MICROINVERTERS IN STRING 2 (N) JUNCTION BOX PROJECT NAME &ADDRESS 600 V, NEMA 3R 1 G LINE BREAKER, 240V JOE RECCHI • UL LISTED L1 20A�2P 2 __ 3 19417 45TH DR NE, 0 (E) 200A MAIN ARLINGTON, WA 98223 ° SERVICE PANEL, APN#: 009-282-000-073-00 08 MICROINVERTERS IN STRING 3 L2 2 P 240V AHJ: CITY OF ARLINGTON (WA) UTILITY: PUGET SOUND ENERGY 20A/2P LOAD G ° L1 SYSTEM DETAILS SUPPLY SIDE DC SIZE:11.480 KW DC-(STC) N N AC SIZE:9.772 KW AC ENPHASE IQ8A-72-2-US (240V) G INTERCONNECTION (28)REC SOLAR REC410AA PURE(410W) MICROINVERTERS ONE UNDER v G G AT MAIN PANEL (28)ENPHASE IQ8A-72-2-US(240V) EACH PANEL (240V) #6 AWG BARE CU BONDED GEC REVISIONS NOTES APPENDIX(AS APPLICABLE FOR TO BE BUILT DRAWING SETS): (A)TOTAL AC VOLTAGE DROP NOT TO EXCEED 2%TO INTERCONNECTION, <3% FROM EXISTING GROUNDING REV DESCRIPTION DATE INVERTER(S)TO UTILITY TRANSFORMER. (B)ALL CONNECTORS 75C RATED. (C)ALL CONDUCTORS COPPER, UNLESS OTHERWISE NOTED. (D)OUTDOOR EQUIPMENT ELECTRODE SYSTEM NEMA3R. (E)ALL CONDUCTORS MUST BE PROTECTED FROM ACCESS BY A FENCE OR SUITABLE COVER, OR OUT OF REACH. (F) PROPERTY LINES, BOUNDARIES AND ALL OTHER EXTERIOR MEASUREMENTS ARE FOR REFERENCE ONLY,AND MUST BE VERIFIED BY A LICENSED SURVEYOR OR CIVIL ENGINEER. (G) NO PVC ALLOWED ON ROOF OR IN ATTIC. (H)MC4 CONNECTORS MAY NOT BE JOINED WITH 'MC4 COMPATIBLE'CONNECTORS. (1)TAP CONNECTIONS IN PANEL MUST NOT VIOLATE CONDITIONS OF ACCEPTABILITY FROM PANEL MANUFACTURER'S NRTL LISTING, OR FIELD LABEL REQUIRED. (J) PV WIRES MAY NOT BE LAID DIRECTLY ON ROOF. (K )TY WRAPS FOR WIRE MANAGEMENT MUST BE STRUCTURAL(S21)UL APPROVED, OR EQUAL. (L) DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS AND WORK. CONDUIT ROUTING, WHEN INDICATED, DOES NOT SHOW ALL OFFSETS, DROPS,AND RISES OF RUNS. (M) BURIED CONDUITS UNDER AREAS SUBJECT TO VEHICLE TRAFFIC REQUIRE MIN 24"COVER. (N)NM-B OR PAPER INSULATED CONDUCTORS MAY NOT BE USED EXTERIOR. (O )THE DEVELOPER IS REQUIRED TO CONFIRM EXISTING ELECTRICAL SERVICE SIZE FROM THE UTILITY,AND MAY NOT RELY SOLELY ON EXISTING BREAKER SIZES. (P SHEET TITLE )CONNECTING TO UTILITY EQUIPMENT REQUIRES PRIOR UTILITY CONSENT. ELECTRICAL DIAGRAM DESCRIPTION FORMULA RESULT PV OVERCURRENT PROTECTION NEC 690.9(B) TOTAL INVERTER OUTPUT CURRENT x 1.25=(28 x 1.45)A x 1.25 50.75A (SELECTED OCPD =60A) DRAWN DATE 9/1/2023 EXPECTED TEMP QTY OF CURRENT CONDUIT MINIMUM WIRE GAUGE& CONDUCTOR CONDUCTOR REQUIRED CIRCUIT ADJUSTED NEUTRAL GROUND WIRE DRAWN BY CS WIRE ID DERATE CARRYING CONDUIT SIZE AMPACITY @ AMPACITY @ CONDUCTOR CONDUCTOR CONDUCTOR WIRE TEMP(°C) (90°C) CONDUCTORS FILL DERATE (TBD ON SITE) TYPE 90°C(A) 75°C(A) AMPACITY(A) AMPACITY @ 90°C(A) SIZE&TYPE SIZE&TYPE SHEET NUMBER 1 27 1 6 0.8 3/4"METAL #10 THWN-2 40 35 18.13 32.00 NONE #8 THWN-2 2 27 1 2 1 3/4"METAL #6 THWN-2 75 65 50.75 75.00 #6 THWN-2 #8 THWN-2 PV-04 3 27 1 2 1 3/4"PVC #6 THWN-2 75 65 50.75 75.00 1 #6 THWN-2 NONE GENERAL NOTES CONTRACTOR SITE NOTES GROUNDING NOTES INTERCONNECTION NOTES 2.1.1 A LADDER WILL BE IN PLACE FOR INSPECTION IN ACCORDANCE 2.5.1 GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR 2.7.1 LOAD SIDE INTERCONNECTION SHALL BE IN BLOSSOM SOLAR WITH OSHA REGULATIONS. THEIR PURPOSE, AND GROUNDING DEVICES EXPOSED TO THE ACCORDANCE WITH NEC 705.12. 2.1.2 THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS ELEMENTS SHALL BE RATED FOR SUCH USE. 2.7.2 THE SUM OF THE UTILITY OCPD AND INVERTER SYSTEM IS A UTILITY INTERACTIVE SYSTEM WITH NO STORAGE 2.5.2 PV EQUIPMENT SHALL BE GROUNDED IN ACCORDANCE CONTINUOUS OUTPUT MAY NOT EXCEED 120 PERCENT OF BLOSSOM SOLAR BATTERIES. WITH NEC 690.43 AND NEC TABLE 250.122. BUSBAR RATING PER NEC 705.12. 2.1.3 THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY 2.5.3 METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND 2.7.3 THE SUM OF 125 PERCENT OF THE POWER SOURCE(S) 1706 LOMBARD AVE, PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. ENCLOSURES CONSIDERED GROUNDED IN ACCORDANCE WITH OUTPUT CIRCUIT CURRENT AND THE RATING OF THE EVERETT, WA 98201 2.1.4 PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING NEC 250.134 AND 250.136(A). OVERCURRENT DEVICE PROTECTING THE BUSBAR SHALL PHONE- (425)610-7067 AND PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED IN 2.5.4 EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED IN NOT EXCEED 120 PERCENT OF THE AMPACITY OF THE ACCORDANCE WITH SECTION NEC 110.26. ACCORDANCE WITH NEC 690.45 AND INVERTER BUSBAR, PV DEDICATED BACKFEED BREAKERS MUST BE 2.1.5 ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MANUFACTURER'S INSTALLATION PRACTICES LOCATED OPPOSITE END OF THE BUS FROM THE UTILITY MAINTAINED IN ACCORDANCE WITH THIS CODE AND THE APPROVED 2.5.5 EACH MODULE WILL BE GROUNDED AS SHOWN IN SOURCE OCPD IN ACCORDANCE WITH NEC 705.12. MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF COVERING MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. 2.7.4 AT MULTIPLE ELECTRIC POWER SOURCES OUTPUT SERVES TO PROTECT THE BUILDING OR STRUCTURE. 2.5.6 THE GROUNDING CONNECTION TO A MODULE SHALL BE COMBINER PANEL, TOTAL RATING OF ALL OVERCURRENT ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT PROTECTION DEVICES SHALL NOT EXCEED AMPACITY OF EQUIPMENT LOCATIONS INTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE. BUSBAR. HOWEVER, THE MAIN OVERCURRENT PROTECTION 2.2.1 ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS IN 2.5.7 GROUNDING AND BONDING CONDUCTORS, IF INSULATED, DEVICE MAY BE EXCLUDED IN ACCORDANCE WITH NEC ACCORDANCE WITH NEC 110.26. SHALL BE COLORED GREEN OR MARKED GREEN IF#4 AWG OR 705.12. 2.2.2 WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE LARGER PER NEC 250.119 2.7.5 FEEDER TAP INTERCONNECTION (LOAD SIDE) IN RATED FOR EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY 2.5.8 THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH NEC ACCORDANCE WITH NEC 705.12. NEC 690.31 (A),(C)AND NEC TABLES 310.15 (13)(2)(A)AND 310.15 (13)(3)(C). 690.47 AND NEC 250.50 THROUGH 250.106. IF EXISTING SYSTEM IS 2.7.6 SUPPLY SIDE TAP INTERCONNECTION IN ACCORDANCE 2.2.3 JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV INACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODE WITH TO NEC 705.12 WITH SERVICE ENTRANCE MODULES IN ACCORDANCE WITH NEC 690.34. SYSTEM PROVIDED IN ACCORDANCE WITH NEC 250, NEC 690.47 CONDUCTORS IN ACCORDANCE WITH NEC 230.42. PROJECT NAME &ADDRESS 2.2.4 ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE AND THE AHJ. 2.7.7 BACKFEEDING BREAKER FOR ELECTRIC POWER INVERTER IS NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT. 2.5.9 GROUND-FAULT DETECTION SHALL COMPLY WITH NEC SOURCES OUTPUT IS EXEMPT FROM ADDITIONAL JOE RECCHI 2.2.5 ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED 690.41(13)(1)AND (2)TO REDUCE FIRE HAZARDS FASTENING PER NEC 705.12. 19417 45TH DR NE, PERSONNEL IN ACCORDANCE WITH NEC APPLICABLE CODES. ARLINGTON, WA 98223 2.2.6 ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED DISCONNECTION AND OVERCURRENT PROTECTION NOTES APN#: 009-282-000-073-00 FOR OUTDOOR USAGE WHEN APPROPRIATE. 2.6.1 DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT GUSTI WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING t,3 was NF AHJ: CITY OF ARLINGTON (WA) STRUCTURAL NOTES ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED "LINE 1z; �oF tic UTILITY: PUGET SOUND ENERGY 2.3.1 RACKING SYSTEM & PV ARRAY WILL BE INSTALLED IN SIDE" (TYPICALLY THE UPPER TERMINALS). �o �G ACCORDANCE WITH THE CODE-COMPLIANT INSTALLATION MANUAL. 2.6.2 DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY v y �_, ZPd SYSTEM DETAILS TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES, AND PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH DC SIZE: 11.480 KW DC-(STC) RAILS MUST ALSO EXTEND A MINIMUM DISTANCE BEYOND EITHER 2.6.3 PV SYSTEM CIRCUITS INSTALLED ON OR IN HABITABLE 1 r AC SIZE:9.772 KW AC EDGE OF THE ARRAY/SUBARRAY, IN ACCORDANCE WITH RAIL BUILDINGS SHALL INCLUDE A RAPID SHUTDOWN FUNCTION TO 48721 (28)REC SOLAR REC410AA PURE(410W) MANUFACTURER'S INSTALLATION PRACTICES. REDUCE SHOCK HAZARD FOR EMERGENCY RESPONDERS IN (28)ENPHASE IQ8A-72-2-US(240V) 2.3.2 JUNCTION BOX WILL BE INSTALLED PER MANUFACTURER'S ACCORDANCE WITH 690.12 s10rAa. SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED & 2.6.4 ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO sealed 07sep2023 mike@h2dc.com REVISIONS SEALED PER LOCAL REQUIREMENTS. NEC 690.8, 690.9, AND 240. H2DC PLLC WA UBI#: 604 476 076 REV DESCRIPTION DATE 2.3.3 ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED 2.6.5 INVERTER ON-GRID BRANCHES SHALL BE CONNECTED TO A ELECTRICAL ONLY AND SEALED W/APPROVED CHEMICAL SEALANT PER CODE BY A SINGLE BREAKER OR GROUPED FUSE DISCONNECT(S) IN LICENSED CONTRACTOR. ACCORDANCE WITH NEC 110.3(B). 2.3.4 ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO 2.6.6 IF REQUIRED BY THE AHJ, SYSTEM WILL INCLUDE GREATER THAN THE SPAN DISTANCE SPECIFIED BY THE RACKING ARC-FAULT CIRCUIT PROTECTION IN ACCORDANCE WITH NEC MANUFACTURER OR PROFESSIONAL ENGINEERING GUIDANCE. 690.11 AND UL1699B. 2.3.5 WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE STAGGERED AMONGST THE ROOF FRAMING MEMBERS. SHEET TITLE WIRING & CONDUIT NOTES NOTES 2.4.1 ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON DRAWN DATE 9/1/2023 MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. DRAWN BY CS 2.4.2 CONDUCTORS SIZED IN ACCORDANCE WITH THE NEC SHEET NUMBER 2.4.3 AC CONDUCTORS TO BE COLORED OR MARKED PER NEC 2.4.4 LISTED OR LABELED EQUIPMENT SHALL BE INSTALLED AND USED IN ACCORDANCE WITH ANY INSTRUCTIONS INCLUDED IN THE LISTING PV-05 OR LABELING PER NEC AWARNING &WARNING CONTRACTOR ELECTRICAL SHOCK HAZARD POWER SOURCE OUTPUT CONNECTION. DO NOT RELOCATE BLOSSOM SOLAR TERMINALS ON THE LINE AND THIS OVERCURRENT DEVICE. LABEL LOCATION:MAIN SERVICE DISCONNECT,POINT GU S TI LOAD SIDES MAY BE ENERGIZED OF INTERCONNECTION q.� N� IN THE OPEN POSITION PER CODE:705.12(B)(2)(3)(b) pF kitic�o BLOSSOM SOLAR LABEL LOCATION:COMBINER PANEL,AC DISCONNECT, U y ; . �' 1706 LOMBARD AVE, POINT OF INTERCONNECTION EVERETT, WA 98201 PER CODE:NEC 690.13(B) PHOTOVOLTAIC SYSTEM •• • PHONE- (425)610-7067 48721 AWARNING LABEL LOCATION: MAIN SERVICE DISCONNECT,UTILITY METER 7�1t PER CODE:NEC 690.13(B) sl0NXL TURN OFF PHOTOVOLTAIC AC RAPID' • • ' sealed 07sep2023 mike@h2dc.com DISCONNECT PRIOR TO SOLAR H2DC PLLC WA UBI#: 604 476 076 WORKING INSIDE PANEL ELECTRICAL ONLY LABEL LOCATION: RSD INITIATION DEVICE,AC DISCONNECT PER CODE:NEC 690.56(C)(3) LABEL LOCATION:COMBINER PANEL(S),MAIN SERVICE DISCONNECT PER CODE:NEC 110.27(C),OSHA 1910.145(f)(7) SOLAR PV SYSTEM EQUIPPED PHOTOVOLTAICWITH RAPID SHUTDOWN POWER LABEL LOCATION:DC CONDUIT/RACEWAY/CABLE TRAY PER CODE:NEC 690.31(G)(3-4) TURN RAPID SHUTDOWN SWITCH TO THE PROJECT NAME &ADDRESS so nRe ecrRic "OFF"POSITION TO P P""E`S SHUT DOWN PV SYSTEM JOE RECCHI PHOTOVOLTAIC SYSTEAC DISCONNECTAND REDUCE SHOCK HAZARD 19417 45TH DR NE, RATED AC • IN THE ARRAY ARLINGTON, WA 98223 NOMINALOPERATING AC VOLTAGE: • APN#: 009-282-000-073-00 LABEL LOCATION:POINT OF INTERCONNECTION LABEL LOCATION:MAIN SERVICE DISCONNECT CAUTION PER CODE:NEC 690.54 PER CODE:NEC 690.56(C)(1)(a) AHJ: CITY OF ARLINGTON (WA) A CAUTION MULTIPLE SOURCES OF POWER. UTILITY: PUGET SOUND ENERGY PHOTOVOLTAIC SYSTEM CIRCUIT ISBACKFED POWER TO THIS BUILDING IS ALSO SUPPLIED SYSTEM DETAILS LABEL CODE: NEC90.1 (F),NECEDISCONNECT DC FROM THE FOLLOWING SOURCES WITH ACSIZE:9.1.480 KW 772KWACC-(STC) PER CODE:NC 690.13(F),NEC 705.12(B)(3-4),NEC 690.59 DISCONNECT DISCONNECTS LOCATED AS SHOWN. (28)RECSOLARR APURE(410W) (28)ENPHASE 108A-72-2-72-2-US(240V) LABEL LOCATION:AC DISCONNECT AWARNING ADDRESS: 19417 45TH DR NE, ARLINGTON, WA 98223 PER CODE:NEC 690.13(B) REVISIONS ELECTRIC SHOCK HAZARD • • DISCONNECT DO NOT TOUCH TERMINALS REV DESCRIPTION DATE TERMINALS ON BOTH LINE&LOAD SIDES MAYBE ENERGIZED IN OPEN POSITION UNDE' • DO NOT DISCONNECT FUSES UNDER LOAD THE DC CONDUCTORS OF THIS LABEL LOCATION:MAIN SERVICE DISCONNECT PHOTOVOLTAIC SYSTEM ARE PER CODE:NEC 690.15(C)&NEC 690.33(E)(2) UNGROUNDED AND MAYBE ENERGIZED PHOTOVOLTAIC SYSTEM DC DISCONNECT AWARNING DUAL POWER SOURCE AUTHORIZED PERSONNEL ONLY SECOND SOURCE IS PHOTOVOLTAIC SYSTEM Note:WARNING labels must resemble format in example above with over-sized WARNING, SHEET TITLE LABEL LOCATION:MAIN SERVICE DISCONNECT exclamation point in triangle,colors,etc. q PER CODE:NEC 705.12(B)(3-4),NEC 690.59 WARNING LABELS &WARNING THIS EQUIPMENT FED BY MULTIPLE SOURCES. DRAWN DATE 9/1/2023 TOTAL RATING OF ALL OVERCURRENT DEVICES EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE DRAWN BY CS SHALL NOT EXCEED AMPACITY OF BUSBAR. LABEL LOCATION:POINT OF INTERCONNECTION,COMBINER PANEL MAIN SERVICE PANEL SHEET NUMBER PER CODE:NEC 705.12(B)(2)(3)(c) AC COMBINER PANEL AC DISCONNECT UTILITY METER PV-06 A B C D E F REFERENCE ONL'Y CONTRACTOR BLOSSOM SOLAR 1 FRONT OF HOUSE ➢z BLOSSOM SOLAR 1706 LOMBARD AVE, EVERETT, WA 98201 2 PHONE- (425)610-7067 3 4 ROOF 1 O PROJECT NAME &ADDRESS JOE RECCHI 5 19417 45TH DR NE, O ARLINGTON, WA 98223 N APN#: 009-282-000-073-00 N 0 AHJ: CITY OF ARLINGTON (WA) 6 UTILITY: PUGET SOUND ENERGY SYSTEM DETAILS DC SIZE:11.480 KW DC-(STC) AC SIZE:9.772 KW AC (28)REC SOLAR REC410AA PURE(410W) O (28)ENPHASE IQ8A-72-2-US(240V) 7 REVISIONS REV DESCRIPTION DATE 8 ROOF 2 SHEET TITLE INSTALLATION 9 RESOURCE DRAWN DATE 9/1/2023 DRAWN BY CS 10 SHEET NUMBER PV-07 "DIMENSIONS ARE 2D (FLAT) GENERAL DATA 1821±2.5[71.7±0.11 132haif-cut REC heterojunction bifacial cells with 28[1.11 901[35.51 460[18.11 _ Cell type: lead-free,gapless technology,6 strings of22 cells in series 153.7[6.05] Glass: 0.13 in(3.2 mm)solarglass with anti-reflective surface treatment El1100[43.31+ in accordance with EN 12150 Backsheet: Highly resistant polymer(black) 6.0±0.2 Frame: Anodized aluminum(black) [0.24±0.011 Junction box: 3-part,3 bypass diodes,lead-free v c IP68 rated,in accordance with IEC 62790 si • Connectors: Staubll MC4 PV-KBT4/KST4(4 mm2) 1110.2 in accordance with IEC 62852,I P68 only when connected a[0.43±0.011 * Cable: 12 AW G(4 mm2)PV wire,43+47 in(1.1+1.2 m) inaccordancewithEN50618 20.s±o.s �� 1200[47.21 - [0.8±0.02] Dimensions: 71.7x40xl.2in(19.91 ft2)/1821 x 1016 x 30 mm(1.85 m2) 0 153.7[6.051 Weight: 45 lbs(20.5 kg) i Origin: Made in Singapore f 451181 22.5[0.91 671±3[26.4±0.12] 30[1.21 Measurements in mm Iinl fftt ELECTRICAL DATA Product Code':RECxxxAA Pure CERTIFICATIONS Power Output-PMA,(Wp) 390 395 400 405 410 IEC 61215:2016,IEC 61730:2016,UL 61730 Watt Class Sorting-(W) 0/+5 0/+5 0/+5 0/+5 0/+5 IEC62804 PID IEC61701 Salt Mist Nominal Power Voltage-VMPe(V) 40.6 41.0 41.4 41.8 42.2 IEC62716 Ammonia Resistance v Nominal Power Current-I.,(A) 9.61 9.64 9.67 9.69 9.72 UL61730 Fire Type Class 2 Open Circuit Voltage-Voc(V) 48.4 48.6 48.8 49.1 49.4 IEC62782 Dynamic Mechanical Load IEC 61215-2:2016 Hailstone(35mm) Short Circuit Current-Isc(A) 10.38 10.39 10.40 10.41 10.42 IEC62321 Lead-freeacc.to RoHS EU 863/2015 Power Density(W/ft2) 19.6 19.8 20.1 20.3 20.6 ISO14001,ISO 9001,IEC 45001,IEC 62941 Panel Efficiency(%) 21.1 21.4 21.6 21.9 22.2 use O C E ❑ Eib�, rhif Power Output-PMAx(Wp) 297 301 305 308 312 ht"M, Le.dFe Nominal Power Voltage-Vmpp(V) 38.3 38.6 39.0 39.4 39.8 ® TEMPERATURE RATINGS* - NominalPowerCurrent-IMPP(A) 7.77 7.79 7.82 7.83 7.85 NominaI Module Operating Temperature: 44*C(±2*C) REC ALPH (X Z Open Circuit Voltage-Voc(V) 45.6 45.8 46.0 46.3 46.6 Temperature coefficient of PMA%: 0 24%/°K t Short Circuit Current-Isc(A) 8.38 8.39 8.40 8.41 8.42 Temperature coefficient of Vac: -0.24%/°K o0 Values at standard test condition(STCairmass AM 1.5,irradiance 10.75W/sq ft0000W/m2),temperature 77F(25°C),based on a productionspread Temperature coefficient of lsc: 0.04%/'K PURE SERIES temperatuance ofre 2(rC),a&IX±3%with[nonewattdaerexxxinalmodule operating thenominalpowerclaure(NMat TCabove.mass irradiance 800W/ z temperature 68"F(20°C),windspeed 33 ft/s(I m/s).*Where xxx indicates the nominal power class(P,,rx)at STC above. 'The temperature coefficients stated are Linea r va lues MAXIMUM RATINGS ' DELIVERY INFORMATIONOpera - PRODUCT SPECIFICATIONS Maximum al voltage: 40...1000V Standard REC ProTrust Panels per pallet: 33 u -� -� Maximum system voltage: 1000V Certified Instatledbyan dSolar EC No Yes Yes Panels per 40ftGP/high cube container: 792(24 pallets) � Certified Solar Professional Maximum test load(front): +7000Pa(1461bs/ft2)' System Size All Q5kW 25-500kW Panels per 53 ft truck: 891(27pallets) N Maximum test load(rear): -4000 Pa(83.5 Ibs/ft2)` Product Warranty(yrs) 20 25 25 Max series fuse rating: 25A Power Warranty(yrs) 25 25 25 LOW LIGHT BEHAVIOUR N Max reverse current: 25 A Labor Warranty(Y rs) 0 25 10 Typical low irradiance performance ofmodule at STC: 'See installation manual for mounting instructions. Power in Year l 98% 98% 98% 82 v Design load-Test load/1.5(safetyfactor) o Annual Degradation 0.25% 0.25/ 0.25% ---------=-------------------1---------i P N Power in Year 25 92% 92% 92% ----------------------------------------- TheRECProTrustWarrantyisonlyavailableonpanelspurchased "' m o --- ------- EXPERIENCE through an REC Certified Solar Professional installer.Warranty a a conditions apply.See www.recgroup.com for more details. - - ID - m a - m m lmadiance(W/m') � 410 - R Available from: 25 YEAR 04 • ..o • LEADFREE Founded in1996,REC Group isan international pion eering solar energy company dedicated to empowering consumers REC Solar PTE.LTD. ®-OHSOHS LOMPLIANT - - ■- REC �^ with clean,affordable solar power.As Solar's Most Trusted,REC is committed to high quality,innovation,and a low I 20 Tuas South Ave.14 carbon footprint in the solar materials and solar panels it manufactures.Headquartered in Norway with operational Singapore 637312 %X headquarters in Singapore,REC also has regional hubs in North America,Europe,and Asia-Pacific. post@recgroup.com www.recgroup.com t2iENPHASE IQ8M and IQ8A Microinverters INPUT DATA MCI 108M-72-2-USA: Commonly used module pairings' w 260-460 295-500 Module compatibility 54-cell/108 half-cell,60-cell/120 half-cell,66-cell/132 half-cell and 72-cell/144 half-cell MPPT voltage range V 30-45 32-45 _ Operating range V 16-58 G ✓ Min./Max.start voltage V 22/58 Max.input DC voltage v 60 1 Max.continuous input DC current A 12 v Max.input DC short-circuit current A 25 sE 0 Max.module Is A 20 .:. _ 0 Overvoltage class DC port II DC port backfeed current mA 0 VI" Milk PV array configuration 1 x 1 Ungrounded array;No additional DC side protection required;AC side protection requires max 20A per branch circuit OUTPUT 1' A: A: Peak output power VA 330 366 Max.continuous output power VA 325 349 Nominal(L-L)voltage/range2 V 240/211-264 Max.continuous output current A 1.35 1.45 Q 8 M and 1 Q 8A Microinverters Nominal frequency Hz 60 Our newest IQ8 Microinverters are the industry's first microg rid-forming,software defined Easy to install Extended frequency range Hz 47-68 microinverters with split-phase power conversion capability to convert DC power to AC Lightweight and compact with plug-n- AC short circuit fault current over 2 power efficiently.The brain of the semiconductor-based microinverter is our proprietary 3 cycles Arms play connectors application specific integrated circuit(ASIC)which enables the microinverter to operate in grid-tied or off-grid modes.This chip is built in advanced 55nm technology with high speed Power Line Communication(PLC) Max.units per 20 A(L-L)branch circuit' 11 digital logic and has superfast response times to changing loads and grid events,alleviating between components Total harmonic distortion <5% constraints on battery sizing for home energy systems. Faster installation with simple two-wire Overvoltage class AC port III cabling AC port backfeed current mA 30 Enphase High productivity and reliability Power factor setting 1.0 Produce power even when the grid is Grid-tied power factor(adjustable) 0.851eading-0.85 lagging down* Peak efficiency % 97.8 97.7 yea,mied More than one million cumulative hours CEC weighted efficiency % 97.5 97 of testing Part of the Enphase Energy System,IQ8 IQ8 Series Microinverters redefine Night-time power consumption mw 60 Series Microinverters integrate with the reliability standards with more than one Class II double-insulated enclosure IQ Battery,IQ Gateway,and the Enphase million cumulative hours of power-on Optimized for the latest high-powered MECHANICAL 1 ATA App monitoring and analysis software. testing,enabling an industry-leading PV modules Ambient temperature range -40°C to+60°C(-40°F to+14o°F) limited warranty of up to 25 years. Relative humidity range 4%to 100%(condensing) Microgrid-forming DC Connector type MC4 Complies with the latest advanced grid support** Dimensions(H x W x D) 212 mm(8.3")x 175 mm(6.9")x 30.2 mm(1.2") CERTIFIED Remote automatic updates for the Weight 1.08 kg(2.38 Ibs) L SAFETY -A latest grid requirements Cooling Natural convection-no fans Connect PV modules quickly and easily IQ8 Series Microinverters are UL listed Configurable to support a wide range Approved for wet locations Yes to IQ8 Series Microinverters usingthe as PV Rapid Shutdown Equipment and of grid profiles PPollution degree PD3 included Q-DCC-2 adapter cable with conform with various regulations,when Meets CA Rule 21(UL 1741-SA)and IEEE plug-n-play MC4 connectors. installed according to manufacturer's 1547:2018(UL 1741-SB 3'd Ed.) Enclosure Class II double-insulated,corrosion resistant polymeric enclosure instructions. Environ.category/UV exposure rating NEMA Type 6/outdoor Note: 1 I08 Microinverters cannot be mixed together with previous generations of Enphase microinverters(I07 CA Rule 21(UL 1741-SA),UL 62109-1,IEEE 1547:2018(UL 1741-SB 3''Ed.),FCC Part 15 Class B,ICES-0003 Class B,CAN/CSA-C22.2 NO.107.1-01 Series,IQ6 series,etc)in the same system. Certifications This product is UL Listed as PV Rapid Shutdown Equipment and conforms with NEC 2014,NEC 2017,and NEC 2020 section 690.12 and C22.1- *Only when installed with IQ System Controller 2,meets UL 1741. 2018 Rule 64-218 Rapid Shutdown of PV Systems,for AC and DC conductors,when installed according to manufacturer's instructions. **IQ8M and I08A support split-phase,240V installations only. (1)Pairing PV modules with wattage above the limit may result in additional clipping losses.See the compatibility calculator at ©2022 Enphase Energy.All rights reserved.Enphase,the Enphase logo,I08 Microinverters, https://Iink.enphase.com/module-compatibility.(2)Nominal voltage range can be extended beyond nominal if required by the utility. and other names are trademarks of Enphase Energy,Inc.Data subject to change. I08MA-12A-DS-0069-03-EN-US-2022-12-27 (3)Limits may vary.Refer to local requirements to define the number of microinverters per branch in your area. IQ8MA-12A-DS-0069-03-EN-US-2022-12-27 Enphase IQ Combiner 4/4C Data Sheet MODEL NUMBER Enphase Networking IQ Combiner 4 (X-IQ-AM1-240-4) IQ Combiner 4 with Enphase IQ Gateway printed circuit board for integrated revenue grade PV production metering(ANSI C12.20+/-0.5 i)and consumption monitoring(+/-2.5 i).Includes a silver solar shield to match the IQ Battery system and IQ System Controller 2 and to deflect heat. IQ Combiner 4C(X-IQ-AM1-240-4C) IQ Combiner 4C with Enphase IQ Gateway printed circuit board for integrated revenue grade PV production metering (ANSI C12.20+/-0.5%)and consumption monitoring(+/-2.50/).Includes Enphase Mobile Connect cellular modem (CELLMODEM-M1-06-SP-05),a plug-and-play industrial-grade cell modem for systems up to 60 microinverters. (Available in the US,Canada,Mexico,Puerto Rico,and the US Virgin Islands,where there is adequate cellular service in Enphase The Enphase IQ Combiner 4/4C with Enphase the installation area.)Includes a silver solar shield to match the IQ Battery and IQ System Controller and to deflect heat. IQ Gateway and integrated LTE-M1 cell ACCESSORIES AND REPLACEMENT PARTS (not included,order separately) Q Combiner 4/4 C Ensemble Communications Kit Includes COMMS-KIT-01 and CELLMODEM-M1-06-SP-05 with 5-year Sprint data plan for modem (included only with IQ Combiner 4C) COMMS-CELLMODEM-Ml-06 Ensemble sites CELLMODEM-M1-06-SP-05 4G based LTE-M1 cellular modem with 5-year Sprint data plan X-IQ-AM1-240-4 consolidates interconnection equipment CELLMODEM-Ml-06-AT-05 4G based LTE-Ml cellular modem with 5-year AT&T data plan Circuit Breakers Supports Eaton BR210,BR215,BR220,BR230,BR240,BR250,and BR260 circuit breakers. X-IQ-AM1-240-4C into a single enclosure and streamlines IQ BRK-10A-2-240V Circuit breaker,2 pole,10A,Eaton BR210 BRK-15A-2-240V Circuit breaker,2 pole,15A,Eaton BR215 microinverters and storage installations by BRK-20A-2P-240V Circuit breaker,2 pole,20A,Eaton BR220 BRK-15A-2P-240V-B Circuit breaker,2 pole,15A,Eaton BR215B with hold down kit support providing a consistent, pre-wired solution for BRK-20A-2P-240V-B Circuit breaker,2 pole,20A,Eaton BR220B with hold down kit support residential applications. It offers up to four EPLC-01 Power line carrier(communication bridge pair),quantity-one pair XA-SOLARSHIELD-ES Replacement solar shield for IQ Combiner 4/4C 2-pole input circuits and Eaton BR series XA-PLUG-120-3 Accessory receptacle for Power Line Carrier in IQ Combiner 4/4C(required for EPLC-01) �ENPHASE bulbar assembly. XA-ENV-PCBA-3 Replacement n - y p y printed circuit board(PCB)for Combiner 4/4C X-IQ-NA-HD-125A Hold down kit for Eaton circuit breaker with screws. ELECTRICAL SPECIFICATIONS Smart Rating Continuous duty Includes IQ Gateway for communication and control System voltage 120/240 VAC,60 Hz Includes Enphase Mobile Connect cellular modem Eaton BR series busbar rating 125 A r (CELLMODEM-M1-06-SP-05),included only with IQ Max.continuous current rating 65A Combiner 4C Max.continuous current rating(input from PV/storage) 64A • Includes solar shield to match Enphase IQ Battery Max.fuse/circuit rating(output) 90 A aesthetics and deflect heat Branch circuits(solar and/or storage) Up to four 2-pole Eaton BR series Distributed Generation(DG)breakers only(not included) Flexible networking supports Wi-Fi, Max.total branch circuit breaker rating(input) 80A of distributed generation/95A with IQ Gateway breaker included Ethernet,or cellular Envoy breaker 10A or 15A rating GE/Siemens/Eaton included I Optional AC receptacle available for PLC bridge L Production metering CT 200 A solid core pre-installed and wired to IQ Gateway Provides production metering and consumption monitoring Consumption monitoring CT(CT-200-SPLIT) A pair of 200 A split core current transformers MECHANICAL DATA Simple Dimensions(WxHxD) 37.5 x 49.5 x 16.8 cm(14.75"x 19.5"x 6.63").Height is 21.06"(53.5 cm)with mounting brackets. r Weight 7.5 kg(16.5 Ibs) • Centered mounting brackets support single Ambient temperature range -40°C to+461 C(-400 to 1150 F) ` stud mounting I Cooling Natural convection,plus heat shield i - Supports bottom,back and side conduit entry Up to four 2-pole branch circuits for 240 VAC Enclosure environmental rating Outdoor,NRTL-certified,NEMA type 3R,polycarbonate construction • plug-in breakers(not included) Wire sizes 20 A to 50 A breaker inputs:14 to 4 AWG copper conductors 60 A breaker branch input:4 to 1/0 AWG copper conductors X IQ AM1 240 4C 80A total PV Or Storage branch CIfCUIts Main lug combined output:10 to 2/0 AWG copper conductors 9 Neutral and ground:14 to 1/0 copper conductors Always follow local code requirements for conductor sizing. Reliable Altitude To 2000 meters(6,560 feet) S.. Durable NRTL-certified NEMA type 3R enclosure INTERNET CONNECTION OPTIONS Five-year limited warranty Integrated Wi-Fi 802.11b/g/n Two years labor reimbursement program coverage Cellular CELLMODEM-M1-06-SP-05,CELLMODEM-M1-06-AT-05(4G based LTE-M1 cellular modem). Notethat an Enphase I included for both the IQ Combiner SKU's Mobile Connect cellular modem is required for all Ensemble installations. I UL listed Ethernet Optional,802.3,Cat5E(or Cat 6)UTP Ethernet cable (not included) " COMPLIANCE Compliance,IQ Combiner UL 1741,CAN/CSA C22.2 No.107.1, 47 CFR,Part 15,Class B,ICES 003 I Production metering:ANSI C12.20 accuracy class 0.5(PV production) I U` Consumption metering:accuracy class 2.5 X-IQ-AM1-240-4 Compliance,IQ Gateway UL 60601-1/CANCSA 22.2 No.61010-1 LISTED To learn more about Enphase offerings,visit enphase.com v E N P H AS E, To learn more about Enphase offerings,visit enphase.com E N P H AS E® ©2022 Enphase Energy.All rights reserved.Enphase,the Enphase logo,IQ Combiner 4/4C,and other names are trademarks of Enphase Energy,Inc.Data subject to change.02-14-2022 Data Sheet Enphase Q Cable Accessories Enphase Q Cable Accessories REGION:Americas CONDUCTOR SPECIFICATIONS Certification UL3003(raw cable),UL 9703(cable assemblies),DG cable Flame test rating FT4 Compliance RoHS,OIL RES I,CE,UV Resistant,combined UL for Canada and United States Conductor type THHN/THWN-2 dry/wet Enphase The Enphase Q Cable'M and accessories are part of Disconnecting means The AC and DC bulkhead connectors have been evaluated and approved by UL for use as the load-break the latest generation Enphase IQ System'".These disconnect required by NEC 690. QCable Accessories accessories provide simplicity, reliability, and faster Q CABLE TYPES/ORDERING OPTIONS installation times. Connectorized Models Size/Max Nominal Voltage Connector Spacing PV Module Orientation Connector Count per Box Q-12-10-240 12 AWG/277 VAC 1.3 m(4.2 ft) Portrait 240 Q-12-17-240 12 AWG/277 VAC 2.0 m(6.5 ft) Landscape(60-cell) 240 Q-12-20-200 12 AWG/277 VAC 2.3 m(7.5 ft) Landscape(72-cell) 200 ENPHASE Q CABLE ACCESSORIES Name Model Number Description Raw Q Cable Q-12-RAW-300 300 meters of 12 AWG cable with no connectors ' Enphase Q Cable Field-wireable connector(male) Q-CONN-10M Make connections from any open connector • Two-wire,double-insulated Enphase Q Cable Field-wireable connector(female) Q-CONN-10F Make connections from any Q Cable open connector is 50%lighter than the previous generation Cable Clip Q-CLIP-100 Used to fasten cabling to the racking or to secure looped cabling Enphase cable • New cable numbering and plug and play Disconnect tool Q-DISC-10 Disconnect tool for Q Cable connectors,DC connectors,and AC module mount connectors speed up installation and simplify Q Cable sealing caps(female) Q-SEAL-10 One needed to cover each unused connector on the cabling wire management • Link connectors eliminate cable waste Terminator Q-TERM-10 Terminator cap for unused cable ends Enphase EN4 to MC4 adaptor' ECA-EN4-S22 Connect PV module using MC4 connectors to IQ micros with EN4(TE PV4-S SOLARLOK). 150mm/5.9"to MC4. Enphase EN4 non-terminated adaptor' ECA-EN4-FW For field wiring of UL certified DC connectors.EN4(TE PV4-S SOLARLOK)to non-terminated cable.150mm/5.9" Field-Wireable Connectors Enphase EN4 to MC4 adaptor(long)' ECA-EN4-S22-L Longer adapter cable for EN4(TE PV4-S SOLARLOK)to MC4.Use with split cell modules or PV modules with short DC cable.600mm/23.6" • Easily connect Q cables on the roof without Replacement DC Adaptor(MC4) Q-DCC-2 DC adaptor to MC4(max voltage 100 VDC) complex wiring UTX Adaptor DC Replacement p p ( ) Q-DCC-S DC adaptor to UTX(max voltage 100 VDC) • Make connections from any open connector and center feed any section of cable within 1.Qualified per UL subject 9703. branch limits • Available in male and female connector types TERMINATOR SEALING CAPS Terminator cap for unused cable Sealing caps for unused aggregator ends,sold in packs of ten and cable connections (Q-TERM-10) (Q-BA-CAP-10 and Q-SEAL-10) DISCONNECT TOOL CABLE CLIP Plan to use at least one per Used to fasten cabling to the racking installation,sold in packs of ten or to secure looped cabling,sold in (Q-DISC-10) packs of one hundred(Q-CLIP-100) To learn more about Enphase offerings,visit enphase.com ©2020 Enphase Energy.All rights reserved.Enphase,the Enphase logo,Enphase IQ 7A,Enphase IQ Battery,Enphase Enlighten,Enphase IQ E A 1 P H A S E. Envoy,and other trademarks or service names are the trademarks of Enphase Energy,Inc.Data subject to change. E N P H A S E To learn more about Enphase offerings,visit enphase.com `� G��I fl/`'1J G 2020-06-26 u / I RON RI DGE Aire'" Racking System Rails AireTm Al Rail AireTm A2 Rail AireTm Rail Ties AireTm Dock moss" The lighter, open Aire TM The tougher, open Aire TM Structurally connect and Connects AireTm Rails to rail for standard conditions. rail for higher load capacity. bond AireTm Rails together. attachments with ease. • 6'spanning capability 8'spanning capability Reinstallable, up to 5x Clicks on, slides easily • Wire management tray Wire management tray Internal splice design Drops into open slots • Mill or anodized black Mill or anodized black No more splice rules Anodized assembly i �! Clamps & Grounding — AireTm Lock Mids AireTm Lock Ends AireTm Lock Stealth AireTm Lug ANIIA-" .�. Securely bond between Securely bond modules to Securely bonds modules to Bonds AireTm Rails to modules to AireTm Rails. AireTm Rails along ends. rail ends, entirely hidden. grounding conductors. • Fits 30-40mm modules Fits 30-40mm modules Angled for easy install Simplified with single bolt ' Utilizes UFO°design Easy rail engagement Robust tether leash Low-profile form factor • Minimal 1/2"gap Clean aesthetics Fits most modules Works with 10-6 AWG Breathe easy with accelerated installations Accessories The AireTm racking system has been carefully crafted to streamline every part of the installation process, taking out all of the tiresome hassles—so that you get off the roof and on to your next project faster than ever. Aire TM Caps Aire TM Clip Aire TM MLPE Mount AireTm All Tile Hook AireTm retains the strength and reliability that IronRidge installers have come to depend on. Whether you're a seasoned installer with years under your belt or just getting started in solar, breathe easy with open Aire TM. '� e "PRO Strength Tested PE Certified All components have been evaluated ® Pre-stamped engineering letters are Block entry and provide a Keeps wiring contained in Securely bonds MLPE and Attaches rails to tile roofs, for superior structural performance. available online for most states. finished look to Aire TM Rails. open AireTm Rail channels. accessories to AireTm Rails. with AireTm Dock included. • Stay secure on rail ends No module interference Glove-friendly installation Works on flat, S, &W tiles • Symmetrical, with drain Simple press-in design Lays flush in rail channel Single-socket installation Class A Fire Rating Design Assistant Cover rough-cut ends Slot for easy removal Low profile form factor Optional deck flashing Certified to maintain the fire resistance ® Free online software makes it simple rating of the existing roof structure. to create, share, and price projects. Resources — Design Assistant �.S\ C,oI�vIS;"'%, Approved for FL Hurricane Zones _. �� F0 .......___...Oti /1 UL 2703 Listed System 25-Year Warranty Quickly go from rough layout *:�°°°TAPPgo�,* AireTm has Florida Product Approval. ,Q? FLX2 W r�... -ai - Additional details can be found on the to fully engineered system. _-,:. * Z_ ® Entire system and components meet , Products are guaranteed to arrive "_` Florida BuildingCode website. F i L.'t STATE OF %�� Go to IronRidge.com/design -.,F� ��oR,oPfa� the latest effective UL 2703 standards. without any impairing defects. Learn More at bit.ly/florida-afire rnnnm o ,��_ IRONRIDGE AIRE RAIL Al 1 ITEM NO DESCRIPTION QTY IN KIT 1 Aire Rail, Al, Black(or Clear), 170 1 Part Number Description AE-Al-170B AIRE RAIL, Al, BLACK, 170 AE-Al-170M AIRE RAIL, Al, MILL, 170 1) Aire Al 1.40 1.17 170 1.38 1.70 1.04 0.22 Part Number Material Value AE-Al-170B 6000-Series Aluminum Black AE-Al-170M 6000-Series Aluminum Clear v1.0 /lam IRON RIDGE AIRE LOCK MID /l IRONRIDGE AIRE LUG (CLEAR AND BLACK) 1 1 4 2 3 ITEM NO. DESCRIPTION QTY IN KIT ® 1 CAP SCREW, 5/16 X 3/4, HEX HEAD 1 2 TOP PLATE GROUNDING LUG 1 3 RETAINING CLIP, GROUNDING LUG 1 ITEM NO. DESCRIPTION 4 T-NUT, SHEET METAL 1 AE-MID-01-Al AIRE LOCK MID, CLEAR AE-MID-01-B1 AIRE LOCK MID, BLACK PART NUMBER DESCRIPTION WIRE SIZE RANGE (AWG) AE-LUG-01-M1 AIRE LUG 6-10 1) CAP SCREW, 5/16 X 3/4 3) RETAINING CLIP 01.00 1.12 1)AIRE LOCK MID 0.75 0.28 1.10 [ + ] 0.50 0.30 1/2" HEAD 5/16-18 THD 0 1 1/2" Head Property Value Property Value J 0 w Material 300 Series Stainless Steel Material Polypropylene CO E 0.44 0 1g Finish Clear Finish Black ao � 11 2)TOP PLATE 4)T-NUT, SHEET METAL M 1.16 1.50 1.18 0.95 0.26 2 0 0.45 1.40 � 0.75 + Property Value Property Value Item No. Material Finish Material Tin Plated Aluminum Material 300 Series Stainless Steel 1 300 Series Stainless Steel Clear and Black Finish Clear Matte Finish Clear 2 Polypropelene Black v1.0 v1.0 4X 0 .32 THRU THIS EDGE TOWARDS ROOF RIDGE (CLEARANCE FOR 10 5/16'' HARDWARE) ivy 9 Y O 04.000 0 8 aulQ' 18.00 7 2.500 0 6 6.50 �--{ 01 .250 5 I 9.00 3.750 500 18.00 1 .500 ZUIGVL 4 ZQ 4 1 .9 FLASHING HEIGHT 3 I ABASE (ITEM 2) AND (ITEMS 4 & 5) POST (ITEM 6) 11 TJ ITEM DESCRIPTION QTY. POST AND FLASHING AVAILABLE IN MILL, CLEARO. 1 1 CAP SCREW, HEX HEAD, 5/16"-18 X 3/4"UNC-2A, GRADE 8 1 ANODIZED, AND BRONZE ANODIZED FINISHES. 2 QBASE, 1-1/4"ID, FOR 5/16" HARDWARE, A360.1 CAST AL 1 STAINLESS STEEL LAG SCREWS INCLUDED WITH 3 LAG SCREW, HEX HEAD, 5/16"X 3", ZINC 2 ANODIZED FINISHES. 4 FLASHING,SPUN CONE, 18"X 1 8"X.032",3003 AL, MILL 1 Quick Mount P 5 COLLAR, COUNTER FLASHING, 1-1/4"ID EPDM 1 TITLE: 6 POST, 1-1/4"OD X 3-1/4", 6063-T5, MILL 1 QMNS: QBASE SHAKE AND SLATE 7 WASHER,SEALING, 5/16"ID X 1-1/4"OD, EPDM BONDED SS 1 MOUNT 8 WASHER, FENDER, 5/16"ID X 1"OD, 18-8 SS 1 9 WASHER,SPLIT-LOCK, 5/16"ID, 18-8 SS 1 UNLESS OTHERWISE SPECIFIED: SIZE DRAWN BY: RAD REV DIMENSIONS ARE IN INCHES 10 CAP SCREW, HEX HEAD,5/16''-18 X 1" UNC-2A, 18-8 SS 1 TOLERANCES: A DATE: 1/15/2013 6 FRACTIONAL± 1/8 PROPRIETARY AND CONFIDENTIAL TWO PLACE DECIMAL ±.18 THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF QUICK MOUNT PV.ANY REPRODUCTION IN PART OR AS DO NOT SCALE DRAWING A WHOLE WITHOUTTHE WRITTEN PERMISSION OF QUICK MOUNT PV IS PROHIBITED. THREE PLACE DECIMAL ±.12$ SCALE: 1:8 WEIGHT:1.93 SHEET 1 OF 1 5 4 3 2 1 14>WIN MCPHERSON MCPE I ENGINEERING Structural Analysis Report For Photovoltaic System Addition to Existing Structure At V M c p�� '3� W A9gl��J 1:ze The RECCHI Residence 23025 65 19417 45TH DR NE 0 *� LISTER-° ARLINGTON, WA 98223 ��IONAL'-G This item has been digitally signed and sealed on 09/21/2023 Designed in Accordance with IBC/IRC 2018,ASCE 7-16 Date: 9/20/23 Job#: 23-14184 E.O.R.: Ryan McPherson, P.E. Ryan)MCPhersonap04 9240 Limonite Ave Jurupa Valley, CA 92509 Mobile: (909) 566-0066 Email: SE@mcpe.group 1 of 7 9/20/2023 3:59 PM ©McPherson Engineering �MCPHERSON By: T.S. ENGINEERING Date: 9/20/23 Table Of Contents Project Info 3 Gravity Loads 4 Lateral Loads 5 Wind Uplift Design 6 Summary 7 *Note: This engineering report is limited to the information presented to Engineer via plans, site information, photos, and written correspondence as provided by Client. On-site structural observations and verification of site conditions are not included herein. Engineering for manufactured products such as photovoltaic modules or racking systems is excluded from this report. Please refer to the manufacturer's specifications, certifications, and pre-engineered packages for product engineering. Installations of solar modules and related equipment must be performed in accordance with manufacturer recommendations, local codes, local regulations, industry best practices, and applicable safety standards. Owner and/or Contractor shall notify Engineer should any damage, deterioration, or descrepancies between current condition of the structure or otherwise as this letter describes before proceding with construction. This letter applies only to regions of the structure where solar modules will be supported and the supporting elements. 2of7 9/20/2023 3:59 PM ©McPherson Engineering �MCPHERSON By: T.S. ENGINEERING Date: 9/20/23 Project Info Location: 19417 45TH DR NE ARLINGTON,WA 98223 Existing Structure Info: Number of Stories= 1 Aroof= 1800 sq.ft. Roof Square Footage A3ra fir = 0 sq.ft. Third Floor Square Footage(if applicable) A2na flr = 0 sq.ft. Second Floor Square Footage(if applicable) Site Properties: Lattitude = 48.172946 Longitude = -122.169218 Ss = 1.056 S, = 0.377 Exposure Category= C Ult. Wind Speed = 98 m.p.h. P.V.Array Info: Model = REC410AA PURE Height of Panel = 71.70 in. Width of Panel = 40.00 in. Area of Panel = 19.9 ft.2 Number of New Panels = 28 Number of Exis. Panels= 0 Total Area of Array= 557.7 ft.2 Spacing of Anchors = 4.0 ft. max. on center rows of racks per panel = 2 Panel Tilt= 7-27 deg 3of7 9/20/2023 3:59 PM ©McPherson Engineering �MCPHERSON By: T.S. ENGINEERING Date: 9/20/23 Gravity Loads Existing Loads: Roof Design Loads: Roofing= 2.0 p.s.f. Metal Paneling roofing Sheathing= 1.5 p.s.f. 1/2" Plywood Framing= 1.5 p.s.f. 2x8 Rafters Misc= 1.0 p.s.f. DLr1 = 6.0 p.s.f. Roofing Dead Load (applied to top of rafters/trusses only) Ceiling= 2.0 p.s.f. Drywall and framing DLr2 = 8.0 p.s.f. Total Existing Roof Dead Load LLr = 20.0 p.s.f. Roof Live Load (Per C.B.C,Table 1607.1) SL = 25.0 p.s.f. Snow Load Floor Design Loads: (if applicable) Flooring= 10.0 p.s.f. Weight of floor finish Sheathing= 2.2 p.s.f. 3/4" plywood Framing= 2.0 p.s.f. 2x framing or manufactured floor truss Interior Partitions= 15.0 p.s.f. 2x framed walls with drywall finish each side Ceiling= 5.0 p.s.f. Drywall ceiling finish below M isc. = 0.8 p.s.f. DLf = 35.0 p.s.f. Total Existing Floor Dead Load L= 179.0 ft Proposed Loads: Panels= 2.8 p.s.f. weight of panels including rack system DLrl_proposed = 8.8 p.s.f. Proposed Roof Dead Load (applied to top only) DLr2_proposed = 10.8 p.s.f. Total Proposed Roof Dead Load LLr proposed — 0.0 p.5.f. Roof Live Loads need not be applied to the area covered with by PV panel where the clear space between the panels and the roof sureface is 24in or less,1607.13.5.1 item 1 Exception Check Proposed Gravity Loads: Total Existing Roof Load Wex = (DLr1 + LLr) (Aroof) = 46.8 kips Total Proposed Roof Load Wprop = (DLr1 + LLr) (Aroof-Aarray) + (DL0_proposed+ LLr proposed) (Aarray) = 37.2 kips Proposed Load Demand Wprop- Wax = -20.54% TOTAL DECREASE IN GRAVITY LOADS, PANELS OKI Wax 4of7 9/20/2023 3:59 PM ©McPherson Engineering �MCPHERSON By: T.S. MOPE ' ENGINEERING Date: 9/20/23 Lateral Loads Seismic Design Parameters Risk Category= 2 Per Table 1-5-1 R= 6.5 Response Modification Factor(Table 12-2.1) Site Class = D Per 11.4.2 le = 1 Seismic Importance Factor(Table 1.5-2) Ss= 1.06 Short Period P.G.A. Si = 0.38 1-Sec Period P.G.A. S.D.C. = D Seismic Design Category Per 11.6 Fa= 1.20 Site Coefficient per Table 11.4-1 ASCE 7-16 Supplement#1 Tables used for Fa and Fv F, = 1.70 Site Coefficient per Table 11.4-2 (note:section 11.4.8 Exception#2 calc used) SMS = SDS Fa = 1.27 Short Period M.C.E. Per Eq. 11.4-1 SM1 = SD, Fv = 0.64 1-Sec Period M.C.E. Per Eq. 11.4-2 SDS = 2/3 (SMS) = 0.84 Short Period Design Parameter Per Eq 11.4-3 SD1 = 2/3 (SM1) = 0.43 1-Sec Period Design Parameter Per Eq 11.4-4 Approximate Fundamental Period (Per 12.8.2.1) T=Ct(hn)x per Eq. 12.8-7 hn = 15 ft Ct = 0.02 (per table 12.8-2) x= 0.75 (per table 12.8-2) T= 0.15 sec Approximate Fundamental Period TL = 8 sec Long-Period Transition Period per Figure 22-12 Seismic Response Coefficient(Per 12.8.1.1) CS = (SDS le)/R = 0.13 Seismic Response Coefficient Per Eq. 12.8-2 Cs1 = 1.5*(SD1 le)/R T = 0.65 Max.Seismic Response Coefficient Per Eq. 12.8-3 if T <_ TL Cs2 = 0.01 Min.Seismic Response Coefficient Per Eq. 12.8-5 Cs2 = 0.044 SDS le = 0.04 Min.Seismic Response Coefficient Per Eq. 12.8-5 Cs3 = 0.5 S1 le/R = 0.03 Min.Seismic Response Coefficient Per Eq. 12.8-6 if S 1 >_ 0.6g Cs = 0.13 Design Seismic Coefficient Check Additional Base Shear Wexisting = 25.1 kips Weight of Existing Structure Wpaneis = 1.5 kips Weight of Proposed Panels Vexisting = Cs Wexisting = 3.3 kips Roof Level Shear of Existing Structure Vpanels = Cs Wpanels= 0.2 kips Additional Roof Level Shear of Proposed Panels Vpanels = 6.12% < 10% PER I.E.B.C. 1103.2 Exception#2, STRUCTURE DOES NOT Vexisting REQUIRE SEISMIC RETROFIT, PANELS OKI 5of7 9/20/2023 3:59 PM ©McPherson Engineering �MCPHERSON By: T.S. MOPE ' ENGINEERING Date: 9/20/23 Wind Uplift Anchorage Rooftop Solar Panels Wind Pressures(Section 29.4,ASCE 7-16) Vuit = 98 mph K,= 1.00 (sec 26.8.2) h = 15 ft Exposure Category= C KZ= 0.85 (sec 26.10.1) Roof Zone= 2 Kd= 0.85 (sec 26.6) Roof A= 7-27 deg Ke= 1.00 (sec 26.9) qh=0.00256 K, KZt Kd Ke Vz qh= 17.76 (eq.26.10-1) GPp= -2 uplift yE= 1.5 (sec 29.4.4) ya= 0.77 (fig 29.4-8) Flush Mounted Panels-ASCE Section Flat Roof Panels-ASCE Section 29.4.3 29.4.4(where applicable) (where applicable) yE= 1.5 FIG 29.4-7) yc= 0.96 (fig 29.4-7) hpt= 0 ya= 0.77 (fig 29.4-8) yp= 0.9 (fig 29.4-7) to= 0.00 deg (panel tilt) GPp= -2 uplift GCrn,= 1.4 uplift p = qh(GPp) YE Ya (eq 29.4-7) p = qh(GCrn) YE Yc Yp (eq 29.4-6) p = -41.0 p.s.f. p = 32.2 p.s.f. Check Anchorage to Existing Structure 0.6DL-0.6W controlling load combination (eq. 16-15 for ASD) DL= 2.8 p.s.f. dead load of panel (inlcuding rack system) W= 41.0 p.s.f. wind load normal to face of panel Arealag = 12.0 sq.ft. area tributary to each anchor SPanc = 4.0 ft. spacing of anchors P,plift=Arealag (0.6DL-0.6W) = 274.1 Ibs total uplift on anchor Material = DFL lumber anchor material Dialag = 5/16 in. diameter of screw Penlag= 2.5 in. min. penetration to existing framing Wiag = 266 lb/in. withdrawal load per in.of penetration per NDS Table 11.2A CD = 1.6 load duration factor for wind per NDS Table 2.3.2 Ct= 0.8 temperature factor per NDS Table 2.3.3 NOscrews= 2 number of screws in withdrawal Fallow= Penlag(Wlag CD Ct) * Noscrews= 1702.4 Ibs total allowable withrawal on anchor Puplift = 0.16 < 1.00 Anchor is OKI Pallow Anchorage = USE (2) 5/161N. DIA. LAG SCREW(S) AT 4FT. MAX. O.C. W/2.51N. MIN. PENETRATION 6of7 9/20/2023 3:59 PM ©McPherson Engineering �MCPHERSON BY: T.S. ENGINEERING Date: 9/20/23 Summary Gravity Loads: DEMAND DECREASED BY 20.54% = OK! Lateral Loads: DEMAND INCREASED BY 6.12%< 10% = OK! Anchorage: DEMAND OF 274.11-13. < CAPACITY OF 1702.41-13. = OK! USE (2) 5/161N. DIA. LAG SCREW(S) AT 4FT. MAX. O.C. W/ 2.51N. MIN. PENETRATION Summary: STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY ANCHORS ON EAVES/OVERHANGS ARE OK! 7of7 9/20/2023 3:59 PM ©McPherson Engineering CONTRACTOR NEW PHOTOVOLTAIC ROOF MOUNTED SYSTEM - 11 .480 KW DC/9.772 KW AC 19417 45TH DR NE, ARLINGTON , WA 98223 BLOSSOM SOLAR NEW PV SYSTEM SPECIFICATIONS SHEET INDEX BLOSSOM SOLAR SYSTEM SIZE- DC SIZE 11.480 KW DC-(STC) PV-01 COVER PAGE 1706 LOMBARD AVE, AC SIZE:9.772 KW AC PV-02 SITE PLAN EVERETT,WA 98201 MODULE: (28)REC SOLAR REC410AA PURE(410W) �GUSTIN� PV-03 ATTACHMENT PLAN&DETAILS INVERTER: (28)ENPHASE IQ8A-72-2-US(240V) ti4'OF W/►sy �� PV-04 ELECTRICAL DIAGRAM PHONE-(425)610-7067 w ,��+ C� G PV-05 NOTES U�AT Z PV-06 WARNING LABELS APPLICABLE CODES rn PV-07 INSTALLATION RESOURCE ALL WORK SHALL CONFORM TO THE FOLLOWING CODES: J EQUIPMENT DATASHEETS ATTACHED 2018 INTERNATIONAL BUILDING CODE ,� R 48721 2018 INTERNATIONAL RESIDENTIAL CODE s,Q 45TH D R N E LEGEND 2018 INTERNATIONAL EXISTING BUILDING CODENjkL 2018 INTERNATIONAL FIRE CODE ----- -PROPERTY LINE 2020 NATIONAL ELECTRICAL CODE sealed 07sep2023 mike@h2dC.Com AS ADOPTED BY CITY OF ARLINGTON (WA) H2DC PLLC WA UBI#:604 476 076 6'-3" f FENCE LINE ELECTRICAL ONLY — — — — oqnv:,a.,e,�..u,'.re.PE CITY OF AELINGTON OM:G=IIS,L Ne-I .P—t L=Masoa, Mike "=N.OU=eHill,1,C=M.kl MIG.,y PLLC,00=EIecMcal,CN=Mite MCGmre DRIVEWAY BUILDING DE ARTMENT PE EH1iYe®IQtic cam DESIGN CRITERIA McGuire. PEA WN;roo 15:3Er]].1y"Tea' ROOF SURFACE TYPE: INTERLOCK METAL TILE F n PGFEdiW, isaa 1126 I I AP P VED ROOF FRAMING:2"X8" RAFTER @ 24"OC r` PROJECT NAME&ADDRESS BUILDING STORY:ONE STORY I FRONT OF HOUSE I DATE - BY GROUND SNOW LOAD:25 PSF N JOE RECCHI WIND SPEED:98 MPH 4 6 NO CHANGES UTHORIZED WIND EXPOSURE: B UNLESS APPR VED BY THE 19417 45TH A 82 RISK CATEGORY: II BUILDING IN 3PECTOR PN#: 0 9-28TON,WA 98223 APN#: 009-282-000-073-00 AHJ: CITY OF ARLINGTON (WA) PROJECT NOTES ( UTILITY: PUGET SOUND ENERGY 1.1.1 THIS PHOTOVOLTAIC(PV)SYSTEM SHALL COMPLY WITH THE I RELEVANT YEAR OF THE NATIONAL ELECTRIC CODE(NEC),ALL O SYSTEM DETAILS MANUFACTURER'S LISTING AND INSTALLATION INSTRUCTIONS, — VICINITY MAP AND THE RELEVANT CODES AS SPECIFIED BY THE AUTHORITY ' DC SIZE:11.480 W DC-(STC) HAVING JURISDICTION'S(AHJ)APPLICABLE CODES. in N AC SIZE:SOLAR KW AC 1.1.2 THE UTILITY INTERCONNECTION APPLICATION MUST BE (28)REC SOLAR R -72-2-A PURE(410W) APPROVED AND THE PV SYSTEM MUST BE INSPECTED PRIOR TO I o (28)ENPHASE IQBA-72-2-US(240V) OPERATION iC3 v 13 ' 1.1.3 ALL PV SYSTEM COMPONENTS; MODULES, w REVISIONS UTILITY-INTERACTIVE INVERTERS,AND SOURCE CIRCUIT I ° o o v • v COMBINER BOXES ARE IDENTIFIED AND LISTED FOR USE IN REV DESCRIPTION DATE PHOTOVOLTAIC SYSTEMS AS REQUIRED BY NEC AND OTHER o 0 0- GOVERNING CODES o 0 1.1.4 ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE. IF EXPOSED TO SUNLIGHT, IT SHALL BE UV RESISTANT.ALL PLAQUES AND SIGNAGE WILL BE INSTALLED AS I v. REQUIRED BY THE NEC AND AHJ. I 14'-2" SCOPE OF WORK I r; SATELLITE MAP SHEET TITLE 1.2.1 CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND SPECIFICATIONS OF THE GRID-TIED PHOTOVOLTAIC SYSTEM. i — COVER PAGE THE CONTRACTOR WILL BE RESPONSIBLE FOR COLLECTION OF — — — EXISTING ONSITE CONDITIONS TO DESIGN,SPECIFY,AND —6'-3" INSTALL THE ROOF-MOUNTED PHOTOVOLTAIC SYSTEM DRAWN DATE 9/1/2023 DETAILED IN THIS DOCUMENT DRAWN BY CS _ - SHEET NUMBER PROPERTY PLAN '" PV-01 PV-01 SCALE:1/16"= V-0" -s NOTES: VISIBLE, LOCKABLE & LABELED AC PLAN VIEW TOTAL ROOF AREA: 1851 FTZ LEGEND CONTRACTOR 1 ROOF ACCESS POINT SHALL NOT BE DISCONNECT LOCATED WITHIN TOTAL PV ARRAY AREA: 557.67 FT LOCATED IN AREAS THAT REQUIRE THE TOTAL%OF ROOF COVERED BY PV: 30.13% PLACEMENT OF GROUND LADDERS OVER 1 OFT OF THE UTILITY METER a + FIRE SETBACKS OPENINGS SUCH AS WINDOWS OR DOORS, " BLOSSOM SOLAR m AND LOCATED AT STRONG POINTS OF BUILDING CONSTRUCTION IN LOCATIONS WHERE THE ACCESS POINT DOES NOT =MECHANICAL VENT CONFLICT WITH OVERHEAD BLOSSOM SOLAR OBSTRUCTIONS SUCH AS TREE LIMBS, FLUE I PLUMBING VENT WIRES OR SIGNS. -0 —=FENCE LINE 1706 LOMBARD AVE, 2. STRUCTURES,PATIO COVERS,AND/OR O MICROINVERTER(1 PER MODULE) EVERETT,WA 98201 ADDITIONS BUILT WITHOUT PERMITS TO BE RESOLVED BY SEPARATE PERMIT FRONT OF HOUSE O PHONE-(425)610-7067(28)REC SOLAR REC410AA PURE(410W)MODULES WITH ENPHASE IQBA-72-2-US(240V)UNDER EACH MODULE OJUNCTION BOX;SIZE DETERMINED IN FIELD 1 4 CONDUIT RUN;SURFACE MOUNTED(ACTUAL CD O CONDUIT RUNS TO BE DETERMINED IN FIELD) 0 O (E)UTILITY METER(UNDERGROUND SERVICE) 5 O MAIN SERVICE PANEL 6 O7 AC DISCONNECT _ OB (N)ENPHASE IQ COMBINER BOX 4 ROOF 1 PROJECT NAME 8 ADDRESS JOE RECCHI O 19417 45TH DR NE, 3 N�GAJSTINF ARLINGTON,WA 98223 0 4 ti OF WI1Sy�h .!� APN#:009-282-000-073-00 0 v y� Z rot AHJ: CITY OF ARLINGTON (WA) UTILITY: PUGET SOUND ENERGY rn f 413721 SYSTEM DETAILS DC SIZE:11.480 KW DC-(STC) �S�oH AC SIZE:9.772 KW AC �' (28)REC SOLAR REC410AA PURE(410W) (28)ENPHASE IQ8A-72-2-US(240V) CD- 0 E:I O sealed 07sep2023 mike@h2dc.com SLOPE -18° H2DC PLLC WA UBI#:604 476 076 AZIMUTH -270° 2 0 0 ELECTRICAL ONLY ROOF 1 MODULE QTY -13 REVISIONS O "_ RAFTER -2"X8" @ 24"O.C. SURFACE TYPE -INTERLOCK METAL TILE REV DESCRIPTION DATE SLOPE -18, AZIMUTH -90, O ROOF 2 MODULE QTY -15 _ RAFTER -2"X8" @ 24"O.C. SURFACE TYPE -INTERLOCK METAL TILE ROOF 2 TI 40 SHEET TITLE SITE PLAN fDRAWN DATE 9/1/2023 j` DRAWN BY CS ti SHEET NUMBER SITE PLAN 1 PV-02 ➢z PV-02 SCALE:1/8"=1'-0" DISTRIBUTED LOAD CALCULATIONS NOTE: LEGEND CONTRACTOR MODULE REC SOLAR REC410AA PURE(410W) 1. CONTRACTOR/INSTALLER TO VERIFY COMPATIBILITY OF MODULE WEIGHT 45 LBS ANY BRANDS OR PRODUCTS SUBSTITUTED OR USED AS -ATTACHMENT POINTS DIMENSIONS(L"x W') 71 7°x ao' ALTERNATES WITHIN ANY BRAND-SPECIFIC SYSTEMS. MODULECONTRACTOR SHALL SUPPLY AND PRESENT - RAIL BLOSSOM SOLAR TOTAL DI OF MODULES 71 2 CERTIFICATES OF COMPATIBILITY TO THE BUILDING -STRUCTURAL MEMBER TOTAL WEIGHT OF MODULES 260.0o LBS TYPE OF RACKING IRONRIDGE AIRE RAIL OFFICIAL UPON INSPECTION AS NEEDED. TYPE OF ATTACHMENT OBASE METAL SHAKE&SLATE MOUNT AATACHMENT 2. REFER TO PV MODULE MANUFACTURER'S INSTALLATION BLOSSOM SOLAR DISTRIBUTED WEIGHT OF RACKING 0.5 PSF INSTRUCTIONS FOR RAIL SPACING SPECIFICATIONS TOTAL WEIGHT OF ARRAY 1538.83 LBS x' 1706 LOMBARD AVE, AREA OF MODULE 19.92 SQFT. Ryan JMcPherson TOTAL ARRAY AREA 557.67 SOFT_ EVERETT,WA 98201 DISTRIBUTED LOAD 12.76 PSF PHONE-(425)610-706 4'-0"OC ATTACHMENT SPACING 4'-0"OC ATTACHMENT SPACING S M CP/� �� of W'AS'6'�s _0O 23025165 This item has been digitally signed and sealed on 09/21/2023 PROJECT NAME&ADDRESS JOE RECCHI 19417 45TH DR NE, STRUCTURAL MEMBER @ 24"OC STRUCTURAL MEMBER @ 24"OC ARLINGTON,WA 98223 APN#:009-282-000-073-00 1 .0 TYPICAL ATTACHMENT PLAN PORTRAIT 1 1 TYPICAL ATTACHMENT PLAN LANDSCAPE qHJ: CITY OF ARLINGTON (WA) P V-0 SCALE: NTS PV-03 SCALE: NTS UTILITY: PUGET SOUND ENERGY SYSTEM DETAILS DC SIZE:11.480 KW DC-(STC) AC SIZE:9 772 KW AC (28)REC SOLAR REC410AA PURE(410W) (28)ENPHASE IQ8A-72-2-US(240V) IRONRIDGE REVISIONS END/MID PV MODULE C MP REV DESCRIPTION DATE PV MODULE IRONRIDGE AIRE RAIL SEE ENLARGED VIEW r \ POST, 1-1/4"OD X VARIED HEIGHT(3.25", \ (E)METAL SLATE/TILE ROOF 4.5",6.5",8.5",11.5", 12 5",14.5",17.5") / \ SHEET TITLE / QBASE, 1-1/4"ID,FOR 5116"HARDWARE,A360 ` MIN.(2)5/16"x 3"SS LAG SCREWS ATTACHMENT PLAN I CASTAL WITH MIN.OF 2"EMBEDMENT INTO \ STRUCTURAL MEMBER AS & DETAILS (E)STRUCTURAL MEMBER SPECIFIED BY MANUFACTURER DRAWN DATE 9/1/2023 DRAWN BY CS (E)STRUCTURAL MEMBER 2 ATTACHMENT DETAIL 3 ENLARGED VIEW SHEET NUMBER PV-03 Scale: NITS PV-03 PV-03 Scale: NTS MICROINVERTER SPECIFICATIONS SOLAR MODULE SPECIFICATIONS VISIBLE, LOCKABLE & LABELED AC AMBIENT TEMPERATURE SPECIFICATIONS CONTRACTOR MANUFACTURER/MODEL# ENPHASE IOSA-72-2-US(240V) MANUFACTURER/MODEL# REC SOLAR REC410AA PURE(410W) DISCONNECT LOCATED WITHIN RECORD LOW TEMP 9°C 9NRUT POWER RANGE 295w-500W vMP 42.20v AMBIENT TEMP(HIGH TEMP 2%AVG.) 27°C MIN/MAX START VOLTAGE 22V/58V IMP 9.72A 10FT OF THE UTILITY METER MINIMUM CONDUIT HEIGHT ABOVE ROOF SURFACE 7/8" NOMINAL AC VOLTAGE 240V VOC 49.40V BLOSSOM SOLAR MAX CONT.OUTPUT CURRENT 1.45A IISC 10.42A ��GUSTIN� MAX CONT.OUTPUT POWER 349W TEMP COEFF.VOC -D.24%/°C MAX MODULES PER STRING 11 (11 MICROINVERTERS) ti of W�ylH c BLOSSOM SOLAR rr, s 1706 LOMBARD AVE, EVERETT,WA 98201 R TO UTILITY GRID 48721 PHONE-(425)610-7067 ROMEX CAN BE USED IN LIEU OF CONDUIT FOR INTERIOR BUILDING AND ATTICI NAL L1 L2 N RUNS ONLY. DO NOT USE ROMEX IN CONDUIT OR OUTDOOR ENVIRONMENTS. sealed 07sep2023 mike@h2dc.com LINE N) ENPHASE COMBINER PANEL H2DC PLLC WA UBI#:604 476 076 (E) BI-DIRECTIONAL ( ELECTRICAL ONLY UTILITY METER NEMA 3R, UL LISTED,125A RATED (N) SERVICE RATED M 1-PHASE, 3-W, REC SOLAR REC410AA PURE (41OW) (ENPHASE X-IQ-AM1-240-4/4C) AC DISCONNECT: LOAD 120V/240V VISIBLE, LOCKABLE, 10 MICROINVERTERS IN STRING 1 1OA OR 15A BREAKER IS IQ GATEWAY LABELED 60 A FUSED, SUITABLE FOR USE (2) 60A FUSES, 240V, WIRELESS NEMA 3R, UL LISTED SUPPLY SIDE ENPHASE Q MODEM co L1 L1 CONNECTION CABLE(S) L2 L2 15A/2P N N 1� (E) 200A/2P MAIN PROJECT NAME 8 ADDRESS 10 MICROINVERTERS IN STRING 2 I (N) JUNCTION BOX o G 1 7 BREAKER, 240V � 600 V, NEMA 3R 1 � — LINE � JOE RECCHI UL LISTED 20A/2P 2 3 19417 45TH DR NE, L2 ° (E) 200A MAIN ARLINGTON, WA 98223 ti APN#:009-282-000-073- 0 SERVICE PANEL, 08 MICROINVERTERS IN STRING 3 L1 2 P 0 0 240V AHJ: CITY OF ARLINGTON (WA) 2 0 UTILITY: PUGET SOUND ENERGY LL1 20A/2P LOAD i.,G o SYSTEM DETAILS L2 - - SUPPLY SIDE DC SIZE:9.772 W DC-(STC) - - - AC SIZE:9.772 KW AC LG N N INTERCONNECTION (28)REC SOLAR REC410AA PURE(410V11) ENPHASE IQ8A-72-2-US (240V) LF?�? AT MAIN PANEL (28)ENPHASE IQ8A-72-2-US(240V) MICROINVERTERS ONE UNDER �J EACH PANEL (240V) #6 AWG BARE CU BONDED GEC REVISIONS NOTES APPENDIX(AS APPLICABLE FOR TO BE BUILT DRAWING SETS): (A)TOTAL AC VOLTAGE DROP NOT TO EXCEED 2% TO INTERCONNECTION, <3% FROM EXISTING GROUNDING REV DESCRIPTION DATE INVERTER(S)TO UTILITY TRANSFORMER. (B)ALL CONNECTORS 75C RATED.(C)ALL CONDUCTORS COPPER, UNLESS OTHERWISE NOTED. (D)OUTDOOR EQUIPMENT _ _ ELECTRODE SYSTEM NEMA3R. (E)ALL CONDUCTORS MUST BE PROTECTED FROM ACCESS BY A FENCE OR SUITABLE COVER, OR OUT OF REACH. (F)PROPERTY LINES, BOUNDARIES AND ALL OTHER EXTERIOR MEASUREMENTS ARE FOR REFERENCE ONLY,AND MUST BE VERIFIED BY A LICENSED SURVEYOR OR CIVIL ENGINEER. (G) NO PVC ALLOWED ON ROOF OR IN ATTIC. (H)MC4 CONNECTORS MAY NOT BE JOINED WITH'MC4 COMPATIBLE'CONNECTORS. (I)TAP CONNECTIONS IN PANEL MUST NOT VIOLATE CONDITIONS OF ACCEPTABILITY FROM PANEL MANUFACTURER'S NRTL LISTING, OR FIELD LABEL REQUIRED. (J) PV WIRES MAY NOT BE LAID DIRECTLY ON ROOF. (K )TY WRAPS FOR WIRE MANAGEMENT MUST BE STRUCTURAL (S21) UL APPROVED, OR EQUAL. (L)DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS AND WORK.CONDUIT ROUTING,WHEN INDICATED, DOES NOT SHOW ALL OFFSETS, DROPS, AND RISES OF RUNS. (M) BURIED CONDUITS UNDER AREAS SUBJECT TO VEHICLE TRAFFIC REQUIRE MIN 24"COVER. (N) NM-B OR PAPER INSULATED CONDUCTORS MAY NOT BE USED EXTERIOR. (0 THE DEVELOPER IS REQUIRED TO CONFIRM EXISTING ELECTRICAL SERVICE SIZE FROM THE UTILITY,AND MAY NOT RELY SOLELY ON EXISTING BREAKER SIZES. (P SHEET TITLE CONNECTING TO UTILITY EQUIPMENT REQUIRES PRIOR UTILITY CONSENT. ELECTRICAL DIAGRAM DESCRIPTION FORMULA RESULT PV OVERCURRENT PROTECTION NEC 690.9(B) TOTAL INVERTER OUTPUT CURRENT x 1.25=(28 x 1.45)A x 1.25 50.75A (SELECTED OCPD =60A) DRAWN DATE 9/1/2023 TEMP QTY OF CURRENT MINIMUM CONDUCTOR CONDUCTOR REQUIRED CIRCUIT ADJUSTED NEUTRAL GROUND WIRE EXPECTED CONDUIT WIRE GAUGE& DRAWN BY CS DERATE CARRYING CONDUIT SIZE AMPACITY @ AMPACITY @ CONDUCTOR CONDUCTOR CONDUCTOR SIZE&TYPE WIRE ID WIRE TEMP(°C) (90°C) CONDUCTORS FILL DERATE (TBD ON SITE) TYPE 90°C(A) 75°C(A) AMPACITY(A) AMPACITY @ 90°C(A) SIZE&TYPE SHEET NUMBER 1 27 1 6 0.8 3/4"METAL #10 THWN-2 40 35 18.13 32.00 V n NONE #8 THWN-2 ` -0 A 2 27 1 2 1 3/4"METAL #6 THWN-2 75 65 50.75 75.00 #6 THWN-2 #8 THWN-2 r �F 3 27 1 2 l 3/4"PVC #6 THWN-2 75 65 50.75 75.00 #6 THWN-2 NONE G E N E RA L NOTES CONTRACTOR SITE NOTES GROUNDING NOTES INTERCONNECTION NOTES 2.1.1 A LADDER WILL BE IN PLACE FOR INSPECTION IN ACCORDANCE 2.5.1 GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR 2.7.1 LOAD SIDE INTERCONNECTION SHALL BE IN BLOSSOM SOLAR WITH OSHA REGULATIONS. THEIR PURPOSE,AND GROUNDING DEVICES EXPOSED TO THE ACCORDANCE WITH NEC 705.12. 2.1.2 THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS ELEMENTS SHALL BE RATED FOR SUCH USE. 2.7.2 THE SUM OF THE UTILITY OCPD AND INVERTER SYSTEM IS A UTILITY INTERACTIVE SYSTEM WITH NO STORAGE 2.5.2 PV EQUIPMENT SHALL BE GROUNDED IN ACCORDANCE CONTINUOUS OUTPUT MAY NOT EXCEED 120 PERCENT OF BLOSSOM SOLAR BATTERIES. WITH NEC 690.43 AND NEC TABLE 250.122. BUSBAR RATING PER NEC 705.12. 2.1.3 THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY 2.5.3 METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND 2.7.3 THE SUM OF 125 PERCENT OF THE POWER SOURCE(S) 1706 LOMBARD AVE, PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. ENCLOSURES CONSIDERED GROUNDED IN ACCORDANCE WITH OUTPUT CIRCUIT CURRENT AND THE RATING OF THE EVERETT,WA 98201 2.1.4 PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING NEC 250.134 AND 250.136(A). OVERCURRENT DEVICE PROTECTING THE BUSBAR SHALL PHONE-(425)610-7067 AND PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED IN 2.5.4 EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED IN NOT EXCEED 120 PERCENT OF THE AMPACITY OF THE ACCORDANCE WITH SECTION NEC 110.26. ACCORDANCE WITH NEC 690.45 AND INVERTER BUSBAR, PV DEDICATED BACKFEED BREAKERS MUST BE 2.1.5 ROOF COVERINGS SHALL BE DESIGNED, INSTALLED,AND MANUFACTURER'S INSTALLATION PRACTICES LOCATED OPPOSITE END OF THE BUS FROM THE UTILITY MAINTAINED IN ACCORDANCE WITH THIS CODE AND THE APPROVED 2.5.5 EACH MODULE WILL BE GROUNDED AS SHOWN IN SOURCE OCPD IN ACCORDANCE WITH NEC 705.12, MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF COVERING MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. 2.7.4 AT MULTIPLE ELECTRIC POWER SOURCES OUTPUT SERVES TO PROTECT THE BUILDING OR STRUCTURE. 2.5.6 THE GROUNDING CONNECTION TO A MODULE SHALL BE COMBINER PANEL, TOTAL RATING OF ALL OVERCURRENT ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT PROTECTION DEVICES SHALL NOT EXCEED AMPACITY OF EQUIPMENT LOCATIONS INTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE. BUSBAR. HOWEVER, THE MAIN OVERCURRENT PROTECTION 2.2.1 ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS IN 2.5.7 GROUNDING AND BONDING CONDUCTORS, IF INSULATED, DEVICE MAY BE EXCLUDED IN ACCORDANCE WITH NEC ACCORDANCE WITH NEC 110.26. SHALL BE COLORED GREEN OR MARKED GREEN IF#4 AWG OR 705.12. 2.2.2 WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE LARGER PER NEC 250.119 2.7.5 FEEDER TAP INTERCONNECTION (LOAD SIDE) IN RATED FOR EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY 2.5.8 THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH NEC ACCORDANCE WITH NEC 705.12. NEC 690.31 (A),(C)AND NEC TABLES 310.15 (13)(2)(A)AND 310.15 (13)(3)(C). 690.47 AND NEC 250.50 THROUGH 250.106. IF EXISTING SYSTEM IS 2.7.6 SUPPLY SIDE TAP INTERCONNECTION IN ACCORDANCE 2.2.3 JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV INACCESSIBLE, OR INADEQUATE,A GROUNDING ELECTRODE WITH TO NEC 705.12 WITH SERVICE ENTRANCE MODULES IN ACCORDANCE WITH NEC 690.34. SYSTEM PROVIDED IN ACCORDANCE WITH NEC 250, NEC 690.47 CONDUCTORS IN ACCORDANCE WITH NEC 230.42. PROJECT NAME&ADDRESS 2.2.4 ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE AND THE AHJ. 2.7.7 BACKFEEDING BREAKER FOR ELECTRIC POWER JOE RECCHI INVERTER IS NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT. 2.5.9 GROUND-FAULT DETECTION SHALL COMPLY WITH NEC SOURCES OUTPUT IS EXEMPT FROM ADDITIONAL 2.2.5 ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED 690.41(B)(1)AND (2) TO REDUCE FIRE HAZARDS FASTENING PER NEC 705.12. 19417 45TH DR NE, PERSONNEL IN ACCORDANCE WITH NEC APPLICABLE CODES. ARLINGTON,WA 98223 2.2.6 ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED DISCONNECTION AND OVERCURRENT PROTECTION NOTES APN#: 009-282-000-073-00 FOR OUTDOOR USAGE WHEN APPROPRIATE. 2.6.1 DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT GUSTI�y WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING was E AHJ: CITY OF ARLINGTON (WA) � STRUCTURAL NOTES ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED "LINE �' aF �'►� ' UTILITY: PUGET SOUND ENERGY 2.3.1 RACKING SYSTEM & PV ARRAY WILL BE INSTALLED IN SIDE" (TYPICALLY THE UPPER TERMINALS). ,����� c�0 ACCORDANCE WITH THE CODE-COMPLIANT INSTALLATION MANUAL. 2.6.2 DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY y - SYSTEM DETAILS TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES,AND PERSONNEL, BE LOCKABLE,AND BE A VISIBLE-BREAK SWITCH DC SIZE:11.480 KW DC-(STC) RAILS MUST ALSO EXTEND A MINIMUM DISTANCE BEYOND EITHER 2.6.3 PV SYSTEM CIRCUITS INSTALLED ON OR IN HABITABLE .' AC SIZE:9.772 KWAC EDGE OF THE ARRAY/SUBARRAY, IN ACCORDANCE WITH RAIL BUILDINGS SHALL INCLUDE A RAPID SHUTDOWN FUNCTION TO 48721�3 (28)REC SOLAR R A PURE(410V1n �Q"6i�9♦ (28)ENPHASE IQBA-72-2--72-2-U5(240� MANUFACTURER'S INSTALLATION PRACTICES. REDUCE SHOCK HAZARD FOR EMERGENCY RESPONDERS IN SIGNAL 2.3.2 JUNCTION BOX WILL BE INSTALLED PER MANUFACTURER'S ACCORDANCE WITH 690.12 REVISIONS SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED & 2.6.4 ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO sealed 07sep2023 mike@h2dc.com SEALED PER LOCAL REQUIREMENTS. NEC 690.8, 690.9, AND 240. H2DC PLLC WA UBI#:604 476 076 REV DESCRIPTION DATE 2.3.3 ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED 2.6.5 INVERTER ON-GRID BRANCHES SHALL BE CONNECTED TO A ELECTRICAL ONLY AND SEALED W/APPROVED CHEMICAL SEALANT PER CODE BY A SINGLE BREAKER OR GROUPED FUSE DISCONNECT(S) IN LICENSED CONTRACTOR. ACCORDANCE WITH NEC 110.3(B). 2.3.4 ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO 2.6.6 IF REQUIRED BY THE AHJ, SYSTEM WILL INCLUDE GREATER THAN THE SPAN DISTANCE SPECIFIED BY THE RACKING ARC-FAULT CIRCUIT PROTECTION IN ACCORDANCE WITH NEC MANUFACTURER OR PROFESSIONAL ENGINEERING GUIDANCE. 690.11 AND UL1699B. 2.3.5 WHEN POSSIBLE,ALL PV RELATED RACKING ATTACHMENTS WILL SHEET TITLE BE STAGGERED AMONGST THE ROOF FRAMING MEMBERS. NOTES WIRING & CONDUIT NOTES 2.4.1 ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON DRAWN DATE 9/1/2023 MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT DRAWN BY CS UP-SIZING. 2.4.2 CONDUCTORS SIZED IN ACCORDANCE WITH THE NEC SHEET NUMBER 2.4.3 AC CONDUCTORS TO BE COLORED OR MARKED PER NEC 2.4.4 LISTED OR LABELED EQUIPMENT SHALL BE INSTALLED AND USED PV-05 IN ACCORDANCE WITH ANY INSTRUCTIONS INCLUDED IN THE LISTING OR LABELING PER NEC CONTRACTOR AWARNING &WARNING ELECTRICAL SHOCK HAZARD LL SOURCE OUTPUT N.DO NOT RELOCATEBLOSSOM SOLAR U T,EVICE. TERMINALS ON THE LINE AND LABEL LOCATION:MAIN SERVICE DISCONNECT,POINT SCyUSTIN�. LOAD SIDES MAY BE ENERGIZED OF INTERCONNECTION F WASyj� •!� BLOSSOM SOLAR IN THE OPEN POSITION PER CODE:705.12(B)(2)(3)(b) OZ 1706 LOMBARD AVE, LABEL LOCATION:COMBINER PANEL,AC DISCONNECT, POINT OF INTERCONNECTION 1 tT7 EVERETT,WA 98201 PER CODE:NEC 690.13(B) MAIN PHOTOVOLTAIC PHONE-(425)610-7067 DISCONNECTSYSTEM 48721 AWARNING } LABEL LOCATION: MAIN SERVICE DISCONNECT,UTILITY METER SIONai. PER CODE:NEC 690.13(B) TURN OFF PHOTOVOLTAIC AC RAPID • • ' sealed 0LLC W 23 mike@h2dc.com 476com H2DC PLLC WA UBI#: 604 476 076 DISCONNECT PRIOR TO SOLAR PV SYSTEM ELECTRICAL ONLY WORKING INSIDE PANEL LABEL LOCATION: RSD INITIATION DEVICE,AC DISCONNECT PER CODE:NEC 690 56(C)(3) LABEL LOCATION:COMBINER PANEL(S),MAIN SERVICE DISCONNECT PER CODE:NEC 110.27(C),OSHA 1910.145(9(7) SOLAR PV SYSTEM EQUIPPED WARNING: PHOTOVOLTAIC WITH RAPID SHUTDOWN POWER LABEL LOCATION DC CONDUIT/RACEWAYICABLE TRAY TURN RAPID SHUTDOWN PROJECT NAME&ADDRESS PER CODE:NEC 690.31(G)(3-4) SWITCH TO THE "OFF"POSITION TO JOE RECCHI SHUT DOWN PV SYSTEM PHOTOVOLTAIC SYSTEM AC DISCONNECT AND REDUCE 19417 45TH DR NE, SHOCK HAZARD ARLINGTON,WA 98223 RATED AC OUTPUT CURRENT: ' IN THE ARRAY fii APN#:009-282-000-073-00 NOMINAL OPERATING AC VOLTAGE: 240 V I CAUTION LABEL LOCATION:POINT OF INTERCONNECTION LABEL LOCATION:MAIN SERVICE DISCONNECT AHJ: CITY OF ARLINGTON (WA) PER CODE:NEC 690.54 PER CODE:NEC 690.56(C)(1)(8) UTILITY: PUGET SOUND ENERGY A CAUTION MULTIPLE SOURCES OF POWER. POWER R TO THIS BUILDING IS ALSO SUPPLIED SYSTEM DETAILS PV SYSTEMDC SIZE:11.480 KW (STC) LABEL LOCATION:MAIN SERVICE DISCONNECT FROM THE FOLLOWING SOURCES WITH AC SIZE:9.772 KWAC PER CODE:NEC 690.13(F),NEC 705.12(B)(3-4),NEC 690.59 (28)REC SOLAR REC410AA PURE(41OW) DISCONNECTDISCONNECTS LOCATED AS SHOWN: (28)ENPHASE IQ8A-72-2-US(240 V) LABEL LOCATION:AC DISCONNECT A WARNING 1 ADDRESS: 1941745TH DR NE,ARLINGTON,WA 98223 PER CODE:NEC 690.13(B) REVISIONS ELECTRIC SHOCK HAZARD REV DESCRIPTION DATE DO D• • • TER ruNAALSSONBOTHu�aI LOAD SIDES MAYBE ENERGIZED IN OPEN POSITION UNDER • . DO NOT DISCONNECT FUSES UNDER LOAD THE DC CONDUCTORS OF THIS LABEL LOCATION:MAIN SERVICE DISCONNECT PHOTOVOLTAIC SYSTEM ARE UNGROUNDED AND MAYBE ENERG VFD PER CODE:NEC 690.15(C)&NEC 690.33(E)(2) PHOTOVOLTAIC SYSTEM DC DISCONNECT A WARNING DUAL POWER SOURCE AUTHORIZED PERSONNEL ONLY SECOND SOURCE IS PHOTOVOLTAIC SYSTEM Note:WARNING labels must resemble format SHEET TITLE in example above with over-sized WARNING, LABEL LOCATION:MAIN SERVICE DISCONNECT exclamation point in triangle,Colors,etc. WARNING LABELS PER CODE:NEC 705.12(B)(3-4),NEC 690.59 WARNING DRAWN DATE 9/1/2023 THIS EQUIPMENT FED BY MULTIPLE SOURCES- TOTAL RATING OFALOVERCURP.ENTDEVICES DRAWN BY CS L EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE SHALL NOT EXCEED AMPACITY OF BLISBAR. _ MAIN SERVICE PANEL SHEET NUMBER LABEL LOCATION:POINT OF INTERCONNECTION,COMBINER PANEL AC COMBINER PANEL PER CODE:NEC 705.12(B)(2)(3)(c) AC DISCONNECT UTILITY METER PV— CONTRACTOR q g C D E F BLOSSOM SOLAR 1 ➢z FRONT OF HOUSE BLOSSOM SOLAR 1706 LOMBARD AVE, EVERETT,WA 98201 2 PHONE-(425)610-7067 3 4 ROOF 1 O PROJECT NAME&ADDRESS JOE RECCHI 5 AR19417 45TH DR NE, _ I p LINGTON,WA 98223 (V APN#:009-282-000-073-00 O AHJ: CITY OF ARLINGTON (WA) UTILITY: PUGET SOUND ENERGY 6 SYSTEM DETAILS DC SIZE:11.480 KW DC-(STC) AC SIZE:9.772 KW AC (28)REC SOLAR REC410AA PURE(410W) (28)ENPHASE IQ8A-72-2-US(240V) 7 0 o REVISIONS CD O REV DESCRIPTION DATE r 8 _1 p r ROOF 2 SHEET TITLE INSTALLATION RESOURCE 9 DRAWN DATE 9/l/2023 DRAWN BY CS SHEET NUMBER 10 PV-07 **DIMENSIONS ARE 2D (FLAT) ' GENERAL DATA 1821t2s 171.7�art 2811.1; _ 9a1135.51 46011A11 Cell type: 132half-cut REC heterojunction bifadal cells with - - lead-free,gapless technology,6 strings of22 cells inseries r a 153.716.051 ' Glass 0.13in(3.2mm)solarglasswithanti-reflective surface treatment ❑ ram_ 1100-43.31+ in accordance with EN 12159 Backsheet: Highly resistant polymer(black) 610_02 [o z4mo 011 Frame: Anodized aluminum(black) - 3-part,3 bypass diodes,lead-free o ■ Junction box: IP68 ro ted,in accordance with IEC 62790 ry Staubli MC4 PV-KBT4/KST4(4 mmz) 0 11-0.2 N w�v Connectors: is accordance wi I LC 62852,IP66 anly when cannec led [0.4310.011 • 12AWG(4mm2)PV wire,43+47in(1.1+1.2m) _ tzoo 147.21 Cable: in accordance with EN 50618 t` Dimensions: 71,7x 40x 12 in(19.91 ft;)/1821 x 1016 x 30 mm(1.85 m-) - (06t0A21 153.7[6051 t 7 � Weight: 45lbs(20.5 kg) • 6711_3[zc 4_a1z • 45 M81 22.510 9' Origin: Made in Singapore r i3011.21 Measurements m mm lm] ' ELECTRICAL DATA Product Code':RECxxxAA Pure CERTIFICATIONS PawerOutput-P;p (Wp) 390 395 400 405 �10 IEC 61215,2016,IEC 61730:2016,UL 61730 IEC 62804 PID Wat,Class Sorting-(W) 0/+5 0/+5 0/+5 0/+5 5 IEC61701 Salt Mist Nominal Power Voltage-V;,n,(V) 40.6 41.0 41.4 41,8 422 IEC 62716 Ammonia Resistance u Nominal Power Current-I.,,_(A) R61 9.64 9.67 9.69 9.72 UL61730 Fire Type Class 2 In Open Circuit Voltage- (V) 48.4 48,6 48.8 491 49.4 IEC 62782 Dynamic Mechanical Load P g t IEC61215-2:2016 Hailstone(35mm) Short Cucuit Current-I„(A) 10.38 10.39 10.40 10.41 1(142 IECb2321 Lead-lreeacc.toRoHSEU863/2015 PowerDensit y(W/ft2) 19.6 19.8 20.1 20.3 20.6 IS014001,ISO9001,IEC 45001,IEC 62941 Pa ne I Efficiency 1%) 21.1 21.4 21.6 219 22.2 pVE Ok C E a jyP Power Output-P,,,,(1Wp) 297 301 305 308 312 ni-k Nominal Power Voltage-V.,.P,(V) 383 38.6 39.0 39.4 39.8 TEMPERATURE RATINGS- E- 0 Nominal Power Current-I,;,(A) 7J7 7.79 7.82 7.83 7.85 Nomin=I Module Operating Temperature: 44`C(t2°C) Z RE[ ALPH (X(,) Open Circuit Voltage-Vt,.IV) 45.6 45.8 46.0 46.3 46.6 Temperature coefficient of Pu,,,: -0.24%/"K Short Circuit Current-Ist(A) 838 839 8.40 8.41 8.42 Temperature coefficient ofV,c: -0.24%/°K Va4lasatslaldard leg carldaiord(STCGairmassWW"-d6ance107SV0/sgftQODOW/W).tertgeretwe77'F;SQ,based onaptoduct'm wead lemperature coefficient ofls,_: 0.04%/-K with a tr:Ierencrof P,,,.V�_&Lt e3%wiUdnonelwtldass.Nrxnnal moduL aperaAnQlen+peratWe(NNgT.ai•ltwssfJ415,irradiance800 W/m'. The temperaturecoe SERIES lea,Nrerrte68?(2UTI W,r�.±ed33ft/sIlmis)'YAMwnjKatesthemtttn]lptmerda5s{P„y)6l5TCabava ffirientsstatedarelinearralues PURE _MAXIMUM RATINGS ARR'A T DELIVERY INFORMATION Opera tionaltemperature: -40...*185°1` Standard RECPraTrust Panels per pallet: 33 - Paximum �stemvoltage 100V nREC No Yes Yes Panelsper40ft GP/high cuhecontainer 792(24 pallets) PRODUET SPEOREATIONS Cerhfiied Solar Pro Fessional Maximum test load(front): +7000Pa(146lbs/ft')' System Size All s25kW25-500kW Panels per 53fttruck: 891(27pallets) Maximum test load(rear): -40DO Pat(83.5lbs/ft2)• Product Warranty(yrs) 20 25 25 Max series fuse rating: 25A Power Warranty(yrs) 25 25 25 LOW LIGHT BEHAVIOUR Warrant 0 25 10 Typical low irradiance per Fornlanceof module atSTC: m Nlaxreverse currenl: 25A Labor Warranty ) 'See installation manual For mounting insrructions Power in Year 98% 98% 98% Design load=Test load/LS(safety factor) Annual Degradation 0.25% 0.25% 0.25% PmverinYear25 92% 92% 92% w The RECPreTfustWarraelyis only availa�leon panels purchased - a - - :hroughanREC CwtiSed Solar Proress•onal install-'Warranty - - -Y y conGUom aD3ly.See wwe/.recgrouµ com for more de tails. °Irradiance(W/m2) 12 . - Available from: �. • , Foundedin]996.REC Group is an international pioneeringsolaF energy company dedicated to empowering consumers REC Solar PTE.LTD. ®with clean,affordable solar power.As Solar's Most Trusted.REC is committed to high quality,innovation.and a low I 20Tuas South Ave.14 �EC - • - - - carbon Footprint in the solar materials and solar panels it manufactures Headquartered in Norway with operational Singapore 637312 heddquat ters in Singapore.REC also has regional hubs in North America.Europe.and Asia-Pa6fic. post@recgroupcom wwwcrecgmup.com ENPHASE IQ8M and IQ8A Microinverters v INPUT DATA rCI U: �: Commonly used module pairings' w 260-460 295-500 Module compatibility 54-cell/108 half-cell,60-cell/120 half-cell,66-cell/132 half-cell and 72-cell/144 half-cell MPPT voltage range V 30-45 32-45 Operating range V 16-58 Min./Max.start voltage V 22/58 Max.input DC voltage v 60 Max.continuous input DC current A 12 Max.input DC short-circuit current A 25 Max.module Ix A 20 Overvoltage class DC port II DC port backfeed current mA 0 PV array configuration 1 x 1 Ungrounded array;No additional DC side protection required;AC side protection requires max 20A per branch circuit r r r: is Peak output power VA 330 366 Max.continuous output power VA 325 349 Nominal(L-L)voltage/range2 V 240/211-264 Max.continuous output current A 1.35 1.45 IQ8M and FICQ8A Microinverters Nominal frequency Hz 60 Extended frequency range Hz 47-68 Our newest IQ8 Microinverters are the industry's first microgrid-forming,software defined Easy to install microinverters with split-phase power conversion capability to convert DC power to AC Lightweight and compact with plug-n- AC short circuit fault current over 2 3 cycles Arms power efficiently.The brain of the semiconductor-based microinverter is our proprietary play connectors application specific integrated circuit(ASIC)which enables the microinverter to operate In Max.units per 20 A(L-L)branch circuit' 11 grid-tied or off-grid modes.This chip is built in advanced 55nm technology with high speed Power Line Communication(PLC) digital logic and has superfast response times to changing loads and grid events,alleviating between components Total harmonic distortion `5 constraints on battery sizing for home energy systems. Faster installation with simple two-wire Overvoltage class AC port III cabling 30 AC port backfeed current mA ,Enphase High productivity and reliability Power factor setting 1.0 Produce power even when the grid is Grid-tied power factor(adjustable) 0.85 leading-0.85 lagging down" Peak efficiency % 97.8 97.7 More than one million cumulative hours CEC weighted efficiency % 97.5 97 of testing so Part of the Enphase Energy System,IQ8 IQ8 Series Microinverters redefine Night-time power consumption mw Series Microinverters integrate with the reliability standards with more than one Class II double-insulated enclosure MFfHANICAL DATA IQ Battery,IQ Gateway,and the Enphase million cumulative hours of power-on Optimized for the latest high-powered App monitoring and analysis software. testing,enabling an industry-leading PV modules Ambient temperature range 40°C to+60°C(-40°Fto+140°F) limited warranty of up to 25 years. 4%to 100%(condensing) Relative humidity range Microgrid-forming DC Connector type MC4 Complies with the latest advanced grid Dimensions(H x W x D) 212 mm(8.3")x 175 mm(6.9")x 30.2 mm(1.2") support" Weigh 1.08 kg(2.381bs) CERTIFIE Remote automatic updates for the latest grid requirements Cooling Natural convection-no fans Configurable to support a wide range Approved for wet locations Yes Connect PV modules quickly and easily IQ8 Series Microinverters are UL listed of grid profiles PD3 to IQ8 Series Microinverters using the as PV Rapid Shutdown Equipment and Pollution degree included Q-DCC-2 adapter cable with conform with various regulations,when Meets CA Rule 21(UL 1741-SA)and IEEE installed according Enclosure Class Ildoubie-insulated,corrosion resistant polymeric enclosure plug-n-play MC4 connectors. 9 to manufacturer's 1547.2018(UL 1741-SB 3r'Ed.) instructions. Environ.category/UV exposure rating NEMA Type 6/outdoor Note: COMPLIANCE OTMOMM IQ8 Microinverters cannot be mixed together with CA Rule 21(UL 1741-SA),UL 62109-1,IEEE 1547:2018(UL 1741-SB 3r1 Ed.),FCC Part 15 Class B,ICES-0003 Class B,CAN/CSA-C22.2 NO.107.1-01 previous generations of Enphase microinverters 0Q7 Certifications This product is UL Listed as PV Rapid Shutdown Equipment and conforms with NEC 2014,NEC 2017,and NEC 2020 section 690.12 and C22.1- Series,IQ6 Series,etc)in the same system. 201E Rule 64-218 Rapid Shutdown of PV Systems,for AC and DC conductors,when installed according to manufacturer's instructions. 'Only when installed with IQ system controller 2,meets ul_1741 •'IQ8M and I08A support split-phase,240V installations only. (1)Pairing PV modules with wattage above theiimit may result In additional clipping losses.See the compatibility calculator at ©2022 Enphase Energy.All rights reserved.Enphase,the Enphase logo,108 Microinverters, https://Iink.anphase.com/module-compatibility.(2)Nominal voltage range can be extended beyond nominal if required by the utility. IQBMA-I2A-DS-0069-03-EN-US-2022-12-27 and other names are trademarks of Enphase Energy,Inc.Data subject to change. IQ8MA-I2A-DS-0069-03-EN-US-2022-12-27 (3)Limits may vary.Refer to local requirements to define the number of microinverters per branch in your area. Enphase IQ Combiner 4/4C MODEL NUMBER Data Sheet Enphase Networking IQ Combiner 4 (X-IQ-AM1-240-4) IQ Combiner 4 with Enphase IQ Gateway printed circuit board for integrated revenue grade PV production metering ANSI C1Z20+/-0.59G)and consumption monitoring(+/-2.53/o).Includes a silver solar shield to match the IQ Battery system and IQ System Controller 2 and to deflect heat IQ Combiner 4C(X-IQ-AM1-240-4C) IQ Combiner 4C with Enphase IQ Gateway printed circuit board for integrated revenue grade PV production metering (ANSI C12.20+/-0.59/)and consumption monitoring(+/-2.51/).Includes Enphase Mobile Connect cellular modem (CELLMODEM-Ml-06-SP-05),a plug-and-play industrial-grade cell modem for systems up to 60 microinverters. (Available in the US,Canada,Mexico,Puerto Rico,and the US Virgin Islands,where there is adequate cellular service in Enphase The Enphase IQ Combiner 4/4C with Enphase the installation area.)Includes a silver solar shield to match the IQ Battery and IQ System Controller and to deflect heat.ACCESSORIES AND REPLACEMENT PARTS (not included,order separately) IQ Gateway and integrated LTE M1 cell Q Combiner 4/4 C Ensemble Communications Kit •'Includes COMMS-KIT-Ol and CELLMODEM-Ml-06-SP-05 with 5-year Sprint data plan For modem (included only with IQ Combiner 4C) COMMS-CELLMODEM-MI-06 Ensemble sites CELLMODEM-MI-06-SP-05 4G based LTE-Ml cellular modem with 5-year Sprint data plan X-IQ-AM1-240-4 consolidates interconnection equipment CELLMODEM-MI-06-AT-05 4G based LTE-Ml cellular modem with 5-year AT&T data plan Circuit Breakers Supports Eaton BR210,BR215,BR220,BR230,BR240,BR250,and BR260 circuit breakers. X-IQ-AM1-240-4C into a single enclosure and streamlines IQ BRK-10A-2-240V Circuit breaker.2 pole,10A,Eaton BR210 BRK-15A-2-240V Circuit breaker,2 pole,l5A,Eaton BR215 microinverters and storage installations by BRK-20A-2P-24OV Circuit breaker,2 pole,20A,Eaton BR220 BRK-15A-2P-240V-B Circuit breaker,2 pole,l5A,Eaton BR215B with hold down kit support providing a consistent, pre-wired solution for BRK-20A-2P-24OV-B Circuit breaker,2 pole,20A,Eaton BR220B with hold down kit support EPLC-01 Power line carrier(communication bridge pair),quantity-one pair residential applications. It offers up to four XA-SOLARSHIELD-ES Replacement solar shield for IQ Combiner 4/4C 2-pole input circuits and Eaton BR series XA-PLUG-120-3 Accessory receptacle for Power Line Carrier in IQ Combiner 4/4C(required for EPLC-Ol) n - ENPHASE b u S ba r assembly. XA-ENV-PCBA-3 Replacement IQ Gateway printed circuit board(PCB)for Combiner 4/4C X-IQ-NA-HD-125A Hold down kit for Eaton circuit breaker with screws ELECTRICAL SPECIFICATIONS Smart Rating Continuous duty Includes IQ Gateway for communication and control System voltage 1201240 VAC,60 Hz " Includes Enphase Mobile Connect cellular modem Eaton BR series busbar rating 125 A r,l � (CELLMODEM-Ml-06-SP-OS),included only With IQ Max.continuous current rating 6 A " Combiner4C Max.continuous current rating(input from PV/storage) 64A Includes solar shield to match Enphase IQ Battery Max.fuse/circuit rating(output) 90 A aesthetics and deflect heat Branch circuits(solar and/or storage) Up to four 2-pole Eaton BR series Distributed Generation(DG)breakers only(not included) Flexible networking supports WI-Fi, Max.total branch circuit breaker rating(input) 80A of distributed generation/95A with IQ Gateway breaker included Ethernet,Or Cellular Envoy breaker 10A or 15A rating GE/Siemens/Eaton included I Optional AC receptacle available for PLC bridge Production metering CT 200 A solid core pre-installed and wired to IQ Gateway Provides production metering and consumption Consumption monitoring CT(CT-200-SPLIT) A pair of 200 A split core current transformers monitoring MECHANICAL DATA Dimensions(WxHxD) 375 x 49.5 x 16.8 cm(14.75"x 19.5•x 6.63").Height is 21.06"(53.5 cm)with mounting brackets. Simple �- Weight ZS kg(16.5 Ibs) Centered mounting brackets support single Ambient temperature range -400 C to+460 C(-400 to 1150 F) stud mounting Cooling Natural convection,plus heat shield I Supports bottom,back and side conduit entry type of carbonate construction Enclosure environmental rating Outdoor,NRTL-certified,NEMAt e3R,p y Up to four 2-pole branch circuits for 240 VAC plug-in breakers(not included) Wire sizes 20 A to 50 A breaker inputs:14 to 4 AWG copper conductors 60 A breaker branch input:4 to 1/0 AWG copper conductors X-IQ-AM1-240-4C 80A total PV or storage branch circuits Main lug combined output:10 to 2/0 AWG copper conductors Neutral and ground:l4 to 1/0 copper conductors Always follow local code requirements for conductor sizing. Reliable Altitude To 2000 meters(6,560 feet) Durable NRTL-certified NEMA type 3R enclosure INTERNET CONNECTION OPTIONS Five-year limited warranty Integrated Wi-Fi 802.11b/g/n Two years labor reimbursement program coverage Cellular CELLMODEM-M1-06-SP-05,CELLMODEM-M1-06-AT-05(4G based LTE Ml cellular modem).Note that an Enphase Mobile Connect cellular modem is required for all Ensemble installations. included for both the IQ Combiner SKU's Ethernet O (or,802.3,Cat5E Optional, Cat 6)UTP Ethernet cable (not included) P UL listed COMPLIANCE Compliance,IQ Combiner UL 1741,CAN/CSA C22.2 No.107.1,47 CFR,Part 15,Class B,ICES 003 Production metering:ANSI C12.20 accuracy class 0 5(PV production) U� Consumption metering:accuracy class 2.5 C ompliance,IQ Gateway UL 60601-1/CANCSA 22,2 No.61010-1 LISTED X-IQ-AM1-240-4 To learn more about Enphase offerings,visit en�hase.com u ENPHASE. To learn more about Enphase offerings,visit enphase.com E N P H AS E O 2022 Enphase Energy.All rights reserved Enphase,the Enphase logo,IQ Combiner 4/4C,and other names are trademarks of Enphase Energy,Inc Data subject to change.02,14-2022 Data Sheet Enphase Q Cable Accessories Enphase Q Cable Accessories REGION:Americas CONDUCTOR SPECIFICATIONS Certification UL3003(raw cable),UL 9703(cable assemblies),DG cable Flame test rating FT4 Compliance RoHS,OIL RES I,CE,UV Resistant,combined UL for Canada and United States Conductor type THHN/THWN-2 dry/wet Enphase The Enphase Q Cable'"' and accessories are art of P p Disconnecting means The AC and DC bulkhead connectors have been evaluated and approved by UL for use as the load-break the latest generation Enphase IQ System".These disconnect required by NEC 690 QCable Accessories accessories provide simplicity, reliability,and faster Q CABLE TYPES/ORDERING OPTIONS Installation times. Connectorized Models Size/Max Nominal Voltage Connector Spacing PV Module Orientation Connector Count per Box Q-12-10-240 12 AWG/277 VAC 1.3 m(4-2 ft) Portrait 240 Q-12-17-240 12 AWG/277 VAC 2.0 m(6.5 ft) Landscape(60-cell) 240 Q-12-20-200 12 AWG/277 VAC 2.3 m(7.5 ft) Landscape(72-cell) 200 ENPHASE Q CABLE ACCESSORIES Name Model Number Description Raw Q Cable Q-12-RAW-300 300 meters of 12 AWG cable with no connectors Enphase Q Cable Field-wireable connector(male) Q-CONN-10M Make connections from any open connector Two-wire,double-insulated Enphase Q Cable Field-wireable connector(female) Q-CONN-10F Make connections from any Q Cable open connector is 50%lighter than the previous generation Cable Clip Q-CLIP-100 Used to fasten cabling to the racking or to secure looped cabling Enphase cable Disconnect tool Q-DISC-10 Disconnect tool for Q Cable connectors,DC connectors,and AC module mount New cable numbering and plug and play connectors speed up installation and simplify Q Cable sealing caps(female) Q-SEAL-10 One needed to cover each unused connector on the cabling wire management Terminator Q-TERM-10 Terminator cap for unused cable ends Link connectors eliminate cable waste Enphase EN4 to MC4 adaptor' ECA-EN4-S22 Connect PV module using MC4 connectors to IQ micros with EN4(TE PV4-S SOLARLOK). 150mm/5.9"to MC4. Enphase EN4 non terminated adaptor' ECA EN4-FW For field wiring of UL certified DC connectors.EN4(TE PV4-S SOLARLOK)to non-terminated cable 150mm/5.9" Enphase EN4 to MC4 adaptor(long)' ECA-EN4-S22-L Longer adapter cable for EN4(TE PV4-S SOLARLOK)to MC4.Use with split Field-Wireable Connectors cell modules or PV modules with short DC cable.600mm/23.6" Easily connect Q cables on the roof without Replacement DC Adaptor(MC4) Q-DCC-2 DC adaptor to MC4(max voltage 100 VDC) complex wiring Replacement DC Adaptor(UTX) Q-DCC-5 DC adaptor to UTX(max voltage 100 VDC) Make connections from any open connector and center feed any section of cable within 1.Qualified per UL subject 9703. branch limits Available in male and female connector types TERMINATOR SEALING CAPS Terminator cap for unused cable Sealing caps for unused aggregator ends,sold in packs of ten and cable connections (Q-TERM-10) W (Q-BA-CAP-10 and Q-SEAL-10) DISCONNECT TOOL CABLE CLIP t Plan to use at least one per Used to fasten cablingto the racking installation,sold in packs often or to secure looped cabling,sold in (Q-DISC-10) packs of one hundred(Q-CLIP-100) To learn more about Enphase offerings,visit enphase.com ©2020 Enphase Energy All rights reserved Enphase,the Enphase logo,Enphase IQ 7A.Enphase IQ Battery,Enphase Enlighten,Ennhase IQ EN P H A S E. Envoy,and other trademarks or service names are the trademarks of Enphase Energy,Inc Data subject to change E N P H A S E. To learn more about Enphase offerings,visit enphase.com 2020-06-26 man //r IRON RIDGE Ai rd" Racking System AireT""All Rail Aire'"A2 Rail Aire"" Rail Ties Aire TM Dock IWOI The lighter, open Aire TM The tougher, open AireTI Structurally connect and Connects AireT"' Rails to rail for standard conditions. rail for higher load capacity. bond AireT`" Rails together attachments with ease. -� 6'spanning capability 8'spanning capability • Reinstallable, up to 5x Clicks on, slides easily - Wire management tray Wire management tray • Internal splice design Drops into open slots • Mill or anodized black Mill or anodized black • No more splice rules Anodized assembly • Aire TN' Lock Mids AireTm Lock Ends AireTm Lock Stealth AireTm Lug yw f `4 _ i i► r Securely bond between Securely bond modules to Securely bonds modules to Bonds AireTm Rails to modules to AireTm Rails. AireTm Rails along ends. rail ends, entirely hidden. grounding conductors. s Fits 30-40mm modules Fits 30-40mm modules • Angled for easy install Simplified with single bolt • Utilizes UFO°design Easy rail engagement • Robust tether leash Low-profile form factor . Minimal 1/2"gap Clean aesthetics • Fits most modules Works with 10-6 AWG 3reathe easy with accelerated installati, The AireTm racking system has been carefully crafted to streamline every part of the installation process, taking out all of the tiresome hassles—so that you get off the roof and on to your next project faster than ever. AireTm Caps Aire' Clip AireTm MLPE Mount AireTm All Tile Hook AireTm retains the strength and reliability that IronRidge installers have come to depend on. Whether you're a _ seasoned installer with years under your belt or just getting started in solar, breathe easy with open Aire TM. � �+ Strength Tested PE Certified • All components have been evaluated ® Pre-stamped engineering letters are Block entry and provide a Keeps wiring contained in Securely bonds MLPE and Attaches rails to tile roofs, for superior structural performance. available online for most states. finished look to AireTm Rails. open AireT"' Rail channels. accessories to AireTm Rails. with AireT"' Dock included. • Stay secure on rail ends No module interference • Glove-friendly installation Works on flat, S, &W tiles • Symmetrical, with drain Simple press-in design • Lays flush in rail channel Single-socket installation Class A Fire Rating Design Assistant Cover rough-cut ends Slot for easy removal • Low profile form factor Optional deck flashing Certified to maintain the fire resistance l� Free online software makes it simple rating of the existing roof structure. to create, share, and price projects. Desi n Assistant �.�``'c�Vsr''%., Approved for FL Hurricane Zones g � F0 UL 2703 Listed System 25-Year Warranty Quickly go from rough layout =*Q *' Aires' has Florida Product Approval. to fully engineered system. Additional details can be found on the ® Entire system and components meet Products are guaranteed to arrive - STATE �ti.� Florida Building Code website. Go to IronRidge.com/design ; `�,a�/,��, the latest effective UL 2703 standards. without any impairing defects. ''��°;�����na°���`� L_CaJIL o• M0 2022 IronRidge,Inc.All rights reserved.U.S.Patents Pending.Version 1.0 _ ����_ MOM IRONRIDGE JAIRE RAIL Al ITEM NO DESCRIPTION QTY IN KIT 1 Aire Rail, Al, Black(or Clear), 170 1 Part Number Description AE-Al-170B AIRE RAIL, Al, BLACK, 170 AE-Al-170M AIRE RAIL, Al, MILL, 170 1) Aire Al 1.40 F�1.17 170 -T 1.38 1.04JE1.70 0.22 Part Number Material Value AE-Al-170B 6000-Series Aluminum Black AE-Al-170M 6000-Series Aluminum Clear v1.0 IRONRIDGE AIRE LOCK MID v. IRONRIDGE AIRE LUG (CLEAR AND BLACK) 1 4 2 3 ITEM NO. DESCRIPTION OTY IN KIT 0 1 CAP SCREW, 5/16 X 3/4, HEX HEAD 1 2 TOP PLATE GROUNDING LUG 1 3 RETAINING CLIP, GROUNDING LUG 1 ITEM NO. DESCRIPTION 4 T-NUT, SHEET METAL 1 AE-MID-01-Al AIRE LOCK MID, CLEAR AE-MID-01-B1 AIRE LOCK MID, BLACK PART NUMBER DESCRIPTION WIRE SIZE RANGE(AWG) AE-LUG-01-M1 AIRE LUG 6-10 1)CAP SCREW, 5/16 X 3/4 3)RETAINING CLIP 1.00 _ � 1.12 1)AIRE LOCK MID 75 .o 0. 0 28 1.10 + 0.50 0.30 1/2" HEAD -5/16-18 THD i J 1/2" Head Property Value Property Value � 1 ' w00 UO w Material 300 Series Stainless Steel Material Polypropylene m 0.44 Finish Clear Finish Black ao � O�� 18 g I 2)TOP PLATE 4)T-NUT, SHEET METAL 0 M 1.16 1.50 1.18 0.26 0.95 2 1.40 0.45 0.75 Property Value Property Value Item No. Material Finish Material Tin Plated Aluminum Material 300 Series Stainless Steel 1 300 Series Stainless Steel Clear and Black Finish Clear Matte Finish Clear 2 Polypropelene Black v1.0 v1.0 4X 0 .32 THRU THIS EDGE TOWARDS ROOF RIDGE% 10 (CLEARANCE FOR 5/16" HARDWARE) - 9 s 4 O 04.000 O Q o 8 0 O , 18.00 7 2.500 6 1 6.50 f— 01 .250 5 I f 9.00 — 3.750 .500 18.00 -� 1 .500 �_ 4 OUl4K I 1 .90 FLASHING HEIGHT 3 ABASE (ITEM 2) AND (ITEMS 4 & 5) POST (ITEM 6) 2 ITEM DESCRIPTION QTY. POST AND FLASHING AVAILABLE IN MILL, CLEAR 1 No ANODIZED, AND BRONZE ANODIZED FINISHES. 1 CAP SCREW, HEX HEAD,5/16"-18 X 3/4"UNC-2A,GRADE 8 1 2 QBASE, 1-1/4"ID, FOR 5/16"HARDWARE,A360.1 CAST AL 1 STAINLESS STEEL LAG SCREWS INCLUDED WITH 3 LAG SCREW, HEX HEAD,5/16"X 3",ZINC 2 ANODIZED FINISHES. Quick Mount PV: 4 FLASHING,SPUN CONE, 18"X18"X.032",3003 AL,MILL 1 5 COLLAR,COUNTER FLASHING, 1-1/4"ID EPDM 1 TITLE: 6 POST, 1-1/4"OD X 3-1/4", 6063-T5,MILL 1 QMNS: QBASE SHAKE AND SLATE 7 WASHER,SEALING, 5/16"ID X 1-1/4'OD, EPDM BONDED SS 1 MOUNT 8 WASHER, FENDER,5/16"ID X 1"OD, 18-8 SS 1 9 WASHER,SPLIT-LOCK,5/16"ID, 18-8 SS 1 UNLESS OTHERWISE SPECIFIED: SIZE DRAWN BY: RAD REV DIMENSIONS ARE IN INCHES 10 CAP SCREW, HEX HEAD,5/16"-18 X 1"UNC-2A, 18-8 SS 1 TOLERANCES: A DATE: 1/15/2013 6 _ FRACTIONAL±1/8 PROPRIETARY ANDCONNDENTIAL TWO PLACE DECIMAL ±.18 THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF QUICK MOUNT PV.ANY REPRODUCTION IN PART OR AS DO NOT SCALE DRAWING THREE PLACE DECIMAL ±.125 SCALE:1:8 I W EIGHT:1.93 SHEET 1 OF 1 A WHOLE WITHOUT THE WRITTEN PERMISSION OF QUICK MOUNT PV IS PROHIBITED. 5 4 I 3 2 T 4AIN&I WWI H E R S 0 N ENGINEERING Structural Analysis Report For Photovoltaic System Addition to Existing Structure MCPH At ��` OF WAS y,pr The RECCHI Residence 1-3025165 19417 45TH DR NE c/sT10'�v��'�` ARLINGTON, WA 98223 NAL� This item has been digitally signed and sealed on 09/21/2023 Designed in Accordance with IBC/IRC 2018,ASCE 7-16 Date: 9/20/23 Job#: 23-14184 E.O.R.: Ryan McPherson, P.E. Ryan JMcPheson - Y 9240 Limonite Ave CITY Off' ARLITmTGTON I Jurupa Valley, CA 92509 BUILDING DEPARTMENT ! Mobile: (909) 566-0066 APPROVED Email: SE@mcpe.group DATE 3 BY Received NO CHANGES AUTHORIZED UNLESS APPROVED BY THE SEP 2 2 2023 BUILDING INSPECTOR 1of7 9/20/2023 3:59 PM ©McPherson Engineering r� BY: T.S. ENGINEERING Date: 9/20/23 Table Of Contents Project Info 3 Gravity Loads 4 Lateral Loads 5 Wind Uplift Design 6 Summary 7 *Note: This engineering report is limited to the information presented to Engineer via plans,site information, photos,and written correspondence as provided by Client. On-site structural observations and verification of site conditions are not included herein. Engineering for manufactured products such as photovoltaic modules or racking systems is excluded from this report. Please refer to the manufacturer's specifications, certifications,and pre-engineered packages for product engineering. Installations of solar modules and related equipment must be performed in accordance with manufacturer recommendations, local codes, local regulations, industry best practices,and applicable safety standards. Owner and/or Contractor shall notify Engineer should any damage,deterioration,or descrepancies between current condition of the structure or otherwise as this letter describes before proceding with construction. This letter applies nniv-_ .-1.n c of the structure where solar modules will be supported and the supporting elements. 2of7 9/20/2023 3:59 PM ©McPherson Engineering � By: T.S. MCPHERSON ENGINEERING Date: 9/20/23 Project Info Location: 19417 45TH DR NE ARLINGTON,WA 98223 Existing Structure Info: Number of Stories= 1 Aroof= 1800 sq.ft. Roof Square Footage Asrd flr= 0 sq.ft. Third Floor Square Footage(if applicable) A2nd flr= 0 sq.ft. Second Floor Square Footage(if applicable) Site Properties: Lattitude= 48.172946 Longitude= -122.169218 Ss= 1.056 S, = 0.377 Exposure Category= C Ult.Wind Speed= 98 m.p.h. P.V.Array Info: Model= REC410AA PURE Height of Panel= 71.70 in. Width of Panel= 40.00 in. Area of Panel= 19.9 ft.2 Number of New Panels= 28 Number of Exis. Panels= 0 Total Area of Array= 557.7 ft.2 Spacing of Anchors= 4.0 ft. max.on center rows of racks per panel= 2 Panel Tilt= 7-27 deg 3of7 9/20/2023 3:59 PM ©McPherson Engineering �MCPHERSON By: T.S. A1cPE 1 ENGINEERING Date: 9/20/23 Gravity Loads Existing Loads: Roof Design Loads: Roofing= 2.0 p.s.f. Metal Paneling roofing Sheathing= 1.5 p.S.f. 1/2" Plywood Framing= 1.5 p.s.f. 2x8 Rafters Misc= 1.0 p.s.f. DLri= 6.0 p.s.f. Roofing Dead Load(applied to top of rafters/trusses only) Ceiling= 2.0 p.s.f. Drywall and framing DLr2 = 8.0 p.s.f. Total Existing Roof Dead Load LLr= 20.0 p.s.f. Roof Live Load(Per C.B.C,Table 1607.1) SL= 25.0 p.s.f. Snow Load Floor Design Loads: (if applicable) Flooring= 10.0 p.s.f. Weight of floor finish Sheathing= 2.2 p.s.f. 3/4" plywood Framing= 2.0 p.s.f. 2x framing or manufactured floor truss Interior Partitions= 15.0 p.s.f. 2xframed walls with drywall finish each side Ceiling= 5.0 p.s.f. Drywall ceiling finish below Misc. = 0.8 p.S.f. DLf= 35.0 p.s.f. Total Existing Floor Dead Load L= 179.0 ft Proposed Loads: Panels= 2.8 p.s.f. weight of panels including rack system DLri_proposed= 8.8 p.s.f. Proposed Roof Dead Load(applied to top only) DLL-proposed= 10.8 p.S.f. Total Proposed Roof Dead Load LLr_proposed = 0.0 p.S.f. Roof Live Loads need not be applied to the area covered with by PV panel where the clear space between the panels and the roof sureface is 24in or less,1607.13.5.1 item 1 Exception Check Proposed Gravity Loads: Total Existing Roof Load Wax= (DLrt + LLr) (Aroof) = 46.8 kips Total Proposed Roof Load Wprop= (DLr, + LLr) (Aroof'Aarray) + (DLr1_proposed+ LLr—proposed) (Aarray) = 37.2 kips Proposed Load Demand Wprop-Wax = -20.54% TOTAL DECREASE IN GRAVITY LOADS, PANELS OKI Wex 4of7 9/20/2023 3:59 PM ©McPherson Engineering MCPHERSON By: T.S. MCP£ 1 ENGINEERING Date: 9/20/23 Lateral Loads Seismic Design Parameters Risk Category= 2 Per Table 1-5-1 R= 6.5 Response Modification Factor(Table 12-2.1) Site Class= D Per 11.4.2 le= 1 Seismic Importance Factor(Table 1.5-2) Ss= 1.06 Short Period P.G.A. Si = 0.38 1-Sec Period P.G.A. S.D.C.= D Seismic Design Category Per 11.6 Fa= 1.20 Site Coefficient per Table 11.4-1 ASCE 7-16 Supplement#1 Tables used for Fa and Fv Fv= 1.70 Site Coefficient per Table 11.4-2 (note:section 11.4.8 Exception#2 calc used) SMS- SDs Fa= 1.27 Short Period M.C.E. Per Eq.11.4-1 SM1- SD1 Fv= 0.64 1-Sec Period M.C.E.Per Eq.11.4-2 SDS = 2/3 (SMS) = 0.84 Short Period Design Parameter Per Eq 11.4-3 SD1 = 2/3 (SM1) = 0.43 1-Sec Period Design Parameter Per Eq 11.4-4 Approximate Fundamental Period(Per 12.8.2.1) T=Ct(hn)x per Eq.12.8-7 hn = 15 ft Ct= 0.02 (per table 12.8-2) x= 0.75 (per table 12.8-2) T= 0.15 sec Approximate Fundamental Period TL = 8 sec Long-Period Transition Period per Figure 22-12 Seismic Response Coefficient(Per 12.8.1.1) CS = (SDS le)/R = 0.13 Seismic Response Coefficient Per Eq.12.8-2 Cs1 = 1.5*(SD1 le)/R T= 0.65 Max.Seismic Response Coefficient Per Eq. 12.8-3 if T <TL Cs2= 0.01 Min.Seismic Response Coefficient Per Eq.12.8-5 Cs2= 0.044 SDS le= 0.04 Min.Seismic Response Coefficient Per Eq.12.8-5 Cs3= 0.5 S1 le/R = 0.03 Min.Seismic Response Coefficient Per Eq.12.8-6 if S1 >_ 0.69 CS = 0.13 Design Seismic Coefficient Check Additional Base Shear Wexisting = 25.1 kips Weight of Existing Structure Wpaneis= 1.5 kips Weight of Proposed Panels Vexisting = Cs Wexisting = 3.3 kips Roof Level Shear of Existing Structure Vpanels= Cr,Wpanels= 0.2 kips Additional Roof Level Shear of Proposed Panels Vpanels = 6.12% < 10% PER I.E.B.C. 1103.2 Exception#2,STRUCTURE DOES NOT Vexisting REQUIRE SEISMIC RETROFIT, PANELS OK! 5of7 9/20/2023 3:59 PM ©McPherson Engineering �MCPHERSON By: T.S. rncRE ' ENGINEERING Date: 9/20/23 Wind Uplift Anchorage Rooftop Solar Panels Wind Pressures(Section 29.4,ASCE 7-16) Vult= 98 mph K,= 1.00 (sec 26.8.2) h= 15 ft Fxposure Category= C KZ= 0.85 (sec 26.10.1) Roof Zone= 2 Kd= 0.85 (sec 26.6) Roof 6= 7-27 deg Ke= 1.00 (sec 26.9) qh=0.00256 KZ Kzt Kd Ke Vz qh= 17.76 (eq.26.10-1) GPp= -2 uplift VE= 1.5 (sec 29.4.4) Va= 0.77 (fig 29.4-8) Flush Mounted Panels-ASCE Section Flat Roof Panels-ASCE Section 29.4.3 29.4.4(where applicable) (where applicable) VE= 1.5 FIG 29.4-7) VC= 0.96 (fig 29.4-7) hpt= 0 Va= 0.77 (fig 29.4-8) Vp= 0.9 (fig 29.4-7) W= 0.00 deg(panel tilt) GPp= -2 uplift GCrm= 1.4 uplift p = qh(GPp) YE Ya (eq 29.4-7) p = qh(GC,,,) YE YC Yp (eq 29.4-6) p = -41.0 p.s.f. p = 32.2 p.s.f. Check Anchorage to Existing Structure 0.6DL-0.6W controlling load combination(eq.16-15 for ASD) DL= 2.8 p.s.f. dead load of panel(inlcuding rack system) W= 41.0 p.s.f. wind load normal to face of panel Arealag = 12.0 sq.ft. area tributary to each anchor SPanc= 4.0 ft. spacing of anchors P"piift=Areaiag (0.6DL-0.6W) = 274.1 Ibs total uplift on anchor Material = DFL lumber anchor material Dialag = 5/16 in. diameter of screw Penlag= 2.5 in. min.penetration to existing framing wlag = 266 Ib/in. withdrawal load per in.of penetration per NDS Table 11.2A CD= 1.6 load duration factor for wind per NDS Table 2.3.2 Ct= 0.8 temperature factor per NDS Table 2.3.3 NOscrews= 2 number of screws in withdrawal Pallow=Penlag(Wlag CD Ct)* Noscrews= 1702.4 Ibs total allowable withrawal on anchor Puplift 0.16 < 1.00 Anchor is OKI Pallow Anchorage= USE (2)5/161N. DIA. LAG SCREW(S)AT 4FT. MAX. O.C. W/2.51N. MIN. PENETRATION 6of7 9/20/2023 3:59 PM CMcPherson Engineering By: T.S. Date: 9/20/23 ENGINEERING Summary Gravity Loads: DEMAND DECREASED BY 20.54%=OKI Lateral Loads: DEMAND INCREASED BY 6.12%< 10%=OKI Anchorage: DEMAND OF 274.11.13. < CAPACITY OF 1702.4LB. = OKI USE (2) 5/161N. DIA. LAG SCREW(S)AT 4FT. MAX. O.C.W/2.51N. MIN. PENETRATION Summary: STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY ANCHORS ON EAVES/OVERHANGS ARE OKI 7 of 7 9/20/2023 3:59 PM ©McPherson Engineering I BLOSSOM SOLAR Gs 11 .48 kW Photovoltaic Solar System W-, � . 4 rdbo i 18" From Ridge ' 36" Pathway to Ridge --A Net Meter,MSP Solar Combiner Panel Joe Recchi Main Disconnects Solar Service 19417 45th Dr NE Disconnect Line Side Connection Location Arlington, WA 98223 Rapid Shutdown Switch Connector Part Number (Adjacent to PIet Meter& Main Disconnects) IPCS4002 Received AUG .10 2023 1. I 1� i �': -z �f C> For the best experience, open this PDF portfolio in Acrobat X or Adobe Reader X, or later. Get Adobe Reader Now! C> For the best experience, open this PDF portfolio in Acrobat X or Adobe Reader X, or later. Get Adobe Reader Now! Permit#: 5579 Permit Date: 08/29/23 Permit Type: SOLAR INSTALLATION Project Name: Recchi Solar Project Applicant Name: Madison Martinez, Blossom Solar Applicant Address: 3609 168th St NE#3507 Applicant, City, State, Zip: Arlington,WA 98223 Contact: Madison Martinez Phone: 425-610-7067 Email: ofEce@blossomsolar.com Scope of Work: 11.48kW grid tied roof mounted solar system Valuation: 37961.76 Square Feet: 1100 Number of Stories: I Construction Type: VB Occupancy Group: R-3; Residential ID Code: Permit Issued: 10/13/2023 Permit Expires: 10/11/2024 Form Permit Type: SOLAR INSTALLATION Status: VOID/WITHDRAWN Assigned To: Kristin Foster Property Parcel# Address Legal Description Owner Name Owner Phone Zoning RECCHI JOSEPH P 100 SINGLE 00928200007300 19417 45TH DR NE JR FAMILY RESIDENCE Plan Reviews Date Review Type Description Assigned To Review Status 09/22/2023 SOLAR INSTALLATION BUILDING Approved Fees Fee Description Notes Amount Web Only-Building Plan Review Enter 1 if permit is for:accessory dwelling $509.46 unit,accessory structure,commercial addition,commercial alteration, commercial building,commercial racking, duplex,master sign program,multi-family, residential addition,residential alteration, residential single family,solar installation, spray booth installation.(Table 4-2) Credit Card Service $15.28 Processing/Technology $25.00 Building Permit Table 4-1 $783.78 Credit Card Service $24.26 Permit Extension $110.00 Credit Card Service $3.30 Total $1,471.08 Attached Letters Date Letter Description 10/13/2023 Building Permit 08/29/2023 Web Form-Building Application Payments Date Paid By Description Payment Type Accepted By Amount 08/29/2023 XBP Con£ $509.46 152755960 08/29/2023 Weston Ferguson 152755960 Kristin Foster $15.28 10/13/2023 XBP Conf: $808 78 156098890 10/13/2023 Weston Ferfuson 156098890 Kristin Foster $24.26 02/26/2024 XBP Con£ $110.00 166596460 02/26/2024 Stephanie Stewart 166596460 $3.30 Outstanding Balance $0.00 Notes Date Note Created By: 03/07/2024 Received permit cancellation request.Saved the request to the folder. Hannah Hardwick 02/26/2024 permit extension request received and routed for review. Hannah Hardwick 02/26/2024 The permit extension has been approved pending fees.Emailed to have fees paid for extension. Hannah Hardwick Permit not extended until fees are paid. 02/26/2024 Permit extension fee has been paid.The new expiration date is 10/11/2024 Hannah Hardwick 02/23/2024 sent expiration notice Hannah Hardwick 10/13/2023 payment made.sent permit for signature to applicant Hannah Hardwick 09/22/2023 Received structural calcs. Kristin Foster 09/20/2023 Emailed that we need stamped plans by a structural engineer. Kristin Foster 09/08/2023 Received engineered stamped plans,however are not stamped by a structural engineer. Kristin Foster 08/31/2023 Requested a structural engineer's certification letter. Kristin Foster 08/30/2023 Emailed for completed application,plans and engineering if applicable. Kristin Foster 08/30/2023 Received completed application and site plan. Kristin Foster Uploaded Files Date File Name 03/07/2024 18853592-20240307 BLD5579 Permit Cancellation Request.pdf 02/26/2024 18693960-20240226 BLD5579 Permit Extension Request.pdf 10/13/2023 17183246-2023 BLD5579 Signed.pdf 10/13/2023 17180244-20231013 BLD5579 Approved Structural Analysis.pdf 10/13/2023 17180245-20231013 BLD5579 Approved Plans.pdf 08/30/2023 16699428-20230829 BLD5579 MicroinverterSpecs.pdf 08/30/2023 16699429-20230829 BLD5579 PanelSpecs.pdf 08/30/2023 16699430-20230829 BLD5579 RackSystemSpecs.pdf 08/30/2023 16699431-20230829 BLD5579 AttachmentSpecs.pdf