Loading...
HomeMy WebLinkAbout2013-029THE CITY COUNCIL OF THE CITY OF ARLINGTON, WASHINGTON, DO RESOLVE: SECTION 1. That certain comprehensive Transportation Improvement Plan for the six years commencing July 1, 2014 as detailed in the attached "Exhibit A" is hereby adopted as the Official Six Year Transportation Improvement Plan for the City of Arlington. PASSED at a regtilar meeting of the City of Arlington, Washington held on thc. 18'h day ot'Noyernber 2013, Barbra Tolbert, Mayor Kristil Banfield, City C lei-k APPROVED AS TO FORM: 'ne y Stew ?nC nifCi 1�torne No. ITransportation Capital Project Comments 1 Pavement Preservation Program ! nd maintain existing roadway pavement, 4 TBD. 2 :Arlington Trail Construction Program ledestrian trails per the City's Trail Plan (non - ion facilities) 3 67th Ave, Phase 3 - 204th St to Lebanon St ! E 67th Ave between 204th abnd Lebanon. in early 2014. 4 173rd St, Phase 3 pse 5 173rd St, Phase 1 use 1 6 173rd St, Phase 2 struct 173rd St Phase 2 7 Smokey Point Blvd/188th St Intersection calks, and ADA ramps to the Smokey Point Blvd Improvements section 8 ' 211th PI NE - 67th Ave NE to SR530-59th ant to reroute 211th to SR530 via 59th, 2016/17 - i 1.8-Construct frontage road and RIRO at 9 WSDOT - SR531; 43rd Ave to 67th Ave 72nd Ave) per WSDOT route alignment study; provement. 10 : WSDOT - SR531; 67th Ave to SR-9 72nd Ave) from 67th Ave to SR-9; mobility and 11 AWSDOT - SR530/SR9/Burke Signalization Burke and SR9 as described in the WSDOT SR9 an 12 5N000 - 172nd Corridor, SR9 to McElroy oute to Breckhaus-Beach TDR Receiving Area. Road jest. 13 186th St NE - SR9 to City Limits j with sidewalks both sides. The total project (as prepares! by Snoh. County. The City"s portion i 14 .Arlington Valley Road - 67th Ave NE to standard road connecting 67th Ave NE to 204th 204th St NE ign 15 Smokey Point Blvd 175th PL to 200th St NE Lion with West Arlington Plan to determine PLANNING 16 Smokey Point Blvd 200th St NE to SR530 Lion with Island Crossing Development to nts. TOTAL $ fii7TdR'Ti •n TIB Grant Funding PSRC/STP Fundinf Total Other Funding Total City Funds NOTES 1. Project completion dependant on funding availil, 2. City funding includes City Transportation funds'