Loading...
HomeMy WebLinkAbout202 E JACKSON ST NE_BLD20080201_2026 i o�2 'NSPECTION REPORT 1 • Permit No..51dW96-;)01 Lot #: Address: Contractor: (�n C • • Owner: 0. Date: APPROVAL ❑ PARTIAL APPROVAL ❑ OLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE be rework can be;-approv ❑ Please contact inspector. �` j ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Al la Inspector: Date:IF r .� TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork (J Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in )2,kFinal ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: �,y i � T'---� i i i � � i - ► � i ,_ i ■ �� � 1 l' r � � � _ ` • �. � - - - - - � { - i � i i i _ i � 1 i _ 1 � � ti _ � _� 1 Ii 1 I INSPECTION REPORT '—) • Permit No.: L62-0a9b 01 Lot #: Address: 4115 .5- Dl,fmotc- Ave- Contractor:Tn man, Con • • Owner: Kai SLhe(ler Date: la - /a -o 9 ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION EXCORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Wa$ not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. h P✓ Inspector: Date: 44zOq/ TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in XFinal ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: 5 �� / Y 1 3r-7 INSPECTION REPORT --) • Permit No.: o e o uaj Lot #: Address: N 1 S s o L_!2 .-,p i g zc� c Sc.rc s o �o , Contractor: • Owner: Date: ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION PLCORRECTION REQUESTED &-6orrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. hf l i Inspector: . Date. TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove Cl Rough-in 4iLFinal ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: t ti � } I, '+ _ .. I -� �I � - - _ - - � � � �� � - � - - - - � '� - - � - - , _ _ �� � _ - - '� 4 NSPECTION REPORT • Permit No.: oB o z.d Lot#: Address: y Contractor: • Owner: Date: i ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION WZORRECTION REQUESTED Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. 5;:CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Inspector: i. { Date: L—S _0g TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in .�L Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: ./, �� 1 INSPECTION REPORT �� • Permit No.: 1�—��� Lot #: Address: IF Contractor: Pt►'M,g,J boy-Y";"_ • Owner: Date: !G 'a 3 APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. Inspector: Date: �(l-'3 -03,:- TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing WDrywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: i i -� i � � - i i�. Ii i i ri i i ii i _� - - � - i � i i r 4 INSPECTION REPORT • Permit No.: 0 -096% Lot #: Address: �� Contractor: �_f yk eV Owner: r, Date: K ' c6 PO El, El PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection,. ❑ QAILL 435-0674 FOR RE-INSPECTION - 24 hour notice required. vow rpv Pp4i Inspector: Date: !:�-" 'P TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage Insulation ❑ Other: r- I ,. • - ,. •r i _ ii / ;2 I INSPECTION REPORT • Permit No29701ac / Lot #: Address: > 5_' S. Contractor: 3 - • Owner: Date: AAPPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. 14,41 v Inspector: _ Date:&'la-or TYPE OF INSPECTION REQUESTED ❑ Under-floor , Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation Ll Foundation ❑ Shear Nailing ❑ Groundwork Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: I . I �` 1' I ., INSPECTION REPORT • Permit No.: a� Lot #: Address: Contractor: • s Owner: Date: ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION 654.,CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. 047 4 cQ g IH Inspector: Date: A,? TYPE OF INSPECTION REQUESTED ❑ Under-floor 06 Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove '&Rough=i ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: t w i� 1 I 'Z3 t INSPECTION REPORT • Permit No.: 0 fg oLo I Lot #: Address: 41 C -s O 4-,l M p 1 e Contractor: r7✓ti.� }�L,� • ` Owner: Date: 9- /-7- APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. l�ti i3 Inspector: �-r ` Date: %-/S -c)8 TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ee- ;4 Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove 4Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: i 4 ' - 3�S P INSPECTION REPORT Permit No.: oc -a / Lot #: Address: cs s s o�► Contractor: 'Pez-t—!n� C cs 1— Owner:— Date: 9 ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION cellCCORRECTION REQUESTED ,Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. TV, ��:1 rLy�tt' P►�S; Flc+(/f f-j s/vg- w i ST- wesr N , Ta yp �_i oa.,i .4-L& /n1 r0 T t.�n r�6 Ty 6v- T -2>1PP Gr19Zv Inspector: Date: g—/S-,D 8 TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ,Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: i� ■ ■ ■ mim — ■ ■ ■ ■ ■ ■ I ■ • — ■ ■ 17 1 ■ ■ �-L' ■ - MEN ■ — ■ ■ ■ ■ ■ ■ � - mom ■ ■ I- � ■ ■ ~ - 1 IMME ME - • 1 —i . I' . . ' •. d ■ ot, • Mmo1 07 • 1 ■ mmom WIN mom Lim - ■ ■ ■ - ■-` — In ■ ■ ■ - 0 — ■Z ■ No . ■ J No IJL 1 No ■ Anmj: - m No ou Y IN ■ • • � r- ' - 11 ` : I, 1 ■ J `--rc ■ ! - - - 7 ■ — !. !■ mmml r! — ■ ■ ■ MEN — il ■ -i1 sII 771111 ■ ■ ■ - rom ■ • 7 — I — ■ ■0 ■ - ■ ■ . . - ME 1 ■ ■ ■ ■ . . ■ 1 " - "MSPECTION REPORT • Permit No.: (f' Lot #: Address: 411S S. �c sr/✓� Contractor: . � Owner: S�,=A ,--A-e- Date: ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. ZA A Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: I • I 1 - CITY OF ARLINGTON � 238 N,OLYMPIC AVE.-ARLINGTON,WA.98223 'Iddjee e,5 PHONE:(360)403-3421 s�- Permit#: BLD20080201 BUILDING PERMIT Project Address: 4-tF S OLYMPIC AVE, ARLINGTON Parcel No: 00411700701100 PROPERTY OWNER APPLICANT CONTRACTOR KAY SCHELLER KAY SCHELLER PRIMARY CONSTRUCTION LLC 917 WEBSTER ST 917 WEBSTER ST 20615 67TH AVE NE MUKILTEO,WA 98275-1821 MUKILTEO,WA 98275-1821 MUKILTEO,WA 98275 Phone:425.508.0858 Phone:425.508.0858 LICENSE#:PRIMACL944RF EXP:12/1/2009 Email: Email: PLUMBING CONTRACTOR 1 1 D YOUNGS PLUMBING MARYSVILLE,WA Lic#:DYOUNGP976PA Ex :10/1/2009 Lic#: I v: JOB DESCRIPTION FIRE REPAIR VALUATION: $0 PERMIT TYPE:Residential PERMIT GROUP:Fire Repair NUMBER OF STORIES:0 TYPE OF CONSTRUCTION: NUMBER OF DWELLING UNITS:0 OCCUPANT GROUP. ` CODE:2006 OCCUPANT LOAD: 1 BASEMENT:0 1ST FLOOR:O 2ND FLOOR:0 BASEMENT:0 I ST FLOOR:0 2ND FLOOR:0 3RD FLOOR:0 GARAGE:0 DECK:0 OTHER:0 13RD FLOOR:0 GARAGE:0 DECK:0 OTHER:0 FRONT CACK SIDE SETBACK REARSETBACK REQUIRED: PROPOSED: IREQUIRELY. PROPOSED: RE UIRED: PROPOSED: HEIGHT ALLOWED:O PROPOSED:O REQUIRED: PROPOSED: SETBACK NOTES: PERMITAPPROVAL I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY,NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID Signatur Print Name j jDate Rule sed By iDa ATTENTION IT 1S UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED.UBC109/1BCl 10/IRC110. ARCHIVE APPLICANT = ASSESSOR OTHER i BLD20080201 CONDITIONS • None PERMIT FEES Description Fee Amount Paid Balance [Ne C-Plumbing Permit Fee $0.00 $0.00 $0.00 C-Mechanical Permit Fee $0.00 $0.00 $0.00 Total Due: $0.00 $0.00 $0.00 INSPECTIONS THIS PERMIT AUTHORIZES ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY.ANY CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS,SIDEWALKS,DRIVEWAYS,MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION CALL FOR INSPECTIONS BUILDING/ENGINEERING/PARKS/UTILITIES/FINAL(360)435-0674 FIRE(360)403-3607 When calling for an inspection please leave the following information: Permit Number,Job Site Address,Type of Inspection being requested,Contact Name and Phone Number,Date Prefereed,and whether you prefer morning or afternoon. • None H x rn n m y r tTl r tTl ID > C1) '+ m O N a Z O X 00 O n (! x No z o C/ UNi c C m H Na a m O 6 z cn y O � > � � z r n N y fD y R� O r z n n � r � � o I � Z � d 5 a y dd O r Z i O d o CJ Cd d � z � � C y d m ~ n z> IDrD O rt O o ' H It a � fD LT1 � oN 89 d z � t.; C .� J z H rD a' O y n O N N r o (. z cn z c) m 0 M �.3�%,, a Sb A.. I yr � � w W co W O z O ui N 0 00 3 _ 00 !! L— /W� z+ Q J .� V J W .16 .Y.91 �` l•• LL T w S U. .9.9 fizz 3 Cr vl all ®UA ry.all � i' ^ f� � '•.-,� � <z CO)15 E3 I I •� Cd li Il � lu - Iti T - C 1 I S i x - r r II i 1 T � _ J � I I I Primary Construction 20615 67th Ave N,E Arlington,WA 98223 Phone:425-754-0749 Fax:360-618-7266 7/27/2008 Estimate: SCHELLER_KAY Claim Number: 47-M182-479 Insured: SCHELLER,KAY Policy Number: 98-GA-8587-1 Property: PO BOX 95 Type of Loss: Fire MUKILTEO,WA 98275-0095 Deductible: $2,000.00 Home: (425)355-2704 Price List: WASE7178131 Business: (425)513-9897 Restoration/Service/Remodel F=Factored In,D=Do Not Apply Date of Loss: 7/15/2008 Date Inspected: 7/16/2008 Summary for Dwelling Line Item Total 192,331.56 General Contractor Overhead @ 10.0% x 192,331.56 19,233.16 General Contractor Profit @ 10.0% x 192,331.56 19,233.16 Sales Tax @ 8.50% x 230,797.67 19,617.80 Replacement Cost Value (Including General Contractor Overhead and Profit) 250,415.68 Less Deductible (2,000.00) Net Payment $248,415.68 Tim Brocato (425)508-0858 ALL AMOUNTS PAYABLE ARE SUBJECT TO THE TERMS, CONDITIONS AND LIMITS OF YOUR POLICY. Primary Construction is please to present an estimate to complete the restoration to the structure due to fire damage.This estimate is based on damage visible at time of inspection.Any continuing damage hidden from view is not included in this estimate.Could include but not limited to:rot decay,electrical,plumbing,heating,code upgrades,permits,fees or other requirements are not included unless specifically detailed in the text of the bid..These costs:if any,will be identified and document as soon as possible in the construction process.Please contact our office with any questions you may have regarding your project. Sincerely Timothy Brocato (RECEIVED JUL 2 9 2008 COA PERMIT CENTER Coup a-uo8 oa,®t I :� _- .: � . i i'' .� I��},���� ��� Primary Construction SCHELLER,KAY 7/27/200A SCHELLER_KAY Main Level KITCHEN-ONE Ceiling Height: 8' 4ZIT277.44 SF Walls 84.51 SF Ceiling 361.95 SF Walls&Ceiling 84.51 SF Floor 37.67 LF Ceil.Perimeter 34.08 LF Floor Perimeter N Missing Wall: I- 317"X 6'8" Opens into LIVING-ONE Goes to Floor DESCRIPTION QUANTITY UNIT COST RCV 5/8"drywall-hung,taped,ready for texture 361.95 SF 1.46 528.45 Sea]stud wall for odor control(white pigmented shellac) 361.95 SF 0.62 224.41 Texture drywall-machine 361.95 SF 0.27 97.73 Mask per square foot for drywall or plaster work 104.51 SF 0.15 15.68 Seal then paint the walls and ceiling(2 coats) 361.95 SF 0.64 231.65 Mask and prep for paint-plastic,paper,tape(per LF) 37.67 LF 0.89 33.53 Custom cabinets-wall units-42"tall 4.50 LF 152.64 D 686.88 Custom cabinets-wall units-up to 24"tall 3.00 LF 126.52 D 379.56 Cabinetry-lower(base)units-High grade 7.50 LF 145.48 D 1,091.10 Countertop-Flat laid plastic laminate 7.50 LF 34.12D 255.90 4"backsplash for flat laid countertop 11.50 LF 6.78 D 77.97 Countertop edge treatment-wood 7.50 LF 4.87 D 36.53 Countertop subdeck-particle board 15.00 SF 2.08D 31.20 Carpenter-Finish,Trim/Cabinet-per hour 1.50 HR 53.99 D 80.99 Set up and cut outs Light fixture 2.00 EA 60.72 D 121.44 Window sill-the on 2"x 4"wall 5.00 LF 8.69 43.45 SCHELLER_KAY Page:2 Primary Construction SCHELLER,KAY 7/27/2008 CONTINUED-KITCHEN-ONE DESCRIPTION QUANTITY UNIT COST RCV Window blind-horizontal or vertical-Large 1.00 EA 113.42 D 113.42 There is only small,large and extra large. Detach&Reset Refrigerator-top freezer-25 to 30 cf 1.00 EA 50.01 50.01 Detach&Reset Range-freestanding-electric 1.00 EA 49.04 49.04 R&R Angle stop 2.00 EA 29.25 D 58.50 Rough in plumbing-per fixture 1.00 EA 523.09 D 523.09 Plumbing fixture supply line 2.00 EA 13.63 D 27.26 DrainNent line-PVC pipe with fitting and hanger,2" 16.00 LF 9.24 D 147.84 Water supply line-copper with fitting and hanger, 1/2" 16.00 LF 11.92 D 190.72 Sink faucet-Kitchen 1.00 EA 160.06D 160.06 Sink-double 1.00 EA 284.53 D 284.53 Exhaust fan 1.00 EA 150.69 D 150.69 Wall heater 1.00 EA 164.55 D 164.55 Stud wall-2"x 4"x 8'- 16"oc 6.00 LF 11.89 D 71.34 Stud wall between the kitchen and living room is a false wall and will need to be replaced. Labor to frame 2"x 4"x 8'non-bearing wall- 16"oc 6.00 LF 7.24 D 43.44 Baseboard-2 1/4" 34.08 LF 2.05 D 69.86 Paint baseboard-one coat 34.08 LF 0.63 21.47 Totals: KITCHEN-ONE 6,062.29 SCHELLER_KAY Page: 3 t I i Primary Construction SCHELLER,KAY 7/27/2008 LIVING-ONE Ceiling Height:8' irr fr v� a 419.45 SF Walls 215.04 SF Ceiling 634.49 SF Walls&Ceiling 215.04 SF Floor Ij 55.42 LF Ceil.Perimeter 51.83 LF Floor Perimeter k Missing Wall: 1- 37'X 8'0" Opens into HALL-ONE Goes to Floor/Ceiling Missing Wall: 1 - 37'X 6'8" Opens into KITCHEN-ONE Goes to Floor DESCRIPTION QUANTITY UNIT COST RCV 5/8"drywall-hung,taped,ready for texture 634.49 SF 1.46 926.36 Texture drywall-machine 634.49 SF 0.27 171.31 Mask per square foot for drywall or plaster work 272.04 SF 0.15 40.81 Sea]then paint the walls and ceiling(2 coats) 634.49 SF 0.64 406.07 Mask and prep for paint-plastic,paper,tape(per LF) 55.42 LF 0.89 49.32 Window blind-horizontal or vertical-Large 2.00 EA 113.42 D 226.84 Window sill-the on 2"x 4"wall 12.00 LF 8.69 104.28 Wall heater 1.00 EA 164.55 D 164.55 Thermostat-electric heat 1.00 EA 55.66 D 55.66 Baseboard-2 1/4" 51.83 LF 2.05 D 106.25 Paint baseboard-two coats 51.83 LF 0.95 49.24 Casing-2 1/4" 17.00 LF 1.55 D 26.35 Paint door slab only-2 coats(per side) L00 EA 22.08 22.08 Paint door/window trim&jamb-2 coats(per side) 1.00 EA 24.78 24.78 Seal stud wall for odor control 634.49 SF 0.55 348.97 Totals: LIVING-ONE 2,722.87 SCHELLER_KAY Page:4 1 -1 Primary Construction SCHELLER,KAY 7/27/2008 1'tiz,e„{r 101 HALL-ONE Ceiling Height:8' 2'`' _ 340.67 SF Walls 74.21 SF Ceiling 414.88 SF Walls&Ceiling 4"�2 3•� 74.21 SF Floor R S�SL91iE 1 7 q IT 2' 42.58 LF Ceil.Perimeter 42.58 LF Floor Perimeter 1 ar-��2a•a•b rri Missing Wall: 1- 397"X 8'0" Opens into LIVING-ONE Goes to Floor/Ceiling Subroom 2: Clst2 Ceiling Height: 8' 2 54.67 SF Walls 2.92 SF Ceiling T 57.58 SF Walls&Ceiling 2.92 SF Floor C � 6.83 LF Ceil.Perimeter 6.83 LF Floor Perimeter H 2'3"-A an i crone ri Subroom 1: Clst Ceiling Height:8' F 53.33 SF Walls 2.77 SF Ceiling 56.10 SF Walls&Ceiling 2.77 SF Floor 6.67 LF Ceil.Perimeter 6.67 LF Floor Perimeter al DESCRIPTION QUANTITY UNIT COST RCV 5/8"drywall-hung,taped,ready for texture 528.56 SF 1.46 771.70 Texture drywall-machine 528.56 SF 0.27 142.71 Seal then paint the walls and ceiling(2 coats) 528.56 SF 0.64 338.28 Mask and prep for paint-plastic,paper,tape(per LF) 56.08 LF 0.89 49.91 Casing-2 1/4"stain grade 17.00 LF 2.54D 43.18 Interior door-Colonist-pre-hung unit 2.00 EA 145.82 D 291.64 Paint door slab only-2 coats(per side) 4.00 EA 22.08 88.32 Paint door/window trim&jamb-2 coats(per side) 4.00 EA 24.78 99.12 Closet shelf and rod package 3.60 LF 18.80 D 67.68 Door knob-interior 2.00 EA 34.57 D 69.14 SCHELLER_KAY Page: 5 Primary Construction SCHELLER,KAY 7/27/2008 CONTINUED-HALL-ONE DESCRIPTION QUANTITY UNIT COST RCV Light fixture 1.00 EA 60.72D 60.72 Smoke detector 1.00 EA 39.76 D 39.76 Plumbing fixture supply line 2.00 EA 13.63 D 27.26 Rough in plumbing-per fixture 1.00 EA 523.09 D 523.09 Seal stud wall for odor control(white pigmented shellac) 528.56 SF 0.62 327.71 Baseboard-2 1/4" 56.08 LF 2.05 D 114.96 Paint baseboard-two coats 56.08 LF 0.95 53.28 Totals: HALL-ONE 3,108.46 BATH-ONE Ceiling Height: 8' a,6„ 4 193.33 SF Walls 35.58 SF Ceiling n gnTNONE 228.92 SF Walls&Ceiling 35.58 SF Floor En TONE I 2-4^+2'3^I'll' j e 24.17 LF Ceil.Perimeter 24.17 LF Floor Perimeter 10, f71" 1 tl_�_7 DESCRIPTION QUANTITY UNIT COST RCV 5/8"drywall-hung,taped,ready for texture 228.92 SF 1.46 334.22 Texture drywall-machine 228.92 SF 0.27 61.81 Mask per square foot for drywall or plaster work 35.58 SF 0.15 5.34 Seal then paint the walls and ceiling(2 coats) 228.92 SF 0.64 146.51 Mask and prep for paint-plastic,paper,tape(per LF) 24.17 LF 0.89 21.51 Light fixture 1.00 EA 60.72 D 60.72 Bathroom fan,light,and heater 1.00 EA 197.22 D 197.22 SCHELLER KAY Page:6 Primary Construction SCHELLER,KAY 7/27/2008 CONTINUED-BATH-ONE DESCRIPTION QUANTITY UNIT COST RCV Plumbing fixture supply line 2.00 EA 13.63 D 27.26 Rough in plumbing-per fixture 3.00 EA 523.09D 1,569.27 Pocket door unit-birch 1.00 EA 176.56 D 176.56 Paint door slab only-2 coats(per side) 2.00 EA 22.08 44.16 Detach&Reset Bathtub 1.00 EA 405.07 D 405.07 Waterproof panel tub surround w/trim-up to 65 SF 1.00 EA 245.07 D 245.07 Shower faucet 1.00 EA 216.50 D 216.50 Detach&Reset Toilet 1.00 EA 173.29D 173.29 Detach&Reset Pedestal sink 1.00 EA 200.77 D 200.77 Sink faucet-Bathroom 1.00 EA 119.83 D 119.83 Water supply line-copper with fitting and hanger, 1/2" 16.00 LF 11.92D 190.72 Mirror- 1/4"plate glass 9.00 SF 9.19D 82.71 Bath accessory 3.00 EA 21.51 D 64.53 Seal stud wall for odor control 228.92 SF 0.55 125.91 Baseboard-2 1/4" 24.17 LF 2.05 D 49.55 Paint baseboard-two coats 24.17 LF 0.95 22.96 Shelving- 16"-in place 8.00 LF 7.91 D 63.28 Storage for linens Totals: BATH-ONE 4,604.77 SCHELLER_KAY Page: 7 Primary Construction SCHELLER,KAY 7/27/2008 !L �$r BED-ONE Ceiling Height: 8' T 424.00 SF Walls 146.72 SF Ceiling 570.72 SF Walls&Ceiling 146.72 SF Floor " to ` 53.00 LF Ceil.Perimeter 53.00 LF Floor Perimeter ,4 A L 6'2" Subroom 1: Clst Ceiling Height: 8' � 128.00 SF Walls 12.00 SF Ceiling tD 140.00 SF Walls&Ceiling 12.00 SF Floor 10 16.00 LF Ceil.Perimeter 16.00 LF Floor Perimeter DESCRIPTION QUANTITY UNIT COST RCV 5/8"drywall-hung,taped,ready for texture 710.72 SF 1.46 1,037.65 Texture drywall-machine 710.72 SF 0.27 191.89 Mask per square foot for drywall or plaster work 158.72 SF 0.15 23.81 Seal then paint the walls and ceiling(2 coats) 710.72 SF 0.64 454.86 Mask and prep for paint-plastic,paper,tape(per LF) 69.00 LF 0.89 61.41 Interior door-lauan/mahogany-pre-hung unit 1.00 EA 132.14 D 132.14 Bypass(sliding)door set-lauan/mahogany 1.00 EA 116.65 D 116.65 Paint bypass door set-slab only-2 coats(per side) 4.00 EA 31.01 124.04 Paint door slab only-2 coats(per side) 2.00 EA 22.08 44.16 Paint door/window trim&jamb-2 coats(per side) 2.00 EA 24.78 49.56 Closet shelf and rod package 6.00 LF 18.80 D 112.80 Door knob-interior 1.00 EA 34.57 D 34.57 Smoke detector 1.00 EA 39.76 D 39.76 Window sill-the on 2"x 4"wall 5.00 LF 8.69 43.45 Window drapery-hardware-Large 1.00 EA 110.89 D 110.89 SCHELLER_KAY Page: 8 Primary Construction SCHELLER,KAY 7/27/2008 CONTINUED-BED-ONE DESCRIPTION QUANTITY UNIT COST RCV Seal stud wall for odor control (white pigmented shellac) 552.00 SF 0.62 342.24 Light fixture 1.00 EA 60.72D 60.72 Totals: BED-ONE 2,980.60 61'6'1-3'11"A STORAGE-ONE Ceiling Height:8' Hd @ATM 236.00 SF Walls 51.18 SF Ceiling THALL-0PE 287.18 SF Walls&Ceiling 51.18 SF Floor c 29.50 LF Ceil.Perimeter 29.50 LF Floor Perimeter DESCRIPTION QUANTITY UNIT COST RCV 5/8"drywall-hung,taped,ready for texture 287.18 SF 1.46 419.28 Texture drywall-machine 287.18 SF 0.27 77.54 Mask per square foot for drywall or plaster work 51.18 SF 0.15 7.68 Seal then paint the walls and ceiling(2 coats) 287.18 SF 0.64 183.80 Mask and prep for paint-plastic,paper,tape(per LF) 29.50 LF 0.89 26.26 Interior door-lauan/mahogany-pre-hung unit 1.00 EA 132.14 D 132.14 Paint door slab only-2 coats(per side) 2.00 EA 22.08 44.16 Paint door/window trim&jamb-2 coats(per side) 2.00 EA 24.78 49.56 Door knob-interior 1.00 EA 34.57 D 34.57 Light fixture 1.00 EA 60.72 D 60.72 Plumbing fixture supply line 2.00 EA 13.63 D 27.26 Rough in plumbing-per fixture L00 EA 523.09 D 523.09 SCHELLER KAY Page:9 -.l Primary Construction SCHELLER,KAY 7/27/2008 CONTINUED-STORAGE-ONE DESCRIPTION QUANTITY UNIT COST RCV Water heater-50 gallon-Electric-9 yr 1.00 EA 699.69 D 699.69 Water supply line-copper with fitting and hanger, 1" 16.00 LF 14.57 D 233.12 Shelving-24"-in place 5.70 LF 8.71 D 49.65 Seal stud wall for odor control(white pigmented shellac) 236.00 SF 0.62 146.32 Baseboard-2 1/4" 29.50 LF 2.05 D 60.48 Paint baseboard-two coats 29.50 LF 0.95 28.03 Totals: STORAGE-ONE 2,803.35 U GARAGE-ONE Ceiling Height:8' i 445.33 SF Walls 187.83 SF Ceiling 633.17 SF Walls&Ceiling 187.83 SF Floor 55.67 LF Ceil.Perimeter 55.67 LF Floor Perimeter DESCRIPTION QUANTITY UNIT COST RCV 5/8"drywall-hung&fire taped only 633.17 SF 1.22 772.47 Exterior light fixture 1.00 EA 75.92 D 75.92 Shelving- 12"-in place 12.00 LF 6.82D 81.84 Seal stud wall for odor control(white pigmented shellac) 445.33 SF 0.62 276.10 Totals: GARAGE-ONE 1,206.33 SCHELLER_KAY Page: 10 I I Primary Construction SCHELLER,KAY 7/27/2008 I-4'2"-1-54" STORAGE-TWO Ceiling Height;8' - 236.00 SF Walls 51.18 SF Ceiling ALL-, 287.18 SF Walls&Ceiling 51.18 SF Floor 29.50 LF Ceil.Perimeter 29.50 LF Floor Perimeter 5'7' 5,9„--1 d: DESCRIPTION QUANTITY UNIT COST RCV Shelving-24"-in place 5.70 LF 8.71 D 49.65 Labor to frame 2"x 4"x 8'non-bearing wall-24"oc 14.75 LF 6.57 D 96.91 Stud wall-2"x 4"x 8'-24"oc 14.75 LF 10.38 D 153.11 Seal stud wall for odor control(white pigmented shellac) 236.00 SF 0.62 146.32 5/8"drywall-hung,taped,ready for texture 287.18 SF 1.46 419.28 Texture drywall-machine 287.18 SF 0.27 77.54 Mask per square foot for drywall or plaster work 51.18 SF 0.15 7.68 Seal then paint the walls and ceiling(2 coats) 287.18 SF 0.64 183.80 Mask and prep for paint-plastic,paper,tape(per LF) 29.50 LF 0.89 26.26 Interior door-lauan/mahogany-pre-hung unit 1.00 EA 13 2.14 D 132.14 Paint door slab only-2 coats(per side) 2.00 EA 22.08 44.16 Paint door/window trim&jamb-2 coats(per side) 2.00 EA 24.78 49.56 Door knob-interior 1.00 EA 34.57 D 34.57 Light fixture 1.00 EA 60.72 D 60.72 Plumbing fixture supply line 2.00 EA 13.63 D 27.26 Rough in plumbing-per fixture 1.00 EA 523.09 D 523.09 Water heater-50 gallon-Electric-9 yr 1.00 EA 699.69 D 699.69 Water supply line-copper with fitting and hanger, 1" 16.00 LF 14.57D 233.12 Shelving-24"-in place 5.70 LF 8.71 D 49.65 Seal stud wall for odor control(white pigmented shellac) 236.00 SF 0.62 146.32 SCHELLER KAY Page: ll �: I Primary Construction SCHELLER,KAY 7/27/2008 CONTINUED-STORAGE-TWO DESCRIPTION QUANTITY UNIT COST RCV Baseboard-2 1/4" 29.50 LF 2.05 D 60.48 Paint baseboard-two coats 29.50 LF 0.95 28.03 Totals: STORAGE-TWO 3,249.34 � BED-TWO Ceiling Height:8' 424.00 SF Walls 147.11 SF Ceiling 571.11 SF Walls&Ceiling 147.11 SF Floor 53.00 LF Ceil.Perimeter 53.00 LF Floor Perimeter L�L � •� Subroom 1: Clst Ceiling Height:8' L125.33 SF Walls 11.67 SF Ceiling ry 137.00 SF Walls&Ceiling 11.67 SF Floor 1 9' 15.67 LF Ceil.Perimeter 15.67 LF Floor Perimeter DESCRIPTION QUANTITY UNIT COST RCV 5/8"drywall-hung,taped,ready for texture 708.11 SF 1.46 1,033.84 Texture drywall-machine 708.11 SF 0.27 191.19 Mask per square foot for drywall or plaster work 158.78 SF 0.15 23.82 Seal then paint the walls and ceiling(2 coats) 708.11 SF 0.64 453.19 Mask and prep for paint-plastic,paper,tape(per LF) 68.67 LF 0.89 61.12 Interior door-lauan/mahogany-pre-hung unit 1.00 EA 132.14 D 132.14 Bypass(sliding)door set-lauan/mahogany 1.00 EA 116.65 D 116.65 SCHELLER_KAY Page: 12 I I Primary Construction SCHELLER,KAY 7/27/2008 CONTINUED-BED-TWO DESCRIPTION QUANTITY UNIT COST RCV Paint bypass door set-slab only-2 coats(per side) 4.00 EA 31.01 124.04 Paint door slab only-2 coats(per side) 2.00 EA 22.08 44.16 Paint door/window trim&jamb-2 coats(per side) 2.00 EA 24.78 49.56 Closet shelf and rod package 6.00 LF 18.80 D 112.80 Door knob-interior 1.00 EA 34.57 D 34.57 Smoke detector L00 EA 39.76 D 39.76 Window sill-the on 2"x 4"wall 5.00 LF 8.69 43.45 Window drapery-hardware-Large 1.00 EA 110.89D 110.89 Seal stud wall for odor control(white pigmented shellac) 549.33 SF 0.62 340.58 Light fixture 1.00 EA 60.72 D 60.72 Totals: BED-TWO 2,972.48 HALL-TWO Ceiling Height:8' s 336.67 SF Walls 69.42 SF Ceiling s16 406.09 SF Walls&Ceiling 69.42 SF Floor 1U" 42.08 LF Ceil.Perimeter 42.08 LF Floor Perimeter Missing Wall: 1- 3'l"X 8'0" Opens into LIVING-TWO Goes to Floor/Ceiling UHIM-1 WU Subroom 1: Clst Ceiling Height:8' 53.33 SF Walls 2.77 SF Ceiling 56.10 SF Walls&Ceiling 2.77 SF Floor 6.67 LF Ceil.Perimeter 6.67 LF Floor Perimeter 2'1"-1 SCHELLER_KAY Page: 13 i t Primary Construction SCHELLER,KAY 7/27/2008 Subroom 2: Clst2 Ceiling Height:8' �2 54.67 SF Walls 2.92 SF Ceiling T 57.58 SF Walls&Ceiling 2.92 SF Floor N io 6.83 LF Ceil.Perimeter 6.83 LF Floor Perimeter �-2'3' DESCRIPTION QUANTITY UNIT COST RCV 5/8"drywall-hung,taped,ready for texture 519.77 SF 1.46 758.86 Texture drywall-machine 519.77 SF 0.27 140.34 Seal then paint the walls and ceiling(2 coats) 519.77 SF 0.64 332.65 Mask and prep for paint-plastic,paper,tape(per LF) 55.58 LF 0.89 49.47 Casing-2 1/4"stain grade 17.00 LF 2.54 D 43.18 Interior door-Colonist-pre-hung unit 2.00 EA 145.82D 291.64 Paint door slab only-2 coats(per side) 4.00 EA 22.08 88.32 Paint door/window trim&jamb-2 coats(per side) 4.00 EA 24.78 99.12 Closet shelf and rod package 3.60 LF 18.80 D 67.68 Door knob-interior 2.00 EA 34.57D 69.14 Light fixture 1.00 EA 60.72 D 60.72 Smoke detector 1.00 EA 39.76 D 39.76 Plumbing fixture supply line 2.00 EA 13.63 D 27.26 Rough in plumbing-per fixture 1.00 EA 523.09 D 523.09 Seal stud wall for odor control(white pigmented shellac) 519.77 SF 0.62 322.26 Carpenter-General Framer-per hour 0.00 HR OPEN LINE Baseboard-2 1/4" 55.58 LF 2.05 D 113.94 Paint baseboard-two coats 55.58 LF 0.95 52.80 Totals: HALL-TWO 3,080.23 SCHELLER_KAY Page: 14 Primary Construction SCHELLER,KAY 7/27/2008 8"1'10"�-4'10 � BATH-TWO Ceiling Height:8' " S. 4'e" 193.33 SF Walls 3 5.5 8 SF Ceiling emm.Twe 228.92 SF Walls&Ceiling 35.58 SF Floor '11'12'1'1-2'6 tlALI 24.17 LF Ceil.Perimeter 24.17 LF Floor Perimeter'�6 I DESCRIPTION QUANTITY UNIT COST RCV Texture drywall-machine 228.92 SF 0.27 61.81 Mask per square foot for drywall or plaster work 35.58 SF 0.15 5.34 5/8"drywall-hung,taped,ready for texture 228.92 SF 1.46 334.22 Sea]then paint the walls and ceiling(2 coats) 228.92 SF 0.64 146.51 Mask and prep for paint-plastic,paper,tape(per LF) 24.17 LF 0.89 21.51 Light fixture 1.00 EA 60.72 D 60.72 Bathroom fan,light,and heater 1.00 EA 197.22 D 197.22 Plumbing fixture supply line 2.00 EA 13.63 D 27.26 Rough in plumbing-per fixture 3.00 EA 523.09D 1,569.27 Pocket door unit-birch 1.00 EA 176.56 D 176.56 Paint door slab only-2 coats(per side) 2.00 EA 22.08 44.16 Bathtub 1.00EA 552.47D 552.47 Waterproof panel tub surround w/trim-up to 65 SF 1.00 EA 245.07 D 245.07 Shower faucet 1.00 EA 216.50 D 216.50 Detach&Reset Toilet 1.00 EA 173.29D 173.29 Pedestal sink 1.00 EA 355.44 D 355.44 Sink faucet-Bathroom 1.00 EA 119.83 D 119.83 Water supply line-copper with fitting and hanger, 1/2" 16.00 LF 11.92D 190.72 Mirror- 1/4"plate glass 9.00 SF 9.19D 82.71 Bath accessory 3.00 EA 21.51 D 64.53 SCHELLER_KAY Page: 15 i� Primary Construction SCHELLER,KAY 7/27/2008 CONTINUED-BATH-TWO DESCRIPTION QUANTITY UNIT COST RCV Seal stud wall for odor control(white pigmented shellac) 193.33 SF 0.62 119.96 Baseboard-2 1/4" 24.17 LF 2.05 D 49.55 Paint baseboard-two coats 24.17 LF 0.95 22.96 Shelving- 16"-in place 8.00 LF 7.91 D 63.28 Totals: BATH-TWO 4,900.79 10r-5'14'3"-+ KITCHEN-TWO Ceiling Height: 8' 4,1„ ,,A 276.11 SF Walls 87.65 SF Ceiling KITE MLM 363.76 SF Walls&Ceiling 87.65 SF Floor 2�1 38.33 LF Ceil.Perimeter 33.75 LF Floor Perimeter T 4'T' 3'f0. F3'3 H Missing Wall: 1- 471 X 6'8" Opens into LIVING-TWO Goes to Floor DESCRIPTION QUANTITY UNIT COST RCV 5/8"drywall-hung,taped,ready for texture 363.76 SF 1.46 531.09 Seal stud wall for odor control(white pigmented shellac) 363.76 SF 0.62 225.53 Texture drywall-machine 363.76 SF 0.27 98.22 Mask per square foot for drywall or plaster work 107.65 SF 0.15 16.15 Seal then paint the walls and ceiling(2 coats) 363.76 SF 0.64 232.81 Mask and prep for paint-plastic,paper,tape(per LF) 38.33 LF 0.89 34.11 Custom cabinets-wall units-42"tall 4.50 LF 152.64 D 686.88 Custom cabinets-wall units-up to 24"tall 3.00 LF 126.52 D 379.56 Cabinetry-lower(base)units-High grade 7.50 LF 145.48 D 1,091.10 SCHELLER_KAY Page: 16 Primary Construction SCHELLER,KAY 7/27/2008 CONTINUED-KITCHEN-TWO DESCRIPTION QUANTITY UNIT COST RCV Countertop-Flat laid plastic laminate 7.50 LF 34.12 D 255.90 4"backsplash for flat laid countertop 11.50 LF 6.78D 77.97 Countertop edge treatment-wood 7.50 LF 4.87 D 36.53 Countertop subdeck-particle board 15.00 SF 2.08 D 31.20 Carpenter-Finish,Trim/Cabinet-per hour 1.50 HR 53.99 D 80.99 Set up and cut outs Light fixture 2.00 EA 60.72 D 121.44 Window sill-the on 2"x 4"wall 5.00 LF 8.69 43.45 Window blind-horizontal or vertical-Large L00 EA 113.42 D 113.42 There is only small,large and extra large. Detach&Reset Refrigerator-top freezer-25 to 30 cf 1.00 EA 50.01 50.01 Detach&Reset Range-freestanding-electric 1.00 EA 49.04 49.04 R&R Angle stop 2.00 EA 29.25 D 58.50 Rough in plumbing-per fixture 1.00 EA 523.09 D 523.09 Plumbing fixture supply line 2.00 EA 13.63 D 27.26 DrainNent line-PVC pipe with fitting and hanger,2" 16.00 LF 9.24 D 147.84 Water supply line-copper with fitting and hanger, 1/2" 16.00 LF 11.92D 190.72 Sink faucet-Kitchen 1.00 EA 160.06 D 160.06 Sink-double 1.00 EA 284.53 D 284.53 Exhaust fan 1.00 EA 150.69 D 150.69 Wall heater 1.00 EA 164.55 D 164.55 Stud wall-2"x 4"x 8'- 16"oc 6.00 LF 11.89 D 71.34 SCHELLER KAY Page: 17 1 ! Primary Construction SCHELLER,KAY 7/27/2008 CONTINUED-KITCHEN-TWO DESCRIPTION QUANTITY UNIT COST RCV Stud wall between the kitchen and living room is a false wall and will need to be replaced. Labor to frame 2"x 4"x 8'non-bearing wall- 16"oc 6.00 LF 7.24 D 43.44 Baseboard-2 l/4" 33.75 LF 2.05 D 69.19 Paint baseboard-one coat 33.75 LF 0.63 21.26 Totals: KITCHEN-TWO 6,067.87 1 F3 LIVING-TWO Ceiling Height:8' w 414.11 SF Walls 212.28 SF Ceiling 626.39 SF Walls&Ceiling 212.28 SF Floor 55.58 LF Ceil.Perimeter 51.00 LF Floor Perimeter Missing Wall: 1- 417"X 618" Opens into KITCHEN-TWO Goes to Floor Missing Wall: l - 311"X 8T" Opens into HALL-TWO Goes to Floor/Ceiling DESCRIPTION QUANTITY UNIT COST RCV 5/8"drywall-hung,taped,ready for texture 626.39 SF 1.46 914.53 Texture drywall-machine 626.39 SF 0.27 169.13 Mask per square foot for drywall or plaster work 269.28 SF 0.15 40.39 Seal then paint the walls and ceiling(2 coats) 626.39 SF 0.64 400.89 Mask and prep for paint-plastic,paper,tape(per LF) 55.58 LF 0.89 49.47 Window blind-horizontal or vertical-Large 1.00 EA 113.42 D 113.42 Window sill-the on 2"x 4"wall 12.00 LF 8.69 104.28 Wall heater 1.00 EA 164.55 D 164.55 Thermostat-electric heat L00 EA 55.66D 55.66 SCHELLER_KAY Page: 18 i� i� I `1 l Primary Construction SCHELLER,KAY 7/27/2008 CONTINUED-LIVING-TWO DESCRIPTION QUANTITY UNIT COST RCV Baseboard-2 1/4" 51.00 LF 2.05 D 104.55 Paint baseboard-two coats 51.00 LF 0.95 48.45 Casing-2 l/4" 17.00 LF 1.55 D 26.35 Paint door slab only-2 coats(per side) 1.00 EA 22.08 22.08 Paint door/window trim&jamb-2 coats(per side) 1.00 EA 24.78 24.78 Seal stud wall for odor control 626.39 SF 0.55 344.51 Totals: LIVING-TWO 2,583.04 a'e^+3'i a'----1 STORAGE-THRE Ceiling Height: 8' 6"a �a 10 269.33 SF Walls 62.33 SF Ceiling ek 331.67 SF Walls&Ceiling 62.33 SF Floor ch,01 33.67 LF Ceil.Perimeter 33.67 LF Floor Perimeter STOPAW-RM ts� Subroom 1: Clst Ceiling Height:8' 225.33 SF Walls 31.17 SF Ceiling N 256.50 SF Walls&Ceiling 31.17 SF Floor 1 28.17 LF Ceil.Perimeter 28.17 LF Floor Perimeter DESCRIPTION QUANTITY UNIT COST RCV 5/8"drywall-hung,taped,ready for texture 588.17 SF 1.46 858.73 Texture drywall-machine 588.17 SF 0.27 158.81 Mask per square foot for drywall or plaster work 93.50 SF 0.15 14.03 SCHELLER_KAY Page: 19 Primary Construction SCHELLER,KAY 7/27/2008 CONTINUED-STORAGE-THRE DESCRIPTION QUANTITY UNIT COST RCV Sea]then paint the walls and ceiling(2 coats) 588.17 SF 0.64 376.43 Mask and prep for paint-plastic,paper,tape(per LF) 61.83 LF 0.89 55.03 Interior door-lauan/mahogany-pre-hung unit 1.00 EA 132.14 D 132.14 Paint door slab only-2 coats(per side) 2.00 EA 22.08 44.16 Paint door/window trim&jamb-2 coats(per side) 2.00 EA 24.78 49.56 Door knob-interior 1.00 EA 34.57 D 34.57 Light fixture L00 EA 60.72 D 60.72 Plumbing fixture supply line 2.00 EA 13.63 D 27.26 Rough in plumbing-per fixture 1.00 EA 523.09D 523.09 Water heater-50 gallon-Electric-9 yr L00 EA 699.69D 699.69 Water supply line-copper with fitting and hanger, 1" 16.00 LF 14.57D 233.12 Shelving-24"-in place 5.70 LF 8.71 D 49.65 Seal stud wall for odor control(white pigmented shellac) 494.67 SF 0.62 306.70 Door hinges-Standard grade(set of 3) 4.00 EA 30.17 D 120.68 Finish Hardware Installer-per hour 1.00 HR 48.29 D 48.29 Sheathing-radiant barrier- 1/2"-OSB 64.00 SF 0.98 D 62.72 Window blind-horizontal or vertical-Large L00 EA 113.42D 113.42 Baseboard-2 1/4" 61.83 LF 2.05 D 126.75 Paint baseboard-two coats 61.83 LF 0.95 58.74 Totals: STORAGE-THRE 4,154.29 SCHELLER_KAY Page:20 Primary Construction SCHELLER,KAY 7/27/2008 GARAGE-THREE Ceiling Height:8' 452.00 SF Walls 191.72 SF Ceiling 1 643.72 SF Walls&Ceiling 191.72 SF Floor 56.50 LF Ceil.Perimeter 56.50 LF Floor Perimeter DESCRIPTION QUANTITY UNIT COST RCV 5/8"drywall-hung&fire taped only 643.72 SF 1.22 785.34 Exterior light fixture 1.00 EA 75.92 D 75.92 Shelving- 12"-in place 12.00 LF 6.82 D 81.84 Seal stud wall for odor control(white pigmented shellac) 452.00 SF 0.62 280.24 Totals: GARAGE-THREE 1,223.34 BED-THREE Ceiling Height:8' Q 422.67 SF Walls 146.32 SF Ceiling ^ 568.99 SF Walls&Ceiling 146.32 SF Floor 52.83 LF Ceil.Perimeter 52.83 LF Floor Perimeter v Fz{ � 6' Subroom 1: Clst Ceiling Height:8' - _ 125.33 SF Walls 11.67 SF Ceiling i N 137.00 SF Walls&Ceiling 11.67 SF Floor 10, 15.67 LF Ceil.Perimeter 15.67 LF Floor Perimeter DESCRIPTION QUANTITY UNIT COST RCV 5/8"drywall-hung,taped,ready for texture 705.99 SF 1.46 1,030.75 Texture drywall-machine 705.99 SF 0.27 190.62 Mask per square foot for drywall or plaster work 157.99 SF 0.15 23.70 SCHELLER_KAY Page:21 V I Primary Construction SCHELLER,KAY 7/27/2008 CONTINUED-BED-THREE DESCRIPTION QUANTITY UNIT COST RCV Seal then paint the walls and ceiling(2 coats) 705.99 SF 0.64 451.83 Mask and prep for paint-plastic,paper,tape(per LF) 68.50 LF 0.89 60.97 Interior door-lauan/mahogany-pre-hung unit 1.00 EA 132.14 D 132.14 Bypass(sliding)door set-lauan/mahogany 1.00 EA 116.65 D 116.65 Paint bypass door set-slab only-2 coats(per side) 4.00 EA 31.01 124.04 Paint door slab only-2 coats(per side) 2.00 EA 22.08 44.16 Paint door/window trim&jamb-2 coats(per side) 2.00 EA 24.78 49.56 Closet shelf and rod package 6.00 LF 18.80 D 112.80 Door knob-interior 1.00 EA 34.57 D 34.57 Smoke detector 1.00 EA 39.76D 39.76 Window sill-the on 2"x 4"wall 5.00 LF 8.69 43.45 Window drapery-hardware-Large 1.00 EA 110.89 D 110.89 Seal stud wall for odor control(white pigmented shellac) 548.00 SF 0.62 339.76 Light fixture 1.00 EA 60.72 D 60.72 Totals: BED-THREE 2,966.37 "°+ LIVING-THREE T T,, -•"�"„T a.„ Ceiling Height:8' iI 420.45 SF Walls 219.89 SF Ceiling 640.34 SF Walls&Ceiling 219.89 SF Floor 56.58 LF Ceil.Perimeter 51.75 LF Floor Perimeter Missing Wall: 1 - 4'10"X 6'8" Opens into KITCHEN-THRE Goes to Floor Missing Wall: 1 - 311"X 810" Opens into HALL-THREE Goes to Floor/Ceiling SCHELLER_KAY Page:22 Primary Construction SCHELLER,KAY 7/27/2009 DESCRIPTION QUANTITY UNIT COST RCV 5/8"drywall-hung,taped,ready for texture 640.34 SF 1.46 934.90 Texture drywall-machine 640.34 SF 0.27 172.89 Mask per square foot for drywall or plaster work 276.89 SF 0.15 41.53 Seal then paint the walls and ceiling(2 coats) 640.34 SF 0.64 409.82 Mask and prep for paint-plastic,paper,tape(per LF) 56.58 LF 0.89 50.36 Window blind-horizontal or vertical-Large 2.00 EA 113.42 D 226.84 Window sill-the on 2"x 4"wall 12.00 LF 8.69 104.28 Wall heater 1.00 EA 164.55 D 164.55 Thermostat-electric heat 1.00 EA 55.66 D 55.66 Baseboard-2 1/4" 51.75 LF 2.05 D 106.09 Paint baseboard-two coats 51.75 LF 0.95 49.16 Casing-2 1/4" 17.00 LF 1.55 D 26.35 Paint door slab only-2 coats(per side) 1.00 EA 22.08 22.08 Paint door/window trim&jamb-2 coats(per side) 1.00 EA 24.78 24.78 Totals: LIVING-THREE 2,389.29 r3 ir$ n HALL-THREE Ceiling Height:8' 334.00 SF Walls 69.40 SF Ceiling ,0`26"1� a 403.40 SF Walls&Ceiling 69.40 SF Floor r,r' rr 41.75 LF Ceil.Perimeter 41.75 LF Floor Perimeter Fsi� s im F Missing Wall: 1- 311"X 8'0" Opens into LIVING-THREE Goes to Floor/Ceiling SCHELLER_KAY Page:23 Primary Construction SCHELLER,KAY 7/27/2008 Subroom 2: Clst2 Ceiling Height:8' _�z 52.00 SF Walls 2.63 SF Ceiling " 54.63 SF Walls&Ceiling 2.63 SF Floor t,.__-_.. 6.50 LF Ceil.Perimeter 6.50 LF Floor Perimeter 9 h-2'3"-{ tlNIX-IXKli Subroom 1: Clst Ceiling Height: 8' z 56.00 SF Walls 3.03 SF Ceiling C 59.03 SF Walls&Ceiling 3.03 SF Floor 7.00 LF Ceil.Perimeter 7.00 LF Floor Perimeter 2'T-I - ------- DESCRIPTION QUANTITY UNIT COST RCV 5/8"drywall-hung,taped,ready for texture 517.06 SF 1.46 754.91 Texture drywall-machine 517.06 SF 0.27 139.61 Seal then paint the walls and ceiling(2 coats) 517.06 SF 0.64 330.92 Mask and prep for paint-plastic,paper,tape(per LF) 55.25 LF 0.89 49.17 Casing-2 1/4"stain grade 17.00 LF 2.54D 43.18 Interior door-Colonist-pre-hung unit 2.00 EA 145.82 D 291.64 Paint door slab only-2 coats(per side) 4.00 EA 22.08 88.32 Paint door/window trim&jamb-2 coats(per side) 4.00 EA 24.78 99.12 Closet shelf and rod package 3.60 LF 18.80 D 67.68 Door knob-interior 2.00 EA 34.57 D 69.14 Light fixture 1.00 EA 60.72 D 60.72 Smoke detector 1.00 EA 39.76 D 39.76 Plumbing fixture supply line 2.00 EA 13.63 D 27.26 Rough in plumbing-per fixture 1.00 EA 523.09 D 523.09 Seal stud wall for odor control(white pigmented shellac) 517.06 SF 0.62 320.58 SCHELLER_KAY Page:24 Primary Construction SCHELLER,KAY 7/27/2008 CONTINUED-HALL-THREE DESCRIPTION QUANTITY UNIT COST RCV Baseboard-2 1/4" 55.25 LF 2.05 D 113.26 Paint baseboard-two coats 55.25 LF 0.95 52.49 Totals: HALL-THREE 3,070.85 F-5'3"�1,7„6„ BATH-THREE Ceiling Height:8' q 193.33 SF Walls 35.58 SF Ceiling T}I$M 228.92 SF Walls&Ceiling 35.58 SF Floor VAM j n 24.17 LF Ceil.Perimeter 24.17 LF Floor Perimeter 1 2',"10'�2'E"V I HALL" DESCRIPTION QUANTITY UNIT COST RCV 5/8"drywall-hung,taped,ready for texture 228.92 SF 1.46 334.22 Texture drywall-machine 228.92 SF 0.27 61.81 Mask per square foot for drywall or plaster work 35.58 SF 0.15 5.34 Seal then paint the walls and ceiling(2 coats) 228.92 SF 0.64 146.51 Mask and prep for paint-plastic,paper,tape(per LF) 24.17 LF 0.89 21.51 Light fixture 1.00 EA 60.72 D 60.72 Bathroom fan,light,and heater 1.00 EA 197.22 D 197.22 Plumbing fixture supply line 2.00 EA 13.63 D 27.26 Rough in plumbing-per fixture 3.00 EA 523.09 D 1,569.27 Pocket door unit-birch 1.00 EA 176.56 D 176.56 Paint door slab only-2 coats(per side) 2.00 EA 22.08 44.16 Detach&Reset Bathtub 1.00 EA 405.07 D 405.07 SCHELLER KAY Page:25 Primary Construction SCHELLER,KAY 7/27/2009 CONTINUED-BATH-THREE DESCRIPTION QUANTITY UNIT COST RCV Waterproof panel tub surround w/trim-up to 65 SF 1.00 EA 245.07 D 245.07 Shower faucet 1.00 EA 216.50D 216.50 Detach&Reset Toilet 1.00 EA 173.29 D 173.29 Detach&Reset Vanity 3.00 LF 34.12D 102.36 Countertop-solid surface-Average grade 3.00 SF 63.14 D 189.42 Sink faucet-Bathroom L00 EA 119.83 D 119.83 Water supply line-copper with fitting and hanger, 1/2" 16.00 LF 11.92 D 190.72 Mirror- 1/4"plate glass 9.00 SF 9.19D 82.71 Bath accessory 3.00 EA 21.51 D 64.53 Sea]stud wall for odor control 228.92 SF 0.55 125.91 Baseboard-2 1/4" 24.17 LF 2.05 D 49.55 Paint baseboard-two coats 24.17 LF 0.95 22.96 Shelving- 16"-in place 8.00 LF 7.91 D 63.28 Totals: BATH-THREE 4,695.78 -107'- 1 KITCHEN-THRE Ceiling Height:8' - 10'1' 277.11 SF Walls 89.45 SF Ceiling I aan+TFn L- KITCHWTtM 366.56 SF Walls&Ceiling 89.45 SF Floor _ 1 z 38.67 LF Ceil.Perimeter 33.83 LF Floor Perimeter ry N4'1 o--}3' �3 4 Missing Wall: 1- 4'10"X 6'8" Opens into LIVING-THREE Goes to Floor DESCRIPTION QUANTITY UNIT COST RCV SCHELLER_KAY Page:26 � 1 Primary Construction SCHELLER,KAY 7/27/2008 CONTINUED-KITCHEN-THRE DESCRIPTION QUANTITY UNIT COST RCV 5/8"drywall-hung,taped,ready for texture 366.56 SF 1.46 535.18 Seal stud wall for odor control(white pigmented shellac) 366.56 SF 0.62 227.27 Texture drywall-machine 366.56 SF 0.27 98.97 Mask per square foot for drywall or plaster work 109.45 SF 0.15 16.42 Seal then paint the walls and ceiling(2 coats) 366.56 SF 0.64 234.60 Mask and prep for paint-plastic,paper,tape(per LF) 38.67 LF 0.89 34.42 Custom cabinets-wall units-42" tall 4.50 LF 152.64 D 686.88 Custom cabinets-wall units-up to 24"tall 3.00 LF 126.52 D 379.56 Cabinetry-lower(base)units-High grade 7.50 LF 145.48 D 1,091.10 Countertop-Flat laid plastic laminate 7.50 LF 34.12 D 255.90 4"backsplash for flat laid countertop 11.50 LF 6.78D 77.97 Countertop edge treatment-wood 7.50 LF 4.87 D 36.53 Countertop subdeck-particle board 15.00 SF 2.08 D 31.20 Carpenter-Finish,Trim/Cabinet-per hour 1.50 HR 53.99 D 80.99 Set up and cut outs Light fixture 2.00 EA 60.72 D 121.44 Window sill-the on 2"x 4"wall 5.00 LF 8.69 43.45 Window blind-horizontal or vertical-Large 1.00 EA 113.42 D 113.42 There is only small,large and extra large. Detach&Reset Refrigerator-top freezer-25 to 30 cf 1.00 EA 50.01 50.01 Detach&Reset Range-freestanding-electric 1.00 EA 49.04 49.04 R&R Angle stop 2.00 EA 29.25 D 58.50 SCHELLER KAY Page:27 Primary Construction SCHELLER,KAY 7/27/2008 CONTINUED-KITCHEN-THRE DESCRIPTION QUANTITY UNIT COST RCV Rough in plumbing-per fixture 1.00 EA 523.09 D 523.09 Plumbing fixture supply line 2.00 EA 13.63 D 27.26 DrainNent line-PVC pipe with fitting and hanger,2" 16.00 LF 9.24 D 147.84 Water supply line-copper with fitting and hanger, 1/2" 16.00 LF 11.92 D 190.72 Sink faucet-Kitchen 1.00 EA 160.06 D 160.06 Sink-double 1.00 EA 284.53 D 284.53 Exhaust fan 1.00 EA 150.69 D 150.69 Wall heater 1.00 EA 164.55 D 164.55 Stud wall-2"x 4"x 8'- 16"oc 6.00 LF 11.891) 71.34 Stud wall between the kitchen and living room is a false wall and will need to be replaced. Labor to frame 2"x 4"x 8'non-bearing wall- 16"oc 6.00 LF 7.24 D 43.44 Baseboard-2 1/4" 33.83 LF 2.05 D 69.35 Paint baseboard-one coat 33.83 LF 0.63 21.31 Totals: KITCHEN-THRE 6,077.03 Area Totals: Main Level 7,513.35 SF Walls 2,296.53 SF Ceiling 9,809.87 SF Walls and Ceiling 2,296.53 SF Floor 2,499.83 Total Area 934.83 LF Floor Perimeter 2,296.53 Floor Area 241.67 Exterior Perimeter 960.83 LF Ceil.Perimeter 1,933.33 Exterior Wall Area of Walls 7,513.35 Interior Wall Area Total: Main Level 70,919.37 ROOF SCHELLER_KAY Page:28 1 f Primary Construction SCHELLER,KAY 7/27/2008 Roofl 1 3,141.36 Surface Area 31.41 Number of Squares 251.00 Total Perimeter Length 67.17 Total Ridge 87.50 Total Hip Length Length DESCRIPTION QUANTITY UNIT COST RCV Laminated-30 yr.-comp.shingle rfg-incl.felt 36.50 SQ 154.91 D 5,654.22 Two and one half squares added for starter. Ridge cap-composition shingles 179.00 LF 2.73 D 488.67 Roof vent-turtle type 10.00 EA 34.94 D 349.40 R&R Flashing-pipe jack 6.00 EA 27.43 D 164.58 Cleaning Technician-per hour 6.00 HR 30.78 D 184.68 For clean up Sheathing- 1"x 6"-tongue and groove 2,400.00 SF 3.04D 7,296.00 Hip or roof intersection 6/12 slope(hip/valley length) 175.00 LF 41.65 D 7,288.75 This is to frame both sides hip roof Truss-6/12 slope 843.00 LF 4.96 D 4,181.28 Fascia- V x 6" #3 cedar 260.20 LF 3.67 D 954.93 Fascia- 1"x 4" #3 cedar 244.20 LF 3.02D 737.48 2"x 4"lumber(.667 BF per LF) 276.00 LF 1.47 D 405.72 This cost is for the framing in of the soffit areas. Trim board- 1"x 6"-installed(pine) 1,132.00 LF 3.74D 4,233.68 This cost is for the one by six T&G pine soffit.I added 10%wast Attic vent-gable end-metal- 12"x 18" 26.00 EA 48.70D 1,266.20 These are vents for soffit Totals: Roofl 33,205.59 SCHELLER_KAY Page:29 1 Primary Construction SCHELLER,KAY 7/27/2008 Area Totals: ROOF 3,141.36 Surface Area 31.41 Number of Squares 25 1.00 Total Perimeter Length 67.17 Total Ridge Length 87.50 Total Hip Length Total: ROOF 33,205.59 NORTH/SIDE 0.00 SF Walls 0.00 SF Ceiling 0.00 SF Walls&Ceiling 0.00 SF Floor 0.00 SF Short Wall 0.00 LF Floor Perimeter 0.00 SF Long Wall 0.00 LF Ceil.Perimeter DESCRIPTION QUANTITY UNIT COST RCV Storm door assembly 3.00 EA 212.61 D 637.83 Overhead door&hardware- 10'x T-High grade 2.00 EA 897.62D 1,795.24 Exterior door-metal-insulated/wood-High grade 3.00 EA 420.15 D 1,260.45 Door lockset&deadbolt-exterior 3.00 EA 70.53 D 211.59 Aluminum window,picture/fixed 12-23 sf(2 pane) 3.00 EA 229.36 D 688.08 Aluminum window-casement,9-13 sf 3.00 EA 254.37 D 763.11 Add for"Low E"glass 84.00 SF 4.72 396.48 Caulking-acrylic 231.00 LF 1.78 411.18 2"x 6"cedar-deck grade(1 BF per LF) 84.00 LF 3.08 D 258.72 Around the overhead doors. Mailboxes-commercial/group-keyed 3.00 EA 30.23 D 90.69 Door peep hole 3.00 EA 17.62D 52.86 Door numbers/letters-plastic or metal-up to 4" 6.00 EA 12.65 D 75.90 Gutter/downspout-aluminum-up to 5" 145.00 LF 4.56 D 661.20 Prime&paint gutter/downspout 145.00 LF 1.08 156.60 Exterior light fixture 3.00 EA 75.92 D 227.76 Flashing, 14"wide 96.00 LF 2.55 D 244.80 SCHELLER_KAY Page:30 �1 Primary Construction SCHELLER,KAY 7/27/2008 CONTINUED-NORTH/SIDE DESCRIPTION QUANTITY UNIT COST RCV Flashing on top of the brick Siding-shiplap-cedar 800.00 SF 3.40D 2,720.00 We will need to pull off the brick face to sheet the walls. House wrap(air/moisture barrier) 800.00 SF 0.34D 272.00 Cleaning Technician-per hour 2.00 HR 30.78 D 61.56 This cost is for power washing. Seal&paint single garage door opening&trim 2.00 EA 66.51 133.02 Prime&paint door slab only-exterior(per side) 3.00 EA 30.79 92.37 Paint door/window trim&jamb-2 coats(per side) 3.00 EA 24.78 74.34 Prime&paint exterior soffit-wood 200.00 SF 1.47 294.00 Seal&paint trim 196.00 LF 0.96 188.16 Seal&paint wood siding 800.00 SF 0.92 736.00 Mask the surface area per square foot-plastic and tape 311.00 SF 0.16 49.76 Painter-per hour 2.00 HR 54.10 D 108.20 Cut in time Additional charge for a retrofit exterior door 3.00 EA 45.51 D 136.53 R&R Top plate-2"x 4" 192.00 LF 1.89 D 362.88 The top plate of exterior wall is chaff ed.We will need to replace both of then Totals: NORTH/SIDE 13,161.31 SOUTH/SIDE 0.00 SF Walls 0.00 SF Ceiling 0.00 SF Walls&Ceiling SCHELLER_KAY Page: 31 i Primary Construction SCHELLER,KAY 7/27/2009 0.00 SF Floor 0.00 SF Short Wall 0.00 LF Floor Perimeter 0.00 SF Long Wall 0.00 LF Ceil.Perimeter DESCRIPTION QUANTITY UNIT COST RCV Storm door assembly 3.00 EA 212.61 D 637.83 Exterior door-metal-insulated/wood-High grade 3.00 EA 420.15 D 1,260.45 Glass light,up to 24"x 24" 3.00 EA 118.82 D 356.46 Door lockset&deadbolt-exterior 3.00 EA 70.53 D 211.59 Aluminum window,picture/fixed 12-23 sf(2 pane) 2.00 EA 229.36 D 458.72 Aluminum window,horiz.slider 12-23 sf 1.00 EA 195.19 D 195.19 Aluminum window-casement,6-8 sf 2.00 EA 222.80 D 445.60 Add for"Low E"glass 44.00 SF 4.72 207.68 Caulking-acrylic 199.00 LF 1.78 354.22 Gutter/downspout-aluminum-up to 5" 145.00 LF 4.56 D 661.20 Prime&paint gutter/downspout 145.00 LF 1.08 156.60 Exterior light fixture 3.00 EA 75.92 D 227.76 Siding-shiplap-cedar 800.00 SF 3.40D 2,720.00 House wrap(air/moisture barrier) 800.00 SF 0.34 D 272.00 Prime&paint door slab only-exterior(per side) 3.00 EA 30.79 92.37 Paint door/window trim&jamb-2 coats(per side) 3.00 EA 24.78 74.34 Prime&paint exterior soffit-wood 200.00 SF 1.47 294.00 Seal&paint trim 196.00 LF 0.96 188.16 Seal &paint wood siding 800.00 SF 0.92 736.00 Mask the surface area per square foot-plastic and tape 275.00 SF 0.16 44.00 Painter-per hour 2.00 HR 54.10 D 108.20 Cut in time Clothes dryer vent-installed 3.00 EA 50.92 D 152.76 SCHELLER_KAY Page: 32 i I Primary Construction SCHELLER,KAY 7/27/2008 CONTINUED-SOUTH/SIDE DESCRIPTION QUANTITY UNIT COST RCV Ductwork-flexible-insulated-4"round 60.00 LF 5.30D 318.00 R&R Stud wall-2"x 4"x 8'- 16"oc 16.00 LF 13.10 D 209.60 We will need to re frame about 16 feet of wall. R&R Labor to frame 2"x 4"x 8'load bearing wall- 16"oc 16.00 LF 8.79 D 140.64 Additional charge for a retrofit exterior door 3.00 EA 45.51 D 136.53 R&R Top plate-2"x 4" 192.00 LF 1.89 D 362.88 Top plate of exterior wall is charred.We will need to replace both. Totals: SOUTH/SIDE 11,022.78 EAST/SIDE 0.00 SF Walls 0.00 SF Ceiling 0.00 SF Walls&Ceiling 0.00 SF Floor 0.00 SF Short Wall 0.00 LF Floor Perimeter 0.00 SF Long Wall 0.00 LF Ceil.Perimeter DESCRIPTION QUANTITY UNIT COST RCV Aluminum window,picture/fixed 12-23 sf(2 pane) 2.00 EA 229.36 D 458.72 Add for"Low E"glass 40.00 SF 4.72 188.80 Caulking-acrylic 40.00 LF 1.78 71.20 Gutter/downspout-aluminum-up to 5" 40.00 LF 4.56 D 182.40 Prime&paint gutter/downspout 40.00 LF 1.08 43.20 Siding-shiplap-cedar 212.00 SF 3.40D 720.80 House wrap(air/moisture barrier) 212.00 SF 0.34D 72.08 Prime&paint exterior soffit-wood 60.00 SF 1.47 88.20 Seal&paint trim 60.00 LF 0.96 57.60 SCHELLER_KAY Page: 33 i Primary Construction SCHELLER,KAY 7/27/2008 CONTINUED-EAST/SIDE DESCRIPTION QUANTITY UNIT COST RCV Seal&paint wood siding 212.00 SF 0.92 195.04 Mask the surface area per square foot-plastic and tape 60.00 SF 0.16 9.60 Painter-per hour 0.50 HR 54.10 D 27.05 Cut in time V x 4"lumber(.333 BF per LF) 35.00 LF 1.58D 55.30 For small roof above the windows. Carpenter-General Framer-per hour 4.00 HR 49.90 D 199.60 Frame roofs Corrugated fiberglass roofing(greenhouse type) 36.00 SF 1.88 D 67.68 R&R Top plate-2"x 4" 26.00 LF 1.89 D 49.14 Totals: EAST/SIDE 2,486.41 WEST/SIDE 0.00 SF Walls 0.00 SF Ceiling 0.00 SF Walls&Ceiling 0.00 SF Floor 0.00 SF Short Wall 0.00 LF Floor Perimeter 0.00 SF Long Wall 0.00 LF Ceil.Perimeter DESCRIPTION QUANTITY UNIT COST RCV Aluminum window,picture/fixed 12-23 sf(2 pane) 2.00 EA 229.36D 458.72 Add for"Low E"glass 40.00 SF 4.72 188.80 Caulking-acrylic 40.00 LF 1.79 71.20 Gutter/downspout-aluminum-up to 5" 40.00 LF 4.56 D 182.40 Prime&paint gutter/downspout 40.00 LF 1.08 43.20 Siding-shiplap-cedar 212.00 SF 3.40 D 720.80 SCHELLER KAY Page:34 Primary Construction SCHELLER,KAY 7/27/2008 CONTINUED-WEST/SIDE DESCRIPTION QUANTITY UNIT COST RCV House wrap(air/moisture barrier) 212.00 SF 0.34D 72.08 Prime&paint exterior soffit-wood 60.00 SF 1.47 88.20 Sea]&paint trim 60.00 LF 0.96 57.60 Sea]&paint wood siding 212.00 SF 0.92 195.04 Mask the surface area per square foot-plastic and tape 60.00 SF 0.16 9.60 Painter-per hour 0.50 HR 54.1OD 27.05 Cut in time R&R Top plate-2"x 4" 26.00 LF 1.89 D 49.14 Totals: WEST/SIDE 2,163.83 GENERAL/CON 0.00 SF Walls 0.00 SF Ceiling 0.00 SF Walls&Ceiling 0.00 SF Floor 0.00 SF Short Wall 0.00 LF Floor Perimeter 0.00 SF Long Wall 0.00 LF Ceil.Perimeter DESCRIPTION QUANTITY UNIT COST RCV General Demolition-per hour 427.00 HR 35.09 D 14,983.43 We will not only need to remove all drywall and insulation and some framing.We will need to remove the entire roof along with the soffit,and all siding and windows.The siding is chaired all around the top 6"of the wall this siding is channel vertical ceder that starts at the base of the wall and ends at the top.I have received two bids to demo that came in at 22,OOO.With dumping cost. Dumpster load-Approx.40 yards,7-8 tons of debris 8.00 EA 879.00 D 7,032.00 Fuel surcharge(Bid item) 1.00 EA 800.00* 800.00 This charge is for the dumpster.We are charged a 50.00 dollar fuel charge each trip,pick up and drop off. Temporary toilet(per month) 7.00 MO 103.75 D 726.25 Delivery charge(Bid item) 1.00 EA 50.00* 50.00 SCHELLER_KAY Page: 35 I Primary Construction SCHELLER,KAY 7/27/2008 CONTINUED-GENERAL/CON DESCRIPTION QUANTITY UNIT COST RCV There is a 50.00 fee for the temp toilet to be delivered and then picked up at completion of the job. Cleaning Technician-per hour 12.00 HR 30.78 D 369.36 This is for daily clean up through out the project. R&R Board-up windows and doors 384.00 SF 1.47 D 564.48 2"x 4"lumber(.667 BF per LF) 32.00 LF 1.47 D 47.04 For board up. General Laborer-per hour 2.00 HR 33.72 D 67.44 Time need for safety Taxes,insurance,permits&fees(Bid item) 1.00 EA 1,250.00*D 1,250.00 This amount will be for plans if needed,pennits if needed,and other. Cleaning Technician-per hour 27.00 HR 30.78 D 831.06 This amount is for post construction clean.I gave 9,hrs per unit. Administrative/supervisor labor charge(Bid item) 10.00 HR 45.00*D 450.00 Time needed to set up job,with plans meeting with the city and others. Totals: GENERAL/CON 27,171.06 CODE/UPDATE 0.00 SF Walls 0.00 SF Ceiling 0.00 SF Walls&Ceiling 0.00 SF Floor 0.00 SF Short Wall 0.00 LF Floor Perimeter 0.00 SF Long Wall 0.00 LF Ceil.Perimeter DESCRIPTION QUANTITY UNIT COST RCV Blown-in insulation- 14"depth-R38 2,418.00 SF 1.04D 2,514.72 This is for the attic area new blown in SCHELLER KAY Page:36 i Primary Construction SCHELLER,KAY 7/27/2008 CONTINUED-CODE/UPDATE DESCRIPTION QUANTITY UNIT COST RCV Batt insulation- 10"-R30 2,418.00 SF 1.23 D 2,974.14 Crawl space up date Batt insulation- 4"-RI 1,342.00 SF 0.63 D 845.46 Doors and windows minus ed out Insulation Installer-per hour 6.00 HR 64.02D 384.12 This time will be used for wrapping of the water pipes.No line item Visqueen vapor barrier 2,418.00 SF 0.29 D 701.22 Firesafing-draft stop 432.00 LF 1.25 D 540.00 This is needed for all out side wall corners and corners at fire wall all the way down.. Labor to frame 2"x 4"x 8'non-bearing wall-24"oc 39.00 LF 6.57 D 256.23 2"x 6"lumber(1 BF per LF) 200.00 LF 1.75 D 350.00 This is framing for the attic access Header-double 2"x 8" 128.00 LF 4.29 D 549.12 Carpenter-General Framer-per hour 8.00 HR 49.90 D 399.20 Needed labor to demo out the wall areas that will need to have headers installed. Television cable outlet 6.00 EA 64.07D 384.42 Rewire-average residence-copper wiring 2,398.50 SF 3.28 D 7,867.08 Rigid conduit,2" 8.00 LF 15.52D 124.16 Phone,TV,or speaker outlet 6.00 EA 16.86 D 101.16 Outlet or switch cover 110.00 EA 2.06 D 226.60 Outlet 66.00 EA 12.13 D 800.58 Switch 44.00 EA 12.12 D 533.28 SCHELLER_KAY Page:37 i Primary Construction SCHELLER,KAY 7/27/2008 CONTINUED-CODE/UPDATE DESCRIPTION QUANTITY UNIT COST RCV Door chime 3.00 EA 111.36 D 334.08 220 volt outlet 6.00 EA 22.94D 137.64 220 volt outlet cover 6.00 EA 4.42 D 26.52 Meter base and main disconnect-200 amp 3.00 EA 244.46 D 733.38 Meter mast for overhead power-2 1/2"conduit 1.00 EA 453.87 D 453.87 Grounding rod-copper clad with clamp, 8' 3.00 EA 79.20 D 237.60 Breaker panel- 150 amp 3.00 EA 828.83 D 2,486.49 Circuit breaker-ground-fault circuit-interrupter(GFI) 6.00 EA 54.52D 327.12 Circuit breaker-arc-fault circuit-interrupter(AFC1) 6.00 EA 52.37 D 314.22 Circuit breaker-220 volt-double pole 6.00 EA 33.27D 199.62 Circuit breaker-bolt-on- 1 pole, 15 to 50 amp 24.00 EA 27.77 D 666.48 Coaxial TV cable 200.00 LF 1.25 D 250.00 Bathroom fan,light,and heater-Large 3.00 EA 216.15 D 648.45 R&R Trunk cable-Extra heavy gauge copper conductors 1.00 LF 32.55 D 32.55 R&R Washing machine outlet box with valves 3.00 EA 192.60 D 577.80 Sheathing-plywood- 1/2"CDX 1,929.60 SF 0.96D 1,852.42 1 have talk with the city of Arlington they will require us to sheet the out side of the building for sheer.Mr Scott Black Carpenter-General Framer-per hour 32.00 HR 49.90D 1,596.80 This labor will be needed to sheer nail the exterior of the building.It is very time consuming and must be done right.The city of Arlington is requiring this. Totals: CODE/UPDATE 30,426.53 SCHELLER_KAY Page:38 n Primary Construction SCHELLER,KAY 7/27/2008 Crawl 1 CRAWL/SPACE Ceiling Height: 8' �11'0L c c 1 1,898.67 SF Walls 2,387.00 SF Ceiling 4,285.67 SF Walls&Ceiling 2,387.00 SF Floor 237.33 LF Ceil.Perimeter 237.33 LF Floor Perimeter DESCRIPTION QUANTITY UNIT COST RCV Foam pipe insulation- 1/2"wall for 1/8"to 3/4"pipe 250.00 LF 2.98 D 745.00 Foam pipe insulation- 1/2"wall for 1"to 1 1/2"pipe 150.00 LF 3.62D 543.00 Totals: CRAWL/SPACE 1,288.00 Area Totals: Crawl 1,898.67 SF Walls 2,387.00 SF Ceiling 4,285.67 SF Walls and Ceiling 2,387.00 SF Floor 2,466.56 Total Area 237.33 LF Floor Perimeter 2,387.00 Floor Area 240.00 Exterior Perimeter 237.33 LF Ceil.Perimeter 1,920.00 Exterior Wall Area of Walls 1,898.67 Interior Wall Area Total: Crawl 1,288.00 Line Item Subtotals: SCHELLERKAY 191,844.88 Adjustments for Base Service Charges Adjustment Drywall Installer/Finisher 249.88 Painter 108.20 Tile/Cultured Marble Installer 128.60 Total Adjustments for Base Service Charges: 486.68 LINE ITEM TOTALS:SCHELLER KAY 192,331.56 SCHELLER_KAY Page:39 1 1 I Primary Construction SCHELLER,KAY 7/27/2008 Grand Total Areas: 9,412.01 SF Walls 4,683.53 SF Ceiling 14,095.54 SF Walls and Ceiling 4,683.53 SF Floor 1,172.17 LF Floor Perimeter 1,198.17 LF Ceil.Perimeter 4,683.53 Floor Area 4,966.39 Total Area 9,412.01 Interior Wall Area 3,853.33 Exterior Wall Area 481.67 Exterior Perimeter of Walls 3,141.36 Surface Area 31.41 Number of Squares 251.00 Total Perimeter Length 67.17 Total Ridge Length 87.50 Total Hip Length SCHELLER_KAY Page:40 Trade Summary Includes all applicable Tax,General Contractor O&P,and Base Service Charges DESCRIPTION LINE ITEM REPLACEMENT ACV MAX ADDITIONAL QNTY COST TOTAL AMT AVAILABLE APP APPLIANCES Detach&Reset Refrigerator-top freezer-25 3.00 EA $195.34 $195.34 $0.00 to 30 cf Detach&Reset Range-freestanding- 3.00 EA $191.55 $191.55 $0.00 electric TOTAL APPLIANCES $386.89 $386.89 $0.00 CAB CABINETRY Countertop subdeck-particle board 45.00 SF $121.87 $121.87 $0.00 Countertop-Flat laid plastic laminate 22.50 LF $999.55 $999.55 $0.00 Countertop edge treatment-wood 22.50 LF $142.68 $142.68 $0.00 4"backsplash for flat laid countertop 34.50 LF $304.55 $304.55 $0.00 Countertop-solid surface-Average grade 3.00 SF $246.62 $246.62 $0.00 Custom cabinets-wall units-up to 24"tall 9.00 LF $1,482.55 $1,482.55 $0.00 Custom cabinets-wall units-42"tall 13.50 LF $2,682.96 $2,682.96 $0.00 Carpenter-Finish,Trim/Cabinet-per hour 4.50 HR $316.34 $316.34 $0.00 Cabinetry-lower(base)units-High grade 22.50 LF $4,261.84 $4,261.84 $0.00 Detach&Reset Vanity 3.00 LF $133.27 $133.27 $0.00 TOTAL CABINETRY $10,692.23 $10,692.23 $0.00 CLN CLEANING Cleaning Technician-per hour 47.00 HR $1,883.55 $1,883.55 $0.00 TOTAL CLEANING $1,883.55 $1,883.55 $0.00 DMO GENERAL DEMOLITION Remove Dumpster load-Approx.40 yards,7- 8.00 EA $9,155.67 $9,155.67 $0.00 8 tons of debris Remove General Demolition-per hour 427.00 HR $19,508.43 $19,508.43 $0.00 TOTAL GENERAL DEMOLITION $28,664.10 $28,664.10 $0.00 DOR DOORS Bypass(sliding)door set-lauan/mahogany 3.00 EA $455.64 $455.64 $0.00 Interior door-Colonist-pre-hung unit 6.00 EA $1,139.14 $1,139.14 $0.00 Interior door-lauan/mahogany-pre-hung 6.00 EA $1,032.28 $1,032.28 $0.00 unit Overhead door&hardware- 10'x 7'-High 2.00 EA $2,337.41 $2,337.41 $0.00 grade Pocket door unit-birch 3.00 EA $689.63 $689.63 $0.00 Storm door assembly 6.00 EA $1,660.90 $1,660.90 $0.00 Note: Slight variances may be found within report sections due to rounding Page:41 Trade Summary includes all applicable Tax,General Contractor O&P,and Base Service Charges DESCRIPTION LINE ITEM REPLACEMENT ACV MAX ADDITIONAL QNTY COST TOTAL AMT AVAILABLE DOR DOORS Glass light,up to 24"x 24" 3.00 EA $464.11 $464.11 $0.00 Exterior door-metal-insulated/wood- 6.00 EA $3,282.21 $3,282.21 $0.00 High grade Additional charge for a retrofit exterior door 6.00 EA $355.53 $355.53 $0.00 TOTAL DOORS $11,416.85 $11,416.85 $0.00 DRY DRYWALL 5/8"drywall-hung,taped,ready for texture 8,532.99 SF $16,464.55 $16,464.55 $0.00 5/8"drywall-hung&fire taped only 1,276.89 SF $2,058.78 $2,058.78 $0.00 Mask per square foot for drywall or plaster 1,917.91 SF $380.27 $380.27 $0.00 work Texture drywall-machine 8,532.99 SF $3,044,87 $3,044.87 $0.00 TOTAL DRYWALL $21,948.47 $21,948.47 $0.00 ELE ELECTRICAL Bathroom fan,light,and heater 3.00 EA $770.34 $770.34 $0.00 Bathroom fan,light,and heater-Large 3.00 EA $844.29 $844.28 $0.00 Breaker panel- 150 amp 3.00 EA $3,237.41 $3,237.41 $0.00 Circuit breaker-220 volt-double pole 6.00 EA $259.90 $259.90 $0.00 Circuit breaker-arc-fault circuit-interrupter 6.00 EA $409.11 $409.11 $0.00 (AFCI) Circuit breaker-ground-fault circuit- 6.00 EA $425.91 $425.91 $0.00 interrupter(GFI) Circuit breaker-bolt-on- 1 pole, 15 to 50 24.00 EA $867.77 $867.77 $0.00 amp Door chime 3.00 EA $434.97 $434.97 $0.00 Exhaust fan 3.00 EA $588.60 $588.60 $0.00 Grounding rod-copper clad with clamp, 8' 3.00 EA $309.36 $309.36 $0.00 Meter mast for overhead power-2 1/2" 1.00 EA $590.93 $590.93 $0.00 conduit Meter base and main disconnect-200 amp 3.00 EA $954.87 $954.87 $0.00 Phone,TV,or speaker outlet 6.00 EA $131.71 $131.71 $0.00 220 volt outlet 6.00 EA $179.21 $179.21 $0.00 220 volt outlet cover 6.00 EA $34.52 $34.52 $0.00 Outlet 66.00EA $1,042.36 $1,042.36 $0.00 Outlet or switch cover 110.00 EA $295.04 $295.04 $0.00 Switch 44.00 EA $694.33 $694.33 $0.00 Note: Slight variances may be found within report sections due to rounding Page:42 I Trade Summary Includes all applicable Tax,General Contractor O&P,and Base Service Charges DESCRIPTION LINE ITEM REPLACEMENT ACV MAX ADDITIONAL QNTY COST TOTAL AMT AVAILABLE ELE ELECTRICAL Rigid conduit,2" 8.00 LF $161.65 $161.65 $0.00 Rewire-average residence-copper wiring 2,398.50 SF $10,242.94 $10,242.94 $0.00 Smoke detector 6.00 EA $310.60 $310.60 $0.00 R&R Trunk cable-Extra heavy gauge copper 1.00 LF $42.38 $42.38 $0.00 conductors Thernnostat-electric heat 3.00 EA $217.41 $217.41 $0.00 Television cable outlet 6.00 EA $500.51 $500.51 $0.00 Coaxial TV cable 200.00 LF $325.50 $325.50 $0.00 Wall heater 6.00 EA $1,285.46 $1,285.46 $0.00 TOTAL ELECTRICAL $25,157.07 $25,157.07 $0.00 EQC MISC.EQUIPMENT-COMMERCIAL Door numbers/letters-plastic or metal-up to 6.00 EA $98.82 $98.82 $0.00 4" TOTAL MISC.EQUIPMENT-COMMERCIAL $98.82 $98.82 $0.00 FEE PERMITS AND FEES Delivery charge(Bid item) 1.00 EA $65.10 $65.10 $0.00 Fuel surcharge(Bid item) 1.00 EA $1,041.60 $1,041.60 $0.00 Taxes,insurance,permits&fees(Bid item) 1.00 EA $1,627.50 $1,627.50 $0.00 TOTAL PERMITS AND FEES $2,734.20 $2,734.20 $0.00 FNC FINISH CARPENTRY/TRIMWORK Trim board- V x 6"-installed(pine) 1,132.00 LF $5,512.25 $5,512.25 $0.00 Baseboard-2 1/4" 616.49 LF $1,645.48 $1,645.48 $0.00 Casing-2 1/4" 51.00 LF $102.92 $102.92 $0.00 Casing-2 1/4"stain grade 51.00 LF $168.66 $168.66 $0.00 Closet shelf and rod package 28.80 LF $704.96 $704.96 ,$0.00 Shelving- 12"-in place 24.00 LF $213.11 $213.11 $0.00 Shelving- 16"-in place 24.00 LF $247.17 $247.17 $0.00 Shelving-24"-in place 22.80 LF $258.58 $258.58 $0.00 TOTAL FINISH CARPENTRY/TRIMWORK $8,853.13 $8,853.13 $0.00 FNH FINISH HARDWARE Bath accessory 9.00 EA $252.06 $252.06 $0.00 Door lockset&deadbolt-exterior 6.00 EA $550.97 $550.97 $0.00 Door knob-interior 12.00 EA $540.12 $540.12 $0.00 Note: Slight variances may be found within report sections due to rounding Page:43 Trade Summary Includes all applicable Tax,General Contractor O&P,and Base Service Charges DESCRIPTION LINE ITEM REPLACEMENT ACV MAX ADDITIONAL QNTY COST TOTAL AMT AVAILABLE FNH FINISH HARDWARE Door hinges-Standard grade(set of 3) 4.00 EA $157.13 $157.13 $0.00 Finish Hardware Installer-per hour 1.00 HR $62.87 $62.87 $0.00 Mailboxes-commercial/group-keyed 3.00 EA $118.07 $118.07 $0.00 Door peep hole 3.00 EA $68.83 $68.83 $0.00 TOTAL FINISH HARDWARE $1,750.05 $1,750.05 $0.00 FRM FRAMING&ROUGH CARPENTRY 1"x 4"lumber(.333 BF per LF) 35.00 LF $72.00 $72.00 $0.00 2"x 4"lumber(.667 BF per LF) 308.00 LF $589.50 $589.50 $0.00 2"x 6"lumber(1 BF per LF) 200.00 LF $455.70 $455.70 $0.00 2"x 6" cedar-deck grade(1 BF per LF) 84.00 LF $336.86 $336.86 $0.00 R&R Stud wall-2"x 4"x 8'- 16"oc 16.00 LF $272.90 $272.90 $0.00 Stud wall-2"x 4"x 8'- 16"oc 18.00 LF $278.65 $278.65 $0.00 Stud wall-2"x 4"x 8'-24"oc 14.75 LF $199.34 $199.34 $0.00 R&R Labor to frame 2"x 4"x 8'load bearing 16.00 LF $183.11 $183.11 $0.00 wall- 16"oc Labor to frame 2"x 4"x 8'non-bearing wall- 18.00 LF $169.68 $169.68 $0.00 16"oc Labor to frame 2"x 4"x 8'non-bearing wall- 53.75 LF $459.79 $459.79 $0.00 24"oc Hip or roof intersection 6/12 slope 175.00 LF $9,489.95 $9,489.95 $0.00 (hip/valley length) Header-double 2"x 8" 128.00 LF $714.95 $714.95 $0.00 Carpenter-General Framer-per hour 44.00 HR $2,858.68 $2,858.68 $0.00 Carpenter-General Framer-per hour 0.00 HR $0.00 $0.00 $0.00 Sheathing-plywood- 1/2"CDX 1,929.60 SF $2,411.85 $2,411.85 $0.00 Sheathing- 1"x 6"-tongue and groove 2,400.00 SF $9,499.39 $9,499.39 $0.00 Sheathing-radiant barrier- 1/2"-OSB 64.00 SF $81.66 $81.66 $0.00 R&R Top plate-2"x 4" 436.00 LF $1,072.90 $1,072.90 $0.00 Truss-6/12 slope 843.00 LF $5,444.03 $5,444.03 $0.00 TOTAL FRAMING&ROUGH CARPENTRY $34,590.94 $34,590.94 $0.00 HVC HEAT, VENT&AIR CONDITIONING Ductwork-flexible-insulated-4"round 60.00 LF $414.04 $414.04 $0.00 Clothes dryer vent-installed 3.00 EA $198.89 $198.89 $0.00 TOTAL HEAT, VENT&AIR CONDITIONING $612.93 $612.93 $0.00 Note: Slight variances may be found within report sections due to rounding Page:44 i Trade Summary Includes all applicable Tax,General Contractor O&P,and Base Service Charges DESCRIPTION LINE ITEM REPLACEMENT ACV MAX ADDITIONAL QNTY COST TOTAL AMT AVAILABLE INM INSULATION-MECHANICAL Foam pipe insulation- 1/2"wall for 1"to 1 150.00 LF $706.98 $706.98 $0.00 1/2"pipe Foam pipe insulation- 1/2"wall for 1/8"to 250.00LF $969.99 $969.99 $0.00 3/4"pipe TOTAL INSULATION-MECHANICAL $1,676.97 $1,676.97 $0.00 INS INSULATION Blown-in insulation- 14"depth-R38 2,418.00 SF $3,274.16 $3,274.16 $0.00 Batt insulation- 10"-R30 2,418.00 SF $3,872.34 $3,872.34 $0.00 Batt insulation- 4"-R13 1,342.00 SF $1,100.79 $1,100.79 $0.00 Firesafing-draft stop 432.00 LF $703.08 $703.08 $0.00 House wrap(air/moisture barrier) 2,024.00 SF $895.98 $895.98 $0.00 Insulation Installer-per hour 6.00 HR $500.12 $500.12 $0.00 Visqueen vapor barrier 2,418.00 SF $912.99 $912.99 $0.00 TOTAL INSULATION $11,259.46 $11,259.46 $0.00 LAB LABOR ONLY Administrative/supervisor labor charge(Bid 10.00 HR $585.90 $585.90 $0.00 item) General Laborer-per hour 2.00 HR $87.80 $87.80 $0.00 TOTAL LABOR ONLY $673.70 $673.70 $0.00 LIT LIGHT FIXTURES Light fixture 18.00EA $1,423.03 $1,423.03 $0.00 Exterior light fixture 8.00 EA $790.78 $790.78 $0.00 TOTAL LIGHT FIXTURES $2,213.81 $2,213.81 $0.00 MPR MOISTURE PROTECTION Caulking-acrylic 510.00LF $1,188.73 $1,188.73 $0.00 TOTAL MOISTURE PROTECTION $1,188.73 $1,188.73 $0.00 MSD MIRRORS&SHOWER DOORS Mirror- 1/4"plate glass 27.00 SF $323.07 $323.07 $0.00 TOTAL MIRRORS&SHOWER DOORS $323.07 $323.07 $0.00 PLM PLUMBING Drain/Vent line-PVC pipe with fitting and 48.00 LF $577.47 $577.47 $0.00 hanger,2" Sink faucet-Kitchen 3.00 EA $625.20 $625.20 $0.00 Note: Slight variances may be found within report sections due to rounding Page:45 Trade Summary Includes all applicable Tax,General Contractor O&P,and Base Service Charges DESCRIPTION LINE ITEM REPLACEMENT ACV MAX ADDITIONAL QNTY COST TOTAL AMT AVAILABLE PLM PLUMBING Sink faucet-Bathroom 3.00 EA $468.06 $468.06 $0.00 Pedestal sink 1.00 EA $462.79 $462.79 $0.00 Detach&Reset Pedestal sink 1.00 EA $261.40 $261.40 $0.00 Rough in plumbing-per fixture 18.00 EA $12,259.14 $12,259.14 $0.00 Water supply line-copper with fitting and 48.00 LF $910.56 $910.56 $0.00 hanger, 1" Water supply line-copper with fitting and 96.00 LF $1,489.91 $1,489.91 $0.00 hanger, 1/2" Sink-double 3.00 EA $1,111.36 $1,111.36 $0.00 R&R Angle stop 6.00 EA $228.50 $228.50 $0.00 Plumbing fixture supply line 24.00 EA $425.91 $425.91 $0.00 Shower faucet 3.00 EA $845.65 $845.65 $0.00 Detach&Reset Toilet 3.00 EA $676.86 $676.86 $0.00 Bathtub 1.00 EA $719.33 $719.33 $0.00 Detach&Reset Bathtub 2.00 EA $1,054.80 $1,054.80 $0.00 R&R Washing machine outlet box with 3.00 EA $752.30 $752.30 $0.00 valves Water heater-50 gallon-Electric-9 yr 3.00 EA $2,732.99 $2,732.99 $0.00 TOTAL PLUMBING $25,602.23 $25,602.23 $0.00 PNL PANELING&WOOD WALL FINISHES Waterproof panel tub surround w/trim-up to 3.00 EA $957.24 $957.24 $0.00 65 SF TOTAL PANELING&WOOD WALL FINISHES $957.24 $957.24 $0.00 PNT PAINTING Paint baseboard-one coat 101.66 LF $83.89 $83.89 $0.00 Paint baseboard-two coats 514.83 LF $640.47 $640.47 $0.00 Paint bypass door set-slab only-2 coats 12.00 EA $487.28 $487.28 $0.00 (per side) Paint door slab only-2 coats(per side) 33.00 EA $954.16 $954.16 $0.00 Paint door/window trim&jamb-2 coats(per 33.00 EA $1,070.80 $1,070.80 $0.00 side) Prime&paint gutter/downspout 370.00 LF $523.28 $523.28 $0.00 Painter-per hour 5.00 HR $354.22 $354.22 $0.00 Mask and prep for paint-plastic,paper,tape 848.67 LF $989.05 $989.05 $0.00 (per LF) Mask {V}per square foot-plastic and tape 706.00 SF $147.92 $147.92 $0.00 Note: Slight variances may be found within report sections due to rounding Page:46 Trade Summary Includes all applicable Tax,General Contractor O&P,and Base Service Charges DESCRIPTION LINE ITEM REPLACEMENT ACV MAX ADDITIONAL QNTY COST TOTAL AMT AVAILABLE PNT PAINTING Seal&paint single garage door opening& 2.00 EA $174.19 $174.19 $0.00 trim Seal&paint wood siding 2,024.00 SF $2,438.33 $2,438.33 $0.00 Prime&paint exterior soffit-wood 520.00 SF $1,000.94 $1,000.94 $0.00 Seal then paint{V} (2 coats) 8,532.99 SF $7,151.22 $7,151.22 $0.00 Seal stud wall for odor control 1,718.72 SF $1,237.85 $1,237.85 $0.00 Seal stud wall for odor control(white 6,600.32 SF $5,358.60 $5,358.60 $0.00 pigmented shellac) Seal&paint trim 512.00 LF $643.65 $643.65 $0.00 Prime&paint door slab only-exterior(per 6.00 EA $241.91 $241.91 $0.00 side) TOTAL PAINTING $23,497.76 $23,497.76 $0.00 RFG ROOFING Laminated-30 yr.-comp,shingle rfg-incl. 36.50 SQ $7,361.80 $7,361.80 $0.00 felt Corrugated fiberglass roofing(greenhouse 36.00 SF $88.13 $88.13 $0.00 type) Flashing, 14"wide 96.00 LF $318.73 $318.73 $0.00 R&R Flashing-pipe jack 6.00 EA $214.28 $214.28 $0.00 Ridge cap-composition shingles 179.00 LF $636.25 $636.25 $0.00 Roof vent-turtle type 10.00 EA $454.92 $454.92 $0.00 TOTAL ROOFING $9,074.11 $9,074.11 $0.00 SDG SIDING Siding-shiplap-cedar 2,024.00 SF $8,959.84 $8,959.84 $0.00 Attic vent-gable end-metal- 12"x 18" 26.00 EA $1,648.59 $1,648.59 $0.00 TOTAL SIDING $10,608.43 $10,608.43 $0.00 SFG SOFFIT,FASCIA,&GUTTER Fascia- 1"x 4" #3 cedar 244.20 LF $960.21 $960.21 $0.00 Fascia- 1"x 6" #3 cedar 260.20 LF $1,243.31 $1,243.31 $0.00 Gutter/downspout-aluminum-up to 5" 370.00 LF $2,196.74 $2,196.74 $0.00 TOTAL SOFFIT,FASCIA,&GUTTER $4,400.26 $4,400.26 $0.00 TIL TILE Window sill-the on 2"x 4"wall 66.00 LF $914.19 $914.19 $0.00 TOTAL TILE $914.19 $914.19 $0.00 Note: Slight variances may be found within report sections due to rounding Page:47 Trade Summary Includes all applicable Tax,General Contractor O&P,and Base Service Charges DESCRIPTION LINE ITEM REPLACEMENT ACV MAX ADDITIONAL QNTY COST TOTAL AMT AVAILABLE TMP TEMPORARY REPAIRS R&R Board-up windows and doors 384.00 SF $734.95 $734.95 $0.00 Temporary toilet(per month) 7.00 MO $945.58 $945.58 $0.00 TOTAL TEMPORARY REPAIRS $1,680.53 $1,680.53 $0.00 WDA WINDOWS-ALUMINUM Aluminum window,horiz. slider 12-23 sf 1.00 EA $254.14 $254.14 $0.00 Aluminum window-casement,6-8 sf 2.00 EA $580.17 $580.17 $0.00 Aluminum window-casement,9-13 sf 3.00 EA $993.56 $993.56 $0.00 Add for"Low E"glass 208.00 SF $1,278.25 $1,278.25 $0.00 Aluminum window,picture/fixed 12-23 sf(2 9.00 EA $2,687.65 $2,687.65 $0.00 pane) TOTAL WINDOWS-ALUMINUM $5,793.77 $5,793.77 $0.00 WDT WINDOW TREATMENT Window blind-horizontal or vertical-Large 9.00 EA $1,329.06 $1,329.06 $0.00 Window drapery-hardware-Large 3.00 EA $433.13 $433.13 $0.00 TOTAL WINDOW TREATMENT $1,762.19 $1,762.19 $0.00 TOTALS $250,415.67 $250,415.68 $0.00 Note: Slight variances may be found within report sections due to rounding Page:48 Primary Construction SCHELLER,KAY 7/27/2008 Recap by Room Estimate:SCHELLER_KAY SCHELLER_KAY Page:49 I Primary Construction SCHELLER,KAY 7/27/2008 Area: Main Level KITCHEN-ONE 6,062.29 3.15% LIVING-ONE 2,722.87 1.42% HALL-ONE 3,108.46 1.62% BATH-ONE 4,604.77 2.39% BED-ONE 2,980.60 1.55% STORAGE-ONE 2,803.35 1.46% GARAGE-ONE 1,206.33 0.63% STORAGE-TWO 3,249.34 1.69% BED-TWO 2,972.48 1.55% HALL-TWO 3,080.23 1.60% BATH-TWO 4,900.79 2.55% KITCHEN-TWO 6,067.87 3.15% LIVING-TWO 2,583.04 1.34% STORAGE-THRE 4,154.29 2.16% GARAGE-THREE 1,223.34 0.64% BED-THREE 2,966.37 1.54% LIVING-THREE 2,389.29 1.24% HALL-THREE 3,070.85 1.60% BATH-THREE 4,695.78 2.44% KITCHEN-THRE 6,077.03 3.16% Area Subtotal: Main Level 70,919.37 36.87% Area: ROOF Roofl 33,205.59 17.26% Area Subtotal: ROOF 33,205.59 17.26% NORTH/SIDE 13,161.31 6.84% SOUTH/SIDE 11,022.78 5.73% EAST/SIDE 2,486.41 1.29% WEST/SIDE 2,163.83 1.13% GENERAL/CON 27,171.06 14.13% CODE/UPDATE 30,426.53 15.82% Area: Crawl CRAWL/SPACE 1,288.00 0.67% Area Subtotal: Crawl 1,288.00 0.67% Subtotal of Areas 191,844.88 99.75% Base Service Charges 486.68 0.25% Total 192,331.56 100.00% SCHELLER_KAY Page:50 Primary Construction SCHELLER,KAY 7/27/2008 Recap by Category O&P Items Total Dollars % APPLIANCES 297.15 0.12% CABINETRY 8,212.17 3.28% CLEANING 1,446.66 0.58% GENERAL DEMOLITION 22,015.43 8.79% DOORS 8,768.71 3.50% DRYWALL 16,607.63 6.63% ELECTRICAL 19,321.87 7.72% MISC.EQUIPMENT-COMMERCIAL 75.90 0.03% PERMITS AND FEES 2,100.00 0.84% FINISH CARPENTRY/TRIMWORK 6,799.64 2.72% FINISH HARDWARE 1,344.13 0.54% FRAMING&ROUGH CARPENTRY 26,567.54 10.61% HEAT, VENT&AIR CONDITIONING 470.76 0.19% INSULATION-MECHANICAL 1,288.00 0.51% INSULATION 8,647.82 3.45% LABOR ONLY 517.44 0.21% LIGHT FIXTURES 1,700.32 0.68% MOISTURE PROTECTION 907.80 0.36% MIRRORS&SHOWER DOORS 248.13 0.10% PLUMBING 19,663.76 7.85% PANELING&WOOD WALL FINISHES 735.21 0.29% PAINTING 17,944.43 7.17% ROOFING 6,969.35 2.78% SIDING 8,147.80 3.25% SOFFIT,FASCIA,&GUTTER 3,379.61 1.35% TILE 573.54 0.23% TEMPORARY REPAIRS 1,290.73 0.52% WINDOWS-ALUMINUM 4,449.90 1.78% WINDOW TREATMENT 1,353.45 0.54% Subtotal 191,844.88 76.61% Base Service Charges 486.68 0.19% General Contractor Overhead @ 10.00% 19,233.16 7.68% General Contractor Profit @ 10.00% 19,233.16 7.68% O&P Items Subtotal 230,797.88 92.17% SCHELLER_KAY Page: 51 Primary Construction SCHELLER,KAY 7/27/2008 Structural Damage Claim Policy When you have a covered structural damage claim to your real property,you should know: - We want you to receive quality repair work to restore the damages to your property. - We will provide you with a detailed estimate of the scope of the damage and costs of repairs. Should the contractor you select have questions concerning our estimate,they should contact your claim representative directly. Depending upon the complexity of your repair,our estimate may or may not include an allowance for general contractor's overhead and profit. If you have questions regarding general contractor's overhead and profit or whether general contractor services are appropriate for your loss,please contact your claim representative before proceeding with repairs. _ If you select a contractor whose estimate is the same as or lower than our estimate,based on the same scope of damages,we will pay based upon their estimate. If your contractor's estimate is higher than ours,you should contact your claim representative prior to beginning repairs. - State Farm cannot authorize any contractor to proceed with work on your property. Repairs should proceed only with your authorization. - State Farm does not guarantee the quality of the workmanship of any contractor or guarantee that the work will be accomplished within any specific time frame. - It is understood that the contractor is hired by you,our insured,and that they work for you- not State Farm. If you have any questions or need additional information regarding your claim please contact your claim representative immediately. SCHELLER_KAY Page: 52 I � m c G=� � `^ � _ .v,ez � .R.y a a �I w a a U � E7! Ln dJ a F s 1 1 1 y „V,LI � b b 3 u I o T _ 1 .Y.S .6.[ .11.91 ZD u ry io 1S .e.n � o c U SEATTLE ASBESTOS TESL`, LLC NVLAP ACCREDITATION LAB CODE;200768-0 19711 Scriber Lake Road,Suite D,Lynnwood,WA 98036 AHERA Inspector Number. 1028667 Phone:(425)673-9850,Fax:(425)673-9810 www.seattleasbestostest.com J steve c�seattleasbestostest.cm ASBESTOS SURVEY REPORT Property Location: 202 E Jackson St.,'Arlington, WA 98223 Prepared for: Mr. Tim Brocato Primary Construction, LLC 20615 67th Ave NE, Arlington Prepared by: Steve (Fanyao) Zhang AHERA Cert. 1028667; expiration date: 04/2009 Seattle Asbestos Test, LLC 19711 Scriber Lake Road, Suite D Lynnwood, WA 98036 Inspection Date: 7/25/2008 Report Date: 7/28/2008 Note:Summary information for asbestos at named property can be found in"Conclusions"section of the report,in the floor plans,or in table 3,Nature and piWbution of Asbaatas.A"point Count SupplemenC,N attached,may change the original asbestos percentage. RECEIVED AUG 0 12008 COA PERMIT CENTER I i 6"y 41 Page 1 of 5 SEAT LE ASBESTOS TEST, LLC NVL,AP ACCREDITATION LAB.CODE.200768-0 19711 Scriber Lake Road,Suite D,Lynnwood,WA 98036 AHERA Inspector Number: 1028667 Phone-(425)673-9850,Fax:(425)673-9310 www.seatdeasbcstostestco=/sieve@seattleasbestostest.com Property Location 202 E Jackson St.,Arlington,WA 98223 Purpose/Scope of Survey This survey is intended to investigate, sample and test ACM in accordance with 40 CFR 763,86, the EPA regulations for Asbestos Hazard Emergency Response Act (AHERA). The client named will use this report to meet their regulatory requirements in their project. Method ology/F i nd i nge Inspection, sampling and assessment procedures were performed in general accordance with the AHERA guidelines published by the U.S. EPA in 40 CFR Part 763 subpart E, October 30, 1957. The surrey include three integrated tasks: visual inspection, sampling and quantification. Special attention should be paid to the following: material classification, recognizing of homogeneous areas, differentiation between friable and nonfriable asbestos, and interpretation of testing results. Mated.al classificatton There are three main kinds of material according to EPA sampling guidelines. They are Surfacing Material, Thermal system Insulation, and Miscellaneous material. The classification bears implications for number of samples to be taken- For Surfacing material, there's the 3-5-7 rule, meaning 3 samples from less than 1,000 square feet area, 5 samples from 1,000 to 5,000 square feet area, and 7 samples from greater than 5,000 square feet area, For Thermal system material, with some exceptions, 3 samples should be taken for each homogeneous area. For Miscellaneous material, at least one sample should be taken from each homogeneous material. Table 1 shows the types of material recognized during the survey, and the following is a tabulated summary of the material types: Total miscellaneous Material-- ------ ---- - _-- --- ----- > 50 Page 2 of 6 SEATTLE ASBESTOS TEST, LLG NVLAP ACCREDITATION LAB CODE:200768-0 19711 Scriber Lake A,oad,Suite D,Lynnwood,WA,98036 AHERA Inspector Number: 1028667 Phone:(425)673-9850,Pow(425)673-9810 www-seattleasbestostesLcom/steve(a seattleasbestostest.caioo Property Location 202 E Jackson St.,Arlington,WA 98223 Total Thermal Systern Insulations(TSI) 1 Total Surfacing Material-------------- - ----- ----------- ____—___ 0 Homogeneous AfM Homogeneous material means an area of surfacing material, thermal system insulation material or miscellaneous material that is uniform in color and texture. It should be pointed out that materials appear to be homogeneous and adjacent to each other may in fact have different contents in terms of asbestos, and only laboratory testing will decide whether they are really the some homogeneous area. Table 2 shows the identified homogeneous areas for this survey. Total homogeneous areas . . ____-- _ .---- 29 For each homogeneous area, its representative location and sample number are given in the table. Friable vs Non friable A material that contains asbestos is friable if the material, when dry, may be crumbled, pulverized, or reduced to powder by hand pressure, and includes previously non-friable material after such previous nonfriable material becomes damaged to the extent that it meets the criteria as a friable material. The term friable during an AHERA asbestos survey applies only to ACM, and table 3 shows friable ACMs and nonfriable ACMs during this survey. Total ACM found on the property— -- 0 LaboratorkTesting_R_asults i i, Page 3 of 5 SEATTLE ASBESTOS TEST, LLC NVLAP ACCREDITATION LAB CODE: 200768-0 1971 l Scriber Lake Road,Suite D,Lyimwood,WA 98036 AHERA Inspector Number.. 1028667 Phone:(425)673-9850,Fair:(425)673-9810 Property Location www.seattleasbestoste.at.aom/steve@seattleasbestostest.conoi 202 E Jackson Sf:,Arlington,WA 98223 Analytical testing is done in house in Seattle Asbestos Test, which is a NVLAP Accredited lab and participates in PAT rounds administered by NVLAP. Seattle Asbestos Test has over 20 years of analytical testing experience among its key analysts, and it conducts extensive inter- and intra- laboratory QA/QC testing. The method of testing employed are polarized light microscopy, or PLM. For QC purposes, one in every ten samples are analyzed as duplicate and check samples are randomly cross-analyzed by different analysts. Table 4 is the test,results for the samples taken during the survey. For each sample, it is sub-divided into layers if the sample is separable, and each layer is then prepared into slides and analyzed separately. Each layer is also described to show its color, and nature, so that it provides a check to the homogeneous area classification done on site. Different from the lab report format, which is listed in the appendices, Table 4 also shows the location of each sample, and the material as seen by the inspector on-site. This kind cross-reference enhances degree of certainty to the final report. The following is a tabulated summary Total number of sample 26 Total number of layers--- -------- -- ---_._ __m�---____— 53 Conclusions No ACMs were found on the client property during the inspection. The units has roofing shingles (sample 10), and the exterior walls are wood paneling. The windows are metal framed. The interior flooring are mostly carpets (sample 15) covering sheet vinyl (samples 16,17, 18). The walls and ceilings are gypsum boards with fiber glass insulation. Page 4 of 5 SEATTLE ASBESTOS TEST, LLC NVLAP ACCREDITATION LAB CODE: 200768-0 19711 Sexiber Lake R ad,Suite D,Lynnwood,W.A.93036 AHERA Inspector Number: 0028667 Phone:(425)673-9850,-par:(425)673-9810 Property Location www_seattleasbestostest_com f sbeve@seaWcssbestostest_com 202 E Jackson St.,Arlington,WA 98223 Limitations Major limitations of this survey are: (1) it's impossible to sample every inch of building material by the method called, (2) sample appears , the same, i.e., homogeneous may in fact be different in terms of asbestos containing, (3) concealed or difficult-to-access materials, such as underground constructions, areas under vast carpeted spaces where it is difficult to reveal everything under the carpet, materials inside walls, or under plywood if destructive sampling is'not possible, and debris pile from burning can not be adequately sampled, (4) random sampling scheme called by the method may skip areas that contains asbestos, and (5) measurements of area, length and size are all estimated, and should not be relied on for bidding purposes. As such, materials that are not addressed in this survey should be assumed ACM and should be treated as such unless additional samples were taken and tested otherwise. Any effort for additional survey that may take place after the release of this report should be in the farm of an addends. This report is for the exclusive use of Client named and their representatives. The inspection and the report follow the general guidance recommended by AHERA, and no any other warranty, express or implied, is made. Any unauthorized use or use of this report beyond its scope are strictly prohibited, and Seattle Asbestos Test, LLC and its inspectors resume no liability. Respectfully Submitted, Steve (l~anyao) Zhang � t 9 ~ cQ CL � b � § 0 E - q 2 k ed k /CL k � k % k w U iL r_ 2 O �0 _ $ 0 7 m � q �\ / § CL� © 7z zE cn 2 p 2 (D a) @ $ o m J C F- F U- - _ § � � / / 7 M I SEATTLE ASBESTOS TEST, LLC N11LAP LAB CODE:200768-0 19711 scidber Lake Road,Suite D,Lytlnwood,WA 98036 AHI=RA Inspector Number: 10286E7 phone:(425)673-9950,Fax:(425)673-9810 Property Location t+vww.seattleasbestostesf,com/steve(,7p seaWeasbestostest-com 2021-Jackson St.,Arlington,WA 98223 T 53 Total Layers SAMPLE LAYER DEWRFTION MATERIAL SAMPLE LOCATION ASBESTOS NUMBER I TYPE TYPE 14 1 Green woven fibrous matedal M-01 unit 1 N/A NIA 1-1 2 Brown Masto M-02 unit 1 N/A NIA 1-2 1 Tan powdery material with paint M-03 unit 1 Chrysotile a1 1-2 2 White chalky material with paper M-04 unit 1 N/A N/A 1-3 1 Tan powdery material with paint M-05 unit 1 Chrysotile, <1 1-3 2 White chalky material with paper Ma unit 1 NIA NIA 1-4 1 Silver foil M-07 until NIA NIA 1-4 2 Tan paper with blade mastic M-08 unit 1 NIA N/A 1-4 3 Pink fibrous material M-09 unit 1 WA N/A 1-5 1 Off-White sheet vinyl M-10 unit 1 NIA NIA 1-5 2 Gray fibrous material with mastic M-11 unit 1 N/A N/A 1-5 3 Off White sheet vinyl M-12 unit 1 NIA N/A 1-5 4 Gray fibrous material Ah mastic M-13 unit 1 NIA NIA 1-5 6 Black asphaltic fibrous material M-14 unit 1 NIA NIA 1-5 8 Brown wood debris M-15 unit 1 NIA NIA 1-6 1 Brown wood block M-16 unit 1 NIA NIA 1-6 2 f (*asphalticfibrousmalWal M-17 unit NIA NIA 1-7 1 Off-White sheet vinyl M-16 unit 1 NIA N/A 1-7 2 Gray fibrous material with mastic M-19 unit 1 NIA N/A 1-8 1 Off-While sheet vinyl M-20 unit 1 NIA N/A 1-8 2 Gray tltxous material with mastic M-21 unit 1 NIA NIA 1-8 3 Black asphaltic fibrous material M-22 unit 1 N/A NIA 2-1 1 pink fibrousmatelial M-23 unit NIA N/A 2-2 1 Black asphaltic material with sand M-24 unit 2 NIA NIA 2-$ 1 White powdery material with palm M-25 unit 2 NIA NIA 2-3 2 White chalky material with paper M-26 unit 2 NIA N/A 2-4 1 White powdery material with paint M 27 unit 2 N/A NIA 2-4 2 White chalky material with paper ma unit 2 NIA NIA 2-5 1 White powdery material with paint M9 unit 2 NIA N/A 2-5 2 White chalky material,with paper M-30 unit 2 NIA NIA 2-6 1 Brown fibrous materiat ' M,31 unit 2 NIA N/A 3-1 1 Red woven fibrous material M-32 unit 3 NIA NIA 3-1 2 White mastic M-33 unit 3 NIA NIA 3-2 1 Brown sheet vinyl M-34 unit 3 NIA NIA 3-2 2 Black asphaltic material with inestic M-35 unit 3 NIA N/A 3,3 1 Brown sheet vinyl W36 unit 3 N/A N/A 3-3 2 Black asphaltic material with mastic M-37 unit 3 N/A NIA 3-4 1 Whitelbiack sheet vinyl M-38 unit 3 NIA NIA 3-4 2 Gray fibrous material with mantle M-39 unit 3 N/A NIA 3-5 1 White powdery material with paint M-40 unit 3 NIA N/A CJ h- C M z z iazzz g ¢ aa ¢ aa ¢ saga ¢ 3 d Z O � CL m W M M C*3 4YJ co m G" Grb co m 0 !+Y M Y Q i fy Q r.n .. W C9V W � g 7 7 a •� , H FL CL d ZE � � � ZB E E E ^ti OEy, Al 1p 0,0 h+i r-I 2 p N r N a- N I- N 0 r N �..� kn N J m N La � it? t+ 1�- 00 c0s- Qy w+ hi Z C�7 R+7 ri R+S K�J t�J �"i <YJ r'li t j �j chi 00 � tl4 a j ttl � Q r N cr) r r- e- 2 M M M 0 3 C'% Co .. .v = _ G G G G C C C C C G C � C C C CC .0 C c G r- C: G C G 'L C C LU a G a � O S i o w _ O I— 52 S2 a n c `� m �° in = FL R M >1.0m Lr cc �- rr w � ao ram} N CA CV CV r r N r r r CD Cry r try r +• CV r r rt r CV . c kc L� 8 , z M [ � im m WL T CO co S= c"Ir Chi Chi ICJ ek s� 1 r rLL I Y N M > r +r � m � Cq CV r r rt 1 r r r r N A �^ c- T r C6 C6 C9 � co C6 x 1A !{y r i i SEATTLE ASBESTOS TEST LLC NVLAP LAB cove 200768-0 19711. scriber Lake Road,Suite D,Lywwood,WA 98036 AHERA Inspector Number 1028667 Phone-(425)673-9850,Fax.:(425)673-9810 www.seaWeasbestostest.com/stew@seattleasbostostesL wzn Property Location ZOZ E Jackson St.,Arlington,WA 98223 Table 1; Types o aten 61 Total Material Type SAMPLE LAYER MATERIAL MATERIAL DESCRIPTION LOCATION NUAMTYPE 1-1 1 "1 Green woven fibrous material unit 1 1-1 2 M-02 Brown Mastic unit 1 1-2 1 M-03 Tan powdery material with paint unit 1 composite 2 M 04 White chalky material with paper unit 1 result-<1% 1-3 1 M-05 Tan powdery material with paint unit 1 Composite 2 M-06 White chalky material with paper unit 1 result<1% unit 1 1-4 1 M-07 Silver foil 1-4 2 M-08 Tan paper with black mastic unit 1 1-4 3 M-09 Pink fibrous material unit 1 1-5 1 M-10 Off-White$heat vinyl unit 1 1-5 2 M-11 Gray fibrous material with mastic unit 1 1-6 3 pit-12 Off White sheet vinyl unit 1 1-5 4 M-13 Gray fibrous material with mastic unit 1 1-5 6 M-14 Black asphaltiG fibrous material unit 1 1-5 0 M-15 Brown wood debris . unit 1 1-6 1 M-16 Brown wood block unit 1 1-6 2 M-17 Black asphaltic fibrous material unit 1 1-7 1 M-18 Off White sheet vinyl unit 1 1-7 2 M-19 Gray fibrous material with mastic unit 1 1-8 1 M-20 Off-White sheet vinyl unit 1 1-8 2 M-21 Gray fibrous material with mastic unit 1 1-8 3 M-22 Black asphaltic fibrous material unit 1 2-1 1 M-23 Pink fibrous material unit 2 2-2 1 M-24 Black asphaltic material with sand unit 2 2-3 1 M-26 White powdery material with paint unit 2 2-3 2 M-26 White chalky material with paper unit 2 2-4 1 M-27 White powdery material with paint unit.2 2-4 2 M-28 White Chalky material with paper unit 2 2-5 1 M-29 White powdery material with paint unit 2 2-5 2 M-30 White chalky material with paper unit 2 2-6 1 M-31 Brown fibrous material unit 2 3-1 1 M-32 Red woven fibrous material unit 3 3-1 2 M-33 White mastic unit 3 3-2 1 M-34 Brown sheet vinyl unit 3 3-2 2 M-35 Black asphaltic material with mastir, unit 3 3-3 1 M-36 Brown sheet vinyl unit 3 3-3 2 M-37 Black asphaltic material with mastic unit 3 3-4 1 M-38 Whiteiblack sheet vinyl unit 3 O N N � 'coo h•. o N is G Ll o CL tz CL M C4 COEn CO Co P7 M M Ct7 r7 M M C9 J 6jj «, LU .rr A. L W G Q O T a ` p a 0 tWL o . 3 �. 'r m o � � � m Q 2 7 er= ME j E � � 2 Q � '.1C � � U d Q me Ch �n ` dp WG� rCgC7 1� was — *- 'L� N r R11 r N r N W r Cy � �' '•"" W 6 C6 � w r7 r� raj � cr► c+�i ,�"i i°? a � r SEATTLE ASBESTOS TEST, LLC NVLAP ACCREDITATION LAB CODE:200768-0 19711 Scriber Lake Road,Suite U,Lypnwood,WA 98036 AHERA inspector Number: 1028687 phone:(425)673-9850,Fax:(425)673-9810 Property Location www.seattleasbestostestcom/steve9seWleasbestostest.com 202 E Jackson 5t.,Arlington,WA 98223 FLOOR PLAN AND SAMPLING SCHEME Property Location:202 E Jackson St., Arlington, WA 98223 Batch Number:200856909 Job Number:NIA Date analyzed: 7/26/2008 Samples Talken.26 Unit 3 Unit 2 Unit 1 I g 1 2 3 1 2 3 4 5 Kitchen Bath Laundry Kitchen Bath Laundry Laundry Bath Kitchen 2 7 11 12 3 4 8 9 4 5 6 6 7 8 Living (Bedroom Living Bedroom Bedroom Living Room Room 10 Room 5 E Jackson St_ Note:(1)Positive samples in bold face and underlined,(2)Map not exact,not in scale i Page 1 of 4 SEATTLE ASBESTOS TEST, LLC NVLAP Actrsedl{ation Lynnwood Laboratory:19711 Scribe'Take Rd,Suite D,L ywiwood,WP.98036,Tel:425,673.9850,Fox:425,673.9810 Lab Code:200768-0 Bellavue LaboratorY:12777 Noah.'Ap Way,Suite 24,]Bellevue,WA 98005;Tel:42s.861.1111,Fax:425.861.1118 Website:http:llww*.seatttcasbcstoAtasL Wtt4 E-3t 4,admio@1s easbe=fftast,com ANALYTICAL LABORATORY REPORT PLM by Method EPA1600/11-931116 Attn.:Mr.Tim Broc ato Client Job#:NIA Client:Primary Construction, LLC Laboratory Batch#: 200855909 Address:20615 67th Ave NE,Arlington Date Received: 7/25/2008 Samples Received: 26 Email: Date Analyzed: 7/26/2008 360.618,7266 Samples Analyzed: 26 Project:202 E Jackson St.,Arlington,WA 98223 t;lien#Sample Layer Dason ion o Asbestos �Ncon�-Flbrous a/o Non-asbestos Lab Ip tp p Fibers ts Fibers Green woven fibrous None Filler, Binder '00 . ynthptic 1 1.1 1 fibers material detected Nona Mastic/binder inder 3 Cellulose 2 Brown Mastic detected 2 1_2 1 an powdery 2 ,Ghry,sotiie Bindertfiller, Paint 5 Cellulose material with paint Composite result<1% 2 Nhite chalky None Binder/filler 25 Cellulose %terial with paper doteeted Gypsum/binder Tan powdery 2 Ch sotile Binder/filler, Paint 7 Cellulose 3 1-3 1 material with paint JVhite chalky (None Sinder/filler �23 Cellulose Composite result c1°� 2 material with paper detected Gypsum/binder (None Foil/binder None detected 4 1-4 1 Silver foil ,detected Tan paper with black None Filler,As halt/binder 70 Cellulose 2 mastic detected p - None I 3 Pink fibrous materialdetected Filler, Glass beads 90 Glass fiber 5 1T6 1 Off White sheet None inyUbinder None detected vinyl detected 2 Gray fibrous material None Binder/filler, 68 Cellulose Frith mastic detected Mastic/binder 'Off White sheet None (None detected 3 vinyl detected Vinyl/binder 4 Gray fibrous material None Binder/filler, 71 ,Cellulose 1 with mastic ietected Masticlbinder i Steve Zhan /Delia Galda -".,Report review d by Steve(Fanyao)Zhang, President Analyzed by s c i Page 2 of 4 SEATTLE ASBESTOS TEST, L,LC NVLAPACVeditatlon Lytmwood Laboratory-.19711 Scriber Lake Rd,Suite D,Lyanwooda WA 98036;Tel:425.673.9950,Fart:425.673,9$10 Lab Code;20076&0 Bellevue Laboratory:12727'Northup way,Suite 24,neUevue,WA.98005;Tel:425,861,1111,Fax;425 961,1118 Websft http,/hvww,5ca leasbcstustest,W1A, E-mail;udniiun alsusttleas6cstostest.ca ANALYTICAL LABORATORY REPORT PLM by Method EPA/600/R-931116 Attn.:Mr.Tim Brocato Client Job*NIA Client:Primary Construction, LLC Laboratory Batch#_ 200856009 AddreSS:20615 t37th Ave NE;Arlington gate Received: 7/25/2008 Samples Received: 25 Email, Date Analyzed: 7/25/2008 360.618.7266 Samples Analyzed; 26 Project:202 E Jackson St., Arlington,WA 98223 Client Sample Asbeatas Non-Fibrous Non-asbestos Lab 11) ID Layer aeacriptlon 96 Fibers Com Hants Fibers 5 Black asphaltic T".*ne Filler,Asphalt, Binder 67 Cellulose fibrous material ected 6 Brown wood debris None pod Debris 7 Cellulose detected 6 1-6 1 Brown wood block None Wood Aggregates 4 Cellulose detected 2 Black asphaltic None !Filler,Asphalt, Binder 69 Cellulose fibrous material detected 7 1-7 1 ff-White sheet None VinyUbinder None detected vinyl detected 2 Gray fibrous material None Binderlfiller, 72 Cellulose i with mastic detected Maaticlbinder J Off-White sheet one in {/binder None detected $ 1-8 1 vinyl detected y 2 ray fibrous material None Binder/filler, 71 Cellulose with mastic detected Mastic/binder Black as haltic Nona 3 p Filler,Asphalt, Binder 67 Cellulose fibrous material detected g 2-1 1 Pink fibrous material one etected Filler, Glass beads 90 Glass fiber !Black asphaltic None s halt/binder, Sand 25 Glass Fibers 90 2-2 1 material with sand detected p 11 2.3 1 White powdery None inderlfiller, Paint 5 ellulose material with paint detected 2 hits chalky None Binderlfiller 25 Cellulose material with paper etected ypsum/binder Analyzed by: Steve Zhang 1 Delia Gaida Repot-reviewed : Steve (Fanyao)Fhang, President Page-3 of 4 SEATTLE ASBESTOS TEST, LLC WLAPAmedlWon Lynnwood LaWratory:19711 Spdber LvU Rd,Suite D.Lymt'wood,WA.98036;Tel:425,573.9850,Fax:425-673,9810 Lob Code'2007WO 13e11evae Laborakwr..12727 Nortbhup Way,Suite 24,13e11oim,WA,98005;Tea;425,861.1111,Fax:425.861.1118 Website:hq:llwww.stWtlr,,sbestmtcst.00Ea, F.--mail:admin{asscalticasbeswAest.com ANALYTICAL LABORATORY REPORT PLM by Method FPA1600/R-931116 Attn.:Mr.Tim Brocato Client Job S:N/A Clients Primary Construction, LLC Laboratory Batch A 200866909 Addmss;20615 67th Ave NE,Arlington Cate Received: 7/25/2008 Samples Received: 26 Email, Date Analyzed: T125/2008 3M.618.7266 Samples Analyzed: 26 Project 202 E Jackson St.,Arlington,VITA 98223 Lab J Client Sample y$r Description % Asbestoe Non-Fibrous a� Non-asbestos �p Fibers Components Fibers 12 2.4 1 White powdery None 8inderfflller, Paint 7 cellulose imaterial with paint detected 2White chalky INone Iginder/filler 23 Dellulose material with paper detected ypsumlbinder 13 2-5 1 White powdery . !None 13indertfiiler, Paint 4 Cellulose material with paint detected i 2 White chalky INone Binderifiller 26 Cellulose material with paper detected Gypsum/binder 14 2-6 1 Brown fibrous (None Diller, Glass beads 90 Mass fiber material detected 15 3-1 1 Iced woven fibrous None Filler, Binder 63 Synthetic aterial detected fibers 2 White mastic (None Mastic/binder 3 Cellulose detected 1G 3-2 1 Brown sheet vinyl lNo ected ne Vinyl/binder 2 Cellulose 2 Black asphaltic None Asphalt/binder, Filter 70 Cellulose material with mastic detected 17 3-3 1 Brown sheet vinyl (None Vinyl/binder [70 Cellulose detected iBlack asphaltic None � I 2 material with mastic detected Asphalt/binder, Filler Cellulose 18 3-4 1 Whitelblack sheet Vinyl/binder None detected vinyl f detected 2 �Nfth 3reay fibrous material Nome SinderAller, 70 Cenulose mastic detected IMasticJbinder Analyzed by: Steve 2 hang!Delia Caide Report reviewed)b -lSeve(Fanyao)Zhang,President Page 4 of 4 SEAT LE ASBESTOS TEST, LLC NVLAPAccreditgtlon Lynnwood Labormry:19711 Senber La1w K Sate D,L,yn"104 WA 98036;Tel:425.673.9850,Fax:425.673.9810 Lab Code:20076H DcU"ue Labaedtory:1272.7 NprihW Way,Suite 24,8ottevue.,WA 98005;Tel:425,663 3111,mac:425.861.111.3 Websake:lTtepJ/www.sentdes+slxstastest,cozbw E-mai1:astmi7, eatficaibertosteat rAm ,ANALYTICAL LABORATORY REPORT PLM by Method EPA1600IR-931116 Attn.:Mr.Tim Brocato Client Job*,NIA Client:Primary Construction, LLC Laboratory Batch#: 200856909 Address:20616 67th Ave NE,Arlington Cate Received. 7/25/2008 Samples Received: 26 Email: Date Analyzed: 7/25/2008 360.618,7260 Samples Analyzed: 26 Project:202 E Jackson St.,Arlington,WA 98223 Lab ID client sample Layer Description °i6 Asbestos Non-Fibrous o Nan-asbestos ID Fibers Cam newts Fibers 19 3-5 1 White powdery Wane Binder/tiller, Paint 6 Cellulose material with int �_ detected 2 Whlte chalky 1 iNone Binder/filler 22 Cellulose material with paper detaeted sum/binder 20 1 White powdery None Binder/filler, Paint 4 Cellulose material with paint detected 2 White chalky NOAO Binderlfiller 10 (Cellulose imaterial with paper detected sum/binder 21 3_7 1 ;White powdery r None Binder/filler, Paint 5 Cellulose material with paint detected 2 White chalky (Node Binder/filler 20 {Cellulose Zterial with paper detected Gypsurnibinder 22 3-13 1 White sheet vinyl (NoneVinyl/binder INone detected etected 2 Gray fibrous material one Binder/filler, TO 'Cellulose with mastic detected Mastidbinder 3 (Brown woad debris ntected Wood Debris 7 Cellulose 23 3-9 1 White powdery None Binder/filler, Paint 5 Cellulose Material with paint detected 2 'White chalky None Binder/tlller 20 Cellulose +material with paper detected Gypsum/binder 24 3-10 1 White fibrous None Diller, Glass beads 90 Glass fiber material detected �- iNhite fibrous None 25 31 i 1 materialdetected Filler,Glass beads 90 Glass fiber 26 312 1 White fibrous (None material detected ],Filler, Glass beads 90 Glass fiber Analyzed by. Steve Zhang/Delia Gaida Report reviewedby' Steve (Fanyao)Zhang, President SEATTLE ASBESTOS TEST,LLC NVLAP Accredited,20076H 19711 Scribcr Lake Road,suite D,LyttttwoK WA 98036 Tch(425)673-9850 Fax;(425)673-9910 www.seattlembestostest.com Lab Batch*200856909 Accredited,Experim ed,Insured,and Well Managed! CHAIN OF CUSTODY ANALYSIS:BULK ASBESTOS TEST POINT COUNT(400"POINT COUNT(1000"POINT COUNT(Gravimetric"Otter Client-.Mr.Tim Broaato Address:PdMaty Constriction, LLC 20615 filth Ave NB, Arlington Phone: Fax- Project Loc.:202 E Jackson St.,Arlington,WA,98223 Job#:N/A Number of Ssmples:26 Sample Condition-Good Damged Severe Danlage(Spillage) --- vqC CLIENT SAMPLE# S ANTLE DESCR3 MON LAB 1D AIR 1 t 2 2 3 3 4 { 4 $ 5 6 6 7 7 8 9 _ 10 to 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 24 24 2b i 25 2e Print Name St m Cwnpany Name i Date Time Sampled Stcve Zhan / Seattle Asbestos Tea LLC f ReifncLWsh 'Sucve im Zhm -a'" 'aatCle,A,sbeyro6LcBCt LC f' r Delivered strvc sn Seattle Asbestck TcALLC R9eelY Steve im ao - 3csttlo Asbestos Test LLC 7f25/200S Ana- alhmgtai Seattle Asbestos Test LLC 7/25/2008 ,1 Re_porbed�U-e(Fanvao)Zbang 'Seattle Asbestos Test LLC Result reporWS method:Phone Fax____, , Pick-up report Seattle Asbestos'test warrants the test results to'be of a pxceision normal for the type and metbodology employed for each sample submitted and disclaims any other warrants,expressed or implied,including warranty of fitness for a particular purpose and warranty of merchantability.Seattle Asbestos'Pest accepts no legal responsibility for the purpose for which the client uses the test insults. By signing on this;Pem the clients agree m relieve Seattle Asbestos Test of any liability that may arise;Rota the test results. Invoices paid lair,may be charged of interest,and invoices go to collection,may be charged 17%to 25%of calloc6on foe. Chccks with NSF wi11 be charged$54_ �� `I I Tirl'BrQ -ato,Sr.,Contractor `� M1 : z ^ Z0615 67th Ave.NE,#B,Rrim WA 98223 + e S`y Officge 50.4010390.. PP,IMAR.Y CONSTRUCTION LLC .,. AO.403.0393 r�u�crt :' �-• �,� w wwwoimarS!llcnet Confidential Facsimile Transmission To: Am From:Rabi I'i Fax: . ' Wages: 1� Phone: Date' Comments: Ar&Lk (�j Y 11 -TV1 aw kb Ity 4 VLQ.,. 4, RECEIVED AUG 0 12008 COA PERMIT CENTER PRIMAKY ONSTRI.ICTION - "quality You Can Trust" UL Seattle Asbestos Test 14258611118 p.1 SEATTLE ASBESTOS TEST, LLC WAR ACCREDITATION LAB CODE 200768-0 19711 Scriber Lake Road.Suite D,Lynnwood,wA 98036 Tel:425.673.9850,Fax:425.673.9810 wwwseattleasbestoslesLcom,admin@seattleasbestostest.com FAX TRA N S M I TT.A L F01ZM To: Mr.Tim Brocato From: Steve Zhang Company: Primary Construction,LLC Date: 712512008 CC: Phone: Pages: Fax: 360.618.7266 Sample Results: Client Job#:Two survey reports Laboratory Batch#: Messages:Thank you for your business. �i 71"' a ti Information contained in this fax is highly confidential.If you are not the intended recipient,and have received this fax in error,please notify the sender immediately,and destroy the copies you've received without reading or saving them. DECEIVED JUL 2 9 2oa8 COA PERMIT CENTER 6L)b a-mg0ad1 ,y i ; � �� Seattle Asbestos Test 14258611118 p.2 1 Page 3 of 5 SEATTLE ASBESTOS TEST, LLC NVLAP ACCREDITATION LAB CODE:200768-0 19711 Scriber Lake Road,Suite D,Lynnwood,WA 98036 AHERA Inspector Number: 1028667 Phone: (425)673-9830,Fax:(425)673-9810 www.seattteasbestostest.com 1 steve@seattleasbestostest.com - Property Location 202E Jackson St.,Arlington,VVA"9822T� Analytical testing is done in house in Seattle Asbestos Test, which is a NVLAP Accredited lab and participates in PAT rounds administered by NVLAP. Seattle Asbestos Test has over 20 years of analytical testing experience among its key analysts, and it conducts extensive inter- and intra- laboratory QAJQC testing. The method of testing employed are polarized light microscopy, or PLM. For QC purposes, one in every ten samples are analyzed as duplicate and check samples are randomly cross-analyzed by different analysts Table 4 is the test results for the samples taken during the survey. For each sample, it is sub-divided into layers if the sample is separable, and each layer is then prepared into slides and analyzed separately. Each layer Is also described-tu-shuw R5 cviui, amd nature, so that it provides a check to the homogeneous area classification done on site. Different from the lab report format, which is listed in the appendices, Table 4 also shows the location of each sample, and the material as seen by the inspector on-site- This kind cross-reference enhances degree of certainty to the final report. The following is a tabulated summary Total number of samples ---—-----------------—---------------—---—-----—------—-----------> 26 Total number of layers---------------------------------------—-----------—------------> 53 Conclusions No AGMs were found on the client property during the inspection. The units has roofing shingles (sample 10), and the exterior walls are wood paneling. The windows are metal framed. The interior flooring are mostly carpets (sample 15) covering sheet vinyl (samples 16,17, 18). The walls and ceilings are gypsum boards with fiber glass insulation. RECEIVED JUL 2 9 2008 COA PERMIT CENTER G(�D �og�aoi _ � �� l .C;�_�. �Y' ' IV _ I`� W W o � °t= A15 ga `a- `f' Ll _s V 0 J l -�— k-A � � q 1 � CA 3 ci 0 a I ff I I� I I I I I I f •� - I I _ I f I I I 3I -2 VT, .. I I i l� —ti — �[ I ► I � °r4 1 0 a s I I I ,� � 1 II I ' � I 1 , , , I � •I I � � " l I f 1 ! I C I I i 7 BLD20080201 - arusko Page 1 of 1 BLD - Building Permit Ver: 2008B Priority: Normal #BLD20080201 Owner: ISCHELLER, KAY status: JAPPLIED address: 415 S OLYMPIC AVE,ARLINGTON post date: 7/29/2008 data screens: Select Screen... functions: Select Permit Function... -71 Eire Repair REVIEWS Add Review Remove Review Print Close Review Description Assigned To Due Date (#) Req? Done? ASSIGN 2000 C-Building I CYOUNG 8/1/20081 0 i Y I N ASSIGN { 2002 C-Building II SBLACK 8/1/2008 0 Y N ASSIGN 2008 C-Community Development I !ARUSKO 8/1/2008 0 Y N ASSIGN http://coaweb2.arlington.local/pennittrax/PermitTraxMain/wfPermitConsoleReviews.aspx... 7/29/200 8. -- RESIF.�I�ITIAL ADDITION'i LTERAT1ON PERMIT APPLICATION Department of Community Development City of Arlington • 238 N Olympic Ave. •Arlington, WA 98223 • Phone (360)403 3551 • FAX(360)403 3447 THIS APPLICATION TO BE USED FOR ONE AND TWO DWELLING UNITS RESIDENTIAL STRUCTURES. THIS APPLICATION MUST BE ACCOMPANIED BY TWO (2) SETS OF CONSTRUCTION DRAWINGS, TWO(2) ACCURATE, FULL Y DIMENSIONED PLOT PLANS AND ONE(1) CROSS CONNECTION CONTROL SURVEY(if adding plumbing). TYPE OF PERMIT: ( ) Residential Addition ( ) Residential Alteration r aj�E Q pl �- Also Including: ( ) Plumbing ( ) Mechanical Project Address: 4zj� .o ' f244m Ic Aqr� - , Parcel ID#: -06z11/ 76o7o/ f C7o Lot#: � , �� PjLfC '7 Subdivision: pl'iP�S lTi Ta t42�iNc,'ra,� l o�� D�oo Project Description:- iL I1PP Valuation: Owner: �<Ai 'H Phone Number: Address: /7 IL City: MU 'r 1�.P22) State: QA:_ Zip Code: CtA2_7 S_ Contact Person: KA Y Phone Number: Cell Phone: L�ZS a0_7i 4?!j Fax: E-mail: Address: LlI 7 10 ea.SMkST City: pav-it.TE-O State: WA' Zip Code: 6475 ,-l I?� Building Area(Sq Ft): Ist Floor: .- (01v fjjhd Floor: 31d floor: Deck: Garage/Carport: Basement: Project Valuation Contractor: PPM&g o-,J5 . CLC Phone umber:(�) 4(23-- o 3 9O Address: —� N City: State: �' Zip Code: Contractor's License Number: Pp-imAeL94yAr_ Expiration: t Z- I •-o 7 Plumbing Contractor Phone Number: 7-5) o0`] - '� Address: City:MQ-915✓i� VY� State: A Zip Code: Contractor's License Number:D yDU AEG P9 7t PA Expiration: (O s 01 -D`1 Mechanical Contractor: C Phone Number: Address: City: State: Zip Code: Contractor's License Number: Expiration: certify that t e above infor ation is correct and that the construction on, and the occupancy and the use of the above- describe p be' acc d ce with the laws, rules and regulation of the tale o Washington. t�� Ap licants Sig ature Date F�rint Applicants Name RECEIVED FOR STAFF USE ONLY JUL G A 9 2OOnp � �8000t ��. SB U Permit# Accepted By Amount eceived Receipt# ^OqfflffTER WEB Forms—285 Page 1 of 2 04/08 sb r -- ' RESIDENTIAL ADDITION/ALTERATION PERMIT APPLICATION Department of Community Development City of Arlington • 238 N Olympic Ave. •Arlington, WA 98223 • Phone (360)403 3551 • FAX(360)403 3447 Water Supply Piping A. Fixture Units: Number of Fixtures X Fixture Units=Total Fixture Units r B. Distance from meter to most remote outlet:��%' feet. I' C. Difference in elevation between meter and highest fixture:_��feet above meter or feet below meter. D. Pressure in street main: psi. (Measure with gauge or check with Water Department) Number of Plumbing Fixtures (Including Rough-Ins) Plumbing Accessory Main Total Fixture Total Number Fixtures Dwellingunit Residence #X Multiplier Fixtures Units Bar Sink X 1.0 = Bathtub or Combination Bath/Shower 3 X 4.0 = Clotheswasher 3 X 4.0 = Dishwasher X 1.5 = Hose Bibb X 2.5 = Kitchen Sink X 1.5 = Laundry Sink X 2.0 = Lavatory Bathroom Sink 3 X 1.0 = Shower Stand Alone Each Head X 2.0 = Water Closet Toilet 3 X 2.5 = Whirlpool Bath or Combination Bath/Shower 3 X 4.0 = Water Heater Other TOTAL Traps other than above items FIXTURE UNITS: p� I hereby certify that the above information is correct and that the construction on, and the occupancy and the use of the above- des eZr will be in acco ance with the laws, rules and regulation of the State of Washington. �� c ' / 200 Applicants ignature , Date/'0 7TV'no-A.a az'_4 Pri t Applicants Name RECEIVED FOR STAFF USE ONLY JUL 2 9 2008 _f Da?bb% of �.�(� Permit# Accepted By Amount Received Recelpt# 0r'M1 rRece"'-ived WEB Forms—285 Page 2 of 2 04/08 sb It •i �i a . _ �f. ,--I A- � I�r�:S�l,�}�.