HomeMy WebLinkAbout17713 48TH DR_BLD20080020_2026 -VSPECTION REPORT • Permit No.: c96 oo zo Lot #: Address: i 7 7 jU �b Contractor: YAW s • Owner: Date: :APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT • Permit t3 e t No.: 02-o Lot#: Address: /77 / 3 418 0"" Ott- Contractor: Owner: Date: - / z-"s—og ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ;CORRECTION REQUESTED �s Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. f �Ih2sa c�S 7o 66 3`I -3 g`' ",c'J'f 'r-►-ao U ILy.I PrA,J V►44,L_ OW OS M w,A'L_ iu O O 42 za ,J. w S 1C��s A� 4A.+,-) Jor., .s q--r ,t Ah h c`�2 Ga�rc Inspector: 5� 1--- Date: 1--(-09 TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: NSPECTION REPORT • Permit No.: a 6 a o 2 c7 Lot#: Address: i -7-7 f 3 � B`— Q A_ Contractor: A-A Owner: Date:,IZJP PROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. /-1 e Pn-a v e'o Inspector: Date: / Z-S-o 8 TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: "SPECTION REPORT /f 0'1 I�"hh�ffi�L.+f ✓Z� r"0'4-7_j T-- • Permit No.: ©b oc-LQ Lot #: qa 2 1 Address: 1-77 o-w- 1 Contractor: ors 43 A-rY+y .65 • Owner: Date: PPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. 1;70/L- Pry, NT i�vATFY. Inspector: Date: 9-z,a-o e TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing Cl Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical `EKGrid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: /4pl INSPECTION REPORT • Permit No.:0&-CX7c�O Lot #: _ Address: Contractor: / /Jrrorr Owner: Date: ❑ APPROVAL 16,PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTIO 4 hour notice required. Inspector: Date: .7—/y -yrl:� TYPE OF INSPECTION REQUESTED ❑ Under-floor ',�4 Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing - ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Finales ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT • Permit No.: 629-009OLot#: boa Address: 7 Contractor: 4 h ha • ♦ Owner: 14 rPb lk Date: rid— / 67 4APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Ize ! a,46r2 a ;_u 0, �r ur -L✓ � n � �a�, Y Inspector: Date: 142 � ?—e _ TYPE OF INSPECTION REQUESTED ❑ Under-floor Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove �21 Rough-in ❑ Final ❑ Masonry ❑ Drainage Insulation 0 Other: INSPECTION REPORT �v Permit No.: ©9 oo z." Lot #: Address: I -7-7 r 3 4 a c>_t Contractor: Ap Owner: Date: 7—� APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Inspector: tt Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping AFooting ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing 0:-Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: CITY OF ARLINGTON 238 N.OLYMPIC AVE.-ARLINGTON,WA.98223 PHONE:(360)403-3421 Permit#: BLD20080020 BUILDING Project Address: 17713 48TH DR, ARUNGTON Parcel No: 31052100400101 PROPERTY OR ABBATARE HANGER ABBATARE HANGER ABBATARE HANGER 17713 48TH DR LOT C&D 17713 48TH DR LOT C&D ARLINGTON,WA 98223 ARLINGTON,WA 98223 Phone:206.915.2299 Phone:206.915.2299 LICENSE#: EXP: Email: Email: PLUMBING CONTRACTOR MECHANICAL CONTRACTOR Lic#: Exo.: Lic#: Ex : i DESCRIPTION ARLINGTON CORPORATE AIR PARK HANGER C.THIS PERMIT INCLUDES THE BUILDING,PLUMBING AND MECHANICAL. ALL WILL BE ISSUED AT THE SAME TIME. VALUATION: $1,396,416 PERMIT TYPE:Commercial PERMIT GROUP:Manufacturing/Industrial New NUMBER OF STORIES: I TYPE OF CONSTRUCTION:II-B NUMBER OF DWELLING UNITS:0 OCCUPANT GROUP:S-1 CODE:2006 OCCUPANT LOAD:5/hanger PROPOSEDEXis,rING AREA BASEMENT:0 1 ST FLOOR:0 2ND FLOOR:0 1 BASEMENT:0 1 ST FLOOR: 19200 2ND FLOOR:0 3RD FLOOR:0 GARAGE:0 DECK:0 OTHER:0 13RD FLOOR:0 GARAGE:0 DECK:0 OTHER:0 REQUIRED PROPOSED: RE UIRED: PROPOSED: REQUIRED: PROPOSED: HEIGHTALLOWED:O PROPOSED:O REQUIRED: PROPOSED: SETBACK NOTES: PERMITAPPROVAL AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY,NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. THI S APPLICATION IS NOT A PERMIT U Til-MNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID Signature ate Released By Date AT ENTION I S UNLAWFUL TO USE OR OCCUPY NO OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED.UBC109/IBC110/IRC110. ARCHIVE APPLICANT ASSESSOR OTHER BLD20080020 CONDITIONS • Each building(C&D)will be on separate water meters(per approved site civil drawings). There are 2 units in each building,therefore an RPBA will need to be installed at each meter as premise isolation per W-13. For this review see approved site civils for Abbatare Inc.Date approved 1/20/06 for any drainage or paving requirements. I would like to see specific information on the sizing and construction materials for the "seal/lid sump"(retention vaults?)for the floor drains.It is my understanding that they are supposed to be able to hold 150 gallons in the worst case scenario of two planes spilling fuel. This is an excellent idea.Is there a standard label we could use in the future for this kind of structure so that I know what I'm looking at? External building sumps installed for the internal floor drains are required to meet all sanitary sewer standards and inspections.Contact Virgil Renfroe @ 360-403-3516. FYI to applicant:Water/sewer connection&tap-in fees must be paid and permit paperwork signed before water meter is installed and before calling for a side sewer inspection. Call COA Utilities with questions at 360-403-3526 or 3524. • Obtain Electrical Permit from State Department of Labor&Industries. • Pursuant to UPC 605.2 a water service shutoff shall be installed on the water line as it enters the building. • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure.Check the job card for all required City inspections including final project approval and final occupancy inspections. • A pressure regulator valve(PRV)shall be installed near the water shutoff. • Final Locations of illuminated exit signs&emergency lighting subject to field inspection by the Building Official. 0 48 hours notice is required when requesting your FINAL Engineering Inspection. 360-403-3500 • Request final Fire Department Inspection(360)403-3607. • New and existing buildings shall have approved address numbers,building numbers or approved building identification placed in a position that is plainly visible from the street or road fronting the property. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be legible from the public way,at least 4 inches high with a''/2 inch min.stroke width on a contrasting background. • Call for locates of underground utilities 2 business days prior to any excavation. l-800-424-5555 • Call for required inspections as noted and prior to backfill. PERMIT FEES Description _ _ fee :Amount Paid Balance Due C-Building Permit Fee $8,429.95 $0.00 $8,429.95 C-Plumbing Permit Fee $145.00 $0.00 $145.00 C-Mechanical Permit Fee $90.00 $0.00 $90.00 C-Building Plan Review Fee $0.00 ($2,000.00) ($2,000.00) C-Building Plan Review Fee $5,479.74 $0.00 $5,479.74 C-State Building Code Surcharge $4.50 $0.00 $4.50 C-Traffic Mitigation $41,937.50 $0.00 $41,937.50 Total Due: $56,086.69 ($2,000.00) $54,086.69 INSPECTIONS THIS PERMIT AUTHORIZES ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY.ANY CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS,SIDEWALKS,DRIVEWAYS,MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION. CALL FOR INSPECTIONS BUILDING/ENGINEERING/PARKS/UTILITIES/FINAL(360)435-0674 FIRE(360)403-3607 �:. I I When calling for an inspection please leave the following information: Permit Number,Job Site Address,Type of Inspection beingrequested,Contact Name and Phone Number,Date Prefereed,and whether you prefer morning or afternoon. • C-Footings • C-Foundation Wall • C-Foundation Drainage • C-Plumb Ground Work • C-Plumb Rough In • C-Gas Test/Pipe • C-Equipment-Mechanical • C-Shear Nailing-Exterior • C-Ceiling Grid • C-Framing • C-W all Insulation/Caulk • C-Sheetrock Nail • C-Building Final • F-Fire Final • C-Underfloor • C-Gas Piping Groundwork • External sump tanks prior to backfill w O w C7 U S-i u ® 44 Qi H C:) O a� H CD cq � U) po r o � a v V v �' p W w A� V v v � w � A ® Ate ~ Q Q o W A � p U Q � A w O H cn Zw, U) p d w W 0E-1 w w O Z � w z 0 bz 0 � ZO P u W � +-j N zx � � H H H - \l nERMIT Permit Review Details Permit: BLD20080020 1000 - P-Cross Conn Premise Isolation Complete? Y 02/05/2008 gtararan 30 Each building(C&D)will be on separate water meters(per approved site civil drawings). Y There are 2 units in each building,therefore an RPBA will need to be installed at each meter as premise isolation per W-13. Total Time: 30 1002 -P-Engineering I Complete? N Total Time: 0 1004 -P-Engineering II Complete? Y 01/28/2008 khale 30 No comment Y Total Time: 30 1006 -P-Engineering III Complete? Y 02/05/2008 tcross 30 For this review see approved site civils for Abbatare Inc.Date approved 1/20/06 for any Y drainage or paving requirements. Total Time: 30 1012 -P-Pre-Treatment Complete? Y 01/25/2008 sboyd 25 1 would like to see specific information on the sizing and construction materials for the Y "seal/lid sump"(retention vaults?)for the floor drains. It is my understanding that they are supposed to be able to hold 150 gallons in the worst case scenario of two planes spilling fuel. This is an excellent idea. Is there a standard label we could use in the future for this kind of structure so that I know what I'm looking at? Total Time: 25 1014-P-Public Works I Complete? Y 02/06/2008 sblacker 0 Y Total Time: 0 1020 -P-Sewer Complete? Y 02/01/2008 vrenfroe 10 External building sumps installed for the internal floor drains are required to meet all sanitary Y sewer standards and inspections.Contact Virgil Renfroe @ 360-403-3516. Total Time: 10 1026 -P-Utilities Fees Complete? Y 02/04/2008 rshepard 45 FYI to applicant:Water/sewer connection&tap-in fees must be paid and permit paperwork Y signed before water meter is installed and before calling for a side sewer inspection. Call COA Utilities with questions at 360-403-3526 or 3524. Total Time: 45 1028 -P-Water Complete? Y 01/25/2008 eanderson 10 1 have no comments for the Info submitted. Y Total Time: 10 1032 -P-Utilities I Complete? Y 02/01/2008 Itaylor 5 No comments Y Total Time: 5 1034 -P-Utilities II Complete? Y 01/25/2008 gschlagel 0 See Earl's Comments Y Total Time: 0 1036 -P-Utilities III Complete? Y 01/30/2008 frapelyea 5 See comments from Virgil Renfroe. Y Total Time: 5 2000 -C-Building I Complete? Y 01/28/2008 sblack 180 Provide specifications for heaters. Y Provide NREC. 02/04/2008 arusko 0 2nd review N 02/05/2008 sblack 45 NREC to be done by deferred submittal Y Total Time: 225 2/6/2008 4:41:52 PM Page 1 of 2 2008 -C-Community Development Complete? N Total Time: 0 2014-C-Planning I Complete? N Total Time: 0 3000 -X-Airport Complete? Y 02/06/2008 dcarman 15 No Comments for this review Y Total Time: 15 3002 -X-Executive Complete? Y 01/24/2008 sphelps 2 Business license required prior to operating any business out of this location. Y Total Time: 2 3004-X-Fire Complete? Y 02/05/2008 tcooper 15 1. Provide 3 fire extinguishers per side under a low hazard occupancy Y Total Time: 15 Total Reviews: 20 Total Time: 447 2/6/2008 4:41:52 PM Page 2 of 2 rrrrr - � lJxJ BLD- Building Permit Ver. 2008 *aLD20080020 owner JABBATARE HANGER-ARLINGTON,CORPO status'JAPPLIED address:117713 48TH OR,ARLINGTON post date:jvm2ow data screens: Select Screen.., functions: Select Permit Function._ NIESSAGESMOLDS ku llkiwav close aermit fees are$12,149 19 MESSAGE NEVER sblacker 2, OOB Traffic mitigation fees for all 4 buddurgs fur Arlington A rparb Phase 111 25 pm peak trips are due for Arlington traffic mitigation fees 1/2 of those fees(S41 937-50)to be collected with issuance of this budding(#2 of 4) permit and the remainder to be collected with the fourth building permit The external sump tanks provided to capture spills to the internal floor MESSAGE NEVER vtenfroe 2/10008 drains are a wastewater inspection item and must meet all DOE standards for hazardous material containment.VLR ¢]Done I 1 r lad INverxt /: y v G``Y °^ NEW (` - OMMERCIAL/MUI' --'IFAMILY �fr o PERMIT APPLICATION 1 Department of Community Development City of Arlington • 238 N Olympic Ave. •Arlington, WA 98223 • Phone (360) 403 3431 • FAX (360)403 3447 THIS APPLICATION TO BE USED FOR NEW COMMERCIAL STRUCTURES AND RESIDENTIAL DWELLINGS UNITS CONTAINING TOWNHOUSES OR THREE OR MORE UNITS. THIS APPLICATION MUST BE ACCOMPANIED BY EIGHT(8)SETS OF CONSTRUCTION DRAWING, EIGHT(8)SETS OF STRUCTURAL DRAWINGS AND CALCULATIONS,EIGHT(8)SETS OF SITE PLANS, EIGHT(8)SETS OF SPECIFICATIONS IF APPLICABLE, THREE(3) SETS OF ENERGY CODE CALCULATIONS, THREE(3)SETS OF GEOTECH REPORT. TWO(2) SETS OF THE APPROV,�De UK PERMI�t � Name of Project: ' 1 ' ` 1 ► ` 4Q Project Address: 1 ( 7 L104%" t>1r• W�f V4lb Parcel ID#: �bt' ��Z. Legal Description �&IL.I M4,-r-b T% 1�11%PAWQ — Owner: a,&4-1 I.L V�d h L� 0..1'll hone Number: O6 !�;7_ )a2•491 1 Address: 10 SO y PL " City: L_ J96r0V State: LLW Z�ip/�Code: lot �/ �A Architect: *��-� �jQ' -lam Phone Number: aug - {S- ` ` C)b Cell Phone: Fax: g0j, "1 ^ Igo( E-mail: - ' Address: �•o� �— City: State: 1-s- 1 Zip Code: ��'�8 sP Engineer: Phone Number: Cell Phone: Fax: E-mail: Address: City: State: Zip Code: General Contractor: Phone Number: Cell Phone: Fax: E-mail' Address: City: State: Zip Code: - Contractor's License Number: Expiration: Contact Person: Phone Number: Cell Phone: Fax: E-mail, Address: City: State: Zip Code: Proposed Scope of Work: Estimated Project Vaiue• ouiiding Footprint' Occupancy Classification: Type of Construction: Number of Stories: Total Square Footage: Square/Footage per Floor: Parking Spaces Provided: Barrier Free Spaces: he by certify that the above information is correct and that the construction on, and the occupancy and the use of the above- desc 'bed property will be in accordance with the laws, rules and regulation of the State of Washington. Appll its Si re Date Pr"44= it RA Q. FOR STAFF USE ONLY RECEIVEU b�b 302 b Dd-0 0 ' ()CoaSq JAN Permit# Accepted By Amount Received Receipt# Date Received WEB Forms—07 Page 1 of 1 5/05 dwa s ' � � of:.:9.�(Y .. �0�' . 6., ` r { .'�� ♦ • � � . r i ,. • f '• _ a � .� ' ' ' � �� Z d�:a i„ '� r ,.. ; � ' �' r 7 �-� Pagei of MAYES TESTING ENGINEERS,INC Field Copy/Subject to Review 20225 Cedar Valley Road,Suite 110 Ph 425.742.9360 Lynnwood,WA 98036 Fax 425.745.1737 Project No.: i �`��:; 1 Date: 10029 S.Tacoma Way,Suite E-2 Ph 253.584.3720 Project: Tacoma,WA 98499 Fax 253.584.3707 7911 NE 33rd Drive,Suite 190 Ph 503.281.7515 Permit No.: Weather: Portland,OR 97211 Fax 503.281.7579 _ _ ,.. Project Address: Inspector: A.5 Hours: Owner: Time: to Engineer: '', 1^�3 :,,�,_�;•,) : r'''\rr. Inspector: Hours: Architect: Time: to Contractor: Inspector: Hours: Type of Inspection: ; Time: to Samples: �J - SUMMARY: e_iy w'-u. it -ril T ,'y E /�- G;I_-i Ir.�C t+.J : 1'6 �_ ,-7Un 1 ��►.� J ', (�r�_ !, - J r I ' r�,U �r_ ), ��,S_ )1--'/ >. I "l /A-> t,JfrC /r\3 c -r- ;) ) 11UU 'III f > - i (K-A r, N LJRF :.� �11 A Ufa T(_xZ U'F CA r - t-I El rz A- riL J I.A LE LJA ,, J >E r, f i N1A-:I-?t1 iM M Q E r< C 5+ c JF- L i r i , / 1' ;•) E rV i i-� 12 A6Y �._f J I_ T A l 3 is M E i ! C' A N i To the best of our wledge, all items inspected today are in conformance with approved'plans,'and speolfications Yes ❑ No ❑ Preliminary Inspection NONCONFORMING CONDITIONS/CORRECTIVE ACTIONS TAKEN: MTE 1000-3C, Rev 2, 4/1/07 AYES VESTING ENGINEERS, INC. Lynnwood Office 20225 Cedar Valley Road Suite 110 Lynnwood,WA 98036 MTE No.: L09001 ph 425.742.9360 Project: ABBATARE fax425.745.1737 Tacoma office Address: North 1-5 Arlington Airport Exit (172nd) East, Arlington, WA 10029 S.Tacoma Way Permit No.: 20080020 (Bldg 17713), 07-7551 (Bldg 17725), 20080139 (Bldg 178m to E-2 Bldg Dept.: City of Arlington latoma,WA 98499 ph 253.584.3720 fax 253.584 3707 Owner: Arlington Air Park/Abbatare Portland Office Architect: 7911 NE 33rd Drive Engineer: Mid-Mountain Contractors, Inc. Site 190 Contractor: Bahnmiller Construction Inc. ortland, 97211 � nc. ph 503.281.7515 Pagel fax 503.281.7579 Date: 1/6109 Weather: (indoors) Inspection: Structural Steel Sample(s): N/A Onsite for a bolting inspection on (3) steel frame buildings. Upon completion of bolting installation, Buildings 17713, 17725 and 17804 were inspected using the calibrated wrench method. An MTE-issued torque wrench with current calibration date was used to verify proper torque. Primary members were secured with 1" A325 high-strength bolts at 570 foot-pounds of torque. Secondary members were secured with 3/4" A325 high-strength bolts at 350 foot-pounds of torque. All bolts were found to have proper tensioning and met AISC and job specs. To the best of our knowledge, items inspected this date are in accordance with approved plans and specifications. INSPECTOR: Anthony Garland REVIEWED BY: Zft ,� ��c�by G. Beckerle, P.E. cc: Kevin Bahnmiher—Bahnmiller Construction; Bldg Dept—City of Arlington