HomeMy WebLinkAbout20111 44TH DR NE_996307_2026 INSPECTION REPORT7"
Permit No.: Lot#: aO
-� Address: ' // 'ILI IVE
Contractor:
• Owner:
Date:
1 a APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in
❑ Masonry ❑ Drainage ��Final
nsulation
0 Other:
INSPECTION REPORT
1 �
Permit No.: Z Lot#: .3a
Address: 71*
Contractor: /00.,70✓aI7
• Owner: 3Sri, ��—ZP
Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notic required.
Inspector: Date:
TOPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ?<Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
0 Other:
INSPECTION REPORT
Permit No.: Lot#:
-' Address: •?ZC AL
Contractor:
• Owner: 12 _ l
Date: /a 9 - 9
,;340PROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
- 1�7
J y
Inspec . Date: —
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall; Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Fi al
❑ Masonry ❑ Drainage Insulation
Other: /2Oz26 -
INSPECTION REPORT
Permit No.: �1^_- Lot#: C;?c
•' Address: -20/// 41 y 7 4,1E
Contractor: 0!O2 ®van
• Owner:
Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ACORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Tr 2
L. k/
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor Framing ❑ Gas Piping
❑ Footing X,Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
1 �
Permit No.: 9C/^266 7 Lot#: a
Address: C:�aC, n+ O)Z- / :
Contractor: NMI,)
Owner: y__d_
Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
/`---{�
r
i
J
Inspect Date: Z --
TYPE OF INSPECTION REOUTED
❑ Under-floor ❑ Framing Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
Akechanical ❑ Grid ❑ Struct. Slab
ood Stove ❑ Rough-in ❑ Final
❑ Masonry Cl Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
Permit No.: 0 Lotter#: O�Q
�Address: ol// 1 7-71--�q
Contractor: 1)0r)0 V Qn
Owner:
Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
en
Inspe or: Date:
TY OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ rid ❑ Struct. Slab
❑ Wood Stove ough-in ❑ Final
❑ Masonry �LUJ D ainage ❑ Insulation
❑ Other:
INSPECTION REPORT
Permit NoA?_360 7 Lot #:
~ Address: c> 0//� �`� O�C_
Contractor: /1,17 n I/(2 h
• Owner: —�S�% -' Z
Date: ��A, `� I
AW APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
A
Inspector: �� Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑drywall, Nailing ❑ Consultation
❑ Foundation ./�"`f Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
N INSPECTION REPORT
� Permit No.: Lo #:
Address: ��/�
Contractor: /e/?O _VA 6�
• Owner: o�S'3.5�1
Date:
� Af'FROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTI - 24 hour notice required.
Inspector: Date:
OF INSPECTION REQUESTED
Under-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
0 Other:
R-' INSPECTION REPORT
0
Permit No.: Lot#:
Address: cP-0/// Y7 rly- C)k
Contractor: )t?AOVIA)
Owner:
Date: el- r') V /0
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Date:
TYPE F INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry � zj� —, ❑ Insulation
0 Other:
INSPECTION REPORT
Permit No.: 4 C"2 6C 7 Lot#: e;
Address: III q41 rn Q_
Contractor: ANJO 01A)
• Owner:
Date: �2 —13—eI
PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
`foundation ❑ Shear Nailing ❑ Groundwork
❑ echanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
• C , 1_ Lot #:
� Permit No..
Address: o��/�/ `fV7-77- Q�
7
Contractor:
Owner: S
Date:
ROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
ns \
�Pe Date:
TYP OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
C I TY OF A RIL I NGTON /
S` CONSTRUCTION RE RM I T
PERMIT NO_ : SS—Z&O7
Owner: DONOVAN HOMES 7610 77TH PL NE MARYSVILLE 98270
Value of Work: $92,739.00 Tax ID: HC PH II LOT 22 Phone: 360 659-8082
Describe Work: NEW CONSTRUCTION
Proposed Use: RESIDENCE
Legal Description:
Job Address: 2011 44TH DR NE
Contractor's Name Type Address License#
DONOVAN HOMES GEN 7610 77TH PL NE DONOVH*077BN
GENE'S PLUMBING MEC 7619 70TH PL. NE. NEWHOP*125P6
GENE'S PLUMBING PLB 7619 70TH PL. NE. NEWHOP*125P6
P E R M I T F E E S
Equipment and Fixtures ------ Number Fee Total Charge
--------------------------------- ------ --------
PLUMBING FIXTURES 12 $7.00 $84.00
FURNACE/UNIT HEATER 1 $14.80 $14.80
RANGE 1 $10.65 $10.65
VENTILATION FANS 4 $7. 25 $29.00
DRYER 1 $10.65 $10.65
METAL FIREPLACE & CHIMNEY 1 $10.65 $10.65
WATER HEATER 1 $10.65 $10.65
GAS PIPING 1-4 OUTLETS 1 $4.75 $4.75
SUBTOTAL...... $175. 15
TOTALS Fee
Permit Fee $843.50
Equipment $91. 15
Fixture $84.00
Mech Permit $23.50 /
Plan Fee $548.28
Plumb Permit $25.00 `� {
State fee $4.50
SI RE:
TOTAL FEE................. $1,619.93 I ER BY CERTIFY THAT I H VE READ
AN EX MINED THIS APPLICATION AND
PAYMENTS $487.34 K W T E SAME TO BE TRUE AND COR-
R T A L PRO SION OF WS AND
TOTAL DUE. . . . .... . ........ $1,132.59 0 INA CES 0 RNI TH TYPE OF
W K W LL B MP D W H WHETHER
S CI I H N 0 .
EIPT # [1 /
IY
00
rA
ki
P-E ',"EIIVED
Z4 41*-L A A Ull G S' 1�a,so 9
0 F A R L I N G TO N
CITY OF ARLINGTON
CONSTRUCTION
PERMIT 6)9
❑ COMBINATION BUILDING MECHANICAL PLUMBING ❑ SIGN PERMIT NO. 3Lt Z
j OWNER MAIL ADDRESS 'A CITY ZIP PHONE
crac Jo�v l��c��•r� l�' f�r'L oZ
ARCHITECT OR UESIGNE MAIL ADDRESS CITY ZIP PHONE
5 36
GENLRALCONIRAC OR MAIL ADORE SS CITY ZIP PHONE LI NSE(
MECHANICAL CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE IT
/y' tl,a,lyrll ►i�,.edr+�� �az?1 yzd=sck b6�F.3
PLUMBING CONTRACTOR MAIL ADDRESS j CITY ZIP '�PHONE LICENSE LICENSE
ill�' . NA �L�tG' ��CJr�F' 7-/-� k JO
CLASS Of WORK
O®NEW ❑AUDITION ❑ALTERATION ❑REPAIR ❑DEMULI IION ❑BUILDING RELOCATION
IS VALUAI ION OF WORK !�/J ✓'�
Z S
LLt ;
w DESCRIBE WORK31
,
n :V
m PRUPUSt U USE Of BUILDING I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLIC
on r j TION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PRO
w
z LLGAL DES(RIP I IUN Of PROPLRTY(SHOWN BELOW OR AT TACH FOUR COPIf S) SIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WO
.;p T� WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT,T
J LO I � BLOC Of W ( - -1~
a ,F pk
GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY
w VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE i
1- LOCAL LAW REGULATING CONSTRUCTION OF THE PERFORMANCE
� TAX iD NUMBER F'R M PROPERTY TAX STATEMENT CONSTRUCTION. PERMIT EXPIRES 1 YEAR FROM DATE OF ISSUANC
a (1 Ytr (�
O l f 1 SIGNATURE OF CONTRACTOR OR UT RIZED AGENT DATE
C) JUBAUURLSS
(01'1;ICI-'USC ONLY) ECIIANICAL
PLUMBING
NO.
TYPE OF FIXTURE PEE :'.rtxTVRls NO. TYPE OF EQUIPMENT FEB z'a FIXTURES
'7/ ATER CLOSLfi O1LEf
iR CONU.UNITS-H.P. EA. J •Rst..
2. A'11iTUB tiTRIGPRATION UNITS-tLP.EA. ui .li>K•'
A
OILERS-II.P.EA. LgLip.Ilrt••
VATORYWASII BASIN
)AS FIRED A.C.UNITS-TONNAOP.[IA. ' ul •114" _
HOWPR
'I'iCHCN SINK QDISPOSAL / ORCED AIR SYSTEiMS-D.T.U. MCA
ALL IIRATERS-B.T.U. M _
)ISTIWASIIER
.AUNDRY TRAY NIT IIQA'I'URS-B:f.u. M
iVAPORATiVECOOLERS
/ :LOTIIES WASIIUR
- :L(Yili[5 DRYERS -
A'fL'IL HEAT[lt
ITITILJL'1'ION FAN -
R1NAL —
LANOE I IUOD COMMERCIAL —
)RINKING FOUNTAIN
IR HANDLING UNIT- CI'M _-
'LOOR DRAIN
•'fpVQ -
ACUUM BREAKL'RS
LOOP DRAINS-RAINLRADERS LrfAL PIREPIACQ CHIMNEY -
INK(SCRVICB-DN2 E`1C.)
A'ICR IICATER --
.—� 'AS PIPING '(up to S-$3.00.addol.
•F ul melt list must be provided _
SUB TOTAL
SUB TOTAL
PERMIT PERMIT
TOTAL FEQ -_ TOTAL PEQ
PLAN NU E PLAN CHECK FEE
SIULYARU L BACK SFRLLISLIBACK RLAR
FEE RECEIPT NO.
�S �� $,'`� Z, 3q I
USt' f t Lot AREA vnFnNt SIZE U VALUATION FEE /
FEES (-ry
1 a)E5 ❑NO O 1
IY L CONS (XCUP Y GROUP NO.OF I) ELUNG UNITS PLAN CHECKING NG F
BU'LDING
SI/.L 1 BLOC.. NO.OF SFURILS MAX.OCC-I-OAU
PLUMBING
"1 FIRE SPRINKLERS REQUIRED
YES 04O MECHANICAL /
���., STATE BLDG.CODE L1
COMMENTS �(✓ �- ENERGY CODE SURCHARGE 111
PENALTY SEC.303(a)
WATER/SEWER FEES
TOTAL
PER,4fiT VALIDATION
I' - .% .' WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT&RECEIPT
PAID CRII BY
DATE
BUILDING OFFICIAL
CC:ASSESSOR,APPLICANT,TREASURER, BLDG DEFT RECORDS COPY