HomeMy WebLinkAbout139 S STILLAGUAMISH AVE_993787_2026 INSPECTION-REPORT
¢ti1N G?'O Permit No.:W-32F 2 Lot#:
Address:
Contractor:
qs ,SO Owner:
IN O Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:/,-
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
{� 2
Permit No.: Lot It:
Address:
Contractor:��,/�
Owner: 1�i12Gd
Date: 2_4fa C2 d
PROVAL ❑ PARTIAL APPROVAL
VIOL TION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CAL 435-0674 FOR RE SPECTION -24 hour notice required.
Inspector: Date: �SJ
TYPE OF INSPECTION REQUES D
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing A)rywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other: ?
*_ev
INSPECTION REPORT
Permit No.: Lot #:
Address: 1. 39 �S �S _Qf�2� nis�Z
Contractor: o�-
• Owner:ff.�
Date: 13 1il
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
IL
�c
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
Permit No.: 915 3 7 7 Lot#: Z
Address: / 3 q
Contractor: _� I '
Owner: 3 V3
Date:
,-C AP ROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Ins ctor: - Date: 3 � �
TYP14 OF INSPECTION REQUESTED
❑ Under-floor 1A Framing PA- ' ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage Insulation
❑ Other:
INSPECTION REPORT
Permit No.: `,3 7 Lot#: �—
•
Address: f -
Contractor:
Owner:
Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
U pJ
Inspector: JDate
TYPE OF INSPECTION REQUESTED
❑ Under-floor /Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in N❑ Final
❑ Masonry ❑ Drainage Insulation
❑ Other: — / Q
INSPECTION REPORT
C
N G?'o Permit No.: Lot#:
Q Address: �JG r i
Contractor:
-ys ,SO Owner:
FII N G Date: o
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION --Q--C70RRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674/FOR RE-INSPECTION - 24 hour notice required.
— _
_ a Z)/,/,7-z:2x) ,�
ell
GT�,
Inspect �= Dater
T�fkOF INSPECTION REQUESTED
❑ Under-floor 2F,Framing Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
MZ J O7 Pt-H,15 STD tZ—;hJ
INSPECTION REPORT
Permit No.: �?—3 2 E Lot#:
Address: 1,39 l S � �( Q/✓/�
Contractor: �
Owner: �25 -,5-jX-,q79/
Date:
PPROVAL ❑ PARTIAL APPROVAL
❑ ION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑- Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical Grid ❑ Struct. Slab
Ell Wood Stove ' Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
0 Other:
INSPECTION REPORT
Permit No.: g Lot#: 0/—y
Address: l3q '.5 5�1��q�/"_:WS1�1
Contractor:
Owner:
Date: �� 35�
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
v,z-.-.✓ F t-r ,r
6 AZ
eq
O � a x
f�
Inspecto .�� Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ar Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
Permit No.: 'C)�,_?2 Lot #:
Address: 6 t
Contractor:
Owner: 3L13
Date:
_a'AF'F'ROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Ins — Date:
TI PE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ rywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
�^ INSPECTION REPORT
Permit No.: Lot#:
Address: 6-)
Contractor: _L172j_
Owner: 2 - :�g99-axz
Date: i` 000
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Ins Date:
TYPI OF INSPECTION REQUESTED
Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
0 Other:
INSPECTION REPORT
�-
Permit No.:Q q 3� � Loth�#--:- I
Address: / _�) Cl 5 51 1 F
Contractor: 4'4!� IA.1
Owner: LI C--
Date:
3--APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
r
r
Inspector: j Date:
TYPE OF INSPECTION REQUESTED
KUnder-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove Cl Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
Permit No.: 53?—3�7r Lot#:
Address: /.3 C
Contractor:
Owner:
Date: OC-®�aCCO
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION I,CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
TYPE OF INSPECTION REQUESTED
XJ
Under-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
Permit No.: �l Lot#: --
Address: f 3 9 S S�:s
Contractor: /C} ��✓ C-12a�
Owner: �� �`f�Zi�
Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspector: Date:
TYPE OF INSPECTION REQUESTED
nder-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
0 Other: &—L- La'
nil INSPECTION REPORT �. 9
Permit No.: - Lot
Address: 31 S cS �1L
Contractor:
Owner:
Date: lo?-,;?-99
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
i
1-2
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stovp ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
pe"l .,1 0f, - ; 60
I�zNSPECTION REPORT
Permit No.: Lot*
Address: 139
111;W;V`/l Contractor: (2; f-ZL
Owner: ?6 0-!e 709' 9r3 0' 727nk`
Date: /2 r
❑ APPROVAL PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspe Date:
TYP OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
N' OF= P-RL- I NO-rON
CONIS-rRUC-rION P:IaRM11 -F
IS
I.,
Valzae 7 Work-
40 3- -7qS
I- '-T
.;cb Pdoress.- 1.7'
o r r a c t-o r, s N,-=,:s E- Type Address -.L-ensc-#
P P. M 1 7
I Equipment and Fixtures 'Number :,h-
S U B 7 0 T P
IDTPLS ;:ea
7:
CTAL FEE. .. .. ... .. iv, C-5-4-.36
1,3,218.2-7
FD
h
ST ► LLi4�,4 UAmi ,5H A\/E-►4UE
N oo. cl� i3''W.
0
Q� FAGE OF G�JR$
p�
PRO?. L. 6,0.03'
la'-ay UriLITY EA4EME T _
2�011 �
I
OI
;_
a �
lo-O 12`-O� IDt d" 8`-�� 3 �w� lu� 10'-OW
-
Z Z tZ I n r 1 [ �}
O G>A r"E �/!�'- r -- V O Imo. L I
Gro
zz' Oft AT
GTo . wA
0
t4. 04"28'
PRoT'. L. l01. 28'
NOV 2 ` 1999
-TAX -TQ
CITY OF ARLINGTON
99-37,F/7
CITY OF ARLINGTON
CONSTRUCTION
PERMIT
❑ COMBINATION BUILDING ❑ MECHANICAL ❑ PLUMBING ❑ SIGN PERMIT NO. R7
j OWNER MAIL ADDRESS CITY ZIP PHONE ��
Brb gau Kt -iAJ Q29 12 &o 771 /1j, J-- &L,-L.jv (, 98z23 y3s - yo9tp
ARCHITECT OR DESIGNER MAIL ADDRESS City ZIP PHONE
I&iL.Y3cR-
GENERAL CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE I
AF LAB C01S7-PUC-l!'yj y12 E- 14)'(04LAA.IL De AeL;a. 98zz3 `/03-la5l
MECHANICAL CONTRACTOR MAIL ADDRESS CITY >' ZIP PHONE LICENSE I
CCZ-s Hpc47 Ng
PLUMBINt CONTRACTOR J MAIL ADDRESS CITY ZIP PHONE LICENSE 0
3 CLASS OF WORK
CC JA NLW ❑ADDITION ❑ALTERATION ❑REPAIR ❑UEMULI I ION ❑BUILDING RELOCATION
Q VALUATION Of WORK
W DESCRIBE WORK
3 t_ ELL �;Al �-Am 6=
m PROPOSED USE OF BUILDING
1 HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICA-
uNi TION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVI-
;
Z LLGAL LIE RIP I ION Dt PROPERTY( HOWN BELOW OR ATTACH FOUR COPIES) SIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK
J
J L(11 .6-2 BLOCK OF F-.'. WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT.THE
a } Q 1Gct GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO
w VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
Lu LOCAL LAW REGULATING CONSTRUCTION OF THE PERFORMANCE OF
a TAX ID NUMBER FROM PROPERTY TAX STATEMENT CONSTRUCTION. PERMIT EXPIRES 1 YEAR FROM DATE OF ISSUANCE.
� SIGNATUR fCONT CTORO AUTH RIZEDAG NT DATE
V )OB ADDRLSS 1 /
,, �� c�c�L2 cr`m( S Yl X
? No✓ Z
(OFFICE USE ONLY)
PLUMBING ECHANICAL
NO. TYPE OF FIXTURE FEE x's FIXTURES NO. TYPE OF EQUIPMENT FEE x's FIXTURES
ATER CLOSET(TOILET) IR COND.UNITS—H.P. EA. u •list"
2— 3ATHTUIB EFRIGERATION UNITS—H.P.EA. ui .list•'
.AVATORY(WASI I BASIN) 3OILERS—H.P.EA. tip.list**
/ MOWER AS FIRED A.C.UNITS—TONNAGEEA. qLip.list'*
TCHEN SINK&DISPOSAL ORCED AIR SYSTEMS—B.T.U. MEA
1SHWASHER ALL HEATERS—B.T.U. M
UNDRY TRAY NIT HEATERS—B.T.U. M
/ LOTHES WASHER IVAPORATIVE COOLERS
ATETtT �`Y LOTHFS DRYERS
RINAL ENTILATION FAN
RINKINGFOUNTAIN *L�AAS
EHOOD COMMERCIAL
LOOK DRAIN ANDLING UNIT— CPM
ACUUM BREAKERS EOOF DRAINS—RAINLEADERS LFIREPLACE&CHIMNEY
-INK SERVICE—BAR,ETC. R HEATER
IPING *(up to 5=$3.00,addnl.=$35
ui ment list must be provided
SUBTOTAL SUB TOTAL
PERMIT I PERMIT
TOTAL FEE I TOTAL FEE
SIOL YARD SE I B CK STRLLT SL 1 BACK REAR YARD SET AI" CX14Tf�' /PLAN CHECK/FEE O
I � RECEI/TNO
� O�
USF / 1 ( LOI AREA VACA }SITE It
'ES [—]!NO FE VALUATION FEE
TYPE E NSII—� OCCUPNCY GROUP NO.OFIDWELLING UNITS PLAN CHECKING VG `tea l�o n II
1 I BU'LDING s ��
SIZE UI BLUG.1 NO Of STORp.� I MAX.OC�AD PLUMBING
F IRE SPRINKLERS REQUIRLO
❑YES �NO MECHANICAL
STATE BLDG.CODE
COMMLIILTS-�
ENERGY CODE SURCHARGE �-{
PENALTY SEC.303(a)
)ft)o
WATER/SEWER FEES
NOV 2 ® 199Q TOTAL
Vw I CS.T p4"1 !In A-S PERMIT VALIDATION
WHEN PROPERLY VALIDATED (IN THIS SPACE)THIS IS YOUR PERMIT&RECEIPT
PAID CR# BY
BUILDING OFFICIAL DATE
cc:ASSESSOR,APPLICANT,TREASURER,BLDG. DEFT RECORDS COPY