Loading...
HomeMy WebLinkAbout19400 VISTA DR_993676_2026 `INSPECTION REPORT Permit Lot #: Address: / ��y�� ��/S I)jc— Contractor: • Owner: LDS— g—�f373 Date: . APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ $truct. Slab ❑ Wood Stove ❑ Rough-in Final ❑ Masonry ❑ Drainage ❑ sulation ❑ Other: INSPECTION REPORT Permit No.: J 7 Lot #: Address: 19 lno L lz:z - OL�e__ Contractor: w�105yZA(k • Owner: SCE-`t373 Date: ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. Inspector: Date: T PE OF INSPECTION REQUESTED ❑ Under-floor ❑ raming ❑ Gas Piping ❑ Footing Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT Permit No.:7 — Lot#: oa Address: 19 C - A/C' Contractor: ' Owner: 7� Date: /� •— () 'ICI ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. v i n Inspector: / Date: TYPE OF INSP CTION REQUESTED ❑ Under-floor Framing ❑ Gas Piping ❑ Footing ❑ rywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork mechanical ❑ Grid ❑ Struct. Slab J Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: A INSPECTION REPORT Permit No.: 7 7 3�o 76 Lot #: Address: ��— Contractor:n(6) 1WOwner:_ Date: APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. p Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage nsulation ❑ Other: f� INSPECTION REPORT t � - Permit No.: i- Lot #: 7,q Address: Contractor: • Owner: �S Date: OVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Inspector: Date: PE OF INSPECTION REQUEST D ❑ Under-floor ❑ Framing Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: c� INSPECTION REPORT Permit No.: Lot Address: Contractor: CS' t)G • Owner: Date: - 3 APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FO RE-INSPECTION -24 hour notice required. Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry Drainage ❑ Insulation ❑ Other: INSPECTION REPORT \ Permit No.-I G` �� Lot#:: Z ~ Address: effgft - G `Y -V Contractor: '1 • Owner: Date: ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 F R RE-INSPECTION - 24 hour n tice required. i Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ; Drainage ❑ Insulation ❑ Other: INSPECTION REPORT " Permit No.: Lot Address: J9 YC L'ILJ't�- ly Contractor: 1' • Owner: r ;Y - Date: LAPPROVAL ❑ PARTIAL APPROVAL i ViC�L.ATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. 1 G 1 Inspector: _ Date: - TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing - ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove Rough-in ❑ Final ❑ Masonry J Drainage ❑ Insulation ❑ Other: INSPECTION REPORT � Permit No.: 7 Lot#: 7 ~ Address: l y L/D 0 Contractor: NSa. . -ra Lvs-t-- • Owner: _S S C1 `f 3 7_3 Date: la C1 S —tl �PPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Inspector: Dat PE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ rywall, Nailing ❑ Consultation ❑ Foundation Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT Permit No.: 9b Lot#: _ Address: Contractor: • Owner: — '2-9 23 Date: 10_`f—%9 ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION a-COTTECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. 42 Ire 'o L Inspect � Date: Jc- TYP OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation Shear Nailing ❑ Groundwork ❑ Mechanical ❑ rid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT • Permit No. (O 7(aLot t � #: �a Address: Contractor: • Owner4/4-5-- Date: �PPROVAL ❑ PARTIAL APPROVAL VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. i Inspector: Date: TYPE OF INSPECTION REQUESTED �nder-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT Permit No. Lot#: -' Address: Gf== Contractor: Owner: -1 3 7 3 Date: C ICt APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Insp Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ ooting ❑ Drywall, Nailing ❑ Consultation ,' Foundation ❑ Shear Nailing ❑ Groundwork • Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT Permit No.: /-3 74 Lot Address: Contractor: • Owner: r 3 Date: 1G 4 g APPROVAL ❑ PARTIAL APPROVAL ❑ )VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Inspector: Date: L / TYPE OF INSPECTION REQUESTED Xo nder-floor ❑ Framing ❑ Gas Piping ooting ❑ Drywall, Nailing ❑ Consultation undation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: C I-ry Qv ARE- I NO-r N CONOY RUCT I ON i=KERM I T FXaRmly NO- s ss—a6-76 Owner: SELBY-jCHNSON CONS1RUCT"ON 1NC 1L'_'2 SDRINGBROOY. Ru LAKE 'Err NS s Value of Work: 8�,A422.0Z Describe Work: CL SSTROCTION Proposed Use: S.FR Legal Description: CRO!.i1M RIDGE- ESTATES DIti ' LCT 72 Jots Address: 19LOe VIST 1 DR. Contractor' s Na3ie Type Address License# SELL`?-IO ;: OhF 1E2c SOPINCLROCK RD s PUSET HEATING CO INC. '� PC', ?GX 336 Li; STE`V TL!GET=i;2 484 D DF!'v'E S CCS.`,M -`ii-1 M.Z 1 i4•" _i220 vv.3.. D!? 5E El Ste: 0�vL`k P E R M I T F E E S - - ; ;i Equipment and Fixtures- - -- - ---`- - Number _Fee Total Charge PLUMBING FIX`URES 12 $7.00 $84. &- FURNACE/UNIT HEATER 1 $14.80 $14.80 RANGE i $10.55 10.S5 VENTILATION FANS 4 $7.25 $24.00 DRYER i S10.65 $1€0: 65 METAL FIREPLACE & HIMNEY 1 $10.S5 $10.65 ! WATER HEATER _ _ 1 $10. 55 '$1055. '.,PS PIPING 1-4 O!�TL_T� 1 $4.7,: $4. 7E SUBTOTAL...... $175. 15 t ' TOTALS Fee =?: $793=50 _- .. $91. 15 $84z 00 SIGNATURE: _ TOTAL FEE........... ... ... $1,537.43 7 i4EREBY C=R! i AND EXAM*!NED THIS A=:="_I='CATION PAYMENTS.................. 1414.21 KNOW THE SPME TO BE TRUE RECT ALL PROLISICNS OF r.xEn n. TOTAL DUE.. . . . . . . . . . . . . . . . $1, 123.22 ORDINANCES GOVERNING WORK W'LL �S[baC - -- aU nrF7C- - (Cc- CITY OF ARLINGTON CONSTRUCTION PERMIT ❑ COMBINATION BUILDING (ErMECHANICAL 111' PLUMBING ❑ SIGN PERMIT NO.3 �-7/ { OWNLR MAIL ADDRESS CITY zip PHONE '7 Sad BY-THFIsor► Lo�,�I�^� ZZz SArr�r broJ�c 1St� �� 8sE y5 -y37�/ uMr 04 t ARCHITECT OR DESIGNER MAIL ADORES CITY ZIP PHONE C>?RNE onl�s4 P•O 9c)y I(o2-q 046eA-1 S1wV'e5 WO 11056� /- �o � 9y8-3yzI GENERAL CONTRACTOR MAIL ADDRESS CITY ZIP ` ' LIC NSE' 5EL�� Jl1Hn /1 Cu�st�c Ly- S-Q-f j- 367 ALBYJC106 '. MLCI IANICAL CONTRACTOR MAIL XDDR'VSS CITY ZIP QkfONE LICENSE/ P_uge, - K-r-A-� 1(ou 127t' 1tJG I).E- 6.I4- Ste✓eyo q$258 `�jy)-ylll �1ubETH16y80 PLUMBING CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE &SioM PJIA6!� 11320 3ro ' ✓(dc 5.E' E It"✓e 1� ydav8-77f1 �.33�7-7/76 AVE5r-P4,3Lj® CLASS OF WORK PL,j-N/ CLJdE, I� L JNLW ❑AUDITION ❑ALTERATION ❑REPAIR ❑DEMOLI IION ❑BUILDING RELOCATION = ALUATIONOF WORK C Lul UESCRIBL WORK P- t. ( Llld -rtr SL (� PRU"t U USE Of BUILDING I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICG u m,', ( V I TION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PRO E LL(,,\LOLMRIP11 I PRUPIRTY(5 BELOWURALTACHFOURCUPIfS) SIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WOR 7 J L01 7— BLULK _ Or WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT.TF s GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITYT, u Dld I VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE O iTAX ID NUMBER FROM PROPERTY TAX STATEMENT LOCAL L NSTRUCTION OF THE PERFORMANCE f 31 D D D ODU 2- CONS CT �i1. PER T EXP ES 1 YEENTAR FROM/ DATE OF 1 SUANCE .� Sic �P t cTOR oR A T �ri/cL rf i A`1 � i j IOB UURL55 / / t Mgou I�lsfK rlJc n�11^ fad L'r� Cjo223 lQ1 (OPPICE USB ONLY) 13CHANICAL PLUMBING NO. TYPE OF FIXTURE FEE :'a FIXTURES NO. TYPE Of,EOUIPMIICT- PER :9 FIXTURES ATER CLOSUT -OILCI') IR COND.UNITS-II.P. EA. d .list"' Z. 3ATHTUB EPRIGERATION UNITS-H.P.EA d .list" VATORY(WAS[I BASIN OILERS-I I.P.EA. d .list.. 110WE3t AS FIRED A.C.UNITS-TONNAGE EA. d .list- 'TCIIEN SINK A DISPOSAL ORCLD AIR SYSTEMS-B.T.U. MEA ISHWASHER JWALL HEATERS-B.T.U. M UNDRY TRAY lu NIT II EATFRS-B.T.U. M LOT}i ES WASHER VAPORATIVECOOLERS - p31;Ll1flATPA- . 1 LOTII ES DRYBRS RINAL LxriLATIONPAN KINKING`*OUNTAIN ANGEIIOOD COMMLPC1AL LOOR DR UN MR IIANDLING UNIT- CPM VACUUM BREAKERS oVE OOP DRAINS-RAINLRADERS irl'AL FIREPLACHA CHIMNEY INK SIIRVICII,-BAR,MIC WATER IIIW1'14t )AS PIPING *(.p to 5-S3.00,addnl. $.75 'F ui mert list must be provldcd I SUBTOTAL SUB TOTAL PERMIT PERMIT TOTALPEE TOTAL�LPEEJ SIDL YARU SE I B ILK STRLLI SL IBACK REAR YARD SE-TTBB/ACK PLAN CHECK NUMBER CHECK f EE��/`�f LAN RECEIPT FNO,h,� %b 4/5 —71 v✓ ? i USF I LOT AREA _ VACANT SITE FEES VALUATION fEE ICJ 76-1 ❑YES ❑NO TYPE OF NS1. OCCUPA GROUP NO.OF DWELLING UNITS PLAN CHECKING VG /Lj 57 3 cI) BUrLDING s 5 3 5c SILL OI BLUG, NO,OF'STURILS MAX,OCC.LOAD / PLUMBING FIRE SPRINKLERS REQUIRED ❑YES NO MECHANICAL COMMENTS STATE BLDG.CODE ENERGY CODE SURCHARGE PENALTY SEC.303(a) RECEIVED WATERISEWER FEES TOTAL Sn 1 q E r 1 1599 PERMWHEN P OPERLYVALIDATION �/ WHEN PROPERLY VALIDATED (IN THIS SPACEI THIS IS YOUR PERMIT d�RECEIPT 111 OF ARLINC,TON PAID CRN BY 4 C BUILDING OFFICIAL DATE cc: ASSESSOR PPLiCANT.TREASURER,BLDG.DEFT RECORDS COPY LEGEND ® YARD W/DROP INLET PROTEXT. EXISTING & PROPOSED DRAINAGE COURSE F-7 R=300.00' I VEHICLE SHOWN FOR PARKING SPACE ASP V/S Tq DRIVE yAL T RD 5' PLANTER SI7?lP TEMP. ARMORED CONS7RUC710N 5' SIDEWALK ENTERENCE AND PROPOSED CONCRETE DRIVEWAY --_i . (20' WIDTH) p f0' UTILITY ESMT. -ter � Chi 3 O '� PORCy I eq O + / h 1 .0, 25 , � I NEW HousE o �� W / 0 38 0, aW 00 ;r PAn0ioE ) Ii 10X1¢' k O 2 , O TEMP. INTERCEPTOR SWALE 1 TEMP. SILT FENCE N2716'12"W 85.56' NOTES S.R. 9 1.) EROSION/SEDIMENT CONTROL MEASURES MUST BE FUNT70NAL AND BE R E C E I E D MAINTAINED THROUGHOUT CONSTRUCTION. 2.) MAINTAIN POSITIVE DRAINAGE AWAY FROM THE STRUCTURE. SEP 1 999 3.) ENTIRE LOT, WHERE EXPOSED SOILS REMAIN AFTER CONSTRUCTION IS COMPLETE SHALL BE TOPSOILED, SEEDED AND/OR SODDED AND LANDSCAPES WITH PLANTS AND BARK/MULCH. CITY OF ARLi GTON 4.) ROOF DRIANS TO DISCHARGE INTO EXISTING STORM DRAINAGE SYSTEM. _ ENTIRE SITE TO BE DISTURBED. 5.) TEMPORARY INTERCEPTOR SWALE TO DISCHARGE INTO EXISTING STORM DRAINAGE SYSTEM. SCALE.• 10 = 20' LOT NO. 72 LOT AREA 4579 SF IMPERVIOUS AREA Z422 SF SITE PLAN FOR CROWN RIDGE ESTATES DIV. 1 SELBY—JOHNSON CONSTRUCTION, INC. FILE NO.MJ-98-0024—FP / A.F.NO.199907195003 1222 SPRINGBROOK RD IN SECTION 14, T. 31 N., R. 5 E, NI!M. LAKE STEVENS, WA 98258 19400 VISTA DRIVE — ARLINGTON, Wei 9822J PHONE (425) 337-4733 TAX NO.