HomeMy WebLinkAbout19316 VISTA DR_993657_2026 r(� INSPECTION REPORT
4io
Permit No.: Lot#:Address: !93 16 ViSi A Ort,
Contractor:Owner: �5
Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
IV
I
Inspector: Date: •
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ ct. Slab
❑ Wood Stove ❑ Rough-in Final
❑ Masonry ❑ Drainage ❑ In ulation
0 Other:
M INSPECTION REPORT
P
Permit No.:1fi—- 7 Lot#:
Address: /g,3/6
Contractor:
4D
-
Owner: 0�1" 8 ZLY7�
Date: //-%c/ ` 7q
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
1 "
Inspector:
Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Final
❑ Masonry ❑ Drainage '❑ Insulation
❑ Other: Q zf
INSPECTION REPORT
Permit No.: Lot#: �S
Address:
Contractor: . "-L
Owner:
Date:
❑ APPROVAL PARTIAL APPROVAL
El VIOLATION
VIOLATION ORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 OR RE-I SPECTION -24 hour notice required.
r
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Final
❑ Masonry ❑ Drainage �Jnsulation
0 Other:
� INSPECTION REPORT
Permit No.: �9— S7 Lot #: 2S
Address: ) 931( V Go�Gt- DF—
Contractor: L\L 15 � C2z2
• Owner: Y- Z�,�-�f 373
Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
11
Inspector: Al I Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor XDrywall,
raming ❑ Gas Piping
❑ Footing Nailing ❑ Consultation
❑ Foundation hear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage 0 Insulation
❑ Other:
INSPECTION REPORT
Permit No.: 7 Lot#:
Address: _l9�/ �G� LOP—
Contractor: �2
Owner: 4Qs—_5_ -4373
Date: 1®
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspector: Date: /,j
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑xz,
raming ❑ Gas Piping
❑ Footing rywall, Nailing ❑ Consultation
❑ Foundation hear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
J � INSPECTION REPORT
Permit No.: - 3 S7 Lot #: 7.'
Address: _/ 9 3j rcc V�4 �
Contractor:
Owner: 7 3
Date: D -/c -q
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage Insulation
❑ Other: Q�
�� ,� INSPECTION REPORT
Permit No.: "'3 6 5 7 Lot #: �'2S
Address: Z 93
Contractor: Z ( J
Owner:
Date: 10
❑ APPROVAL PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date: 4J
/
TYP F INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage <sulation
❑ Other:
INSPECTION REPORT
� Permit No.:99— 346 7 Lot #:
Address: Z2314e, �/ -
Contractor:
Owner: �S _
Date:
' APPROVAL ❑ PARTIAL APPROVAL
OLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: te: ' l
TYPE OF INSPECTION REQUESTED
❑ Under-floor Framing ❑ Gas Piping
❑ Footing ❑ w
a
ll
,
Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
Mechanical ❑ Grid ❑ Struct. Slab
❑ ood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
Permit No.: 5 Lot #:
Address: 19 ql a L//S7�9 p
Contractor: ' n L.
Owner:_6QZI 3 -)
Date: .16 —6 —1 S
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Insp Date: -
TY4 OF INSPECTION REQUESTED
Xder-floor ❑ Framing ❑ Gas Piping
oting ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
0 Other:
INSPECTION REPORT
Permit No.:77 r r7 Lot#: 75"
Address:
Contractor:
• Owner: Y-23^._ Z,19 y 3-7 3
Date: l4 /-/—92
PROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
��tr9�L
Date:
T PE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove XRough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
off\ INSPECTION REPORT
421
Permit No.: //_ �S Lot #:
Address:
Contractor: C
Owner: — 2
Date: ��!'
❑ APPROVAL PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
10
�1
c
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing Xca
rywall, Nailing ❑ Consultation
❑ Foundation hear Nailing El Groundwork
❑ Mechanical rid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
Permit No.: 36 _7Lot#: 2-5—
Address: Z 3/ �
Contractor: �'zLW QZ2� �
• Owner:
Date: /4:� 7 l
V11LATION
ROVAL ❑ PARTIAL APPROVAL
❑ ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
i
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry Drai e ❑ Insulation
❑ Other: Z �
INSPECTION REPORT
Permit No.: / / C 5 Lot #: 1195
Address: 193 /6�Uiz / /4 Ac
Contractor: 3
Owner:
Date:
❑ APPROVAL �4RTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
7>�-\ z),\ 1�d/ E
Inspector: 9_ � Date: '
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing �<Gas Piping
❑ Footing ❑ Drywall. Nailing onsultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ .Rough-in ❑ Final
❑ Masonry Drainage ❑ Insulation
❑ Other:
_.G�`�L` INSPECTION REPORT
-7 Permit No.: 35 t#,.
Address:
Contractor:
Owner: O 3
Date: - l
PPROVAL ❑ PARTIAL APPROVAL
zll❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspecto . Dater/
TYPE OF INSPECTION REQUESTED
4Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
Permit No.: — 57 Lot#:
Address: 19_3!(e V� ,Q
Contractor:
Owner: ��S —
Date:
I APPROVAL ❑ PARTIAL APPROVAL
Ll LATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: VA Date: rim
TYPE OF INSPECTION REQUESTED
J der-floor ❑ Framing ❑ Gas Piping
Doting ❑ Drywall, Nailing ❑ Consultation
Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
V
C I T O V R RL-I NGYON
CONOYRUCT I ON PERM I T
PERMIT` NO-
Owner: SELBY-JOHNSON CONSTRUCTION INC 1222 SPRINGBROOK RD LAKE STEVENS
Value of Work: $69,391.00 Tax ID: 143-4-010-0002 Phone. 4E5--508-4367
ODescribe Work: NEW CONSTRUCTION
1 Proposed Use: SFR
Legal Description: CROWN RIDGE ESTATES LOT 75
Job Address: 19316 y1STA DR
Contractor's Nape -'IE- �_�_s_ ___
SELBY-JOHN$ON = 1222 SPRINGBROOK RD 11
PUGET HEATING CO INC. 11L_ PO BOX 336 LK STEV
DAVE'S CUSTOM, PLUMBING = _- 11320 36TH DR SE
P E R M I T F E _ -
Equipment and Fixtures Number Fee Total Charge
- -- - - --
PLUMBING FIXTURES 12 $ :T�- $84.00
FURNACE/UNIT HEATER 1 ?: . ?, $14.8 '
! MANGE 1 - - $10.65 '
S VENTILATION FANS 4 = $29.00
DRYER 1 $10.65 '
METAL FIREPLACE & CHIMNEY 1 :1z- _I_ $10.65
' WATER HEATER 1 r $10.65
' GAS PIPING 1-4 OUTLETS 1 14. `5 $4.7n
S U B T O T A L...... $175. 15
TOTALS r
Permit Fee Equipment = _• __
Fixture
Mech Permit =<. 50
Plan Fee ' .
Plumb Permit
State fee
TOTAL FEE................. S1&,LATURE_ !` /
�1,5$8.99 I - HH
AND EXAMINED -
PAYMENTS......... ......... $49f. 46 KNOW THE SAME
RECT ALL PROV_� _
TOTAL DLE................. S1sQ€53.5:, A3nAlrc�' f nl �Dh
i
DATE
I 3t
FL_�' _
;- ,.�,
CITY OF ARLINGTON
CONSTRUCTION
�-y PERMIT
❑ COMBINATION BUILDING MECHANICAL jfl' PLUMBING ❑ SIGN PERMIT N0.3(�
j OWNER MAIL ADDRESS CITY ZIP PHONE ? 15as-4f36 9�d67*w
SELB Y-�lOHwsorl (o�lsf�^�. )222- 5on:g brook ga Ly- 5te-jeo �IBzS�s EL/40 503-L/37LI guot-
ARCHITECT OR DESIGNER MAIL ADDRESS' LJ CITY ZIP PHONE
CgAi+I,ia: P-0- Bc)k 162q 0<« l 51wires 105-6'� i— ago — eye-3yzr
GENERAL LIN RAC MAIL ADDRESS CITY ZIP }10t1 LICENSE
5ELB1� Johlli5],1LO,lyf-Lnc 12Z2s4.rl,Ltbra0kAd LY- 5t>wl,4s '19z5.e5 so - 367 SEL9YJCoSl. .
MLCHANICAL CONTRACTOR MAIL DDR S CITY ZIP Cy�59ONE LICENSE/
Puyt-f- (1� Ay J(q Z I27t, Alc I).E• L14- Str✓C00 U55 33y-y/ll &6-ErH16Y8D
PLUMBING CONTRACTOR MAIL ADDRESS/ CITY ZIP PHONE LICENSE
In �ka-) 645iom Y)K�tb4'ut 113Z0 3(ol4l 0rl✓C 5.E- E.ttle y�zUg—��►/ : 377176 pMVESCp43zi
3 CLASS OF WORK P4
O INLW ❑ADDITION ❑ALTERATION ❑REPAIR El IION ❑BUILDING RELOCATION
>Y
Q ALUA!IONOF W K
z
y DESCRIBE WORK
3 nn l Flo
I— 17�1 1aF! unl'l1 r�.G a.� St lL n.K
m PFuPOSE U USE OF BUILDING
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLIG
w ti M.rtj di4fl I I AA TION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PRO\(
uE scRIPu 1 PRUPI RTY(SkIOWN BELOW OR ATTACH FOUR CUPIE S) SIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WOR
� Lur 75 BLOCK Uf WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT.TF
a GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITYT'
w VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE O
w LOCAL L ONSTRUCT ION OF THE PERFORMANCE C
TAX ID NUMBER FROM PROPERTY TAX STATEMENT CON 'ON, PERMIT S 1 YEAR FROM DATE OF ISSUANCE
0.2 J L'J 3 0 ��V !iCJU S GNA F CO A T RIZED ATE
V108 AOURLSS
t )31� L t JIJG hll'- kA) w„ 15aZ3 X. 1%S r �
(OFI'ICI!USE ONLY)
PLUMBING ECHANICAL
NO. TYPB OF FIXCURP FEE i s FIXTURES NO. TYPE OF BOUIPMENT FEE :'�FIXTURES
ATPR CLOSBT OILL'T IR COND.UNITS-H.P. EA. 7 ui P.Ilt'•
Z. ATIITUB tEPRIGERATION UNITS-H.P.EA d .Ilt-
VATORY(WASH I BASIN OE.ERS-H.P.EA. d .llt••
'IIOWFR AS FIRED A.C.0 NITS-TONNAGE EA. v d .lit•"
TCHEN SINK&DISPOSAL 'ORCED AIR SYSTEMS-B.T.U. MEA
ISHWASHPIt ALL HEATERS-B.T.U. M
UNDRY TRAY ]NIT HEATERS-B.T.U. M
LOTH ES WASHER :VAPORATI V B COOLERS
ATUR HEATER I LOTH ES DRYERS
RINAL 1 ENTILATION FAN
RINKIN%FOUNTAIN kANGB HOOD COMMERCIAL
LOOR DRAIN IR HANDLING UNIT- CPM
VACUUM BRCAKPRS r VE
tOOF DRAINS-RAINLEADERS / ETAL FIREPLACE&CIIIMNEY
'INK SERVICr;-BAR.Mt. ATTIR IIIIAI'F1t
AS PIPING *(up to S-$3.00.oddnl. t.75
"Bquipmeit listmust be provided
SUB TOTAL SUB TOTAL
PERMIT PERMIT
TOTAL PEP TOTAL FBE
SILL YARD St 18 CK STRLLI�L IBACK REAR YARD SETBACK PLAN CHECK NUMBER PLAN CHECK FEE
q- d� _ FEE �y` RECEIPTNO
USE /E
LOT ARt VACANT SITE �O
_ _ _^ � �Q 3 ❑YES ❑NO FEES VALUATION (FEE /
TYPE F CpNSI. OCC NCY GROUP NO.OF DWELLING UNITS PLAN CHECKING V 0-9G /u f-
v z BU'LDING f g-/ 75
SI/.L OF SLUG. NU.Of STURILS MAX.OCC.LOAD
I ' t1l PLUMBING
1 IRE SPRINKLERS REQUIRED
❑YES MECHANICAL
STATE BLDG.CODE
COMMENTS
.� ENERGY CODE SURCHARGE -`
U.B.C.
A� PENALTY PENAY SEC.303(+)
"� WATER/SEWER FEES
l
TOTAL
I�]/ PERMIT VALIDATION
w WHEN PROPERLY VALIDATED IIN THIS SPACE)THIS IS YOUR PERMIT 6 RECEIPT
PAID CRR BY
BUILDING OFFICIAL DATE
cc: ASSESSOR,APPLICANT.TREASURER.BLDG. DEFT RECORDS COPY
N27'16'12"W
TEMP. ARMORED CONSTRUCTION VISTA DRIVE
ENTERENCE AND PROPOSED
CONCRETE DRIVEWAY (20' WIDTH) o ASPHALT RD V0
to
5' PLANTER STRIP ®®
5' SIDEWALK
70.00
10' UTILITY EASEMENT
- - - o
5'
- �U3
O M p
PORCH
---------------
21
20.0'
o
ca
I 00
�n
26.0'
Z 5 14.0'`r Z
TEMP. INTERCEPTOR SWALE
PATIO/DECK J
10'x14'
N
TEMP. SILT FENCE
LEGEND N27'l6'12"W 70.00'
® YARD DRAIN W/DROP INLET PROTEXT. S. R. 9
--�� EXISTING do PROPOSED
DRAINAGE COURSE
li I VEHICLE SHOWN FOR
�'— — PARKING SPACE
NOTES
1.) EROSION/SEDIMENT CONTROL MEASURES MUST BE FUNTIONAL AND BE
MAINTAINED THROUGHOUT CONSTRUCTION.
2.) MAINTAIN POSITIVE DRAINAGE AWAY FROM THE STRUCTURE.
J.) ENTIRE LOT, WHERE EXPOSED SOILS REMAIN AFTER CONSTRUCTION IS
COMPLETE, SHALL BE TOPSOILED, SEEDED AND/OR SODDED ANn
LANDSCAPED WI7H PLANTS AND BARK/MULCH.
4.) ROOF DRIANS TO DISCHARGE INTO EXISTING STORM DRAINAGE SYSTEM.
ENTIRE SITE TO BE DISTURBED.
5.) TEMPORARY INTERCEPTOR SWALE TO DISCHARGE INTO EXISTING r1it:
STORM DRAINAGE SYSTEM.
SCALE. in - 20' LOT NO. 75 LOT AREA 7,703 SF IMPERVIOUS AREA Z 686 SF
SITE PLAN FOR CROWN RIDGE ESTATES DI V 1
SELBY—JOHNSON CONSTRUCTION, INC. FILE NO.MJ-98-0024—FP / A.F.NO.199907195003
1222 SPR/NGBROOK RD IN SECTION 14, T. 31 N., R. 5 E., W.M.
LAKE STEVENS, WA 98258 19316 VISTA DRIVE - ARLINGTON, WA 98223
PHONE (425) 337-4733 TAX NO.