HomeMy WebLinkAbout18302 TURNBERRY PL_993455_2026 fiIk INSPECTION-REPORT
�M#v Permit No.: 92-13 Lot#: 173
Address: g3�a
Contractor:
Owner: -1125` 3 i — 7%3
Date: ZQ-o27—��i
`t! APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Insp ctor:
TY F INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in nal
❑ Masonry ❑ Drainage A�sulation
❑ Other:
INSPECTION REPORT
Permit No.: -3 . Lot#: 93
Address: L?,30a / PL
Contractor: "7-L All
Owner: 32 ` 7/ 3 7
Date: O ( -��
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspect Date:le
TYPtdF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT._
Permit No.(T J 4 YSLot#:
Address c)ZL
Contractor: CN1 ST
Owner:
Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION Lk- 6RRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
7ALL 435-674 FOR R�NSPETION - 24 hour notice required.
� r. _
—
45
— � �
o Z
Inspe Date:
T PE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in I)U, Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT'-
Permit No.: " ` 3 �-� Lot #:
Address: 1530a 7_W-121--xP!2Y
Contractor: __J L R CCl _1 E)T
• Owner: -7
Date:
❑ PROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
CK
Inspector: Date: \
TY OF INSPECTION REQUESTED
❑ Under-floor :J Framing ❑ Gas Piping
❑ Footing rywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
0 Other:
INSPECTION REPORT
Permit No.77- 5_5_ Lot # 93
Address /g3oa T LO/
41 Contractor TL efyt
Owner
Date y -qq
-1 APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-MM FOR RE-INSPECTION - 24 hour notice required.
06 75Z
Ins Date '
T PE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ inal
❑ Masonry ❑ Drainage Insulation
they dAi44AW &4o2 �
INSPECTION REPORT
Permit No Lot # 17 3
Address L 57
Contractor j j
Owner 3�5_' 61Y, 2 /aZ
Date 3 —5 S
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION — 3- >RRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-E929 FOR RE-INSPECTION - 24 hour notice required.
i' /J ;- 5
Inspec or Date
TY E OF IN PECTION REQUESTED
❑ Under-floor Framing j Gas Piping
❑ Footing lJ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
,,II
Permit No.� j7s�s— Lot #��
• Address 18.3(1,�L -L.s��n� �-u
Contractort--
Owner
Date 7 C1
❑ APPROVAL XPARTIAL APPROVAL
❑ VIOLATION XCORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-9:72 FOR RE-INSPECTION - 24 hour notice required.
�i
6-Al A'Aic
V
Inspector Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor Framing ��as Piping
❑ Footing �:<JDrywall, Nailing LJ Consultation
�eMechanical
Foundation ❑ Shear Nailing ❑ Groundwork
Cl Grid ❑ Struct. Slab
❑ Wood Stove Rough-in ❑ Final
❑ Masonry /❑drainage ❑ Insulation
❑ Other
INSPECTION REPORT
O
Permit No. 4� S__Lot #
Address CtS 2.0s;z ZLY:n f 9L
Contractor -_J Ln<�—�)-T
Owner 4)j 5 ®c6 — 12-'2-
Date & -- .2—q—q y
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-a224 FOR RE-INSPECTION - 24 hour notice required.
06 -7�z
Inspe Ie Date
Z 77
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation AXShear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
0 Other
INSPECTION REPORT
Permit No. Lot# 93
Address /
Contractor _"T L
Owner 1/95--3-0Y — 7/ � —
Date —It—q 5
❑ APPROVAL ❑ PAEJTAL APPROVAL
❑ VIOLATION ORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-t20 FOR RE-INSPECTION - 24 hour notice required.
spec Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry Drainage ❑ Insulation
❑ Other �i
INSPECTION REPORT
Permit No 7 L "3 45 J Lot #
• Address 6 r_-1) 0 a LLC
Contractor c,
Owner
Date ( — 1 0 — CC C'
APPROVAL LJ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435_ FOR RE-INSPECTION - 24 hour notice required.
G6 7�1
141 C
Inspector Date lb
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry /-Wbrainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No. - ot#
.� Address /k3 02 �TLt1
Contractor �L
Owner 'l-7-S-5-0E— 7/-2 a
Date & r 3
❑ APPROVAL PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-9724�OR RE-INSPECTION - 24 hour notice required.
Czlie Is
- Date
PE OF INSPECTION REQUESTED
nder-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION'REPORT
/ ®Permit No. —3 -5—ot# I
Address __'/930c"a TiA" t_ W�*
Contractor
Owner
Date,5_-,(Di�,
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
c Date '
PE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No. Lot #
Address A K
00, T
Contractor
�--�
Owner41)
Date S cP Z/ j
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspe r Date
rffi OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
XFooting ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
p INSPECTION REPORT
Permit No. 9> 3_55 Lot #�
Address �F/o &I 2�
Contractors
Owner
4;0 Date
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
n ect Date-
PE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No.<f _ 3 Lot #
Address
41) Contractor _"T L_
Owner �a2�� �—�1 7�2
Date
❑ APPROVAL ❑ P IAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice requi d.
. I
� 6� ��•�� .
Insp Date -
TYPE OF INSPECTION REQUESTED
❑ nder-floor ❑ Framing ElGas Piping
11� noting ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical Cl Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
f
C I T E OF= Rini_I NOTON
r CONIS-r UCT I ON FDIaRM I T
` O Owner ,C��1L,r� a� 4`iiv`v�r,.�.[�i.._.HpC__�.z .cSE. �a
' `,value fl3 Work,. $10,1,40` .00, �ax i �`n i:i. . s-� �) Q�.h'�an2: :2'5-508-7i�i
Describe Work: NEN C �S T R,U C-i IDIN'
Proposed Use: Sk R
Legal Description:
Job Address: 18302 'UR,,BERR't
Contractor' s Name Tyne Address License#
ti —1 ..' !;i..i:... `ti 'vS =�}t 2 to L' "! —
?i�AL I TY HEAry i 'v- 1927L GIBBON RD QUAL'1' .*c8I Q
4ry A t r. :s.=E4 1l J_.lH S: r.V.
' P E R M I T F E E S
Equipment and Fixtures number Fee Total Charge
FURNACE/UN,7 ` 'HEATER 1 $14.80 $14= 80
' RANCE 1 $10.8v �10.BC_
ANS
t !i!AL `I REP LACE & CHIMNEY i $10.65
WATER HEATER 1 $10.85 0.85
' SAS t I�INS 1-4 'rl�VETS 1 $4. 7 $4.75
S U B T 0 T A L...... $203.40
TOTALS Fee
Permit Fee %897.=255
Equipment f8��y ��{8.40
Y=J{L LCT''rvL $1YAJ.�L�0�
Me ch Permit
Plan Fee *582.2
State wee $Ei.50
Sc-001 Mitigation $94Z.001 C
SiGNATi.iRE�
TOTAL FEE................. $2,677.8E €N E
AND EXAM I N" �:I S R�'Pi I CA
PAYMENTS........... .... ... =€78. 1 {ia�i;s T BSc S ;M' To BE TRUE PND CQR—
RECT ALL N. VISIONS LAWS Ai45
TOTAOUE. . ... $2. 198.65 OF-RD' ANCES GC��-{,\„7 E. TYPEOF,
j,.l WORK W ITS �aHFT
ld -�0 _ -
HUILDING ' -
ow
rrr
to
Ol
VAN
Ile
Stu f3
�1
C 42-5)
s
i
C,
7� - 3S 5�-
CITY OF ARLINGTON
CONSTRUCTION
PERMIT GP)
❑ COMBINATION ❑ BUILDING ❑ MECHANICAL ❑ PLUMBING ❑ SIGN PERMIT N0,J4
7
" OWNER MAIL ADDRESS _ 9 CITY ZIP plwzC PHONE
1 V''wy, (�Gtiy �l�Z 3 �44� S� S �� FCJ ot1,ds � IA, C2C,4) ��/Z-7®®7 -
-
ARCHITECTORDESIGNER MAIL ADDRESS CITY ZIP PHONE
GENERAL CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE/
Co ln5Ay�.�k�c , Sc�v.-� �� S C��+mac�� t Z� S0� - 71 Z Z '
MECHANICAL CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE/
PLUMBING CONTRACTOR MAIL ADDRESS CITY ZIP PFIONE LICENSE
III
WCL 0 Z) V,J l,l (cJ 1 I'
CLASS OF WORK
❑NLW ❑ADDITION ❑ALTERATION ❑REPAIR ❑DEMOLI I ION ❑BUILDING RELOCATION
VALUATION OF WORK
�C ,C IC)L
j U CRIBS WORK
t4 ew Vim. LL�
G PRUPOSt D USE OF BUILDING I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THI6 APPLICA-
Gc C -C TION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVI-
LLGAL ULS<'RIPI ION Ol PROPERTY(SHOWN BELOW OR ATTACH FOUR COPIES) SIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK
j LOI C13 BLOCK Sff OF �j(� z Ir' WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT.THE
GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO
u _�j O Q —6 C6 VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
i TAX ID NUMBER FROM PROPERTY TAX STATEMENT LOCAL LAW REGULATING CONSTRUCTION OFTHE PERFORMANCE OF
CONSTRUCTION. PERMIT EXPIRES 1 YEAR FROM DATE OF ISSUANCE.
E SIGNATURE F CONTRACTOR OR AUTHORIZED AGENT DATE
JOB ADDRESS _ ,C-
(01INCL USl3ONLY)
PLUMBING MP NI )CAL
NO. TYPE OP PIXTURE FEl3 s's FIXTURES NO. TYPE OF EQUIPMENT FEE s i FIXTURES
75- mvit CLOSET 'i'OILHI, Ili CONU.UN I'15—I I_I'. EA. '. ui .BA"
fy ETRIGRIINFION UNITS S—ILP.EA. ui .list•'
T/ SA'Il1'RJfl
VA'fORYL-A ASI I BASIN OILERS—H t
P.EA. ? u P.li "
110WER AS FIRED A.C.UNri'S—TONNAGE EA. U94p.list"
TCIIEN SINK do DISPOSAL :OEtCED AIR SYSTEMS—B:f.U. MCA
ASHWASHLIt AL L HEATERS—B.T.U. M
SUNDRY TRAY NIT HEATERS—B.T.U. M
I LO.111ES WASHER WAPORATIVE COOLERS
WATER HEATER _� LO'1'ilhS DRYERS
KINAL - ENTIL.ATION PAN
KINKING FOUNTAIN ANGE HOOD COMMERCIAL
"LOOK DRAIN
IR HANDLING UNIT— CPM
VACUUM BREAKERS TOVL'
OOP DRAINS—RAINLEADERS ETAL FIREPLACE&CHIMNEY
'INK SERVICE—BAR.ETC.) WATER I IL'AI'ER
AS PIPING -(.p to 5-$3.00,oddnl.v S.75
ui ment list must be provided
1
SUB TOTAL SUB TOTAL
PERMIT PERMIT
TOTAL FILE TOTAL FEE
SIUL YARD SL I BACK 5 FRLLT SL T BACK REAR YARD SETBACK PLAN CHECK NUMBER PLAN CHECK FEE
FEE, L RECEIPT NO/
USE' /ONI ' LOT AREA VACANT SITE FEES VALUATION FEE
21 -
�O �C\� ❑-Yt5 ❑NO
TYPL OI C NSI , OCCUP7CY GROUPI NO.OF DWELLING UNITS PLAN CHECKING NG � i QJ C41 w7
V lfVj I � v` BU'LDING T —1 I
SILL 01 BLDG. NO.OF STORILS MAX.00C.LOAD
PLUMBING
l FIRE SPRINKLERS REQUIRED
❑NO MECHANICAL
❑YES
STATE BLDG.CODE _—xd
COMMENTS ENERGY CODE SURCHARGE
UBC.
PENALTY SEC.303(�)
RECEIVED
WATERISEWER FEES
'APR 16 1999 TOTAL
PERMIT VALIDATION
CITY OF ARLINGTON WHEN PROPERLY VALIDATED (IN THIS SPACE)THIS 15 YOUR PERMIT L RECEIPT
PAID CR1F _ BY
BuurnH�oFOFFICIAL T� DATE
cc:ASSESSOR,APPLICANT,TREASURER, BLDG. DEFT. RECORDS COPY