Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
110 E 3rd St_BLD5772_2026
CITY OF ARLINGTON 18204 59th Avenue NE,Arlington,WA 98223 INSPECTIONS:360-403-3417-Permit Center:360-403-3551 BUILDING PERMIT 110 E 3RD ST Permit#: 5772 Parcel#:31051100100600 PERMIT EXPIRES 180 DAYS AFTER DATE OF ISSUANCE. Scope of Work:Replace existing 1M BTU Boiler with(2)500K BTU Boilers. Valuation:35000.00 APPLICANT llr-jff CONTRACTOR ' ARLINGTON CITY OF Hermanson Company/Kaytlyn Hamill Hermanson Company 238 N OLYMPIC AVE 1221 2nd Ave N 1221 2nd Ave N ARLINGTON,WA 98223 Kent,WA 98032 Kent,WA 98032 206-775-6414 206-573-2023 LIC:602 004 844 EXP:03/31/2024 LIC:HEWACLW513J EXP:08/25/2024 MECHANICAL CONTRACTOR PLUMBING CONTRACTOR LIC#: EXP: LIC#: EXP: JOB DESCRIPTION PERMIT TYPE: COMMERCIAL MECHANICAL CODE YEAR: 2018 STORIES: 1 CONST.TYPE: 1B DWELLING UNITS: OCC GROUP: B;Business BUILDINGS: OCC LOAD: PERMIT APPROVAL . The issuance or granting of this permit shall not be construed to be a permit for,or approval of,any violation of this Code or any other ordinance or order of the City,of any state or federal law,or of any order,proclamation,guidance advice or decision of the Governor of this State.To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law,or order,proclamation,guidance advice or decision of the Governor of this State,this permit shall not authorize such work and shall not be valid.The building official is authorized to prevent occupancy or use of a structure where in violation of this Code,any other City ordinances of this jurisdiction or any other ordinance or executive order of the City,or of any state or federal law,or of any order,proclamation,guidance advice or decision of the Governor.The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect,inaccurate or incomplete information,or in violation of any City ordinance,regulation or order,state or federal law,or any order,proclamation,guidance or decision of the Governor. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED.IBC110/IRC110. SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on your sales tax return form and coded City of Arlington#3101. DIM signed by Kayllyn Hamill DN:E=kM1amill@hermenson.com,CN=K Ylr Kaytlyn Hamill-.,t U='.-.,-,—'.,y'=Po". DC=berm soo,DC=local 0 2/0 7/2 0 2 4 02/07/2024 Date:-...., C=I.aoe•ao• Applicant Signature Date Building Official Date - CONDITIONS , Adhere to approved plans.Approved job copy shall be onsite for inspections.Call in for inspections. The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations.The property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or community.The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities before commencing construction.The property owner shall ensure that the construction project complies with all applicable design review requirements. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY.ANY CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS,SIDEWALKS,DRIVEWAYS, MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION. T PERMIT FEES Date Description Fee Amount 02/08/2024 Web Only-Mechanical Commercial Plan Review $480.12 02/08/2024 Credit Card Service $14.40 02/08/2024 Processing/Technology $25.00 02/08/2024 Boiler<100 BTU/h 3-15 hp $30.00 02/08/2024 Mechanical Base $25.00 Total Due: $574.52 Total Payment: $574.52 Balance Due: $0.00 CALL FOR INSPECTIONS Call by 3:30 pm for next day inspection,allow 48 hours for Fire Inspections When calling for an inspection please leave the following information: Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon INSPECTION INFORMATION I Pass/Fail i COMMERCIAL MECHANICAL APPLICATION • Community&Economic Development City of Arlington• 18204 59th Ave NE•Arlington,WA 98223 • Phone(360) 403-3551 This application is for new, addition, altered or replaced mechanical installation and new or altered gas piping and must be accompanied by ELECTRONIC CONSTRUCTION DRAWINGS and CUT SHEETS and/or information outlined in the MECHANICAL SUBMITTAL REQUIREMENTS,if applicable. Type of Permit: ❑ New Installation ❑ Addition ❑ Alteration 0 Replaced ❑ Gas Piping Type I and Type H Hood Systems required submittal of the Commercial Mechanical Addenda Property Address. 110 E 3rd St Project Valuation: 35000 Lot#: Parcel ID No.: 31051100100600 Preferred Contact: ❑ Owner O Contractor Project Description: Replace existing 1 M BTU Boiler with (2) 500K BTU Boilers. Owner Name: City of Arlington Office No.: Email Address: lgrindy@arlingtonwa.gov Cell No.: Mailing Address: City: State: Zip: Contractor Name: Hermanson Company Office No.: Email Address: khamill@hermanson.com Cell No.: (206) 775-6414 Mailing Address: 1221 2nd Ave N City: Kent State: WA Zip: 98032 L&I Contractor License Number: HERMACLO05BJ Expiration Date: 08/25/2024 • New gas piping requires a pressure test hooking to any appliance • Sediment traps (drips) are required on all gas lines • Gas lines are required to be supported/secured per IFGS,Section 415 • Proper Combustion air and venting required for all appliances • A shut-off valve is required within 6 feet of each appliance Gas Piping Specification and complete Schematic PAGE 3 O Not Applicable ❑ CSST ❑ Brass ❑ Other Proposed Piping Material: ❑ Black Steel ❑ Galvanized Steel Proposed Piping Size: ❑ 1/2" ❑ 5/8 ❑ 3/4" ❑ 1" ❑ 11/2 ❑ 2" Inlet Pressure: Pressure Drop: Specific Gravity: REV03.2022 Page 1 of 3 MECHANICAL PERMIT FEES (per unit Type of Fixture No. of Units Cost per Unit Subtotal Additional Plan Review fees x $ 75.00 = $ Air Cond.Unit<_100Btu h x $ 15.00 = $ Air Cond.Unit>100Btu h x $ 25.00 = $ Air Cond.Unit>50OBtu/hp x $ 50.00 = $ Air Handling Units x $ 15.00 = $ Base Mechanical Fee $ 25.00 $ 25.00 Boiler<100Btu/h>3hp 2 x $ 15.00 = $30 Boiler>1 million Btu/h<50hp x $ 25.00 = $ Boiler>1.5 million Btu/h<50hp x $ 50.00 = $ Boiler>100Btu h 3-15h x $ 15.00 = $ Boiler>500Btu h 15-30hp x $ 25.00 = $ Commercial Hoods-Type I x $ 25.00 = $ Commercial Hoods-Type II x $ 50.00 = $ Diffusers x $ 15.00 = $ Dryer Ducting x $ 15.00 = $ Ductwork(drawings required) x $ 25.00 = $ Evaporative Coolers x $ 15.00 = $ Exhaust/Ventilation Fans x $ 15.00 = $ Fireplace/Insert/Stove x $ 15.00 = $ Forced Air Heat<_100 Btu h x $ 15.00 = $ Forced Air Heat>100 Btu h x $ 25.00 = $ Gas Clothes Dryer x $ 15.00 = $ Gas Fired AC <_100 Btu/h x $ 15.00 = $ Gas Fired AC >100 Btu/h x $ 25.00 = $ Gas Fired AC > 500 Btu h x $ 50.00 = $ Gas Pi in <_ 5 units x $ 15.00 = $ Gas Piping> 5 units (plus <5 units x $ 2.00 = $ Heat Exchangers x $ 15.00 = $ Heat Pump-Condensing Unit x $ 25.00 = $ Hot Water Heat Coils x $ 15.00 = $ Miscellaneous Appliance-regulated by x $ 15.00 = $ mechanical code,not otherwise specified Pkg.Units 5100btu x $ 25.00 = $ Pkg.Units >100btu x $ 50.00 = $ Range/Cook top-Gas Fired x $ 15.00 = $ Refrigeration Unit<_100Btu h x $ 15.00 = $ Refrigeration Unit>100Btu h x $ 25.00 = $ Refrigeration Unit>500Btu h x $ 50.00 = $ Re-inspection fee (all) x $ 75.00 = $ Unit Heaters <_ 100 Btu h x $ 15.00 = $ Unit Heaters >100 Btu h x $ 25.00 = $ VAV Boxes (Variable Air Volume,part of air x $ 10.00 = $ conditioning system) Wall Heaters - Gas Fired x $ 25.00 = $ Water Heater- Gas Fired x $ 25.00 = $ Permit Fee $ Table 4-8; Plan Review Fee $ Processing/Technology Fee $25.00 Total $s0.00 REV2.2020 Page 2 of 3 PRESSURE PIPING SCHEMATIC COMPLETE FOR GAS PIPING ONLY ❑ SCHEMATIC IS TO SCALE ❑ SCHEMATIC NOT TO SCALE Show Pipe Size(s) and Length(s) from meter to all appliances NOTE: Any interior pressure regulators must be indicated I hereby certify that I am the El Owner, ❑Applicant, ElCon tractor,and authorized to sign this application and that the above information is correct and construction on,and the occupancy and the use of the above-described property will be in accordance with the laws,rules and regulation of the State of Washington,and the City of Arlington.A final inspection and approval shall be obtained when complete. DIgI EIlk signed O„Ka,l Ma., Kaytlyn Hamill DNE-knamlll�e,maso om N-kak,k amlll.D=SPD Kaytlyn Hamill 1/15/24 DU—a t—tU.,A �t,o �a,ma o��om y.DC-,o,p Signature Print Name Date REV2.2020 SAVE PRINT Page 3 of 3 MECHANICAL ABBREVIATIONS MECHANICAL LEGEND MECHANICAL GENERAL NOTES SHEET ND SHDRAWING INDEX EET TITLE CURRENT REVISION 1. WORK SHALL CONFORM TO APPLICABLE CODES AND REGULATIONS INCLUDING BUT NOT LIMITED TO THE 2018 IBC 2018 WSEC 2018 IMC AND MO.00 COVER SHEET-A AMPS IBC INTERNATIONAL BUILDING CODE 0"X10" RECT SUPPLY AIR DUCT SIMILAR YEAR WAC 296-104 BOILER RULES INCLUDING ALL WASHINGTON STATE OR AHJ SPECIFIC AMENDMENTS. Mo.011 SCHEDULES SHEEN VAC HVAC AC AIR CONDITIONING FGC INTERNATIONAL FUEL GAS CODE 0"X10" UP TOWARD Mo.02 CONSTRUCTION STANDARDS-HVAC Hermanson ACH AIR CHANGES PER HOUR CW INDUSTRIAL COLD WATER �X / 2. DO NOT SCALE DRAWINGS, DIMENSIONS GOVERN. DIMENSIONS ARE TO FACE OF STUD, CONCRETE, OR MASONRY UNO. ACT ACOUSTICAL CEILING TILE ID INSIDE DIAMETER DIMENSION Mo.o3 CONSTRUCTION STANDARDS-Hvnc AD ACCESS DOOR IF INVERT ELEVATION 10"X10° RECT SUPPLY AIR DUCT 3. LOCATION AND DETAILS OF EQUIPMENT, DUCT ROUTING, AND CONNECTIONS ARE APPROXIMATE. COORDINATE FINAL LOCATIONS WITH OTHER Mp3.o1 EN ARCED Rlpmc p LAN &DETAIL-Hvnc Building Today,Defining Tomorrow ADD'L ADDITIONAL IEER INTEGRATED ENERGY EFFICIENCY RATIO 0"X" DN AWAY TRADES. INSTALL IN ACCORDANCE WITH APPROVED SUBMITTALS AND DETAIL DRAWINGS WHEN APPLICABLE. AFF ABOVE FINISHED FLOOR IMC INTERNATIONAL MECHANICAL CODE / Hermanson Company LLP 4. VERIFY EXISTING CONDITIONS, DIMENSIONS, DETAILS, ETC. NOTIFY PROJECT ENGINEER OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH WORK. 1221 2nd Avenue North N NCHES 0"X10" Kent,Washington 98032 AFG ABOVE FINISHED GRADE RECT RETURN DUCT AHJ AUTHORITY HAVING JURISDICTION IN WG INCHES WATER GAUGE 10"X10" 5. WHEN CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF THE WORK, DETAILS SHALL BE THE SAME AS FOR OTHER SIMILAR Tel:(206)575-9700 AHU AIR HANDLING UNIT IPLV INTEGRATED PART LOAD VALUE �® UP/TOWARD WORK. IF ADDITIONAL QUESTIONS REMAIN, CONTACT THE PROJECT ENGINEER PRIOR TO PROCEEDING. Fax:(206)575-9800 AL/ALUM ALUMINUM KW KILOWATTS APN NUMBER www.hermanson.00m AMP/AMPS AMPERAGE AT LEAVING AIR TEMPERATURE 10"X 10" RECT RETURN DUCT 6. ALL STRUCTURAL OPENINGS AND PLATFORMS SHALL BE PROVIDED BY THE GENERAL CONTRACTOR UNO. Contractor Reg/:HERMACLO05BJ AP ACCESS PANEL LB/LBS POUND/POUNDS 10"X�© DN/AWAY 7. DUCT SEALING AND CONSTRUCTION TO MEET SMACNA AND ENERGY CODE REQUIREMENTS, UNO. REFER TO DUCT PRESSURE CLASS SCHEDULE 31051100100600 ARCH ARCHITECT LF/LIN FT LINEAL FOOT/FEET IN THIS DOCUMENT. BC BEADED COLLAR LP LOW PRESSURE 0"X10" RECT EXHAUST BDD BACKDRAFT DAMPER LPG LIQUID PROPANE GAS 0"X10 8. ALL CEILING DIFFUSERS ARE 4-WAY THROW UNLESS NOTED OTHERWISE. BE BELOW FLOOR PS LOW PRESSURE STEAM �I UP/TOWARD LEGAL DESCRIPTION BHP BRAKE HORSEPOWER VG LEAVING 9. ALL DUCT DIMENSIONS ARE OUTSIDE DIMENSIONS BEFORE SOUND LINING HAS BEEN ACCOUNTED FOR (ODSL, WITH SOUND LINING 0 1", UNO) 10"X10" RECT EXHAUST Section 11 Township 31 Range OS Quarter NE PAR B CITY ARL BLA REC AFN BLDG BUILDING LWA SOUND POWER RATING LEVEL (IN DB) 10. OUTSIDE AIR INTAKES ON ALL AIR HANDLING UNITS SHALL BE 10 FEET AWAY FROM ANY VENTS, STREETS, LOADING DOCK, NEIGHBORING LOT 201908155003 BEING A PTN OF NW 1 4 NE 1 4 SD SEC BOD BOTTOM OF DUCT LWG LOW WALL GRILLE 10"X10°© DN/AWAY LINES & FUEL BURNING EQUIPMENT OR 3 FEET BELOW / 25' ABOVE ANY CONTAMINANT SOURCE WITHIN 10 FEET. / / BOP BOTTOM OF PIPE WT LEAVING WATER TEMPERATURE ARLINGTON PD BOT BOTTOM MA MAKE-UP AIR 0"0 11. ALL AIR ECONOMIZERS SHALL BE CAPABLE OF THE FOLLOWING PER C403.5.1 & C403.5.5: BS BIRD SCREEN BLOCK STEEL MAX MAXIMUM -0% TO 100% OF THE DESIGN SUPPLY AIR WITH FAULT DETECTION & DIAGNOSTIC REPORTING. BTU BRITISH THERMAL UNIT MAX MAKE UP AIR UNIT 10"0 ROUND DUCT - UP/TOWARD -CONTROLLED BY A CONTROL SYSTEM DETERMINING IF THE OUTSIDE AIR CAN MEET PART OR ALL OF THE BUILDING COOLING LOADS. 110 E 3RD ST -INTEGRATED TO PROVIDE PARTIAL COOLING EVEN WHEN MECHANICAL COOLING IS REQUIRED. K kme 1 I `� ARLINGTON, WA 98223 BTUH BRITISH THERMAL UNITS PER HOUR MBH 1000 BRITISH THERMAL UNITS/HOUR CAP CAPACITY MCA MINIMUM CIRCUIT AMPACITY 0 12. OUTSIDE AIR INTAKE, RELIEF, AND EXHAUST OPENINGS SHALL BE EQUIPPED WITH MOTORIZED CLASS 1 LOW LEAK (<4 CFM/SF ® 1'WG) CBD CALIBRATED BALANCING DAMPER MD MOTORIZED DAMPER � 10'0 � ROUND DUCT - DN/AWAY DAMPERS OR GRAVITY PER EXCEPTIONS IN C403.7.8) DAMPERS WHICH CLOSE AUTOMATICALLY WHEN SYSTEM IS OFF OR UPON POWER FAILURE, } CC CONTROLS CONTRACTOR MFR MANUFACTURER �J UNO FOR SSMOKE CONTROL SYSTEM OPERATION CD CEILING DIFFUSER/CONDENSATE DRAIN MISC MISCELLANEOUS 2'X10"0 FLATOVAL DUCT - UP/ TOWARD 13. THE CONTROL SYSTEM SHALL MEET C403 AND BE PROGRAMMABLE, CAPABLE OF BEING SET FOR DIFFERENT DAY TYPES PER WEEK, DEADBAND 1 CDWR CONDENSER WATER RETURN MIN MINIMUM/MINUTE SETTING OF AT LEAST 5-F, BETWEEN THE HEATING AND COOLING SETPOINTS AND SETBACK TEMPERATURES WITH OPTIMAL START CONTROL. CDWS CONDENSER WATER SUPPLY MPS MEDIUM PRESSURE STEAM 2"X10"0 ii FLATOVAL DUCT - DN/ AWAY CONTROL SYSTEM SHALL INCLUDE A MICROPROCESSOR AND BE CAPABLE OF VARYING FLOWS AND RESETTING SUPPLY AIR & WATER TEMPERATURES BY REPRESENTATIVE BUILDING LOADS WHERE REQUIRED IN C403.4. OEM CUBIC FEET PER MINUTE MT MOUNT r` \_ CHWR CHILLED WATER RETURN MTD MOUNTED 14 WHERE Ha nark coin �ECIDOR CHWS CHILLED WATER SUPPLY MUA MAKE-UP AIR DUCT OVERLAP 90 DAYS O REQUIRED BY 1 03 O O F THE DATE OF SYSTEMAC RECORD DRAWINGS Q ACTUALF THE INSTALLATION SHALL E PROVIDED CEPTANCE PER HE ENERGY CODE. AN OP RATTING MANUALANDM E BUILDING AINTTENAANCE MANUALSHALL B WITHIN E cos-7n 10"0 o Qe9�°p wasg��Fy�� CLG CEILING MUW MAKE-UP WATER PROVIDED TO THE BUILDING OWNER. ALL HVAC SYSTEMS SHALL BE BALANCED AND A WRITTEN BALANCING REPORT SHALL BE PROVIDED TO THE Area COL COLUMN NA NOT APPLICABLE OWNER. HVAC CONTROL SYSTEMS SHALL BE TESTED TO ENSURE THAT THEY OPERATE IN ACCORDANCE WITH APPROVED PLANS. A PRELIMINARY a� ' CONC CONCRETE NO NORMALLY CLOSED/NOISE CRITERIA 10 0 BOOT TAP COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED PRIOR TO ISSUANCE OF A FINAL CERTIFICATE OF �II OCCUPANCY. A COMPLETE FINAL COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PROVIDED TO THE OWNER. - a149 COND CONDENSATE NG/NGAS NATURAL GAS 10"0 o CONN CONNECT/CONNECTED/CONNECTION NIC NOT IN CONTRACT 15. MECHANICAL SYSTEMS SHALL COMPLY WITH SEISMIC RESTRAINT REQUIREMENTS OF THE BUILDING CODE, SMACNA AND ASCE 7. ALL LIFE SAFETY __ s CONT CONTINUOUS/CONTINUATION NO NORMALLY OPEN/NUMBER OR HAZARDOUS MATERIAL RELATED SYSTEMS SHALL BE DEEMED AN Ip-1.5 FOR RESTRAINT METHODS OR AS NOTED ON THE DRAWINGS. REFER °Na'E CONTR CONTRACTOR NEW NON-POTABLE WATER 10"0 45' TAP TO CODES FOR INSTALLATION REQUIREMENTS AND EXCEPTIONS BASED ON SIZING, WEIGHTS AND MOUNTING HEIGHTS. - January 05,2024 COOED COORDINATE N-R NON-RESIDENTIAL 16. PROVIDE EARTHQUAKE RESTRAINTS FOR HVAC EQUIPMENT AS REQUIRED BY SMACNA SEISMIC RESTRAINT MANUAL, SEISMIC HAZARD B. WIRES FOR COP COEFFICIENT OF PERFORMANCE OA/OSA OUTSIDE AIR 10 0 0"0 CT COOLING TOWER OBD OPPOSED BLADE DAMPER VOLUME DAMPER CEILING SYSTEM ETC. SHALL NOT BE HUNG OFF HVAC EQUIPMENT OR HVAC EQUIPMENT SUPPORTS. _ 1 CU CUBIC/CONDENSER UNIT OD OUTSIDE DIAMETER/DIMENSION '1� 17, PROVIDE FIRE AND COMBINATION FIRE/SMOKE DAMPERS WHERE SHOWN ON PLANS AND WHERE REQUIRED PER CODE, AT 1-1/2 HR RATING CW DOMESTIC COLD WATER/CONDENSER WATER PCF POUNDS PER CUBIC FOOT 10 OT CALIBRATED BALANCING DAMPER UNO. DR DUCTBOARD/DRY BULB/DECIBEL PD PRESSURE DROP R/D 18. ALL PIPING PENETRATIONS THROUGH RATED ASSEMBLIES SHALL BE SEALED WITH AN ILL APPROVED FIRE CAULKING. ALL MATERIALS EXPOSED ISSUE FOR PERMIT CDC DIRECT DIGITAL CONTROL PH PHASE RISE(R) & DROP(D) WITHIN PLENUMS SHALL BE NON-COMBUSTIBLE OR SHALL BE UL LISTED AND LABELED FOR INSTALLATION IN PLENUMS OR AS HAVING A FLAME DEFL DEFLECTION POC POINT OF CONNECTION SPREAD INDEX S 25 AND A SMOKE-DEVELOPED INDEX OF S 50. M DEG DEGREE/DEGREES P/PRESS PRESSURE TRANSITION CIA DIAMETER PSI POUNDS PER SQUARE INCH 19. SMOKE DETECTORS PROVIDING AUTOMATIC SHUTDOWN SHALL BE PROVIDED IN THE RETURN AIR, PER MECH CODE, SUCH AS HVAC EQUIPMENT M niamipal Arington HighS ool9 Key Plan OMPR DAMPER PSIG POUNDS PER SQUARE INCH GAUGE DELIVERING (NOT EXHAUST) >2000 OEM (INCLUDING MULTIPLE UNITS DUCTED INTO COMMON DISTRIBUTION OR RETURN, WITH A TOTAL SUPPLY Airpo DN DOWN QTY QUANTITY TURNING VANES/SPLITTERS >2000 CFM) OR EACH STORY OF RETURN SYSTEMS OVER 15,000 OEM IN A MULTI-STORY INSTALLATION, NOT IN SYSTEMS SERVING SINGLE nwq' DOAS DEDICATED OUTSIDE AIR SYSTEM R/(R) RETURN GRILLE/RELOCATED/RETURN DUCT MOUNTED SMOKE DETECTOR ROOMS/SPACES. SMOKE DETECTORS SHALL BE PROVIDED BY EC, INSTALLED BY MC (WHEN IN DUCTWORK). POWER-WIRING AND INTERLOCK TO DWG DRAWING RA RETURN AIR FIRE ALARM SYSTEM BY ELECTRICAL CONTRACTOR AS APPLICABLE. VAV BOX (WITH FAN) SHUTDOWN CAN BE THROUGH CONTROLS SYSTEM. EXH EXHAUST RD/RND ROUND BACK DRAFT DAMPER 20. ARCHITECTURAL ACCESS PANELS SHALL BE PROVIDED AND INSTALLED BY GC AT ALL CONCEALED EQUIPMENT AND DEVICE LOCATIONS, UNO. EA EACH/EXHAUST AIR REF REFERENCE EAT ENTERING AIR TEMPERATURE REQ REQUIRED FLEXIBLE DUCT 21. ALL MOTOR STARTERS NOT SHOWN IN EQUIPMENT SCHEDULES SHALL BE FURNISHED AND INSTALLED BY ELECTRICAL CONTRACTOR. MOTOR VICINITY MAP EC EGGCRATE GRILLE/END CAP/ELEC CONTRACTOR RESID RESIDENTIAL AIR FLOW (DRAWN AIR) EFFICIENCIES TO MEET OR EXCEED ENERGY CODE C405.8 MINIMUM. EER ENERGY EFFICIENT RATING RE RELIEF �V> AIR FLOW (FORCED AIR) 22. FOR ALL "SEALED AIR TIGHT" OR PRESSURIZED SHAFTS/ROOMS AND PRESSURE/TEMPERATURE/HUMIDITY CONTROLLED ROOMS, THE FOLLOWING NO SCALE EF EXHAUST FAN RG REFRIGERANT DISCHARGE GAS SHALL OCCUR: 0 EFF EFFICIENCY RL REFRIGERANT LIQUID -USE CHAPTER 909 OF THE LATEST IBC FOR MAX ALLOWABLE LEAKAGE AREA, FOLLOWING THE GUIDELINES FOR TIGHT STAIR SHAFT EL ELEVATION RPM REVOLUTIONS PER MINUTE CONSTRUCTION. ELEC/ELECT ELECTRICAL/ELECTRIC RS REFRIGERANT SUCTION -ALL VERTICAL JOINTS, CORNERS AND WALL TRACKS (TOP AND BOTTOM) SHALL BE PROVIDED WITH A CONTINUOUS SEAL FOR THE LENGTH OF T _" �I EMCS ENERGY MANAGEMENT CONTROL SYSTEM S SUPPLY COMBINATION FSD THE JOINT (BY GC) _ FIRE DAMPER -ANY FLOOR DECKING PERPENDICULAR TO THE CONSTRUCTION SHALL BE CAULKED BY GC FILLING WITH ROCK WOOL IS NOT ACCEPTABLE. ENT ENTERING SA SUPPLY AIR SMOKE DAMPER -ANY PENETRATIONS OF THE CONSTRUCTION DUCTWORK, CONDUIT, PIPING ...1l SHALL BE SEALED ON BOTH SIDES fL EQUIP EQUIPMENT SAT SATURATION/SUPPLY AIR TEMPERATURE -ALL DOORS SHALL BE PROVIDED WITH TIGHT(FITTING GASKETS AND THRE�HOCD SWEEPS, AND OPEN AGAINST THE DIRECTION OF PRESSURE. _`1 _ ESP EXTERNAL STATIC PRESSURE SO SMOKE DETECTOR MOTOR OPERATED DAMPER S e q o -IN ADDITION TO ABOVE, ROOM ENVELOPE TO HAVE VAPOR BARRIER FOR HUMIDITY CONTROLLED ROOMS __-.;- EWT ENTERING WATER TEMPERATURE S/D SLIP & DRIVE CONNECTION oERR -ROOM ENVELOPE TO BE INSULATED (R-11 MIN) IF TEMPERATURE DIFFERENCE EXCEEDS 10-F TO ADJACENT AREAS " F EXIST/(E) EXISTING S-C SEATTLE - - CODE EXH EXHAUST SEER SEASONAL ENERGY EFFICIENCY RATING ACCESS DOORS 23. ALL ADHESIVES, SEALANTS, PAINTS AND COATINGS USED DURING THE INSTALLATION/FINISH WORK SHALL MEET THE LEED REQUIREMENTS FOR IEQ. a F FAHRENHEIT SENS SENSIBLE SOUND TRAP FAC FIRE ALARM CONTRACTOR SL SOUND LINED 24. MAXIMUM STANDARD LENGTH OF FLEXIBLE DUCT SHALL BE PER BUILDING STANDARDS OR 12' MAX; UP TO 25' MAXIMUM LENGTH IS ACCEPTABLE FLEX CONNECTION IF; FLEX DUCT ((UL-181 TESTED & NOT "CONNECTOR' IS USED, DUCT 0 IS INCREASED BY 1 NOMINAL SIZE & BENDS DO NOT EXCEED 235' T ReVISIOnS FD FIRE DAMPER SM SHEETME AL ____ TOTAL. REFER Tb INSTALLATION DETAILS FOR SUPPORT REQUIREMENTS. FLEXIBLE DUCT FLAME SPREAD RATING SHALL BE < 25 AND SMOKE 4 •! FDC FIRE DEPARTMENT CONNECTION SPEC SPECIFICATION i6"X16"ODSL ACOUSTICALLY LINED DUCT DEVELOPED RATING SHALL BE < 50. USE THERMAFLEX MODEL G-KM FOR LOW AND MEDIUM PRESSURE APPLICATIONS OR APPROVED EQUAL. FF FINISHED FLOOR SO SCREENED OPENING OD = OUTSIDE DIMENSIONS FIC FURNISHED AND INSTALLED BY CONTRACTOR SOO SLAB ON GRADE SL = SOUND LINING (THICKNESS) 25. ELECTRICAL METERING OF SYSTEMS AS REQUIRED BY ENERGY CODE SECTION C409 IS BY ELECTRICAL. THE ELECTRICAL DESIGN & CONTRACTOR FIB FURNISHED AND INSTALLED BY OWNER SP STATIC PRESSURE TEAM WILL FURNISH THE NECESSARY ELECTRICAL DISTRIBUTION AND METERING COMPONENTS - SEE ELECTRICAL DRAWINGS. THE MECHANICAL FLA FULL LOAD AMPS SF SQUARE FEET FABRIC DUCT CONTRACTOR WILL FURNISH A BUILDING MANAGEMENT SYSTEM CAPABLE OF COLLECTING AND STORING THE INFORMATION WITH A VISIBLE FLEX FLEXIBLE SS STAINLESS STEEL DISPLAY/NOTIFICATION READILY ACCESSIBLE TO OPERATION AND MANAGEMENT PERSONNEL AS REQUIRED. J - FLR FLOOR STRUC STRUCTURAL CLEARANCE� 26. THE PROJECT TEAM IS COLLECTIVELY RESPONSIBLE FOR COMPLIANCE WITH ENERGY CODE REQUIRED "RENEWABLE ENERGY SYSTEMS" AS WELL AS FOB FLAT ON BOTTOM TA TRANSFER AIR El AIR DIFFUSER C406 EFFICIENCY PACKAGES" AS APPLICABLE TO THE PROJECT AND AS COORDINATED DURING DESIGN WITH ENTIRE DESIGN/CONSTRUCTION ° t'I FOIC FURNISHED BY OTHERS, TEMP TEMPERATURE/TEMPORARY (WITH CORE BLANKOFF/ROTATE) TEAM. i,. - INSTALLED BY CONTRACTOR TBD TO BE DETERMINED FOS FLAT ON SIDE TOD TOP OF DUCT ® CEILING EXHAUST AIR GRILLE - FOT FLAT ON TOP TOS TOP OF STEEL/TOP OF SLAB �iai f FP FIRE PROTECTION TOT TOTAL CEILING RETURN OR TRANSFER - FPM FEET PER MINUTE TSP TOTAL STATIC PRESSURE AIR GRILLE FSAE FIRE SERVICE ACCESS ELEVATOR TSTAT THERMOSTAT o SLOTTED DIFFUSER (PLAN VIEW) FSD FIRE/SMOKE DAMPER TYR TYPICAL AREA OF WORK - FT FOOT/FEET UH UNIT HEATER REVISION CLOUD & TRIANGLE FUT FUTURE UNO UNLESS NOTED OTHERWISE ##0 ROUND DUCT SYMBOL FV FACE VELOCITY V VOLT ##X#H0 FLATOVAL DEGREES SYMBOL SYMBOL SITE MAP G GRILLE VA VENTILATION AIR N# - GA GAUGE/GALLON VD VOLUME DAMPER S POINT OF CONNECTION NO SCALE _01/05/24 WSS ISSUE FOR PERMIT GALV GALVANIZED VEL VELOCITY CD1-100 GRID TAG IDENTIFIER = TYPE-CFM No. Date By Description GC GENERAL CONTRACTOR VERT VERTICAL 8"0 SIZE GPM GALLONS PER MINUTE VFD VARIABLE FREQUENCY DRIVE T T'STAT/TEMP SENSOR Co CARBON DIOXIDE SENSOR GRIDGRILLE/REGISTER/DIFFUSER VOL VOLUME H HUMIDITY SENSOR GWB GYPSUM WALL BOARD W WRAPPED DUCT Design Team HD HEAD WE WET BULB SD SMOKE DETECTOR CO CARBON MONOXIDE SENSOR HORIZ HORIZONTAL WG WATER GAUGE HP HORSEPOWER/HIGH PRESSURE W/ WITH SP STATIC PRESSURE SENSOR Design HR HOUR W/0 WITHOUT ®C OCCUPANCY SENSOR NITROGEN DIOXIDE SENSOR Drawn DPM HSPF HEATING SEASONAL PERFORMANCE FACTOR W/SF WATTS PER SQUARE FOOT HT HEIGHT WAC WASHINGTON ADMINISTRATIVE CODE Checked DTN HWTG HIGH WALL TRANSFER GRILLE WSEC WASHINGTON STATE ENERGY CODE EXISTING DUCTWORK HWR HOT WATER RETURN Pre Construction Number 14-23-23985 HWS HOT WATER SUPPLY DEMO DUCTWORK HX HEAT EXCHANGER �I WALL-MOUNTED GRILLE Construction Number HZ HERTZ PIPE ELBOW UP Issue Date 01/05/24 a PIPE ELBOW ON DIRECTION OF FLOW t t DIRECTION OF SLOPE DOWN �] PLUG OR CAP t ��t PRESS REDUCING ASSEMBLY COVER SHEET t SOLENOID VALVE PUMP - HVAC 2-CHWS/CHWR-5 CHILLED WATER SUPPLY/RETURN zRL/IRS--S REFRIGERANT LIQUID/SUCTION NG NATURAL GAS LPG LIQUID PROPANE GAS 2-CDWS/CDWR-S CONDENSER WATER SUPPLY/RETURN -HWS/HWR--S HEATING WATER SUPPLY/RETURN FOR CITY USE CO CONDENSATE w O e o 0 �FOV� FUEL OIL VENT -FOS/FOR- FUEL OIL SUPPLY/RETURN I\V/I zRDG REFRIGERANT DISCHARGE GAS PUMP SCHEDULE - DEMO LAST UPDATED 010424 UNIT AREA BASIS OF INDOOR/ OPER. SHUT-OFF CONSTR ENERGY ELECTRICAL WEIGHT TAG LOCATION SERVED DESIGN TYPE CONFIG GPM OUTDOOR HEAD(FT) HEAD(FT) PRESS(PSI)RATING(ER) RPM BHP HP V/PH LBS REMARKS ; HWP-1 MECH RM214 HWS B&G1531 END SUCTION PARALLEL 42 INDOOR 35.0 - 150 - 1750 0.53 1.00 4603 - 1 Hermanson HWP-2 MECH RM 214 HWS B&G 1531 END SUCTION PARALLEL 42 INDOOR 35.0 150 1,110 0.13 1.00 460 3 1 HWP-3 MECH RM 214 BOILER B&G 60 IN-LINE CENT. SINGLE 70 INDOOR 25.0 - 150 - 1,750 0.62 1.00 460/3 - 1 Building Today,Defining Tomorrow GENERAL ALL TRADES TO CONFIRM EQUIPMENT REQUIREMENTS(ELECTRICAL,WEIGHT,SIZE,ETC...)WITH APPROVED SUBMITTALS PRIOR TO INSTALLATION;FIELD COORDINATE FINAL LOCATION& INSTALL PER MANUFACTURERS REQUIREMENTS Hermanson Company LLP 1 DEMO 1221 2nd Avenue North Kent,Washington 911032 Tel:(206)575-9700 Fax(206)575-9800 GAS HOT WATER BOILER SCHEDULE - DEMO LAST UPDATED: 01/04/24 www.hermansoson.com UNIT BASIS OF INPUT OUTPUT NG EWT LWT ELECTRICAL FLUE SIZE WEIGHT Contractor Reg/:HERMACLO05BJ TAG LOCATION SERVES DESIGN MBH MBH CONN °F °F GPM FLA V/PH INCHES LBS REMARKS B-1 MECH RM I HYD HEAT P-KTHERMIFICNM-1000 1,000 1 850 1 1" 1 150 180 57 - 120/1 1 12" 750 1 1 GENERAL ALL TRADES TO CONFIRM EQUIPMENIT REQUIREMENTS(ELECTRICAL,WEIGHT,SIZE,ETC...)WITH APPROVED SUBMITTALS PRIOR TO INSTALLATION;FIELD COORDINATE FINAL LOCATION& INSTALL PER MANUFACTURERS REQUIREMENTS 1 DEMO PUMP SCHEDULE LAST UPDATED 010424 ARLINGTON PD UNIT AREA BASIS OF INDOOR/ OPER. SHUT-OFF CONSTR ENERGY ELECTRICAL WEIGHT TAG LOCATION SERVED DESIGN TYPE CONFIG GPM OUTDOOR H FAD(FT) HFAD(FT) PRESS(PSI)RATING(ER) RPM BHP HP V/PH LBS REMARKS 110 E 3RD ST HWP-1 MECH RM 214 BOILER B&G E-1531 END SUCTION PARALLEL 42 INDOOR 35.0 37.3 150 53 1,613 0.58 1.00 460/3 110 1-7 ARLINGTON, WA 98223 HWP-2 MECH RM 214 BOILER B&G E-1531 END SUCTION PARALLEL 42 INDOOR 35.0 37.3 150 53 1,613 0.58 1.00 460/3 110 1-7 HWP-3A MECH RM 214 BOILER B&G PL-45 IN-LINE CENT. SINGLE 33 INDOOR 15.0 32.0 150 3,300 1/6 115/1 15 1-3 6 HWP-3B MECH RM 214 BOILER B&G PL-45 IN-LINE CENT. SINGLE 33 INDOOR 15.0 32.0 150 3,300 1 6 115 1 15 1-3 6 GENERAL ALL TRADES TO CONFIRM EQUIPMENT REQUIREMENTS(ELECTRICAL,WEIGHT,SIZE,ETC...)WITH APPROVED SUBMITTALS PRIOR TO INSTALLATION;FIELD COORDINATE FINAL LOCATION& INSTALL PER MANUFACTURERS REQUIREMENTS 1 ELECTRICAL CONTRACTOR TO PROVIDE SCCR PROTECTION DIRECTION FOR EQUIPMENT AS REQUIRED BY LATEST APPROVED VERSION OF THE NATIONAL ELECTRICAL CODE,PRIOR TO ORDER. MANUFACTURER TO PROVIDE SCCR LISTING(65 KAIC MINIMUM OR PER ELECTRICAL CONTRACTOR CALCULATION)INSIDE CONTROL PANEL AS REQUIRED BY NATIONAL ELECTRICAL CODE. �gODOR 2 DISCONNECT AND MOTOR STARTED BY ELECTRICAL CONTRACTOR �9�FWAsg�NFy 3 PROVIDE WITH P&T TAPS,DP GAUGE ACROSS PUMP. MOTOR TO BE TEFC FOR OUTDOOR INSTALLATIONS. 4 PUMPS INSTALLED IN PARALLEL OPERATING CONFIGURATION,PROVIDE NON-OVERLOADING MOTORS AND SIZE TO ACCOMODATE SINGLE PUMP OPERATING CONDITION O 2 5 PUMP TO BE MOUNTED ON 4"MIN CONCRETE PAD(BY GC)WITH SEISMIC RATED SPRING ISOLATORS;PROVIDE FULLY GROUTED FRAME UNDER PUMP FOR MASS AND MOTOR SHAFT ALIGNMENT 6 PROVIDE WORKING PRESSURE RATING OF 150 PSI 7 CLEAN WATER PUMP BETWEEN 1 TO 200 HP,PROVIDE ENERGY RATING(ER)SHOWING COMPLIANCE WITH DOE REGULATIONS 361�o�,E�" TONAL E GAS HOT WATER BOILER SCHEDULE LAST UPDATED: 01/04/24 January 05,2024 UNIT BASIS OF INPUT OUTPUTtNGEWT LWT ELECTRICAL tINCHES WEIGHT TAG LOCATION SERVES DESIGN MBH MBH °F °F GPM FLA V/PH LBS REMARKS B-01 MECHRM HYD HEAT LOCHINVAR FTX500 500 489 150 180 33 15 120/1 460 1,2,3,4,5,6,7,8 B-02 MECH RM HYD HEAT LOCHINVARFTX500 500 489 150 180 33 15 120/1 460 1,2,3,4,5,6,7,8 GENERAL ALL TRADES TO CONFIRM EQUIPMENT REQUIREMENTS(ELECTRICAL,WEIGHT,SIZE,ETC...)WITH APPROVED SUBMITTALS PRIOR TO INSTALLATION;FIELD COORDINATE FINAL LOCATION& ISSUE FOR PERMIT INSTALL PER MANUFACTURERS REQUIREMENTS 1 ELECTRICAL CONTRACTOR TO PROVIDE SCCR PROTECTION DIRECTION FOR EQUIPMENT AS REQUIRED BY LATEST APPROVED VERSION OF THE NATIONAL ELECTRICAL CODE,PRIOR TO ORDER. MANUFACTURER TO PROVIDE SCCR LISTING(65 KAIC MINIMUM OR PER ELECTRICAL CONTRACTOR CALCULATION)INSIDE CONTROL PANEL AS REQUIRED BY NATIONAL ELECTRICAL CODE. 2 DISCONNECT AS REQUIRED BY ELECTRICAL CONTRACTOR Key Plan 3 PROVIDE INTEGRAL PUMP AND THREE WAY VALVES INTERNAL TO UNIT 4 REQUIRES MECHANICAL ROOM WITH HEAT TO PREVENT FREEZING OF THE CONDENSATE BY GC 5 UL LABELED. PROVIDE WITH HIGH HOT WATER TEMP AND MANUAL PROBE LOW WATER LIMIT AND BOILER DRAFT FAILURE CUT OUTS, FLOW SWITCH,ON/OFF CONTROL VIA NEW DDC CONTROL SYSTEM&INTERNAL UNIT CONTROLS 6 CONDENSING STYLE @ 88%MINIMUM EFFICIENCY(8%HIGHER THAN CODE)AND 50°ENTERING WATER CONDITIONS 7 PROVIDE WITH CONDENSATE NEUTRALIZATION KIT AND PIPE TO DRAIN 8 IF MULTIPLE BOILERS ARE INSTALLED,PROVIDE ISOLATION VALVES TO ISOLATE FLOW THROUGH INACTIVE BOILERS(BY CC) Revisions _01/05/24 WSS ISSUE FOR PERMIT No. Date By Description Design Team Design WSS Drawn DPM Checked DTN Pre Construction Number 14-23-23985 Construction Number Issue Date 01/05/24 SCHEDULES SHEET - HVAC FOR CITY USE M0 .01 VIBRATION ISOLATION / SEISMIC SCHEDULE LAST UPDATED: 01/04/24 H e r m a n s o n UNIT BASIS OF DEFL BASE SEISMIC TAG SERVES DESIGN' INCH TYPE RESTRAINT REMARKS NA BOILERS KNC RSP 0.125 WEDGE ANCHOR 10 12 14 15 Building Today,Defining Tomorrow NA BASE MOUNTED PUMPS KNC FHS 1 2 or 4 CIB WEDGE ANCHOR 8 10 14 15 NA CHILLED HYDRONIC OR CONDENSER WATER PIPE KNC SH 1 CABLE RESTRAINT 5 8 9 15 Hermanson Company LP NA NATURAL GAS PIPING CABLE RESTRAINT 15 16 1221 2nd Avenue North NA DUCTWORK - - CABLE RESTRAINT 5 8 15 Kent,Washington 98032 Tel:(206)575-9700 GENERAL ALL TRADES TO CONFIRM EQUIPMENT REQUIREMENTS(ELECTRICAL,WEIGHT,SIZE,ETC...)WITH APPROVED SUBMITTALS Fax:(206)575-9800 PRIOR TO INSTALLATION;FIELD COORDINATE FINAL LOCATION&INSTALL PER MANUFACTURERS REQUIREMENTS www.hermanson.00m NOTE: CTB=COOLING TOWER BASE,CIB=CONCRETE INERTIA BASE Contractor Reg/:HERMACLO05BJ 1 OR EQUAL ISOLATION(ISAT,MASON,VIBRACOUSTICS OR AS APPROVED),CONFIRM INSTALL METHOD WITH FIELD PRIOR TO ORDER 2 SEISMIC RATED CURB/ISOLATOR 3 USE HEIGHT SAVING BRACKETS FOR SPRING ISOLATORS 4 INTERNAL ISOLATION PROVIDED INTEGRAL WITH UNIT 5 PROVIDE FLEXIBLE HOSES FOR PIPING CONNECTIONS AT UNIT 6 WHERE DESIGNATED AS REQUIRED BY DESIGN ENGINEER BASED ON UNIT MOUNTING LOCATION IN ACOUSTICALLY/VIBRATIONALLY SENSATIVE AREAS 7 LAG BOLT(WOOD)OR WEDGE ANCHOR(CONCRETE)TO CONCRETE PAD WITH NEOPRENE GROMMET IF NON-SEISMIC RATED ISOLATOR USED 8 CONFIRM EQUIPMENT RPM,REFER TO"REQUIRED DEFLECTION BASED ON RPM"SPREADSHEET TO DETEREMINE PROPER DEFLECTION AR L I N GTO N P D 9 THREE SPRING HANGERS FROM ROTATING EQUIPMENT CONNECTIONS 10 SEISMIC RESTRAINT AS REQUIRED BY CODE AND/OR LOCAL AUTHORITY HAVING JURISDICTION OR PER SMACNA GUIDELINES *SUSPENDED EQUIP WITH IP=1.0 AND>20LBS REQUIRES SEISMIC BRACING-IF THE COMPONENT/EQUIPMENT IS RIGIDLY ATTACHED TO THE DUCT AND THE DUCT IS BRACED,THEN NO ADDITIONAL ST SEISMIC IS REQ'D.COMPONENTS/EQUIP>75LBS REQUIRE INDEPENDENT VERTICAL SUPPORTS AND SEISMIC BRACING.EQUIP WITH IP=1.5 AND<20LBS AND FLEXIBLY CONNECTED MAY BE OMITTED ARUNGTON,110E 3RD RD ST 11 FLOOR STAND PROVIDED BY MECHANICAL CONTRACTOR 98223 12 4"MINIMUM(CONFIRM WITH STRUCTURAL ENGINEER BASED ON EQUIPMENT WEIGHT AND EMBED ANCHOR DEPTH REQ'D)CONCRETE HOUSEKEEPING PAD INSTALLED UNDER UNIT BY GC 13 FOR UNITS THAT ARE GREATER THAN 2 HP IN SIZE 14 PROVIDE 1.5X'S UNIT WEIGHT IN CONCRETE BELOW UNIT AND MAXIMUM OF 1/8"DEFLECTION ACROSS LENGTH OF UNIT BY GC 15 DEFLECTION AS REQUIRED PER ASHRAE APPLICATIONS,CHAPTER 48 BASED ON STRUCTURE ITEM WILL BE SUPPORTED FROM(VERIFY PRIOR TO ORDER) 16 COMPONENT IMPORTANCE FACTOR(Ip=1.5) 17 PROVIDE SEISMIC RATED SPRING ISOLATION IF LOCATED OVER ACOUSTICALLY SENSATIVE(IE.RESIDENTIAL)SPACES TO ACCOMMODATE TESTING DO PIPING MATERIAL SCHEDULE WAS LAST UPDATED: 03/04/24 ��O op wasq��Fy PIPE SERVICE LOCATION I MATERIAL JOINT METHOD(S) REMARKS NATURAL/LPG GAS LOW PRESSURE(7"WC TO 2 PSI) - l A53 BLACK STEEL ERW SCH 40, THREADED(52"),MEGAPRESS-G, p ABOVE GROUND GRADE B WELDED IN SHAFTS&>2-1 2" Ip=1.5;WRAPPED OR COATED FOR EXTERIOR LOGQTIONS 36149 CORRUGATED STAINLESS STEEL Ip=1.5;INCREASE SIZE AR REQUIRED VERSUS SCHEDULE 40 TO ABOVE GROUND TUBING MECHANICAL ACCOMMODATE INCREASED PRESSURE DROP �oNa3,E ' A53 BLACK STEEL ERW SCH 40, January 05,2024 UNDERGROUND GRADE B MEGAPRESS-G,WELDED Ip=1.5;REQ'D WATERPROOF COATING UNDERGROUND PE MECHANICAL OR BUTT FUSED I 1.5 HEATING HOT WATER UNDERGROUND DUCTILE IRON GROOVED OR FLANGED UNDERGROUND BS ERW SCH 40 WELDED OR GROOVED ABOVEGROUND COPPER(L) GROOVED,PRESSFIT(<2"),OR SOLDER ISSUE FOR PERMIT A53 BS ERW SCH 40,GRADE B(510"1, WELDED(>>-10"),GROOVED(2 ABOVE GROUND A53 BS ERW STD,GRADE B(�12") 1/2"TO B").MEGAPRESS 02 BARRIER REQ'D;INCREASE ONE NOMINAL PIPE SIZE OVER COPPER. Key Plan ABOVE GROUND PEX-A PEX FLARE JOINT PROTECT IF IN RA PLENUM IF NOT 25/50 FLAME SPREAD/SMOKE DEV RATED, CONFIRM PRESSURE RATING VS SERVICE TEMP WITH 15%SAFETY MIN. COIL CONDENSATE ABOVE GROUND PVC SCH 40 SOLVENT CEMENTED IF NOT IN A RA PLENUM SOLID CORE NOT FOAM MFG INSTALL INSTRUCTIONS MUST BE FOLLOWED,MUST BE LISTED AND ABOVE GROUND CPVC(1/2"TO 2") CPVC CEMENT LABELED FOR USE IN RETURN AIR PLENUMS,AND PROVIDE FIELD APPLIED LABEL ON PIPE NOTING"PLENUM RATED" ABOVE GROUND COPPER(DWV) SOLDER ABOVEGROUND COPPER(LOR M) PRESSFIT(<_21,SOLDER(>>-2 1 2" HEAT TRACE EXPOSED OUTDOORS, HEAT TRACE(BY EC)AND INSULATE PIPE WHERE TRACED. 120V POWER NEAR GARAGE ENTRY NA NA REQUIRED(BY EC),CONFIRM AMP DRAW REQUIREMENT WITH MANUFACTURER. SELF REGULATING,STYLE WITH TEMP CONTROLLER. SALMON SAFE JACKET TO PREVENT ZINC OR COPPER LEACHING INTO STORM SYSTEM, ABOVE GROUND COPPER,ZINC BASED PIPING NA PAINT OR PROVIDE NON ZINC BASED PIPING SUPPORTS ON EXTERIOR OF BUILDING NOTE: BOLD&UNDERLINE REPRESENTS THE HERMANSON CORPORATE STANDARD MATERIAL AND JOINT METHOD FOR FACH SERVICE TYPE Revisions MINIMUM PIPE INSULATION LAST UPDATED: 08/07/23 FLUID DESIGN INSULATION CONDUCTIVITY NOMINAL PIPE DIAMETER INCH OPERATING CONDUCTIVITY MEAN TEMP 1 TO 1-1/2 TO 4 TO TEMP°F RANGE RATING°F d' <1-1/29 <4 <8 >_8 HEATING SYSTEMS'(STEAM,CONDENSATE,HYDRONIC HOT WATER) >350 0.32-0.34 250 4.5 5.0 5.0 5.0 1 5.0 251-350 0."'31 200 3.0 4.0 IS 4.5 4.5 201-250 0.27-0.30 150 2.5 2.5 2.5 3.0 3.0 141-200 0.25-0.29 1 125 1.5 1 1.5 2.0 2.0 2.0 105-140 0.21-0.28 1 100 1.0 1 1.0 1.5 1.5 1.5 DOMESTIC HOT WATERS DOMESTIC HOT WATER RECIRCULATION' _ NA 0.21-0.28 100 1 0.5 0.75 s 1.0 1.25 s 1.5 2.0 s 2.0 2.0 DOMESTIC COLD WATERS;HORIZONTAL RAIN LEADERS&CONDENSATE PIPE TO MAIN VERTICAL RISER CONDENSATION PREVENTION ONLY - NA 0.21-0.27 75 0.5 0.5 0.5 0.5 0.5 COOLING SYSTEMS' CHILLED WATER BRINE AND WATERSIDE ECONOMIZER SYSTEMS - 40-60 0.21-0.27 75 0.5 0.5 1 1.0 1.0 1.0 <40 0.20-0.26 75 0.5 1.0 1.0 1.0 1.5 REFRIGERANT PIPING(SEATTLE ONLY) - IN COND SPACE 0.21-0.26 75 0.5 0.5 0.5 0.5 0.5 OUT COND SPACE 0.21-0.26 75 1.0 1.0 1.0 1.0 1.0 -01/05/24 WSS ISSUE FOR PERMIT UNLINED No. Date By Description STORAGE TANKS ALL SIZES R-12.56 NOTES: GENERAL ALL PIPING EXPOSED TO WEATHER TO BE PROTECTED FROM SUNLIGHT,MOISTURE,WIND AND MAINTENANCE DAMAGE AND SHIELDED FROM SOLAR DEGREDATION,ADHESIVE TAPES ARE NOT ALLOWED Design Team 1 NOT REQUIRED FOR STRAINERS,CONTROL VALVES&BALANCING VALVES ASSOCIATED WITH PIPING 1"OR LESS IN DIA. Design WSS 2 TYPICAL CONDENSER WATER PIPE IN NON-ECONOMIZER SYSTEMS IS NOT INSULATED 3 SEE R403 FOR RESIDENTIAL INSTALLATIONS 4 FOR PIPING SMALLER THAN 1-1/2 INCH AND LOCATED IN PARTITIONS WITHIN CONDITIONED SPACES,REDUCTION OF Drawn DPM INSULATION THICKNESSES BY 1 INCH SHALL BE PERMITTED,BUT NOT TO A THICKNESS OF LESS THAN 1 INCH Checked DTN 5 DOMESTIC HOT WATER PIPE INSULATION SHALL HAVE A MINIMUM WALL THICKNESS OF NOT LESS THAN THE DIAMETER OF THE PIPE FOR PIPE UP TO 2 INCHES IN DIAMETER.INSULATION WALL THICKNESS SHALL NOT BE LESS THAN 2 INCHES Pre Construction Number 14-23-23985 FOR A PIPE OF 2 INCHES OR MORE IN DIAMETER,NOTE THAT THIS IS PER UPC SECTION 609.11.2.IN JURISDICTIONS THAT REQUIRE DOMESTIC HOT WATER PIPING TO BE INSULATED PER THE ENERGY CODE,USE THE 105-140 ROW Construction Number FROM HEATING SYSTEMS ABOVE. 6 SEATTLE ONLY:UNFIRED TANKS USED TO STORE WATER AT TEMPERATURES ABOVE 130,F SHALL INCLUDE A Issue Date 01/05/24 MINIMUM OF R-2 ADDITIONAL INSULATION FOR EVERY 10°F INCREASE IN STORED WATER TEMPERATURE OVER 130°F. 7 SEATTLE ONLY:FOR HEATED WATER CIRCULATION SYSTEMS,BOTH SUPPLY AND RETURN PIPE INSULATION SHALL BE AT MINIMUM 1 INCH THICKER THAN ROW 105-140 FROM HEATING SYSTEMS,ABOVE,EXCEPT WHERE PIPING IS CENTERED WITHIN A FRAMING CAVITY 4"DEEPER THAN THE PIPE THAT IS COMPLETELY FILLED WITH BATT OR BLOW IN INSULATION. CONSTRUCTION STANDARDS - HVAC FOR CITY USE M0 .02 TABLE 305.4 PIPING SUPPORTSPACINGR ,UCT CONSTRUCTION STANDARDSSTANDARD INSERT METHODS ' PIPING MATERIAL HORIZONTAL VERTICAL •UCT CONSTRUCTION STANDARDS 1 NEW AND EXISTING CONDITIONS OHermans1t MAXIMUM MAXIMUM SPACING(feet) SPACING(feet) Hermanson ABS pipe 4 10` Building Today,Defining Tomorrow Aluminum pipe and tubing 10 15 PLUMBING AND PIPING HARDWARE REQUIRED HARDWARE REQUIRED HARDWARE REQUIRED HARDWARE REQUIRED ♦BANGER INSERT ♦MIN14JNDERCUT INSERT •BANGER INSERT •WEDGE ANCHOR BOLT Hermanson Company UP Cast-iron pipe' 5 15 HANGER MATRIX BY PIPE MATERIAL •BABLEOLT WITH H90*WASHERELET END 6CABLEBOLT I H90*ERELET END •THREADED ROD THRTA R EAIN.DED DO RODOUPLING 12212nd Avenue North WAS Copper or copper-alloy pipe 12 10 ♦ ♦ Tel:(2os)575 Washington700 98032 _ Fax:(206)575-9800 Copper or copper-alloy tubing 8 10 Schedule 40/80/Standard:Threaded,Buttwelded,Socket Welded,Grooved v www.hermanson.com CPVC pipe or tubing,1 inch Contractor eg/ ERMACLO05B7 and smaller =_/_'° •/_ . s/e ---- -- - g. CPVC pipe or tubing,1'/4 inches '/° and larger 4 10` Lead pipe Continuous 4 Pipe Material:Steel Pipe Conditions:High Temperature Systems PB pipe or tubing 2Z/3(32 inches) 4 Schedule 40/80/Standard:Threaded,Buttwelded,Socket Welded,Grooved PE-RTI inch and smaller 2%(32inches) 10` Pip, HARDWARE REQUIRED HARDWARE REQUIRED HARDWARE REQUIRED HARDWARE REQUIRED ARLINGTON PD al/=^-r' awl: r3/a •CABLE WITH REBAR OR ♦WEDGE ANCHOR BOLT ♦DEWALT 109 INSERT ♦WEDGE ANCHOR BOLT PERT 1'/4 inches and larger 4 10` 3-Y-4" alwir 12 afee oG TOGGLE END ♦CABLE WITH Si EYELET END ♦ROD COUPLING AND NUT •NUT AND ROD COUPLING PEX tubing 1 1RCh and smaller 2Z/3(32 inches) 10` Bonerclwi, s/a •NUT AND WASHER •THREADED ROD •THREADED ROD BeBerawr 3/4 110 E 3RD ST PEX tubing 1'/°inches and larger 4 10` R. I-C " r16 - - zr z4 zoiee,oc s. ,6. 6f�ar ARLINGTON, WA 98223 Polypropylene(PP)pipe or 22/ (32 inches) 10` Pipe tubing,1 inch and smaller a Na-Hub Polypropylene(PP)pipe or tubing,l'/°inches and larger 4 10 3/e o.o.g.rsomcuuee.esl a.. z/: o.c. z• lm6d PVC pipe 4 10` 6/e a.r.o f--p x'rrnmce.Rlie,l 11 Zvi: a/• O.C.uz•—c PIi.r,l r1. I.C.uz°from 1-plic,l ��gODORN e•-1o" eieet Steel tubing 8 IO ""' `-in z F o.a.uz•fr..,r°.oe.e,l � . . . . J�9 oY wasq�N 9 Steel pipe 1 12 15 HARDWARE REQUIRED HARDWARE REQUIRED HARDWARE REQUIRED "ROD For Sl:1 inch-25.4 mm,1 foot-304.8 min. ♦BEAM CLAMP CABLE WITH LOOP END ♦BEAM CLAMP Solvent Weld,Threaded ♦CABLE WITH 90`EYELET END ♦THREADED ROD a.See Section 301.18. •BOLT AND WASHER ♦NUT ♦NUT ,p 361499 O �, b.The maximum horizontal spacing of cast-iron pipe hangers shall be Em - ' increased to 10 feet where 10-foot lengths of pipe are installed. '-'//r- _""'' 3/R `vr0NAL Ems' s z c.Mid-story said.. s/e January 05,2024 Pressed,Soldered,Grooved 3"-1-,., aevls.—P 318 BRM O.C. _-1,t"-_" alwl,4,4oR 3,6 6f«aC. ISSUE FOR PERMIT Y3/P-3" awi, 1/3 16 feet U.C. 4"-6" Clwis 1/= 10 f•M a.c. 8' clwir s/B 16 feMO.G w'P-H-MAT Key Plan Revisions _01/05/24 WSS ISSUE FOR PERMIT No. Date By Description Design Team Design WSS Drawn DPM Checked DTN Pre Construction Number 14-23-23985 Construction Number Issue Date 01/05/24 CONSTRUCTION STANDARDS - HVAC FOR CITY USE M0 .03 Hermanson Building Today,Defining Tomorrow A B A B Hermanson Company LlP 1221 2nd Avenue North Kent,Washington 98032 Tel:(206)575-9700 Fax:(206)575-9800 www.hermanson.00m Contractor Reg/:HERMACLO05BJ BOILER EMERGENCY BOILER EMERGENCY SHUT-OFF SWITCH SHUT-OFF SWITCH (RELOCATE SWITCH TO OUTSIDE OF ROOM TO COMPLY WITH CSD-1 ---- - - -I - - - - - - - - - - - - - - - - -i - - - - - - - - - - - - DOC WORKSTATION DDC WORKSTATION Lill ARLINGTON PD 110 E 3RD ST uH 2 uH z ARLINGTON, WA 98223 3"FD-B,W/TP 3"FD-B,W/TP GWH-1 3"FD-B,W/TP 3"FD-B,W/TP GWH-1 HOT WATER HEATING COIL HOT WATER HEATING COIL RE-CONNECT TO EXISTING AHU-2 AHU-2 PIPING AND UTILNIES. c� 1 -------- MODIFY AS REO'D. DX COOLING COIL o HWS a DX COOLING COIL HWR ________ FILTER SECTION �� VSD FILTER SECTION55— �� HWS VSD 2'V ON 2'V ON �geoDOR�� O 2'V UP-VTR U 2'V UP-VIR e9�OY WAS,� FIYIP-1 } 2"HWS c� 2"HWS O 2 _2 f 2"HWR DN 2"HWR DN 1 RHG M 1 RHG HWP-1 ET- RE1 se149 RLL RLL HWP_2 C �OnISTEt�Oc�' ��SSS/ONAL E ' AIR AIR January 05,2024 SEPARATOR SEPARATOR SF_1 3"FD-B,W/TP SF-1 3"FD-B,W/TP q"RPBA 1'"RPBA yle 4"CW ON 4"VTR-SEE MANUALS FOR '1"CW ON MANUFACTURER'S MATERIAL B 1 B-02 RECOMMENDATION(TYP 2) 1/2"COND WITH NEUTRALIZATION ---- - - -� - - - - - - - _ _ - - - - - - - - - _ NWP KIT TO DRAIN. ISSUE FOR PERMIT B-1 HWP-38 RE-CONNECT TO EXISTING PIPING AND UTILITIES.MODIFY AS REO'D. 21�"GAS DN 21�"GAS DN SEE INSTALAL FOR DETAILS.UNIITT40TO MBE IINSTALLLED Key Plan IN PARALLEL AREA OF WORK a � 2ND FLOOR ENLARGED DEMO PIPING PLAN - HVAC 2ND FLOOR ENLARGED PIPING PLAN - HVAC SCALE: 1/4"= 1'-0" SCALE: 1/4"- 1'-0" Revisions NOTE: GAS REGULATOR SPRING ISOLATING TRIPLE DUTY VALVES BUTTERFLY VALVE SENSOR WELL FOR CONTROLS PIPE HANGERS WITHIN ARE ACCEPABLE HANGER MAX.OF 4X'S MAIN PIPE 0 20'-0"(TYP) ALTERNATE WITH MEMORY STOP # AND FLOW SWITCH(BY GC) MINIMUM 5 PIPE ISOLATORS TO PAD HYDRONIC MAIN ,I�" GAS SHUTOFF VALVE DIAMETERS STRAIGHT SILENT CHECK VALVE — PIPE ON PUMP INLET PRESSURE GAUGE T HANGER THERMOMETER(TYP) FLUE TO OUTSIDE OSHA APPROVED BUTTERFLY VALVE OF BUILDING COUPLING GUARD �C/ RELIEF VALVE — SUPPORT MOTOR AS REQUIRED PIPE REDUCER PIPED FULL SIZE (AS REQUIRED) BALL VALVE(TYP) TO DRAIN — PST TAPS(TYP) FLEX CONN.(TYP) STRAINER —01/05/24 WSS ISSUE FOR PERMIT II SUCTION DIFFUSER WITH PST TAP(TYP) No. Date By Description • STRAINER(PERMANENT GAS BOILER STRAINER ONLY;REMOVE SENSOR WELLS FOR SILENT CHECK STRAINER FINE MESH STRAINER CONTROLS(TYR) VALVE AS REQ'D WITHIN 48 HRS.OF SYSTEM PRESSURE I I BALL VALVE STARTUP) (TYR) J I� PAD(BY EEPGC) g GAUGE TYP Y HOUSEKEEPING Desi n Team WITH HOSE ADAPTOR CHECK VALVE Design WSS Drawn DPM DRAIN TO FLOOR DRAIN(NOT O ` STORM/ROOF DRAIN)THRU REFER TO VIBRATION BALL VALVE WITH ISOLATION SCHEDULE Checked DTN HOSE ADAPTOR CONDENSATE NEUTRALIZER KIT FOR ISOLATION CONCENTRIC REDUCER(TYR) PIPE SUPPORT UNION(TYR) REQUIREMENTS CONCRETE INERTIA SENSOR WELL FOR CONTROLS Pre Construction Number 14-23-23985 BUTTERFLY OR BALL VALVE BASE IF NOT INSTALLED SEISMIC SPRING (FLOW SWITCH) WITH MEMORY STOP(TYR) AT GRADE IN MECH RM. ISOLATORS AS PER NOTES: Construction Number HOUSEKEEPING PAD BY GC, EQUIPMENT SCHEDULE. 1.INSTALL STRAINER AT UNIT IF NOT INSTALLED AT DISTRIBUTION PUMP. VERIFY MINIMUM PAD BOLT ISOLATORS TO PAD 2.PUMP MAY BE PROVIDED INTEGRAL WITH BOILER-REFER TO EQUIPMENT SCHEDULE. Issue Date 01/05/24 TTOAC SS ACCOMMODATE ALL SIZE ISOLATOR BASE MOUNTED END SUCTION TO AC0LT EMBEDMENT, EDGE CONDENSING GAS BOILER DETAIL TYPICAL IN-LINE CENTRIFUGAL PUMP DETAIL BOLT EMBEDMENT,EDGE n CENTRIFUGAL PUMP DETAIL n DISTANCE AND SPACING PER MP3.01 M�� NOT TO SCALE IBC M�J NOT TO SCALE NOT TO SCALE ENLARGED PIPING PLANS - HVAC FOR CITY USE 1 3' 5' 0' 15' 25' M P 3 .01 SCALE: ;"=1' 2' 4' 3 c wl 0 ~ t z N P¢Qo h w w E 3 0 5 a o LU O C W CQ LLJ z U O N Oo O S w C N cn 01-1 WE2 a. w\ = ■ ry CoI I I I I I I I old � : � $ O `o Qcn a a m z. u ¢ xEd Qom " _ CL Ai o � o w o U ZZ p p ao W Z o o ^ ¢ G ¢ N LL J ow oa �m E �- J AM 0 lu- LLI �rB =o w 222ABU '- £ Y z o 5 J o z =} w } Lu L,.i w m. .. V 3 N o ? r0 j �� N Z os wawU Z � m � o dNwa oU Wo Q- g 2 W w O¢J 3 ~- H N g2VUg Z O Z r N w W Lv0 W g W O¢ 4NZ w O 4 w Up O rQ.W U vi 3� � mmo� wcii 3 � d � �� � � � w � N UwgW o O U O N ® O d �3 OZ� ZJ�dO� JZ m WZ Q¢NZ} N g ri W U d Z ¢UNQ V X�W N WN U m OR wU� O¢O L'-� JQ O x vlQ 00Z-N S ¢ O WQO �' O.' Z = W ¢ 2�¢�Z ¢� N QS ¢F--mN 2 N H 2 o co Wz 31-3 cvN4 .¢3 p ¢ \ >¢�ZJ ¢ r o z rp,n� W 3 U w 0 ? w Z NO 4' ZJWNUO N N x W¢O V U O Z p 2 OZN4 Z- (n\ Z ¢ J Z JO \� Wes. =m�F-2 WS S Q(Y NI=-N g I¢- Vl H VW w Q Vl 2 NCZ'J O J�W� =O p U UO w¢¢ mgQOCWJO dp g ¢ JN U ��U _U O _ N O O ONmO N V ¢¢ N 0 Z v� 4�} WWNW JH (n W 6g sgN3S m = �Z zo w w m = 3dW- z3Z oz�xwa K¢x 4� UOZ�W..z o f/1 W� Q 44J Z --Y 1- 0 t/jZ 1- ON -Wwr >gU30W N:Z § O VZ UZ Ym W W U Z vJ w HW g Zm O -- K00WUm E - Z - f § g�0 0 d m p ¢ U OZO¢ J 4 ¢ O -'C¢.J NU'. w O K� NZ I.�H4. 4QZU -� O'mO Q 2 tis 0123U O. Q 2. Z w0 Q OZ O UW o w o44 5�m¢ o �v o = OJ U J K w N J. O U K O U O N z K W ¢ 2 WO mJd�N2 C.7VJWQL-�li Y X.Z�W' �WO� Wp NU U,•� U3 O4¢ J?m NN O w0 ¢ 3 W C § NW �NF- � �V tw'U � 4i¢ } rJW U 0 FW- Z� ZOO J wW ZZ�O J �g4 �� � �� 4'02Z� N w F- � .NZ¢OO Z mod. z ¢w ¢ OUO ? _ >� ~� �¢ r-� ic3 0 }"_' u'wa� �� NCY.�� zc�3zgw mzi N� 3 JV �go=N o z vmwzo ow N �o�w mw¢¢ wo J ox o oW o0 U z ¢ ¢¢ W oq� Zm o? �� W�� Nw z xo 0 3z cJ ¢ w o n wUw z Ow ZUz Ow Z¢ 9Un4 00 W-Z !-Q¢Fi 0 NNW g Q J �U �� Q NNU fnoZZ UI- �O N QZ W 20 W W gOQ VIm- g? ���Z �gU� TZ m LLI W W3 c7 ~� Z m �Z .'30Zo �¢ OwZQN) Fd-OQd QNWOE O�Z ¢O cZc �Z= ~ F- N w W w4 Z Z -W >O N ORW O- �W J gm3 ¢ Z d ¢ .=OZ - ZZJ3 U J4 W� �Z ¢ Z4 U CCW 2 ¢OZ p�¢S 4 V0 QZOZ QLJZ24U g�Z m> O WQ p�Z�O U w N w N m SOW Q N�W4 OtrwW SO W W w O N Z �d U�wJ �S 4dmp HOS¢~m0 K 110 OS Z JW mpgQm m K O J4rwp Z Zrw� U�OwQ (n ZZCD Up ZW m U 3 Z. �> �O�U dS �Li <- QUm=JOR.. �o p NJ ONUz> Ow J 0. L�] 0 2=ZWw w �IN-g v (n2 LLI ZZ 4 dr W 0 �Vm dHFN-Q w3 JNV= �ZO- -Jg Z J m ZN ZQ U W Wi S Z �Q UO2 LLIN mU 24.JWxN K m UZ m�t� 00 'W. 6 N= ¢ W m ONIQY F=- m gGj OQQg F- J OQ d OU( p O2 W ~O - UWOU m� dZW� HW J�NIw- F-�W Kw LW� Q QJ3 Z m¢ Z 4 g�0�w OwSZ� ¢¢w0 NQ S Smclz m m4^mU Z �g O VON�a d22� C}7�WQ o UU¢ dg U �w d Z p �Q\ OJWw (2/)O Cu'JOQS CN,2E, -, NOd r� 3k NJO ¢�Wp� Z �� \ O O ��O¢W O mN-g ZmN ZO Ud oZ,,3 Z wc-,O �mU WU WSW Ngpwpd ¢ SO N QOZCJ> Ow Jz X WKm.� W Z �Z ZN W ZF m N W NO wWZ3 UN m^ �¢ON 3W 4 X gQ W JNO Z O Ust X Y 8FZW� N W }N ¢ H J_ OU J U W m Hm S�2W ZI\ W �Q �4KUZK Q4 m�Z 3 V N0¢ U U V�Qi--• = � mpW W w QU Z� g Z z Z ~3g� WMO m¢ZQUO mwNN¢U N-12Z O �Op �OL'-la 4' > ZW N w�WSZ N NW4� w C) �O wZ w F-� p 30 N O O =W 04'WU OUo ZWIrU LYZ¢I-WZ �N¢ w0 W Q�d ��}.wO K �O B oO J HZ=-g 2 UZN� KUUO NJ �� pQ [/j OV W O W zr•J J}QZ NZ� ¢ Oo OUP-Sm20 2�r >U O Om0 NZNm� 11 4 N_ w d 00_�W ¢ pOKr �ZF- Qm U O z Z O g o mJ o sO¢ W pwUJ �W ow Nn _FWw 2� g ��>w> UvK¢z m Q� m 3 rU2p� JUOw OwUg� NU Wd4W0 XQO U�gm. U¢QQg 3�W �_ \ Q�LJ ~�=N OU J wZ N H Z S rJ O N QQ O Q FF-� m� O Z- N ZW F- w 2 ¢ON 006 Sig �N5 OW a O �2 cJW ¢ ZW N Q ¢W - W3 W WK 4 Z Q O F- VN J WF-� W¢W �gKN40 m - =Vw O KNJ UJ Z 2W g KN O 3 N �W WZmF- �WFW- WWWI> U�ZN U g00' �� E- O �OwpU N 3-~ 4m w OU ¢Z ZZ F= I ¢d m�JQ QXN g Od KN3 gw¢J OF�-K ZO Z OZg QOOF-� J pW W wV�gO Z w0 V WtNnmd ¢ G OQ _ NV ¢ _ �. O J- JN00. wy J Z O}OwtiZ LJL�Z �Z 0 =ZN U/�?-yWy--U v=iw O w2K�z n¢- -w-.w �w _ Uw O 2 wp z ¢ff- N fY W = W�W mUW N NWT'- JKO rJ ¢ I- Q Z �WJ Z O -K=W SWCm Nw¢J O^ W W U w QO' 2�Z0 _WJ SL�ZW OWZNO ¢JH W¢ Z Nmp �k-�pW H S U aLi �m N (r.� - pN 3 Q¢ O O< R U N ZO OZ ��¢d wj0 W¢N¢24' Y¢m�Ug grQ YVU- U Q=N a�UQQOm W EM ZU ZJQO QW Z Hm gOmO HAWJgm mOW WZOKO H�Z �W CNN NWWNW U -m ¢ O�ULULI�=04 O g zJ OoUm BOO o~r� K�ODU¢ NO�O �W � Wow � ro x w oJw �� JQNW UZ ¢ U�^ N W'dH V- OY�iJKO S> N ZZ W Ow ¢Op J Qw UO&� Q �ON¢H¢ U�r SOUQW U�Z pZ�N� U 4'W HUSK WZ��Op W N�Wp 4 J�Z UW .1� O FW Z]C N 4N= U O w� Q6�Ow Ww0 OZ�W W¢QwVI� QNO OZ aZ WwON¢ C OW OWN JO}}�mg 2 g 4'd 0-U\ 0 o. o c� T _g z ¢oQ tty� NN oc�rz- Na F-LZ �o> g� Sg2c> >- % L�L Y og x �� dJv�zJwzzJzO ¢ mJJJ>> r 5 µ1GJI�<d Og O JK W SO J �r CD �QZ SOW SOd'30U U4'O -W �Z JF-a g �04' Jtwi OS Od�¢QQ J X ..O LJ JL<�L�ON 1��.1..1 3N O F- > 33 ¢ Oz d ¢ OJ Q 000 F-NUV- 30>d000 moF aU 42 d3N NO/��li d dW WN ¢ AHD WV-UO F-Ur •-- cV r7 4 L6 c0 N CD Oi O. N M f0 I� Oi. O N iA 10 � Z OCD �W Z fwn z V IW N w Z W O w d' w ¢ W W ^ I N m - X Z = Z 3 3 < C. o o _ 1 Z oN W F- K O ZII O O U O g }.O 4 � Ow OdW Z �C) .4.i F'- Jm O m m O w w JN U I-U U U U Z 4 g W O W g w O Q Z p W V N O Q m g H J W N N d ��Z W g Z O } V W ¢go0 F-O Z- Z �NO CJ U �. J NO UW (U }U O N p Q H Z¢ (n J� U N Z IW/10 Z l'` /Z�) O y. 00 U J J Z Z N N U U 4 m W W O U O OW4' (nmV W m m O !r O O N Um Z O �Fai O 2 Z L�N W W J N Q om . ¢ O O K Q p O z � Z � ��.W.. �WO� UOW JN Z U �W S W � U pN U O o U � F- m 00 0 4 �r 4 d � Z d S 2 W W X W p V r= O W O W U W N W W W a w J33 OU�N� QOLJi, UrO O O �J = 00 > ¢ZO¢ wd g m oo O Z p Z N U zz w 3 Q 3¢ od x} „l ¢ �r x¢ x> o o > ¢ o o a4 x U ¢ w �J o 0 0 >Nz N m J Q U U W O L'-1 ¢ U J O O �.. 0 3 0 3 0 3 0 0 > > d ? r N JC, ¢ 0 0 o mm ago N NJJ�N3 N¢ �3 ¢ w3 w¢ ¢ ¢ 0 F- a w ¢ - c� U\ U\ U\ U\ U\ U\ p o] 4J Z U U WWLi � II ZU� NZOKZ Z WwUV NZ4U��OQ ZQOO U. Z O O H N U 0>W F- O g O O O w V w4 wz w4 wz wa wz o 0 5 5 m o fn o ¢ N w o ¢ J�� m �o Z o5w o� z N g aa���v w 7:i JJK rco W W o m v > c� F- F- o m W¢Q w U O ¢ J ?� W W- W W J g-W Z ¢Z W W W ¢O N W U Nv U U¢N d' Iwo d U o. N X W d OOS W d 0' 000 W z w oN w m 3 d a m O 4 d N 4 U 4'z J U 2 U- O.S . wo o cc z n. n � � r r 00 .00 00 P. ®.@ s ® ® � a � �W o z =r � ro3 f o � xx xx ec xx xxOd\�Zp\p 00 00 00 oo ooNZ IgNO p) u DID 3�:of� O F- 2 N ®® CD U O Cx_JU O U w Zw }¢ > W F- W� g W � J Q 4'z0 Z Z F- r O O N N m U¢wz wz o ¢ L1. N m ww0 d O r L� ¢ W o O d w g U w ¢d F- O g a,g W Z W W U Z Z ¢ U W d' O ¢g }2 c70 ¢L�. Z 4 gg N Z =� go O 2 � O ¢ w O w } w /!1 O 3 O C7 U ;�J U N ~J '� F=W¢W w O F-Z Q O 4'm V O O W O 0} Z W g W O W r Z Z W V/ \2 r �i1 f- Z d � W \ J \ F- ¢¢ w 2- U w 4 p 4 N 2 U W- m w o O W g U K g N W w O FS-H g w O K w N U Z 3¢ w wF-2 a Z O O \ N O W 2 4 O 0 0 Z.� H z ~ 4' O d g Q Z Sdd'NF-N W JO �w 1- O W UO NN j OJdN OF- W ..0 \� \ n. O W O. =Om ¢QUCj¢>W¢ W a ~ZH�a O W C1�'J H �2�0�OZw d¢mUNF-OJw Z W�U W 0 W Q a W ? W N Q Z W /_� =ONON 3 ¢¢ ¢N- W- ¢3U ¢.Z �ZFWF---� W W JO V C�W yN¢¢�FFI�-�Iw- Lei. O OQQOJ¢ <W¢0 `�WNQ OON 4'N OJ3 rUOFZgd J}UO j¢OQ OdW W4d yy.V4 IJ Z_¢HO �HLLiON dF- F--Z OD O �00 ZZ mHKZNN 40-WQ 4a'V 4¢V OSOmgNQ gg �W W J¢V JO W W W N O NNV_-ZZ W OZ W W d-W 1- W¢J-J (¢j W ZC (/) W Q N mJ W W�m W W W 2 W V O> W did j?3 j LJg ��W U=OZZ d �Z N NOpN NZZ2�a''Z�IY O W U' C.?SUJ J�W 4, I ZO mOgLi Z O W r W K W w OJ W L;zJUN W W OO JJg Q2 ZZ_ 3 3 3 Y X Y oo g O Z D O O Y Y H K g l O-Z O O W 2- K O d 4 Y w 4 Z O Z 4 m ¢¢d'U r w r F 0 0 l O d W O N 2 2 1-r�zz!-4�Ow¢Zw20¢ OLioN w li L�a4=04 N N��w`�LVi. Sx F•-F•-oN>r-F-Uc�i�`'-'�oz000L�ooL� ¢ oZo N?woo¢¢oo¢00000a�o�xo�oo���.,oWwwwwW�.,w»rQg�L�. w¢wo��:�SQo���w00000i�}zzowoww¢o��¢�'_¢¢¢ ZZ ZZZZ ZZ2Z YJd J JJ J JNJ Jg .-figs�g��gg Z ZZZ ZZ20¢Q004d /W U. J Z CQ7 N W Z Li V - W V m g p C,N F-4 H 4 V Jd't7 J O N U W c�c73 w� 'zJ3¢�JJa.aaj3d¢om���U-a��»4UC\J-Od41 ¢mOU O20\NN�\QOww mW WUJdN QO\ (WWJ�4004W N=dWm000NN SZ ¢p.WWWO �y� mLiU�ww�ZZa Y_] gg�gggggggg g gg 2 Z ZZ Z ZZ0004ddd O_d6_O�K��d'4'�KKd'�N N NNN N N N N N NN N N N F-F-I-I-F-f-F-F- LMLI � � �»»»»>33333333 W Q J Q o U r o Z U - Z U N Z Z Ldi T O J o W ¢� W W W W w w O Z O O W Z O mm >Q W W N d W 4 W O O g p N U C ¢� U W O J W N O J �J W K Uh. ti\\J !- Z V N W Z U W W C.7 SU VJ 1 _]ZZ rOd'NZ m� 0 W m� d iil ZQ V F- w g U O H¢ N W LWiO d d 4' �, W �Z WVUZ w 3 F- m Z 4 w O O O K g d 4 \¢¢ Z N Q¢W Z O U ¢H J W J 0 o d g O O g O U ¢ N d W OV w W Z JKJ W H J- V F--W O W O O�¢d J o N o 3 3 a w o 0 3 0 -z w d ¢r c� g o z z g K m}w a�'z w o zo z N \ o zoN o SSSc� Sow oa. z�� \ w o¢ N -U -w J N N}}z Z 1. L i W W W l i 4' ¢¢ F--C,J N W I_O V\H V V -V 4.Q J Q N 3 F'- O Q¢d O m O W U W U J W Q ~ Q ZC¢J�JZz Cog W pd..r OJO 00 W SS W N.�W W�i3�i- W¢\=O F--ZI-Z O V Z W ¢¢ 1.�L�T H -g 4 0 m O m NI- -Y�- O J��aU¢ LyI Ww ca cJ �rF- w Or¢w o tr-oo o x ww Uz¢goz w� ¢ p >�yL� J ¢W NOU�WOSgW w20YlyYOZ��gN2x�m�UQQ wUU U=U�Z1-�Ktwi�U WmUI-'-IK�d ZU Z2\��C}��U QH Ufa����WQO�CE�Vxl c2nU�4'O VS-]¢00 a4(n�\�>�W¢KOW� Od Z=.��3WN W 3 W-0 0 0 N N 0 Z U Z ¢¢a¢aa¢¢a¢¢¢¢¢mUmmmmmmmmmcdii��cw��mc2ii�cw000000WOW�00000wow00000w�w"zc�azx ��zzoxzxx¢���z»>��3oZ55 �� oo���c¢a�cwac����xoo=xxxo�= W W w W W W W W w- g � v d' 4' J N \N 4 N xF- �WC.7 \4 U o dooar »do 33�33coJzzzzzoa c.JWC9 a ¢cox W wU��4r�2 U U W�mc� Nti �W¢o F- gom. d or�N UUU mOli W.2S Jga a'VOW=JOOOfnF-1-¢m UOOmL�S2J o o 0000001-03mpW W<gZ03XQ<UWiiWJJg ZCYN3XX QppL�U-gJ J00 000_d NN O d¢Vd 4'3004�NI-i33XN Q Q¢¢¢¢Q 4¢¢d¢¢¢m m m m m m m m m m m U U US U U U U U U U U U U U U U U U V U O O m W d¢ L�L.�w L i L i L�� gut 7 U' V U' 2 2=2 2 x 2=2 S x O C W N N r CA LJ� K n 41 N LU N N th Z N k�4 6SOS W 3 O a O = O °2 C om UJ W cJ 3 n c o 'F p LL Z a L x 33333 Z �Z b� YQ COY m q z 1 C C Chu' N- VJ I I I OI� p G U ci 1 1� � = a `=' IIIIiIIIIIIIZ _ 28cn m e t e o m O O U d Q. a i C'f N N df cif Z N °� zz ¢.1 z0 O OLd (7 a Q"S vi ZO 0ua pQ 0 ul o � !pqcx7 m oo�w ~ 08 Q a m"S Q Q N N Q w Q z LL d 8 8- fi o� u '-0 y vv w w > ��"•"' w �lu w w a a r J J z ¢ u J = sss Z W = z 8 = sg� � �o W = o o o GZ o oOru9 o Ga QQ w O Gj> of 3 8 w> wm000 9 H 9 wmoo 9 Jm �z S �o ...an.. � N z w z wu znn O O w F� . - ;; N rQ S.-i Q Z Z Za Vj IA f^ aQ FU . n n V f V w 0 O Ir ' Z w M M 5 0� 9 U >w Vvw O0 aO aa� c a� ZpQ 4 Q�J m Q Q 12 O 0 ( u 17,. R W LL o00 W LL o000 > �j v vpo[ = W gg 00 Z O M ui M N 0 O O MM.�i.�-� �J Oa d w �8 O� O W W o ���s x oo 1a0 g x �o a30 x c'e o x Y.I 8 o Q,RQ G W o 0 000o G 9b Iog z W� 0� saa 3 ^J^ a vo J o 88188 3 zoo a u 0 3 c7 O 1 Z o z-z u. ✓ ° r z o zzzz �z, �2� f ° + vQ� >m z = G G _ .� 'Z Opz 8 �Z w� w F W p we gQ t w8 m 7 V I� N � Z W I v tM•t M .wN-.` d �� f 7 Z = = N 9 U w 3 7zM O O GI z z0 n _ N o o�ow cv o z z n 0 z 3 a WrL � 0 0 �V�//�� W�ou o� 2o9 .W.1 Ilb Wv�,wo 0 TT Z Z F V/ z Z Z LL w Z�V v H ,w S m V i i Q. � d �x WQN{A w ZK Wwg �x W C ~ 8z"" r' U dd 3 li dm.� 3. a. Odd >i Off+ F-o� t9 dm 3 OaLL z O V J ��m w5w o �xv r 1 zOJ a� oo� S J ° ` zz�� 6 000P= W o �io w dy fy _ wZ eC �f ,dG a k' bb O r o b d. P, bbu�'i og �z3 Z F o� "+ xa> > 7 w ... nx o w } 77 ww Z- OOP. OL U m O Z Q Q JC7 Z M c�i Z M ZIQ o F ug zz zz oF-O z v'z O oo� W oo� " c� (n z� ^ � o Q�xo° o ww? o ti ww�� wuQu¢ .:pw bubJ,~z.,wd pal--O 0' F W E E O iWi � F �� �md,n�d ada min°-�O�Ow Owy z LL Z 0ZZ 7Z LL MM �7 ZOU N d N 0zLL LL Z(�)U• J>~Q❑V O Q Z M M$ d W Q <.7 V a W 0 Z In N a W U Z J 0 C•1 (� Qr W(-)v }F Q (n C7 "�'.�"(7 9w W Wd' O ww as �H2pw V"Z"UO o .�z,W fflm d` 3 any �a 0ocv you mQ�zc�� 20? �w 3 r °a o ro zil m F a m o mmm 55n'0�� zo m °° � -1 z�� 4;xx52,o a Y n. K-ROOE QOd�!g a i2g V W F3.S0.Jz w 7 ��oWQdw, ww W C 0`�r2Ex-f!wz aW 0 �oGa ��w owF '�mz0xz z o & _ v ~ £� ocK�z� f �>� pz=3 �" Mr r ws oa o•� N ug 000R �i f�pQwd.d��O�N� u� � 3`3n zx �G u, �",! aJuJ ab wF-QnQ.owm Q �xx ��i � ,fJ3u zQ IL Q d' LLQ K di tiH"a�-a LL Q�d OF W m w IL Q�d RQ w w@1p Q W S=Q Z LL 4 W M Z LL Q W Q O�O Z< 0 f"i" F d � W� � Z IL�OOP U 0 O {nn ¢] O Z. \�� M= o¢ m w m OD 00¢z-z a w E 2' N _ Z Z~ a O O O cvv °� o� avvv °�nzo.<i fz� o�ow{�;Wu�S �Gixm O N N N EB d 0 �� N N N N W 4 I=-LL�t;-- O ZO - _`� Z 3 a F FFSa N S a r 2:x 0 8VzwZow TT QoQ CCJJ zwu'nr�3'nw.,. oK K O K iaQ.Z 0�1-03 + ~¢ LTS.. K JK LLZ OK m v�zaw ucxiu ��� o� ~vQ�x ocxiuucxi -<wbw=05`R' —8z .w Oww t <���5�gozo� J W W W Z w J �z w J W W W W Z J Q�fOi'��C� Y.S f � . ff� J..o Q".o fx ".w�Sa SRdd u Q ¢4w x 8 a 0u m' Oz .+ z Q 0 � w �� w - PM4 w ��mm w 3 O ~ 3 z N � 3 0 a o Z C g= o Q� o� = N N O rn R ~ e8 ~ Q Q ann c Z �z ���b 4� L.LLLJ Y a N Z E Q 5 z= 0 0 a �LL cn o a Z. O cn o I I I z o o cti a c4 o z w U) to U K O LL K OZ ao ovioo�n o O Z O O ur oLn Lno Z Z p� -AI I/1 R M N.-� fV O ti ti .ti p II--xx Z O FZ O. u UUWap� > .,0 o w z o zN `o`�° "a a z viQ zo �F.,gWx p 0 , oinOOLn oz u� oo Ino C7 �xF-w�-.W n_ �.�. a x� V ui vrrirJ�o z Q~u�0°r1x w� � W g z zopza$u+. LLwzu'i gO - o o ...uZZSovxi l08 M Q7W W NO In N O Yf ,U vl O O V 1 O W F W Z Y U O� V tri RN N- W p jQ h W W O. W O Wa 1A .ti.a O.y F•W UG $u YYN('W o Q.ZZQ ern}� Z OF ' OOIn ut O ti of Nvl O t(�O OZ Qti Zp 7i Ill d'N.- - > �Z Z w1 d x I'- ti v O ry O }O.-i O.-i j I,ll Z W _ 0 w m a Z O ham' Fx- C N N LL I- IK ti F~.,a.Z-i W iZi W Y in Z 1n o w>{af.N.. W.IIy�Wr�Q w O m Q w F V 1.R 1 N.y ti O V z O O 6.4 W O ~a x t Z O w w O V a' f W c � � Om¢s WSL �uiw �o- oa�o ' O O~you Z ao x pQ �gv=�=�� Wgc7� F u o W z 05u1y a N v=i wZ a F-w 0 Zo o OWO y O of Yf Ltf ut{�f ry�ry W�w�9U6Z mN6'�i lyjN Z~�U Z ^Z^ 3 F' ao� w 3ga�aWaPo�ala--owu tnp f-.. py z W F z oo3�FYil�=N�ga�ox� a $ _ m Qg=ao F zz•t NOO+co� oD p I� aN�O�b en 6 Op�� F-OLLw(7}K Y-Hg W M M M N N N N N N N N N N Z�N F'O p � gQo$gg454� 4�4344 �44 -s8z2cozx'd.'o-FQ zpz-3z � ZQ MNN NN O N=N�N NFNN zEd 'OZ2I!,aV mo x O,O— z 00000 a . -a 0�00 ¢ av= t`faag�=Q�x��`J�` ?`�W. O I- z w x to apl-a�o,�f F's¢xF"'-'Ffo Z u u a a u z Yazd°z�uWWi°�pooLLo��ggmac`�uo '9mow zf wO M N N R $ n� �B4wt000a FZi O m WAvNV I� $Z Zz o w $ m�~.. c ? o o 8 o O zO w i 3 � m L M F3 C a N coO � 8�i 1l•1L N C� � o N a N � Z_ Nh M RE o a 3 0 0 o O E ro PO O �G �� fn j " co CL C C N U U Q c4 co 1 ; , € � M= e�U 0" E " "" Z �� °�Ib�, 40 O Y I I I I I I IIm .� z E U) a = CO G LU Q a z z �2 0 ° U c o o r 110 W F U O P ileum S3uz i _� ai �k a gr j e o 44t Wow LU C9 oc �. F n 0 .7 FFF vi C� W pj� Wi d � OCar3 C�z Kg�3 gill ;;� ;0 CIO Gfm� Ile 1 H � ow 2,2,0 bA a9i �a y,c Z H 4 O U U U U G U fozo f�. ~ fiN U �^ E J aCO IL N N O C G Q= O4 U II �w F!A d IL EL ?? c oo ' o c a° m w uh w w o A o? > Q Q U U U U U tO �7 0. 0. 0. a o, a a a v, n ,� �;.a i o F— M c 0 ^ w N ° N � o FArn z �`��aio �� LU 3 wcu E 3 o m b 0 Z LU Sig CY) W � d N z' Wa � a = c Q m o t $ �Z mAl 21 1 1 - o o� F56 LL t5spo Ro 499 0---- - ----- - — _ _— - - - -----� Z10 w ooQp�Q N V' OJ O aZa J YY 1'2Z J ° sNF W LLo spa °� U f enn g o OLU = KNLLC W M Lu 8 a y N z 0,0 J 0 w OLL m -r- - y Q LPL a °W Z =3 Z N N / 0. fn ai ZU' W �2 OLL ZO Q g yr pr, 0.r ¢> J LL 7 W Z f 0 o y G W �O 08 LLJ ��yiw > MLL 0 m F <n 0 z 0 m 3 0 a j W CIL 2 y ml r] U 02~Qt�/ 0. 3 m ° z Z iV III I J •II Z �c CO a � wwN pQ J Lij O } w a�j�y a'_Z LL W 6 Q - } W O G LL W Z�m O K OR J W �� z oaO== a c�i=�U)0 �w w tt� °wa o zww W4za aN gOQ.. w 5 w� � W�� a mm Z 33 ay w z °' Oo�N W m3 3 m a5 LL mmmLL3m y5»0a w000 mNwm W J �Q Z OLL LLJ i c)Z ° QW ,- W m U Z C7 / �,'.._.....-._..__._. w-" a� w = yang°wz- I O ] ?yw m0�0 Z L,J m U N �y� Whiz, O.W*wQ Q rL w OV i CO apw O5>�28y > >w Zz° ado �] Uwe Ho Y oa m 3 - Z( Iw-dWJrJ y= = Zam Z��¢ w e ^J Z 1 w p J m L zw y wa LU - SW 3N W CL J CIF IF LL 2 CL �a F i c z aac m� 8 a -... N Q 0 4 ``wnn o � m z U 0 • z >� W ��7 Z 00 mi W Z w 0� ry a O mr O11 m3 Q L L• sal U a 0 a O p Q Y° 8 w O XX z p\N w� � N> fA M � x � I I Y NN, AP f .go \at L ANIk . w . % VA sue.!• r • lk � Z f • 1 t � s i i • '1 1 •K t- f � � e 1" �i i Permit#: 5772 Permit Date: 01/15/24 Permit Type: COMMERCIAL MECHANICAL Project Name: 14-23-23985 Arlington PD Boiler Applicant Name: Hermanson Company/Kaytlyn Hamill Applicant Address: 1221 2nd Ave N Applicant, City, State, Zip: Kent,WA 98032 Contact: Kaytlyn Hamill Phone: 206-775-6414 Email: khamill@hermanson.com Scope of Work: Replace existing 1M BTU Boiler with (2) 500K BTU Boilers. Valuation: 35000.00 Square Feet: 494 Number of Stories: 1 Construction Type: 113 Occupancy Group: B; Business ID Code: Permit Issued: 02/07/2024 Permit Expires: 08/06/2024 Form Permit Type: COMMERCIAL MECHANICAL Status: COMPLETE Assigned To: Hannah Hardwick Property Parcel# Address Legal Description Owner Name Owner Phone Zoning 31051100100600 110 E 3RD ST ARLINGTON CITY 940 OPEN OF SPACE/PARKS Contractors Contractor Primary Contact Phone Address Contractor Type License License# Hermanson Company Kim Lange 206-573-2023 1221 2nd Ave N CONSTRUCTION UBI 602 004 844 CONTRACTOR Hermanson Company Kim Lange 206-573-2023 1221 2nd Ave N CONSTRUCTION L&I HERMACLO05BJ CONTRACTOR Inspections Date Inspection Type Description Scheduled Date Completed Date Inspector Status C 14. Scheduled time for 07/30/2024 MECHANICAL 08/01/2024 08/02/2024 BUILDING Approved FINAL inspection is 9 AM C14. Requests before noon. 05/30/2024 MECHANICAL Call on the way,206-775- 05/31/2024 SafeBuilt Not Completed FINAL 9240 C14. 04/22/2024 MECHANICAL 04/23/2024 BUILDING Not Completed FINAL Plan Reviews Date Review Type Description Assigned To Review Status 01/16/2024 COMMERCIAL BUILDING Approved MECHANICAL Fees Fee Description Notes Amount Enter 1 if permit is for commercial Web Only-Mechanical Commercial Plan mechanical $480.12 Review (Table 4-1) Credit Card Service $14.40 Processing/Technology $25.00 Boiler< 100 BTU/h 3-15 hp Enter#of units $30.00 Mechanical Base Permit Fee $25.00 Credit Card Service $2.40 Inspection $75.00 Credit Card Service $2.25 Total $654.17 Attached Letters Date Letter Description 02/07/2024 Building Permit 01/15/2024 Web Form-Building Application Payments Date Paid By Description Payment Type Accepted By Amount 01/15/2024 XBP Con£ $480.12 163189585 01/15/2024 Kaytlyn Hamill 163189585 Hannah Hardwick $14.40 02/07/2024 XBP Con£ $80.00 165064556 02/07/2024 Kaytlyn Hamil 165064556 $2.40 06/25/2024 XBP Conf: $75.00 203310861 06/25/2024 Kaytlyn Hamill 203310861 Hannah Hardwick $2.25 Outstanding Balance $0.00 Notes Date Note Created By: 07/22/2024 sent expiration notice Hannah Hardwick 06/25/2024 Additional Inspection fee has been paid.Okay to schedule another inspection. Hannah Hardwick 06/21/2024 sent expiration notice and additional inspection fee.there have been 2 failed inspection attempts Hannah Hardwick resulting in needing an additional fee for another attempt. 05/31/2024 A re-inspection fee due for the third final inspection at a rate of$75 per hour. Kristin Foster 01/16/2024 Emailed for hard copies Hannah Hardwick Uploaded Files Date File Name 02/07/2024 18482594-2024 BLD5772 IssuedPermit.pdf 02/07/2024 18475544-20240207 BLD5772 Approved Plans.pdf 01/15/2024 361bc3al23269c73bl4fc654acbl8aeb arlington mechanical boiler apnlication.pdf