HomeMy WebLinkAbout17802 TOPPER CRT_983193_2026 a
INSPECTION REPORT
Permit No. O / 3 Lot #
Address 1-Ma O qax.L
Contractor Lea,✓d" A,,
Owner 74a
Date '!�''—� 9
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-�0.-72244 FOR RE-INSPEC ION - 24 hour notice required.
Inspector Date _
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
n
INSPECTION REPORT
C,^' 1- 7 3 Lot #c:Permit No. )Address / 7 -
Contractor . ��� , � ^ej'
Owner `7 9(a
Date CJ C
APPROVAL ❑ PARTIAL APPROVAL
VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspector A IA Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ raming ❑ Gas Piping
❑ Footing Drywall, Nailing ❑ Consultation
❑ Foundation ❑ hear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
�/
. A Permit Noq !t Lot #
• Address / �G�•
Contractor
Owner
v c
Date
ROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspector Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ final
❑ Masonry ❑ Drainage Insulation
❑ Other
Q INSPECTION REPORT
Permit No. Lot# _
Address
A
Contractor ,
Owner �} 7
Date f 3r'11—9—q
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
f
i
Inspector Date
PE OFF PECTION REQUESTED
❑ Under-floor Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No. %._&Z3 Lot#
Address _/ 7&g, C/----
Contractor
• Owner
Date
ROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Af
Inspector Date
JV
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing XGas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
Foundation ❑ Shear Nailing ❑ Groundwork
Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
r
INSPECTION REPORT
Permit Nog Lot #
Address
Contractor
• Owner S'8� t3
Date 3"
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION r�ORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
14
Inspector Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ rid ❑ Struct. Slab
❑ Wood Stove >�Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No. Lot # '?3
• Address
Contractor
Owner ,2s-
Date a"
PROVAL ❑ PARTIAL APPROVAL
❑ VIOL tON ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspector Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation hear Nailing ❑ Groundwork
KV ❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No.W!�;31Lot#
Address f ? n wit
Contractor �0 �''
Owner 425__—�q --�4 3-3
Date Z /Z
APPROVAL ❑ PARTIAL APPROVAL
rJ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
7--
Inspect - ` — - Date 11
TYPE OF INSPECTION REQUESTED
Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
i
fA ��� .,_. INSPECTION REPORT
r� Permit No. �'-.3/ 93 Lot # L?,J,
Address 1'7 9C:a
Contractor
Owner
Date /j—* --!
,D-AI"PROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspector o Date
TYP F INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
xFoundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
L
INSPECTION REPORT
Permit No. 9,?-.3/"?3 Lot # q
• Address f 73 o-_a
Contractor
Owner Ala - - 7
Date �e, - ;2 9 - 9 �
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
I nspec '`_"' Date C52- 3_c=--`7 9*
TYPE 8F INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other L
INSPECTION REPORT
Permit No. - 1 3 Lot # 93
Address
Contractor 1
• Owner
Date
APPROVAL ❑ PARTIAL APPROVAL
—J IOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
ly
i'
InspectorLA Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
Other
CX--FY O E_ AEA L_XNe�-OW
C0MSTFZLJCT=0N PE_R1' X-V
R E=R MX-F- N0 _ e 95-3JL!�)3
Owner: DEILY, DEAN 16720 NE 116TH ST. REDMOND 98052 4(Q -
Value of Work: $113,826.00 Tax ID: HVE 93 Phone: Z@4 869-6618
Describe Work: NEW CONSTRUCTION
Proposed Use: SFR
Legal Description:
�^ Job Address: 17802 TOPPER CT.
Contractor's name Type Address License#
R �
[� M DEAN DEILY CO. 16720 1%!E. 116TH ST. DEANDCL033RP
PACIFIC HEATING M 825 7TH AVE PACTFHA093Q5
GUND`'RSON PLiUNSTNG n P.0. BOX 1228 GUNDEP*056MG
P E R M I T F E E S
Equipment and Fixtures Number Fee Total Charge
PLUMBING FIXTURES --_^-- -- 14-- -- $7.00 _ _.�$98.00
FURNACE/UNIT HEATER 1 $13.15 $13.15
RANGE 1 $9.50 $9.50
VENTILATION FANS 5 $6.50 $32.50
DRYER 1 $9.50 $9.50
METAL FIREPLACE & CHIMNEY 1 $9.50 $9.50
WATER HEATER 1 $9.50 $9.50
GAS PIPING 1-5 OUTLETS 1 $5.00 $5.00
S U 8 T 0 T A L. .. . .. $186.65
TOTALS Fee
Equipment $88.65
Fixture $98.00
Mech Permit $22.00
Permit Fee $863.50
Plan Fee $561.28
Plumb Permit $15.00
State
�� s
fee $4.60 -
Scool Mitigation $941.00
SIGMA RE:
TOTAL FEE..... ...... . .. ... $2,593.93 I HEREBY CERTIFY THAT I HAVE READ
AND EXAMINED THIS APPLICATION AND
PAYMENTS. .. . . . . . . . . . . . .. . . $474.53 KNOW THE SAME TO 8E TRUE AND COR-
RECT ALL PROVISIONS OF LAWS AND
TOTAL DUE. . . . .. .. . . . . . . . . . $2,119-40 ORDINANCES GOVERNING -rPIS T; E OF
WORK WILL �TIHER
SPECK
DATE RECEIPT # � �?� •�Z.
BUILDING OFFICIAL]
INSPECTION REPORT
Permit No. Lot# IF3--
Address
Contractor
Owner _ ��S=�/ 4 f— 74
Date
PPROVAL ❑ PARTIAL APPROVAL
5° ---�--V-LATION ❑ CORRECTION REQUESTED
+� ❑ Corrections listed below MUSY!3E MADE before work can be a
❑ Please contact inspector. approved.
❑ Was not able to perform inspection.
_❑ CALL 455-0724 FOR RE-INSPECTION- 24 hour notice required.
0 -
A
W
E
2
0
N
Z
Q
H
h7
' inspector
Date
W TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing
❑ Footing ❑ Gas Piping
❑ Foundation ❑ Drywall, Nailing ❑ Consultation
r El Mechanical ❑ Shear Nailing ❑ Groundwork
❑ Grid ~ O tract, Slab
J O Wood Stove ❑ Rough-in
❑ Masonry inal
❑ Drainage
❑ Other Insulation
'�
JUL-13-99 TUE 07 :26 AM STANTON MEADOWS 7946266 P. 02
CITY OF ARLINGTON, WASHINGTON - BUILDING DEPARTMENT
No building Construction shol' be commenced until permit holder or
INSPECTION RECORD his agent has posted this Inspection Record Card in a conspicuous
place in front to the premises.
�,
OWNER G CONTRACTOR
,:08 ADDRESS b (nZ- J�-'7_a-12 LOP NUMBER TYPE GROUP
NATURE of WORK / —
ti 2
USE of BUILDING .�5�'f ( �( ^� !
PERMIT NO. -3T DATE ISSUED
INSPECTOR MUST SIGN ALL SPACES PERTAINING TO THIS JOB
INSPECTION DATE iNSPECTOR'S SIGNATURE
POUR NO CONCRETE FOOTING
UNTILTHIS SECTION ! FOUNDATION -
HAS BEEN SIGNED
DO NOT POUR FLOOR UNTILTHIS SECTION PLUMBING(groundwoA() _
HAS BEEN SIGNED
GAS PIPING(groumw ark)COVER NO WORK -
ROUGH PLUMBING
UNTILTHIS SECTION ROUGH GAS PIPING _
HAS BEEN SIGNED
ROUGH HEATING and VENTILATION
FRAMING
INSULATION
'4 *A01
WALLBOARD `
UNDERFLOOR / - - ✓-- -ter
SEWER
REFRIGERATION _
FINAL
PLUMBING FIXTURES
1
GAS PIPING
HEATING and VENTILATION _
SHEAR WALL.
MISCELLANEOUS
i SETBACKS --
GRADING
DRAINAGE --
r
JOB COMPLETED: Date Signed by
CITY OF ARLINGTON
CONSTRUCTION
PERMIT
740
❑ COMBINATION ❑ BUILDING ❑ MECHANICAL ❑ PLUMBING ❑ SIGN PERMIT NO. 7ZC13
j OWNER MAIL ADDRESS CITY ZIP PHONE '
Dean Deily Company 16720 NE 116th St . Redmond, WA 98052 425-869-6618
ARCH(TECTOR DESIGNER MAIL ADDRESS CITY ZIP PHONE d^'j, 6
same as above
GENERAL CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE M
same as abvoe
MECHANICAL CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE f
Pacific Heating & Air 825 7th Ave Kirkland, WA 98033 425-889-9345
PLUMBING CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE N
Gunderson Plumbing 17700 147th St SE Monroe, WA 98272 360-794-5335
3 CLASS OF WORK
cc OgNLW ❑ADDITION ❑ALTERATION ❑REPAIR ❑DIE MOLITION BUILDING RELOCATION
Q VALUATION OF WORK
Z >LU
LLU DESCRIBE WORK
3 New Home Construction
M PROPOSE U USE OF BUILDING
w Single Family I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICA-
TION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVI-
K LLGAL UESCRIPIION OF PROPERTY(SHOWN BELOW OR ATTACH FOUR COPIES)
_j C� SIGNS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK
J LOI • 3 BLOCK OF Highland View Estates WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT.THE
a GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO
W VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
F-
J TAX ID NUMBER FROM PROPERTY TAX STATEMENT LOCAL LAW REGULATING CONSTRUCTION OF THE PERFORMANCE OF
a CONSTRUCTION.PERMIT EXPIRES 1 YEAR FROM DATE OF ISSUANCE.
?06- oob- 0 3 -oo
SIGNATURE OF CONTRACTOR OR AUTHORIZED AGENT DATE
V IOB AOURI SS
t !?8 v Z -Z PP E.2 GcTU W x RA" - wa to
(OPFICE USE ONLY)
PLUMBING MECHANICAL
NO. TYPE OF PIXTURE FEE :'s FIXTURES NO. TYPE OF EQUIPM13dT FEE s's FIXTURES
A'1T3R CLOSET TOILET IR COND.UNITS—H.P. EA. igtip.lit•
ATIMB LEFRIGERATION UNITS—H.P.EA 7 ui .list•"
VATORY ASH BASIN OB ERS—II.P.EA. r ui .list—
HOWER 3AS FIRED A.C.UNITS—TONNAGE EA. !quip.fist—
TCIIEN SINK&DISPOSAL FORCED AIR SYSTEMS—B.T.U. MEA
1SHWASHER NALL HEATERS—B.T.U. M
UNDRY TRAY NIT HEATERS—H.T.U. M
/ LOTH ES WASHER 1VAPORATIVECOOLERS
ATER HEATER �LOTHES DRYERS
RINAL ZA
ILATION FAN
KINKING FOUNTAIN E HOOD COMMERCIAL
LOOR DRAIN ANDLING UNIT— CPM
ACUUM BREAKERS EOOF DRAINS—RAINLEADERSL FIREPLACE A CHIMNEY
INK ERVICE—BAR.ETC. R HEATER
AS PIPING *(up to 5—S3.00,addol.=S.75
�� ..Equipment list mut be rovided
72
I
SUB TOTAL F SUB TOTAL
PERMIT PERMIT
TOTAL FEE TOTAL FEE
SIUL YARD SL BACK SiREEI SETBACK REAR YARUSETBP KI ] /� AN CHECK FEE
S3rap I RECEIPT NO �6�n
USF/ONI LOT AREA VACANT SITE 11 (� /
2 7 �iC-7
C, n '� ❑ FEE VALUATION FEE
TYPLOF /O�NSII OCCUPA GROUP NOS.OF`/JZ'WELLING UNITS PLAN CHECKING VG
`� I BU'LDING f �
SIZL OI BLDG O� NO.OT STORILS MAX.OCC LOAD
T l PLUMBING
F IRE SPRINKLERS REQUIRED
❑YES LSj"6— MECHANICAL
STATE BLDG.CODE
COMMENTS / ENERGY CODE SURCHARGE
U.B.C.
PENALTY
RECEIVED SEC.303(a)
WATER/SEWER FEES
JUN 3 p 1998 TOTAL
PERMIT VALIDATION
CITY OF ARLINGTON WHEN PROPERLY VALIDATED (IN THIS SPACEI THIS IS YOUR PERMIT 6 RECEIPT
PAID CRR__ BY
cc:ASSESSOR.APPLICANT, TREASURER. BLDG DEPT BUILDING OFFICIAL DATE
RECORDS COPY