HomeMy WebLinkAbout17726 TOPPER CRT_983192_2026- _ INSPECTION REPORT
Permit No. Lot # �1
' • Address
Contractor ��Z% L�G�
Owner
Date
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
CA L 435-0724 FOR RE-INSPECTION - 24 hour notic required.
�S
I Date r
T OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ` ruct. Slab
❑ Wood Stove ❑ Rough-in Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
eoINSPECTION REPORT
Permit No. 9- 319c� Lot # 9a
Address 7 ? a 67
Contractor D � ,
Owner qJ5 9,205-
Date Za—egL3
PROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
2 � 3
Inspector Date '
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing all, Nailing ❑ Consultation
❑ Foundation )04s=r Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
P +�.. INSPECTION REPORT
Permit No. 9,R 3l 9-_2 Lot # !�F,Q
Address i 7 A ,-1 n
Contractor ,L -
Owner 7.-�[� �—
Date /G
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Insp Date459—'
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ inal
❑ Masonry ❑ Drainage Insulation
❑ Other
INSPECTION REPORT
Permit No. 9.Q Lot # 9--:11
' • Address 1 '7 7 ►�� � , ,�
Contractor
Owner
Date Y
❑ APPROVAL ART) PPROVAL
❑ VIOLATION ❑ CORRECT-49N REQUESTED
❑ Corrections listed below MUST BE MADE before wor can b_e approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice quired.
I
Inspector , _ Date � -
TYPE OF IN PECTION REQUESTED
❑ Under-floor Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
L
nn INSPECTION REPORT
\ Permit No.2� Lot #
Address 7
r
Contractor
Owner
Date fC —/A
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspector Date
TYPE OF INSPECTION REQUESTED
Cl Under-floor Framing Gas Piping
❑ Footing ❑ Drywall, Nailing .0 Consultation
❑.,Foundation ❑ Shear Nailing ❑ Groundwork
Mechanical Grid ❑ Struct. Slab
El Wood Stove ough-in ❑ Final
❑ Masonry ?E,
Drainage ❑ Insulation
❑ Other },
INSPECTION REPORT
Permit NoW - :31ja Lot # Z;2, _
Address 17 '7 9,Lo
Contractor �„ _ f i —J!;
• Owner
Date
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ prywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
L
INSPECTION REPORT
Permit No. o J/ _Lot#
Address
Contractor )
• Owner
Date
❑ APPROVAL ❑ P��IAL APPROVAL
❑ VIOLATION —�I CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ C L 435-0724 FPR RE-INSPECTION - 24 hour notice required.
C of
Oi1L
LC.r
oe
Ins ect Date
TYP OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ rywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical J rid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other L111-
^A INSPECTION REPORT
Permit No. 9'2-3/9� Lot #
Address / 7 70;)6 � C�—
Contractor
• Owner
Date
PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspector Date
TYPE OF INSPECTION REQUESTED
YUnder-floor ❑ Framing J Gas Piping
:IFooting ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
L-1
INSPECTION REPORT
FPermit No. - c) Lot # qe
AddressC�—
Contractor &a,"iJ
• Owner -A135- --2905__
Date C1% "1 'C1g l.S
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspec Date
TYPE INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stoj,,,,',XjDrainage
ough-in ❑ Final
❑ Masonry ❑ Insulation
❑ Other
INSPECTION REPORT
,1 Permit No. 9 cy, .;�/!E2 Lot#��
Address 7 .7 a le
Contractor
• Owner
Date
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspector Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
.Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
L
z-7
INSPECTION REPORT
—
Permit No. Lot #
Address '7 YXPWL;,� C -
Contractor SC
• Owner
Date
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
ink�'&.n �IOA45 __S0_ r_a'CzS
s Date
OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ noting ❑ Drywall, Nailing ❑ Consultation
undation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
L_
INSPECTION REPORT
Permit No. q __Z 19 P- Lot # F,;?_
ESL • Address 77 -a Lc -awn, _ C" -
Contractor z'
Owner 1
° Date
Taken By
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
on
�L
Inspector Date g�
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other L
V't INSPECTION REPORT
Permit No. Cs '1� # 9.d
Address
Contractor
OwnerDate
Taken By -TIC
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspector Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
` F e ❑ Shear Nailing ❑ Groundwork
J Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
Other - -
INSPECTION REPORT
Permit No. Lot#
• Address /.? �'L,
OV—
Contractor -
Owner
Date
Taken By
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION Att=RRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
0 Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
I n r Date 7
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
Masonry ❑ Drainage IF, ❑ Insulation
Other
.v
C� C=TY O f= AR L_XNSTOIN
I CORISTRUCT=OM PIERMX-F
I PERh1=T N0 _ z 9 3-9Z
Owner: DEILY, DEAN 16720 NE 116TH ST. REDMOND 98052
Value of Works $95,205.00 Tax ID: HVE 92 Phone: 206-869--•6618
Describe Work: NEW CONSTRUCTION
Proposed Use: SFR
Legal Description:
Job Address: 17726 TOPPER CT.
Contractor's Name Type Address License#
DEAN DEILY CO. G 16720 NE. 116TH ST. DEANDCL033RP
PACIFIC HEATING M 825 7TH AVE PACIFHAO93Q6
GUNDERSON PLUNGING P P.O. BOX 1228 GUNDEP*066MG
P E R M I T F E E S
Equipment :arid Fixtures Number Fee Total Charge
PLUMBING FIXTURES --1.2v -- $7.00 $84 00
FURNACE/UNIT HEATER 1 $1.3-1.5 $13 15
RANGE 1 $9 50 $9 50 '
VENTILATION FANS 4 $6 50 $26 00
DRYER 1 $9 50 $9 50
METAL FIREPLACE & CHIMNEY 1 $9 50 $9 50
WATER HEATER 1 $9 50 $9.50
GAS PIPING 1-5 OUTLETS 1 $5 00 $5 00
I 'ti U M 1 U 1 A L___ - I.S. I
1ulnw rt.
Equipment $82.15
Fixture $84 00
Mech Permit $22.00
Permit Fee $779.75
Plan Fee $506 84
Plumb Permit $15.00 / �
State fee $4.50 ( I
School Mitigation $941.00
SIGMA E: �
TOTAL FEE. ................ $2,435.24 I HEREBY CERTIFY THAT I HAVE READ
AND EXAMINED THIS APPLICATION AND
PAYMENTS........... ....... $321.20 KNOW THE SAME TO BE TRUE AND COR-
RECT ALL PROVISIONS OF LAWS AND
TOTAL DUE................. $2,114_04 ORDINANCES GOVERNING THIS TYPE OF
WORK WILL GE COMIF11>156 W WHETHER
DATE RECEIPT # SPEC R N
BUILDING OFF! A?_
s'
ro
5'
3 CRC
po
se�C1_
0' F-EON—i
20,
38,3z'
51 i E PLAN
SCAB i = Zo'
R[644LANt� view s LOT q 2.
r�1-6
r 644 L..a-h,4
psis
CITY OF ARLINGTON
CONSTRUCTION
PERMIT /0
❑ COMBINATION ❑ BUILDING ❑ MECHANICAL ❑ PLUMBING ❑ SIGN PERMIT NO.
�31
t OWNER MAIL ADDRESS CITY ZIP PHONE
Dean Deily Company 16720 NE 116th St . Redmond, WA 98052 425-869-6618
ARCHITECT OR DESIGNER MAIL ADDRESS CITY ZIP PHONE
same as above
GENERAL CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE N
same as abvoe
MECHANICAL CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE/
Pacific Heating & Air 825 7th Ave Kirkland, WA 98033 425-889-9345
PLUMBING CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE
Gunderson Plumbing 17700 147th St SE Monroe , WA 98272 360-794-5335
3 CLASS OF WORK
cog NLW ❑AUDITION ❑ALTERATION ❑REPAIR ❑DEMOLITION ❑BUILDING RELOCATION
Q VALUAI ION OF WORK
Z
W DESCRIBE WORK
3 New Home Construction
m PROPOSE U USE OF BUILDING
w Single Family I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICA-
TION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVI-
Z LEGAL DESCRIPTION OI PROPERTY(SHOWN BELOW OR ATTACH FOUR COPIES)
SIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK
J LUI �Z BLOCK . OF Highland View Estates WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT. THE
a GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO
W VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
F-
TAX ID NUMBER FROM PROPERTY TAX STATEMENT LOCAL LAW REGULATING CONSTRUCTION OF THE PERFORMANCE OF
IL
2 $Zo ooa - 6`lL—moo CONSTRUCTION. PERMIT EXPIRES 1 YEAR FROM DATE OF ISSUANCE.
SIGNATURE OF CONTRACTOR OR AUTHORIZED AGENT DATE
V 108 ADURI SS 1-7 a4'
T I A� To_R?Ce- 6a war X � °-' A4W'..4-
(OPFICE USE ONLY)
PLUMBING MPCIIANICAL
NO. TYPE OF PIXTURE PEE i'.FIXTURES NO. TYPE OF EQUIPMENT FEE :'.FIXTURES
ATER CLOSET TOILEC IR COND.UNITS-H.P. EA ul .IIjL-
ATIITUB EWRIGERATION UNITS-H.P.EA u p.lit•"
VATORY ASH BASIN IOILERS-II.P.EA. 3qLdp.lit**
fIOWER PAS FIRED A.C.UNITS-TONNAGE EA. 7 u .lit*"
1 TCHEN SINK R DISPOSAL TORCED AIR SYSTEMS-B.T.U. MEA
ISHWASHER WALL HEATERS-B.T.U. M
UNDRY TRAY JNIT HEATERS-B.T.U. M
LOTHES WASHER WAPORATIVE COOLERS
ATER HEATER LOTIIES DRYERS
RINAL fq- fVENTILATION PAN
KINKING FOUNTAIN 4ASPIPING
E HOOD COMMERCIAL
?LOOR DRAIN ANDLING UNIT- CPM
UUM BREAKERS B
OOF DRAINS-RAINLEADERS L FIREPLACE A CHIMNEY
INK ERVICE-BAR,ETC. R HEATER
•u to S=S3.00.addol.=S.7S
-Equpment listmut be provided
SUB TOTAL SUB TOTAL
PERMIT PERMIT
TOTALFEB TOTALPEE
SIDE YARD IBACK SFRLLISLIBACK REAR YARD B AN CHECKNUMBER PLAN CHECK FEE
/ _ �I O FEE RECEIPT NO
USE/ J( LOT ARLA VACANT SIT
'l 'jd O -72 0-YES NO ES VALUATION FEE
TYPE OF CONS OCCUPANCY GROUP NO.OF DWELLING UNITS PLAN CHECKING NG `^7
I BUTDING $ 7 ( 1-S
SIZE Of BLDG NO.OF STORIES MAX.OCC.LOAp
Ce�-Cr r
PLUMBING
F IRE SPRINKLERS REQUIRED
❑YES NO MECHANICAL
STATE BLDG.CODE
(� v ENERGY CODE SURCHARGE C
`� PENALTY U.B.C.
' N 3 n 1998 WATER/SEWER FEES
V 1Y V �} TOTAL
CITY OF ARUNGTON PERMIT VALIDATION
WHEN PROPERLY VALIDATED (IN THIS SPACE)THIS IS YOUR PERMIT&RECEIPT
PAID CRIi BY
cc:ASSESSOR,APPLICANT,TREASURER, BLDG DEPT BUILDING OFFICIAL DATE
RECORDS COPY