HomeMy WebLinkAbout17702 TOPPER CRT_983191_2026 INSPECTION REPORT
Permit No. Lot#
Address
Contractor
Owner �L�
Date 1 —f
f Y
❑ PPROVAL ❑ PARTIAL APPROVAL
❑ V LATION ❑ CORRECTION REQUESTED
❑ Correction listed below MUST BE MADE before work can be approved.
❑ Please conta nspector.
❑ Was not able to p orm inspection.
❑ CALL 435- FOR'RE-INSPECTION - 24 hour notice required.
06 -7 y
117
Inspector Date
TYPE OF INSPECTION REQUESTED \z�
❑ Under-floor ❑ Framing ❑ Gas I _
❑ Footing ❑ Drywall, Nailing ❑ Con4tiffion A
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab �C
❑ Wood Stove ❑ Rough-in —.N^Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No. W-3191 Lot # 39
10
Address f 77C' Tc.` 2�zE2�
Contractor 0 QfLLf FA-F—b
M Owner `�(oy —�(033
Date3-013 -9cj
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
7]1- ase contact inspector.
a�snotable to=OR
C -0724E-INSPECTION - 24 hour notice required.
Inspector Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid J Struct. Slab
❑ Wood Stove ❑ Rough-in Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPOR'`,
Permit No. `Jr /12' 7 / Lot #
Address / ?7C}of T2)g.4vA2,i—
Contractor ��
Owner`-� +�
Date � C Z f`�
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
_0 Please contact inspector.
lq_�V_as not able to perform inspection_._
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspector ` : �.� -�. -- Date
TYPE OF INSPECTION.REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab .
❑ Wood Stove ❑ Rough-in Final r-a--
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No. — / Lot #�
• Address 0o2- CI--
Contractor
Owner �o����C6�/ '�,
Date
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
L
Inspectar;;- Date
TY EJOF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ) Drywall, Nailing ❑ Consultation
❑ Foundation /❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No.[9 19 Lot # 'R8
Address 0 oZ (:Ir�
410 Contractor
Owner
Date 4-:p-07-—
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION >�' CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
1 �''
Inspector Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage Insulation
❑ Other , `
P9 INSPECTION REPORT
Permit No. 7 / Lot # 22
Address 1T76,9
Contractor N)_OdA"v�
Owner
Date —9 J
ROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-I PECTION - 24 hour notice required.
Inspector _ Date
TYPE OF INSPECTION REQUESTED/
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ -oundation El Shear Nailing ❑ Groundwork
Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry p Drainage ❑ Insulation
❑ Other
L
INSPECTION REPORT
3�
Permit No. � Lot#
Address
Contractor /
OwnerZ
Date
PROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
i
Inspector Date
/ TYPE OF INSPECTION REQUESTED
❑ Under-floor �\X Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
`I]'Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
1 Permit NoC f Lot #
Address 7
Contractor
Owner ' = 1 �
Date
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
�-n
C
Inspector Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing XCUS
rywall, Nailing ❑ Consultation
❑ Foundation hear Nailing ❑ Groundwork
❑ Mechanical rid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
1 ` ` Permit No. ? Lot #
Address Z 2,2_c,2,�Contractor &e"
Owner
Date
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
❑ Corrections listed below MUST BE MA E before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
LL AIA
-
vl�
i C4
LuNib
AL
Inspector Date
TYPE OF IN PECTION REQUESTED
❑ Under-floor Framing / Gas Piping
❑ Footing Drywall, Nailing ❑ Consultation
Foundation ❑ Shear Nailing ❑ Groundwork
Mechanical Grid ❑ Struct. Slab
J Wood Stove Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No. 9Y -.3/ 1W Lot#
• Address 1 7 -:I-
Contractor
Owner
Date 9
❑ APPROVAL ❑ P JAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
I�spect�r _— Date
E OF INSPECTION REQUESTED
❑ Under-floor _Framing V Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ oundation ❑ Shear Nailing ❑ Groundwork
Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove Al ❑ Final
❑ Masonry T Drainage ❑ Insulation
❑ Other
L
nn� INSPECTION REPORT
9 °
Permit No. Lot # _
Address
Contractor L_ .&
• Owner 12.q, 0
Date g %s
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspector Date
PE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing XDrywall, Nailing ❑ Consultation
❑ Foundation hear Nailing ❑ Groundwork
❑ Mechanical rid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ,q Qrainage ❑ Insulation
❑ Other / �,
INSPECTION REPORT
Permit No. 9 _3/ S ! Lot #
Address %27 L Q
Contractor
Owner -4/34— - 7a c
Date %6 - -
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ORRECTION REQUESTED
❑ Corrections listed below MUST BE MAD fore work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
N.W f
Inspector Date 0 `
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
Cl Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other L
_ INSPECTION REPORT
Permit No. % Lot # d
Address
Contractor _la_„_ 1� ,
Owner
Date i G - / - p,�
PROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please-contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Insp Date
TYPE F INSPECTION REQUESTED
Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
V
INSPECTION REPORT
Permit No. Lot #
Address 17
fj
Contractor ( ,, , L a'L
Owner
Date �f�—'--y 9, —
PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspector A Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove O Rough-in ❑ Final
❑ Masonry 5<Drainage ❑ Insulation
❑ Other
L
INSPECTION REPORT
Permit No. 91Y--ZI 9 i Lot #
Address 7 Gs T
Contractor
Owner
Date
PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspector Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
L
INSPECTION REPORT
Permit No. .:31 f Lot #
Address
Contractor
• Owner y3I `2 G 3�
Date -
PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice re fired.
l
Inspector Date '
r
PE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
L
,� yl INSPECTION REPORT
Permit No. -21--Z j 4'/ Lot#
Address ,
Contractor
•
Owner 5%�3a- - 7 ��.6-
Date 9 -
Taken By
PPROVAL ❑ PARTIAL APPROVAL.
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Date
TYP F INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑' Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
,Other
C=TY O F -
COi !E3-1F 2UCT=OM RaRM=T
PERM=T NO _ 95-33_9_-L
Owner: DEILY, DEAF! 16720 NE 116TH ST. REDMOND 98052
Value of Work: $117,842.00 Tax ID: HVE 88 Phone: 206-869-661.8
Describe Work: NEW CONSTRUCTION
Proposed Use: SFR
l Legal Description:
(� Job Addressvv,: 47702 TOPPER CT.
Contractor's Name Type Address License#
DEAN DEILY CO. G 16720 NE. 116TH ST. DEANDCLO33RP
PACIFIC HEATING M 825 7TH AVE PACIFHAO93Q6
GUNDERSON PLUNGING P P.O. BOX 1228 GUNDEP*O66MG
P E F E E S
Equipment and fixtures Number Fee Total Charge
PLUMBING FIXTURES Y� � 15 $.7.00 --- $105.00
y -FU'NACSf'Cb' 1T TMt_ATERr 1 $13.15 $13.15
RA*eE _ 1 $9.50 $9.50
VENTILATION• FANS.: 5 $6.50 $32.50
DRYER - '. ' 1 $9.50 $9.50
METAL FIREPLACE & CHIMNEY 1 $9.50 $9.50
WATER HEATER 1 $9.50 $9.50
GRS,PIPING „1--5 OUTLETS 1 $5.00 $5.00
S U 8 T 0 T A L...... $193.65
I
TOTALS Fee
Equipment $88.65
Fixture $105.00
Mech Permit $22.00
Permit Fee $881.50 y
Plan Fee $572.98
Plumb Permit $15.00
State fee $4.50
School Mitigation $941.00
SIGNATURE:
TOTAL FEE.......... ....... $2,630.63 I HEREBY CE,�TIFY THAT I HAVE READ
AND EXAMINED THIS APPLICATION AND
PAY14ENTS........ ....... ... $474.53 KNOW THE SAME TO BE TRUE AND COR-
RECT ALL PROVISIONS OF LAWS AND
TOTAL DUE... ........... .. . $2,156.10 ORDINANCESg`UVL' N IS _ OF
WORK WILL Mr,
ETHER
iN
DATE RECEIPT ,
BUILDING OFc=1c:1
CITY OF ARLINGTON
CONSTRUCTION
PERMIT 99—
E] COMBINATION ❑ BUILDING ❑ MECHANICAL ❑ PLUMBING ❑ SIGN PERMIT NO. 31V
j OWNER MAIL ADDRESS CITY ZIP PHONE ssssllll
Dean Deily Company 16720 NE 116th St . Redmond, WA 98052 425-869-6618
ARCHITECT OR DESIGNER MAIL ADDRESS CITY ZIP PHONE
same as above
GENERAL CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE N
same as abvoe
MECHANICAL CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE/
Pacific Heating & Air 825 7th Ave Kirkland, WA 98033 425-889-9345
PLUMBING CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE/
Gunderson Plumbing 17700 147th St SE Monroe , WA 98272 360-794-5335
3 CLASS OF WORK
cog NLW ❑ADDITION ❑ALTERATION ❑REPAIR ❑DEMOLI[ION ❑BUILDING RELOCATION
Q VALUAT ION OF WORK
wS <0. t7
W DESCRIBE WORK
3 New Home Construction
m PRUPUSk U USE OF BUILDING
w Single Family I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICA-
TION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVI-
Z LLGAL UES(RIPIIUN O! PROPERTY(SHOWN BELOW OR ATTACH FOUR COPIES) SIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK
J
LOT 66 BLOCK • OF Highland View Estates WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT.THE
a GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO
W VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
LU LOCAL LAW REGULATING CONSTRUCTION OF THE PERFORMANCE OF
TAX ID NUMBER FROM PROPERTY TAX STATEMENT
IL CONSTRUCTION.PERMIT EXPIRES 1 YEAR FROM DATE OF ISSUANCE.
$701i—oao -o�i� -ob
O SIGNATURE OF CONTRACTOR OR AUTHORIZED AGENT DATE
C) 108 AUURI SS
? f 7 7 o Z -n-ppoL. Co t c/r X x4w'.4-
(OPPICE USE ONLY)
PLUMBING 413CIIANICAL
NO. TYPE OF FIXTURE FEE s:'s FIXTURES NO. TYPE OF EQUIPMENT FEB s's FIXTURES
ATER CLOSET TOILET IR COND.UNITS—H3. EA. ul .list—
ATITTUB EFRIGERATION UNITS—H.P.EA ul .lid••
t� VATORY ASI I BASIN) OILERS—H.P.EA. 7 W .list—
IIOWER AS FIRED A.C.UNITS—TONNAGE EA. 7 u .list••'
TCHEN SINK&DISPOSAL ZORCED AIR SYSTEMS—D.T.U. MEA
ISHWASHER WALL HEATERS—B.T.U. M
AUNDRY TRAY JNIT HEATERS—B.T.U. M
LOTHES WASHER 3VAPORATIVECOOLEPS
ATER HEATER JHANDLING
THES DRYERS
RINAL TILATION FAN
DRINKING FOUNTAIN GE HOOD COMMERCIAL
7LOOR DRAIN UNIT— CPM
ACUUM BREAKERS VE
OOF DRAINS—RAINLEADERS AL FIREPLACB&CHIMNEY
INK(SERVICE—BAR,ETC. L/ ATER HEATER
AS PIPING '(up to 5-$3.00,addol.=3.75
-Equipmegi list must be proAdcd
SUB TOTAL SUB TOTAL
PERMIT PERMIT
TOTAL FEE r 1 TOTAL PE
SIUL YARD SEIBA STRLLTSLIBACK REAR YARD SE ER.
A K PLANCHECKNUMB ._ 1 1 LAN CHECK FEE
FE 1 RECEIPT NO.9`S
USE:/ [ LOT ARFA VACANT SITE C� v
'L Z� U FEE$ ' = VALUATION FEE
TYPE OF yS1 OCCUPAN GROUP NO.OF DWELLING UNITS PLAN CHECKING VG a vC�
V `Y � C/ l
SILL U! BLOC, NO.OF STORIES MAX.OCC.LOAD
�f9 L 7 BUTDING $PLUMBING
F IRE SPRINKLERS REQUIRED
❑YES �10 MECHANICAL
COMMENTS STATE BLDG.CODE
RE C C I\J`E® ENERGY CODE SURCHARGE a
C G 31 PENALTY U.B.C.
_ SEC.303(+)
J UN 3 0 1993 WATER/SEWER FEES
TOTAL
2 � 101,n( OF ARLINGTTON PERMIT VALIDATION
O \_
WHEN PROPERLY VALIDATED (IN THIS SPACE)THIS IS YOUR PERMIT 8 RECEIPT
PAID CRq--By
v BUILDING OFFICIAL DATE
cc: ASSESSOR,APPLICANT,TREASURER, BLDG DEPT RECORDS COPY