HomeMy WebLinkAbout18824 Smokey Point Blvd Unit 7_BLD5811_2026 CITY OF ARLINGTON 18204 59th Avenue NE,Arlington,WA 98223 INSPECTIONS: 360-403-3417-Permit Center:360-403-3551 BUILDING PERMIT 18824 SMOKEY POINT BLVD UNIT 7 Permit#: 5811 PERMIT EXPIRES 180 DAYS AFTER Parcel#: 01100600000700 DATE OF ISSUANCE. Scope of Work: spray booth installation Valuation:22500.00 OWNER APPLICANT CONTRACTOR SMOKEY POINT ENTERPRISES LLC Pete Munoz Pete Munoz 1029 85TH ST SE PO Box 1804 PO Box 1804 EVERETT,WA 98208-2004 Marysville,Wa,98270 Marysville,Wa 98270 3606597500 3606597500 LIC: EXP: MECHANICAL CONTRACTOR PLUMBING CONTRACTOR LIC#: EXP: LIC#: EXP: JOB DESCRIPTION PERMIT TYPE: COMMERCIAL MECHANICAL CODE YEAR: 2018 STORIES: 1 CONST.TYPE: 11113 DWELLING UNITS: OCC GROUP: F-1;Factory Mod.Hazard BUILDINGS: OCC LOAD: PERMIT APPROVAL The issuance or granting of this permit shall not be construed to be a permit for,or approval of,any violation of this Code or any other ordinance or order of the City,of any state or federal law,or of any order,proclamation,guidance advice or decision of the Governor of this State.To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law,or order,proclamation,guidance advice or decision of the Governor of this State,this permit shall not authorize such work and shall not be valid.The building official is authorized to prevent occupancy or use of a structure where in violation of this Code,any other City ordinances of this jurisdiction or any other ordinance or executive order of the City,or of any state or federal law,or of any order,proclamation, guidance advice or decision of the Governor.The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect,inaccurate or incomplete information,or in violation of any City ordinance,regulation or order,state or federal law,or any order,proclamation,guidance or decision of the Governor. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY,NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED.IBC 110/IRC 110. SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on your sal return form and coded City of Arlington#3101. 03/19/2024 Applicant SignatuW Date Building Official Date CONDITIONS Adhere to approved plans.Permit shall be onsite for inspection.Call for final inspection The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations.The property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment lie 3/ssudI NOI.LVNHO3NI NOI DUSNI uooula;;e ao Oulwow aajwd no,(aaq;agm pue'pa;sanbai guiaq uor;aadsul;o adfs'zagwnN;lwgad :uoi;uwao3ul 2UIMoll03 ag;aneal aseald uoi;aadsul uu r03 guillua uagM suoi;aadsul a.ri3 ao3 sanoq gt mollu°uol;aadsul,fup;xau lo;wd 0£:£ fq lle0 SNOI.LaadSNI HOA ZZdO 00'0$ :anQ aauelug 6Z'ZZt,$ :;ualukud le;oZ 6Z'ZZb$ :anQ lu;o,L 00'9Z$ aseg leoiuepaW VZOZ/6WE0 00'9 L$ sued;u9NsIuaMsne4x3 VZOZ/6 L/£0 00'9Z$ A6010ug39y6ulss900Jd bZOZ/6 UEO Lti'OL$ aolnaaS pJe0;lpaJO 4ZOVWCO 99'9173 MGIAO2l ueld lel3Jawua03 leoluepavq bZOZ/6L/£0 ;unowd aag uoudlaasaQ a;uQ S93A. lmad NOISSIY�i2i�d 9JV-UddRS H2IIfl632I THAN('313`S'93fI0'HV i `SAVMHARIQ`SYIdM9QIS `SgUfID)NIVWOQ OI"Igfld 31-11 NO NOI XINISN00 ANV A-INO A.L'99dO-dd 9,LdARId NO 9NOQ HE[O.L NNOM SIl3AO3.LIM9J SIH.L'QH.LON NNOM 3H L A INO SHZFdOHi fiV. lmHd SIHI •s;uawaimbal nnatAoi ugisop olquoilddu Ile qj!m saildwoo loofoid uoilmnsuoo auj Iugl ainsuo llvgs iaunm fvadoacl ogjL•uotIan.gsuoo Outouounuoo aiojoq soiluoginu Juunalaz aqj uzo.Ij Slunoiddu put,sjiuuad AZussaoau Ilu 2uiutu;go ioj olgtsuodsaz oq llugs iaumo A4jadozd ogjL•A4tunuiwoo ao • COMMERCIAL MECHANICAL APPLICATION o Community&Economic Development City of Arlington•18204 59th Ave NE•Arlington,WA 98223,Phone(360)403-3551 This application is for new,addition,altered or replaced mechanical installation and new or altered gas piping and must be accompanied by ELECTRONIC CONSTRUCTION DRAWINGS and CUT SHEETS and/or information outlined in the MECHANICAL SUBMITTAL REQUIREMENTS,if applicable. Type of Permit: [3 New Installation ❑ Addition ❑ Alteration ❑ Replaced ❑ Gas Piping Type I and Type H Hood Systems required submittal of the Commercial Mechanical Addenda l`b 8 0 (� Project Valuatio . Property Address: 1 t p boo Lot#: Parcel ID No.: L Preferred Contact: O Owner O Contractor Project DescripLion3* 4f JJ5*/&4YQ1Tt&x )1'gff)r Owner Name: Office No.:Email Address: Cell No.: ZoC? `363 - � Iu !p 1 Mailing Address: city: State: Zip: Contractor Name: Office No Email Address: M Gl h t7 ( er Cell No.: 'm C1 MailingAddresspd a�X U� City: C State: U -- Zip:R �-10 L&I Contractor License Number: Expiration Date: • New gas piping requires a pressure test hooking to any appliance • Sediment traps (drips)are required on all gas lines • Gas lines are required to be supported/secured per IFGS,Section 415 • Proper Combustion air and venting required for all appliances • A shut-off valve is required within 6 feet of each appliance Gas Piping Specification and complete Schematic PAGE 3 O Not Applicable T 0 Brass 0 Other Proposed Piping Material: O Black Steel 0 Galvanized Steel Propose ng Size: 0 1h" 0 5/s" O 3/4" 0 1" O 11/z" 0 2" In et Pressure: Pressure Drop: Specific Gravity: RECEIVED FEBn 7 nnoi REV03.2022 Pagelof3 ............. MECHANICAL PERMIT FEES (per unit Type of Fixture No.of Units Cost per Unit Subtotal Additional Plan Review fees x $75.00 = $ Air Cond.Unit 5100Btu h x $ 15.00 = $ Air Cond.Unit>100Btu h x $25.00 = $ Air Cond.Unit>500Btu h x $ 50.00 = $ Air Handling Units x $ 15.00 = $ Base Mechanical Fee $25.00 $25.00 Boiler<100Btu h>3h x $ 15.00 = $ Boiler>1 million Btu h<50h x $25.00 t[$ $ Boiler>1.5 million Btu h<50h x $50.00 Boiler>100Btu h 3-15h x $ 15.00 = $ Boiler>500Btu h 15-30hp x $25.00 = $ Commercial Hoods-'rype I x $25.00 = $ Commercial Hoods-Type II x $50.00 = $ Diffusers x $ 15.00 = $ Dryer Ducting x $ 15.00 = $ Ductwork(drawings required) x $25.00 = $ Evaporative Coolers x $ 15.00 = $ Exhatist Ventilation Fans x $ 15.00 = $ Fire lace Insert Stove x $ 15.00 = $ Forced Air Heat<_100 Btu h x $ 15.00 = $ Forced Air Heat>100 Btu h x $25.00 = $ Gas Clothes Dryer x $ 15.00 = $ Gas Fired AC<_100 Btu h x $ 15.00 = $ Gas Fired AC>100 Btu h x $25.00 = $ Gas Fired AC>500 Btu h x $ 50.00 = $ Gas Pi in <_ 5 units x $ 15.00 = $ Gas Piping> 5 units (plus<5 units x $2.00 = $ Heat Exchangers x $ 15.00 = $ Heat Pump-Condensing Unit x $ 25.00 = $ Hot Water Heat Coils x $ 15.00 = $ Miscellaneous Appliance-regulated by x $15.00 = $ mechanical code,not otherwise specified Pkg.Units 5100btu x $25.00 = $ Pkg.Units>100btu x $50.00 = $ Range/Cook top-Gas Fired x $ 15.00 = $ Refrigeration Unit 5100Btu h x $ 15.00 = $ Refrigeration Unit>100Btu h x $25.00 = $ Refrigeration Unit>500Btu h x $ 50.00 = $ Re-ins ection fee all x $75.00 = $ Unit Heaters:5 100 Btu h x $ 15.00 = $ Unit Heaters>100 Btu h x $ 25.00 = $ VAV Boxes (Variable Air Volume,part of air x $ 10.00 = $ conditioning system) Wall Heaters-Gas Fired x $25.00 = $ Water Heater-Gas Fired x $25.00 = $ Permit Fee $ Table 4-8; Plan Review Fee $ Processing/Technology Fee $25.00 Total $ REV2.2020 Page 2 of 3 PRESSURE PIPING SCHEMATIC COMPLETE FOR GAS PIPING ONLY ❑ SCHEMATIC IS TO SCALE ❑ SCHEMATIC NOT TO SCALE Show Pipe Size(s) and Length(s) from meter to all appliance NOTE:Any interior pressure regulators must be indi ed I hereby certify that I am theDOwner,DApplicant ❑Contractor,and authorized to sign this application and that the above information is correct d construction on,and the occupancy and the use of the above-described property will be in accordance with the laws,rules and regula i r of the State of Washington,and the City of Arlington.A final inspection and approval shall be obtained when complete. V11- Signature Print Name Date SAVE PRINT Page 3 of REV2.2020 OD Date ca bdoor Page of Job Ref. Where custom is standard. cabdoor.com Subject 17. J4 L.- L 1 RECEi - - LU. 4 2900 Pringle Road SE, N1-150 Salem, OR 97 Installation Manual Industrial Booths Class I >> Open Front Booths - I B >> Open Front Bench Booths - IBB >> Enclosed Industrial Booths - EIB >> Industrial Exhaust Chamber- IBC >> Exhaust Bench - EB This Installation Manual reviews an introduction, safety, component description, installation, maintenance and warranties of RTT's industrial spray booths. 888-452-6684 www.rttsolutions.com Revised August 2020 Follow us: RTT Engineered Solutions 2975 Discovery Blvd.Rockwall,TX 75032 Toll-Free 888-452-6684 Email sales@rttsolutions.com www.rttsolutions.com F1 Cl 1 hi r;ZOO�,r�' Contents 1. Introduction............................................................. 2 4.5 Lights..........................................................................................19 1.1 Introduction ...............................................................................2 4.6 Manometer................................................................................20 1.2 Receiving,Unpacking,and Reporting Missing Items...........2 4.7 Exhaust Filter Installation.......................................................23 2. Safety ..................................................................... 4 4.8 Intake Filter Installation .........................................................23 2.1 Safety Alert Symbol and Signal Words...................................4 4.9 Motor Installation ....................................................................24 2.1.1 Assembly Hazards...................................................................5 4.9.1 Mounting................................................................................24 2.1.2 Operational Hazards..............................................................6 4.9.2 Install Sheaves and Fan Belts.............................................24 2.1.3 Maintenance Hazards.............................................................7 4.9.3 Electrical.................................................................................25 2.1.4 Fire Hazard...............................................................................7 4.10 Tubeaxial Fan..........................................................................26 2.2 Safety Decals...............................................................................8 4.11 Exhaust Duct Installation......................................................26 4.12 Product Door..........................................................................27 4.13 Access Door Limit Switch Installation................................28 3. Component Description ...........................................12 4.14Access Door Latch Installation 29 ............................................ 3.1 Compliance To Applicable Codes.........................................12 4.15 Product Door Limit Switch Installation.............................30 3.2 Material Specifications............................................................12 4.16 Checklist..................................................................................31 3.3 General Description.................................................................12 3.3.1 Paint Area ...............................................................................12 S. Maintenance ...........................................................32 3.3.2 Exhaust Fan and Chambers................................................12 5.1 Maintenance Interval Cart......................................................32 3.3.3 Product Doors.......................................................................12 5.2 Daily............................................................................................33 3.3.4 Door Latch..............................................................................12 5.2.1 Inspect Filters.........................................................................33 3.3.5 Door Limit Switch.................................................................13 5.2.2 Filter Maintenance................................................................33 3.3.6 Air Makeup Unit(Optional) 13 5.2.3 Determine Filter Condition.................................................33 3.4 Exhaust Filter Manometer.......................................................13 5.3 Every Two Months....................................................................33 3.5 Air Solenoid Valve....................................................................13 5.3.1 Lubricate Door Latches........................................................33 3.6 Control Panel ...........................................................................13 5.4 Every Six Months......................................................................34 5.4.1 Check Fan Belts.....................................................................34 4. Installation .............................................................14 5.5 Every Year...................................................................................34 4.1 General.......................................................................................14 5.5.1 Inspect Motor.........................................................................34 4.2 Preliminary................................................................................14 5.5.2 Inspect Fan Wheel.................................................................34 4.2.1 Recommended Booth Layout Tools.................................14 5.5.3 Inspect and Clean Air Solenoid Valve...............................35 4.2.2 Booth Layout Steps..............................................................15 4.2.3 Recommended Booth Installation Tools.........................16 6. Warranty.................................................................36 4.3 Planning Ahead........................................................................16 6.1 Returning Items for Credit......................................................36 4.4 Booth Assembly 17 6.2 Back Charges For Material And Labor..................................37 1 r;ZOO�,r�, Introduction 1.1 Introduction Thankyou for purchasinga RTTspray booth. Please read and understand this manual before usingyour booth and follow all of the safety instructions. Please be sure to keep this manual with your booth at all times. This manual explains the assembly and routine maintenance of the RTTspray booth and covers the following: >> Open Front Booths- I >> Open Front Bench Booths- IBB >> Enclosed Industrial Booths- EIB >> Industrial Exhaust Chambers- IBC >> Exhaust Bench - EB The spray booth itself consists of four major components: paint area,exhaust fan and chamber, product doors and, in some cases, an air makeup unit.A brief description is provided for these and other related items. The text contained in this manual is for current production models. Some instructions and maintenance procedures may not apply to your specific unit. Equipment modifications from original design and specifications are strictly prohibited. Modifications may compromise safe operation of the booth,subjecting users to serious injury or death and may void any remaining warranty. This Operator's Manual does not replace, nor does its use release,the operator from observing all safety or operating limitations as well as any applicable federal,state, provincial or local regulations. 1.2 Receiving, Unpacking,And Reporting Missing Items Check for damage when receiving and unloading equipment. Note on Bill of Lading"FREIGHT DAMAGE" Notify the RTT customer service department immediately of any damage. Unpack all items and verify on packing list within ten (10) days of receipt. Notify RTT customer service department of missing items and discrepancies immediately. RTT will not pay for overnight freight on shorted items. If overnight freight is necessary,the buyer shall be accountable for freight costs. For quality control, RTT's Shipping Department photographs all items as they are packed. Per company policy,two independent checks are performed to verify each item against the packing list. If RTT determines that the reported shortage was checked off in our records, replacement parts will be shipped AND invoiced accordingly. Items that can be shipped UPS usually take one to three days to receive,depending on distance. Items too large for UPS will ship via common freight. This shipping method typically takes from one to five days to reach the destination. 2 r;ZOO�,r�' During the warranty period, RTT will repair or replace, free of charge, any parts that RTT has verified to be defective in materials or workmanship. If inspection of the equipment does not disclose any defect in workmanship of material, repairs will be made at a reasonable charge, which will include the costs of labor, materials and transportation. 3 r;ZOO�,�r 2. Safety 2.1 Safety Alert Symbol And Signal Words Before assembling, operating or servicing the spray booth,you must read, understand and follow the instructions and safety warnings in this manual.Your spray booth may not be equipped with some of the optional equipment described in this manual. NEVER ALLOW ANYONE TO OPERATE THIS EQUIPMENT WITHOUT PROPER TRAINING! The safety information in this manual is denoted by the safety alert symbol: A The level of risk is indicated by the following signal words: DANGER - Indicates a hazardous situation, which, if not avoided, WILL result in death or serious injury. A WARNING WARNING - Indicates a hazardous situation, which, if not avoided, could result in death or serious injury. A CAUTION CAUTION - Indicates a hazardous situation, which, if not avoided, could result in minor or moderate injury. NOTICE NOTICE - Indicates a situation that could result in damage to the equipment or other property. 4 ENGINEERED SOLUTIONS 4 2.1.1 Assembly Hazards A WARNING Prevent serious injury or death. Overriding a safety system may result in unsafe equipment, which may result in serious injury or death. Do not override safety devices. A WARNING Blade hazard. Keep hands clear of rotating parts. Follow lockout procedure before servicing. A WARNING Prevent serious injury or death. Use adequate lifting devices to raise, move and install booth components. A WARNING Prevent serious injury or death. Electrical installations must be performed by qualified electricians. Installation must conform to all national, local, and provincial codes and standards. s 0 1 �0�'r ENGINEERED SOLUTIONS 2.1.2 Operational Hazards A WARNING Prevent serious injury or death. Do not operate machine with guards and/or covers open or removed. A WARNING Prevent serious injury or death. Only trained and qualified personnel may operate booth. A WARNING Prevent serious injury or death. Never operate spray booth while under the influence of drugs, alcohol or while feeling ill. A WARNING Prevent serious injury or death. Always wear personal protective equipment (PPE) appropriate for job. Read Material Safety Data Sheet for products used in spray booth. A WARNING Shock hazard. Only a qualified electrician may open electrical control cabinet. Disconnect and lockout/tagout all power sources before adjusting, repairing, or cleaning booth. ENGINEERED SOLUTIONS 2.1.3 Maintenance Hazards A WARNING Prevent serious injury or death. Disconnect and lockout/tagout all power sources before adjusting, repairing, or cleaning booth. A WARNING Prevent serious injury or death. Service, maintenance and adjustments must be performed by trained and qualified personnel. A WARNING Burn hazard. Do not touch hot parts. Allow to cool before servicing. A WARNING Prevent serious injury or death. Always wear personal protective equipment (PPE) appropriate for job. Read Material Safety Data Sheet for products used in spray booth. 2.1.4 Fire Hazard No smoking or open flame in or near spray booth. Local fire codes prohibit smoking in the vicinity of spray painting operations. A WARNING Explosion and fire hazard. No smoking or open flame within 50 feet of spray booth. 7 r;ZOO�,r�, Do not store flammable liquids adjacent to or inside spray booth. Read all product labels and instructions. Do not use any electric powered airless spray rigs, pressure washers or similar equipment when applying a low flash point solvent or peel coating. Run spray booth exhaust fan to purged a ngerous vapors that could ignite or explode while cleaning or performing maintenance inside spray booth. AN APPROVED FIRE PROTECTION SYSTEM MUST BE INSTALLED ON YOUR SPRAY BOOTH TO COMPLY WITH NFPA 33, SECTION 9. PORTABLE FIRE EXTINGUISHERS MUST BE LOCATED IN OR AROUND YOUR PAINT MIX ROOM PER NFPA 10. 2.2 Safety Decals Severe Injury Hazard Do not enter equipment while in operation. Equipment may start automatically. Eel Do not operate with door open. Installation,operation and service must be done by a trained (l technician only. �h No smoking Failure to follow these instructions can result in death or injury.P n1etlin1FeV5 No open flames O No sparks Risque de Blessures Graves Ne pas entrer dans cot appareil pendant('operation. Cot apparel)pout demarrer automatiquement a tout moment. Ne pas operer I'apparell avec la porte ouverte. 7 t � � L'installation,I'operation et 1'entretien doit titre eectues par un installateur eprouve. _\7 Le non-respect de ces instructions pout entramer de la mort ou des yblessures. 1 � • Electrical Shock Hazard Improper installation,adjustment,alleration,service or maintenance can result in death,injury Disconnect electric before service. or property damage.Read the Installation,Operation and Service Manual thoroughly before More than one disconnect switch may installing or servicing this equipment. be required to disconnect electric from Installation,modification,reglage ou maintenance incorrectes peuvent provoquer de la mort,des equipment. blessures ou des degats materiels.Liser attentivement le manuel d'installation,d'operations et Equipment must be properly grounded. d'entretien avant('installation ou 1'entretien de cot equipment. Failure to follow these instructions can result This heater must be installed in accordance with the manufacturer's instructions and local in death or electrical shock. codes.In the absence of local codes,follow the National Fuel Gas Code,ANSI Z223.1/NFPA 54 of the CAN/CSAB149 installation code. Cot aerotherme doit titre installe en accord avec les instructions du fabricant et les regulations locaux.S'il n'y a pas des regulations Iocaux,('installation doit titre en accord avec le Code Risque de Choc Electrique National de Gaz de Carburant,ANSI Z223.1/NFPA 54 ou le Code d'installation,CAN/ Debrancher le courant avant 1'entretien. GSA-13149. Plus qu'un interrupteur de verrouillage peut We requis pour debrancher le courant electrique de cot appareil. 9W A WARNING L'appareil doit titre connecte a une source de courant reliee a la terre. Le non-respect de ces instructions pout To protect you and others against death or serious injury, all entraner de la mort ou des chocs electriques. applicable labels shown must be on the booth and must be legible. If any of these labels are missing or cannot be read, contact your RTT for replacement labels. s 2.3 NFPA 33 Standards for Spray Application Reprinted with permission from NFPA 33-2016, Standard for Spray Application Using Flammable or Combustible Materials,Copyright©2010, National Fire Protection Association, Quincy, MA. This reprinted material is not the complete and official position of the NFPA on the referenced subject,which is represented only by the standard in its entirety. The following is section 10 from NFPA 33: 10.1 General. Maintenance procedures shall be established to ensure that all spray application apparatus and processes are operated and maintained in accordance with the manufacturers specifications and the requirements of this standard. Maintenance shall be the responsibility of the users of the apparatus and processes. 10.1.1 Spray application operations shall not be conducted outside predetermined spray areas. 10.1.2 Inspection of extinguishing systems shall be conducted to ensure that the performance of the extinguishing system components will not be affected by overspray and residues. 10.2 Combustible Deposits. 10.2.1 All spray areas shall be kept free of excessive accumulation of deposits of combustible residues. 10.2.2 Combustible coverings (thin paper, plastic) and strippable coatings shall be permitted to be used to facilitate cleaning operations in spray areas. 10.2.2.1 Where plastic covering is used, it shall be of a static dissipative nature or shall have a maximum breakdown voltage of 4 kV to prevent accumulation of a hazardous static electric charge. 10.2.3 If residue accumulates to excess in booths, duct or duct discharge points, or other spray areas, all spraying operations shall be discontinued until conditions have been corrected. 10.3 High-Pressure Hose Lines. High-pressure hose lines that convey flammable or combustible coating material in "airless" spray application operations shall be inspected daily and shall be repaired or replaced as necessary. Hose lines and equipment shall be located so that, in the event of a leak or rupture, coating material will not be discharged into any space having a source of ignition. 10.4 Maintenance Procedures 10.4.10verspray collectors shall be inspected daily and clogged filters shall be discarded and replaced. Maintenance procedures shall be established to ensure that overspray collector filters are replaced before restriction to airflow is reduced below the minimum established by Section 7.2. 10.4.2 At the close of the day's operation, all discarded overspray collector filters, residue scrapings, and debris contaminated with residue shall be removed immediately to a designated storage location, placed in a noncombustible container with a tight-fitting lid, or placed in a water-filled metal container. 10.5 Waste Containers. 10.5.1 Approved waste containers shall be provided wherever rags or waste are impregnated with sprayed material, and all such rags or waste shall be deposited therein immediately after use.The contents of waste containers shall be placed in a designated storage location. RTT Waste containers containing flammable liquids shall be located in ventilated areas that meet the requirements of Chapter 7. Such areas shall also meet the electrical area classification requirements of 6.5.5. 9 r;ZOO�,r�, 10.5.3 Waste containers for flammable liquids shall be constructed of conductive materials and shall be bonded and grounded. 10.5.4 Waste containers for flammable liquids shall be handled and stored in accordance with Chapter 8. 10.6 Clothing. Employees'clothing contaminated with sprayed material shall not be left on the premises overnight unless kept in metal lockers. 10.7 Cleaning Operations. 10.7.1 Scope. This section shall apply to the use of flammable or combustible liquids for the flushing and cleaning of equipment. 10.7.2 Liquids. Class I and Class II liquids used in cleaning operations shall be in original shipping containers or in listed safety containers. 10.7.3 Location. Cleaning operations using flammable or combustible liquids shall be conducted inside a spray area with ventilating equipment operating or in ventilated areas that meet the requirements of Chapter 7. Such areas shall also meet the electrical area classification requirements of 6.5.5. 10.7.4 Equipment. Equipment using flammable or combustible liquids shall meet the requirements of 6.5.5 and shall be bonded and grounded. 10.7.5 Manual Cleaning. Individual manual cleaning operations shall be limited to not more than 4 L(1 gal) of flammable or combustible liquid for each cleaning operator. 10.7.6 Liquid Storage. Flammable and combustible liquids shall be handled and stored in accordance with Chapter 8. Containers used for handling,storage, or recovery of Class I liquids shall be constructed of conductive materials and shall be bonded and grounded. 10.8 Solvent Distillation Units (Solvent Recyclers). 10.8.1 Scope. 10.8.1.1 Section 10.8 shall apply to solvent distillation units having distillation chambers or still pots that do not exceed 227 L (60 gal) capacity and are used to recycle Class I, Class II, and Class IIIA liquids. [30:19.6.1.1] 10.8.1.2 This section shall not apply to research,testing,or experimental processes;to distillation processes carried out in petroleum refineries, chemical plants, or distilleries; or to distillation equipment used in dry cleaning operations. [30:19.6.1.2] 10.8.2 Equipment. Solvent distillation units shall be approved or shall be listed in accordance with ANSI/UL 2208, Standard for Solvent Distillation Units. [30:19.6.3] 10.8.3 Solvents. Solvent distillation units shall only be used to distill liquids for which they have been investigated and that are listed on the unit's marking or contained within the manufacturer's literature. [30:19.6.3] 10.8.3.1 Unstable or reactive liquids or material shall not be processed unless they have been specifically listed on the systems markings or contained within the manufacturer's literature. [30:19.6.3.1] 10 r;ZOO�,r�, 10.8.4 Location [30:19.6.4] 10.8.4.1 Solvent distillation units shall only be used in locations in accordinance with their approval or listing. 10.8.4.2 Solvent distillation units shall not be used in basements. 10.8.4.3 Solvent distillation units shall be located away from potential sources of ignition, as indicated on the unit's marking. 10.8.5 Liquid Storage. Distilled liquids and liquids awaiting distillation shall be stored in accordance with Chapter 6 of N FPA 30. 10.9 Spontaneous Ignition Hazards. The same spray booth shall not be alternately used for different types of coating materials if the combination of the materials is conducive to spontaneous ignition, unless all deposits of the first-used coating material are removed from the booth and exhaust ducts priorto spraying with the second coating material. 10.10 Chlorinated Solvents. Coating materials containing chlorinated solvents shall not be used with spray application apparatus or fluid-handling equipment if the chlorinated solvent will come into contact with aluminum within a piping system, pump, enclosed container,or any enclosure that is capable of being pressurized by the potential reaction.This shall apply even if the container or system has been constructed with pressure relief devices. 10.11 Smoking. Signs stating NO SMOKING OR OPEN FLAMES in large letters on contrasting color background shall be conspicuously posted at all spray areas and paint storage rooms. 10.12 Hot Work.Welding, cutting, and other spark producing operations shall not be permitted in or adjacent to spray areas until a written permit authorizing such work has been issued.The permit shall be issued by a person in authority following his or her inspection of the area to ensure that precautions have been taken and will be followed until thejob is completed. r;ZOO�,r�, 3. Component Description 3.1 Compliance To Applicable Codes This spray booth is designed to be in strict accordance with the National Fire Protection Association Standard Number 33, "Spray Application Using Flammable Combustible Materials.The NFPA Standard Safety Code for the Design, Construction and Ventilation of Spray Finishing Operations"This spray booth meets or exceeds the requirements of the Occupational Safety and Health Administration (OSHA). 3.2 Material Specifications The spray booth panels,filter racks and product doors are constructed of 18-gauge steel, conforming to ASTM A653 "Lock Forming Quality".All structural steel channel and angle conform to ASTM A36. 3.3 General Description The spray booth consists of four major components: paint area,exhaust fan and chamber, product doors and, in some cases, an air makeup unit.A brief description is provided forthese and other related items. 3.3.1 Paint Area The paint area is the actual "booth" part of the spray booth. Parts are placed in this area,through product doors, if so equipped,to be painted.Airflows from the intake filters of the booth to the exhaust filters. The booth is constructed of 18-gauge galvanized sheet metal panels which are bolted together.The booth exhaust is routed through the exhaust plenum at the exit of the booth.The exhaust fan then routes the exhaust out through the exhaust duct and discharges it at a point above the roof height of the building. 3.3.2 Exhaust Fan And Chambers The booth exhaust chamber(s) is/are located as shown in the mechanical drawing package included with this manual. Gases are exhausted through the exhaust duct by an electrically powered fan.The fan is made of spark resistant material and the motor is located out of the air stream.The exhaust chamber(s) operate(s) under a negative pressure to induce the required airflow through the exhaust filters. 3.3.3 Product Doors The product doors can be filtered or solid and may be either overhead doors, bi-fold doors,or tri-fold doors. Some industrial spray booths have an open front in lieu of product doors. Overhead doors are equipped with an intrinsically safe pneumatic safety edge.There are two 3-button controls to operate each door. Doors may also be manually operated. 3.3.4 Door Latch Door latches secure doors in closed position and hold contact against rubber seal. Latches are pressure relief latches that allow doors to open in case of explosion.This feature also allows for ease of booth operator egress from the spray booth by applying moderate pressure to the door from inside the booth. 12 r;ZOO�,r�' 3.3.5 Door Limit Switch Optional limit switch to indicate when a door is open on the booth. If a door is in the open position, micro switch contact is opened which breaks the circuit for the paint air solenoid. 3.3.6 Air Makeup Unit(Optional) The air makeup unit (AMU) supplies filtered, heated atmospheric air.This unit may be heated by natural gas, LP gas,steam coils or hot water coils.The temperature of the AMU discharge air is controlled by a temperature controller.The airflow capacity of the fan and motor are matched to the airflow capacity of the spray booth exhaust fans. Some air makeup units also have the capability to provide a paint cure cycle.This cycle, employed after the paint spraying operations are complete,typically involves supplying air that is heated to the paint area of the booth to decrease paint cure times. 3.4 Exhaust Filter Manometer Manometer is used to measure pressure drop across exhaust filters to indicate the condition of the filters. 3.5 Air Solenoid Valve The function of this valve is to interrupt supply of compressed air to painting equipment under certain conditions.This is done to prevent painting from occurring when the booth is not operating as designed or if any booth doors are open.The air solenoid valve is electrically interlocked with booth intake and exhaust fans. If optional switches are purchased, it is also interlocked with product doors and personnel doors. if a fan is not operating properly, or if a door is open,the air solenoid valve will shut off flow of pressurized airto spray gun. Unit should be installed downstream of any regulators and filters and upstream of painting equipment. It should be located near fitting to which painting equipment connects in order to ensure rapid loss of supply pressure. 3.6 Control Panel The spray booth may be equipped with an optional electrical control panel. Electrical schematics are located inside the control panel.Also shown on this drawing is the wiring required for installation. No spare parts are provided with control panel. Panel and its associated wiring must be installed by a licensed electrician.The cabinet that houses controls is either NEMA 1 or NEMA 12 rated. It is not suitable for installation in a Class I, Division II area. Refer to Chapter 6 in the NFPA 33 Standard and consult with the local authority having jurisdiction for definition of this area for paint spray booth. 13 r;ZOO�,r�, 4. Installation 4.1 General This manual is a guide for installing a variety of spray booths.The assembly drawings enclosed are specific for the booth you have purchased.This drawing is an exploded isometric drawing showing the relationship of each panel or part to the next one.A packing list of all components is provided and must be used in addition to the drawing to identify all components. All DAMAGES MUST be reported within 24 hours of receipt and a freight claim filed with the carrier. 4.2 Preliminary RTT booths are manufactured in accordance with NFPA 33 standard for spray application using flammable or combustable materials. However, local codes and regulations may apply to the installation and use of this product.All permits and approvals should be obtained prior to installation and use of the spray booth. 1. Uncrate and inventory all spray booth components to ensure all of the parts are accounted for. Each component is numbered on the exploded view. 2. The floor surface of the booth must be non-combustible material of such character as to facilitate the safe cleaning and removal of residues. The floor surface must be flat and level. 3. Mark the dimensional outline of booth on floor. 4. Follow the step-by-step instructions provided. 4.2.1 Recommended Booth Layout Tools >> Chalk line or self-leveling 5-way laser >> Tape measure >> Marker >> Framingsquare Use the 3-4-5 method (Pythagorean Theorem) AZ+ B2=C2 for a right triangle to layout and square the booth. C is the longest side (hypotenuse) and A and B are the two shorter legs. If a triangle has sides measuring 3,4 and 5 feet (or any other unit), it must be a right triangle with a 900 angle between the short sides.You can multiply each number by the same amount and still use this method. For example let's say that the booth width being installed is 9' I.D., use a multiplier of 3 to achieve the 9' I.D.working width of the booth for your first line (A2) and the right triangle will consist of the following dimensions: >> 3x3=9 (first lineA2) >> 4 x 3= 12 (second line B2) c az+bz=cz a >> 5 x 3= 15 (third line C2) Step one: Locate building drawing showing the booth in the building. b 14 r;ZOO�,r�' 4.2.2 Booth Layout Steps Step 1: Locate a building drawing showing the booth in the building. Step 2: Locate a dimension shown from a reference point such as outside wall, pit, conveyor, building structure, other equipment, etc.to the inside dimension of spray booth. Step 3: Using a chalk line, mark that dimension at two points along a wall (reference point example) and snap a line on the floor. Step 4: Locate the back of the booth and make a mark on the first line that was snapped for the first corner of the booth (I.D.), using T as the first line dimension (AZ example) make another mark at 9' for the back wall of the booth Step 5: Using 12' as our second line dimension (B2 example) make another mark at 12' from one of the corner markings of the back wall off of the first line snapped.When doing so, be sure to stay as square as possible.This is when a framing square comes in handy. Once marked,snap the second line. Step 6: Using 15' as our third line dimension (C2 example) mark and scribe an arc crossing the end of the second line snapped from the opposing corner marking of the back wall off of the first line snapped.This mark is now perfectly square to the back wall of the booth. Snap the third line between these two marks. Step 7: Pull two points off of the third line and snap a fourth line marking the interior work area of the booth. Now that the square interior of the booth is complete, proceed with the rest of the booth (exhaust chambers,fans, air make-up unit etc.) to verify that all components are placed as planned without obstruction. Step 8: Using a laser,verify building clearance,fan ductwork and air makeup unit(if applicable) orientation. Step 9: Using a laser,verify that the floor is level.Any area that will have more than a '/4" gap will need to be shimmed. Step 10: Double check the entire layout for accuracy and to prevent losing your layout,spray clear coat over it before beginning the booth installation. 15 ENGINEERED SOLUTIONS 4.2.3 Recommended Booth Installation Tools >> Step ladders (4',6' and 8') and multi-use ladder >> Wrench and socket sets (1/2", 9/16" and 3/4" most common) >> Screw driver set >> Allen wrenches >> Hammer and dead blow >> Alignment pins and pry bar >> Level (magnetic) >> Caulk gun and utility knife >> 1/4" and 3/8" drive cordless impacts >> 1/2" drive drill >> Drill bits and uni-bit/step-bit >> Hammer drill (SDS) >> Metal nibblers/cutters >> Cut-off saw >> Welding and plasma machines 4.3 Planning Ahead 1. Clearances between other work areas and combustible storage areas must be held as follows: >> 3 ft. minimum clearance at all sides and sealed entry ways (i.e., doorways). >> 3 ft. minimum clearance at all non-sealed entry ways (i.e.,the open face of spray booth or a silhouette openings). >> 10 ft. minimum clearance must be held between the exhaust stack of the booth and the intake of another apparatus. NFPA 33 dictates a minimum discharge clearance of 3 ft.from the nearest combustible material; however,stack height requirements vary with individual states and can be up to 11/2 times the building's roof height from grade. 2. Permits are not included. It is the responsibility of the end user to acquire all permits to install a booth. 3. A FIRE SUPRESSION SYSTEM IS NOT INCLUDED WITH THE BOOTH BUT IT IS REQUIRED. Generally this is supplied and installed by a licensed local installer. 4. Electrical installation must be performed by a licensed electrician familiar with national, local electrical codes and regulations in your location. 16 r;ZOO�,�r 4.4 Booth Assembly When assembling the booth, leave bolts finger tight until the entire booth is assembled.All flanges should face outward. Install bolts from inside so nut is outside of the booth. Use a drift pin to align panel holes when two or more panels are difficult to align by hand. Lay out all floor channel for exhaust chamber and walls.As you attach wall panels together,they will also bolt to the floor channel. A WARNING Prevent serious injury or death. Most booth components weigh 50-500 lbs. Use adequate lifting devices to raise, move and install booth components. NOTICE Prevent equipment damage. Spray booth roof will not support a person. Do not attempt to stand or walk on spray booth roof. Referto exploded view drawings included with yourspray booth. 1. Starting with exhaust chamber at either rear corner, bolt one corner panel and one rear wall corner panel together(use tie channel where applicable). 2. Bolt opposite rear sidewall panel to rear wall panel. 3. Bolt all rear wall panels in place. CHAMBER SIDE PANEL 4. Bolt tie channel along top edge of rear wall panels. FILTER FILLER PANEL 5. Place exhaust fan panel above side and rear wall panels and bolt in place. BOOTH SIDE PANEL 6. Insert filter filler panels between sidewall, roof panels and exhaust chamber. Bolt in place. 7. Following exploded view drawings, continue alternately assembling wall panels and roof panels to each other until you reach front end of booth. Finish off roof section by attaching fire curtain if needed. If booth has front doors, no fire curtain is needed. 17 r;ZOO�,r�' 8. Verify walls are plumb and booth is squarea nd on floor layout marks.Tighten all mounting hardware. 9. Anchor floor channel to floor at a minimum of every 12 inches. 10. Caulk all panel joints inside the booth with the caulk provided. Do not use a silicone caulk. 11. If booth is supplied with a personnel door or product doors, apply gasket to perimeter of all door openings. Attach door hardware and adjust latches. Level door with doors off,then attach doors to hinges. DOOR STOP DOOR SWEEP HOLD DOWN STRIP DOOR 1/8" 5/16 NUT & BOLT DOOR SWEET HOLD DOWN FOAM STRIP TAPE E. 5/16 NUT & BOLT DOOR CHANNEL ' LATCH HOLE FOR ANCHOR BOLT TEK SCREW DOOP SWEEP DOOR HOLD DOWN STRIP )h DOOR SWEEP END VIEW DOOR LATCH DOOR FRAME PRODUCT DOOR AND SEAL DETAIL BASE DETAIL DOOR SWEEP DETAIL 12. Other tallation that may apply to yourtype of booth USE 3/8"O HARDWARE TO ASSEMBLE USE 1/2"0 HARDWARE TO ASSEMBLE @ EACH 5-HOLE PATTERN(NUT&BOLT) ITEMS PICTURED(BOLT,NUT&LOCK WASHERS i FOR OPTIMAL DOOR SEAL APPLY 3/4"GASKET • TO THIS SURFACE • USE 1/2"0 HARDWARE TO ASSEMBLE ITEMS PICTURED(BOLT,NUT&LOCK WASHERS INSTALL PANEL STIFFENERS ON THE OUTSIDE OF CEILING PANEL JUNCTION AS SHOWN DO NOT INSTALL IN BETWEEN 10 O 18 I �0�'r LENGINEERED SOLUTIONS Iwo 4.5 Lights A WARNING Prevent serious injury or death. Electrical installations must be performed by qualified electricians. Installation must conform to all national, local, and provincial codes and standards. 1. Place light fixture into booth panel, center in opening, and bolt in place. 2. Install light fixture in panel from outside of booth as shown in drawing. 3. Caulk perimeter of light fixture lens frame with appropriate caulking. 4. The fixture is provided with an interlock switch that has a normally open contact,which opens when the fixture lens is removed from fixture.The switch is to be wired to disable spray equipment used in spray booth. FIXTURE ENCLOSURE LENS,FRAME GLASS,AND GASKET FIXTURE LENS,FRAME FASTENER FASTENER Et U CAULK SEAM 5/16"0 UNC 18 BOOTH WALL PANEL HEX FLANGE NUT MOUNTING DETAIL PAINT SPRAY BOOTH WALL CAUTION: PANEL WHEN TIGHTENING LENS FRAME FASTENERS,TIGHTEN USING HAND TOOLS ONLY. TIGHTEN UNTIL SIDES OF METAL LENS EX HEAD NUT FRAME MAKES CONTACT WITH FIXTURE ENCLOSURE. OVER TIGHTENING WILL CAUSE LENS FRAME TO WARP AND WILL BREAK DOWN VAPOR SEAL OF LENS 19 ENGINEERED SOLUTIONS 4.6 Manometer Locate manometer on the exhaust chamber so that hardware is not visible inside the booth and can easily be viewed daily. Install close to exhaust filter wall to keep tubing length to a minimum. Excess tubing length will reduce accuracy of the manometer. The high port will connect to work chamber, and the low port will connect to chamber on the suction side of the filter grid. 1. Drill a hole in booth wall just large enough for the plastic hose barb to fit through (approx. 13/32). Install washer and nut on back side. Do not over tighten. 2. Mount manometer on booth wall and ensure it is level using bubble level on manometer. Manometer must be level or it will not be accurate. 2" l. 0 $0 11, 20 r;ZOO�,r�, 3. Turn "Zero Set" knob counterclockwise until it stops,then turn knob counterclockwise three full turns.This will place the adjustment knob in the middle of its travel range. Remove fill plug at top of manometer and slowly fill with red fluid.You will not need the entire bottle. Stop filling as soon as you can see the red fluid enter clear tube at bottom of the manometer.Turn "Zero Set" adjustment knob to set red fluid on 0 mark. If you overfill gauge, remove excess fluid by inserting a pipe cleaner through fill port to blot up excess oil. Once the red fluid is set on zero, replace the fill cap. wyw .20.30 1 4?VU1—$ '.» '09AVIO LQaU.Nh 0 .3c -.05 .10 . 4 I IIIIIIilllllll11411 � I Complete booth assembly and then perform steps 4-6 to set manometer. IMPORTANT:All filters in the booth must be installed and new in order to get an accurate baseline. 4. Turn on exhaust fan. If exhaust fan is connected to a VFD to control the speed of the fan, make sure it is set to run at full speed.You will notice the red fluid should move up the scale and then settle at a number.The number will be different from booth to booth, but that does not matter,this is just a baseline setting. 21 r;ZOO�,r�, 5. Wherever the red fluid stops is where you will place the green arrow. In this example,the red fluid stopped at .25 inches of water column. So because we know our filters are rated for.5 inches of water column, and we know that with clean filters the fan is drawing.25 inches of water column,we simply add the two numbers together to tell us where the filters wi ll pack out. .25 inches of water+ .5 inches of water=.75 inches of water total 0 .20 .30 50 \ 6. Now that baseline is set, measure up the scale .5 inches of water. That is where you will place the red arrow. wwl[R cowMr. 20 .30 . .50 .10 1 1 N IIIIII � II1111 ' I ' I � - At this point,your manometer is set up and ready to use.You should never need to move the arrows once they are placed.Always check the manometer before turning the fan on to ensure the red fluid is sitting on the 0 mark. If the fluid is not on 0,turn "Zero Set" knob to adjust fluid to zero before starting fan. 22 Jim r;zmwwi�rl ENGINEERED SOLUTIONS 4.7 Exhaust Filter Installation Install one wire grid in each filter cell with prongs facing into booth. Exhaust filters will be attached to prongs. FILTER FRAME :��2� FILTER GRID 0 N BOTTOM FLANGE LOCATE GRID ENDS OVER TOP 8 BOTTOM FLANGE OF FRAME FILTER DENSE LAYER TOWARD REAR FILTER GRID FILTER FRAME 4.8 Intake Filter Installation If booth has an intake plenum, insert intake filter into filter grid.The side marked "Air Leaving Side" on filter goes toward inside of booth. FILTER FRAME T9 0 N O V � FILTER TACKY SIDE TOWARD REAR 23 ENGINEERED SOLUTIONS 4.9 Motor Installation Couplings, drive belts, chains or other mounted devices must be in proper alignment, balanced and secure for safe motor operation. 4.9.1 Mounting This motor must be securely mounted. Sufficient ventilation must be provided to insure proper operation. 4.9.2 Install Sheaves And Fan Belts A 1. The fan sheave (A) and motor sheave (B) must be in axial alignment. Shafts must be parallel in both vertical and horizontal planes. 2. The sheaves must be in radial alignment. When sheaves are of equal width, align with a straightedge (C). When sheaves are of unequal width, align center of sheaves. 3. Check fan belts for proper tension and for signs of wear. Belt B should have a slight sag at bottom of sheaves. Belt (D) is properly adjusted. Belt (E) is too loose. Belt (F) is too tight. F R\E 24 IL 4.9.3 Electrical A WARNING Prevent serious injury or death. Electrical installations must be performed by qualified electricians. Installation must conform to all national, local, and provincial codes and standards. Complete booth assembly and then perform steps 1-5 below to connect electrical service to motor. 1 . Determine voltage atyourfacility.RTTdoes not recommend using 120Vsingle phase on motors above 1HP. 2. If a control panel or motor starter was ordered with this booth, confirm that the voltage and phase on the control panel matches the voltage and phase you intend to use. 3. Locate the wiring diagram inside the control panel that matches yourvoltage, phase, and HP. 4. Some motors may have 2 additional red wires.These wires are for an internal thermal overload.We do not use these wires and they should be capped off with wire nuts or electrical tape. 5. Locate the rotation arrow on the fan and verify belts are rotating in the direction of the arrow. If the belts are not rotating in the direction of the arrow, reverse the motor. 6. To insure proper wiring refer to motor nameplate for wiring diagram. 25 4.10 Tubeaxial Fan A WARNING Fan assembly is heavy. Fan assembly weight is approximately 50 - 200 lbs., depending on model. Use an adequate lifting device to install fan assembly. A WARNING Prevent serious injury or death. Electrical installations must be performed by qualified electricians. Installation must conform to all national, local, and provincial codes and standards. The fan and motor assembly will bolt to fan panel. 4.11 Exhaust Duct Installation If equipped with optional exhaust ductwork, it is recommended to have this professionally installed. To assemble ductwork: 1. Bolt pipe with connecting ring to the exhaust fan. AUTOMATIC ROOF 2. Remaining ductwork is crimped on one end to interlock VENTILATOR (ARV) with the next section. Crimped ends of duct shall be TYPICAL SEPARATION p (REGULATED BY installed with the crimped edge pointed inward in the STATE/LOCAL CODES) 72" direction of airflow. STORM COLLAR 3. YourARV(automatic roof ventilator) will be mounted on ROOF LINE FLAT ROOF FLANGE top. PLAIN PIPE ORIENT CRIMP END 4. Storm collarwill attach to duct above flashingto make 3' SECTIONS IN DIRECTION OF it weather proof. A AIR FLOW � o Where more than 25 ft. of piping is required, static pressure DETAIL A71'-� (resistance) is increased and the airflow may be hindered CON �X PLAIN PIPE WITH when using the standard exhaust unit recommended for R NG ION CLEANOUT DOOR use with the booth. 3' SECTION FAN & MOTOR—,�7: Where a piping arrangement of an unusual nature is ASSEMBLY necessary or where two or more elbows are used, a similar condition may exist.Therefore, if either of these situations arises,contact RTT for recommendations. 26 r;ZOO�,r�' Exhaust piping, including the ARV(if used),should extend a minimum of 6 ft. above the highest point of building. There should be an access doorjust above exhaust unit. 4.12 Product Door E C A C A E D- B D B C A C A D B D B C CA C A D B D3 B C A C A E D B D B E Side of door with 2 x 4 in.tube is the hinge side. Before installing door,verify both door channels and top doorstop installed properly and squared.Verify dimension between channels and floor to doorstop with door drawing. Install Left Door 1. Place spacers between door and floor. Door is manufactured to have a 1 in. clearance at bottom, 1/2 in. clearance on top and 1/2 in. clearance on sides. 2. Put hinges in place per dimension (E) on door drawing. Install screw in center of slots A and C on all hinges. Do not tighten screws at this time. 3. Adjust the door in all directions.Assure the door closes completely,then tighten screws. 4. Install screws in center of slots B and D. 5. Remove spacers. 6. Repeat steps 1-5 to install right door. 27 LW ENGINEERED SOLUTIONS 4.13 Access Door Limit Switch installation A E B C E F F D Front View Side View C A— B D 1. Bolt limit switch (A) to limit switch mounting bracket (B) with No.20 x 3/8 in. bolts (E). 2. Unbolt bolt in panel above access door on latch side and bolt the limit switch mounting bracket in place. 3. Measure and cut limit switch lever arm (C) to desired length. 4. Attach limit switch lever arm (C) to limit switch (A) (do not tighten set screw at this time). 5. Attach limit switch trigger plate (D) to door with self tapping screws (F) in front of limit switch lever arm. 6. Make final adjustments to lever arm to assure proper operation. 7. Tighten set screw on limit switch lever arm (Q. 28 ENGINEERED SOLUTIONS 4.14 Access Door Latch Installation EXTEND BOLTS THROUGH ENTIRE DOOR&WALL THICKNESS BOOTH PANELS TEKSCREW ACCESS DOOR IN PLACE WITH BRACKET LIP LATCH SUPPORT ON OUTSIDE OF BRACKET BOLTED P2 LATCH WALL PANEL FLANGE INSIDE PANEL FLANGE ACCESS fDOOR LATCH SUPPORT BRACKET BOLTED P2LATCH IN PLACE LATCH SUPPORT BRACKET BOLTED LATCH SUPPORT BRACKET TEK IN PLACE SCREWED IN PLACE 1. Unbolt two bolts that connect panel and door frame approx.42" from the floor. 2. Insert door latch bracket into panel flange with o the tail laying overthe opposite panel flange. a_ a_ 3. Reinsert bolts and tighten. Q 4. Drill and bolt the P-2 latch striker plate through the door latch bracket and the wall panel. 5. Drill through the door and bolt the P-2 latch to it. 6. Tek screw the tail end of the door latch bracket to the other panel flange. 29 S IL ENGINEERED SOLUTIONS 4.15 Product Door Limit Switch Installation TEK SCREW MOUNTING BRACKET - —_ _ NOUNTING 3/8" BOLT 2 BRACKET 1 4 7 1 2 3 TRIGGER _ TRIGGER 5 PLATE PLATE �!16" NUT \5 TEK SCREW & BOLT DETAIL-B A DETAIL-A SCALE: nts SCALE: nts . . . . . . . . . . . . . . . . DETAIL-B DETAIL—A 1. Bolt limit switch to limit switch mounting bracketwith 3/8 in. bolts. 2. Unbolt bolt in panel and doorstop above center of product door and bolt the limit switch mounting bracket in place.Tek screw the top of the bracket to the upper panel return, if present. 3. Measure and cut limit switch lever arm to desired length. 4. Attach limit switch lever arm to limit switch (do not tighten set screw at this time). 5. Attach the access door limit switch trigger plate to access door with self tapping screws in front of limit switch lever arm. 6. Make final adjustments to lever arm to assure proper operation. 7. Tighten set screw on limit switch lever arm. 30 4.16 Checklist Check the following items prior to start up: 1. Motors wired for proper voltage. 2. All fans and motors turn freely. 3. Lubricate all bearings. 4. Check installation of exhaust fan for proper airflow direction. Generally, exhaust fan airflow is out of booth. 5. Listen for excessive or unusual noise when booth is operating. 6. When door limit switches are applicable,operate the booth and open any door to see if spray gun will shut down. This will verify proper safety operation of the booth. 31 ENGINEERED SOLUTIONS 5. Maintenance A WARNING Prevent serious injury or death. Disconnect and lockout/tagout all power sources before adjusting, repairing, or cleaning booth. A WARNING Prevent serious injury or death. Service, maintenance and adjustments must be performed by trained and qualified personnel. A WARNING Burn hazard. Do not touch hot parts. Allow to cool before servicing. A WARNING Prevent serious injury or death. Always wear personal protective equipment (PPE) specific to the job. Read Material Safety Data Sheet for products used in spray booth. Review and follow all safety precautions before performing any maintenance. 5.1 Maintenance Interval Chart Maintenance Interval Item Daily Every Two Months Every Six Months Every Year Visually Inspect Filters • Lubricate Door Latches • Check And Adjust Belt Tension" • Inspect And Clean Motor • Inspect And Clean Air Solenoid Safety Valve • Adjust belt tension after first week of operation,then every six months thereafter. 32 r;ZOO�,�r 5.2. Daily 5.2.1 Inspect Filters Visually inspect all filters for damage and debris buildup. Replace damaged or clogged filters. 5.2.2 Filter Maintenance A WARNING Prevent serious injury or death. Always wear personal protective equipment (PPE) specific to the job. Wear personal protective equipment to protect against dry paint and dust particles while handling filters. Check manometer gauge daily for condition of filters. Do not change filter based on its appearance. Filters are not necessarily changed at equal time intervals.The usable life of a filter is related to: • Filter material weave • Paint sprayed • Distance from gun to filter • Paint gun type • Amountofthinnerused • Spray pressure 5.2.3 Determine Filter Condition 1. The filter condition is acceptable when the manometer tube scale is between the two arrows. 2. When manometer scale exceeds red pointer flag,filters must be changed. 3. If a different filter media is to be used, manometer setup procedure may need to be changed based on the capacity rating of the media. 5.3 Every Two Months 5.3.1 Lubricate Door Latches Lubricate bearing pin and laminated cam with SAE 30-50 high temperature oil.Tighten set screws in handle as needed. For use in cold areas, use SAE 10-20 high temperature oil. Test explosion-venting feature to verify proper operation. Corrosion and/or build-up of foreign materials may affect proper operation of latches. 33 r;ZOO�,�r 5.4 Every Six Months 5.4.1 Check Fan Belts A 1. The fan sheave (A) and motor sheave (B) must be in axial alignment. Shafts must be parallel in both vertical and horizontal planes. 2. The sheaves must be in radial alignment. When sheaves are of equal width, align with a straightedge (C).When sheaves are of unequal width, align center of sheaves. s 3. Check fan belts for proper tension and for signs of wear. Belt should have a slight sag at bottom of sheaves. Belt(D) is properly adjusted. Belt (E) is too loose. Belt (F) is too tight. F E 5.5 Every Year 5.5.1 Inspect Motor Verify that cooling air to motor has not been diverted or blocked by dirty guards or other obstacles. 5.5.2 Inspect Fan Wheel Inspect fan wheel for buildup of material,which may cause an unbalanced fan wheel.An unbalanced fan wheel may lead to premature failure of the fan wheel, bearings and belt. Clean material buildup as necessary. 34 r;ZOO�,�r 5.5.3 Inspect And Clean Air Solenoid Valve The function of this valve is to interrupt the supply of compressed air to the painting equipment when the booth is not operating as designed or if any booth doors are open. A WARNING My Prevent serious injury. Turn off electrical power, depressurize valve, and vent fluid to a safe area before servicing valve. The time between cleanings varies depending on the medium and service conditions. If voltage to coil is correct, sluggish valve operation,excessive noise or leakage indicates that cleaning is required. Clean strainer or filter when cleaning valve.Thoroughly clean all parts. If parts are worn or damaged, install a complete rebuild kit. Follow instructions included with air solenoid valve. 35 6. Warranty RTT Engineered Solutions has a full one year warranty that begins from the day of shipment on all parts and materials.This warranty does not extend to include labor costs for the replacement of parts or materials covered under warranty. If a part is believed defective, please notify our Customer Service Department.A replacement item shall be shipped and regular freight shall be paid by RTT. If RTT requires the defective part to be returned, appropriate return freight costs shall be paid by RTT. IMPORTANT: Before returning the defective part(s),you must first get an RGA(Return of Goods Authorization)from our Customer Service Department.A copy of the RGA document MUST be included with the returned item(s). The Seller warrants to Buyer that the equipment mentioned herein shall be free from defects of materials or workmanship under normal use and maintenance for a period of one (1)year from date of shipment.The liability of Seller under this warranty shall be limited to the repair or replacement, at Seller's option, of any part or component which may prove to be defective under normal use, service and maintenance after Seller, in its sole discretion, determines same to be defective. Said warranty is conditioned upon Buyer giving Seller immediate written notice of an alleged defect and refraining from the attempted repair of alleged defects without prior written consent of Seller.The Seller makes no warranty whatsoever with respect to accessories or components not supplied by Seller. For any components purchased by Seller for use on or in conjunction with the equipment which is the subject of this contract,the Seller extends to the Buyer only the same warranty granted to Seller by the component vendor or manufacturer. THIS LIMITED WARRANTY IS EXCLUSIVE AND IS IN LIEU OF ANY OTHER WARRANTIES (EXPRESS OR IMPLIED) INCLUDING WARRANTY OF MERCHANTABILITY OR WARRANTY OF FITNESS FOR PARTICULAR PURPOSE AND OF ANY NON- CONTRACTUAL LIABILITIES INCLUDING PRODUCT LIABILITIES BASED ON NEGLIGENCE OR STRICT LIABILITY. EVERY FORM OF LIABILITY FOR DIRECT, SPECIAL, OR CONSEQUENTIAL DAMAGES OR LOSS IS EXPRESSLY EXCLUDED AND DENIED. IN NO CASE SHALL RTT ENGINEERED SOLUTIONS LIABILITY ON THIS WARRANTY EXCEED THE AMOUNT OF THE PURCHASE PRICE. The performance and safety of the equipment mentioned herein is contingent upon proper installation,the use of suitable process materials and operation and maintenance by properly trained personnel. During the warranty period, RTT will repair or replace, free of charge, any parts that RTT Engineered Solutions has verified to be defective in materials or workmanship. If inspection of the equipment does not disclose any defect in workmanship of material, repairs will be made at a reasonable charge,which will include the costs of labor, materials and transportation. 6.1 Returning Items For Credit RTT Engineered Solutions will take back any standard stocked items returned and issue a credit, less a 20%handling and restocking fee. Customer is responsible for all freight charges and the item MUST be returned in its original condition. If the item is damaged in transit you will not receive credit. RTT will mark the Bill of Lading "Damaged"and send you pictures of the damaged item. For custom or non-stock special order items you must contact our Customer Service Department to determine is the item may be returned.Any restocking charges shall be determined on a case by case basis. 36 r;ZOO�,r�' if an item needs to be returned, RTTwil[ issue you an RGA (Return Goods Authorization) form. Please ensure that a copy is sent back with returned item(s). Without an RGA the product maybe lost or returned to stock with no credit issued. Please note that in some cases the freight may be more than the item is worth when credit is received. 6.2 Back Charges For Material And Labor RTT En ineered.Solutions shall not be held responsible for any back charges incurred for materials or labor withoutgpriorwritten consent. Should a problem arise, please notify RTT immediately. Once the issue is investigated,should costs be incurred, an amount shall be agreed on by both parties beforehand. Do NOT attempt modifications or repairs without prior consent as this may void further warranty repairs or credit. RTTwill not accept back charges associated with late delivery. Please address repairs to: RTT Engineered Solutions 2975 Discovery Blvd. Rockwall,TX 75032 Attention: Customer Service Phone: 888-452-6684 Email:sales@rttsolutions.com 37 r;ZOO�,r�' 888-452-6684 www.rttsolutions.com Follow us. RTT Engineered Solutions 2975 Discovery Blvd.Rockwall,TX 75032 Toll-Free 888-452-6684 Email sales@rttsolutions.com www.rttsolutions.com 38 S a P� ins Top O U-C-T Date Page of ca bd oo r - . 3 3 Job Ref. Where custom is standard. cabdoor.com —`1 Subject 3 3 i ICEIAVILED -L� t FEES 0'7 Z A - - - -� -i 1- -- � r 2900 Pringle Road SE, NO150 Salem, OR 97302 Sp IV iz-La O F— -Duc7 Date ICJ�1®� 1 Page of Ca 3 3 Where custom is standard. Job Ref. cabdoorcom - subject 3 - -i - _ -.- � " i - - to - ---- __l - -- 1 - ! F JI { .01 i -- -- CI7:'Y OIL ARLIAT TON- — -- - �--- i - .- BUIL.DING DEPARTMENT � APPROVED i/ , 7/---/X—e e)-; FIR'& 11DDATE 13Y i 6�f`,,Awf1 YJ . I NO QHA�GES AUTHORIZED FEl3 0 7 1024I UNLESS APP,;�I.CM 13Y THE -- BUILD INSPECTOR - - I NO. - 2900 Pringle Road SE, 150 Salem, OR 97302 OD Date ca bd O® r Page of Job Ref. Where custom is standard. cabdoor.com Subject .71 I - i I I -� I1 1 � - I � l � 1 et I _ -TT r1RR E4 C E4 --- -' - r t u i u 4 2900 Pringle Road SE, NO 150 Salem, OR 973102 Permit#: 5811 Permit Date: 02/07/24 Permit Type: COMMERCIAL MECHANICAL Project Name: Chet's Cabinets Spray Booth Applicant Name: Pete Munoz Applicant Address: PO Box 1804 Applicant, City, State, Zip: Marysville,Wa, 98270 Contact: Pete Munoz Phone: 3606597500 Email: munoz6516@comcast.net Scope of Work: spray booth installation Valuation: 22500.00 Square Feet: 8100 Number of Stories: 1 Construction Type: 11113 Occupancy Group: F-1; Factory Mod. Hazard ID Code: Permit Issued: 03/19/2024 Permit Expires: 09/18/2024 Form Permit Type: COMMERCIAL MECHANICAL Status: COMPLETE Assigned To: Hannah Hardwick Property Parcel# Address Legal Description Owner Name Owner Phone Zoning 01100600000700 18824 SMOKEY POINT SMOKEY POINT 637 Warehousing& BLVD UNIT 7 ENTERPRISES LLC Storage Services Contractors Contractor Primary Contact Phone Address Contractor Type License License Pete Munoz Pete Munoz 3606597500 PO Box 1804 OWNER Plan Reviews Date Review Type Description Assigned To Review Status 02/09/2024 COMMERCIAL BUILDING In Review MECHANICAL Fees Fee Description Notes Amount Mechanical Commercial Plan Review Table 4-1 $346.88 Credit Card Service $10.41 Processing/Technology $25.00 ExhaustNentsNent Fans $15.00 Mechanical Base Permit Fee $25.00 Credit Card Service $1.95 Total $424.24 Attached Letters Date Letter Description 03/19/2024 Building Permit Payments Date Paid By Description Payment Type Accepted By Amount 02/09/2024 XBP Con£ $346.88 165233323 02/09/2024 Pete Munoz 165233323 Hannah Hardwick $10.41 03/19/2024 XBP Conf: $65.00 168287958 03/19/2024 Pete Munoz 16828958 $1.95 Outstanding Balance $0.00 Notes Date Note Created By: 03/18/2024 sent fees to be paid again Hannah Hardwick 03/04/2024 permit release is pending the submittal of the fire sprinkler application Hannah Hardwick Uploaded Files Date File Name 03/19/2024 18984381-2024 BLD5811 IssuedPermit.pdf 03/04/2024 18799562-20240304 BLD5811 ApprovedPlans.pdf 02/07/2024 18482183-20240207 BLD5811 SprayBooth Installation Guide.pdf 02/07/2024 18482186-20240207 BLD5811 App.pdf 02/07/2024 18482040-Pete Munoz In Lieu of Contractor Affidavit.pdf • AFFIDAVIT IN LIEU OF CONTRACTOR REGISTRATION Community and Economic Development City of Arlington• 18204 59th Ave NE•Arlington,WA 98223•Phone(360)403-3551 We would like to advise you of the State of Washington's requirement for acting as your own contractor.As the owner of the structure,whether residential or commercial or multi-family,you are allowed to act as your own general contractor. As the owner,if you decide to act as a contractor,you will need to complete this form. %•,�- t tt JA states as follows: Name and Project Address J 1. I have made application for a building permit from the City of Arlington,Washington. 2. I understand that state law requires that all building construction contractors be registered with the State of Washington.The exemptions to this requirement are stated under Section 18.27.090 of the Revised Code Washington,a copy of which is printed on the reverse side of this Affidavit.I have read or am familiar with RCW 18.27.090. 3. I acknowledge that all construction work done pursuant to the proposed building permit for the property described above will be done by the owner of the property or by a licensed contractor. 4. I understand that prior to issuance of a building permit for work which is to be done by any contractor,the City of Arlington must verify that the contractor is registered by the State of Washington,or that one of the exemptions stated under RCW 18.27.090 applies. 5. In order to provide verification to the City of Arlington of my compliance with these requirements,I hereby attest that after reading the exemptions from the registration requirement of RCW 18.27.090,I consider the work authorized under this building permit to be exempt under No. This will therefore,not be performed by a registered contractor. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor or to perform construction work myself. DATE HIS U day of, +�v 202y Signature: � This record was acknowledged before me on g by (date) My1nvZ as 6VJA of C�htfi5 Pwk'ntt-) (name) (type of authority) (name of parry/company) ���`���HI JOH��►rl E �p �c, /s i♦ Nota ublic for the State of Washington My mission Expires: 'L9 s Z o �i *us\, A E1O V P REV2022