HomeMy WebLinkAbout18204 59th Ave Ne_BLD5947_2025 Permit Packet Coversheet
Community and Economic Development
City of Arlington • 18204 59th Avenue NE • Arlington, WA 98223 • Phone (360) 403-3551
Permit Number: BLD5947 Permit Type: Solar Installation
Address: 18204 59th Ave Ne Completed (Month/Year): October 2024
Land Use Bonding or Assignment of Funds
Issued Permit o Confidential Documents. Contact the
Application City to obtain.
Narrative As-Builts
Legal Description Letters and Project Documents
Vicinity Map Other:
Site Plan
Landscape Plan Civil
Complete Streets Checklist Issued Permit
Traffic Impact Analysis Application
Snohomish County Traffic Mitigation Offer Other Applications
WSDOT Traffic Offer Form Construction Calculation Worksheet
Tree Survey Approved Plans
Stormwater Drainage Report Review Comment Form
Geotech Report Letters and Project Documents
Critical Area Evaluation Form Other Agency Permits
SEPA Checklist Reports:
Public Notice Material o Drainage Report Pg:
Water / Sewer Availability Certificate o Stormwater Pg:
Unanticipated Discovery Plan Form o Geotech Pg:
Aerial Photo of Site o All Other Reports
Proposed Building Materials SEPA and Noticing Materials
Lighting Plans and Lighting Cut Sheets As-Builts
Color Elevations Other:
Plat Map
Title Report Building
Lot Closures ✔ Issued Permit
Preliminary Civil Plans ✔ Application
Archaeological Survey Additional Applications
o Confidential Documents. Contact the ✔ Approved Plans
City to obtain. ✔ Letters and Project Documents
Topography (Existing Conditions) Calculations
CC&R’s Project Specification Manuals
Deeds / Easements / Conveyances Reports
/Dedications Certificate of Occupancy
Letters and Project Documents ✔ Other: Pictures & Inspections
Page 1 of 1
CITY OF ARLINGTON
18204 59th Avenue NE, Arlington, WA 98223
INSPECTIONS: 360-403-3417 - Permit Center: 360-403-3551
BUILDING PERMIT
18204 59TH AVE NE Permit #: 5947
PERMIT EXPIRES 180 DAYS AFTER
Parcel #: 31052200200100
DATE OF ISSUANCE.
Scope of Work: Solar panels mounted to roof top of existing building and two carports Valuation: 434206.00
OWNER APPLICANT CONTRACTOR
CITY OF ARLINGTON Veregy Veregy
18204 59TH AVE NE 6406 Castlewat Ct, #100 6406 Castleway Ct. #100
ARLINGTON, WA 98223 Indianapolis, IN 46250 Indianapolis, Indiana 46250
317-402-3893
LIC: 604 821 266 EXP: 02/28/2025
LIC: VERGL*779Q9 EXP: 11/28/2025
MECHANICAL CONTRACTOR PLUMBING CONTRACTOR
LIC #: EXP: LIC #: EXP:
JOB DESCRIPTION
PERMIT TYPE: SOLAR INSTALLATION CODE YEAR: 2021
STORIES: 1 CONST. TYPE:
DWELLING UNITS: OCC GROUP: U; Utility
BUILDINGS: OCC LOAD:
PERMIT APPROVAL
The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any
other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the
Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any
period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice
or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is
authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or
any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or
decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or
on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or
federal law, or any order, proclamation, guidance or decision of the Governor.
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK
AUTHORIZED THEREBY; NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE
STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27.
THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND
ALL FEES ARE PAID.
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN
MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC110/IRC110.
SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on
your sales tax return form and coded City of Arlington #3101.
6/20/2024 05/09/2024
Applicant Signature Date Building Official Date
CONDITIONS
ADHERE TO THE APPROVED PLANS. APPROVED JOB COPY SHALL BE ONSITE FOR INSPECTIONS. CALL FOR
INSPECTIONS.
The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations. The property
owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or
community. The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities
before commencing construction. The property owner shall ensure that the construction project complies with all applicable design
review requirements.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE
PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS,
MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION.
PERMIT FEES
Date Description Fee Amount
06/20/2024 Processing/Technology $25.00
06/20/2024 Building Permit $4,308.41
06/20/2024 Building Plan Review $2,804.81
Total Due: $7,138.22
Total Payment: $7,138.22
Balance Due: $0.00
CALL FOR INSPECTIONS
Call by 3:30 pm for next day inspection, allow 48 hours for Fire Inspections
When calling for an inspection please leave the following information:
Permit Number, Type of Inspection being requested, and whether you prefer morning or afternoon
INSPECTION INFORMATION Pass/Fail
RESIDENTIAL PHOTOVOLTAIC SOLAR PANEL
Community and Economic Development
City of Arlington • 18204 59th Ave NE • Arlington, WA 98223 • Phone (360) 403-3551
The City of Arlington requires a building permit to install Photovoltaic (PV) Solar Panel(s) for residential and
commercial uses. This policy governs Residential uses only.
Other permits may be required per Washington State Labor and Industries or Utility Providers.
SUBMIT ELECTRONIC FILES FOR EACH OF THE FOLLOWING:
REQUIRED DOCUMENTS
City of Arlington Solar Panel Application Roof Plan and Construction Documents
Manufacturer’s installation specifications Engineering, (if required)
Type of Permit: New Installation Addition Replacement
Property Address: Project Valuation:
Lot #: Parcel ID No.: Subdivision:
Project Scope of Work:
Primary Contact: Owner Contractor
Owner Name: Home No.:
Email Address: Cell No.:
Mailing Address: City: State: Zip:
Contractor Name: Office No.:
Email Address: Cell No.:
Mailing Address: City: State: Zip:
L&I Contractor License Number: Expiration Date:
Existing Roof Structure: Existing Roof Material:
Building Square Footage: Number of Stories:
INSPECTION REQUIREMENTS
Roof mount panels require two (2) inspections minimum
1. The first inspection is for the roof mount racking hardware to verify compliance and attachment.
(You may schedule this inspection for the day the panels are being installed. You may begin mounting panels over the
racking prior to inspection but there must be enough racking exposed for the inspector to verify compliance.)
2. The final inspection shall be scheduled when the project is complete and after Labor and Industries has approved the
electrical.
I hereby certify that I am the Owner Contractor and authorized to sign this application and that the above information is
correct and construction on, and the occupancy and the use of the above-described property will be in accordance with the laws,
rules and regulation of the State of Washington, and the City of Arlington.
Signature Print Name Date
LETTER OF TRANSMITTAL/SUBMITTAL
To: From:
Job: Date:
 Attached  Under separate cover via the following items:
 Drawings  Prints  Plans  Samples ÂSpecifications
 Copy of letter  Change order  Misc. Doc’s
Quantity Date Contractor Description
THESE ARE TRANSMITTED AS CHECKED BELOW:
 For approval  No Exceptions Taken  Resubmit copies for approval
 For your use  Action to be taken  Submit copies for distribution
 As requested  Returned for confirmation  Return corrected response
 Reviewed with comments  _____________________________________________________________
 For Bids Due ____ ______________________________  Prints returned after loan to us
Remarks:
Signed By: ____________________________ Dated: ________________________________
1
45 degree stiff leg
behind rack in between
hvac equipment
84"
72"
Your jobsite for permit number 4436929E was inspected 9/25/2024 by Electrical Inspector Michael Hess.
The results of inspection are listed below:
Inspections:
Inspection Date Inspection Result Inspection Comment
9/25/2024 Service,Altered,Underground,208V, Approved Complete 400a, moved PV output
201-400A source from DOT service
to Airport service
The following corrections were written on this inspection today.
The following corrections were marked completed on this inspection today.
You can view all inspection information on this permit online at Labor and Industries, electronic permit
and inspection system. Additional fees may be assessed and will not appear until they are processed by
our support team.
If you do not have any correction(s), no further action is needed at this time.
You may have one or more correction items needing attention:
The results of your inspection request are attached. Your installation did not meet minimum safe-wiring
standards required by Washington state law. [National Electrical Code, RCW 19.28, and/or WAC 296-
46B]
Please note that per RCW 19.28.101(3); all corrections must be made within 15 days of the date issued.
For correction items notated “Reinspect on Finalâ€; you must complete the corrections within 15 days of
the date issued and request a progress inspection or final inspection within 45 days of the date of this
letter.
! "#$%&'()#*+$&*#(,&($''#-.
/0 1! 2.(.+%
/0 1/3344 5 5"67$).86$"$9:;
/0 1<=<><? *@#6*6,&)#79 5
=1 A6-B6(%#CC7
D1 E; F FEG E
H0 I7#CC7JK.(.+%L-&C
> MNO &)6(,6*.)7C&P*$.@$&(&&'$&,&'.Q#7$#*+RP#)@#*+6*@$8&-6(,&($7
S0T1 E 5L
>UTV G5
!TWM>4 ;
=14T 1
X T1 YT Z[Z$#)#$%
\=3 ""
\44T3 5
H]4 ;;
V
>T4 "^_``
/44a13 b(#7$#*c&7$.(
_6(-.): @@(.77.+6)d.7-(#,$#&*8*.(6C. 8*.(_B&*. A&*#*+
"fc E;#(,&($7h
E; ;;G e2``
g c)%#*+c#.)@7
=1 4
"&*$(6-$&(_(#C6(%"&*$6-$_B&*.@@(.77"&*$(6-$&(%,.#-.*7. #-.*7.:
5 5"67$).86% "Z"
2.(.+% A6-B6(%#CC7 " 5 G;55
"$L:; ""
5 5"67$).86% "Z"
2.(.+% A6-B6(%#CC7 h2`gi j
"$L:; ""
\14 14
d6$.*7,.-$#&*%,.d.7-(#,$#&*-B.@P).@d6$."&C,).$.@d6$.*7,.-$&($6$P7
;;
!"#$$#$!$"%&'(&&'%()*'& '(+
,
-
(.
/#01 2$34!!
) 1/. 51"67 2"89!:4"7
) 1/1 51"6$ 2$8:!"4:7
;<= >?@ABCDEE
F==GHIJ==K
&
!3#!L#$!$" MNOPQORSTUVWOX
YZ=
/ )
/ .).
\)/]^_
![#$!#$!$" 2`879:4$$
$!$:$3:``
ab= =I cdG >eDee
f<=
(] )_
!"#$$#$!$" 1 0 1 4g-
hi<II,
-1( .
![#$!#$!$" jkklkmnkojpjnpqplrMstqmnurvwwVxyUQtxz{|wQ}
![#$!#$!$" jkklkmnjojpjnpqplrMstqmnurvwwVxyUQTP~R{|wQ}
![#$!#$!$" jkklk€lojpjnpljprMstqmnurÂ{{NUQTUVWOX|wQ}
!3#!$#$!$" jp€ljllkojpjnpqpkrMstqmnur‚OXUTP~Rƒt~X~‚„UUX{|wQ}
!"#$$#$!$" jpkmlnkjojpjnpnjjrMstqmnur‚XVNzXNV~P UwxVX|wQ}
!"#$$#$!$" jpkmlnk€ojpjnpnjjrMstqmnurvRRN~PTVxQNzXOxR UwxVX|wQ}
!"#$$#$!$" jpkmlnknojpjnpnjjrMstqmnurvwwPOz~XOxR|wQ}