Loading...
HomeMy WebLinkAbout18204 59th Ave Ne_BLD5947_2025 Permit Packet Coversheet Community and Economic Development City of Arlington • 18204 59th Avenue NE • Arlington, WA 98223 • Phone (360) 403-3551 Permit Number: BLD5947 Permit Type: Solar Installation Address: 18204 59th Ave Ne Completed (Month/Year): October 2024 Land Use Bonding or Assignment of Funds Issued Permit o Confidential Documents. Contact the Application City to obtain. Narrative As-Builts Legal Description Letters and Project Documents Vicinity Map Other: Site Plan Landscape Plan Civil Complete Streets Checklist Issued Permit Traffic Impact Analysis Application Snohomish County Traffic Mitigation Offer Other Applications WSDOT Traffic Offer Form Construction Calculation Worksheet Tree Survey Approved Plans Stormwater Drainage Report Review Comment Form Geotech Report Letters and Project Documents Critical Area Evaluation Form Other Agency Permits SEPA Checklist Reports: Public Notice Material o Drainage Report Pg: Water / Sewer Availability Certificate o Stormwater Pg: Unanticipated Discovery Plan Form o Geotech Pg: Aerial Photo of Site o All Other Reports Proposed Building Materials SEPA and Noticing Materials Lighting Plans and Lighting Cut Sheets As-Builts Color Elevations Other: Plat Map Title Report Building Lot Closures ✔ Issued Permit Preliminary Civil Plans ✔ Application Archaeological Survey Additional Applications o Confidential Documents. Contact the ✔ Approved Plans City to obtain. ✔ Letters and Project Documents Topography (Existing Conditions) Calculations CC&R’s Project Specification Manuals Deeds / Easements / Conveyances Reports /Dedications Certificate of Occupancy Letters and Project Documents ✔ Other: Pictures & Inspections Page 1 of 1 CITY OF ARLINGTON 18204 59th Avenue NE, Arlington, WA 98223 INSPECTIONS: 360-403-3417 - Permit Center: 360-403-3551 BUILDING PERMIT 18204 59TH AVE NE Permit #: 5947 PERMIT EXPIRES 180 DAYS AFTER Parcel #: 31052200200100 DATE OF ISSUANCE. Scope of Work: Solar panels mounted to roof top of existing building and two carports Valuation: 434206.00 OWNER APPLICANT CONTRACTOR CITY OF ARLINGTON Veregy Veregy 18204 59TH AVE NE 6406 Castlewat Ct, #100 6406 Castleway Ct. #100 ARLINGTON, WA 98223 Indianapolis, IN 46250 Indianapolis, Indiana 46250 317-402-3893 LIC: 604 821 266 EXP: 02/28/2025 LIC: VERGL*779Q9 EXP: 11/28/2025 MECHANICAL CONTRACTOR PLUMBING CONTRACTOR LIC #: EXP: LIC #: EXP: JOB DESCRIPTION PERMIT TYPE: SOLAR INSTALLATION CODE YEAR: 2021 STORIES: 1 CONST. TYPE: DWELLING UNITS: OCC GROUP: U; Utility BUILDINGS: OCC LOAD: PERMIT APPROVAL The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY; NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC110/IRC110. SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on your sales tax return form and coded City of Arlington #3101. 6/20/2024 05/09/2024 Applicant Signature Date Building Official Date CONDITIONS ADHERE TO THE APPROVED PLANS. APPROVED JOB COPY SHALL BE ONSITE FOR INSPECTIONS. CALL FOR INSPECTIONS. The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations. The property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or community. The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities before commencing construction. The property owner shall ensure that the construction project complies with all applicable design review requirements. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT FEES Date Description Fee Amount 06/20/2024 Processing/Technology $25.00 06/20/2024 Building Permit $4,308.41 06/20/2024 Building Plan Review $2,804.81 Total Due: $7,138.22 Total Payment: $7,138.22 Balance Due: $0.00 CALL FOR INSPECTIONS Call by 3:30 pm for next day inspection, allow 48 hours for Fire Inspections When calling for an inspection please leave the following information: Permit Number, Type of Inspection being requested, and whether you prefer morning or afternoon INSPECTION INFORMATION Pass/Fail RESIDENTIAL PHOTOVOLTAIC SOLAR PANEL Community and Economic Development City of Arlington • 18204 59th Ave NE • Arlington, WA 98223 • Phone (360) 403-3551 The City of Arlington requires a building permit to install Photovoltaic (PV) Solar Panel(s) for residential and commercial uses. This policy governs Residential uses only. Other permits may be required per Washington State Labor and Industries or Utility Providers. SUBMIT ELECTRONIC FILES FOR EACH OF THE FOLLOWING: REQUIRED DOCUMENTS City of Arlington Solar Panel Application Roof Plan and Construction Documents Manufacturer’s installation specifications Engineering, (if required) Type of Permit: New Installation Addition Replacement Property Address: Project Valuation: Lot #: Parcel ID No.: Subdivision: Project Scope of Work: Primary Contact: Owner Contractor Owner Name: Home No.: Email Address: Cell No.: Mailing Address: City: State: Zip: Contractor Name: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: L&I Contractor License Number: Expiration Date: Existing Roof Structure: Existing Roof Material: Building Square Footage: Number of Stories: INSPECTION REQUIREMENTS Roof mount panels require two (2) inspections minimum 1. The first inspection is for the roof mount racking hardware to verify compliance and attachment. (You may schedule this inspection for the day the panels are being installed. You may begin mounting panels over the racking prior to inspection but there must be enough racking exposed for the inspector to verify compliance.) 2. The final inspection shall be scheduled when the project is complete and after Labor and Industries has approved the electrical. I hereby certify that I am the Owner Contractor and authorized to sign this application and that the above information is correct and construction on, and the occupancy and the use of the above-described property will be in accordance with the laws, rules and regulation of the State of Washington, and the City of Arlington. Signature Print Name Date LETTER OF TRANSMITTAL/SUBMITTAL To: From: Job: Date:  Attached  Under separate cover via the following items:  Drawings  Prints  Plans  Samples Specifications  Copy of letter  Change order  Misc. Doc’s Quantity Date Contractor Description THESE ARE TRANSMITTED AS CHECKED BELOW:  For approval  No Exceptions Taken  Resubmit copies for approval  For your use  Action to be taken  Submit copies for distribution  As requested  Returned for confirmation  Return corrected response  Reviewed with comments  _____________________________________________________________  For Bids Due ____ ______________________________  Prints returned after loan to us Remarks: Signed By: ____________________________ Dated: ________________________________ 1 45 degree stiff leg behind rack in between hvac equipment 84" 72" Your jobsite for permit number 4436929E was inspected 9/25/2024 by Electrical Inspector Michael Hess. The results of inspection are listed below: Inspections: Inspection Date Inspection Result Inspection Comment 9/25/2024 Service,Altered,Underground,208V, Approved Complete 400a, moved PV output 201-400A source from DOT service to Airport service The following corrections were written on this inspection today. The following corrections were marked completed on this inspection today. You can view all inspection information on this permit online at Labor and Industries, electronic permit and inspection system. Additional fees may be assessed and will not appear until they are processed by our support team. If you do not have any correction(s), no further action is needed at this time. You may have one or more correction items needing attention: The results of your inspection request are attached. Your installation did not meet minimum safe-wiring standards required by Washington state law. [National Electrical Code, RCW 19.28, and/or WAC 296- 46B] Please note that per RCW 19.28.101(3); all corrections must be made within 15 days of the date issued. For correction items notated “Reinspect on Final”; you must complete the corrections within 15 days of the date issued and request a progress inspection or final inspection within 45 days of the date of this letter.        ! "#$%&'()#*+$&*#(,&($''#-. /0 1! 2.(.+% /0 1/3344 5 5"67$).86$"$9:; /0 1<=<><? *@#6*6,&)#79 5  =1  A6-B6(%#CC7 D1 E; F FEG E H0 I7#CC7JK.(.+%L-&C > MNO &)6(,6*.)7C&P*$.@$&(&&'$&,&'.Q#7$#*+RP#)@#*+6*@$8&-6(,&($7 S0T1 E 5L >UTV G5 !TWM>4 ; =14T 1 X T1 YT Z[Z$#)#$% \=3 "" \44T3 5 H]4 ;;  V  >T4 "^_`` /44a13 b(#7$#*c&7$.(  _6(-.): @@(.77.+6)d.7-(#,$#&*8*.(6C. 8*.(_B&*. A&*#*+ "fc E;#(,&($7h E; ;;G  e2`` g c)%#*+c#.)@7 =1 4 "&*$(6-$&(_(#C6(%"&*$6-$_B&*.@@(.77"&*$(6-$&(%,.#-.*7. #-.*7.: 5 5"67$).86% "Z" 2.(.+% A6-B6(%#CC7 " 5 G;55 "$L:; "" 5 5"67$).86% "Z" 2.(.+% A6-B6(%#CC7 h2`gi j "$L:; "" \14 14 d6$.*7,.-$#&*%,.d.7-(#,$#&*-B.@P).@d6$."&C,).$.@d6$.*7,.-$&($6$P7 ;;        !"#$$#$!$"%&'(&&'%()*'& '(+ , - (.  /#01 2$34!! ) 1/. 51"67 2"89!:4"7 ) 1/1  51"6$ 2$8:!"4:7 ;<= >?@ABCDEE F==GHIJ==K  &  !3#!L#$!$" MNOPQORSTUVWOX YZ=  / ) / .).  \)/]^_ ![#$!#$!$" 2`879:4$$ $!$:$3:`` ab= =I cdG >eDee f<=  (] )_ !"#$$#$!$" 1 0 1  4g- hi<II,   -1( . ![#$!#$!$" jkklkmnkojpjnpqplrMstqmnurvwwVxyUQtxz{|wQ} ![#$!#$!$" jkklkmnjojpjnpqplrMstqmnurvwwVxyUQTP~R{|wQ} ![#$!#$!$" jkklk€lojpjnpljprMstqmnur{{NUQTUVWOX|wQ} !3#!$#$!$" jp€ljllkojpjnpqpkrMstqmnur‚OXUTP~Rƒt~X~‚„UUX{|wQ} !"#$$#$!$" jpkmlnkjojpjnpnjjrMstqmnur‚XVNzXNV~P UwxVX|wQ} !"#$$#$!$" jpkmlnk€ojpjnpnjjrMstqmnurvRRN~PTVxQNzXOxR UwxVX|wQ} !"#$$#$!$" jpkmlnknojpjnpnjjrMstqmnurvwwPOz~XOxR|wQ}