Loading...
HomeMy WebLinkAbout18822 Iris Ct_P26-0166_2026 City of Arlington 18204 59th Avenue NE, Arlington, • • Washington 98223 Phone: 360-403-3551 jNG� WASHINGTON C Invoice Number: 26-0281 INVOICE Invoice Date: March 19, 2026 Account Number: 3148292788 Bill To: Invoice Questions? ATCO Telecommunications Phone: 360-403-3551 708 First St. Email: ced@arlingtonwa.gov Invoice Due Date: March 19, 2026 Record Number: Project A26-0166 Parcel Number: 00738500103319 Location: 18822 IRIS CT Date Description Paid Date Amount Paid Balance March 19, 2026 Processing/Technology Fee (320.341.43.00.02) $25.00 March 19, 2026 Right of Way(006.322.40.00.02) $125.00 TOTAL: Project Fees $150.00 $150.00 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------- REMITTANCE INFORMATION If you are paying by check, please include this portion with your payment and remit to the address listed on this invoice. Remittance Information Invoice Account Total Due Your payment is due by March 19, 2026 Number Number This Invoice 26-0281 3148292788 $150.00 ATCO Telecommunications 708 First St. 18204 59th Avenue NE • op ' • 14 Arlington, Washington 98223 to tt Phone: 360-403-3551 jNG� WASHINGTON C Civil Use - Right of Way Permit Parcel:00738500103319 Permit#:26-0166 Permit Address:18822 IRIS CT Permit Expiration: June 28, 2026 Description of Work:From flowerpot Unk,bore --30'under driveway&place new flowerpot. Rest of work to be completed on private property. OWNER APPLICANT CONTRACTOR ATCO Telecommunications ZIPLY FIBER NW ZIPLY FIBER NW 708 First St. 16315 71ST PL W EDMONDS,WA,98026-4903 16315 71ST PL W EDMONDS,WA,98026-4903 4026708384 permits@atcotelecom.com registration_number: PERMIT APPROVAL The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor. It is unlawful to use or occupy a building or structure until a final inspection has been made and approval or a Certificate of Occupancy has been granted. This permit authorizes only the work noted and covers work to be done on private property only. Any construction on public domain (curbs, sidewalks, driveways, marquees, etc.) will require a separate permit. The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations. The property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or community. The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities before commencing construction. The property owner shall ensure that the construction project complies with all applicable design review requirements. CONDITIONS The applicant is required to notify the City for inspections. Failure to give notice will result in violation of AMC 1 ) Chapter 12.40.240 and may result in additional inspection fees. To request an inspection call 360-403-3417 by 3:30 for next day inspection. Applicant must comply with all applicable City of Arlington, state and federal laws, ordinances, code and regulation in performing the work authorized by this permit. Traffic Control must comply with the current version of MUTCD. Work Hours are 7 am to 7 pm Monday- Saturday (no work on Sundays or City Recognized Holidays). Inspections are not available on Saturday or 2.) Sunday. Non-motorized traffic control must be provided if any part of the work impacts existing non-motorized facilities. Non-motorized traffic control measures shall provide a level of accessibility that are, at minimum, equal to the existing conditions of the site. Two days before starting work, the applicant must have all utilities located. One Call, is a public utility locating 3 ) service (#811 or 1-800-424-5555). Privately installed facilities must also be located using a private utility locating service. Private property owners which may be affected by the proposed work must be notified in advance of potential disruptions in access or utility services. Please be advised Ziply is responsible for ensuring the placement of new and updated structures. Do not restrict 4.) existing use of right of way. Please take special note of secondary accesses that are used for RVA€"s, boats, or other special uses. Restoration of any infrastructure affected by the installation shall be per City of Arlington Standards & 5.) Specifications within a period not to exceed 7 days from completion of the installation. Trench Restoration shall be per Standard Detail R-140; Contact the City Engineer for Roadway Restoration requirements, 360-403-3512. INSPECTIONS Inspection Line: 360-403-3417 Call for inspections by 3:30 pm for next day inspection. Please allow 48 hours for Fire Inspections. Please provide the following information when leaving a message: Permit Number, Type of Inspection, and provide preference of morning or afternoon inspection. Inspection Portal: Please login to customer portal and submit for the desired inspection type for the permit. APPROVED BY Admin - Thad Newport Development Services Engineering Manager ASSOCIATED FEES Date Description Paid Date Amount Paid Balance March 19, 2026 Processing/Technology Fee(320.341.43.00.02) $25.00 March 19, 2026 Right of Way(006.322.40.00.02) $125.00 TOTAL: Project Fees $150.00 $150.00 Credit/Debit Card 450 Payment Successful March 20, 2026 $150.00 $0.00 Right-of-Way Permit Application For submittal checklist, see below. *denotes required fields Project Information *Project Name: 211029 *Description of Project: Engineers Estimated Cost of Construction; $ 2000 Contact Information Owner Information *Owner Name: IZIPLY FIBER NW *Office No.: 402-670-8384 *Email Address: Permits@atcotelecom.o *Cell No.: 402-670-8384 *Mailing Address: 1426 E CASINO RD *City: IEVERETT *State: WA *Zip: 98208 Engineer Information Engineer Name: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: Professional License Number: Expiration Date: Contractor Details Primary Contractor: IPACIFIC CABLE Office No.: Email Address: LUKE@PACCAB.COM Cell No.: 425-348-7735 Mailing Address: IPO BOX 573 City: WOODINVILLE State: WA Zip: 198072 L&I Contractor IPACIFCC954PJ License Number: Expiration Date: 2026-05-31 Acknowledgement I, hereby certify that I have read and examined this application, City of Arlington Municipal Code, Standard Plan & Specifications. Performance of the proposed work shall follow all applicable laws and regulations. The owner/applicant shall assume full and complete responsibility for said work and shall be responsible for the acquisition and compliance of all applicable permits and/or authorizations which may include, but not limited to, Right of Way Permit, WSDW Hydraulic Project Approval(HPA), WSDOE Notice of Intent(NOI), National Pollutant Discharge Elimination System (NPDES), Army Corp. of Engineers Permits, the requirements of the Endangered Species Act, and the Forest Practices Application (FPA). *Print Name: lAutumn Callihan *Date: 2026-03-19 Submittal Checklist Complete package constitutes all items. Only complete submittals will be acce12 Electronic files shall be PDF and submitted through this portal, email or downloadable link to file server. • Construction Plans; refer to Design Recluirements and Chanter 1 of the City of Arlington's Design and Construction Standards and Specifications Manual for required sheets. • Traffic Control Plan. • Road Closure Request. • Temporary Erosion & Sediment Control (TESC) Plan if new or replaced hard surfacing is being constructed. • Certificate of Insurance with the City of Arlington named as Additional Insured. Permit fee and any assurarnce device (Bond or Assignment of Funds) due at time of permit issuance. An invoice with link for payment will be sent to the applicant email address once permit is reviewed and approved. ATCO COMMUNICATIONS SERVICES,LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION.UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL.REF.MUTCD 2009 6A-01(10) IAI" O CITY OF A R L I N G T O N ATCO COMMUNICATIONS SERVICES,llC www.atcotelecom.com 360.563.9000 708 First Street Snohomish,WA 98290 zipY I fiber (D in,gdom Hall Everett,WA98206 of Jehovah's Witnesses_.. c Z I N O U ~ 06 H Z W O z � U Q c~n uim 2 � dw w N N N CO Vm W Ilk O � � U � U) w w m � � o p WORK AREA Z Q z w U U U O Lu Lu H Q Z O O LU U d a O LL DATE: 3.19.26 REVIEWED BY: M. LUNA WTCS#013184 DESIGNED BY: A.CALLIHAN ATCO CONTACT: 208.512.7636 autumn.callihan@atcotelecom.com SCALE: SHEET: VICINITY MAP NOT TO SCALE NO: 1 OF 2 LEGEND: ,--tA ;; ATCO COMMUNICATIONS SERVICES,LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, O SIGNALIZED INTERSECTION MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. PHASE APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY O 4 ENFORCEMENT AUTHORITY IN THE JURISDICTION.UTILIZATION AND IMPLEMENTATION OF THIS PLAN CONE(CANDLESTICK) SHALL BE A RESULT OF THE APPROVAL.REF.MUTCD 2009 6A-01(10) TYPE III BARRICADE ATCO COMMUNICATIONS SERVICES,LLC 188TH ST NE www.alcotelecom.com WORK TRUCK X WORK DETAILS: 360.563.9000 (25 MPH) 708 First Street WORK ZONE LIMITS W20-1 From flowerpot Unk,bore-30'under driveway& Snohomish,WA 98290 3_EP--�EP EP place new flowerpot.Rest of work to be completed SHOULDER 3 on private property. PORTABLE SIGN d3 d3 d3 d3 —EP CONTRACTOR TO PLACE NO I lyfibpr EF EP PARKING SIGNS 72 HOURS 4 EXISTING SIGN � EP—EP PRIOR TO START WORK ® DRIVEWAY 3 SHOULDERd3 43 188TH ST NE Everett,WA98206 ` _ 25 MPH SIDEWAL�d31F'O v o ( ) SPOTTER NEEDED FOR PEDESTRIAN TRAFFIC ARROW BOARD m _ (WHERE REQUIRED) y U d Q rn U) N U DIRECTION OF TRAFFIC W X 1 CDL o Z U _0 (NOT PAVEMENT MARKINGS) X mC14 N O 7 U • W21-5 y (~0 od ` H FLAGGER-SPOTTER ffTZ Z LU OU J C Q (n J • D=O �a m N FLAGGER STATION m o Z8�EP� U m Fp Q J N F OU R9-9 FLOWER POT 0 1 n' LINK z O U \� U U) 2 F PROPOSED 40, w w ' FLOWER POT R9-9 STq 040 M FR N z Q z ui I­_ I­_ g NOTE: w w Z 18822 MON.-FRI.=7:00am TO 4:00pm O O O J d d J LL CHANNELIZATION DEVICE SPACING(feet) MPH TAPER TANGENT 50/70 40 80 DATE: 3.19.26 35/45 30 60 25/30 20 40 REVIEWED BY: M.LUNA WTCS#013184 SIGN LEGEND: SIGN SPACING=X(1) DESIGNED BY: A.CALLIHAN FREEWAY&EXPRESSWAYS 55/70 MPH 1500'± RURAL HIGHWAYS 60/65 MPH 8001± ATCO CONTACT: 208.512.7636 atcotelecom.com RURAL ROADS 45/55 MPH 500'± autumn.callihan@atcotelecom.com SHOULDER TAPER LENGTH=L/3(feet) @ ROAD RURAL ROADS&URBAN ARTERIALS 35/40 MPH 350'± WORK SHOULDER SIDEWALK SHOULDER POSTED SPEED(MPH) RURAL ROADS&URBAN ARTERIALS 25/30 MPH 200'± (2) SCALE: SHEET: AHEAD WORK CLOSED WIDT(feeH 25 30 35 40 45 50 55 60 65 ]� RESIDENTIAL&BUSINESS DISTRICTS 8 40 40 60 90 120 130 150 160 170 190 URBAN STREETS 25 MPH OR LESS 100'± (2) 0 1"=50' L (1)ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, W20-1 W21-5 R9-9 R8-3a 10 40 60 90 90 150 170 190 220 220 240 AT-GRADE INTERSECTIONS AND DRIVEWAYS USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8' (2)THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. NO:2 OF 2 LEGEND: El 7711 EXISTING TERMINAL CITY OF ARLINGTON FTM-1 PROPOSED TERMINAL O ATCO COMMUNICATIONS SERVICES,llC www.alcotelecom.com EXISTING UTILITY POLE 360.563.9000 708 First Street ® PROPOSED NEW POLE Snohomish,WA 98290 I H H 1 EXISTING HANDHOLE PROPOSED NEW HANDHOLE 2'x3' z I I f i b e r M H EXISTING MANHOLE 1. Everett,WA 98206 rn ¢ U EH PROPOSED NEW MANHOLE z c4 FLOWER POT N 0 EXISTING FLOWER POT U N K Lu 6 Z Z O U ® PROPOSED NEW FLOWER POT _ Q U) Q m 2 rn 00_ ~ z a EXISTING UNDERGROUND UTILITY 4- Q N PROPOSED UNDERGROUND \ U CONSTRUCTION[HAND DIG,BORE] _ r �—� EXISTING AERIAL SPAN \ Ll— 00 PROPOSED AERIAL SPAN _ O. L^/ � CENTER LINE I ' — — PARCEL LIMITS[PROPERTY LINE] ►� s I y EOP EDGE OF PAVEMENT i AhL FOA ROW RIGHT OF WAY O ti U WORK DETAILS: } m uj U ~ z From Flower pot Unk,bore-30'under driveway&place new �'.yle _ z Q W ` U U U flowerpot.Hand dig rest to customer property. Q _}P r F f W -') Of Z W W W J 18822 a a zLL MINIMUM STANDARDS FOR DIRECTIONAL BORING STREET CROSSINGS a DATE: EX.GRADE - DESIGNED BY: A. CALLIHAN _. JO ATCO CONTACT: 208.512.7636 12"MIN 48"MIN utumn.callihan@atcotelecom.com BORE PIT FROM EX.UTILITIES RECEIVE IT Knowwhanbekm SCALE: SHEET: Call before you d� -PLACE T DMA KER BACKFITLEDA UTILITY OWNERS DIN 12"LIFTS WITH MATERIAL NOT T O O -BORE PIT TO BE BACKFILLED AND COMPACTED IN 72"LIFTS WITH MATERIAL REMOVED -FLOW OF ANY NEARBY DRAINAGE MUST BE MAINTAINED AT ALL TIMES -PROTECT ROOTS AT ALL TREE LOCATIONS,FIELD ADJUST AS NECESSARY SCALE TYPICAL BOREDETA/LS NO: 1 OF CONSTRUCTION PERMIT APPLICATION Community&Economic Development City of Arlington • 18204 591h Avenue NE Arlington,WA 98223 • Phone (360) 403-3551 CIVIL (TYPE I) ❑ GRADING/PAVING/DRAINAGE (TYPE II) ❑ RIGHT OF WAY(TYPE III) TYPE I&II ONLY NEW DEVELOPMENT ❑ REDEVELOPMENT ❑ Project Name: 211029 Snohomish County Tax Parcel I.D. A 00738500103319 ,Project Address/Location: 18822 IRIS CT APT B Description of Project: From flowerpot Unk, bore —30' under driveway & place new flowerpot. Rest of work o be completed on private property. OWNER Name: Address: City: State: Zip: Phone: Email: APPLICANT Name: Ziply Fiber Northwest, L L C Address: 426 E Casino Rd. City: Everett State: WA Zip: 98208 Phone: 402-670-8384 Email: grpatcopermits(@ziply.com ENGINEER _ Name: Address: City: State: Zip: Phone: Email: License#: Expiration: CONTRACTOR Name: Pacific Cable Construction, Inc. Address:P.O. Box 573 Citv: Woodinville State: WA Zi :98072 Phone: 425-348-7735 Email: Luke-@-.oaccab.com License#: P A C I F C C 9 5 4 P Expiration: I hereby certify that I have read and examined this application, City of Arlington Municipal Code, Standard Plan & Specifications. Performance of the proposed work shall follow all applicable laws and regulations.The owner/applicant shall assume full and complete responsibility for said work and shall be responsible for the acquisition and compliance of all applicable pemlits and/or authorizations which may include, but not limited to, Right of Why Penuit,WSOW Hydraulic Project Approval (HPA),WSDOE Notice of Intent(NOi),National Pollutant Discharge Elimination System (NPDES),Anny Corp. of Engineers Permits,the requirement oftlle Endangered Species Act;and the Forest Practices Application(FPA). '� Signature ----------------------- - Print Name: Autumn Callihan Date: 3/19/26 ----------------------------- ---------- - Page 1 of2 REVII/2018 .Complete package constitutes all items. Only complete submittals will be accepted._ Civil -Submittal Requirements,Type I: D Complete Application; D Construction Plans including cut/fill quantities; . 2 full size plan sets 22"x 34" • PDF file of the complete plan set . 2 full size set of landscape plans 22"x 34" D Marysville Utility plans, ifapplicable (2 sets); D Drainage Analysis including calculations and downstream analysis (2 sets) and (PDF file); refer to Stormwater Drainage Requirements; D Geotechnical Report (2 sets) and (PDF file); D SEPA is required if 500 or more cubic yards of cut/ fill is proposed (not required if included with a Land Use Permit); D Grading cut/ fill quantity: -------- D Design Vehicle - demonstrate turning radius include 45' Fire truck, dual axle, 256 inch wheel base; D Complete Streets Checklist D Drafts of easement(s) dedication(s), and/or CAPE(s) for review; D Flood Hazard Permit Application and required documentation if project is within 100 year flood plain; refer to Flood Hazard guidance documents; D Construction Calculation Worksheet; D NPDES Permit (if required); See Storm Water Drainage Report, New or Redevelopment Flowcharts, D Assurance Device will be required prior to Permitlssuance (Bond or Assignment of Funds); D Permit Fee due at time of permit submittal. Grading/Paving/Drainage Submittal Requirements,Type I1: D Complete Application; D Construction Plans including import/export quantities; . 2 full size plan sets 22"x 34" . PDF file of the complete plan set D Drainage Analysis including calculations and downstream analysis (2 sets) and (PDF file); refer to Stormwater Drainage Requirements; D Geotechnical Report (2 sets) and (PDF file); D SEPA is required if 500 or more cubic yards of cut/fill is proposed (not required if included with a Land Use Permit); D Grading cut/ fill quantity: --------- D Construction Calculation Worksheet; D NPDES Permit (ifrequired); See Storm Water Drainage Report, New or Redevelopment Flowcharts, D Permit fee due at time of permit submittal. Right of Way Submittal Requirements,Type III: Complete Application; 5Q Construction Plans; Traffic Control Plan; ❑ Road dosure Request; ❑ Temporary Erosion &Sediment Control (TESC) Plan; ❑ Certificate oflnsurance with the City ofArlington named as Additional Insured; ❑ Assurance Device will be required prior to Permit Issuance (Bond or Assignment of Funds); Engineers Estimated Cost of Construction; $____________ QI Permit fee due at time of permit issuance. Page 2 of2 4rtk( tot( WASHINGTON Project Information - ' 'nformat;^ Project # 26-0166 Parcel # 00738500103319 Building ID Location 18822 IRIS CT Project Type Civil Use Project Use Right of Way Parent Project# Subdivision Applicant Name ATCO Telecommunications Address 708 First St. Applicant Email permits@atcotelecom.co Phone 4026708384 Cell m Owner Name ZIPLY FIBER NW Address 16315 71ST PL W EDMONDS, WA, 98026-4903 Owner Email Phone Cell Contractor ZIPLY FIBER NW Address 16315 71ST PL W EDMONDS, WA, 98026-4903 Contractor Email Phone Cell Property Information Type/Improveme Accessory/Struct nt ure Current Use Proposed Use Current Zoning Proposed Zoning Project Cost 2000 Project Value 2000 Current Use And From flowerpot Unk, bore --30' under driveway& place new flowerpot. Proposed Rest of work to be completed on private property. Changes Lot Width Lot Depth Map Number Total Area of Building & Accessory Total Area of All Man-made Improvements Structures (Sq Ft) (Sq Ft) General Notes Restrictions/ Variances ©Community Development Online Portal Page 1 of 5 May 19, 2026 03:43PM WASHINGTON Structure Information Structure Type # of Stories Usable Floor Area (Sq Ft) Structure Height # of Units Load per Floor (Lbs) Sign Dimensions # of Bedrooms # of Bathrooms Occupancy With Chairs Tables & Chairs Empty Room Foundation Foundation Type Footing Depth Material Foundation Information Setbacks Front& 0 0 Setbacks Right & 0 0 Rear Left Sides Setbacks Information Water Utility Sewage Utility Gas Utility Electric Utility Driveway Width # of Off Street # of Off Street Parking Loading Miscellaneous Information ©Community Development Online Portal Page 2 of 5 May 19, 2026 03:43PM WASHINGTON Inspections Inspection # Inspection Type Status Date Inspector 26-0298 Civil- Right of Way Pass May 8, 2026 Brian Grieve Inspections ©Community Development Online Portal Page 3 of 5 May 19,2026 03:43PM 4rtk( tot( WASHINGTON Contacts Contact Name Type Project Address Phone ATCO Applicant 708 First St. 402-670-8384 Telecommunications ZIPLY FIBER NW Owner 16315 71ST PL W EDMONDS, WA, 98026-4903 ATCO Others 708 First St. 402-670-8384 Telecommunications ©Community Development Online Portal Page 4 of 5 May 19, 2026 03:43PM 4rtk( tot( WASHINGTON Fees Fee Type Date Debit Credit Balance Project Fees March 19, 2026 $150.00 $150.00 $150.00 $0.00 T O T A L $150.00 $150.00 $0.00 ©Community Development Online Portal Page 5 of 5 May 19, 2026 03:43PM WASHINGTON Project #PJ 26-0166 211029 Routing Details ✓ Department: Permit Tech Intake Review - Approved: March 19, 2026 - Status: Approved Project Application #26-0166 211029- by LaNay Hendrick- Permit Technician at March 19, 2026 04:26PM Status: Approved Activity Type: Application Sent Hello, Your invoice is now ready for payment.You can access and process the payment through our portal. Please visit the following link to view and pay your invoice: https://www.civicgov4.com/wa_arlington/portal/index.php?r=site/dashboard LaNay Hendrick City of Arlington Permit Technician Iendrick@arlingtonwa.gov 360-403-3437 ✓ Department: Permit Tech Final Approval - Approved: May 19, 2026 - Status: Closed Manual Update - Project Application #26-0166 211029- by LaNay Hendrick- Permit Technician at March 19, 2026 04:22PM Status: In Progress Activity Type: Documents Review The following project has been updated manually. Project Application #26-0166 211029 Manual Approval - Project#PJ 26-0071 211029- by LaNay Hendrick- Permit Technician at March 27, 2026 10:48AM Status: Approved Activity Type: Documents Review The following project has been approved manually. Project#PJ 26-0071 211029 Project #PJ 26-0166 211029- by LaNay Hendrick- Permit Technician at April 24, 2026 08:34AM Status: Approved Activity Type: Application Sent Hello, Attached you'll find the issued right-of-way permit. Please review the conditions of the permit and inspections instructions and reach out should you have any questions. @ Community Development Online Portal Page 1 of 5 May 19, 2026 03:44PM 4rtk( tot( WASHINGTON Regards, LaNay Hendrick City of Arlington Permit Technician Iendrick@arlingtonwa.gov 360-403-3437 Manual Closure - Project #PJ 26-0166 211029- by Admin - Hannah Hardwick- Fire Permit Technician II at May 19, 2026 03:42PM Status: Closed Activity Type: Documents Review The following project has been closed manually. Project#PJ 26-0166 211029 ✓ Department: 1st Review CED Inpsector - Approved: March 20, 2026 - Status: Approved Project Application #26-0166 211029- by Brian Grieve- Development Services Inspector at March 20, 2026 08:13AM Status: Approved Activity Type: Application Sent Dear Team, Just completed the CED review. No comment. Brian Brian Grieve City of Arlington Development Services Inspector bgrieve@arlingtonwa.gov 13609131396 ✓ Department: 1st Review Civil - Approved: March 27, 2026 - Status: Approved Project Application #26-0166 211029- by Thad Newport- Development Services Engineering Manager at March 27, 2026 10:05AM Status: Approved Activity Type: Documents Review No civil comments. Thad Newport City of Arlington @ Community Development Online Portal Page 2 of 5 May 19, 2026 03:44PM WASHINGTON Development Services Engineering Manager tnewport@arlingtonwa.gov (360) 403-3434 ©Community Development Online Portal Page 3 of 5 May 19, 2026 03:44PM WASHINGTON Record Actions New Project Application #A26-0166 211029 By LaNay Hendrick- Permit Technician at March 19, 2026 04:18PM Hello, A new project application has been submitted for review. Please login to your CIVICGov Web Application account and visit the link below to view the project details. https://www.civicgov4.com/wa_arlington/projects/details/313 If you cannot click on the link above, please copy and paste the entire link in the browser address bar. Sincerely, CIVICGov Team. Manual Update- Project Application #26-0166 211029 By LaNay Hendrick- Permit Technician at March 19, 2026 04:22PM The following project has been updated manually. Project Application #26-0166 211029 Condition #1 Added By LaNay Hendrick- Permit Technician at March 27, 2026 10:42AM Condition:The applicant is required to notify the City for checklists. Failure to give notice will result in violation of AMC Chapter 12.40.240 and may result in additional checklist fees.To request an checklist call 360-403-3417 by 3:30 for next day checklist. Applicant must comply with all applicable City of Arlington, state and federal laws, ordinances, code and regulation in performing the work authorized by this permit. Condition #2 Added By LaNay Hendrick- Permit Technician at March 27, 2026 10:42AM Condition:Traffic Control must comply with the current version of MUTCD. Work Hours are 7 am to 7 pm Monday-Saturday (no work on Sundays or City Recognized Holidays). Checklists are not available on Saturday or Sunday. Non-motorized traffic control must be provided if any part of the work impacts existing non-motorized facilities. Non-motorized traffic control measures shall provide a level of accessibility that are, at minimum, equal to the existing conditions of the site. Condition #3 Added By LaNay Hendrick- Permit Technician at March 27, 2026 10:42AM Condition:Two days before starting work, the applicant must have all utilities located. One Call, is a public utility locating service (#811 or 1-800-424-5555). Privately installed facilities must also be located using a private utility locating service. Private property owners which may be affected by the proposed work must be notified in advance of potential disruptions in access or utility services. Condition #4 Added By LaNay Hendrick- Permit Technician at March 27, 2026 10:43AM Condition: Please be advised Ziply is responsible for ensuring the placement of new and updated structures. Do not restrict existing use of right of way. Please take special note of secondary accesses that are used for RV's, boats, or other special uses. Condition #5 Added By LaNay Hendrick- Permit Technician at March 27, 2026 10:43AM Condition: Restoration of any infrastructure affected by the installation shall be per City of Arlington Standards &Specifications within a period not to exceed 7 days from completion of the installation.Trench Restoration shall be per Standard Detail R-140; Contact the City Engineer for Roadway Restoration requirements, 360-403-3512. Manual Approval - Project#Pj 26-0071 211029 By LaNay Hendrick- Permit Technician at March 27, 2026 10:48AM The following project has been approved manually. ©Community Development Online Portal Page 4 of 5 May 19, 2026 03:44PM lirttf tot( Project#PJ 26-0071 211029 Checklist #26-0298: Result- Pass By Brian Grieve- Development Services Inspector at May 19, 2026 01:03PM Civil - Right of Way Checklists Checklist#26-0298: Result- Pass hi my name is maribel I'm calling from underground net we do outside of work for zip lee fiber and i just wanted to call in a shop start for one of our permits this is for permit#26-0166 at address 18822 iris court in arlington so my crew is going to be out there tomorrow may 8th so if you have any questions or concerns just give our office a call back at 425-480-8600 thanks and have a good day Manual Closure - Project #Pj 26-0166 211029 By Admin - Hannah Hardwick- Fire Permit Technician II at May 19, 2026 03:42PM The following project has been closed manually. Project#PJ 26-0166 211029 ©Community Development Online Portal Page 5 of 5 May 19, 2026 03:44PM