Loading...
HomeMy WebLinkAbout16910 59th Ave Ne Ste 110_BLD5839_2026 CITY OF ARLINGTON 18204 59th Avenue NE,Arlington,WA 98223 INSPECTIONS:360-403-3417-Permit Center:360-403-3551 BUILDING PERMIT Wr 16910 59TH AVE NE STE 110 Permit#:5839 Parcel#:31052700202000 PERMIT EXPIRES 180 DAYS AFTER DATE OF ISSUANCE. Scope of Work:Installation of Qty.(8)bays of palletized racking Valuation:14158.77 APPLI AW CONTRACTOR Premier Pacific Properties,LLC Engineered Products Engineered Products,a Pape'Company 13700 44TH ST NE 9800 40th Ave S 9883 40th Avenue S LAKE STEVENS,WA 98258 Seattle Seattle,WA 98108 2068541345 206-250-3913 LIC:602 684 203 EXP:01/31/2025 LIC:ENGINPC93100 EXP:02/20/2025 MECHANICAL CONTRACTOR ' PLUMBING CONTRACTOR LIC#: EXP: LIC#: EXP: JOB DESCRIPTION PERMIT TYPE: COMMERCIAL RACKING CODE YEAR: 2018 STORIES: I CONST.TYPE: llB DWELLING UNITS: OCC GROUP: S-2;Storage Low Hazard BUILDINGS: OCC LOAD: PERMIT APPROVAL . The issuance or granting of this permit shall not be construed to be a permit for,or approval of,any violation of this Code or any other ordinance or order of the City,of any state or federal law,or of any order,proclamation,guidance advice or decision of the Governor of this State.To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law,or order,proclamation,guidance advice or decision of the Governor of this State,this permit shall not authorize such work and shall not be valid.The building official is authorized to prevent occupancy or use of a structure where in violation of this Code,any other City ordinances of this jurisdiction or any other ordinance or executive order of the City,or of any state or federal law,or of any order,proclamation,guidance advice or decision of the Governor.The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect,inaccurate or incomplete information,or in violation of any City ordinance,regulation or order,state or federal law,or any order,proclamation,guidance or decision of the Governor. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED.IBC110/IRC110. SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on your sales tax return form and coded City of Arlington#3101. A6�— 4/22/2024 �ll 04/17/2024 Applicant Signature Date Building Official Date CONDITIONS I Special inspection required for drilling and cleaning of anchor holes and anchor length verification.Approved job copy shall be onsite for inspections.Adhere to approved plans.Call for inspections. The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations.The property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or community.The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities before commencing construction.The property owner shall ensure that the construction project complies with all applicable design review requirements. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY.ANY CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS,SIDEWALKS,DRIVEWAYS, MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION. PERMIT FEES ' Date Description Fee Amount 04/22/2024 Building Plan Review $244.36 04/22/2024 Credit Card Service $7.33 04/22/2024 Processing/Technology $25.00 04/22/2024 Building Permit $358.25 04/22/2024 Credit Card Service $11.50 Total Due: $646.44 Total Payment: $646.44 Balance Due: $0.00 _ CALL FOR INSPECTIONS Call by 3:30 pm for next day inspection,allow 48 hours for Fire Inspections When calling for an inspection please leave the following information: Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon INSPECTION INFORMATION I Pass/Fail COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION ` Community and Economic Development City of Arlington• 18204 59th Ave NE•Arlington,WA 98223 • Phone(360) 403-3551 The following information is required for Commercial, Multi-Family,and Mixed-Use Building Permit Applications. Mark each box to designate that the information has been provided. Please submit this checklist as part of the submittal documents.See ASSISTANCE BULLETIN#30 for detailed design requirements. EACH BUILDING OR STRUCTURE REQUIRES A SEPARATE SUBMITTAL. SUBMIT ELECTRONIC FILES FOR EACH OF THE FOLLOWING;Incomplete applications will not be accepted. REQUIRED DOCUMENTS ❑ City of Arlington Commercial Tenant Improvement Permit Application ❑ Site Plan ❑ Architectural Plans ❑ Structural Plans ❑ Structural Calculations ❑ Mechanical System Modifications, (if applicable) ❑ Plumbing System Modifications, (if applicable) ❑ Project Specification Manuals, (if applicable) ❑ WSEC Compliance Forms,(if applicable) https:[/waenergycodes.com/ ❑ Special Inspection and Testing Agreement ❑ Deferred Submittal Request ❑ Airport Property Lease (if building is located within the Arlington Airport Property Boundary) 1. Plan Review fee is due at time of submittal and remaining balance will be due at time of issuance. 2. The City of Arlington does not review or inspect electrical systems.Contact Labor and Industries at lni.wa.gov or 360-416-3000. A. DEFERRED SUBMITTALS If the project requires any of the following,a Deferred Submittal Request MUST be completed.Deferred submittals require separate applications,plans and plan review. 1. Mechanical Plans (if not included in the plan set) 2. Plumbing Plans (if not included in the plan set) 3. Fire Sprinkler 4. Fire Alarm S. Signage B. SPECIAL INSPECTION AND TESTING AGREEMENT A Special Inspection Firm is required to perform special inspections for the following type of work. *The Special Inspection and Testing Agreement MUST be submitted with the Building Application. ❑ Reinforced Concrete ❑ Structural Steel and Welding 0 Bolting in Concrete ❑ High-Strength Bolting ❑ Pre-stressed Concrete ❑ Spray-Applied Fireproofing ❑ Shotcrete ❑ Smoke-Control Systems ❑ Structural Masonry ❑ Other-Specify: 0 I acknowledge that all items designated as submittal requirements must accompany my Tenant Improvement Permit Application to be considered a complete submittal. COMMERCIAL TENANT IMPROVEMENT INSTALLATION,MODIFICATION OR REMOVAL MAY REQUIRE A SEPARATE PERMIT SUBMITAL *CHECKALL THAT APPLY ❑ Automatic fire extinguishing systems ❑ Compressed gas systems ❑ Fire pumps ❑ Flammable and combustible liquids (tanks,piping etc.) ❑ Standpipe systems ❑ Hazardous materials ❑ Private fire hydrants ❑ Industrial ovens/furnace ❑ Fire alarm and detection systems ❑ Spraying or dipping operations ❑ High piled/rack storage ❑ Temporary membrane structure,tents(>200 sq.ft.)or canopies(>400 sq.ft.) ❑ Provide details on any of the above checked items: Type of Permit: ❑ New Space ❑ Addition 0 Alteration Property Address: 16910 59th Ave NE#110,Arlington WA 98223 Project Valuation: Lot#: Parcel ID No.: 2740915 Subdivision: Project Scope of work: Palletize Pallet Racking IBC Construction Type: IS IBC Occupancy Type: S2 Building/Space Square Footage: 8,250 Number of Stories: 1 Square Footage Per Floor: 1st 8,250 2nd 3rd 4th Sth 6th Primary Contact: ❑ Owner ❑ Architect ❑ Engineer 0 Contractor Owner Name: Pape Material Handling Inc office No.: 360-403-4702 Email Address: JBarberich@papemh.com Cell No.: Mailing Address: PO Box 407 City: Eugene State: OR Zip:97440 Architect Name: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: Professional License Number: Expiration Date: Engineer Name: Enhano Zhang Office No.: 909.596.1351 Email Address: prjcoordination@scedinc.com Cell No.: Mailing Address: 1815 Wright Ave Suite 200 City: La Verne State: CA Zip: 91 750 Professional License Number: 21022747 Expiration Date: Primary Contractor: Engineered Products Office No.: 206-394-3306 Email Address: JKeenholts@eppape.com Cell No.: 206-854-1345 Mailing Address: 9800 40th ave s. city: Seattle, WA State: 98024 Zip: 98118 L&I Contractor License Number: ENGINPC931 CO Expiration Date: 2/20/25 REV03.2022 Page 2 of 6 COMMERCIAL TENANT IMPROVEMENT MECHANICAL SYSTEM INFORMATION Type of Permit: ❑ New Installation ❑ Addition ❑ Alteration ❑ Replaced ❑ Gas Piping Mechanical Contractor: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: L&I Contractor License Number: Expiration Date: • New gas piping requires a pressure test hooking to any appliance • Sediment traps (drips) are required on all gas lines • Gas lines are required to be supported/secured per IFGS,Section 415 • Proper Combustion air and venting required for all appliances • A shut-off valve is required within 6 feet of each appliance Gas Piping Specification and complete Schematic PAGE 4 O Not Applicable Proposed Piping Material: O CSST O Brass O Black Steel O Galvanized Steel O Other Proposed Piping Size: O 1/2" O S/s" 713/4" O 1" O 11/2" O 2" Inlet Pressure: Pressure Drop: Specific Gravity: MECHANICAL PERMIT FEES (per unit) Type of Fixture No. of Units Cost per Unit Subtotal Additional Plan Review fees x $ 75.00 = $ Air Cond.Unit<_100Btu h x $ 15.00 = $ Air Cond.Unit>100Btu h x $ 25.00 = $ Air Cond.Unit>50OBtu/hp x $ 50.00 = $ Air Handling Units x $ 15.00 = $ Base Mechanical Fee $ 25.00 $ 25.00 Boiler<100Btu/h>3hp x $ 15.00 = $ Boiler>1 million Btu/h<50hp x $ 25.00 = $ Boiler>1.5 million Btu/h<50hp x $ 50.00 = $ Boiler>100Btu h 3-15h x $ 15.00 = $ Boiler>500Btu h 15-30hp x $ 25.00 = $ Commercial Hoods-Type I x $ 25.00 = $ Commercial Hoods-Type II x $ 50.00 = $ Diffusers x $ 15.00 = $ Dryer Ducting x $ 15.00 = $ Ductwork(drawings required) x $ 25.00 = $ Evaporative Coolers x $ 15.00 = $ Exhaust/Ventilation Fans x $ 15.00 = $ Fireplace Insert Stove x $ 15.00 = $ Forced Air Heat<_100 Btu h x $ 15.00 = $ Forced Air Heat>100 Btu h x $ 25.00 = $ Gas Clothes Dryer x $ 15.00 = $ Gas Fired AC <_100 Btu/h x $ 15.00 = $ Gas Fired AC >100 Btu/h x $ 25.00 = $ REV03.2022 Page 3 of 6 COMMERCIAL TENANT IMPROVEMENT MECHANICAL PERMIT FEES (per unit) Gas Fired AC > 500 Btu h x $ 50.00 = $ Gas Pi in <_ 5 units x $ 15.00 = $ Gas Piping> 5 units (plus <5 units x $ 2.00 = $ Heat Exchangers x $ 15.00 = $ Heat Pump-Condensing Unit x $ 25.00 = $ Hot Water Heat Coils x $ 15.00 = $ Miscellaneous Appliance-regulated by x $ 15.00 = $ mechanical code,not otherwise specified Pkg.Units <-100btu x $ 25.00 = $ Pkg.Units >100btu x $ 50.00 = $ Range/Cook top-Gas Fired x $ 15.00 = $ Refrigeration Unit 5100Btu h x $ 15.00 = $ Refrigeration Unit>100Btu h x $ 25.00 = $ Refrigeration Unit>500Btu/h x $ 50.00 = $ Re-inspection fee (all) x $ 75.00 = $ Unit Heaters <— 100 Btu h x $ 15.00 = $ Unit Heaters >100 Btu h x $ 25.00 = $ VAV Boxes (Variable Air Volume,part of air x $ 10.00 — $ conditioning system) Wall Heaters - Gas Fired x $ 25.00 = $ Water Heater- Gas Fired x $ 25.00 = $ Permit Fee $ Table 4-8; Plan Review Fee $ Processing/Technology Fee $25.00 Total $ PRESSURE PIPING SCHEMATIC COMPLETE FOR GAS PIPING ONLY— USE A SEPARATE SHEET, IF NECESSARY ❑ SCHEMATIC IS TO SCALE ❑ SCHEMATIC NOT TO SCALE Show Pipe Size(s) and Length(s) from meter to all appliances NOTE:Any interior pressure regulators must be indicated REV03.2022 Page 4 of 6 COMMERCIAL TENANT IMPROVEMENT PLUMBING SYSTEM INFORMATION Type of Permit: O New Installation O Addition O Alteration O Replaced O Industrial Plumbing Contractor: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: L&I Contractor License Number: Expiration Date: The following items need to be specified on the plans: O Fixture specifications and equipment with locations. O Location and type of all backflow assemblies for each fixture. O Calculations for Grease Interceptor. O Pipe size and location of sanitary and potable water systems. O Riser diagram of waste,vent,and rain water systems,including sizes. O Medical gas piping riser diagram,type of gas, storage room and size of piping. PLUMBING PERMIT FEES (per fixture) Commercial plumbing permits are required to submit line drawings.A plan review fee of 65%per Table 4-6 for plumbing permits will be assessed at time of submittal. Includes two 2 inspections with permit. Type of Fixture No.of Fixtures Cost per Fixture Subtotal Additional Plan Review fees x $ 75.00 = Alteration/repair piping x $ 15.00 = Backflow Assembly x $25.00 = Base Plumbing Fee $ 25.00 $25.00 Bath/Shower Combo x $ 15.00 = Building Main Waste x $ 25.00 = Clothes Washer x $ 15.00 = Dishwasher x $ 15.00 = Drinking Fountain x $ 15.00 = Floor Drains x $ 15.00 = Grease Interceptor x $ 75.00 = Grease Trap x $ 25.00 = Hose Bibb x $ 15.00 = Icemaker Refri erator x $ 15.00 = Irrigation-per meter x $ 25.00 = Kitchen Sink&Disposal x $ 15.00 = Laundry Tray x $ 15.00 = Lavatory x $ 15.00 = Med Gas Pi in <_ 5 inlets outlets x $ 60.00 = Med Gas Piping> 5 inlets/outlets (plus <_ 5 x $ 5.00 = inlets/outlets) Miscellaneous -regulated by plumbing x $ 15.00 = code,not otherwise specified Pretreatment Interceptor x $ 15.00 = REV03.2022 Page 5 of 6 COMMERCIAL TENANT IMPROVEMENT PLUMBING PERMIT FEES (per fixture) Re-inspection Fee all x $ 75.00 = Roof Drains x $ 15.00 = Shower (only) x $ 15.00 = Sink bar,service,etc. x $ 15.00 = Toilets x $ 15.00 = Urinal x $ 15.00 = Vacuum Breakers x $ 25.00 = Water Heater x $ 25.00 = Water Heater-Tankless x $ 25.00 = Permit Fee Table 4-6; Plan Review Fee Processing/Technology Fee $25.00 Total PROPOSED BUILDING USE ❑ New ❑ Addition/Alteration ❑ Medical ❑ Automotive Based ❑ Industrial ❑ Office ❑ Restaurant ❑ Machine Shop ❑ Other: CROSS CONNECTION Please check all appliances that are proposed or permanently connected to the water supply. ❑ Ice Machine ❑ Dialysis Equip. ❑ Air washers ❑ Coffee Urn/Espresso ❑ Hydrotherapy Equip. ❑ Steam Generators ❑ Carbonated Bev. ❑ Dental Equip. ❑ Dye Vats ❑ Fume Hoods ❑ Laboratory Equip. ❑ Pressure Washers ❑ Degreasers ❑ Autoclave/Sterilizers ❑ Cooling Towers ❑ Hot Tub/Spa ❑ Decorative Fountain ❑ Fire Sprinkler ❑ Aquarium ❑ Swimming Pools ❑ Sprinkler w/chemicals ❑ Lawn Irrigation ❑ Well on property ❑ Other: WASTEWATER DISCHARGE Does the plumbing system currently have a grease interceptor? ❑ Yes ❑ No ❑ Don't Know Does the plumbing system currently have an oil/water ❑ Yes ❑ No ❑ Don't Know separator? Is water used in the business process (washing,rinsing, ❑ Yes ❑ No ❑ Don't Know cooling)? Does your business require a NPDES permit? ❑ Yes ❑ No ❑ Don't Know I hereby certify that I am the El Owner, ❑Applicant, [I Contractor,and authorized to sign this application and that the above information is correct and construction on, and the occupancy and the use of the above-described property will be in accordance with the laws, rules and regulation of the State of Washington,and the City of Arlington.A final inspection and approval shall be obtained when complete. Ames Keenholts 2.19.24 Signature Print Name Date SAVE PRINT REV03.2022 Page 6 of 6 l 1 W l 4 i u � u r t ra 1- Engineerin9 es n , nc . 1815 Wright Ave La Verne, GA 91750 Phone:909.590.1351 Fax: 909.590.7180 Project Name : PAPE I-IH �NP�ZN"�ti !� of WASHY c Project Number : 23-0914-13 21022747 Date : 09/21/23 °gSRFGISTF S70NALDigital y signed EN Street Address: 16910 50TH AVE NE #110 Enhao byEnhaoZha g Date:203.09.21 city/state: ARLINGTON, WA 98223 Zhang 114:57522-0700' Scope of Work : STORAGE RACK I U Structural Engineering & Design I nc. 1815 Wrig t Ave La Verne CA 91750 Tel: 909 596 1351 Fax: 909 596 7186 BY: N.V Eng:Mgz. Project: PAPE MH Project#:23-0914-13 TABLE OF CONTENTS II �i Title Page .............................................................................................................. 1 Tableof Contents................................................................................................... 2 j Design Data and Definition of Components .......................................................... 3 Critical Configuration .............................................................. 4 SeismicLoads....................................................................................................... 5 to 6 Column .................................................................................................................. 7 Beam and Connector............................................................................................ 8 to 9 Bracing .................................................................................................................. 10 Anchors................................................................................................................. it BasePlate ............................................................................................................. 12 Slabon Grade....................................................................................................... 13 Other Configurations .............................................................. 14 TYPE A Page of 9/20/2023 i Structural I' Engineering & Design Inc. 1815 Wright Ave La Verne CA 91750 Tel: 909 596 1351 Fax: 909 596 7186 1, By: N.V Eng:Mgz. Project: PAPE MH Project#:23-0914-13 Design Data 1)The analyses herein conforms to the requirements of the: 2021 IBC Section 2209 2022 CBC Section 2209 ANSI MH 16.1-2012 Specifications for the Design of Industrial Steel Storage Racks"2012 RMI Rack Design Manual" ASCE7-16,section 15.5.3 2)Transverse braced frame steel conforms to ASTM A570,Gr.55,with minimum strength, Fy=55 ksi Longitudinal frame beam and connector steel conforms to ASTM A570,Gr.55,with minimum yield, Fy=55 ksi All other steel conforms to ASTM A36,Gr. 36 with minimum yield, Fy= 36 ksi 3)Anchor bolts shall be provided by installer per ICC reference on plans and calculations herein. 4)All welds shall conform to AWS procedures, utilizing E70xx electrodes or similar.All such welds shall be performed in shop,with no field welding allowed other than those supervised by a licensed deputy inspector. 5)The existing slab on grade is 6"thick with minimum 3000 psi compressive strength.Allowable Soil bearing capacity is 750 psf. The design of the existing slab is by others. 6) Load combinations for rack components correspond to 2012 RMI Section 2.1 for ASD level load criteria Definition of Components A 6ax Edam Mm E�•a� tee GAN- a 4 conectof Gearr� 1 Rawk- &se Plate and Mdbws Beam height Lerg*i Wl y j Rame Depth RiDnt Vlewr Down Asla ILona-du6nal# Frame gin e;c�a7ss e {'Tr�rnswerse 3 Frame TYPE A Page of f(� 9/20/2023 I Structural a j ngineering & Design I nc. 1815 Wright Ave La Vernng CAA 91750 Tel: 909 596 1351 Fax: 9Q9.96 7186 By: N.V Eng:Mgz. Project: PAPE MH Project#:23-0914-13 Configuration&Summary:TYPE A — — "RACK COLUMN REACTIONS ASD LOADS 48" 48" AXIAL OL= 75/b AXIAL LL= 4,500/b SEISMIC AXIAL Ps=+/- 2,867/b 144 144„ BASE MOMENT 8,000 in-lb 48" 48" 36" 48" 96" 42" r Seismic Criteria #Bm Lvls I Frame Depth Frame Height #Diagonals I Beam Length Frame Type Ss=1.057, Fa=1.2 3 42 in 144.0 in 3 96 in Single Row Component Description STRESS Column Fy=55 ksi Hannibal IF3014-3x3x14ga P=4575 lb, M=14410 in-lb 0.59-01K Column&Backer None None None N/A Beam Fy=55 ksi HMH 41160/4.125" Face x 0.057"thk Lu=96 in Capacity: 5075 Ib/pr 0.59-01K Beam Connector F =55 ksi Lvl 1: 3 pin OK Mconn=10483 in-lb Mcap=12691 in-lb 0.83-01K Brace-Horizontal F =55 ksi Hannibal 1-1/2x1-1/2x16ga 0.18-01K Brace-Diagonal F =55 ksi Hannibal 1-1/2x1-1/2x16ga 0.27-OK Base Plate Fy=36 ksi 8x5x3/8 Fixity=8000 in-lb 0.59-OK Anchor 2 per Base 0.5"x 3.25"Embed HILTI TZ2 ESR 4266 Inspection Reqd(Net Seismic Uplift=3976 Ib) 0.9-01K Slab&Soil 6"thk x 3000 psi slab on grade. 750 psf Soil Bearing Pressure 0.52-OK Level Load** Story Force Story Force Column Column Conn. Beam Per Level Beam Sp, g Brace Transv Longit. Axial Moment Moment Connector 1 3,000 lb 48.0 in 36.0 in 218 Ib 166 Ib 4,575 lb 14,410 "# 10,483 "# 3 pin OK 2 3,000 Ib 48.0 in 48.0 in 435 Ib 332 Ib 3,050 lb 9,960 "# 7,531 "# 3 pin OK 3 3,000 lb 48.0 in 48.0 in 653 Ib 498 Ib 1,525 lb 5,976 "# 4,045 "# 3 pin OK **Load defined as product weight per pair of beams Total: 1,306 lb 996 Ib Notes TYPE A Page of r b 9/20/2023 M it Structural a !! Engineering & Design I nc. 1815 Wright Ave La Verne CA 91750 Tel: 909 596 1 a51 Fax: 909 596 7186 By: N.V Eng:Mgz. Project: PAPE MH Project#:23-0914-13 Seismic Forces Configuration:TYPE A Lateral analysis is performed with regard to the requirements of the 2012 RMI ANSI MH 16.1-2012 Sec 2.6&ASCE 7-16 sec 15.5.3 Ss= 1.057 Transverse(Cross Aisle)Seismic Load S1= 0.377 V= Cs*Ip*Ws=Cs*Ip*(0.67*P*Ptf+D) vt Fa= 1.200 Cs1= Sds/R Fv= 1.923 = 0.2114 Cs-max*Ip= 0.2114 Sds=2/3*Ss*Fa= 0.846 Cs2= 0.044*Sds Vmin= 0.015 Sd1=2/3*S1*Fv= 0.483 = 0.0372 Eff Base Shear=Cs= 0.2114 Transverse Elevation Ca=0.4*2/3*Ss*Fa= 0.3382 Cs3= 0.5*S1/R Ws= (0.67*PLRFi*PL)+DL(RMI 2.6.2) (Transverse,Braced Frame Dir.)R= 4.0 = 0.0471 = 6,180lb Ip= 1.0 Cs-max= 0.2114 Vtransv=Vt= 0.2114* (150 Ib+6030 Ib) PRF1= 1A Base shear Coeff=Cs= 0.2114 Etransverse 1,306 Ib Pallet Height=hp= 48.0 In Limit States Level rransverse seismic shearperupright DL per Beam Lvl= 50 Ib Level PRODUCT LOAD P P*0.67*PRFi DL hi wi*hi FI Fi*(hi+hp/2) 1 3,000 Ib 2,010 Ib 50 Ib 48 in 98,880 217.7 Ib 15,674-# 2 3,000 Ib 2,010 Ib 50 Ib 96 in 197,760 435.3 Ib 52,236-# 3 3,000 Ib 2,010 Ib 50 Ib 144 in 296,640 653.0 Ib 109,704-# sum: P=90001b 6,030lb 150 lb W=6180lb 593,280 1,306lb 1=177,614 Longitudinal Downaisle Seismic Load Similarly for longitudinal seismic loads,using R=6.0 Ws= (0.67* PLRF2* P) + DL PRF2= 1-0 •• Q - ..4 Cs1=Sd1/(T*R)= 0.1611 = 6,180 Ib (Longitudinal,Unbraced Dir.)R= 6.0 Cs2 0.0372 Cs=Cs-max*Ip= 0.1611 T= 0.50 sec Cs3= 0.0314 Vlong=• 0.1611 * (150 Ib+ 6030 Ib) - Cs-max= 0.1611 [Elonglitudinal= 9961b Limit states[eve/Longlt.selsmic shear paruprigHt -Level--- ----PRODUC LOAD-P--P*0.67-*P- - -DL- - hi----- ----wi*hi- - -- - Fi --- Front view - - - - RF2- -- -- 1 3,000 Ib 2,010 Ib 50 Ib 48 in 98,880 166.0 Ib 2 3,000 Ib 2,010 Ib 50 Ib 96 in 197,760 332.0 Ib 3 3,000 Ib 2,010 Ib 50 Ib 144 in 296,640 498.0 Ib I sum: 6,030 Ib 150 Ib W=6180 Ib 593,280 996 Ib TYPE A Page 5 of 9/20/2023 Structural i Engineering & Design Inc. 1815 Wright Ave La Verne,CA 91750 Tel: 909.596.1351 Fax: 909.596.7186 By: N.V Eng:Mgz. Project: PAPE MH Project#:23-0914-13 Downaisle Seismic Loads Configuration:TYPE A Determine the story moments by applying portal analysis.The base plate is assumed to provide partial fixity. _Seismic Story Forces Typical Frame made Vlong= 996lb Tiibutaryarea oFtwocolurrmns Vcol=Vlong/2= 498 lb ohack Frame ----- - F1= 166 lb i� ,`I.. Typical Frame made F2= 332 lb ./Ortwo columns F3= 498 lb KI Ei K,ER K 10 - ED E4 04 K3;0 - ------- Top View Imo— 96' ——————-- Front View 5ide View Seismic Story Moments Conceptual System COL Mbase-max= 8,000 in-lb <__=Default capacity hl-eff= hi -beam clip height/2 Mbase-v (Vcol*hleff)/2 = 45 in Vcol = 11,205 in-lb <__=Moment going to base Mbase-eff= Minimum of Mbase-max and Mbase-v h2 = 8,000 in-lb M 1-1= [Vcol*hleff]-Mbase-eff M 2-2= [Vcol-(Fi)/2] * h2 _ (498 lb*45 in)-8000 in-lb = [498 lb- 166 Ib]*48 in/2 = 14,410 in-lb = 9,960 in-lb h1 hleff I —L Mseis= (Mupper+Mlower)/2 Beam to Column Mseis(1-1)= (14410 in-lb+9960 in-lb)/2 Mseis(2-2)= (9960 in-lb+5976 in-lb)/2 Elevation = 12,185 in-lb = 7,968 in-lb rho= 1.0000 Summary of Forces LEVEL hi Axial Load Column Moment** Mseismic** Mend-fixity Mconn** Beam Connector 1 48 in 4,575 lb 14,410 in-lb 12,185 in-lb 2,790 in-lb 10,483 in-lb 3 pin OK 2 48 in 3,050 lb 9,960 in-lb 7,968 in-lb 2,790 in-lb 7,531 in-lb 3 pin OK 3 48 in 1,525 lb 5,976 in-lb 2,988 in-lb 2,790 in-lb 4,045 in-lb 3 pin OK Mconn= (Mseismic+ Mend-fixity)*0.70*rho Mconn-allow(3 Pin)= 12,691 in-lb **all moments based on limit states level loading TYPE A Page of 1 % 9/20/2023 M Structural G i Engineering & Design I nc. 1815 Wright Ave La Verne, CA 91750 Tel: 909.596.1351 Fax: 909,596.7186 r By: N.V Eng:Mgz. Project: PAPE MH Project#:23-0914-13 j' Column(Longitudinal Loads) Configuration:TYPE A i Section Properties Section: Hannibal IF3014-3x3xl4ga 3.000 in Aeff= 0.643 in^2 I = 0.749 in^4 Kx= 1.7 x Y Ix= 1.130 in^4 Sy= 0.493 in^3 Lx= 45.9 in Sx= 0.753inA3 ry= 1.080in Ky= 1.0 L ._.�,_.y, 3.000in rx= 1.326 in Fy= 55 ksi Ly= 36.0 in 52f= 1.67 Cmx= 0.85 Cb 1.0 10.075 in j E= 29,500 ksi x 1' 0.75 in Loads Considers loads at level 1 COLUMN DL= 75 lb Critical load cases are:RM.1 Sec 2.1 COLUMN PL= 4,500 lb Load Case 5::(1+0.105*5ds)D+0.75*(1.4+0.145ds)*B*P+0.75*(0.7*rho*E)<=1.0,ASD Method Mcol= 14,410 in-lb axial load coef.- 0.7971516*P seismic moment coef..• 0.5625*Mcol Sds= 0.8456 Load Case 6::(1+014*Sd5)D+(0.85+0.1456s)*B*P+(0.7*rho*E)<=1.0,ASD Method 1+0.105*Sds= 1.0888 axial load coeff.• 0.67787 seismic moment coeff- 0.7*Mcol 1,4+0.14Sds= 1.5184 By analysis,Load case 6 governs utilizing loads as such 1+0.14Sds= 1.1184 0.85+0.14*Sds= 0.9684 Axial Load=Pax= 1.118384*75 Ib+0.968384*0.7*4500Ib Moment=Mx= 0.7*rho*Mcol B= 0.7000 = 3,134 lb = 0.7* 14410 in-lb rho= 1.0000 = 10,087 in-lb Axial Analysis KxLx/rx= 1.7*45.9375"/1.326" KyLy/ry= 1*36"/1.08" Fe > Fy/2 = 56.9 = 33.3 Fn= Fy(1-Fy/4Fe) = 55 ksi*[1-55 ksl/(4*83.9 ksi)] Fe= n^2E/(KL/r)max^2 Fy/2= 27.5 ksi = 46.0 ksi = 83.9ksi Pa= Pn/Qc Pn= Aeff*Fn 52c= 1.92 = 29572 ib/1.92 = 29,572 lb = 15,402lb P/Pa= 0.20 > 0.15 Bending Analysis Check: Pax/Pa + (Cmx*Mx)/(Max*lax) 5 1.0 - - - -- - -- P/Pao+Mx/Max<_-1.0- - -- Pno= Ae*Fy Pao= Pno/52c Myield=My= Sx*Fy = 0.643 in^2*55000 psi = 35365lb/1.92 = 0.753 in^3*55000 psi = 35,365 lb = 18,419 Ib = 41,415 in-lb Max= My/S2f Pcr= n^2EI/(KL)max^2 = 41415 in-Ib/1.67 = n^2*29500 ksi/(1.7*45.9375 in)^2 = 24,799 in-lb = 53,947 lb fix= {1/[1-(52c*P/Pcr)]}^-1 = {1/[1-(1.92*3134lb/53947lb)]}^-1 = 0.89 Combined Stresses (3134 Ib/15402 lb)+(0.85*10087 in-Ib)/(24799 in-Ib*0.89) = 0.59 < 1.0, OK (EQ C5-1) (3134 Ib/18419 lb) + (10087 in-Ib/24799 in-lb) = 0.56 < 1.0,OK (EQ C5-2) **For comparison, total column stress computed for load case 5/s 54.0916 71n4 loads 3668.8413 lb Axial and M= 7565 In lb TYPE A Page 7 of 9/20/2023 p Structural 9 En ineerin & Design I nc. 9 9 1815 Wright Ave La Verne. CA 91750 Tel: 909.596 1351 Fax: 909 596 7186 By: N.V Eng:Mgz. Project: PAPE MH Project#: 23-0914-13 BEAM Configuration:TYPE A DETERMINE ALLOWABLE MOMENT CAPACITY 2.751n A)Check compression flange for local buckling(B2.1) L 1.75 in J w= c-2*t-2*r T = 1.75 in-2*0.057 in-2*0.057 in = 1.522 in 1.625 in w/t= 26.7 1=lambda= [1.052/(k)A0.5]* (w/t) *(Fy/E)A0.5 Eq. B2.1-4 _ [1.052/(4)A0.5]*26.7*(55/29500)A0.5 4.125 in = 0.606 <0.673, Flange is fully effective Eq. B2.1-1 0.057 in B)check web for local buckling per section b2.3 fi(comp)= Fy*(y3/y2)= 50.53 ksi f2(tension)= Fy*(y1/y2)= 102.29 ksi Y= f2/f1 Eq. B2.3-5 Beam= HMH 41160/4.125"Face x 0.057"thk -2.024 Ix= 1.617 1nA4 k= 4+2*(1-Y)A3+ 2*(1-Y) Eq. B2.3-4 Sx= 0.740 iiiA3 = 65.35 Ycg= 2.723 in flat depth=w= yl+y3 t= 0.057 in = 3.897 in w/t= 68.36842105 OK Bend Radius=r= 0.057 in 1=lambda= [1.052/(k)A0.5]*(w/t)*(f1/E)A0.5 Fy=Fyv= 55.00 ksi _ [1.052/(65.35)A0.5] *3.897* (50.53/29500)A0.5 Fu=Fuv= 65.00 ksi = 0.368 < 0.673 E= 29500 ksi be=w= 3.897 in b2= be/2 Eq B2.3-2 top flange=b= 1.750 in bl= be(3-Y) = 1.95 in bottom flange= 2.750 in = 0.776 Web depth= 4.":'^ Fy bl+b2= 2.726 in > 1.2885 in,Web is fully effective Determine effect of cold working on steel yield point Via)per section A7.2 "(imp) Fya= C*Fyc+(1-C)*Fy (EQ A7.2-1) Lcorner=Lc= (p/2)*(r+t/2) y2 0.134 in C= 2*Lc/(Lf+2*Lc) Lflange-top=Lf= 1.522 in = 0.150 in y3 m= 0.192*(Fu/Fy)-0.068 (EQ A7.2-4) depth = 0.1590 Bc= 3.69*(Fu/Fy)-0.819*(Fu/Fy)A2- 1.79 (EQ A7.2-3) = 1.427 since fu/Fv= 1.18 < 1.2 Y� Ycq and r/t= 1 <7 OK 1 12(lenslon) then Fyc= Bc*Fy/(R/t)Am (EQ A7.2-2) IJ- - - = 78.485 ksi Thus, Fya-top= 58.52 ksi (tension stress at top) Fya-bottom= Fya*Ycg/(depth-Ycg) y1= Ycg-t-r= 2.609 in = 113.59 ksi (tension stress at bottom) y2= depth-Ycg= 1.403 in Check allowable tension stress for bottom flange y3= y2-t-r= 1.289 in Lflange-bot=Lfb= Lbottom-2*r*-2*t = 2.522 in Cbottom=Cb= 2*Lc/(Lfb+2*Lc) = 0.096 Fy-bottom=Fyb= Cb*Fyc+(I-Cb)*Fyf = 57.26 ksi Fya= (Fya-top)*(Fyb/Fya-bottom) = 29.50 ksi if F= 0.95 Then F*Mn=F*Fya*Sx= 20.73 in-k �,r Structural Engineering & Design I nc. 1815 Wright Ave La Verne. CA 91750 Tel: 909:596.1351 Fax: 909.596.7186 By: N.V Eng:Mgz. Project: PAPE MH Project#: 23-0914-13 BEAM Contiguration:TYPE A RMI Section 5.2, PT II Section Beam= HMH 41160/4.125" Face x 0.057"thl< Ix=Ib= 1.617 inA4 2.75 in Sx= 0.740 inA3 t= 0.057 in E= 29500 ksi rl--, 5 in I Fy=Fyv= 55 ksi F= 300.0 T Fu=Fuv= 65 ksi L= 96 in Fya= 58.5 ksl Beam Level= 1 1.625 in P=Product Load= 3,000 lb/pair D=Dead Load= 50 lb/pair 4.125 in 0.057 in 1.Check Bending Stress Allowable Loads Mcenter=F*Mn= W*L*W*Rm/8 W=LRFD Load Factor= 1.2*D+ 1.4*P+1.4*(0.125)*P RMI2.2,item a FOR DL=2%of PL, W= 1.599 Rm= 1-[(2*F*L)/(6*E*Ib+3*F*L)] _ _ 1-(2*300*96 in)/[(6*29500 ksi*1.617 inA3)+(3*300*96 in)] = 0.845 Then F*Mn=F*Fya*Sx= 41.14 in-k ILL Ll Thus,allowable load per beam pair=W= F*Mn*8*(#of beams)/(L*Rm*W) a Bean- = 41.14 In-k*8*2/(96in*0.845* 1.599) Length = 5,075 Ib/pair allowable load based on bending stress Mend= W*L*(1-Rm)/8 _ (5075 lb/2)*96 in * (1-0.845)/8 = 4,720 in-lb @ 5075 lb max allowable load = 2,790 in-lb @ 3000 lb imposed product load 2.Check Deflection Stress Allowable Loads Dmax= Dss*Rd Rd= 1-(4*F*L)/(5*F*L+ 10*E*Ib) Allowable Deflection= L/180 = 1-(4*300*96 in)/[(5*300*96 in)+(10*29500 ksi*1.617 inA4)] = 0.533 in = 0.814 in Deflection at imposed Load= 0.315 In if Dmax= L/180 Based on L1180 Deflection Criteria and Dss= 5*W*L^3/(384*E*Ib) L/180= 5*W*L^3*Rd/(384*E*Ib*#of beams) solving for W yields, W= 384*E*I*2/(180*5*LA2*Rd) = 384*1.617 in^4*2/[180*5*(96 in)^2*0.814) = 5,426 Ib/pair allowable load based on deflection 11mits Thus, based on the least capacity of item 1 and 2 above: Allowable load= 5,075 lb/pair Imposed Product Load= 3,000 lb/pair Beam Stress= 0.59 Beam at Level i i Structural Engineering & Design Inc. 1815 MUM Ave I a Ve.rnp. GA A175n Tip— qOA� 5y�_1'15) Fax: 2O9.596.7186 'I By: N.V Eng:Mgz. Project: PAPE MH Project#: 23-0914-13 3 Pin Beam to Column Connection TYPE A e beam en momen s shown Herein snow the result of the maximum induced ixe end monen s torm seismic+static oa s and the code mandated minimum value of 1.50/o(DL+PL) Mconn max= Mseismic+Mend-fixi *0.70*Rho Pi 1 ( tY) rho= 1000 ; = 10,483 in-lb Load at level 1 2" P2 2" P3 1/2" C 121. Connector Type= 3 Pin Shear Capacity of Pin Pin Diam= 0.44 in Fy= 55,000 psi Ashear= (0.438 in)^2*Pi/4 = 0.1507 W2 Pshear= 0.4* Fy*Ashear = 0.4*55000 psi*0.1507inA2 = 3,315 lb Bearing Capacity of Pin tcol= 0.075 in Fu= 65,000 psi Omega= 2.22 a= 2.22 Pbearing= alpha*Fu*diam*tcol/Omega = 2.22*65000 psi*0.438 in*0.075 in/2.22 = 2,135 lb < 3315 lb Moment Capacity of Bracket Edge Distance=E=_1.00_in _ Pin Spacing= 2.0 in___ _____ _ __ __ _Fy=_55,000_psi_— C= P1+P2+P3 tclip= 0.18 in Sclip= 0.127 inA3 = P1+P1*(2.5"/4.5")+P1*(0.5"/4.5") = 1.667*P1 Mcap= Sclip* Mending C*d= Mcap= 1.667 d= E/2 = 0.127 inA3*0.66* Fy = 0.50 in = 4,610 in-lb Pclip= Mcap/(1.667*d) = 4610.1 in-lb/(1.667*0.5 in) Thus, P1= 2,135 lb = 5,531 lb Mconn-allow= [Pi*4.5"+Pi*(2.5"/4.5")*2.5"+Pi*(0.5"/4.5")*0.511] = 2135 LB*[4.5"+(2.511/4.5")*2.5"+(0.51'/4.5")*0.5"] = 12,691 in-lb > Mconn max, OK TYPE A Page q of 9/20/2023 'r Structural N; Engineering & Design Inc. uj 1815 Wright Ave La Verne. CA 91750 Tel: 909.596.1351 Fax: 202.626,7186 I' By: N.V Eng:Mgz. Project: PAPE MH Project#:23-0914-13 I 'u Transverse Brace Configuration:TYPE A Section Properties i Diagonal Member= Hannibal 1-1/2xl-1/2xl6ga Horizontal Member= Hannibal 1-1/2xl-1/2x16ga Area= 0,273 in^2 1.500 in Area= 0.273 inA2 r min= 0.496 in r min= 0.496 in 1.500 Fy= 55,000 psi Fy=55,000 psi K= 1.0 1.500 in K= 1.0 1.500 Qc= 1.92 F7 L JJ Frame Dimensions 0.250 in 0.250 Bottom Panel Height=H= 48.0 in Clear Depth=D-B*2= 36.0 in Frame Depth=D= 42.0 in X Brace= NO Column Width=B= 3.0 in rho= 1.00 Diagonal Member 0 Load Case 6::(i+(L10�c� 85+0,14Sds)*B*P+[0.7*rho*EJ<=1,0,ASD Method n —> Vtransverse= 1,306lb vb Vb=Vtransv*0.7*rho= 1306 Ib*0.7* 1 (kl/r)= (k*Ldiag)/r min = 9141b = (1 x 55.3 in/0.496 in) Ldiag= [(D-B*2)^2+(H-6")A2]^1/2 = 111.5 in Wag = 55.3 in Fe= pi^2*E/(kl/r)^2 H Pmax= V*(Ldiag/D)* 0.75 = 23,419 psi Pmax = 903lb axial load on diagonal brace member Since Fe<Fy/2, 3^typ Pn= AREA*Fn Fn= Fe s = 0.273 inA2*23419 psi -- 23,419 psi Typical Panel = 6,393 lb ConFlcururatkQn Pallow= Pn/9 Check End Weld = 6393 lb/1.92 Lweld= 3.0 in - = 3,330 lb --- - - --Fu=-65-ksi - - -- -- - -- - tmin= 0.060 in Pn/Pallow= 0.27 <= 1.0 OK Weld Capacity= 0.75*tmin*L*Fu/2.5 = 3,510 lb OK Horizontal brace V2= Vb=Vtransv*0.7*rho= 9141b (kl/r)= (k* Lhoriz)/r min Fe= pi^2*E/(kl/r)^2 Fy/2= 27,500 psi = (1 x 42 in)/0.496 in = 40,584 psi = 84.7 in Since Fe>Fy/2, Fn=Fy*(1-fy/4fe) Pn= AREA*Fn Pallow= Pn/Qc = 36,366 psi = 0.273inA2*36366 psi = 9928 lb/1.92 = 9,928lb = 5,171 lb Pn/Pallow= 0.18 <= 1.0 OK TYPE A Page 10 of / 9/20/2023 i u Structural Engineering & Design Inc. �II 1815 Wriclht Ave La Verne CA 91750 Tel: 909 5 6 1351 Fax: 909 596 7186 By: N.V Eng:Mgz. Project: PAPE MH Project M 23-0914-13 Single Row Frame Overturning Configuration:TYPE A I; Loads Critical Load case(s): 1)RMI Sec 2.2, item 7: (0.9-0.2Sds)D+ (0.9-0.20Sds)*B*Papp-E*rho hp I 2)ASCE 7-10 15.5.3.2 reference to section 12.4.3.2,eqtn 7: (0.9-0.2*Sds)DL+(0.9-02*Sds)Papp+Omega*Qe Sds= 0.8456 v Vtrans=V=E=Qe= 1,306 lb (0.9-0.2Sds)= 0.7309 DEAD LOAD PER UPRIGHT=D= 150 lb (0.9-02Sds)= 0.7309 PRODUCT LOAD PER UPRIGHT=P= 9,000 lb B= 1 0(j(j,(j H h Papp=P*0.67= 6,030 lb rho= 1.0000 Wst LC1=Wst1=(0,73088*D+0J3088*Papp*1)= 4,516 lb Omega= 2.006 Wst LC2=Wst2=(0J3088*D+0J3088*P)= 4,516 lb Frame Depth=Df= 42.0 in T Product Load Top Level, Ptop= 3,000 lb Htop-Ivl=H= 144.0 in DL/Lvl= 50 lb # Levels= 3 I� Df Seismic Ovt based on E,E(Fi*hi)= 120,425 in-lb #Anchors/Base= 2 hel ht de th ratio= 3.4 in h = 48.0 in SIDE ELEVATION A Fullv Loaded Rack _ h=H+h 2= 168.0 in Load case 1: Movt= E(Fi*hi)*E*rho Mst= Wsti * Df/2 T= (Movt-Mst)/Df = 120,425 in-lb = 4516 lb*42 in/2 = (120425 in-lb-94836 in-lb)/42 in = 94,836 in-lb = 609 lb Net Uplift per Column Load case 2: Movt= Sum(Fi*hi)*Omega*Qe Mst= Wst2* Df/2 T= (Movt-Mst)/Df = 240,850 in-lb = 4516 lb*42 in/2 = (240850 in-lb-94836 in-lb)/42 in 94,836 in-lb = 3,477 lb Net Uplift per Column Net Seismic Uplift 3,477 lb B Top Level Loaded Only Load case 1: 0 Vi=Vtop= Cs*Ip* Plop>=350 lb for H/D>6.0 Movt= [Vi*h+V2*H/2]*rho = 0.2114*3000 lb = 108,829 in-lb = 634lb T= (Movt-Mst)/Df Vleff= 634 lb Critical Level= 3 = (108829 in-lb-48348 in-lb)/42 in V2=VDT= Cs*Ip*D Cs*Ip= 0,2114 = 1,440 lb Net Uplift per Column = 32 lb Mst= (0.73088*D+0J3088*Ptop*1)*42 in/2 = 48,348 in-lb - Load case-2: — -- — — - — - - -- Vi=Vtop= Cs*Ip* Plop*Omega >=350 lb for H/D >6.0 Movt= [V1*h +V2*H/2] = 0.2114*3000 lb*Omega 215,374 in-lb = 1,268lb T= (Movt-Mst)/Df V1eff= 1,268 lb Critical Level= 3 = (215374 in-lb-48348 in-lb)/42 in V2=dead load shear= Cs*Ip*D Cs= 0.2114 = 3,977 lb Net Uplift per Column = 32lb Mst= M73088*D+0.73088*Ptop)*42 in/2 = 48,348 in-lb Net Seismic U lift= .3j977 lb Anchor Check(2)0.5"x 3.25"Embed HILTI TZ2 anchor(s)per base plate. Special inspection is required per ESR 4266. Pullout Capacity=Trap= 1,961 lb L.A. City Jurisdiction? NO Tcap*Phi= 1,961 lb Shear Capacity=Vcap= 2,517 lb Phi= 1 Vcap*Phi= 2,517 lb Fully Loaded: (1738 Ib/1961 Ib)^1 +(326 Ib/2517 Ib)^1 = 1.02 <= 1.2 OK Top Level Loaded: (1988 Ib/1961 Ib)^1 + (158 Ib/2517 Ib)^1 = 1.08 <= 1.2 OK TYPE A Page I( of t y 9/2 012 0 2 3 Structural u ii Engineering & Design Inc. 1 1816 Wright Ave La Verne CA 91750 Tel: 909 596 1351 Fax: 909 596 71$Q By: N.V Eng:Mgz. Project: PAPE MH Project#:23-0914-13 Base Plate Configuration:TYPE A Section r-- a Baseplate= 8x5x3/8 Eff Width=W = 7.00 In a = 2.50 in Mb Eff Depth=D = 5.00 in Anchor c.c. =2*a=d = 5.00 in Column Width=b = 3.00 in N=#Anchor/Base= 2 I b �~ Column Depth=dc= 3.00 in Fy= 36,000 psi e W L= 2.00 in Plate Thickness=t= 0.375 in Downalsle Elevation Down Aisle Loads Load Case 5.,:(1+0.105*Sds D+0.75*f(1,4+0.i4Sds2*B*P+0.75*[0.7*rho*El<=1,a ASD Method COLUMN DL=75 lb Axial=P= 1.088788* 75 lb+0.75* (1.518384* 0.7*4500 lb) COLUMN PL= 4,500 lb = 3,669 lb Base Moment= 8,000 in-lb Mb= Base Moment*0.75*0.7*rho 1+0.105*Sds= 1.0888 = 8000 in-lb* 0.75*0.7*rho 1.4+0.14Sds= 1.5184 = 4,200 in-lb EffE B= (} Axial Load P= 3,669 lb Mbase=Mb= 4,200 in-lb Effe. Axial stress=fa = P/A= P/(D*W) M1= wL^2/2=fa*L^2/2 = 105 psi = 210 in-lb Moment Stress=fb = M/S=6*Mb/[(D*B^2] Moment Stress=fb2= 2*fb* L/W = 102.9 psi = 58,8 psi Moment Stress=fbl = fb-fb2 M2= fbl*L^2)/2 F = 44.1 psi = 88 in-lb M3 = (1/2)*fb2*L*(2/3)*L= (1/3)*fb2*L^2 Mtotal = M1+M2+M3 = 78 in-lb = 376 in-lb/in S-plate = (1)(t^2)/6 Fb= 0.75*Fy = 0.023 in^3/in = 27,000 psi fb/Fb = Mtotal/[(S-pl ate)(Fb)] F'p 0,7*F'c = 0.59 OK = 2,100 psi OK Tanchor= (Mb-(PLapp*0.75*0.46)(a))/[(d)*N/2] Tallow= 1,961 lb OK = -1,418 lb No Tension Cross Aisle Loads CrA1ca/back"RM15x2.1,item 4:(1+0.115ds)DL+(1+0.145D5)PL*0J5+EV0.75<=1.0,ASDMefhod Check uplift load on Baseplate Check uplift forces on baseplate with 2 or more anchors per RMI 7.2.2. Pstatie= 3,669 lb "When the base plate configuration consists of two anchor bolts located on either side f the column and a net uplift force exists,the minimum base plate thickness Movt*0.75*0:7*rho= 63,223 in-lb- — --- Pselsmlc= Movt/Frame Depth -- _hall be determined based-on_a design bending moment in the plate equal Frame Depth 42.0 in = 1,505 lb to the uplift force on one anchor times 1/2 the distance from P=Pstatic+Pseismic= 5,174 lb the centerline of the anchor to the nearest edge of the rack column" b=Column Depth= 3.00 in T L=Base Plate Depth-Col Depth= 2..00 in Ta Mu a fa = P/A= P/(D*W) M= wL^2/2= fa*L^2/2 I b = 148 psi = 296 in-lb/in Elevation Uplift per Column= 3,976 lb Sbase/in = (1)(t^2)/6 Fbase= 0.75*Fy Qty Anchor per BP= 2 = 0.023 in^3/in = 27,000 psi Net Tension per anchor=Ta= 1,988 lb c= 2.00 in fb/Fb = M/[(S-plate)(Fb)] Mu=Moment on Baseplate due to uplift= Ta*c/2 = 0.47 OK = 1,988 in-lb Splate= 0.117 in^3 fb Fb *0.75= 0.471 OK TYPE A Page P—of ,y 9/20/2023 'i Structural Engineering & Design Inc. 1815 Wright Avg La Verne CA 91750 Tel: 909 596 1351 Fax: 909 596 7186 By: NN Eng:Mgz. Project: PAPE MH Project#:23-0914-13 i Slab on Grade Configuration:TYPE A 1 P slab a __-'-"---,, Concrete Fb fc= 3,000 psi slab tD a tslab=t= 6.0 in Cross tell= 6.0 in --c --- Aisle h x -►I �'- c Sol G p. y B fsoil= 750 psf L > Down Aisle _ Movt= 240,850 in-lb SLAB ELEVATION Frame depth= 42.0 in Baseplate Plan View Sds= 0.846 Base Plate 0.2*Sds= 0.169 Effec.Baseplate width=B= 7.00 in width=a= 3.00 in 0.600 Effec.Baseplate Depth=D= 5.00 in depth=b= 3.00 In R=B/D= 1.400 midway dist face of column to edge of plate=c= 5.00 in FIC^0.5= 54.80 psi Column Loads midway dist face of column to edge of plate=e= 4.00 in DEAD LOAD=D= 75 lb per column Load Case 1) (1.2+0.2Sds)D+ (1.2+0.2Sds)*B*P+rho*E RMI SEC 2.2 EQTN 5 unfactore(iASDload -- 1.36912*75 lb+ 1.36912*0.7*4500 lb+ 1 *5734 lb PRODUCT LOAD=P= 4,500 lb per column = 10,149 lb unfactored ASO load Load Case 2) (0.9-0.2Sds)D+ (0.9-0.2Sds)*B*Papp+rho*E RMISEC2.2 EQTN 7 Papp= 3,015 lb per column = 0.73088*75 lb+0.73088* 0.7*3015 lb+ 1*5734 lb P-seismic=E= (Movt/Frame depth) = 7,331 lb = 5,734 lb per column Load Case 3) 1.2*D+ 1.4*P RMI SEC 2.2 EQTN 1,2 unfactoredLlmltStateload = 1.2*75 lb+ 1.4*4500 lb B= = 6,390 Ib rho Load Case 4) 1.2*D+ 1.0*P+ 1.0E ACI 318-14 Sec 5.3.1 Sds= 0.8456 = 10,324 lb Egtn 5.3.1e 1.2+ 0.2*Sds= 1.3691 Effective Column Load=Pu= 10,324 lb per column 0. 9-0.20Sds= 0.7309 Puncture Apunct= [(c+t)+(e+t)]*2*t = 252.0 in^2 Fpunctl=- [(4/3-+-8/(3*a)l*k*(F'C^0.5)-- - - - - - - - - -fu/Fv=-P-u/(Apunct*Fpunct) - - - -- - = 106.5 psi = 0.468 <1 OK Fpunctl= 2.66*a,*(F'c^0.5) = 87.5 psi Fpunct eff 87.5 psi Slab Bending Pse=DL+PL+E= 10,324 lb Asoil= (Pse*144)/(fsoil) L= (Asoil)^0.5 y= (c*e)^0.5 + 2*t = 1,982 In^2 = 44.52 in = 16.5 in x= (L-y)/2 M= w*x^2/2 S-slab= 1*teff^2/6 = 14.0 in = (fsoll*x^2)/(144*2) = 6.0 in^3 Fb= 5*(phi)*(fc)^0.5 = 512.2 in-lb fb/Fb= M/(S-slab*Fb) = 164.32 psi = 0.519 < 1,OK TYPE A Page 13 of 9/20/2023 l Structural a Engineering & Design Inc. 1815 Wright Ave Lg Verne, CA 91750 Tel: 9 9.59 3 1 Fax: 9O2.5QQ.7186 h! By: N.V Eng:Mgz. Project: PAPE MH Project#:23-0914-13 r — ti' i' Configuration&Summary:TYPE B *RACK COLUMN REACTIONS ASO LOADS 48" AXIAL DL= 50lb 72 AXIAL LL= 3,000lb SEISMIC AXIAL Ps=+/- 2,024 lb 144" 144" 48 BASEMOMENT= 8,000/n-lb 72" 36" j 96" 42" Seismic Criteria #Bm Lvls Frame Depth Frame Heightl #Diagonals Beam Length Frame Type Ss=1.057, Fa=1.2 2 42 in 144.0 in 3 96 in Single Row Component Description STRESS Column Fy=55 ksi Hannibal IF3014-3x3x14ga P=3050 lb, M=14908 in-lb 0.62-OK Column&Backer None None None N/A Beam F =55 ksi HMH 41160/4.125"Face x 0.057"thk Lu=96 in Capacity: 5075 Ib/pr 0.59-OK Beam Connector F =55 ksi Lvl 1: 3 pin OK Mconn=9960 In-lb Mcap=12691 in-lb 0.78-OK Brace-Horizontal Fy=55 ksi Hannibal 1-1/2xl-1/2xl6ga 0.12-OK Brace-Diagonal F =55 ksi Hannibal 1-1/2xl-1/2xl6ga 0.18-OK Base Plate F =36 ksi 8x5x3/8 Fixity= 8000 in-lb 0.48-OK Anchor 2 per Base 0.5"x 3.25" Embed HILTI TZ2 ESR 4266 Inspection Reqd(Net Seismic Uplift=3976 lb) 0.9-OK Slab&Soil 6"thk x 3000 psi slab on grade. 750 psf Soil Bearing Pressure 0.32-OK Level Load** Story Force Story Force Column Column Conn. Beam Per Level Beam Spcg Brace I Transv Longit. Axial Moment Moment Connector 1 3,000 lb 72.0 in 36.0 in 290 lb 221 lb 3,050 lb 14,908 "# 9,960 "# 3 pin OK 2 3,000 lb 72.0 in 48.0 in 581 lb 443 lb 1,525 lb 7,969 "# 4,742 "# 3 pin OK 48.0 in **Load defined as product weight per pair of beams Total: 871 lb 664 lb NOteS TYPE B Page of 9/20/2023 o � F C C zw N m v�n cc G O K m —W dlti�z a2 Q 2 0'-1" Q bo�oosa� o CQ V y � I ,W �oCID 00 ,v Q Q 68' 5 c� T IL Q a c _ Q C CD Ln � o o O In ' c r7 Ae ) Be ) Q 't W CD o N rr 't W o O 4Y B8• 98e fZ^ !L A V Z 'w 48" W v+ Office 44" 46 tl2.. 49' 0 w c �y Z N ol � rn 4 a �s y Q) rn o n D a DRAWN BY: J.KEENHOLTS SCALE: P.a" NTS DATE: Digitally signed E n h a 0 by Enhao Zhang 2-2- 7.1.23 Date: RFcoshaE° JOB NO. Zhang;°o;22-07'00' «�A� CHECKED BY. SHEET NO.� PLAN VIEW EEEVAT ON MEW PLAN NORTH NTS NTS OF 1 SHEETS GENERAL PROJECT NOTES �1B / 1. DESIGNED PER REQUIREMENTS OF THE 2021 IBC,ASCE 7-16,SECTION 15.5.3,&2012 RMI RACK DESIGN MANUAL GENERAL RACK INFORMATION 2. SEISMIC CRITERIA SS=1.057,S1=0.377,FA=1200,FV=1.923 IP=1.0(NO PUBLIC ACCESS),SIDS=0.846,SDI.=0.483,OCCUPANCY CATAG.II / SITE CLASS D-DEFAULT,SEISMIC DESIGN CATAG.D I / 3. STORAGE CAPACITY: TYPE A=3000 LBS PER LEVEL TYP. 3/8" ❑ TYPE B=3000 LBS PER LEVEL TYP. OLUMN 4. ANCHORS:HILTI KWIKBOLT TZ2 ESR#4266,OR POWERS S02 ESR#2502 0 HORIZ. AS USED IN CALCULATIONS OR ICC&ENGINEER APPROVED EQUAL. to BRACE OW 1/2"0 X 3-1/4"MIN.EMBEDT. W ElC1C. 3/16" 1-1/2" NP' 11/2" SPACER EAM 50 FT-LBS TORQUE(HILTI KWIKBOLT TZ2) cc 3/16" TMP' ———— 40 FT-LBS TORQUE(POWERS SD2) COLUMN 8"0 (2)ANCHORS PER BASE PLATE. 1 1/2" 5. PERIODIC SPECIAL INSPECTION IS REQUIRED DURING ANCHOR INSTALLATION.ANCHORS SHALL BE INSTALLED ❑ _ ____ � PER ICC ESR#4266. 41/4" CONNECTOR 6. EXISTING S.O.G.CONCRETE THICKNESS&COMPRESSIVE STRENGTH,6'X 3000 PSI 7. SOIL BEARING PRESSURE 750 PSF. 8. ALL RACK INSTALLATIONS AND RACKS MANUFACTURED IN CONFORMITY WITH THIS STANDARD SHALL DISPLAY IN ONE OR MORE CONSPICUOUS LOCATIONS A PERMANENT PLAQUE EACH NOT LESS THAN 50 SQUARE ❑ INCHES IN AREA AND SHOWING THE MAXIMUM PERMISSIBLE UNIT LOAD IN CLEAR,LEGIBLE PRINT. j DIAG. 9. ALL BOLTS GR.5 OR BETTER,INSTALL TO SNUG TIGHT FIT OR BETTER Lu 2 BRACE 10.ALL WELDING PERFORMED IN THE SHOP OF AN APPROVED FABRICATOR BY AWS CERTIFIED WELDERS USING \ ASE E70XX ELECTRODE OR BETTER.NO FIELD WELDING PERFORMED.SPECIAL INSPECTION IS REQUIRED ONLY FOR H 1"� ❑ LATE& ANY FIELD WELDING. Q ANCHOR 11.THE CLEAR SPACE BELOW SPRINKLERS SHALL BE A MIN.OF 18"BETWEEN TOP OF THE STORAGE AND THE �� CEILING SPRINKLER DEFLECTOR. NOTES: 12.THE PRODUCT SHOWN ON THE DETAILS HEREIN IS ASSUMED TO BE IN GOOD,UNDAMAGED CONDITION.THE USE @ ALL HANNIBAL \ PRODUCT MUST BE FREE OF ANY DAMAGE AND/OR FABRICATION DEFICIENCIES OR IRREGULARITIES.IT IS THE v COLUMN/BASE LOCATIONS TYP. RESPONSIBILITY OF THE OWNER,USER,PRODUCT PROVIDER AND/OR INSTALLER OF THE COMPONENTS TO DESCRIPTION BASE PLATE:8"x 5" DESCRIPTION COLUMN:HMH IF 3014 DESCRIPTION BRACING:HORIZ.&DIAG. NOTIFY SED,INC IN WRITING,OF ANY DAMAGE,DEFICIENCIES OR IRREGULARITIES. _ NOTES: NOT A DEPICTION OF THIS PROJECT 13.IT IS THE RESPONSIBILITY OFTHE OWNER AND/OR USER OFTHE COMPONENTS SHOWN HEREIN TO NOTIFY BED, 10 MATERIAL 3/8"THICK PLATE MATERIAL 14 GAGE THK. MATERIAL 16 GAGE STEEL USE @ ALL HANNIBAL BRACE INC OF ANY DAMAGE OR DEFICIENCIES IN THE SYSTEM DURING USE.THIS INCLUDES SUCH OCCURRENCES F t9 STEEL YIELD ASTM A36,Fy=36,000 PSI STEEL YIELD ASTM A570,Fy=55,000 PSI STEEL YIELD ASTM A570,Fy=55,000 PSI LOCATIONS TYP. SUCH AS IMPACT DAMAGE TO THE COMPONENTS FROM FORKLIFT OR HEAVY MACHINERY,IMPACT FROM ` N DROPPED LOADS ON THE SYSTEM,DAMAGE TO SYSTEMS BY IMPROPER USE OR INSTALLATION,ETC.THE USER OF THE PRODUCT MUST FY SED,INC N WRITING ULD ANY DAMAGE OR DEFICIENCY OCCUR TO THE 3 5 PRODUCT SHOWN HEREIN.IT I IS THE RESPONSIBILITY I OFOTHE OWNER AND/OR USER TO MAINTAIN THE SAFETY �$ AND PROPER USE OF THE STORAGE PRODUCT SHOWN HEREIN. ^x LL 14.IT IS THE RESPONSIBILITY OF THE OWNER/USER OF THE STORAGE SYSTEM SHOWN HEREIN TO REPAIR OR cz N Np REPLACE ANY COMPONENT THAT IS DAMAGED OR OTHERWISE DEFICIENT. nl 1 1 1/16' 1/$" 15.THE OWNER SHALL MAINTAIN THE STRUCTURAL INTEGRITY OF THE RACK SYSTEM BY ASSURING PROPER OPERATIONAL,HOUSE KEEPING AND MAINTENANCE PROCEDURES,BUT NOT LIMITED TO THE FOLLOWING: 801, A.PROHIBIT ANY OVERLOADING OF ANY PALLET POSITIONS AND OF OVERALL RACK SYSTEMS. z O 1" BASE PLATE F.F. B.REGULARLY INSPECT FOR DAMAGE.IF DAMAGE IS FOUND,IMMEDIATELY UNLOAD THE AFFECTED AREA AND W �pI Ip� REPLACE OR REPAIR ANY DAMAGED COLUMNS,BEAMS,OR OTHER STRUCTURAL COMPONENTS. Z 1 3/4" 1" C.REQUIRE ALL PALLETS TO BE MAINTAINED IN GOOD,SAFE,OPERATING CONDITION. 0 D.ENSURE THAT PALLETS ARE PROPERLY PLACED ONTO PALLET LOAD SUPPORT MEMBERS �� a IN PROPERLY STACKED AND STABLE POSITION. O 0. .L. E.REQUIRE THAT ALL GOODS STORED ON EACH PALLET TO BE PROPERLY STACKED AND STABLE. r 8 F.PROHIBIT DOUBLE STACKING OF ANY PALLET POSITION,INCLUDING THE TOP MOST POSITION,UNLESS THE RACK `� Q 3-1/4" SYSTEM IS SPECIFICALLY DESIGNED FOR SUCH LOADING. Z U 5/160 MIN.E BED. G.THE OWNER AND/OR USER OF THE RACK SYSTEM MUST PROVIDE MEASURES TO MITIGATE DAMAGE TO THE `\ \ Ill SAFETY PIN STORAGE RACK BY USE OF IMPACT PROTECTIVE DEVICES IN AREAS WHERE FORKLIFT AND/OR HEAVY MACHINERY K 4 1/8" ARE IN USE. O H.ENSURE THAT THE RACKS ARE NOT MODIFIED OR REARRANGED IN A MANNER NOT WITHIN THE ORIGINAL DESIGN L 4-ri Typ, 1 $� CONFIGURATION. )-41 v �NPO ZHg4, � T 1/2"4 Q of wnsyti 0 U �-33/16"--� Digitally signed 7/160 OR. 3 55 RIVET NOTES: 81 Date: 2102-7 CONFIRM O.A.L.OF ANCHORS WITH INSTALLER TO Z h a n g 2023.09.21 Re",B,Eac� ENSURE REQUIRED EMBEDMENT IS OBTAINED. 5:01:38-07'00' SSioNA E DESCRIPTION 3-PIN CONNECTOR DESCRIPTION 4-1/8"BEAM(HMH#41160) DESCRIPTION HILTI KWIKBOLT TZ2 ANCHOR NOTES: NOTES: MATERIAL 7 GAGE USE @ ALL HANNIBAL BEAM TO COLUMN MATERIAL 16 GAGE NOTES: SIZE 1/2"0 x 3-1/4"MIN.EMBED. SEE NOTE#4 ABOVE FOR ANCHOR STEEL YIELD ASTM A570,Fy=55'000 PSI CONNECTION LOCATIONS TYP. STEEL YIELD ASTM A570,Fy=55,000 PSI USE @ ALL BEAM LOCATIONS TYP. ESR# 4266 SPECS. o M N _ uj N W m S Z Q G LU 2� Lu a z TYPE A SELECTIVE RACK TYPE B SELECTIVE RACK < m z I L— O J cc �D Q 113 611� 1B ----9b+n� r-42u—I 4311 a 4 3 7 " 0 4 3 0 1 4" 4 " 1 4" 14411 4 „ d z a - a 7 o 48113 ' l 1 1 ' 5 3 JOB NO. FRONT VIEW FRONT VIEW SIDE VIEW 23-0914-13 SHEET NO. SED 1 OF 1 DESCRIPTION STORAGE RACK ELEVATIONS Ski 8V38 llVHS SNoinnaOMN TN 'snnOONd 915YE709'do-9VAIPUCH M"i9MY Put'afiviolS CZZ26 VM 'uOlbullJV 63833NIDN3 JO RUSNOO N31118M 2299-9L9-90Z :xD.J Ml-�lr)�,-90Z :Guoqd ......... SS3ddX3 lnOHBM'IOV81NOO N�# 3N 9AV H;6g 0[69� a AG 03ZIN0H1nV 3SMHLO 84M VM 911409S Hinos 3nN3AV HiCt 0026 T- NO INYGanoodi 8W S63HI0 01 V� 9 d o d SV id33X3'S3SOd8nd d3HIO 3 5UJ LLJ 03SO10SIG NO 03sn'031vondna 00 3dVdv sionwNda3H33NION HPUDH IDIJG;D LU 38 ION llVHS N0383HI "I SNOIS30 ONY DNIMV80 SlHi 210d(rVgYdVgd SOMAYFa R T rr PE?UJ Z-" o <> 4, CL C)L) 0 O LLJ LU < LLJ LL- O _> > ry ry z r m LU Lf) C) C) < < 0 Lu LU 4 n u ry u LU LU LU R/ < (n il ir, C> C) > LU >— C) z LL LLJ (S) LLJ C) Q) 0 QDz n n C) Ill < f z D n UJ LL- CL 0 Cl— �J' R/ QDLLJ 77 LL-1 LZ U-i te < z > ry D Lu LLJ > CL 64 C> F) Ll _j AR 'ICA' ('14 CO IT 9 30110N SIHl av38 1704s SN0110n0osd03a0ad S�tSI/E?J�ads 5gfl Jt1v.H fivolviv pue affei s £ZZH VM 'u046uiliy E_ 03a33NION3 JO WSN02 N3.1N RR99-sL,-9U� :xo.� 00££-bE£-"9UZ :auoyd an _ 3 V 4469 O1691 sn z AS 03ZI80H1ntl 3SIMa3Hlo 8L126 M `a}}oeS H1(OS �(N3AV H1Qb 0O86 Ol l# N -.--..._ 5tl id30%3'S35odand a3H10 - < N _ _.. 80 1N3N3an00Nd a03 Sa3H10 Ol 5 U I I P U D H I D I J 2 1 D W a d iD d 2 w x dH NOIJdINOSiQ �,LVQ "ON (350105138 ION3lltlHS3N0383Ho1 ""`� 3dVd v sio aONd QAM33Nl�J1Y3 Y t� W W NOISIAJU SN01530 ONtl MONO SIHl 7IOd ON8Vd38d S9NI NV2IQ q y z O V y o C � � . C-," t , I � _ =3#'t * tr Q$ f {{ i tM+K N r y F +aiK� _1 1 1 Q i t \ [A57 Exr EXCT EYEWAS11 r C/) w PASTAID RN AEA `�`�;, CO2 c ml x,sr�a.+a c 4'f Lu 'd7 � d di i.l Eiii VIdEST EXrr Eli�T 9 KlION slHl s av3e TIVHS sNo13 aoad3d,zv ;a S13nCOL's //Lc?d300'.j'16U11PUVH119;113;BMPue a L?JO;S �ZN6 dM 'uol6uiluy h 03833N N3 JO iN3SNoo Nj IdM 2999-SL9-90Z :X0J 002€-4K-90Z :auOgd — - -- - s ss3Ndzi inoHiiM .oeaiNo3 04 3N @AV H469 O1691 0 5 z aoHlnv 3sIMa3Hlo 81686 VAA 'GRIDGS Hln0S 3nN3/1N HIOti 0026 (:� _ °� o -- —.-- __ - --. - -- -- SV d 3X 'SEOddnd a3H10 W Z —_ a0 1N3N3dn30Nd a03 Sa3H10 01 [� ^(��'g q� 3 a d D d w N d6 NOl,LdIHOS�Q 3.LVQ' •ON 03SO1 SIO NO C-?S!1'031VOndnO 0 v m'S.i o 9 8 b..9 —1 CI I O �3 de Y N U, c�j T w w 3e ION z iVHS NOa3Hi z Q o S NOISIAJU N3i,n aNa 3NIMVdG SIHI 909 UXVd.Vh(d Sovl,, , rl 6r fLLH N�N I F it 4 � i w N 2 / �3 a� 7J i 1� a i I C1� I �I I it i I I i C i ;I 1 - i -1 ,I I t� i F� '.I i'. li �i I O C\1 it i1 i jl i( (I '.I i'' �C II__------—. _ _. MR6HM'NOIEJNI.18 -- idelNVH OWNILL 65'606 kdd l5 L' 6 9 H ------------- ------------.�- ._.....__ 01L#3N3AH H169069 M N M HW 3ddd _mwB1�f1wror+ wo db d a5mmlr Aa x—ewo LU� N Q °T M Icy NOISIA3tl m y z w m m p c m o¢ 0 �j00 z� 6 O z O iF R w m a u¢� a� w m ¢ emu¢ 0 5 Eg o �- _~ w a j a Z g0g0�' W o Y C. 3 p ¢ U 5 0 M m a 0 O z i a x w .�j..., QU tau w ¢ O ¢ O 2 Y Z I'- ¢W Ui wUw w m O ° W y w W w S m g z 2 W O LL Z N F E ° z O' ¢ O �� �Fw,IIZ w <¢¢Ec=na��� w �v�iwp� ' ZoZ� za y5�z pp No� 2 wo U ~ cg0Nmw Z W W 2 m W N�8zE Qy 03 Vmj 2 W 0 Z N¢W N Q O fw 0 2 2 V°J O 2 °O O¢� z Sw<F_ °O O¢ O O ¢��C IIII.- �g �p Q yy O z 8 O ¢2 O ❑ ¢ W w p¢ N (w 0 m J 0 g U d vN LL w 6 IIWULL' a z 2ISO Z O mwp 0 ° w Z�0Q2 Z_m= O p w H [U awcL�Y4aipy3 5mOm 0OZ°7dQ' imZOWr FzWaoo°O wz ZLL = ¢m OW = wm gmuwjl°5s 3Zy¢¢6 ¢¢?WLL au O2 a w a. oVm ap ¢ w o D oM�Mw ¢ 0ww o iO0OoU i wgiO wy F -9 ~ wiommoZgaymo 8maz w ovo w° LLmcDgg9m Zoaza-xmwz a O p W O g °N wZ p U 2 W U 0 �aFFw°¢ z ° O z zU m 2 w.wD E O c7 Zz pF°d pLLNf 0 p?d23 O¢ahwmYWc� FO o j a / /d O¢ 2m FomZaCLLC .11 2 z 7Z d ¢ O a U a 1¢agO -c O Z F a¢ Zw W z w ' rz12w a N m i m 2 � E � ?¢wzo � ° �wwxZOim zxF3''6§ = -6 awJ CCO pa w O a Z 0zw z>j mUaU� w 0d 9 8 ¢¢o U m 'z InOw¢Umh O a cm)¢O OOYm ¢ I¢U U m LLJ y¢ ZJ �, w 9 4Om0y z Si� oe� Omy p¢ W o p2 Wamm ¢ 0) W?ma $ga 0? mOz ¢ m W F O 2aTEN WpN m 1 VI V Cl tli ? m fG h [C Oi 6 l ^ d m U 0 W LL m 2 LO a:z o �o 0 W = O W LL QZ � Q v ¢0 <( U ! > LU �m ---- �' f M Z O a ---- z CO z _ ( qwa, Y OLL �_..��� ILL V ZI -jzp of �<iW � Q f. zoam w— ¢pN Q y W IJ O Q l Y =w uj a m Z x z --.-- Z O w L U W q p! V N o � 0Wlo LE LU w LL� U O'O z'w N (n z'.q w 0:v) w I a_ Lu z / ? I v I z N a I j � r m l c¢> j.._IE: -j .� - qaa T z r y _j aZ0 v ¢IC14 5 v f' cd to II I 1 0- r _ w' w I La LQui l LU w 0 H v ° (01 UI Cc�_� ❑ n _ "' II II z z > q a ¢'�I w',Lu c) ww W' z w o LU wH. w W ¢ o Cl) I m J --,— __J I Z W I ...... I k IL cli 'y� u' --._.__._.. n� { P z wI .,zt� �T io LL -- I �7 m ri Y'I ----- 9 I co y Ov ¢ h D = LLI ` fir\ dFr Q — N N w U /p J Wiwi w W IUJ � L—---- - ui z y Wn LL O a z l d ;mt It .I U xl'w a O �' �� :¢ i - cr z walgl z� LU LLi CID a zI ¢ �II o y w Oj� ' ioch'r '� �to lo. z ;,', _ cc J y Ulwlw F ❑ 8IW j i� � WI 0�; y ZIP 0 Lou 2ti Permit#: 5839 Permit Date: 02/19/24 Permit Type: COMMERCIAL RACKING Project Name: Pape Material Handling Arlington Applicant Name: Engineered Products Applicant Address: 9800 40th Ave S Applicant, City, State, Zip: Seattle Contact: James Ford Keenholts Phone: 2068541345 Email:jeenholts@eppape.com Scope of Work: Installation of Qty. (8)bays of palletized racking Valuation: 14158.77 Square Feet: 8250 Number of Stories: 1 Construction Type: 1113 Occupancy Group: S-2; Storage Low Hazard ID Code: CIC Permit Issued: 04/22/2024 Permit Expires: 10/21/2024 Form Permit Type: COMMERCIAL RACKING Status: COMPLETE Assigned To: Hannah Hardwick Property Parcel# Address Legal Description Owner Name Owner Phone Zoning 31052700202000 16910 59TH AVE NE STE Premier Pacific 300 INDUSTRIAL/ 110 Properties,LLC MANUFACTURING Contractors Contractor Primary Contact Phone Address Contractor Type License License# Engineered Products,a Chris Lang 206-250-3913 9883 40th Avenue CONSTRUCTION UBI 602 684 203 Pape'Company S CONTRACTOR Engineered Products,a Chris Lang 206-250-3913 9883 40th Avenue CONSTRUCTION Labor&Industries ENGINPC93I CO Pape'Company S CONTRACTOR Inspections Date Inspection Type Description Scheduled Date Completed Date Inspector Status 05/15/2024 Inspection 05/16/2024 05/16/2024 BUILDING Approved Plan Reviews Date Review Type Description Assigned To Review Status 04/11/2024 COMMERCIAL RACKING BUILDING Approved with Conditions Fees Fee Description Notes Amount Building Plan Review Table 4-2 $244.36 Credit Card Service $7.33 Processing/Technology $25.00 Building Permit Table 4-1 $358.25 Credit Card Service $11.50 Total $646.44 Attached Letters Date Letter Description 04/17/2024 Building Permit 02/19/2024 Web Form-Building Application Payments Date Paid By Description Payment Type Accepted By Amount 04/11/2024 XBP Conf: $244.36 170097640 04/11/2024 James Keenholts 170097640 Hannah Hardwick $7.33 04/19/2024 XBP Conf: $383.25 170765254 04/19/2024 James Keenholts 170765254 $11.50 Outstanding Balance $0.00 Notes Date Note Created By: received hard copies via mail 4/10/24.emailed link to applicant again for payment and sent a 04/11/2024 Hannah Hardwick follow up email 4/11 regarding the incomplete submittal until paid. 03/19/2024 sent follow up to fees and hard copies Hannah Hardwick 03/14/2024 emailed plan review again for payment.Still pending hard copies as well. Hannah Hardwick 03/04/2024 emailed for payment and hard copies again Hannah Hardwick 02/26/2024 emailed for plan review and hard copies again Hannah Hardwick 02/20/2024 emailed to get plan review fee and hard copies prior to routing for review. Hannah Hardwick Uploaded Files Date File Name 04/22/2024 20199439-2024 BLD5839 IssuedPermit.pdf 04/17/2024 20092851-20240417 BLD5839 Approved Plans.pdf 02/19/2024 4bb04299e2afn250d099eOdbl8aOcf39 napemh-arlington-permit.pdf 02/19/2024 bll743f1708c5a8f49b2e70780829c21 23-0914-13 nape mh calcs.pdf