Loading...
HomeMy WebLinkAbout2011-003 RESOLUTION NO. 2011-003 A RESOLUTION REPLACING RESOLUTION NOS.2010-002 AND 2010-006, AND ADOPTING A REVISED FEE SCHEDULE WHEREAS, the City Council, through ordinance, has adopted regulations requiring certain actions and services; and, WHEREAS, these various ordinances set forth that fees shall be set by resolution; and, WHEREAS, the cost of providing these various services consistent with applicable codes, regulations, and policies periodically increase or decrease, or certain services or practices are discontinued and fees are no longer needed; and, WHEREAS, it is the intent of the City of Arlington to charge appropriate fees and charges that are consistent with the services provided and to cover the public cost of providing these various services so that the public is not subsidizing individual benefits derived therefrom; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ARLINGTON AS FOLLOWS: The following rates, fees, and charges for various services provided, actions performed, or items sold by the city and/or its contract service providers, and fines levied against code violators, are hereby adopted: Section 1. Fees and Charges—General. 1.1 Fees. Fees are intended to cover the normal, recurring costs associated with providing a given service. Fees are non-refundable. 1.2 Prices. In some instances, the City provides certain goods and merchandise for sale. Prices for these goods may be included in this resolution. 1.3 Payment Due. Fees are due at the time the action is requested (e.g., at time of application) or occurs (e.g., prior to a specific action). An applicant may pay all fees of a multi-phased project in advance; however, doing so does not vest applicable fees due. Fees due are those in effect at the time the specific action or phase of an action is requested or occurs. 1.4 Waivers. Upon petition by the applicant, the City Council may waive any of the fees, or portions thereof, for any non-profit organization or government agency. Page 1 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2011-003 Section 2. Land Use Fees. Fees for various services, actions, and permits regarding land use, as per AMC Title 20 Land Use Code, shall be as listed in Table 1: Land Use Fees Table 1: Land Use Fees Action Fee ($ Land Use Permits Zoning Permit 2,222 Special Use Permit 3,306 plus actual cost of Hearing Examiner if re 'd) Conditional Use Permit 3,862 plus actual cost of Hearing Examiner Administrative Conditional Use Permit Seasonal/Special Event 102 Homeless Encampment 508 Preliminary Plats and Binding Site Plans Conditional Use Permit for a Long Plat 6,983 plus actual cost of Hearing Examiner Zoning Permit for a Short Plat 3,068 Final Plats and Binding Site Plans Lon Plat 3,389 Short Plat 1,823 Development Agreements 3,862 plus actual cost of Hearing Examiner if re 'd Master Plan 12,500 Design Review Administrative 212 Design Review Board 423 Forest Practices Permits Permit Review 423 Forest Practices Permit Application Fee 106 plus 106 per acre Review Fee for Conversion Option Harvest Plan Approval 106 plus 106 per acre Review Fee To Lift Moratorium 300 Inspection Fee 127 per hour plus 106 per acre Appeals To City Council 212 To Planning Commission 212 To Hearing Examiner 582 plus actual cost of Hearing Examiner To Shoreline Hearings Board 582 Reconsideration of Decision by: Community Development Director and/or a designee 79 Planning Commission 106 Hearing Examiner 212 plus actual cost of Hearing Examiner City Council 132 Page 2 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2011-003 Action Fee ($) Permit Extension Extension 53 Amendment to or Modification of Permit Insignificant Design Deviations 53 Minor Amendment 317 Major Amendment 1,067 plus cost of Hearing Examiner(if re 'd) BindinR Site Plans Text and/or Design Deviation 741 Lot Line Adjustment or Changes to Number of Lots 1,323 Development Agreement 741 plus actual cost of Hearing Examiner if re 'd Boundary Line Adjustment Boundary Line Adjustment 1,664 Land Use Ordinance Amendment Amendment to Text of Land Use Ordinance 741 Amendment to Zoning Map (rezone) < 5 acres 1,111 > or= 5 acres 1,957 Comprehensive Plan Amendment Minor Amendment (annual cycle) 1,428 Major Amendment (5-year cycle) 2,116 Annexations Submission of 10% Petition 106 Submission of 60% Petition 1,058 If it goes to BRB hearing 794 Shoreline Development Permit SDP in conjunction with a Land Use Permit 529 SDP not in conjunction with a Land Use Permit 1,058 Variance Administrative 635 If it goes to hearing (fee in addition to that paid for 1,217 plus actual cost of Admin. Decision) Hearing Examiner Miscellaneous Actions/Items Zoning Interpretation 106 Pre-Application Meetings 1 st two hours 0 Subsequent meetings 317 per meeting SEPA Review (note: review of checklist included in Land Use Permit fee ) SEPA Only (no land use permit required) 529 Review of requested studies (i.e. traffic, wetland, etc) 159 Page 3 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2011-003 Action Fee $) Review of requested studies (i.e. drainage, geo-tech, etc) 711 Environmental Impact Statement(EIS) 1,058 plus actual cost of consultant Request of Utility Services Outside City Single-Family Residence/Duplex 212 Other Development 635 Section 3. Public Works Fees. Fees for various services, actions and permits shall be as listed in Tables 2-1: Review Fees, 2-2: Grading Plan Review Fees and 2-3: Grading Permit Fees. Table 2-1: Review Fees Action Fee ($) Site Civil Review 6% E.E.C.C* with a minimum charge of 1,587 Additional Plan Review Fee 212 each Miscellaneous Engineering Fee 529 each As-Built Review Fee Included in the site civil review fee Final Plat Review Fee Included in the site civil review fee Inspection Fee 127 per hour-1/2 hour minimum Outside Consultant Review Fee Actual cost Simple Site Plan Review 265 per lot Right of Way 6% E.E.C.C* or maximum 1,058 with a minimum charge of 106 plus inspection fees Right of Way Vacation 1,058 Miscellaneous Staff Time 127 per hour per person-1/2 hour minimum En ineerin Meetings-after 2 hours 317 per meeting Water Availability Certificate SFR 32—Non-SFR 106 Recovery Contract 1,058 plus actual cost GIS Zoning and Land Use Maps 10.00 l lxl7 5.00 2x3 13.00 3x3 19.00 3x4 25.00 Map CD 26.00 Data CDs/FTP 26.00 per client Hourly Rate for Custom Work 127 per hour, '/2 hour minimum Laminating 3/sq ft Shipping 5.00 Fee none * E.E.C.0 Engineer's Estimated Cost of Construction-Includes labor, equipment, material, overhead and profit. Prices shall be from RS Means (latest edition) data adjusted for the Snohomish County area or from local sources if not included in the RS Means database. * Simple Site Plan Review-No water or sewer extension- Single family residence with maximum of 2 lots. *Additional plan review applies when there is a change,addition or revision to the plan. Page 4 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#201 1-003 *Additional plan review fees will be charged at any point in the project when more than 2 reviews are required. * Inspection Fee-commercial and residential plats(storm drainage,landscape,right-of-way and bond inspections). * Outside Consultant Review Fee. * Water Availability Certificate Fee. * Engineering Meetings(first 2 hours are no charge). * Miscellaneous engineering fee-traffic and storm water report/design reviewed in-house. Table 2-2: Grading Plan Review Fees 2009 Fee $ 2010 Fee $ 50 Cubic Yards or less No fee No fee 51 to 100 cubic yards 25.00 25.50 101 to 1,000 cubic yards 39.25 40.00 1,001 to 100,000 cubic yards First 1,000 cubic yards 52.30 53.35 Plus - for each additional 10,000 yards or fraction thereof 26.00 26.50 100,001 to 200,000 cubic yards For the first 100,000 cubic yards 286.25 292.00 Plus - for each additional 10,000 yards or fraction thereof 14.10 14.40 200,001 cubic yards or more For the first 200,000 cubic yards 426.90 435.45 Plus - for each additional 10,000 cubic yards or fraction thereof 7.70 7.85 Other Fees: Additional plan review required by changes, additions or revisions to approved plans (minimum 53.60* 54.70* charge— 1/2 hour) Per hour Per hour *Or the total hourly cost to the City,whichever is the greatest. This cost shall include supervision,overhead, equipment,hourly wages and fringe benefits of the employees involved. Table 2-3: Grading Permit Fees 2009 Fee $ 2010 Fee $ 50 cubic yards or less 25.00 25.50 51 to 100 cubic yards 39.25 40.00 101 to 1,000 cubic yards First 100 cubic yards 39.25 40.00 Plus—for each additional 100 cubic yards or fraction thereof 18.55 18.90 1,001 to 10,000 cubic yards For the first 1,000 cubic yards 206.40 210.50 Plus - for each additional 1,000 yards or fraction thereof 15.40 15.70 10,001 to 100,000 cubic yards Page 5 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION 42011-003 i For the First 10,000 cubic yards 344.90 351.80 Plus - for each additional 10,000 yards or fraction thereof 70.00 71.40 100,001 or more cubic yards or more For the first 100,000 cubic yards 975.30 994.80 Plus - for each additional 10,000 cubic yards or fraction thereof 38.75 39.50 Section 4. Buildine Permit Fees. For determining the value of a structure, the most current issue of the Building Safety Journal Magazine, which offers the legacy building valuation data fee schedule as published by the International Code Council, is adopted b� reference. Fees shall be as listed in Tables 3-1: Building Permit Fees, 3-2: Miscellaneous Building Inspection Fees and 3-3: Miscellaneous Building Permit Fees. Table 3-1: Building Permit Fees Total 2009 2010 2011 2012 Fee ($) Valuation $ 1.00-500.00 28.50 29.00 29.50 30.00 0.00 to 500.00 501.00-2,000.00 28.50 29.00 29.50 30.00 For the first 500.00 plus 3.75 3.75 3.83 3.90 For each additional 100.00, or fraction thereof, to and including 2,000.00 2001.00- 84.75 86.00 86.95 88.50 For the first 2,000.00 plus 25,000.00 17.00 17.25 17.60 17.95 For each additional 1,000.00, or fraction thereof, to and including 25,000.00 25,001.00- 475.75 482.75 491.75 501.35 For the first 25,000.00 plus 50,000.00 12.25 12.50 12.75 13.01 For each additional 1,000.00, or fraction thereof, to and including 50,000.00 50,001.00- 782.00 795.25 810.50 820.10 For the first 50,000.00 plus 100,000.00 8.50 8.70 8.87 9.05 For each additional 1,000.00, or fraction thereof, to and including 100,000.00 100,001.00- 1,207.00 1,230.25 1,254.00 1,272.60 For the first 100,000.00 plus 500,000.00 6.80 6.90 7.04 7.18 For each additional 1,000.00, or fraction thereof, to and including .500,000.00 500,001.00- 3,927.00 3,990.25 4,070.00 4,144.60 For the first 500,000.00 plus 1,000,000.00 5.75 5.90 6.02 6.14 For each additional 1,000.00, or fraction thereof, to and including 1,000,000.00 1,000,001.00 6,80 6,94 7,08 7,21 For the first 1,000,000.00 plus and a 2.00 0.25 0.00 4.60 For each additional 1,000.00, or Page 6 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2011-003 4.45 4.50 4.59 4.68 fraction thereof Total 2013 2014 2015 2016 Fee ($) Valuation $ 1.00- 500.00 30.50 31.00 31.50 32.00 0.00 to 500.00 501.00-2,000.00 30.50 31.00 31.50 32.00 For the first 500.00 plus 3.98 4.06 4.14 4.22 For each additional 100.00, or fraction thereof, to and including 2,000.00 2001.00- 90.20 91.90 93.60 95.30 For the first 2,000.00 plus 25,000.00 18.31 18.67 19.05 19.43 For each additional 1,000.00, or fraction thereof,to and including 25,000.00 25,001.00- 511.33 521.31 531.75 542.19 For the first 25,000.00 plus 50,000.00 13.27 13.53 13.80 14.08 For each additional 1,000.00, or fraction thereof, to and including 50,000.00 50,001.00- 843.08 859.56 876.75 894.19 For the first 50,000.00 plus 100,000.00 9.23 9.42 9.61 9.80 For each additional 1,000.00, or fraction thereof, to and including 100,000.00 100,001.00- 1,304.58 1,330.56 1,357.25 1,384.19 For the first 100,000.00 plus 500,000.00 7.32 7.47 7.62 7.77 For each additional 1,000.00, or fraction thereof, to and including 500,000.00 500,001.00- 4,232.58 4,318.56 4,405.25 4,492.19 For the first 500,000.00 plus 1,000,000.00 6.26 6.39 6.51 6.64 For each additional 1,000.00, or fraction thereof, to and including 1,000,000.00 1,000,001.00 7,36 7,51 7,66 7,81 For the first 1,000,000.00 plus and up 2.58 3.56 0.25 9.19 For each additional 1,000.00, or 4.78 4.87 4.97 5.07 fraction thereof Total 2017 2018 2019 2020 Fee ($) Valuation $ 1.00- 500.00 32.50 33.00 33.50 34.00 0.00 to 500.00 501.00-2,000.00 32.50 33.00 33.50 34.00 For the first 500.00 plus 4.31 4.39 4.48 4.57 For each additional 100.00, or fraction thereof, to and including 2,000.00 2001.00- 95.17 98.85 100.70 102.55 For the first 2,000.00 plus 25,000.00 19.81 20.21 20.62 21.03 For each additional 1,000.00, or fraction thereof, to and including 25,000.00 25,001.00- 552.78 563.68 574.96 586.24 For the first 25,000.00 plus Page 7 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2011-003 50,000.00 14.36 14.65 14.94 15.24 For each additional 1,000.00, or fraction thereof, to and including 50,000.00 50,001.00— 911.78 929.93 948.46 967.24 For the first 50,000.00 plus 100,000.00 9.99 10.19 10.40 10.61 For each additional 1,000.00, or fraction thereof, to and including 100,000.00 100,001.00— 1,411.28 1,439.43 1,468.46 1,497.74 For the first 100,000.00 plus 500,000.00 7.93 8.08 8.25 8.41 For each additional 1,000.00, or fraction thereof, to and including 500,000.00 500,001.00— 4,583.28 4,671.43 4,768.46 4,861.74 For the first 500,000.00 plus 1,000,000.00 6.78 6.91 7.05 7.19 For each additional 1,000.00, or fraction thereof, to and including 1,000,000.00 1,000,001.00 and 7,973.28 8,126.43 8,293.46 8,456.74 For the first 1,000,000.00 plus up 5.17 5.27 5.38 5.49 For each additional 1,000.00, or fraction thereof Table 3-2: Miscellaneous Building Inspection Fees Action Fee $ Inspections outside of normal business hours 50.00 per hour minimum charge 1 hour Reinspection fees assessed under provisions of the 50.00 per hour' current IBC Inspection for which no fee is specifically 50.00 per hour (minimum charge-1 hour) indicated Additional plan review required by changes, 50.00 per hour (minimum charge-1 hour) additions or revised plans For use of outside consultants for plan review and Actual costs inspections, or both. Sto work order (working withoutpermit)' Or the total hourly cost to the City, whichever is greatest.This cost shall include supervision, overhead,equipment, hourly wages,and benefits of the employees involved. 2 Actual costs include administrative and overhead costs. 3 Stop work order(SWO): failure to obtain a valid permit within 48 hour of a SWO will result in double permit fees or a fine of$500 whichever is less. A permit applied for within the 48 hour timeframe may be subject to a fine and/or fee at the discretion of the building official. Table 3-3: Miscellaneous Building Permit Fees Action Fee $ Change lot after plan review completed 100.00 Change plans during or after plan review. New Plan Review Fee Change or revise plans after issuance of Current hourly rate per IBC or new plan review fee permit. Page 8 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2011-003 Action Fee $ Commercial or industrial re-roof IBC value or bid amount Demolitions 100.00 Espresso carts (portable and stand alone 250.00 Fences over 6 feet in height Current hourly rate per IBC for plan review plus 20.00 permit fee Mobile homes 500.00 Modular offices Oob shacks) 350.00 Moved buildings 100.00 prior to moving together with a building permit fee based on the IBC valuation for new building and cost of moved building. Residential re-roofs 0 if plan review required 50.00 Retaining walls (permit not required under 100.00 or IBC valuation, whichever is greater four 4 feet Signs IBC valuation, using permit fee only 4.2 Plumbing Fees. Plumbing fees shall be as listed in Table 3-4: Plumbing Fees. Table 3-4: Plumbing Permit Fees Action Fee $ PERMIT ISSUANCE Plumbing Permit Base Fee 25.00 Medical Gas Systems 100.00 Fixtures and Vents For each plumbing fixture or trap or set of fixtures on one trap (including water, drainage 12.00 piping and backflow protection thereof) Sewers, Disposal Systems and Interceptors For each industrial waste pretreatment interceptor, including its trap and vent, except 25.00 kitchen-type grease interceptors functioning as fixture traps Water Piping and Water Heaters For each water heater including vent 25.00 Lawn Sprinklers, Vacuum Breakers and Backflow Protection Devices For each lawn sprinkler system on any one meter, including backflow protection devices 25.00 thereof Swimming Pools For each swimming pool ors a: Public pool 90.00 Public spa 90.00 Private pool 60.00 Private spa 30.00 Miscellaneous For each appliance or piece of equipment regulated by the Plumbing Code but not 12.00 classed in other appliance categories, or for which no other fee is listed in this code Page 9 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2011-003 4.3 Mechanical Permit Fees. Mechanical permit and inspection shall be as listed in Table 3-5: Mechanical Permit and Inspection Fees. Table 3-5: Mechanical Permit & Inspection Fees Action Fee $ PERMIT ISSUANCE AND HEATERS Mechanical Permit Base Fee 25.00 Furnaces 25.00 Appliance Vents For the installation, relocation or replacement of each appliance vent installed and not 10.00 included in an appliance permit Boilers 25.00 AHU's and Condensing Units 100.00 Evaporative Coolers & Heat Pumps 25.00 Ventilation and Exhaust For each ventilation fan connected to a single duct 10.00 Refrigeration Systems 50.00 For each gas piping system of I to 5 outlets 10.00 For each additional outlet over 5, each 1.00 Miscellaneous For each appliance or piece of equipment regulated by the Mechanical Code but not 25.00 classed in other appliance categories, or for which the fee is listed in the table Table 3-6: Plumbing & Mechanical Plan Review Fees <THAN$500.00 ROUND DOWN TO NEAREST$1,000. >THAN$500.00 ROUNDUP TO NEAREST$1,000.00 Total Valuation Fee $ Less than $1,000.00 150.00 $1,000.00 to $9,999.99 200.00 $10,000 to $19,999.99 250.00 $20,000.00 to $29,999.99 300.00 $30,000.00 to $39,999.99 350.00 $40,000.00 to $49,999.99 400.00 $50,000.00 to $59,999.99 450.00 $60,000.00 to $69,999.99 500.00 $70,000.00 to $79,999.99 550.00 $80,000.00 to $89,999.99 600.00 $90,000.00 to $99,999.99 650.00 $100,000.00 to $199,999.99 700.00 $200,000.00 to $299,999.99 800.00 $300,000.00 to $399,999.99 900.00 $400,000.00 to $499,999.99 1,000.00 $500,000.00 to $599,999.99 1,100.00 Page 10 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2011-003 $600,000.00 to $699,999.99 1,200.00 $700,000.00 to $799,999.99 1,300.00 $800,000.00 to $899,999.99 1,400.00 $900,000.00 to $999,999.99 1,500.00 $1,000,000.00 to $1,999,999.99 1,600.00 $2,000,000.00 to $2,999,999.99 1,700.00 $3,000,000.00 to $3,999,999.99 1,800.00 $4,000,000.00 to $4,999,999.99 1,900.00 5 Million and Up 2,000.00 for the first $5M plus $1.00 for each additional $1,000.00 or fraction thereof Table 3-7: Fire Permit Fees Action Fee $ Fire Sprinklers Plan Review Fee 100.00 Permit Fee Based on Valuation Fire Alarms Plan Review Fee 100.00 Permit Fee Based on Valuation Commercial Hoods (Type I & Type II Plan Review Fee 100.00 Permit Fee Based on Valuation Other Fire Safety System Plan Review Fee 100.00 Permit Fee Based on Valuation Section 5. Cemetery Fees. Fees and prices for various services, actions, and merchandise for cemetery use shall be as listed in Table 4: Cemetery Fees and Prices. Table 4: Cemetery Fees and Prices Product/Service/Action Fee $ Traditional Burial Burial Lot $1,500 Opening & Closing (during business hours $1,000 Opening & Closing after business hours $1,300 Concrete Grave Liner $800 Vaults Monticello $1,595 Continental $1,895 Venetian $2,295 Cameo Rose/ SST Triune $2,995 Vault Internment System $350 Page 11 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2011-003 Inurnment Cremation Lot/Urn Garden $650 Second Right Inurnment $500 Opening & Closing (during business hours $445 Opening & Closing after business hours $695 Liner $310 Childrens Garden Bab land Lot $397 Opening & Closing all times) $488 Bab land Liner $658 Niche Niche Wall I and II, rows 1-3 top half $1,142 Niche Wall I and II, rows 4-6 bottom half $1,089 Opening & Closing (during business hours $445 Opening & Closing after business hours $695 Second Right Niche Wall $545 Niche Inscription—Single $363 Niche Inscription—Double $563 Tent and Chairs for Inurnment $163 Flower Vase for Niche Wall $205 Headstones and Monuments Headstone Setting - 28 x16 or smaller $275 Headstone Setting - 32 x 20 or larger $375 Setting Fee - vase block or garden marker $60 Setting Fee -u ri ht monument (single) $575 Setting Fee -upright monument double $675 Headstone Final Inscription off site $550 Headstone Final Inscription on site $363 Headstone Sales - varies Call Inspection Fee outside sales only) $375 Memorial Marker - varies Call Other Services Memorial Tree w/garden marker $800 Disinterment/Traditional Burial $1,995 Disinterment/ Cremation $650 Pressure Washing $ 40 for first headstone $25 for each additional headstone Section 6. Fees for the Use of City Owned Facilities. Fees for various services, actions, and permits regarding use of City owned facilities shall be as listed in Table 5: Fees for the Use of City Owned Facilities. Table 5: Fees for the Use of City Owned Facilities Page 12 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2011-003 Use/Activity Fee $ Hadley Hall at the Arlington Community Youth Center Without Kitchen One to three hours 15 per hour Over three hours 75 With Kitchen One to three hours 20 per hour Over three hours 125 Athletic Fields League Baseball Youth, resident team 7.50 per youth per season Youth, non-resident team 10 per team per use Adult 25 per use Softball Youth, resident team 7.50 per youth per season Youth, non-resident team 10 per team per use Adult 25 per use Soccer Youth, resident team 7.50 per youth per season Youth, non-resident team 10 per team per use Adult 25 per use Other Youth, resident team 7.50 per youth per season Youth, non-resident team 10 per team per use Adult 25 per use Tournament Baseball Youth, resident team 7.50 per youth per tournament Youth, non-resident team 10 per team per use Adult 25 per use Softball Youth, resident team 7.50 per youth per tournament Youth, non-resident team 10 per team per use Adult 25 per use Soccer Youth, resident team 7.50 per youth per tournament Youth, non-resident team 10 per team per use Adult 25 per use Other Youth, resident team 7.50 per youth per season Youth, non-resident team 10 per team per use Adult 25 per use Lighting Youth 3 per hour Page 13 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION##2011-003 Adult 6 per hour Scheduling Fee for League and Tournament League 15 per team Tournament 15 per tournament Concession Sales League 1 50per season Tournament 25 er day 6.1 Definitions. A. "Youth" is defined as any person 18 years of age or younger. B. "Resident" is defined as any team composed of at least 5 1% Arlington residents. Section 7. Appeal Fees for Violations and Abatement. Fees for various services and actions regarding violations and abatement as per Chapter 11.01 of the Arlington Municipal Code shall be as listed in Table 6: Appeal Fees for Violations and Abatement. Table 6: Appeal Fees for Violations and Abatement Action Fee $ Appeals To Hearing Examiner 582 plus actual cost of Hearing Examiner Fines Forest Practice Violation Fine 317 Section 8. Lieensina Fees. Licensing fees for various licenses issued under various sections of the Arlington Municipal Code shall be as listed in Table 7:- Licensing Fees. Table 7: Licensing Fees License/Activity Fee ($) Annual/renewal business license under AMC Chapter 5.28 60.00 Late payment penalty for each month of delinquency of business 5.00 per month of delinquency license under AMC Chapter 5.28 For new applications applied for between October lst through 45.00 December 30t" the new business license applications pay the following fee of$45. For new applications applied for between January I" through 30.00 March 30t" new business license applications pay the following fee of$30 For new applications applied for April I" through June 30t new 75.00 business license applications pay the following fee. Note: $15 for the remainder of the current business license year and $60 for the new business license year for a total of $75, making the business Page 14 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2011-003 license valid thru June 30` of the following year. Businesses with offices located outside of city limits but conducting 20.00 business within city limits AMC Chapter 5.28 Peddlers & Solicitors License under AMC Chapter 5.04 25.00 Vehicles for Hire License under AMC Chapter 5.12 - First vehicle 35.00 - Each vehicle thereafter 15.00 Cabaret License under AMC Chapter 5.16 (annual) 75.00 Section 9. EMS Fees and Charges. 9.1 Fees and Mileage Charges Established. For purposes of AMC Chapter 3.06, fees and mileage for EMS services shall be set as set forth in Table 8: Emergency Medical Services Rates and Charges. 9.2 EMS Transport Fees. In accordance with the requirements of 42 Code of Federal Regulations (CFR) Parts 410 and 414, which provides that Medicare fees and charges shall apply to Medicare recipients; A. Unmet (excess fee) Part B Deductible and Part B coinsurance amounts. In accordance with the provisions of 42 CFR Parts 410 and 414, the City shall bill the patient for any unmet or excess fee to the extent authorized by federal law. B. Inability to Pay Excess Fee. Individuals who are on fixed or low incomes or do not have the ability to pay the differential because of financial difficulties may submit a request to waive the differential to the City with supporting documentation of the inability to pay. Table 8: Emergency Medical Services Rates and Charges Service Rate $ BLS Non-emergent 476.00 BLS Emergent 476.00 ALS Emergent 741.00 ALS 2 846.00 ALS Response Fee 265.00 Specialty Care Transport Fee 846.00 Mileage all categories) 16.00 per mile Section 9. Dog Licensing, Fees. License Annual Fee ($) Do - unaltered $ 20 Do —altered $ 10 Do —altered senior citizen owner $ 5 Do —altered& micro-chipped $ 5 Replacement Tag fee $ 5 Page 15 CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2011-003 Late Fee—for failure to purchase annual $ 10 license before March 1 Per RCW 49.60.380, the City of Arlington shall honor a request by a blind person or hearing impaired person not to be charged a fee to license his or her guide dog, or a request by a physically disabled person not to be charged a fee to license his or her service animal. All dogs require proof of current Rabies vaccination to be licensed. Proof is also required for alteration and micro-chip to be eligible for the reduced fee. Section 10. Repeal of Previous Fee Resolutions. Resolutions 2010-002 and Resolution 2010-006 are hereby repealed. Section 11. Effective Date. This resolution will become effective immediately upon passage. PASSED by the City Council and APPROVED by the Mayor this day of l_ 2011. CITY OF ARLINGTON Margaret g arson, Mayor ATTEST: Kristin anfield, City Clerk APPROVED AS TO FORM: :::: oSfflWe�,'Cit�-Att rney Page 16 CERTIFICATE OF RESOLUTION I, Kristin Banfield, City Clerk of the City of Arlington, Washington (the "City"), do hereby certify that the attached is a full, true and correct copy City of Arlington Resolution No. 2011-003, passed by the Arlington City Council at their regular meeting on February 22, 2011. Krist' PBanifield, City Clerk Dated this 23rd day of February, 2011.