Loading...
HomeMy WebLinkAbout18112 VINEWAY PL_067115_2026 NSPECTION REPORT Permit No.: c G-211.rLot #: z 6 Address: /g//. - V^C. mar /dZ Contractor: bL C_ - Owner: Date: ✓ -O APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. i n v✓ter. G� Jo Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in A Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT • Permit No.: e!5� Lot #: Address: �� �a 1si e Z✓y,i�L- Contractor: Owner: Date: / ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION a CORRECTION REQUESTED I-Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. e_ akeca- �i►ti� ,D GLAI Inspector: %,i Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing Cl Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in �'4 Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: 1M INSPECTION REPORT • Permit No.: 2115 Lot #: Address: Contractor: G Ae if ♦ Owner: Date: ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE befo e work can be approved. ❑ S�[ Please contact inspector. / �rvrtacN` ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR R INSPECTION -24 our noticJee )required. 5/ Yvr�-s AA t h C_-"I �4 h u caJ / G✓C! /�I� /n 9ic�t U/ de,W/' �- eq ro o 77�hG'l� =7 tvc r h Is� p GI h vt 5�'•� l�ih r-ry f � _ Inspector: l�i/�✓ Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in A& Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: l INSPECTION REPORT ii TOPermit No.: —7//SLot #:Address: f �/ /Contractor:OOwner:Date: P APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Inspector: ^� Date: �2 TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing )W Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: PM INSPECTION REPORT SG TO Permit No.: o - -7i 15 Lot #: Address: /r I12- Contractor: ClgC 9 4 Owner: GRr SHIN O't Date: -a 7 ❑ APPROVAL PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. / Iz-rNSpQCf7nh .lt@ no .'st �� ! 7 0(7 W/ Yzee ,'�eL e U Inspector: Date: _ TYPE OF INSPECTION REQUESTED ❑ Under-floor �� ;A Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork Q-Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation 29 Other: Jl e,,/7-k-) INSPECTION REPORT d7So b to 7 1 1 ii TPermit No.: �-A Lot#:Address: i�' (1Z a � �oContractor: C, X-c- Owner: O Date: 7 ic -o 0 APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Inspector: Date: 7— b-D 7 TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage JK Insulation ❑ Other: = 3 INSPECTION REPORT 44 J 4ti1N G?'0 Permit No.: U� ��� Lot#: 16 Address: /V/� - �� h c- G✓� „ /•/t �n(f � Z Contractor: � �O Owner: �Z N O Date: ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ACORRECTION REQUESTED Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. A/ /1,0-" ❑ Was not able to perform inspection. he ❑ CALL 43 -0674 R RE-INSPECTION -24 hour noticr required. II / J ,,� c . a _ J +. el, p / Inspector: Date: e: `22 TYPE OF INSPECTION REQUESTED ❑ Under-floor A Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation Shear Nailing ❑ Groundwork 1 Qtl Mechanical )roe�, uhsf- Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: ;C ' 3 s, / Ae INSPECTION REPORT ¢ti1N G rO Permit No.: 0 ( S Lot#: Address: /P!6,1. e_ �✓ �� Contractor: G �C �- 4 Owner: IN G� Date: a O ❑ APPROVAL ❑ PARTIAL APPROVAL VIOLATION jK CORRECTION REQUESTED Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. 0 F% Gr r - 3 n IV i ) � � coS / /•/1 ' �� n. ct] oaf, �`��- � e-,I- /(7/- e-A// Inspector: /°fw✓ Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ;4 Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork 11�_A Mechanical ❑ Grid ❑ Struct. Slab J Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT �10N G?'� Permit No.: o 6 7115 Lot #: Q Address: 161 1 Z y N� • s Contractor: G ( -4- Owner: �`sii�IN G AO Date: G—I9-o-7 ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR/RE-INSPECTION - 24 hour notice required. Q �� .n � O i/1 Lb G✓�Phi i /vGi-- yl � � mac`, ga�c,✓> Corc�J%�Ks �a� 3 o sr Corte so�� `dti Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor 5C Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork (Z-$ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: y�f2� INSPECTION REPORT ¢yIN G To Permit No.: 01,5,- 211 S- Lot#: f Q' Address: �//.2 — G� �i✓s �Z Contractor: ' ✓� Aa>� �s Owner: IN � Date: C ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION C,CORRECTION REQUESTED ("Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. r'z:-, V , Gl C /fAti_ Sip gg Clocx'- S e Q,/ r ,(, 1.4 OCA, U4 Lam.! /?ALL S fr4kv►e fi, a hC/ 46 5fcz� /ca// J <�'U;4 �/ 1i A CPS . D/O f e ry- I`C�cci�>> h-�sa'ne-Z�- Inspector: Date: 'y7 TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork A Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT 4yIN Gr0 Permit No.: (!::349-7//5 Lot#: Address: - 1/_2 - L 1�e� "-G x • e Contractor: GAO Owner: IN Date: Y APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. yQ�n a C h , 17 Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing 9 Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT 4ti1N64t G r0 Permit No.: C24-�/�.5 Lot #: l Address: • • G Contractor: NO�0 Owner: Date: 5 P 3 d7 L APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. R Inspector: Date: S ��2 3-02 TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove AU Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: 't 3 z _,yam INSPECTION REPORT ¢ti1N GTO Permit No.: o(. ­7 1 15 Lot #: Address: f a i i L- Contractor: a---L 4 Owner: ING� Date: 5-7-1 -cam ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION a CORRECTION REQUESTED ,Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. PC ep! 1e R V M1 e O"M� eA S 02& Z2 e . Q Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation 0 Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove S'Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: �.at7' F� 6 INSPECTION REPORT N Gr0 Permit No.: ®z,/- 711 S'^Lot#: 46 Q Address: AF1102 - �41 F • •� Z Contractor: �xc 4 Owner: IN G� Date: `l, - 7 ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION J4 CORRECTION REQUESTED Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. 4V S--C>8G2 7,hGJI� Inspector: /v" Date: G TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation 4d Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT ZN G ! ¢1� ?'O Permit No.: 04 7 ( I S Lot Address: (8( I Z J I ► --, Contractor: Owner: IN G Date: `j It -a ❑ APPROVAL a PARTIAL APPROVAL ❑ VIOLATION P CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. / All S7 79ix , ST7L39w.S A i ate, t_ S;o e- Inspector: ot;f'' Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation (L V�f Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT 4~IN GTO Permit No.: �-- 7//57 Lot#: f Q' Address: 1 /�A� L!�► P �=;,i 'l Contractor: Owner: '1 �`r�IN C'� Date: �" '7 25 ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ,CORRECTION REQUESTED 'Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0J674 FOR RE-INSPECTION -24 hour notice required. NJ Sl A/ -1 CGs,nS/ r �ln/<� �GLt-ems• ��r / Fsr Inspector: y Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ; -Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT 4ti1N G TO Permit No.:O 6 -7//S'- Lot #: Q" Address: Contractor: �oran�4/ F�sH•'�� -s ��, ,SO Owner: �jNC' 1Date:�_f r 6 -07 APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.Inspector: Date: `7 , TYPE OF INSPECTION REQUESTED Ql(under-fioor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: /tm INSPECTION REPORT ¢S•1N G 1'O Permit No.: 06- ?1/S" Lot#: l Q' Address: /IF/ Contractor: �T l7`e s-s ems, ,S4 Owner: rN 1 � Date: ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry Drainage ❑ Insulation ❑ Other: INSPECTION REPORT N G TO Permit No.: 61. 7 i 1 r- Lot #: Address: 101 2— V 22a 10i Contractor: ru Owner: �I N O Date: __4- 2--t�-0-7 APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. e7� yF i Inspector: Date: - a TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ''Drainage ❑ Insulation ❑ Other: 'NSPECTION REPORT V�ti1 ti VP � N G TO Permit No.: © . — -71 IS Lot #: Q' Address: IS 11 2— V I N�'JT Contractor: ING,�4 Owner: Date: 3— I`f o"7 APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. Inspector: Date: 3 _1 `1" 07 TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation }4 Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT ii Permit No.: o ro -7 1 i 5 Lot #: Address: 18112r v t nl c;--VdContractor: G rz-L4 Owner: G� Date: 3- 7 -o-7 ,APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Inspector: C Date: 3 ' 7'07 TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping fL J4 Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: NSPECTION REPORT iiN Permit No.: du, n11S' Lot #: Address: i8 I r L- v L'V e\,j�j Contractor: La R.� �-�� Cs G,SO Owner: Date: 7- 13—o' ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION CORRECTION REQUESTED Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. i4 p 7-2 S-A-A Inspector: '- Date: .2---/F-0 7 TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping A Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation 0 Other: fly AQJ Total 'hai CYs, HAW � UVIT •, = rsF J - ow 1 _ea:_ PIP ! . ._ OUTLET-, i Ll B 'T' 0 T A €... . . . , . cloy, 00 `4•U`!'Alake Fee Meat py: 00 TOTA., i=lei;. . . . . . . . . . . . . . . . . 14 101, PAY€'ll:t+l'i'`S. . .. . . . . . . . . .. . . . . . . :al IW(�. C9L� THE _:;ANDY ,1_ p _ TOTAL DUE. . . . . . . . . . . . . . . . . '�J, WU4. 25 DA L .. � 1 ,.1 1 Christopher Young From: Linda Cooper[LCooper@scblaw.com] Sent: Thursday, April 08, 2010 11:14 AM To: Permit Center Subject: 18112 Vineway Place, Arlington, Washington The above-referenced property was completed on or about October 4, 2007. Pursuant to: Section 110.5 Violation of Requirements for Certificate of Occupancy. The City Council affirms that the issuance of any certificate of occupancy is of vital importance in the safeguarding of life safety, property safety and health of occupants of any structure; and further, that the enforcement of all city development regulations is of vital importance to the city's economic vitality and the public good.Any person allowing a building to be occupied without a certificate of occupancy first being issued as required by this Chapter shall be subject to the civil penalty provisions of the Arlington Municipal Code Chapters 1 and 11 and is subject to be abatement in accordance with the abatement procedures specified in Arlington Municipal Code Chapter 16.44, including posting to prevent occupancy. (Emphasis Added) Please forward the Certificate of Occupancy issued by the City of Arlington pertaining to the above-referenced property. You can either forward via US Mail to Michael S. Cooper 18112 Vineway Place Arlington, WA 98223-7404 Or e-mail to m s cooper(d-)yahoo.net or Icooper(cD-scblaw.com If you have any questions please feel free to call Linda Cooper at 206-682-3333 x 5849. Thanks Michael S. Cooper and Linda J. Cooper Linda J. Cooper I Legal Assistant I Short Cressman&Burgess PLLC 1999 Third Avenue, Suite 3000 1 Seattle, WA 98104 (T)206.682.3333 1(F)206.340.88561 Icooper_seblaw.com I www.scblaw.com CONFIDENTIAL: if this jnessal_:�e: is not intended for}you, please delete it and notify the sender. 1 © (1 '♦^ N ' 4 f Z cr .. .. -Q tD Q n�ra y. o 2 aw awwfimp W � ;9�tiw a CC oxanm 33 Aj MEASIR 7� H Va Ul to U1 � i�-•'�'4E gyp`3901 �, t" ro M T_ R is _ -1'��rah131'•� �'� i T r �1 e ENJILOWG DEPARTMENT 143 g � AAT�C Y�...� BYY Ada_,Qb\ \r r Np'O HANGF-S]At`.�!'�k'(Wil ry Lo 5 {{ �y Vl-t i�',�;]f•L.V�I\;"i '~^,.ic � �s•, 1� 35 71 1 N. L, j Carctt �.q� .. 4 ve 4.,, ! it WOR Y _ .•9t } FqC I I i i i If ONG SI GLE FAMILY REF =DENC BUILDING PERMIT APPLICATION Department of Community Development City of Arlington • 238 N Olympic Ave. •Arlington, WA 98223 • Phone (360)403 3431 • FAX(360)403 3447 THIS APPLICATION TO BE USED FOR ONE AND TWO DWELLING UNITS RESIDENTIAL STRUCTURES. THIS APPLICATION MUST BE ACCOMPANIED BY TWO(2) SETS OF CONSTRUCTION DRAWINGS, SIX(6)ACCURATE, FULLY DIMENSIONED PLOT PLANS AND TWO(2) SETS OF ENERGY CODE APPLICATIONS. TYPE OF PERMIT: (Building ( ) Mechanical (V�Plumbing ( irtombination Project Address: ` t� Parcel ID#: Lot#: —1 �J Subdivision: C_ Car Project Description: Owner: �1 Y1 � ytc l IJ rCt sot C� . I , �eOr`a ®r; r�1ndQPhone Number: f -) ve / n 11 I Address: rC. /C� './'C a`_�v" �� City: n d^c^ A State: L`0C-t Zip Code: Contact Person: {t 4`1 ` C k�• Phone Number: Cell Phone: 1�5rr Fax: /-/C J " f a`d 2`2f E-mail: Address: / CJ 3GI zl i c-1� �J�� �/ City: ° arc°�>�� State: �� Zip Code: Lending Agency: Phone Number: Address: City: State: Zip Code: n ] r Contractor: I fir``n V fafy� r y Fle)VYA Phone Number: Address: n �C � ID'�'r ti 6City: � Y Il It L Oe-C.,t, State: C rl)(9' Zip Code: I, 1�o �1 �>1 f t S12512 Oo , Contractor's License Number: Expiration: Plumbing Contractor: Phone Number: Address: Mer ' d�` I w City: �? � State: Zip Code: Contractor's License Number: Q l(2 1 � PL(7? 2-.9 �` Expiration: Mechanical Contractor: Phone Number: Address: City: State: Zip Code: Contractor's License Number: Expiration: FOR STAFF USE ONLY Permit# Acc to By Amou t Received J e t# JUL Page 1 of 2 11 �1 2 � U� 7005 5/05 dwa WEB Forms-46 9 ore :� �v NATURE SAVER TM FAX MEMO 01616 date T o0t o (1 From pages —7 COlUept, J Co. Phone// ✓A)S. 70( /fir Phone J/ Fax Fax Y'.V Fax# 1 G`. V "f St GLE FAMILY REF DENCE Bo BUILDING PERMIT APPLICATION l IN G� Department of Community Development City of Arlington • 238 N Olympic Ave. •Arlington,WA 98223 • Phone (360)403 3431 • FAX (360)403 3447 Number of Plumbing Fixtures (Including Rough-Ins) Total Fixture Total Number Fixtures Plumbing Fixtures Accessory Main Unit#X Dwelling Unit Residence Units Multiplier Bar Sink ` I X 1.0 = Bathtub or Combination Bath/Shower X 4.0 = r Clotheswasher X 4.0 = L. Dishwasher [ X 1.5 = Hose Bibb X 2.5 = Kitchen Sink X 1.5 Laundry Sink X 20 = Lavatory(Bathroom Sink) X 1 0 = j Shower(Stand Alone) Each Head ' X 2.0 = Water Closet(Toilet) X 2.5 = ; G Whirlpool Bath or Combination ' X 40 = q Bath/Shower Water Heater Total Fixture q=1; Other Units � n S1t Traps(other than above items) Column Totals l / D Estimated Project Valuation �� G o , ' ' 2 tea` Building Square Footage �� v 5t o / 1 D q 3`d Floor 1 Floor 2"d Floor �J Basement_ _ Deck Garage I , Water Supply Piping A. Fixture Units: Number of Fixtures X Fixture Units=Total Fixture Units B. Distance from meter to most remote outlet: 96 feet. C. Difference in elevation between meter and highest fixture: _feet above meter or feet below meter D. Pressure in street main: T70 -5.1 psi. (Measure with gaugge or c eck with Vyater Department) ctiec,Nei or51le la;q-S ��'�• '7 �I d � ay C 1+y W01 ev. �eQao( I hereby certify that the above information is correct and that the construction on, and the occupancy and the use of the above- describ d property w'I be in acco nce ith the laws, rules and regulation of the State of Washington. Applicants Signature Date FOR STAFF USE ONLY Permit# Accepted By Amount Received Receipt# Date Received WEB Forms-46 Page 2 of 2 5105 dwa j �I r is