Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
19713 47TH AVE NE_056317_2026
THE FACE OF DOCUMENT HAS A RED BACKGROUND NOT -• • CITY OF ARLINGTr 238 N. Olympic Ave. Arlington,WA 98223 OG'�'O) (360)403-3421 RECEIPT No. 56 7 5 7 I EIVED ****NINE HUNDRED ELEVEN DOLLARS & 00 CENTS � RECEIVED FROM DATE REC.NO. AMOUNT REF.NO. 05—E317 O is/2 8/O5 56757 911. 04) Cr Car-d 2951 Misc `Receipt TANAA 17 3S3 �- INSPECTION REPORT Q - iiGr Permit No.: D� 16317 Lot #: 2-Address: i97 t 3 4 7 A-ytF Contractor: C,��Owner: � Date: ef APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in M-0 Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: 14 INSPECTION REPORT Q 41`IN G�O Permit No.: o 5 6311 Lot #: 2— Address: j 9 7 / 3 117 A ✓6_ • e Z Contractor: G, `LL Owner: IN O Date: 6 + -7—os ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION C-4—CORRECTION REQUESTED orrections listed below MUSAD b foWre v'or can be approved. ❑ Please contact inspector, - ❑ Was not able to perform inspection. tCAL�L35-0 74 F R RE-INSPECTION - 24 hour notice required. Inspector: D e:��%7 -©S� TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in J( Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT 4ti1N G 4t, 0 Permit No.: C)r) ('3 1-7Lot #: ZAddress: 1 y `7 3y 7 J+I/&- vContractor: /Z�94I N G Date: 2_�7 —0 S— APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. L-nn Gi-7-A Inspector: Date: Z7-05— TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ?400ting �.elz- ❑ Drywall, Nailing ❑ Consultation Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: 2_6zl_ 2 ZIP INSPECTION REPORT 1+4G TOpermitNo.: eS G3C I Lot #: ZAddress: 1q_7 13 '4 1 � yeContractor: 6 at_ Owner: Date: -C ,LJ�APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. Inspector: `�Z�' Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing St Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: If Q INSPECTION REPORT 1;4 rPermitNo.: d9 k3j—j Lot #: 2 Address: 19 ,� 712 1-11 AContractor: !Owner: Date: S r-Lo 0!�' ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. i Inspector: C-TL I Date: 6--4 =Os TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing A Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: 1156 k' INSPECTION REPORT V ?' Permit No.: Lot#: 2- O� Address: I el -7 ► 3 q 7 A v4— Contractor: C R.4. �O Owner: 'IN 5-1 s -cam &APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. /Lt l:Zt'f ► u4�p 02.0,_� Inspector: cs Z _ Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor iZ`f Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork �. D( Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage Insulation ❑ Other: 13 qqz ,,-'NSPECTION REPORT ¢ti1N G rO Permit No.: 05 b 31 1 Lot #: 2. Q' Address: I q-7 l 3 y '7 n✓ Contractor: A-L 4 Owner: IN Cs� Date: ❑ APPROVAL PARTIAL APPROVAL ❑ VIOLATION CORRECTION REQUESTED Cd Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. ,M 1 A.4 I S��H'rt.tRT� .� '3l -V L—t-x s 'r-C G tc��CT -T M eZri /L!4 rrrl!�G GoYrss �� ..fL,t �!��.• 1 r4 iA'_P Q0fJ VA'4�i_ 'a k-'- `TU 1 P1J 5,1 fi`_ Inspector: S � Date: 5 -/L^-QS TYPE OF INSPECTION REQUESTED ❑ Under-floor F--Rf Framing 1= Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork (Z-Wf Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: q/ Plow " ' 44SPECTION REPORT ¢ti1N G?'o Permit No.: Lot#: Address: Z Contractor: d t" y�, ,SO Owner: I N O Date: �1"� ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION I,CORRECTION REQUESTED Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. r Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor A Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation 0 Other: :G `t'-1 3 INSPECTION REPORT ti1N G 7'O Permit No.: 0.S 431 1 Lot#: Address: l'i'1 13 1{"7 +` oAru: � Z Contractor: (L'L- �IN G,S4 Owner: Date: 5-1 i—oS ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION (( CORRECTION REQUESTED Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. 11ee1::1 /►cv,�r® t=i'otrr *ee�'®b ❑ Was not able to perform inspection. L 435-0674 FOR RE-INSPECTION -24 hour notice required. d7:Z 7 ® /.iQ Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor A Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork 6 Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT 4ti1N G?'� Permit No.: 05 �v3i l Lot #: L- Q" Address: i 9 7/3 fI*"'` r4'✓� � Contractor: 6 2.4_ O Owner: INOS Date: ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. 3lz . r Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor AFraming ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT N G TO Permit No.: o 5 630 L Address: 19 7 1 3 14-7 &yAF_ Contractor: C /Z_C_ 93, �O Owner: INS Date: S-S-os- ❑ APPROVAL PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. it Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing W Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove /L A Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT 4- , 1,1N G T Permit No.: C S is 3( -7 Lot #:QAddress: 19 -1► 3 4-7Contractor:' Owner: I N G Date: ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION 4 CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. d�,57�4�L ��L✓- rot µ s� �� 14�.G�S713LEs— /�4�� i.e� G�lZ¢zciL - Inspector: �SZ Date: '�S TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation (i-'Kf Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove a Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: 'NSPECTION REPORT Q� ¢ti1N G TD Permit No.: e 5 103 i '7 Lot#: Z— Q Address: I q -7 13 14 -7 A- t � z Contractor: Ca rt,i— O Owner: �s�ING Date: ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ;CORRECTION REQUESTED 94 Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. 0-CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. .�Al � A-LL- .Sc -m /A,u n r13 , ZS r CJW-T%;&K— n1n7- -M Pr;vZ 1YWV AST s tt Inspector: Date: 2--Or- TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ;K Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT Q ¢titN G?'O Permit No.: 06 (P3/ 7 Lot #: 2- Q' Address: I1`7 13 q'7 "15 Contractor: YL e- -ys, ,SO Owner: SIN O Date: Lf—221a —©S' ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Inspector: Date: q^ TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation X Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT yZN G?'o Permit No.: OS 63i-7 Lot #: 2— Q' Address: lei 715 ► ' Contractor: 6 n- O Owner: ING Date: APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. (A N p[7Z��3r—Z�arL N''PD/L, _1 rlJ Inspector: ( Date: 3 Y-OC TYPE OF INSPECTION REQUESTED (Z-A Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: `� 33 INSPECTION REPORT iiG PermitNo.: o,, la31-7 Lot#: Address: J9 7 1 b Y '7 0 Contractor: L_ 1L4— 0 Owner: Date: 3 2"Z- c!� ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION 0,CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Inspector: Date: TYPE OF INSPECTION REQUESTED Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: 'NSPECTION REPORT G1T Y �� Permit No:(5-(v 31 7 Date: 2,/ 1 (0/ D S Address/Lot No:_1 R'1 1 3 L4-1 f-1 f—, 'y Contractor: _G r�_Q_ �lI N GAO Owner: G Q 0- H D y"t S Supervisor: n IL V'✓( S Approval ❑ Correction Required ❑ Corrections listed below MUST BE MADE before work can be approved ❑ Please contact inspector ❑ Was not able to perform inspection ❑ Call 360.435.0674 for re-inspection -24-hour notice required �'' i ►�/1 Inspector: Date: �� � TYPE OF INSPECTION REQUIRED TESC STORM DRAIN ROAD LANDSCAPING ❑Slit Fence ipe ❑Sub-grade ❑Irrigation ❑Check Dam ❑Catch Basin(s) ❑Rock ❑Soil ❑Inlet Protection ❑Manhole(s) A Curb&Gutter ❑Fertilizer ❑Temp.Sed ❑Oil Seperator(s) Sidewalk ❑Bark ❑Sheeting r❑Down Spouts ❑Approach(s) ❑Plants ❑Straw ❑Trash Rack/Overflow ❑ATB ❑Trees ❑Seeding ❑Restrictor ❑Cl.B Asphalt ❑Root Barriers ❑Final ❑Level Spreader ❑Striping ❑Play Equipment ❑Treatment Signing ❑Final filtration �Final NG INSPECTION REPORT ?'� Permit No.: oS 6 3/ 7 Lot#: / Q' Address: /9 7/ 3 zl`7 O Contractor: Z 1L-L -ys Owner: 4IN G Date: 0!5, ) -APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. 1 NS7Y3'�- 3 a x 3C� X__I z i�trY�"ram!- �o►2 ?�s; �,, �p z� !4T �4-�L�4'( � -r7� NU y S Lr,LA'r1 c •! Inspector: cam— Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation C-5( Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation 0 Other: Q� INSPECTION REPORT 4tiZN G rO Permit No.: o 5 6S 17 Lot #: F' Address: /9.7 13 zi "7 A " Contractor: �IL-L O Owner: 9s�IN Date: ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. G Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation A Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: y�o3 MNSPECTION REPORT ¢tiiN G p Permit No.:CJ S`C-3//Lot #: Q" Address: q 7l 3 7 ve-k1:3 Contractor: 616fam' ��O Owner: �/( C IN Date: ^�� APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION *-CORRECTION REQUESTED P-Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation 0 Other: INSPECTION REPORT ¢1�ZN G?'O Permit No.:Os—e53/ 7 Lot#: 4" Address 1 `lW 3'°-40 �4.-,, •� Z Contractor: G'AL ,So Owner: IN G Date: ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION CORRECTION REQUESTED ('Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. •%�� Inspecto : ate: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping St Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation 0 Other: C I T`NP C3F= AFRL I t%Ft3-VUP4 COhlST" FRUC-T I ON PE F:RM I T PE Ft I T 1V0 _ _ &DtS--Es 3 1 7 ONner: GRC HOMES 6306 49TH DR. MARYSVILLE 98270 Value of Work: $169, 000. 00 Tax ID: 005641-000--004-01 Phone: 659-1109 Describe Work: NEW SINGLE FAMILY RESIDENCE Proposed Use: SFR Legal Description: FINCHER SHORT PLAT LOT 2 Job Address: 19713 47TH AVE NE Contractor's Name Type Address License* GRC CONSTRUCTION INC. GEN 6306 49TH DR. NE GRCHOI*077MH WALTS PLUMBING PLB 3224 109TH ST EVT WALTP156BP PUGET HEATING CO INC. NEC PO BOX 336 LK STEV PUGETH*2648D P E R H I T F E E S Equipment and Fixtures Number Fee Total Charge - - - - - - - - - - - ------ -------- ------------ PLUMBING FIXTURES 14 $10. 00 $140. 00 FURNACE/UNIT HEATER 1 $15. 00 $15. 00 VENTILATION FANS 6 $7. 00 $42. 00 DRYER 1 $'11. 00 $11. 00 METAL FIREPLACE & CHIMNEY 1 $11. 00 $11. 00 WATER HEATER 1 $15. 00 $15. 00 GAS PIPING 1-5 OUTLETS 1 E�6. 00 $6. 00 S U B T O T A L. . . . . . $240.00 TOTALS Fee Permit Fee $1, 553. 7 School Mitigation $0. 0.✓ Equipment $100. 00 Fixture $140. 00 Mech Permit $24. 00 Plan Fee $1, 009. 91 Plumb Permit $25. 00 State fee $4. 50 SIGNATURE: TOTAL FEE. . . . . . . . . . . . . . . . . $2, 857. 11 I HEREBY CERTIF AT I HAVE READ AND EXAMINED THIS APPLICATION AND PAYMENTS. . . . . . . . . . . . . . . . . . $911. 00 KNOW THE SAME TO BE TRUE AND COR- RECT ALL PROVISIONS OF LAWS AND TOTAL DUE. . . . . . . . . . . . . . . . . $1, 946. 11 ORD ANCE' GOVE NI G THIS TYPE OF WO K WILL E C PL ED WITH WHE HER S C FIFE ! R NOT. I)A'1'L ,3 3 r v RECEIPT # � 1 1 HoKukIL NG OF C AL t r t,•rs� i� •t v►s � i r » rs� r �::�i �t � 1 I '. ,I J_:.A�.I �.�1 1 1A T _ •1r4 P40W(3 I�.. - ' I .^/� J !•cG�dl� it:. - � � .�yr�.i� ' ''. I :.}I1�•W '.'.0 bR�I,bY 3 :1= : •;:3P Y.! ;A •uK. -iu i 't:su'KJ Ti 11- )04-l11 j' I l 141 L rr3241 c t uq'aJ N�� fY'i►:,)i .: :raxt�tlA �y,Y'i' .1NaH 114 tip, is+3UT t,-kdxbuu F'T bAu 1-0vivaj t.i _ - - - - - 1 ��� �s`L 1 L.� •��� i . -��-t---: 11 • t I • rat3 .,��,a _ X`sr; :r�ak I .i'a7 •�G (�rQ ,t• � ��''i-�:►I7 �:� t � •:I l�r. � T i `•�� 1 `r5 � �, .,i err • t lJ�t ..►/r j - _ � L . III I j- ,I j'� � 6 ' Aa Ir 1 . xs) +Jill 11- a 11 1 ( 7: T. ►ti[] ►, ►A. f , i 1-1 �. f U`4P t.� � : 1 .rC...7•.+� . . . . _ _ . . $!A t1_ - 14 T j''j j'j\ ll'l 1 1�1 1I�i.IA I-AI - - to A f�P 4r%1 A_ I i;.Af1' 114 T Yin 7 t ._ t`'. f -t.fr.IT1 ( i ,Alto. L w .. _ . . . . ..3U� —9AT0b1 QjWf 1>4-- Am' � 1 7 1 � L -?9-A A/ rz C� > 3 P�f (2t�R y il A NA-AA) Rc.t+OZ/-tU 77 rn dq pigpC/,F — -FAY— CO SG 41 GOO M i-O( pRC)f 6SFo sjk : 1 72o �r y`14 pig CoNcRIFr -ACENED P,4 to � yam' jo 2 13 7 Bui rr v DEPT $ t40 u.5 �2 a'I L S.a r aw► - a.sl�tl F3�ck 7 T-H A vl- - �q Z�- -- 9 7 7 t4 Vrzl A/o NEW SINGLE FAMILY I��SIDENCE 74. ", o BUILDING PERMIT APPLICATION I Department of Community Development City of Arlington • 238 N Olympic Ave. •Arlington, WA 98223 • Phone (360) 403 3431 • FAX (360)403 3447 THIS APPLICATION TO BE USED FOR ONE AND TWO DWELLING UNITS RESIDENTIAL STRUCTURES. THIS APPLICATION MUST BE ACCOMPANIED BY TWO (2) SETS OF CONSTRUCTION DRAWINGS, SIX(6)ACCURATE, FULLY DIMENSIONED PLOT PLANS AND TWO(2) SETS OF ENERGY CODE APPLICATIONS. TYPE OF PERMIT: O Building O Mechanical O Plumbing ( j Combination Project Address: l I 1 J �� >- ` Parcel ID#: Lot#: Subdivision: j V1 µ i .�` Project Description: Owner: ��� � r S E z/vc- Phone Number Address: ���(o��/� �7A A VIz ti'-rZ City: /1l/ 7 >Vl��tate: Zip Code: ? _76 Contact Person: A- �� G (, ��/r� Phone Number: Cell Phone: Fax: , E-mail: Address 121 +S Coty! J State: Zip Code: Lending Agency: ,td 2T& 06"-r_1 OIJ7LZk- Phone Number: Address: City: AAMY222-3Al State: Zip Code: Contractor: 64 /TUB s -yVL Phone Number: 6 �5 r 0r�(? Address: City: State: Zip Code: Contractor's License Number: Expiration: Plumbing Contractor. t'i*L T: l��-s c ��'�� Phone Number:��) Address: City: / UJff2 State: Zip Code: Contractor's License Number: (� t( ,- ✓� Expiration: 2t Mechanical Contractor: P� i�' 4P;tf!TNT Phone Number:(( -) 3J�/ Address: City: State: Zip Code: Contractor's License Number: Expiration: FormslNSFR Page 1 of 2 10/04lDWA Ivy f . G``Y °� NEW SINGLE FAMILY RESIDENCE �,� o BUILDING PERMIT APPLICATION ��IvG'� Department of Community Development City of Arlington • 238 N Olympic Ave. •Arlington, WA 98223 • Phone (360)403 3431 • FAX (360)403 3447 Number of Plumbing Fixtures (Including Rough-Ins) Plumbing Accessory Main Total Fixture Total Number Fixtures Dwelling unit Residence #X Multiplier Fixtures Units Bar Sink X 1.0 = --- Bathtub or Combination Bath/Shower X 4.0 = Clotheswasher X 4.0 = Dishwasher X 1.5 = Hose Bibb X 2.5 = Kitchen Sink X 1.5 = Laundry Sink X 2.0 = -- Lavatory (Bathroom Sink) X 1.0 = Shower(Stand Alone) Each Head X 2.0 = -� Water Closet(Toilet) X 2.5 = Whirlpool Bath or Combination Bath/Shower X 4.0 = Water Heater Other TOTAL FIXTURE UNITS: Traps(other than above items) COLUMN TOTALS: Estimated Project Valuation �47 !j: �LJ' Building Square Footage 7?0 __ 15r Floor 5 2nd Floor 3rd Floor y� Basement Deck Garage y 10 D -4 -7 Water Supply Piping A. Fixture Units: Number of Fixtures X Fixture Units=Total Fixture Units B. Distance from meter to most remote outlet: feet. C. Difference in elevation between meter and highest fixture: feet above meter or feet below meter D. Pressure in street main: psi. (Measure with gauge or check with Water Department) I hereby ce 'fy that the above information is correct and that the construction on, and the occupancy and the use of the above- des rib operty will b n�accordance with the laws, rules and regulation of the St to of Washington. �g US Applicants Signature bate Print Applicants Name Forms/NSFR Page 2 of 2 10/04/DWA