HomeMy WebLinkAbout2010-002 RESOLUTION NO. 2010-002
A RESOLUTION REPLACING RESOLUTION NO.785,
AND ADOPTING A REVISED FEE SCHEDULE
WHEREAS, the City Council, through ordinance, has adopted regulations requiring certain
actions and services; and,
WHEREAS, these various ordinances set forth that fees shall be set by resolution; and,
WHEREAS, the cost of providing these various services consistent with applicable codes,
regulations, and policies periodically increase or decrease, or certain services or practices are
discontinued and fees are no longer needed; and,
WHEREAS, it is the intent of the City of Arlington to charge appropriate fees and charges
that are consistent with the services provided and to cover the public cost of providing these
various services so that the public is not subsidizing individual benefits derived therefrom;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ARLINGTON AS FOLLOWS:
The following rates, fees, and charges for various services provided, actions performed, or items
sold by the city and/or its contract service providers, and fines levied against code violators, are
hereby adopted:
Section I. Fees and Char<(es—General.
1.1 Fees. Fees are intended to cover the normal, recurring costs associated with
providing a given service. Fees are non-refundable.
1.2 Prices. In some instances, the City provides certain goods and merchandise for
sale. Prices for these goods may be included in this resolution.
1.3 Payment Due. Fees are due at the time the action is requested (e.g., at time of
application) or occurs (e.g., prior to a specific action). An applicant may pay all
fees of a multi-phased project in advance; however, doing so does not vest
applicable fees due. Fees due are those in effect at the time the specific action or
phase of an action is requested or occurs.
1.4 Waivers. Upon petition by the applicant, the City Council may waive any of the
fees, or portions thereof, for any non-profit organization or government agency.
Page 1
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2010-002
Section 2. Land Use Fees. Fees for various services, actions, and permits regarding land use,
as per AMC Title 20 Land Use Code, shall be as listed in Table 1: Land Use Fees
Table 1: Land Use Fees
Action Fee $
Land Use Permits
Zoning Permit 2,222
Special Use Permit 3,306 plus actual cost of Hearing
Examiner if re 'd)
Conditional Use Permit 3,862 plus actual cost of Hearing
Examiner
Administrative Conditional Use Permit
Seasonal/Special Event 102
Homeless Encampment 508
Preliminary Plats and Binding Site Plans
Conditional Use Permit for a Long Plat 6,983 plus actual cost of Hearing
Examiner
Zoning Permit for a Short Plat 3,068
Final Plats and Binding Site Plans
Long Plat 3,389
Short Plat 1,823
Development Agreements 3,862 plus actual cost of Hearing
Examiner if re 'd
Master Plan 12,500
Design Review
Administrative 212
Desi n Review Board 423
Forest Practices Permits
Permit Review 423
Forest Practices Permit Application Fee 106 plus 106 per acre
Review Fee for Conversion Option Harvest Plan Approval 106 plus 106 per acre
Review Fee To Lift Moratorium 300
Inspection Fee 127 per hour plus 106 per acre
Appeals
To City Council 212
To Planning Commission 212
To Hearing Examiner 582 plus actual cost of Hearing
Examiner
To Shoreline Hearings Board 582
Reconsideration of Decision by:
Community Development Director and/or a designee 79
Planning Commission 106
Hearing Examiner 212 plus actual cost of Hearing
Examiner
City Council 132
Page 2
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2010-002
Action Fee ($
Permit Extension
Extension 53
Amendment to or Modification of Permit
Insignificant Design Deviations 53
Minor Amendment 317
Major Amendment 1,067 plus cost of Hearing
Examiner (if re 'd
Binding Site Plans
Text and/or Design Deviation 741
Lot Line Adjustment or Changes to Number of Lots 1,323
Development Agreement 741 plus actual cost of Hearing
Examiner(if re 'd)
Boundary Line Adjustment
Boundary Line Adjustment 1,664
Land Use Ordinance Amendment
Amendment to Text of Land Use Ordinance 741
Amendment to Zoning Map (rezone)
< 5 acres 1,111
> or= 5 acres 1,957
Comprehensive Plan Amendment
Minor Amendment (annual cycle) 1,428
Major Amendment (5-year cycle) 2,116
Annexations
Submission of 10% Petition 106
Submission of 60% Petition 1,058
If it goes to BRB hearing 794
Shoreline Development Permit
SDP in conjunction with a Land Use Permit 529
SDP not in conjunction with a Land Use Permit 1,058
Variance
Administrative 635
If it goes to hearing (fee in addition to that paid for 1,217 plus actual cost of
Admin. Decision) Hearing Examiner
Miscellaneous Actions/Items
Zoning Interpretation 106
Pre-Application Meetings
1 st two hours 0
Subsequent meetings 317 per meeting
SEPA Review (note: review of checklist included in
Land Use Permit fee)
SEPA Only (no land use permit required) 529
Review of requested studies (i.e. traffic, wetland, etc) 159
Page 3
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2010-002
Action Fee $
Review of requested studies (i.e. drainage, geo-tech, etc) 711
Environmental Impact Statement(EIS) 1,058 plus actual cost of consultant
Request of Utility Services Outside City
Single-Family Residence/Duplex 212
Other Development 635
Section 3. Public Works Fees. Fees for various services, actions and permits shall be as
listed in Tables 2-1: Review Fees, 2-2: Grading Plan Review Fees and 2-3: Grading Permit
Fees.
Table 2-1: Review Fees
Action Fee ($)
Site Civil Review 6% E.E.C.C* with a minimum charge of 1,587
Additional Plan Review Fee 212 each
Miscellaneous Engineering Fee 529 each
As-Built Review Fee Included in the site civil review fee
Final Plat Review Fee Included in the site civil review fee
Inspection Fee 127 per hour-1/2 hour minimum
Outside Consultant Review Fee Actual cost
Simple Site Plan Review 265 per lot
Right of Way 6% E.E.C.C* or maximum 1,058 with a
minimum charge of 106 plus inspection fees
Right of Way Vacation 1,058
Miscellaneous Staff Time 127 per hour perperson-1/2 hour minimum
Engineering Meetings-after 2 hours 317 per meeting
Water Availability Certificate SFR 32—Non-SFR 106
Recovery Contract 1,058 plus actual cost
GIS
Zoning and Land Use Maps 10.00
l lx17 5.00
2x3 13.00
3x3 19.00
3x4 25.00
Map CD 26.00
Data CDs/FTP 26.00 per client
Hourly Rate for Custom Work 127 per hour, '/z hour minimum
Laminating 3/sq ft
Shipping 5.00
Fee none
* E.E.C.0 Engineer's Estimated Cost of Construction includes labor, equipment, material, overhead and profit.
Prices shall be from RS Means (latest edition)data adjusted for the Snohomish County area or from local sources if
not included in the RS Means database.
* Simple Site Plan Review-No water or sewer extension-Single family residence with maximum of 2 lots.
*Additional plan review applies when there is a change,addition or revision to the plan.
Page 4
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2010-002
* Additional plan review fees will be charged at any point in the project when more than 2 reviews are required.
* Inspection Fee-commercial and residential plats(storm drainage,landscape,right-of-way and bond
inspections).
* Outside Consultant Review Fee.
* Water Availability Certificate Fee.
*Engineering Meetings(first 2 hours are no charge).
* Miscellaneous engineering fee-traffic and storm water report/design reviewed in-house.
Table 2-2: Grading Plan Review Fees
2009 Fee $ 2010 Fee $
50 Cubic Yards or less No fee No fee
51 to 100 cubic yards 25.00 25.50
101 to 1,000 cubic yards 39.25 40.00
1,001 to 100,000 cubic yards
First 1,000 cubic yards 52.30 53.35
Plus - for each additional
10,000 yards or fraction thereof 26.00 26.50
100,001 to 200,000 cubic yards
For the first 100,000 cubic yards 286.25 292.00
Plus - for each additional
10,000 yards or fraction thereof 14.10 14.40
200,001 cubic yards or more
For the first 200,000 cubic yards 426.90 435.45
Plus - for each additional 10,000 cubic yards or fraction
thereof 7.70 7.85
Other Fees: Additional plan review required by changes,
additions or revisions to approved plans (minimum 53.60* 54.70*
charge— 1/2 hour) Per hour Per hour
*Or the total hourly cost to the City,whichever is the greatest. This cost shall include supervision,overhead,
equipment,hourly wages and fringe benefits of the employees involved.
Table 2-3: Grading Permit Fees
2009 Fee ($) 2010 Fee ($)
50 cubic yards or less 25.00 25.50
51 to 100 cubic yards 39.25 40.00
101 to 1,000 cubic yards
First 100 cubic yards 39.25 40.00
Plus—for each additional 100 cubic yards or fraction
thereof 18.55 18.90
1,001 to 10,000 cubic yards
For the first 1,000 cubic yards 206.40 210.50
Plus - for each additional
1,000 yards or fraction thereof 15.40 15.70
10,001 to 100,000 cubic yards
Page 5
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION##2010-002
For the First 10,000 cubic yards 344.90 351.80
Plus - for each additional
10,000 yards or fraction thereof 70.00 71.40
100,001 or more cubic yards or more
For the first 100,000 cubic yards 975.30 994.80
Plus - for each additional 10,000 cubic yards or fraction
thereof 38.75 39.50
Section 4. Building Permit Fees. For determining the value of a structure, the most current
issue of the Building Safety Journal Magazine, which offers the legacy building valuation
data fee schedule as published by the International Code Council, is adopted by reference.
Fees shall be as listed in Tables 3-1: Building Permit Fees, 3-2: Miscellaneous Building
Inspection Fees and 3-3: Miscellaneous Building Permit Fees.
Table 3-1: Building Permit Fees
Total 2009 2010 2011 2012 Fee ($)
Valuation $
1.00-500.00 28.50 29.00 29.50 30.00 0.00 to 500.00
501.00-2,000.00 28.50 29.00 29.50 30.00 For the first 500.00 plus
3.75 3.75 3.83 3.90 For each additional 100.00, or
fraction thereof, to and including
2,000.00
2001.00- 84.75 86.00 86.95 88.50 For the first 2,000.00 plus
25,000.00 17.00 17.25 17.60 17.95 For each additional 1,000.00, or
fraction thereof, to and including
25,000.00
25,001.00- 475.75 482.75 491.75 501.35 For the first 25,000.00 plus
50,000.00 12.25 12.50 12.75 13.01 For each additional 1,000.00, or
fraction thereof, to and including
50,000.00
50,001.00- 782.00 795.25 810.50 820.10 For the first 50,000.00 plus
100,000.00 8.50 8.70 8.87 9.05 For each additional 1,000.00, or
fraction thereof, to and including
100,000.00
100,001.00- 1,207.00 1,230.25 1,254.00 1,272.60 For the first 100,000.00 plus
500,000.00 6.80 6.90 7.04 7.18 For each additional 1,000.00, or
fraction thereof, to and including
500,000.00
500,001.00- 3,927.00 3,990.25 4,070.00 4,144.60 For the first 500,000.00 plus
1,000,000.00 5.75 5.90 6.02 6.14 For each additional 1,000.00, or
fraction thereof, to and including
1,000,000.00
1,000,001.00 1 6,80 6,94 7,08 7,21 For the first 1,000,000.00 plus
and a 2.00 0.25 0.00 4.60 For each additional 1,000.00, or
Page 6
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2010-002
4.45 4.50 4.59 4.68 fraction thereof
Total 2013 2014 2015 2016 Fee ($)
Valuation $
1.00-500.00 30.50 31.00 31.50 32.00 0.00 to 500.00
501.00-2,000.00 30.50 31.00 31.50 32.00 For the first 500.00 plus
3.98 4.06 4.14 4.22 For each additional 100.00, or
fraction thereof, to and including
2,000.00
2001.00- 90.20 91.90 93.60 95.30 For the first 2,000.00 plus
25,000.00 18.31 18.67 19.05 19.43 For each additional 1,000.00, or
fraction thereof, to and including
25,000.00
25,001.00- 511.33 521.31 531.75 542.19 For the first 25,000.00 plus
50,000.00 13.27 13.53 13.80 14.08 For each additional 1,000.00, or
fraction thereof, to and including
50,000.00
50,001.00- 843.08 859.56 876.75 894.19 For the first 50,000.00 plus
100,000.00 9.23 9.42 9.61 9.80 For each additional 1,000.00, or
fraction thereof, to and including
100,000.00
100,001.00- 1,304.58 1,330.56 1,357.25 1,384.19 For the first 100,000.00 plus
500,000.00 7.32 7.47 7.62 7.77 For each additional 1,000.00, or
fraction thereof, to and including
500,000.00
500,001.00- 4,232.58 4,318.56 4,405.25 4,492.19 For the first 500,000.00 plus
1,000,000.00 6.26 6.39 6.51 6.64 For each additional 1,000.00, or
fraction thereof, to and including
1,000,000.00
1,000,001.00 7,36 7,51 7,66 7,81 For the first 1,000,000.00 plus
and up 2.58 3.56 0.25 9.19 For each additional 1,000.00, or
4.78 4.87 4.97 5.07 fraction thereof
Total 2017 2018 2019 2020 Fee ($) l
Valuation $
1.00-500.00 32.50 33.00 33.50 34.00 0.00 to 500.00
501.00-2,000.00 32.50 33.00 33.50 34.00 For the first 500.00 plus
4.31 4.39 4.48 4.57 For each additional 100.00, or
fraction thereof, to and including
2,000.00
2001.00- 95.17 98.85 100.70 102.55 For the first 2,000.00 plus
25,000.00 19.81 20.21 20.62 21.03 For each additional 1,000.00, or
fraction thereof, to and including
25,000.00
25,001.00- 552.78 563.68 574.96 586.24 For the first 25,000.00 plus
Page 7
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2010-002
50,000.00 14.36 14.65 14.94 15.24 For each additional 1,000.00, or
fraction thereof, to and including
50,000.00
50,001.00— 911.78 929.93 948.46 967.24 For the first 50,000.00 plus
100,000.00 9.99 10.19 10.40 10.61 For each additional 1,000.00, or
fraction thereof, to and including
100,000.00
100,001.00— 1,411.28 1,439.43 1,468.46 1,497.74 For the first 100,000.00 plus
500,000.00 7.93 8.08 8.25 8.41 For each additional 1,000.00, or
fraction thereof, to and including
500,000.00
500,001.00— 4,583.28 4,671.43 4,768.46 4,861.74 For the first 500,000.00 plus
1,000,000.00 6.78 6.91 7.05 7.19 For each additional 1,000.00, or
fraction thereof, to and including
1,000,000.00
1,000,001.00 and 7,973.28 8,126.43 8,293.46 8,456.74 For the first 1,000,000.00 plus
UP 5.17 5.27 5.38 5.49 For each additional 1,000.00, or
fraction thereof
Table 3-2: Miscellaneous Building Inspection Fees
Action Fee $
Inspections outside of normal business hours 50.00 per hour (minimum charge 1 hour
Reinspection fees assessed under provisions of the 50.00 per hour'
current IBC
Inspection for which no fee is specifically 50.00 per hour (minimum charge1 hour)
indicated
Additional plan review required by changes, 50.00 per hour' (minimum charge-1 hour)
additions or revised plans
For use of outside consultants for plan review and Actual costs`
inspections, or both.
Stop work order (working withoutpermit)
Or the total hourly cost to the City, whichever is greatest. This cost shall include supervision, overhead, equipment, hourly
wages,and benefits of the employees involved.
Z Actual costs include administrative and overhead costs.
3 Stop work order(SWO): failure to obtain a valid permit within 48 hour of a SWO will result in double permit fees or a fine
of$500 whichever is less. A permit applied for within the 48 hour timeframe may be subject to a fine and/or fee at the
discretion of the building official.
Table 3-3: Miscellaneous Building Permit Fees
Action Fee ($)
Change lot after plan review completed 100.00
Change plans during or after plan review. New Plan Review Fee
Change or revise plans after issuance of Current hourly rate per IBC or new plan review fee
permit.
Page 8
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2010-002
Action Fee $
Commercial or industrial re-roof IBC value or bid amount
Demolitions 100.00
Espresso carts (portable and stand alone) 250.00
Fences over 6 feet in height Current hourly rate per IBC for plan review plus 20.00
permit fee
Mobile homes 500.00
Modular offices Oob shacks 350.00
Moved buildings 100.00 prior to moving together with a building permit
fee based on the IBC valuation for new building and
cost of moved buildin .
Residential re-roofs 0
if plan review required 50.00
Retaining walls (permit not required under 100.00 or IBC valuation, whichever is greater
four (4) feet
Signs IBC valuation, using permit fee only]
4.1 Codes Incorporated by Reference. The fee schedules set out in the following
codes shall be incorporated by reference as though set forth herein:
A. International Mechanical Code*
B. Uniform Swimming Pool, Spa& Hot Tub Code*
C. Uniform Housing Code*
D. Washington State Energy Code*
E. Washington State Ventilation & Indoor Air Quality Code*
F. Washington State Historic Building Code*
*The most recently issiwd edition.
4.2 Plumbing Fees. Plumbing fees shall be as listed in Table 3-4: Plumbing Fees.
Table 3-4: Plumbing Fees
Action Fee ($
PERMIT ISSUANCE
For the issuance of each plumbing permit 25.00
For issuing each supplemental permit for which the original permit has not expired, been 10.00
canceled or finaled
Commercial permits plan review fee (based on valuation) 10%
UNIT FEE SCHEDULE (Note: The following do not includepermit-issuin ee.
Fixtures and Vents
For each plumbing fixture or trap or set of fixtures on one trap (including water, drainage 12.00
piping and backflow protection thereof)
For repair or alteration of drainage or vent piping, each fixture 5.00
Sewers, Disposal Systems and Interceptors
For each industrial waste pretreatment interceptor, including its trap and vent, except 20.00
kitchen-type grease interceptors functioning as fixture traps
Rainwaters stems per drain (inside building) 10.00
Water Piping and Water Heaters
Page 9
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2010-002
Action Fee ($)
For installation, alteration, or repair of water piping or water-treating equipment, or both, 5.00
each
For each water heater including vent 12.00
Lawn Sprinklers, Vacuum Breakers and Backflow Protection Devices
For each lawn sprinkler system on any one meter, including backflow protection devices 15.00
thereof
For atmospheric-type vacuum breakers or backflow protection devices not included in
Item l:
I to 5 devices 12.00
Over 5 devices, each 2.00
For each backflow-protection device other than atmospheric-type vacuum breakers:
2 inches 50.8 mm and smaller 12.00
Over 2 inches 50.8 mm 25.00
Swimmin2 Pools For each swimming pool ors a:
Public pool 90.00
Public spa 90.00
Private pool 60.00
Private spa 30.00
Miscellaneous
For each appliance or piece of equipment regulated by the Plumbing Code but not classed 12.00
in other appliance categories, or for which no other fee is listed in this code
4.3 Mechanical Permit Fees. Mechanical permit and inspection shall be as listed in
Table 3-5: Mechanical Permit and Inspection Fees.
Table 3-5: Mechanical Permit & Inspection Fees
Action Fee ($)
PERMIT ISSUANCE AND HEATERS
For the issuance of each mechanical permit 25.00
For issuing each supplemental permit for which the original permit has not expired, 10.00
been canceled or finaled
Commercial permit plan review fee based on valuation) 10%
UNIT FEE SCHEDULE (Note: The following do not includepermit-issuin ee.)
Furnaces
For the installation or relocation of each forced-air or gravity-type furnace or burner, 20.00
including ducts and vents attached to such appliance, up to and including 100,000
Btu/h 29.3 kW
For the installation or relocation of each forced-air or gravity-type furnace or burner, 23.00
including ducts and vents attached to such appliance over 100,000 Btu/h (29.3 kW)
For the installation or relocation of each floor furnace, including vent 20.00
For the installation or relocation of each suspended heater, recessed wall heater or 20.00
floor-mounted unit heater
Appliance Vents
Page 10
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2010-002
Action Fee $
For the installation, relocation or replacement of each appliance vent installed and not 10.00
included in an appliance permit
Boilers, Compressors and AC Units
For the installation or relocation of each boiler or compressor to and including 3 20.00
horsepower(10.6 kW), or each absorption system to and including 100,000 Btu/h (29.3
kW
For the installation or relocation of each boiler or compressor over 3 horsepower (10.6 32.00
kW) to and including 15 horsepower(52.7 kW), or each absorption system over
100,000 Btu/h 29.3 kW to and including 500,000 Btu/hl46.6 kW)
For the installation or relocation of each boiler or compressor over 15 horsepower 42.00
(52.7 kW)to and including 30 horsepower(105.5 kW), or each absorption system over
500,000 Btu/h (146.6 kW) to and including 1,000,000 Btu/h(293.1 kW)
For the installation or relocation of each boiler or compressor over 30 horsepower 60.00
(105.5 kW) to and including 50 horsepower (176 kW), or each absorption system over
1,000,000 Btu/h 293.1 kW to and including 1,750,000 Btu/h 512.9 kW
For the installation or relocation of each boiler or compressor over 50 horsepower (176 98.00
kW), or each absorption system over 1,750,000 Btu/h 512.9 kW)
Air Handling
For each air-handling unit to and including 10,000 cubic feet per minute (cfm) (4719 15.00
Us), including ducts attached thereto
Note: This fee does not apply to an air-handling unit which is a portion of a
factory-assembled appliance, cooling unit, evaporative cooler or absorption unit for
which a permit is required elsewhere in the Mechanical Code.
For each air-handling unit over 10,000 cfm (4719 Us) 20.00
Evaporative Coolers
For each evaporative cooler other than portable type 15.00
Ventilation and Exhaust
For each ventilation fan connected to a single duct 10.00
For the installation of each commercial hood which is served by mechanical exhaust, 50.00
including the ducts for such hood
Gas Piping Systems
For each gas piping system of 1 to 5 outlets 10.00
For each additional outlet over 5, each 1.00
Miscellaneous
For each appliance or piece of equipment regulated by the Mechanical Code but not 15.00
classed in other appliance categories, or for which the fee is listed in the table
Section 5. Cemetery Fees. Fees and prices for various services, actions, and merchandise for
cemetery use shall be as listed in Table 4: Cemetery Fees and Prices.
Table 4: Cemetery Fees and Prices
Product/Service/Action Fee $
Traditional Burial
Burial Lot $1,500
Page 11
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2010-002
Opening & Closing (during business hours $1,000
Opening & Closing after business hours $1,300
Concrete Grave Liner $800
Vaults
Monticello $1,595
Continental $1,895
Venetian $2,295
Cameo Rose/ SST Triune $2,995
Vault Internment System $350
Inurnment
Cremation Lot/Urn Garden $650
Second Right Inurnment $500
Opening & Closing (during business hours $445
Opening & Closing after business hours $695
Liner $310
Childrens Garden
Bab land Lot $397
Opening & Closing all times $488
Bab land Liner $658
Niche
Niche Wall I and II,rows 1-3 top half $1,142
Niche Wall I and 11, rows 4-6 bottom half $1,089
Opening & Closing (during business hours $445
Opening & Closing after business hours) $695
Second Right Niche Wall $545
Niche Inscription— Single $363
Niche Inscription—Double $563
Tent and Chairs for Inurnment $163
Flower Vase for Niche Wall $205
Headstones and Monuments
Headstone Setting - 28 x16 or smaller $275
Headstone Setting - 32 x 20 or larger $375
Setting Fee - vase block or garden marker $60
Setting Fee -upright monument(single) $575
Setting Fee -upright monument double $675
Headstone Final Inscription off site $550
Headstone Final Inscription on site $363
Headstone Sales - varies Call
Inspection Fee outside sales only) $375
Memorial Marker - varies Call
Other Services
Memorial Tree w/garden marker $800
Disinterment/Traditional Burial $1,995
Disinterment/ Cremation $650
Pressure Washing $75
Page 12
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2010-002
Section 6. Fees for the Use of City Owned Facilities. Fees for various services, actions,
and permits regarding use of City owned facilities shall be as listed in Table 5: Fees for the
Use of City Owned Facilities.
Table 5: Fees for the Use of City Owned Facilities
Use/Activity Fee $
Hadley Hall at the Arlington Community Youth Center
Without Kitchen
One to three hours 15 per hour
Over three hours 75
With Kitchen
One to three hours 20 per hour
Over three hours 125
Athletic Fields
League
Baseball
Youth, resident team 7.50 per youth per season
Youth, non-resident team 10 per team per use
Adult 25 per use
Softball
Youth,resident team 7.50 per youth per season
Youth,non-resident team 10 per team per use
Adult 25 per use
Soccer
Youth, resident team 7.50 per youth per season
Youth, non-resident team 10 per team per use
Adult 25 per use
Other
Youth, resident team 7.50 per youth per season
Youth, non-resident team 10 per team per use
Adult 25 per use
Tournament
Baseball
Youth, resident team 7.50 per youth per tournament
Youth, non-resident team 10 per team per use
Adult 25 per use
Softball
Youth, resident team 7.50 per youth per tournament
Youth, non-resident team 10 per team per use
Adult 25 per use
Soccer
Youth, resident team 7.50 per youth per tournament
Youth, non-resident team 10 per team per use
Adult 25 per use
Page 13
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2010-002
Other
Youth, resident team 7.50 per youth per season
Youth, non-resident team 10 per team per use
Adult 25 per use
Lighting
Youth 3 per hour
Adult 6 per hour
Scheduling Fee for League and Tournament
League 15 per team
Tournament 15 per tournament
Concession Sales
League 50 perseason
Tournament 25 er day
6.1 Definitions.
A. "Youth" is defined as any person 18 years of age or younger.
B. "Resident" is defined as any team composed of at least 5 1% Arlington
residents.
Section 7. Appeal Fees for Violations and Abatement. Fees for various services and
actions regarding violations and abatement as per Chapter 11.01 of the Arlington Municipal
Code shall be as listed in Table 6: Appeal Fees for Violations and Abatement.
Table 6: Appeal Fees for Violations and Abatement
Action Fee $
Appeals
To Hearing Examiner 582 plus actual cost of Hearing Examiner
Fines
Forest Practice Violation Fine 317
Section 8. Licensing Fees. Licensing fees for various licenses issued under various sections
of the Arlington Municipal Code shall be as listed in Table 7:- Licensing Fees.
Table 7: Licensing Fees
License/Activity Fee ($)
Annual/renewal business license under AMC Chapter 5.28 60.00
Late payment penalty for each month of delinquency of business 5.00 per month of delinquency
license under AMC Chapter 5.28
For new applications applied for between October 15` through 45.00
December 30th the new business license applications pay the
following fee of$45.
Page 14
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION 42010-002
For new applications applied for between January 15t through 30.00
March 30th new business license applications pay the following fee
of$30
For new applications applied for April lst through June 301 new 75.00
business license applications pay the following fee. Note: $15 for
the remainder of the current business license year and $60 for the
new business license year for a total of$75, making the business
license valid thru June 30`b of the following year.
Businesses with offices located outside of city limits but conducting 20.00
business within city limits AMC Chapter 5.28
Section 9. EMS Fees and Charles.
9.1 Fees and Mileage Charges Established. For purposes of AMC Chapter
3.06, fees and mileage for EMS services shall be set as set forth in Table 8:
Emergency Medical Services Rates and Charges.
9.2 EMS Transport Fees. In accordance with the requirements of 42 Code of
Federal Regulations (CFR) Parts 410 and 414, which provides that Medicare
fees and charges shall apply to Medicare recipients;
A. Unmet (excess fee) Part B Deductible and Part B coinsurance amounts. In
accordance with the provisions of 42 CFR Parts 410 and 414, the City
shall bill the patient for any unmet or excess fee to the extent authorized
by federal law.
B. Inability to Pay Excess Fee. Individuals who are on fixed or low incomes
or do not have the ability to pay the differential because of financial
difficulties may submit a request to waive the differential to the City with
supporting documentation of the inability to pay.
Table 8: Emergency Medical Services Rates and Charges
Service Rate ($)
BLS Non-emergent 476.00
BLS Emergent 476.00
ALS Emergent 741.00
ALS 2 846.00
ALS Response Fee 265.00
Mileage (all categories) 16.00 per mile
Section 10. Repeal of Previous Fee Resolution. Resolution 785 is hereby repealed.
Section 11. Effective Date. This resolution will become effective on March 15, 2010.
Page 15
CITY OF ARLINGTON FEE SCHEDULE RESOLUTION#2010-002
PASSED by the City Council and APPROVED by the Mayor this I bL day of
2010.
CITY OF ARLINGTON
Marga Larson, Nfayor
ATTEST:
Kristi Banfield, City Clerk
APPROVED AS TO FORM:
Ste v Pei e, ity torney
Page 16
CERTIFICATE OF RESOLUTION
1, Kristin Banfield, City Clerk of the City of Arlington, Washington (the "City"),
do hereby certify that the attached is a full, true and correct copy City of Arlington
1 Resolution No. 2010-002, passed by the Arlington City Council at their regular meeting
on March 1, 2010.
Kristih Banfield, City lerk
Dated this 1st day of March, 2010.