HomeMy WebLinkAbout17831 59th Ave Ne_BLD399_2026 CITY OF ARLINGTON
238 N. OLYMPIC AVE - ARLINGTON, WA. 98223
PHONE; (360) 403-3551
BUILDING PERMIT
Address: 17831 59th Ave Permit#:399
Parcel#:31052200403600 Valuation:60000.00
OWNER APPLICANT CONTRACTOR
Name:ARLINGTON ADVANCED Name:Green Fire Production Name:Color&Arches Corporation LLC
MANUFACTURING PARK
Address:3316 FUHRMAN AVE E STE 200 Address:1783 1 59th Ave#7 Address:7625 172nd St SE
City,State Zip:SEATTLE,WA 98102 City,State Zip:Arlington,WA 98223 City,State Zip:Snohomish,WA 98296
Phone: Phone:530-693-5038 Phone:425-773-8949
MECHANICAL CONTRACTOR PLUMBING CONTRACTOR
Name:Color&Arches Corporation LLC Name:
Address:7625 172nd St SE Address:
City,State,Zip:Snohomish,WA 98296 City,State,Zip:
Phone:425-773-8949 Phone:
LIC#:COLORAC906R7 EXP: 3/19/2015 LIC#: EXP:
JOB DESCRIPTION
PERMIT TYPE: Commercial Mechanical CODE YEAR:
STORIES: CONST.TYPE:
DWELLING UNITS: OCC GROUP:
BUILDINGS: OCC LOAD:
PERMIT APPROVAL
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED
THEREBY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO
WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27,
THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID.
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR
A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBCI10/IRC110.
SALES TAX NOTICE:Sales tax relating to construction and construction materials in the City r ngton rust be reported on your sales tax return form
and coded Citv of Arlington#3101. L r /I
Irg
CrDAI
Signature Print Name Date Relras- By Date
CONDITIONS
THIS PERMIT AUTHORIZS ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY
CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS,SIDEWALKS,DRIVEWAYS,MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION.
PERMIT FEES
Date Description Fee Amount
6/13/2014 Mechanical Fee(Enter Fixture Fee) $500 00
6/13/2014 Mechanical Permit Base Fee $25.00
6/13/2014 Mechanical Plan Review Fee $200,00
Total Due: $725.00
Total Payment: $0.00
Balance Due: S725.00
CALL FOR INSPECTIONS
BUILDING(360)403-3417
When calling for an inspection please leave the following information:
Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon
• COMMERCIAL MECHANICAL
PERMIT APPLICATION
Department of Community & Economic Development
City of Arlington • 18204 59th Ave NE •Arlington, WA 98223
Phone (360) 403-3551
THIS APPLICATION MUST BE ACCOMPANIED BY TWO (2) SETS OF CONSTRUCTION
DRAWINGS AND ALL OTHER INFORMATION OUTLINED IN THE MECHANICAL PERMIT
SUBMITTAL REQUIREMENTS, IF APPLICABLE.
Type of Permit: * New Installation 0 Replacement
0 Alteration
Project Valuation: 60,000 Parcel ID# ?
Project Address: 17831 59th ave NE Arlington WA 98223 # 7
Project AC install
Description:
Owner: Brent
Address: 17831 59th ave NE
City: Arlington State: Wq ZIP: 98223
Contact Person: Keith Holton Phone: 5306935038
Cell Phone: 5306935038 Fax Number:
E-mail: bbrec@ymail.com
Address: 17831 59th ave NE # 7
City: Arlington State: Wq ZIP: gg223
Contractor Information
Contractor: Color and Arches Phone: 425.773.8949
Address: 7625 172nd st se
City: Snohomish State: Wq ZIP: 98296
License Number: COLORAC906R7 Expiration: 3/19/2015
Please indicate type of number of appliances:
CONDENSING ® AC (VRF) GAS PIPING
UNIT OUTLET
HEAT PUMP FURNACE UNIT HEATER
(multi-split)
HEAT PUMP BOILER PAINT
(mini-split) BOOTH
Furnace CHILLER DRYER
HEAT REJECTION COOLER TYPE I
EQUIPMENT HOOD
AC (air cooled) ® TYPE II AST
HOOD
AC (water cooled) VENTILATION UST
SYSTEM
AC (evaporator) PACKAGE OTHER
UNIT
Please Attach Plans and Supporting Documents (PDF Only)
Gmail - Roof mount details AC condenser..pdf
STAFF USE ONLY:
Permit Number: Accepted Receipt #
By:
Date Received: Amount Received:
By submission of this form, I hereby certify that the above information is correct and that the
construction on, and the occupancy and the use of the above-described property will be in
accordance with the laws, rules and regulation of the State of Washington.
Permit#: 399
Permit Date: 06/12/14
Permit Type: COMMERCIAL MECHANICAL
Project Name: Green Fire Production
Applicant Name: Green Fire Production
Applicant Address: 17831 59th Ave#7
Applicant, City, State, Zip: Arlington,WA 98223
Contact: Keith Holton
Phone: 530-693-5038
Email: bbrec@ymail.com
Scope of Work: A/C Installation
Valuation: 60000.00
Square Feet: 0
Number of Stories: 0
Construction Type:
Occupancy Group:
ID Code:
Permit Issued: 06/18/2014
Permit Expires:
Form Permit Type:
Status: COMPLETE
Assigned To:
Property
Parcel# Address Legal Description Owner Name Owner Phone Zoning
ARLINGTON
31052200403600 17831 59TH AVE NE ADVANCED 637 Warehousing&
MANUFACTURING Storage Services
PARK
Contractors
Contractor Primary Contact Phone Address Contractor Type License License#
Color&Arches Vernon Lovelace 425-773-8949 7625 172nd St SE CONSTRUCTION COLORAC906R7
Corporation LLC CONTRACTOR
Plan Reviews
Date Review Type Description Assigned To Review Status
06/12/2014 COMMERCIAL Ok to issue z.Christopher Young
MECHANICAL
Fees
Fee Description Notes Amount
Mechanical Fee(Enter Fixture Fee) $500.00
Mechanical Base Permit Fee $25.00
Mechanical Commercial Plan Review Table 4-1 $200.00
Total $725.00
Attached Letters
Date Letter Description
06/13/2014 Building Permit
Payments
Date Paid By Description Payment Type Accepted By Amount
06/18/2014 Keith Holton Cash $725.00
Outstanding Balance $0.00
Uploaded Files
Date File Name
06/12/2014 Roof mount details AC condenser..pdf
06/12/2014 Commercial Mechanical Permit Applicationpdf.pdf
Gmail-Roof mount details AC condenser. 6/12/14 8:09 AM
C.1 I I Vernon Kelly Lovelace <vernonlovelace81@gmail.com>
Roof mount details AC condenser.
A mPRRnnPR
William Inderbitzen <willinderbitzen@gmail.com> Tue, Jun 10, 2014 at 10:36 AM
To: vernon love lace81 @gmail.com
Condensing unit roof mount bases will be constructed from pressure treated lumber and assembled with appropriate
corrosion resistant fasteners and bracing hardware to maintain a secure and level foundation for the life of the
equipment. Support structure will be fastened to underlying steel supports and all roof penetrations will be sealed.
Condensing units will be mounted 20' or more from roof edge.
1) 3 Primary supports will be cut from pressure treated 6x8 stock to accommodate a 1 in12 roof pitch, span the steel
support structure and provide weight distribution.
2) 3 cross members will be cut from 4x4" pressure treated stock to incorporate primary supports, elevate equipment
and provide appropriate unit mounting locations.
3) Hot Dip galvanized or stainless fasteners will be used and cuts that expose lumber interior will be treated with
copper napthenate wood preservative.
4) Roof penetration for copper refrigerant lines and will be sealed with a flexible insulating flashing and caulking
formulated to adhere to galvanized steel.
5) Refrigerant lines and control wires will will be properly insulated, protected from UV damage and mounted on
elevated blocks.
WIWI-
NO
roof_viewjoists.jpg
4i; 121 K
Vernonlovelace <vernonlovelace81 @gmail.com> Tue, Jun 10, 2014 at 12:52 PM
To: "cyoung@arlingtonwa.gov" <cyoung@arlingtonwa.gov>
Will this work for the AC instalion on the roof?
Sent from my iPhone
Begin forwarded message:
From: William Inderbitzen <willinderbitzen@gmail.com>
Date: June 10, 2014 at 10:36:49 AM PDT
To: vernonlovelace8l@gmail.com
https://mail.google.com/mail/u/0/?ui=2&ik=ld9a54af4b&view=pt&se...1=14686da970aebc0d&siml=1468b4ed64586dc3&siml=1468b562b5ab74da Page 1 of 7
Gmail-Roof mount details AC condenser. 6/12/14 8:09 AM
JUUjCIi I. F%VVI 111VU11L UC1Q112! /1V 1.V 11UC11AC1.
[Quoted text hidden]
Christopher Young <cyoung@arlingtonwa.gov> Tue, Jun 10, 2014 at 12:57 PM
To: Vernonlovelace <vernonlovelace81 @gmail.com>
How much does the unit weigh? How close to the roof edge will it be? Is there roof access?
Christopher Young
Building Official
City of Arlington
360-403-3432
cyoung @ arlingtonwa.gov
® �ja
https://mail.google.com/mail/u/0/?ui=2&ik=ld9a54af4b&view=pt&se...1=14686da970aebc0d&siml=1468b4ed64586dc3&siml=1468b562b5ab74da Page 2 of 7
Gmail-Roof mount details AC condenser. 6/12/14 8:09 AM
"The importance of a strong building code is most evident after a disaster."
From: Vernonlovelace [mailto:vernonlovelace8l@gmail.com]
Sent: Tuesday, June 10, 2014 12:53 PM
To: Christopher Young
Subject: Fwd: Roof mount details AC condenser.
[Quoted text hidden]
Vernonlovelace <vernonlovelace81 @gmail.com> Tue, Jun 10, 2014 at 1:16 PM
To: Christopher Young <cyoung@arlingtonwa.gov>
I will get that info to you soon.
Also can we pull the permit ourselves.
Or do we need a mechanical license to pull the Hvac permit.
Sent from my Phone
On Jun 10, 2014, at 12:57 PM, Christopher Young <cyoung@arlingtonwa.gov> wrote:
How much does the unit weigh? How close to the roof edge will it be? Is there roof access?
Christopher Young
Building Official
City of Arlington
360-403-3432
cyoung@?arlingtonwa.gov
<image001.png><image002.png><image003.png>
"The importance of a strong building code is most evident after a disaster."
From: Vernonlovelace [mailto:vernonlovelace8l@gmail.com]
Sent: Tuesday, June 10, 2014 12:53 PM
To: Christopher Young
Subject: Fwd: Roof mount details AC condenser.
https://mail.google.com/mail/u/0/?ui=2&ik=ld9a54af4b&view=pt&se...1=14686da970aebc0d&siml=1468b4ed64586dc3&siml=1468b562b5ab74da Page 3 of 7
Gmail-Roof mount details AC condenser. 6/12/14 8:09 AM
Will this work for the AC instalion on the roof?
Sent from my iPhone
Begin forwarded message:
From: William Inderbitzen <willinderbitzen@gmail.com>
Date: June 10, 2014 at 10:36:49 AM PDT
To: vernon love lace81 @gmail.com
Subject: Roof mount details AC condenser.
Condensing unit roof mount bases will be constructed from pressure treated lumber and
assembled with appropriate corrosion resistant fasteners and bracing hardware to maintain
a secure and level foundation for the life of the equipment. Support structure will be
fastened to underlying steel supports and all roof penetrations will be sealed.
Condensing units will be mounted 20' or more from roof edge.
1) 3 Primary supports will be cut from pressure treated 6x8 stock to accommodate a 1 in12
roof pitch, span the steel support structure and provide weight distribution.
2) 3 cross members will be cut from 4x4" pressure treated stock to incorporate primary
supports, elevate equipment and provide appropriate unit mounting locations.
3) Hot Dip galvanized or stainless fasteners will be used and cuts that expose lumber
interior will be treated with copper napthenate wood preservative.
4) Roof penetration for copper refrigerant lines and will be sealed with a flexible insulating
flashing and caulking formulated to adhere to galvanized steel.
5) Refrigerant lines and control wires will will be properly insulated, protected from UV
damage and mounted on elevated blocks.
<image004.jpg>
Christopher Young <cyoung@arlingtonwa.gov> Tue, Jun 10, 2014 at 1:27 PM
To: Vernonlovelace <vernonlovelace81 @gmail.com>
Just a contractor license is needed
Christopher Young
Building Official
City of Arlington
360-403-3432
cyoungC arlingtonwa.gov
https://mail.google.com/mail/u/0/?ui=2&ik=ld9a54af4b&view=pt&se...1=14686da970aebc0d&siml=1468b4ed64586dc3&siml=1468b562b5ab74da Page 4 of 7
Gmail-Roof mount details AC condenser. 6/12/14 8:09 AM
® J0
"The importance of a strong building code is most evident after a disaster."
From: Vernonlovelace [mailto:vernonlovelace8l@gmail.com]
Sent: Tuesday, June 10, 2014 1:17 PM
To: Christopher Young
Subject: Re: Roof mount details AC condenser.
[Quoted text hidden]
William Inderbitzen <willinderbitzen@gmail.com> Tue, Jun 10, 2014 at 1:39 PM
To: vernonlovelace8l@gmail.com
Each condensing unit weighs 298lbs
They will be a minimum of 24' from the edge of the roof
The roof is accessible by an exterior mounted service ladder on the east side of the building.
[Quoted text hidden]
Vernonlovelace <vernonlovelace81 @gmail.com> Tue, Jun 10, 2014 at 3:54 PM
To: Christopher Young <cyoung@arlingtonwa.gov>
Here are those answers you had.
Sent from my iPhone
Begin forwarded message:
From: William Inderbitzen <willinderbitzen@gmail.com>
Date: June 10, 2014 at 1:39:48 PM PDT
To: vernonlovelace8l@gmail.com
Subject: Re: Roof mount details AC condenser.
[Quoted text hidden]
Christopher Young <cyoung@arlingtonwa.gov> Wed, Jun 11, 2014 at 7:13 AM
To: Vernonlovelace <vernonlovelace81 @gmail.com>
Last question — how many condensers are we talking and what is the spacing?
Christopher Young
https://mail.google.com/mail/u/0/?ui=2&ik=ld9a54af4b&view=pt&se...1=14686da970aebc0d&siml=1468b4ed64586dc3&siml=1468b562b5ab74da Page 5 of 7
Gmail-Roof mount details AC condenser. 6/12/14 8:09 AM
Building Official
City of Arlington
360-403-3432
cyoung @ arlingtonwa.gov
® �ia
"The importance of a strong building code is most evident after a disaster."
From: Vernonlovelace [mailto:vernonlovelace8l@gmail.com]
Sent: Tuesday, June 10, 2014 3:54 PM
To: Christopher Young
Subject: Fwd: Roof mount details AC condenser.
[Quoted text hidden]
Vernonlovelace <vernonlovelace81 @gmail.com> Wed, Jun 11, 2014 at 7:30 AM
To: Christopher Young <cyoung@arlingtonwa.gov>
There is 8 of them and they are spaced over main truss supports about 24' apart.
Sent from my Phone
On Jun 11, 2014, at 7:13 AM, Christopher Young <cyoung@arlingtonwa.gov> wrote:
Last question— how many condensers are we talking and what is the spacing?
Christopher Young
Building Official
City of Arlington
360-403-3432
cyoung@?arfingtonwa.gov
<image001.png><image002.png><image003.png>
https://mail.google.com/mail/u/0/?ui=2&ik=ld9a54af4b&view=pt&se...1=14686da970aebc0d&siml=1468b4ed64586dc3&siml=1468b562b5ab74da Page 6 of 7
Gmail-Roof mount details AC condenser. 6/12/14 8:09 AM
"The importance of a strong building code is most evident after a disaster."
From: Vernonlovelace [mailto:vernonlovelace8l@gmail.com]
Sent: Tuesday, June 10, 2014 3:54 PM
To: Christopher Young
Subject: Fwd: Roof mount details AC condenser.
Here are those answers you had.
Sent from my iPhone
Begin forwarded message:
From: William Inderbitzen <willinderbitzen@gmail.com>
Date: June 10, 2014 at 1:39:48 PM PDT
To: vernon love lace81 @gmail.com
Subject: Re: Roof mount details AC condenser.
Each condensing unit weighs 298lbs
They will be a minimum of 24'from the edge of the roof
The roof is accessible by an exterior mounted service ladder on the east side of the
building.
On Jun 10, 2014 10:36 AM, "William Inderbitzen" <willinderbitzen@gmail.com> wrote:
Condensing unit roof mount bases will be constructed from pressure treated lumber and
assembled with appropriate corrosion resistant fasteners and bracing hardware to maintain
a secure and level foundation for the life of the equipment. Support structure will be
fastened to underlying steel supports and all roof penetrations will be sealed.
Condensing units will be mounted 20' or more from roof edge.
1) 3 Primary supports will be cut from pressure treated 6x8 stock to accommodate a 1 in12
roof pitch, span the steel support structure and provide weight distribution.
2) 3 cross members will be cut from 4x4" pressure treated stock to incorporate primary
supports, elevate equipment and provide appropriate unit mounting locations.
3) Hot Dip galvanized or stainless fasteners will be used and cuts that expose lumber
interior will be treated with copper napthenate wood preservative.
4) Roof penetration for copper refrigerant lines and will be sealed with a flexible insulating
flashing and caulking formulated to adhere to galvanized steel.
5) Refrigerant lines and control wires will will be properly insulated, protected from UV
damage and mounted on elevated blocks.
https://mail.google.com/mail/u/0/?ui=2&ik=ld9a54af4b&view=pt&se...1=14686da970aebc0d&siml=1468b4ed64586dc3&siml=1468b562b5ab74da Page 7 of 7