Loading...
HomeMy WebLinkAbout17831 59th Ave Ne_BLD317_2026 - COMMERCIAL REMODEL PERMIT APPLICATION Department of Community& Economic Development City of Arlington • 18204 59th Ave NE •Arlington, WA 98223• Phone (360)403-3551 THIS APPLICATION MUST BE ACCOMPANIED BY THREE(3) SETS OF CONSTRUCTION PLANS, TWO(2) SETS OF STRUCTURAL CALCULATIONS, ONE(1) SET OF NREC ENERGY CODE APPLICATIONS AND ONE(1) OCCUPANTS STATEMENT OF INTENDED USE. Type of Permit: Change of Use/Remodel Commercial Addition ❑ Tenant Improvement Project Address: 17831 59th Ave. NE Parcel ID#: Project Description- Add one (1)ADA compliant bathroom 1 p Legal Description: Project Valuation: $3200.00 owner: Arlington Advanced Manufacturing Park Phone Number: 360-435-5151 Address: 17825 59th Ave NE City: Arlington State: WA Zip Code: 98223 Contact Person:Kraut Houck Phone Number: 360-435-5151 Cell Phone: Fax: E-mail: kraut@frontier.com Address: 17825 59th Ave. NE City: Arlington State: WA Zip Code: 98238 Contractor: In House N/A Phone Number: Address: City: State: Zip Code: Contractor's License Number: Expiration: Plumbing Contractor: Phone Number: Address: City: State: Zip Code: Contractor's License Number: Expiration. Mechanical Contractor: Phone Number: Address: City State: Zip Code. Contractor's License Number: N/A Expiration: I hereby certify that the above information is correct and that the construction on, and the occupancy and the use of the above- described property will be in accordance with the laws, rules and regulation of the State of Washington. Applicants SignatureDate 0-311-3/2014 Print Applicants Name Kraut FOR STAFF USE ONLY YLb Y7 -Ch, _16=1_ Win a 4P cW PT Permit# Accepted By Amount Received Receipt# Date Received - ' COMMERCIAL REMODEL PERMIT APPLICATION Department of Community& Economic Development City of Arlington • 18204 59"Ave NE •Arlington,WA 98223 • Phone (360)403-3551 Project Name/Tenant T.I. Bathroom Site Address 17835 59th Ave. NE Bldg/Unit/Suite Bldg. 7 IBC Construction Type IBC Occupancy Type Description of Use Bathroom ? Building Square Footage Number of Stories Square Footage Per Floor Will there be any installation, modification or removal of the following? (Check all that apply) Automatic fire extinguishing systems Compressed gas systems Fire alarm and detection systems Fire pumps Flammable and combustible liquids(tanks,piping etc...) Hazardous materials High piled/rack storage Industrial ovens/furnace Private fire hydrants Spraying or dipping operations Standpipe systems Temporary membrane structure,tents(>200sq ft)or canopies(>400 sq ft) Provide details on any of the above checked items: Installation,changes, modifications or removal of any of the above may require additional submittals, Information,or permits during the plan review or construction process. COMMERCIAL REMODEL + -yr, PERMIT APPLICATION Department of Community& Economic Development City of Arlington • 18204 59th Ave NE •Arlington,WA 98223• Phone (360)403-3551 Building Division: The Building Division shall review any revisions and addenda.Approved copies will be given to the contractor to maintain as part of the approved plan set. The City Inspector will monitor the special inspection functions for compliance with the agreement and the approved plans. The City Inspector shall be responsible for approving various stages of construction to be covered and work to proceed. Design Professionals: The architect and engineer will clearly indicate on the plans and specifications for the specific types of special inspection required, and shall include a schedule for inspection and testing. The architect and engineer will coordinate their revisions and addenda process in such a way as to insure all required City approvals are obtained,prior to work shown on the revisions being performed. Owner: The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEMENT: A failure of the special inspector or firm to perform in keeping the requirements of the IBC,the approved plans and this document may void this agreement and the Building Officials approval of the special inspector. In such case a new special inspector and/or firm would need to be proposed for approval.A failure of the design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the project, until nonconforming items have been resolved. ACKNOWLEDGEMENTS: The building permit does not include any mechanical,electrical, plumbing or fire sprinkler/alarm work. These permits are Issued separately. Mechanical,electrical, plumbing,or fire sprinkler/alarm permits require a separate permit application and may also require separate plan review. Please note that any tenant improvement work in a space that involves food handling or preparation requires Snohomish County Health District approval before the permit can be issued. You must provide the Permit Center a copy of the approval letter or the approved plans. Contact the Snohomish County Health District at(425)339-5250 with any questions or for more information. An intake appointment is required for all large Tenant Improvement Building Permit Applications.To determine if your project requires an intake appointment, to schedule an appointment or to ensure that you have the most current information, please contact the City of Arlington Permit Center at(360)403-3551 or by email to Perm itcentera-ci.arlington.waaus. I have read and agree to comply with the terms and conditions of this agreement. Owner: Arlington Advanced Manufacturing Park Date: 03/13/2014 Applicant: Kraut Date: 03/13/2014 Arlington Advanced Manufacturing Park 1783159th Ave. NE, Arlington WA 98223 17831 (bldg. 7) Bathroom Build Out One ADA Compliant Bathroom—8'x 8'. Total build out area 8'x 8' @ 64 sq.ft. Wall construction is 2" x 6" 'treated'floor plates, and 2" x 6" S&B studs, @ 16" O.C. The walls are fully insulated with R-13 fiberglass batting for sound proofing. Interior walls covered with 5/8"Type X sheet rock, mud &taped. Exterior walls will be covered with %"T-1-11 plywood sheeting. Joists will be 2" x 6" S&B, @ 16" O.C., covered with %" plywood decking. Finished bathroom to have one (1)toilet, one (1) Lay. Sink, lighting and exhaust fan. LO 8r 8` rop V I E vV FRO AIT V 16� Permit#: 317 Permit Date: 03/13/14 Permit Type: COMMERCIAL ALTERATION Project Name: AAMP Building 7 Applicant Name: Arlington Advanced Manufacturing Park Applicant Address: 17825 59th Ave NE Applicant, City, State, Zip: Arlington,WA 98223 Contact: Kraut Houck Phone: 360-435-5151 Email: kraut@frontier.com Scope of Work: ADA Bathroom Valuation: 3200.00 Square Feet: 0 Number of Stories: 0 Construction Type: Occupancy Group: ID Code: Permit Issued: 03/20/2014 Permit Expires: Form Permit Type: Status: COMPLETE Assigned To: Property Parcel# Address Legal Description Owner Name Owner Phone Zoning ARLINGTON 31052200403600 17831 59TH AVE NE ADVANCED 637 Warehousing& MANUFACTURING Storage Services PARK Contractors Contractor Primary Contact Phone Address Contractor Type License License# Justus Plumbing,LLC Carolyn Hardin 253-353-0600 3570 E Roosevelt PLUMBING JUSTUPL899QS Ave CONTRACTOR Arlington Advanced 17825 59th CONSTRUCTION Manufacturing Kraut Houck 360-435-5151 Avenue NE CONTRACTOR Inspections Date Inspection Type Description Scheduled Date Completed Date Inspector Status 04/04/2014 C04.PLUMBING DWV and domestic on test. 04/04/2014 04/04/2014 z.Christopher Young Approved GROUNDWORK Work is approved. Framing for ADA restrooms 04/04/2014 C09.FRAMING installed per plan.Rough 04/04/2014 04/04/2014 z.Christopher Young Approved L&I approved. Plan Reviews Date Review Type Description Assigned To Review Status 03/13/2014 COMMERCIAL No issues z.Christopher Young ALTERATION 03/24/2014 COMMERCIAL See note PW-WAT-REV ALTERATION 03/24/2014 COMMERCIAL See Note PW-SEW-REV ALTERATION 03/24/2014 COMMERCIAL PW-ADMIN-GIS ALTERATION Fees Fee Description Notes Amount Building Permit Table 4-1 $108.51 State Surcharge- Ist DU Residential- Ist Unit $4.50 Building Plan Review Table 4-2 $70.53 Total $183.54 Attached Letters Date Letter Description 03/14/2014 Building Permit Payments Date Paid By Description Payment Type Accepted By Amount 03/20/2014 AAMP cash Launa Black $183.54 Outstanding Balance $0.00 Notes Date Note Created By: 06/05/2014 Talked with Brent and Kraut(AAMP),and Joel(Justus Pumbing)about needing a cleanout 2 to Jay Lemke 5 feet from the building at grade in a frame and cover per standard 5-3.13.JL Uploaded Files Date File Name 03/13/2014 LLD 319 Application.pdf Date: 05/11/2026 Permit#: 317 Permit Date: 03/13/2014 Review Date: 03/24/2014 Permit Type: COMMERCIAL ALTERATION Review Type: COMMERCIAL ALTERATION Target Date: 03/27/2014 Scheduled Time: Completed Date: 03/24/2014 Description: See Note Review Status: Assigned To: PW-SEW-REV Time In: Time Out: Hours: Notes Talked to Joel from Justus plumbing and his plan is to tap the sewer main to service the new 03/24/2014 bathrooms. Joel was informed that a monitoring manhole will be required and the sewer tap will need to conform to standard detaill SS-100. JL Property Information Parcel#: 31052200403600 ARLINGTON ADVANCED MANUFACTURING PARK ARLINGTON ADVANCED MANUFACTURING 3316 FUHRMAN AVE E STE 200 PARK 17831 59TH AVE NE SEATTLE,WA 98102 Zoning: 637 Warehousing & Storage ServicesLot: Block: