HomeMy WebLinkAbout17831 59th Ave Ne_BLD317_2026 - COMMERCIAL REMODEL
PERMIT APPLICATION
Department of Community& Economic Development
City of Arlington • 18204 59th Ave NE •Arlington, WA 98223• Phone (360)403-3551
THIS APPLICATION MUST BE ACCOMPANIED BY THREE(3) SETS OF CONSTRUCTION PLANS, TWO(2) SETS
OF STRUCTURAL CALCULATIONS, ONE(1) SET OF NREC ENERGY CODE APPLICATIONS AND ONE(1)
OCCUPANTS STATEMENT OF INTENDED USE.
Type of Permit: Change of Use/Remodel Commercial Addition ❑ Tenant Improvement
Project Address: 17831 59th Ave. NE Parcel ID#:
Project Description- Add one (1)ADA compliant bathroom
1 p Legal Description:
Project Valuation: $3200.00
owner: Arlington Advanced Manufacturing Park Phone Number: 360-435-5151
Address: 17825 59th Ave NE City: Arlington State: WA Zip Code: 98223
Contact Person:Kraut Houck Phone Number: 360-435-5151
Cell Phone: Fax: E-mail: kraut@frontier.com
Address: 17825 59th Ave. NE City: Arlington State: WA Zip Code: 98238
Contractor: In House N/A Phone Number:
Address: City: State: Zip Code:
Contractor's License Number: Expiration:
Plumbing Contractor: Phone Number:
Address: City: State: Zip Code:
Contractor's License Number: Expiration.
Mechanical Contractor: Phone Number:
Address: City State: Zip Code.
Contractor's License Number: N/A Expiration:
I hereby certify that the above information is correct and that the construction on, and the occupancy and the use of the above-
described property will be in accordance with the laws, rules and regulation of the State of Washington.
Applicants SignatureDate 0-311-3/2014
Print Applicants Name Kraut
FOR STAFF USE ONLY
YLb Y7 -Ch, _16=1_ Win a 4P cW PT
Permit# Accepted By Amount Received Receipt# Date Received
- ' COMMERCIAL REMODEL
PERMIT APPLICATION
Department of Community& Economic Development
City of Arlington • 18204 59"Ave NE •Arlington,WA 98223 • Phone (360)403-3551
Project Name/Tenant T.I. Bathroom
Site Address 17835 59th Ave. NE Bldg/Unit/Suite Bldg. 7
IBC Construction Type IBC Occupancy Type
Description of Use Bathroom ?
Building Square Footage Number of Stories
Square Footage Per Floor
Will there be any installation, modification or removal of the following? (Check all that apply)
Automatic fire extinguishing systems
Compressed gas systems
Fire alarm and detection systems
Fire pumps
Flammable and combustible liquids(tanks,piping etc...)
Hazardous materials
High piled/rack storage
Industrial ovens/furnace
Private fire hydrants
Spraying or dipping operations
Standpipe systems
Temporary membrane structure,tents(>200sq ft)or canopies(>400 sq ft)
Provide details on any of the above checked items:
Installation,changes, modifications or removal of any of the above may require additional submittals,
Information,or permits during the plan review or construction process.
COMMERCIAL REMODEL
+ -yr, PERMIT APPLICATION
Department of Community& Economic Development
City of Arlington • 18204 59th Ave NE •Arlington,WA 98223• Phone (360)403-3551
Building Division:
The Building Division shall review any revisions and addenda.Approved copies will be given to the contractor to maintain as part of the approved plan
set.
The City Inspector will monitor the special inspection functions for compliance with the agreement and the approved plans.
The City Inspector shall be responsible for approving various stages of construction to be covered and work to proceed.
Design Professionals:
The architect and engineer will clearly indicate on the plans and specifications for the specific types of special inspection required, and
shall include a schedule for inspection and testing.
The architect and engineer will coordinate their revisions and addenda process in such a way as to insure all required City approvals
are obtained,prior to work shown on the revisions being performed.
Owner:
The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency.
ENFORCEMENT:
A failure of the special inspector or firm to perform in keeping the requirements of the IBC,the approved plans and this document may
void this agreement and the Building Officials approval of the special inspector. In such case a new special inspector and/or firm would
need to be proposed for approval.A failure of the design and/or construction parties to perform in accordance with this agreement may
result in a STOP WORK notice being posted on the project, until nonconforming items have been resolved.
ACKNOWLEDGEMENTS:
The building permit does not include any mechanical,electrical, plumbing or fire sprinkler/alarm work. These permits are Issued
separately. Mechanical,electrical, plumbing,or fire sprinkler/alarm permits require a separate permit application and may also require
separate plan review.
Please note that any tenant improvement work in a space that involves food handling or preparation requires Snohomish County Health
District approval before the permit can be issued. You must provide the Permit Center a copy of the approval letter or the approved
plans. Contact the Snohomish County Health District at(425)339-5250 with any questions or for more information.
An intake appointment is required for all large Tenant Improvement Building Permit Applications.To determine if your project requires
an intake appointment, to schedule an appointment or to ensure that you have the most current information, please contact the City of
Arlington Permit Center at(360)403-3551 or by email to Perm itcentera-ci.arlington.waaus.
I have read and agree to comply with the terms and conditions of this agreement.
Owner: Arlington Advanced Manufacturing Park Date: 03/13/2014
Applicant: Kraut Date: 03/13/2014
Arlington Advanced Manufacturing Park
1783159th Ave. NE, Arlington WA 98223
17831 (bldg. 7) Bathroom Build Out
One ADA Compliant Bathroom—8'x 8'. Total build out area 8'x 8' @ 64 sq.ft.
Wall construction is 2" x 6" 'treated'floor plates, and 2" x 6" S&B studs, @ 16" O.C.
The walls are fully insulated with R-13 fiberglass batting for sound proofing.
Interior walls covered with 5/8"Type X sheet rock, mud &taped.
Exterior walls will be covered with %"T-1-11 plywood sheeting.
Joists will be 2" x 6" S&B, @ 16" O.C., covered with %" plywood decking.
Finished bathroom to have one (1)toilet, one (1) Lay. Sink, lighting and exhaust fan.
LO
8r
8`
rop V I E vV FRO AIT V 16�
Permit#: 317
Permit Date: 03/13/14
Permit Type: COMMERCIAL ALTERATION
Project Name: AAMP Building 7
Applicant Name: Arlington Advanced Manufacturing Park
Applicant Address: 17825 59th Ave NE
Applicant, City, State, Zip: Arlington,WA 98223
Contact: Kraut Houck
Phone: 360-435-5151
Email: kraut@frontier.com
Scope of Work: ADA Bathroom
Valuation: 3200.00
Square Feet: 0
Number of Stories: 0
Construction Type:
Occupancy Group:
ID Code:
Permit Issued: 03/20/2014
Permit Expires:
Form Permit Type:
Status: COMPLETE
Assigned To:
Property
Parcel# Address Legal Description Owner Name Owner Phone Zoning
ARLINGTON
31052200403600 17831 59TH AVE NE ADVANCED 637 Warehousing&
MANUFACTURING Storage Services
PARK
Contractors
Contractor Primary Contact Phone Address Contractor Type License License#
Justus Plumbing,LLC Carolyn Hardin 253-353-0600 3570 E Roosevelt PLUMBING JUSTUPL899QS
Ave CONTRACTOR
Arlington Advanced 17825 59th CONSTRUCTION
Manufacturing Kraut Houck 360-435-5151 Avenue NE CONTRACTOR
Inspections
Date Inspection Type Description Scheduled Date Completed Date Inspector Status
04/04/2014 C04.PLUMBING DWV and domestic on test. 04/04/2014 04/04/2014 z.Christopher Young Approved
GROUNDWORK Work is approved.
Framing for ADA restrooms
04/04/2014 C09.FRAMING installed per plan.Rough 04/04/2014 04/04/2014 z.Christopher Young Approved
L&I approved.
Plan Reviews
Date Review Type Description Assigned To Review Status
03/13/2014 COMMERCIAL No issues z.Christopher Young
ALTERATION
03/24/2014 COMMERCIAL See note PW-WAT-REV
ALTERATION
03/24/2014 COMMERCIAL See Note PW-SEW-REV
ALTERATION
03/24/2014 COMMERCIAL PW-ADMIN-GIS
ALTERATION
Fees
Fee Description Notes Amount
Building Permit Table 4-1 $108.51
State Surcharge- Ist DU Residential- Ist Unit $4.50
Building Plan Review Table 4-2 $70.53
Total $183.54
Attached Letters
Date Letter Description
03/14/2014 Building Permit
Payments
Date Paid By Description Payment Type Accepted By Amount
03/20/2014 AAMP cash Launa Black $183.54
Outstanding Balance $0.00
Notes
Date Note Created By:
06/05/2014 Talked with Brent and Kraut(AAMP),and Joel(Justus Pumbing)about needing a cleanout 2 to Jay Lemke
5 feet from the building at grade in a frame and cover per standard 5-3.13.JL
Uploaded Files
Date File Name
03/13/2014 LLD 319 Application.pdf
Date: 05/11/2026
Permit#: 317
Permit Date: 03/13/2014
Review Date: 03/24/2014
Permit Type: COMMERCIAL ALTERATION
Review Type: COMMERCIAL ALTERATION
Target Date: 03/27/2014
Scheduled Time:
Completed Date: 03/24/2014
Description: See Note
Review Status:
Assigned To: PW-SEW-REV
Time In:
Time Out:
Hours:
Notes
Talked to Joel from Justus plumbing and his plan is to tap the sewer main to service the new
03/24/2014 bathrooms. Joel was informed that a monitoring manhole will be required and the sewer tap
will need to conform to standard detaill SS-100. JL
Property Information
Parcel#: 31052200403600 ARLINGTON ADVANCED MANUFACTURING
PARK
ARLINGTON ADVANCED MANUFACTURING 3316 FUHRMAN AVE E STE 200
PARK
17831 59TH AVE NE SEATTLE,WA 98102
Zoning: 637 Warehousing & Storage
ServicesLot: Block: