Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
17904-A 34TH DR NE_045802_2026
It A0 INSPECTION REPORT N G TD Permit No.: dw 5$c z- Lot #: Q" Address: -79 c`r Contractor: n&T � Z Owner: IN O Date: 77- APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. stJ ,a-L ,+10 P/La�Z7 Inspector: S Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in r9_—;:Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: ,:..r INSPECTION REPOR ,- �� Permit No: Q Q2- Date: 2- Address/Lot No: 4Contractor:(j;4 O Owner: S Supervisor: 10'Approval ❑ Correction Required ❑ Corrections listed below MUST BE MADE before work can be approved ❑ Please contact inspector ❑ Was not able to perform inspection ❑ Calt36��� for re-inspection -24-hour notice required Inspec or: , Date: 7 6o _ TYPE OF INSPECTION REQUIRED TESC STORM DRAIN ROAD LANDSCAPING ❑Slit Fence ❑Pipe ❑Sub-grade ❑Irrigation ❑Check Dam ❑Catch Basin(s) ❑Rock ❑Soil ❑Inlet Protection ❑Manhole(s) J urb &Gutter ❑Fertilizer ❑Temp.Sed ❑Oil Seperator(s) Sidewalk ❑Bark ❑Sheeting Cl Down Spouts J Approach(s) ❑Plants ❑Straw ❑Trash Rack/Overflow ❑ATB ❑Trees ❑Seeding ❑Restrictor ❑Cl.B Asphalt ❑Root Barriers ❑Final ❑Level Spreader ❑Striping ❑Play Equipment ❑Treatment ❑Signing ❑Final ❑Infiltration ❑Final f{ . fo �. INSPECTION REPORT -0 G T 4ti G Permit No.: 04 5�0� Lot #: Ig Q" Address: ( '7�o Y S Y OR- Contractor: [713 9�, ,SO Owner: SIN 1C' Date: "7- 7- 0 Lj ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION (CORRECTION REQUESTED Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ was not able to perform inspection. �9YCALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. C Lt �L TM'L31 l„t TS 770 �`�- Inspector: Date: 0 V TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT ' e y1N GTO Permit No.: _ 5SV-", Lot #: Q Address: • • / Z Contractor: _ ems, ,SO Owner: �iNO Date: ?-cl-l2) APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing >�Qrywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: �573 �•- 'N-QPECTION REPORT R 41,IN O?'0 Permit No.: off S9167- Lot #: Q' Address: / '7 9 o Y 3 y On— Contractor:Contractor: 0 6,i �Q Owner: �I N C' Date: 5- 2.'� - D y vp PROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. Inspector: A�� Date: 5— ac,�z TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage --Qd-insulation ❑ Other: /V1 INSPECTION REPORT 41, N Gr Permit No.: O �- 5�30�Lot#:Address:Contractor:Owner: 910jNG Date: C) ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION CORRECTION REQUESTED errections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ LL 35-0 74 FOR RE-INSPECTION - 24 hour notice required. '0 Inspector: Date: y TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage Insulation 0 Other: INSPECTION REPORT ¢titN G TO Permit No.:<2i Lot#: Q' Address: Z 2<?Oy' 3 Z Contractor: AO 9 Owner: T SwIN G� Date: __0 AAPPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. l Inspector: AV- Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor 0 Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT iING Permit No.. 07"✓t2 Lot #:Address: / zn� �iContractor:Owner:Date: ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION A CORRECTION REQUESTED 11 Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. ST Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor Framing ❑ Gas Piping ❑ Footing /❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: zz� INSPECTION REPORT ySN G T� Permit No.: 014 5 8 o 7- Lot#:O� z. Address: 1'l 9 0 q 314 .o Contractor: 1bg T 4 Owner: 9S�jNG� Date: 5��- oy "a APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Inspector: Date: 5 `-l-0 `0V TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing P-XGas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork 00echanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: 300 �. INSPECTION REPORT 4y�N G To Permit No.: olf 69 o z-. Lot #:D Q' Address: ?9 O 3 11- Aj e� Contractor: -09 T 9s, ,t4 Owner: I've Date: 5-M-OL( ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ACORRECTION REQUESTED %Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. ii � `az Inspector: J&Z Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing *,Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT `33� ¢ti1N G. , Permit No.: 6 ' Lot #: 4" 2 Address: Contractor: IN OHO Owner: _ Date: ;L(APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. Inspector: Date: Sr�U�O TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation > Shear Nailing ❑ Groundwork ❑ Mechanical I i❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: IT'Z �.., INSPECTION REPORT 4C'_i_"*C04 PermitNo.: cog 58o'Z Lot #: C4 4Address: 1 -711o14Contractor: °l,6 X_ Owner: Date: '5-ry -oL/ ❑ APPROVAL 4-PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. rA-r L 3 o i CT P cat Inspector: Date: 5 40 TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ! Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ;Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT NG 4ti1 �?'O Permit No.: OY S�D2 Lot#: F. Y . Address: / 79� 3 Y t�fL- Contractor: /06 11— O Owner: ING Date: APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. U^a 0 tom- '-s i4*_M..a, ~P 04yC-10 Inspector: Date: °/'Z3 -C!K TYPE OF INSPECTION REQUESTED Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: 335 INSPECTION REPORT 4tiZN G j, Permit No.: o if SAD 2. Lot#: Q' Address: l 1$ t Y • � � Contractor: O Owner: 9s I N G Date: q- Zo - o N APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. 4. Inspector: Date: 4-:2e�-42 YPE OF I SPECTION REQUESTED fXUnder-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: "INSPECTION REPORT 4'rN 't Y p Permit No:04-SW� Date• 3/ Address/Lot No: 1 0�- L4 t-IL l)L N t C"- L(Ll Contractor:,G Owner: Supervisor: Lao.(cV2 - L47 13 Approval ❑ Correction Required ❑ Corrections listed below MUST BE MADE before work can be approved ❑ Please contact inspector ❑ Was not able to perform inspection ❑ Call 360.435.0674 for re-inspection -24-hour notice required Inspect 6r� �..� �- Date: _1q-Al-a TYPE OF INSPECTION REQUIRED TESC STORM DRAIN ROAD LANDSCAPING ❑Slit Fence ❑ ipe ❑Sub-grade ❑Irrigation ❑Check Dam ❑Catch Basin(s) ❑Rock ❑Soil ❑Inlet Protection ❑Manhole(s) ❑Curb&Gutter ❑Fertilizer ❑Temp.Sed ❑Oil Seperator(s) ❑Sidewalk ❑Bark ❑Sheeting ❑Down Spouts ❑Approach(s) ❑Plants ❑Straw ❑Trash Rack/Overflow ❑ATB ❑Trees ❑Seeding ❑Restrictor ❑Cl.B Asphalt ❑Root Barriers ❑Final ❑Lev9JSpreader ❑Striping ❑Play Equipment ❑TObtment ❑Signing ❑Final nfiltration ❑Final ""4` ) INSPECTION REPORT N ,SoO S�' ; 1 Permit No.: � `6�v�ot #: . � - 3� �Z /')=Address 1 Contractor: AT Owner: G4ti Date: ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ C LL 435-0674 FOR R, -INSPECTION - 24 hour notice required. � r Inspector: / Date: 2/fY PE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry Drainage ❑ Insulation ❑ Other: INSPECTION REPORT 4ti11N G?,0 Permit No.: Lot#: Address: . 1 Contractor: Owner: I N G Date: APPROVAL ❑ PARTIAL APPROVAL VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. Inspector: Dat PE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping Footing ❑ Drywall, Nailing ❑ Consultation _2�Foundation ❑ Shear Nailing ❑ Groundwork /❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: � y Z p INSPECTION REPORT ii PermitNo.: ©1 5,r°L Lot#:Address: 1-71oy JLf-Contractor:Owner: Date: 2-'�Z-��� t211-APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. Inspector: Date: �- PE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping X Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT' titN G 1' Permit No.: ✓ Lot#: O . � 9 A. Contractor: Q' Address: �7 � Z 9�, .0 Owner: '0INO Date: ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. cif 'd 6f- . � z -y _ ©y Inspector. 6 er— Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping Footing ❑ Drywall, Nailing ElConsultation _Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: 1 C I QF fAFRL I hIGTQtV CONST FRUC-IF I ON PE FRM I T PE RM I -F h!O _ = GD4-5802 Owner: DB JOHNSON CONSTRUCTION 1801 GROVE ST MARYSVILLE 98270 Value of Work: $187, 000. 00 Tax ID: NOT YET ASSIGNED Phone: 360-659-1579 Describe Work: NEW DUPLEX Proposed Use: SFR-2 Legal Description: CAROLA ADDITION LOT 4 Job Address: 17904 34TH PL HE Contractor's Name Type Address License# DB JOHNSON CONSTRUCTION GEN 1801 GROVE ST DBJOHCI044BA G & S HEATING MEC 506 E MAIN ST GSHEAC1147JD MARYSVILLE PLUMBING INC. PLB 13318 SR 530 NE. MARYSPI101JE P E R M I T F E E S Equipment and Fixtures Number Fee Total Charge PLUMBING FIXTURES 24 $10. 00 $240. 00 FURNACEiUNIT HEATER 2 $15. 00 $30. 00 VENTILATION FANS 8 $7. 00 $56. 00 DRYER 2 $11. 00 $22. 00 WATER HEATER 2 $15. 00 $30. 00 GAS PIPING 1-4 OUTLETS 2 $6. 00 $12. 00 I S U B T O T A L. . . . . . $390.00 TOTALS Fee Permit Fee -1, 636. 65 Equipment $150. 00 Fixture $240. 00 Lakewood School Mit $0. 00 Mech Permit 6 . Plan Fee $1, 063. 82 82 Plumb Permit $25. 00 State fee $6. 50 Traffic Mitigation $1, 038. 00 SIGNATURE: TOTAL FEE. . . . . . . . . . . . . . . . . $4, 183. 97 I HEREBY CERTIFY THAT I HAVE READ AK EXAMINED THIS APPLICATION AND PAYMENTS. . . . . . . . . . . . . . . . . . $1, 043. 67 IM HE SAME TO BE TRUE AND COR- RECTLL ROVISIONS -F LAWS AND TOTAL DUE. . . . . . . . . . . . . . . . . $3, 140. 30 NCE GDVER ING THIS TYPE OF f ILL C M LIE WITH WHETHER DATEi�j/ b RECEIPT # SS�� I'ED R O T. NG ILIA' v CITY OF ARLINGTON CONSTRUCTION PERMIT ®COMBINATION BUILDING [:]MECHANICAL [:]PLUMBING SIGN PERMIT NO. OWNER MAIL ADDRESS CITY ZIP PHONE D. B. Johnson Const. 1801 Grove St., #B Marysville 98270 360.659.1579 ARCHITECHT OR DESIGNER MAIL ADDRESS CITY ZIP PHONE Country Roads 930 N. Amy Place Camano Island 98282 360.629.6068 GENERAL CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE# D. B. Johnson Const. 1801 Grove St., #B Marysville 98270 360.659.1579 DBJOHC1044BA MECHANICAL CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE# Marysville Plumbing 13318 SR 530 NE Arlington 98223 360.435.5555 MARYSPI101JE PLUMBING CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE# G & S Heating 500 E Main St. Monroe 98272 360.794.7306 GSHEAC1005C5 CLASS OF WORK ®NEW ADDITION EJALTERATION REPAIR DEMOLITION [:]BUILDING RELOCATION VALUATION OF WORK DESCRIBE WORK NEW CONSTRUCTION PROPOSED USE OF BUILDING I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED HIS APPLICATION DUPLEX AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVISIONS OF LEGAL DESCRIPTION OF PROPERTY(SHOWN BELOWOR ATTACH FOUR COPIES) LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE LOT BLOCK OF Carola Addition COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF TAX ID NUMBER CONSTRUCTION. PERMIT EXPIRES 1 YEAR FROM DATE OF ISSUANCE SIG OF CO7,OIR AUTHORIZED AGENT DATE JOB ADDRESS lX D/-07-Zt7O�7 17Gc q Ply Me- (OFFICE USE ONLY) PLUMBING MECHANICAL NO. TYPE OF FIXTURE NO. TYPE OF EQUIPMENT FEE (p WATER CLOSET(TOILET) AIR COND. UNITS-H.P. EA. BATHTUB ,f REFRIGERATION UNITS-H.P. EA. 1p LAVATORY(WASH BASIN) BOILERS-H.P. EA. / SHOWER I GAS FIRED A.C. UNITS-TONNAGE EA. "+ KITCHEN SINK& DISP / Z " FORCED AIR SYSTEMS-B.T.U. M 2 DISHWASHER / WALL HEATERS-B.T U. M LAUNDRY TRAY UNIT HEATERS-B.T.U. M CLOTHES WASHER EVAPORATIVE COOLERS Z WATER HEATER 2 CLOTHES DRYERS URINAL $ VENTILATION FAN DRINKING FOUNTAIN RANGE HOOD COMMERCIAL FLOOR DRAIN AIR HANDLING UNIT - CPM ^ r VACUUM BREAKERS STOVE I ROOF DRAINS-RAINLEADERS METAL FIREPLACE&CHIMNEY SINK(SERVICE-BAR, ETC.) 2 WATER HEATER GAS PIPING SUBTOTAL SUBTOTAL PERMIT PERMIT TOTAL FEE---T TOTALFEE SIDE YAR ETBACK STREET,SfTPA,CK REAR YARD)S,ETBACK PLAN CHECK NUMBER PLAN CHECK FEE aag�pgl FEE I RECEIPT NO. USE ZONE LOT ARFA VACANT SITE FEES VALUATION FEE -/ ij ��; �� ) [&YES 0 NO PLAN CHECKING �CJ Q TYPE.Oji,CONS T' OCCUPANCY GROUP NO. OF DWELLING UNITS BUILDING A &39 -l' SIZE OF BLDG NO.OF STORIES MAX. OCC.LOAD PLUMBING Id-?y MECHANICAL FIR SPRINKLER REQD S IA It t$LUU.CODE ENERGY CODE SURCHARGE YES O U.B.C. COMW r t\/E PENALTY G EC. (al WATER/SEWER FEES ,AN $ 20s. TOTAL PERMIT VALIDATION p'NG pEp WHEN PROPERLY VALIDATED ON THIS SPACE)THIS IS YOUR PERMIT&RECEIPT PAID CR# BY V L• BUILDING OFFICIAL DATE CC: ASSESSOR,APPLICANT,TREASURER, BLDG.DEPT. RECORDS COPY D.B. Johnson Construction, Inc. ICE Ct Site Information: 1801 Grove St., Unit B Lot 4, of Carola Addition Marysville, WA 98270 (360) 659-1579 Site Address: 17904 3,e Place NE Contact: Stacy Smith Arlington, WA 98223 DBJ Job#: 2296 & 2297 Tax I.D. # DBJ Plan #: 1247 Duplex Lot Area: 10,217 S.F. Scale: 1" = 20' 14.99' N Notes: 1. Downspouts to Infiltration Trench (sidewinder system — 75' per lot— 12 sections total - 76" per section —see construction drawings & manufacturer specs) N 2. Stockpile to be covered within 24 hours. 3. Entire lot to be disturbed. 4. Silt Fence as needed. 5. Denuded soils to be straw covered. 6. Armored Construction Entrance. 7. 2 lot trees required — 1 credit for Street Tree— 1 tree to be planted near rear lot line. 8. Building Height = Approx. 22' 11". 9. Lot Coverage: 10,217 X 35% = 3,575 S.F. °o Proposed = 1,930 S.F. o cp w `Jr? 0 0 RECE1vE \, �pN 0 8 2004 1247 COA gU�LpING DEPT Duplex 6 6 Parking / 53.94' e