Loading...
HomeMy WebLinkAbout17818-B 34TH DR NE_045800_2026 INSPECTION REPORT ¢ti1N G?'o Permit No.: ay 5800 Lot#: 2— Address: f 1 k 18 3 q D2. Z Contractor: -OG3l ,SO Owner: SING Date: to -2-1 -0Y APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. �1/y Gl-P Inspector: Date: 2 TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in 2 0 Final ❑ Masonry ❑ Drainage ❑ Insulation 7 Other: INSPECTION REPOR , G1't Y p� Permit No: O'-/ S g ®p Date: /a- Z-/ - o C/ Address/Lot No: l -','/ 8 S Y O r2 10- Z Contractor: S �lI N GAO Owner: Supervisor: ❑ Approval Correction Required ❑ Corrections listed below MUST BE MADE before work can be approved ❑ Please contact inspector ❑ Was not able to perform inspection ❑ Call 360.435.0674 for re-inspection -24-hour notice required r /Q Inspector: Z Date: ��- TYPE OF INSPECTION REQUIRED TESC STORM DRAIN ROAD ANDSCAPI ❑Slit Fence ❑Pipe ❑Sub-grade ❑Check Dam ❑Catch Basin(s) ❑Rock ❑Soil ❑Inlet Protection ❑Manhole(s) ❑Curb&Gutter ❑Fertilizer ❑Temp.Sed ❑Oil Seperator(s) ❑Sidewalk ❑Bark ❑Sheeting ❑Down Spouts ❑Approach(s) ❑Plants ❑Straw ❑Trash Rack/Overflow ❑ATB ❑Trees ❑Seeding ❑Restrictor ❑Cl.B Asphalt ❑Root Barriers ❑Final ❑Level Spreader ❑Striping ❑Play Equipment ❑Treatment ❑Signing 1.tFinal ❑Infiltration ❑Final �f 35 INSPECTION REPORT ¢SIN G rO Permit No.: D q 5800 Lot#: F' Address: 1-7 3 P� 3�( Da- Contractor:z Contractor: O Owner: �`S�I N Cs Date: ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATIONCORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. Inspector: =� — Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in g_5? Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: 3s3 'INSPECTION REPORT 1N G 2 4ti ?'O Permit No.: o-f 5800 Lot#: Q Address: 1 -7 9 t 8 3'k 02 Contractor: TNT � Z O Owner: Date: 6 -2.'5-o q ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ?—(-CORRECTION REQUESTED Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. 11��iP _ tia a,R� max_ 7"D Lead_ Au nll�'L_ ��ts�t�7frl rJ Inspector: Date: L3 -O y TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in fL X Final ❑ Masonry ❑ Drainage ❑ Insulation i Other: PvI.- INSPECTION REPORT 1;i 7' Permit No.: bq 5a o0 Lot #:Address: I'1 -P � 3Y 0�Contractor: T)6 -4 Owner: Date: (o --'L — 0 L/ ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ;4- CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ��N,Rti- anna�za 0�7 ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. �LL1y� AL✓[_S + R L 51 G^,rb AA 1 N I / 449D9] ,gA)c-= 9-C D�--V V-A,17— 'Poe 10 � xf7'?k. 1 �1►��y 1�t 61.E Sic arl l, -w - Il -To '0'd� r XF��no ,mot!e� y" C���-�cRNC.t� ��•c T7. -�Z� •T-a (f yLo u.�!� Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in 9 Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: L( 08 INSPECTION REPORT ¢S,'IN G'J, Permit No.: Lot#: 2-- Address: 3 q T"- o f-- Z Contractor: hi3 I- O Owner: IT4,1G Date: 9 —27 —d APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing JZ--o Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: 313 INSPECTION REPORT ¢ti1N G 1'O Permit No.: o Lf 5 Ree n Lot#: Z— Q' Address: 1 7 y 119 �� I'll D�-- � Z Contractor: ys, �4 Owner: I N O Date: q- 21-0 5/ ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION CORRECTION REQUESTED (�O.Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. (CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Cam — F%c"k— 344�r 1 CD✓� Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing $Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: lip `1Z7 `ISPECTION REPORT ii T PermitNo.: o4 59c� Lot#: Address: 1 '18 fb 3 4 '`" D '1L Contractor: ►)13 T Owner: G� Date: Y—I '7- o`/ O( APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. f AfS N,l,y4-r7 o 10 Inspector: Date: 4-12 TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage Winsulation ❑ Other: v, ram, INSPECTION RE* ii TPermit No.: 0 y-s000 Lot #: �Address: / 2 8l S- `� r Contractor: ,�0 Owner:Date: ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION 0,,CORRECTION REQUESTED Af"Clo,rrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. Inspector: Date: T —1/ — 5� TYPE O NSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage Insulation ❑ Other: /z. q(p INSPECTION REPORT i4i r PermitNo.: ©q 5foo Lot#: Z— Address: /-7 xi x 3 qContractor: 1)ts� 0,, 0 Owner: Date: if-1 y-0-/ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Eg-,__�Z / Inspector: � - Date: —� TYPE OF INSPECTION REQUESTED ❑ Under-floor �&Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: "4SPECTION REPORT 4tiZN GrO Permit No.: OY Sco Lot#: 2— � Address: /-7 S) 8 3 4�� ` OfL.- Z Contractor: b8 S O Owner: ING( Date: If- ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ,CORRECTION REQUESTED Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. 29 Inspector: Date: �r TYPE OF INSPECTION REQUESTED ❑ Under-floor 0 Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation 0 Other: 9 3/9 ®� INSPECTION REPORT 4C, 0 NGTPermitNo.: Dq 56©0 Lot #: 2- Address: /-79/ e 3Y� O/Z- Contractor: I)e 7 Owner: 4I N O Date: `f j z-0 Y ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION 4 CORRECTION REQUESTED corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Inspector: Date:3-0 PE OF IN PECTION REQUESTED ❑ Under-floor A Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: 3 Z€' INSPECTION REPORT® 1,1N G T 4, G Permit No.: y 58a® Lot#: �" Address: / -78 1f9 3 Y lk 102 Contractor: b RIT � Z O Owner: �s�IN G� Date: `f- 7— V'( APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Ot r Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ,A Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT C ) 7214/ Yp, N G // � ¢yl ?'� Permit No.: �4%5a C6 Lot#: 8 Q' Address: 17,?/Sl- ,Oqr,.y • .� Contractor: �6i 4 Owner: INc'� Date: X APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. Inspector: Date: 5 TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical Grid ❑ Struct. Slab ❑ Wood Stove Rough-in ❑ Final ❑ Masonry AQ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT ii Permit No.: a'-( SSe® Lot#: 2---Address: l-78rP 3 If I` p2OContractor:Owner: O Date: 3 - 3°- o`/ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Inspector: Date: .3-7_0 'o y TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation 4 Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT 1;4 T PermitNo.: QY 5800 Lot #: 2Address: (7818 3 Y " A oContractor:Owner: Date: 3-13-Dq ;_APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. i/i�110L tf'M P A.a�.r.�YJ Inspector: Date: Y— Z 3—oV TYPE OF INSPECTION REQUESTED `Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: '?; if INSPECTION REPORT ¢ti1N GTO Permit No.:4::�J - rBa�Lot#: 62 Q" Address: 1 l8 - 3 /�L &/—c • •� Z Contractor: 00 A617 O Owner: IN 'S �- Date: ❑ APPROVAL ,t� PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. LZIALL 435-0674 FOR RE-INSPECTION 24 hour notice required. 6 2 -25/ - 0`1 eel— i Inspector: Date: �'� TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry Drainage ❑ Insulation ❑ Other: INSPECTION REPORT �- ¢ti1N G 1'O Permit No.: 049z�D Lot#: Address: • � Z Contractor: O Owner: 9`r I N G Date: 7_0 ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION XCORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Inspector: Date: PE OF INSi6ECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove 0 Rough-in ❑ Final ❑ Masonry ?11-Drainage ❑ Insulation 0 Other: INSPECTION REPOW iio Permit No.: 6y Lot #: 02Address:Contractor: Owner: Date: - 9 ,APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. jau�v flA�7tiOsJ t�P l/l�Y� Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping Footing ❑ Drywall, Nailing ❑ Consultation Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry Cl Drainage ❑ Insulation 0 Other: INSPECTION REPORT Permit No . - Lot#: Q Address: • • � Z Contractor: �I�GAO Owner: Date: :3 S �� O\4PPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. � �- 3 3 Inspector: Date: ' TYPE OF INSPECTION REQUESTED Q Under-floor ❑ Framing ❑ Gas Piping Footing ❑ Drywall, Nailing ❑ Consultation Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: C I TNf QF f=tRI I iVGTOhI GONST ERUCT I OR! PE RM I T PE Ft I T iV0_ -Z+-5E300 Owner: DB JOHNSON CONSTRUCTION 1601 GROVE ST KARYSV"ILLE 98270 Value of Work: $153, 000. 00 Tay. ID: NOT YET ASSIGNED Phone: 360-659-1579 Describe Work: NEW DUPLEX Proposed Use: SFR-2 Legal Description: CAROLA ADDITION LOT 2 Job Address: 17818 34TH PL NE Contractor's Hasse Type Address License# DB JOHNSON CONSTRUCTION GEN 1801 GROVE ST DBJOHCIO44BA G & S HEATING MEC 506 E MAIN ST GSHEAC1147JD MARYSVILLE PLUMBING INC. PLB 13318 SR 530 NE. MARYSPI101J£ P E R M I T F E E S Equipment and Fixtures Number Fee Total Charge - ---- --------------------------- ------- ------ --- --- - - ------------ PLUJIBING FIXTURES 20 $10. 00 $200. 00 FURNACE/UNIT HEATER 2 $15. 00 $30. 00 VENTILATION FANS 6 $7. 00 $42. 00 DRYER 2 $11. 00 $= 00 WATER HEATER 2 $15. 00 $30. 00 GAS PIPING 1-4 OUTLETS 2 $6. 00 $12. 00 S U B T O T A L. . . . . . $336.00 TOTALS Fee Permit Fee $1, 438. 25 Equipment $136. 00 Fixture $200. 00 Lakewood School hit $0. 00 Mech Permit $24. 00 Plan Fee $934. 86 Plumb Permit $25. 00 i State fee $4. 50 Traffic Mitigation $1, 038. 00 JAE!,�,J] TORE: TOTAL FEE. . . . . . . . . . . . . . . . . $3, 800.61 BY CERTIFY THAT I HAVE READ AMINED THIS APPLICATION ARID PAYMENTS. . . . . . . . . . . . . . . . . . $930. 83 THE 'SAME BE TRUE AND COR- LL ROVI' ONS OF LAWS AND TOTAL DUE. . . . . . . . . . . . . . . . . $2,869. 78 NC GOV NI THISTYPE OF IC. PL ED WITH WHETHER E NOT. DATE RECEIPT # l NG OFFIC AL ld3a 9Maiina voo C13AI3038 , 04011\ 4.34' - 01 --- ---------- EN a Nr ------------ --- JV X.££ ''" 00 :E 33'X47' ! is c; .06 Er (6 a) Plan i u8ld !: 1014 s •i ! f• s • suopoas Z-Jopulmopis 60 p1 suoPas —ja uuna I 86.00' o N t cu U m N _ L� � a) Cl) w N L O m 0 Z N O -D OD t N Cl) N U M C U N O m O m L0 M U m 0 `C O O C Cfl II a O c U -� 0 CV) m 0 0- 0 E w 0 -0 O M m co U (V (0 � CD 0 m � j c � CD `tx o � c m N � —ter � a) co a) � N O � � � a-tn NO O_ � i LL to CNCC) = ca0 QCD Op � � U 0 QQ � M �' � Q m � � E N _v E - 3 aUi � � �`�' -� (D a) II v ago c fn a U N O �, �O Op co 'o p N O Co.d5 v)� p aj cl) co c U . ... aU ,� o co CO m � a v; 030 U) oc = m o � �. c Q m � �� O m m p 0 .0 U c 0 w w w 0 Q N 0 m -i a m X a 0 � � � 0 00 z —0 U MNM � U-) wr- w0 U) J U) HJ - CITY OF ARLINGTON `-'CONSTRUCTION PERMIT XCOMBINATION BUILDING DMECHANICAL ❑PLUMBING SIGN PERMIT NO. ()q_S-c&Co OWNER MAIL ADDRESS CITY ZIP PHONE D. B. Johnson Const. 1801 Grove St., #B Marysville 98270 360.659.1579 ARCHITECHT OR DESIGNER MAIL ADDRESS CITY ZIP PHONE Country Roads 930 N. Amy Place Camano Island 98282 360.629.6068 GENERAL CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE# D B. Johnson Const 1801 Grove St #B Marysville 98270 360.659.1579 DBJOHC1044BA MECHANICAL CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE# Marysville Plumbing 13318 SR 530 NE Arlington 98223 360.435.5555 MARYSPI101JE PLUMBING CONTRACTOR MAILADDRESS CITY ZIP PHONE LICENSE# G & S Heating 500E Main St Monroe 98272 360.794.7306 GSHEACI005C5 CLASS OF WORK ®NEW []ADDITION ALTERATION [-]REPAIR DEMOLITION BUILDING RELOCATION VALUATION OF WORK $ (53, 3/6. DESCRIBE WORK NEW CONSTRUCTION PROPOSED USE OF BUILDING I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED HIS APPLICATION DUPLEX AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVISIONS OF LEGAL DESCRIPTION OF PROPERTY(SHOWN BELOW OR ATTACH FOUR COPIES) LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT. THE GRANTING LOT 2 BLOCK OF Carola Addition OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION. PERMIT EXPIRES 1 YEAR FROM DATE OF ISSUANCE TAX ID NUMBER 4ATUR CONTR AUTHORIZED AGENT DATE JOB ADDRESS X (OFFICE USE ONLY) PLUMBING MECHANICAL NO. TYPE OF FIXTURE FEE NO. TYPE OF EQUIPMENT F WATER CLOSET(TOILET) / AIR COND, UNITS-H.P. EA. BATHTUB REFRIGERATION UNITS-H.P EA / LAVATORY(WASH BASIN) 7- BOILERS-H.P. EA. r ,g' SHOWER J GAS FIRED A.C. UNITS-TONNAGE EA. / 2 KITCHEN SINK& DISP 2 FORCED AIR SYSTEMS-B T.U. MEA i 2 DISHWASHER LL WALL HEATERS-B.T U. M LAUNDRY TRAY t d / UNIT HEATERS-B.T.0 M 2 CLOTHES WASHER / EVAPORATIVE COOLERS WATER HEATER Z CLOTHES DRYERS URINAL \ (o VENTILATION FAN DRINKING FOUNTAIN RANGE HOOD COMMERCIAL FLOOR DRAIN AIR HANDLING UNIT - CPM e VACUUM BREAKERS STOVE V � ROOF DRAINS-RAINLEADERS METAL FIREPLACE&CHIMNEY SINK(SERVICE-BAR, ETC.) 2 WATER HEATER GAS PIPING SUBTOTAL SUBTOTAL PERMIT PERMIT TOTAL FEE TOTAL FEE PLAN CHECK FEE SIDE YARD?TRACK STREET SETBACK REAR Y_D SETBACK PLAN CHECK NUMBER 2� o�o1�SID -I FEE c.D RECEIPT NO. USE ZQNE j� LOT/AREA 1 VACANT SITE FEES VALUATION FEE II `YES NO G / ❑ PLAN CHECKING q .� TYPEjOV CONSI OCg{1PAN O �CY�GRUP NO.OF DWELLING r r U f UNITS BUILDING SIZE BLDG NO.OF STORIES MAX.OCC. LOAD PLUMBING MECHANICAL FIRE SPRINKLER READ NO ENERGY CODE SURCHARGE PENALTY C_303 COMMENTS WATER/SEWER FEES � Vt E Tm JAN 0 8 1004: TOTAL COA BUILDING DEPT PERMIT VALIDATION WHEN PROPERLY VALIDATED(IN THIS SPACE)THIS IS YOUR PERMIT&RECEIPT PAID CR# BY BUILDING OFFICIAL DATE CC: ASSESSOR,APPLICANT,TREASURER,BLDG.DEPT RECORDS COPY