HomeMy WebLinkAbout18602 35TH AVE NE_035306_2026 4 `/: 33p�-
r✓- INSPECTION REPORT
¢1.1N G?'O Permit No.: s 3 o L, Lot #: o
Q Address: / 96 n Z 3 5 ►�
Contractor: e, 4^ ,j�v• z.�_)
O Owner:
IN C'� Date: £ 5 s
�PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
h
w
n
Inspector: Date: _5 -�'�
I'YPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in 0,Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT q17
T �
N G TO Permit No.: � S 4� Lot#: 4
Q ~' Address:
• e
Z Contractor: Gi f2 (Jlf&'Cd
4 Owner—
IN � Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
P�__Orrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date: a ' Z7" 7p�
PE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
�n INSPECTION REPORT
lv`
41•IN G?'� Permit No.: 51�p Lot#:
Q Address:
Contractor:
93, 0 Owner:
SING Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
. -A
Inspector: ! Date: , - c,
PE OF IN ECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing Drywall, Nailing ❑ Consultation
❑ Foundation fU Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT,
¢ti1N G TO Permit No.: 03—T 30C Lot #:
Address: c
O Contractor:
Owner:
IN G Date: l Lf T
ROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date: S ���—e.3
YPE OF INSPECTION REQUESTED
❑ Under-floor r—a Framing K— DGas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage Insulation
❑ Other:
INSPECTION REPORT / ;2`7
4tiSN G j- Permit No.:Y-53�& Lot #:
Q' Address: X �� 3srf!�
Contractor: OaUle c J
Owner:
j N Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION g CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24rhour notice required.
Inspector: l Date:
ATYPE OF INSPECTION REQUESTED
❑ Under-floor Framing Gas Piping
❑ Footing /❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
-Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
¢L1N GTO Permit No.: 5301, Lot#: i 8
Q' Address: P &01- 3 5 r
Contractor: 4�'JoV,
9s �0 Owner:
IN Date: Z� C
❑ APPROVAL PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
O7- r 1)L
Inspector: — Date: "
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing X Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
0' Foundation ❑ Shear Nailing ❑ Groundwork
—Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove IZ,XRough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT /76i0
¢tiZN G TO Permit No.: �lJ� Lot #- le _
Q' Address: i e
� Z
Contractor: 4t6u .UleLkj
O Owner:
INGS Date: `��
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: 5 Co 777 Date: 4/-
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove Rough-in ❑ Final
❑ Masonry :1 Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
¢titN G r0 Permit No.: 5300 Lot #: /O
Address:
Contractor:
4 Owner:
j N G� Date:
❑ APPROVAL ❑ ,PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
ALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
r
A'r— K I rc.F-fc-=•-- 1,
Inspector: �4� G'1 Date: `
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
,nn INSPECTION REPORT
4y1N G T� Permit No.: 6 �_ Lot it:
Q' Address: LOCQI 35 rw
Z Contractor: r
✓1 (.J
D Owner:
4I N Date:
'APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspector: 5�;r-azC- Date: 3 3-3
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing Drywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
N G J'G Permit No.: Lot #:
Q -- Address:
Contractor:
O Owner:
9s10 j N G� Date:
J� APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspector: Date:
TYPE OF RfSPECTION REQUESTED
Y".Un er-floor ❑ Framing ❑ Gas Piping
/J Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
¢ti1N G�0 Permit No.: Lot #: l�
Q' Address: kt_6 09- As H
� Z
Contractor: cLyi c.w
Owner:
SIN G Date: 'd
❑ APPROVAL ❑ PARTIAL APPROVAL
VIOLATION C4CORRECTION REQUESTED
Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspector: Date:
YPE OF INSPECTION REQUESTED
Under-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPOR-r
N G ro Permit No.: - &Lot #:
IT, Address: p0a 5r'-f
� z
Contractor: Pt l eu--)
O Owner:
I N G� Date:
X APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
<-
Inspector: 5 L f) 7T Date: 7'a3p
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT 7r No
NG /
4ti1 ?'O Permit No.:qL �Lot#:
Address: IP (5�
Contractor:
Owner:
IN IN Date: r-;�` 1
TAPPROVAL ❑ PARTIAL APPROVAL
VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
,10'TYPE OF 1 SPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
-)ki Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
�n INSPECTION REPORT
f V/ �/�, l
¢ti1N G TO Permit No.: �cot #:
-' Address: S�
Z Contractor:
Owner:
�I N G Date:
ROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:. —l —��
PE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
0 Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
C I TY OF AFZL - I MC3-FMM
CMMV -r FZIJ(--T I ON PE Ft I T
PEFtM I T MC3 _ QD3-5392)C5
Owner: GRANDVIEW INC PO BOX 159 ARLINGTON 98223
Value of Work: $92, 000. 00 Tax ID: NOT YET ASSIGNED Phone: 435-7171
Describe Work: NEW SINGLE FAMILY RESIDENCE
Proposed Use: SFR
Legal Description: WHISPERING BREEZES
Job Address: 18602 35TH AVE HE
Contractor's Name Type Address License#
GRANDVIEW INC. GEN P 0 BOX 159 GRANDI*065D1
JEFF J & C HEATING MEC 120 SE EVERETT MAL WAY JCHEA**005RJ
EMERALD PLUMBING PLH 1511 S GRAM
F E R N I T F E E S
Equipment and Fixtures Number Fee Total Charge
--------------------------------------- ------ --
PLUMBING FIXTURES 10 $10. 00 $100. 00
FURNACE/UNIT HEATER 1 $15. 00 $15. 00
VENTILATION FANS 4 #7. 00 $28. 00
DRYER 1 $11. 00 $11. 00
METAL FIREPLACE & CHIMNEY 1 $11. 00 $11. 00
WATER HEATER 1 $15. 00 $15. 00
GAS PIPING 1-4 OUTLETS 1 $6. 00 $6. 00
S U B T O T A L. . . . . . $106.00
TOTALS Fee
Permit Fee $1, 014. 75
Equipment $86. 00
Fixture $100. 00
Mech Permit $24. 00
Plan Fee $659. 59 ( r
Park Mitigation 91, $25. 00 c
\\
Plumb Permit 525. 00
State fee $4. 50
SIGNATURE:
TOTAL FEE. . . . . . . . . . . . . . . . . $2, 913. 84 I HEREBY CERTIFY THAT I HAVE READ
AND EXAMINED THIS APPLICATION AND
PAYMENTS. . . . . . . . . . . . . . . . . . $500. 00 KH THE SAME TO BE TRUE AND COR-
RE T ALL PROVISIONS OF LAWS AND
TOTAL DUE. . . . . . . . . . . . . . . . . $2, 413. 84 O I ANCE GOVERNING THIS TYPE OF
W K WIL FB C PL ED WITH WHETHER
C F LE R NOT�5
DATE RECEIPT #
I%--
DINGY M&YA11
OFFICE COPY
Goy �` 19 ECE j vEp ,�
M^
a7Y0FpRCrNGTp
N
REV
ISED
570.00.
S�
40
00
� cq
cz r'ic�PoS l: CjJ
IX Ov
1 I � EBS�,yr/✓T
s�.0O
Tyr �'yS
CITY OF ARLINGTON
CONSTRUCTION
PERMIT
COMB El BUILDING 0 h1EC11A4ICAL 1 OWNER El PLUMBING � SIGN
PERMIT NO,
MAIL AUURESS CITY
Grandview, Inc. PO BOX 159 ZIP • ruDNE
Arlington 98223 (360) 435-7171
ARCIIIf'CI UR DESIGNER MAIL ADDRESS
Crease CAD CITY ZIP PHONE
ONE
111 SE Everett Mall Way Everett 98208 MAIL AnuRE (425) 349-7769
Get V ss
C11 Y ZIP
Grandview, Inc. PO BOX 159 PHONE c -=
LCIIANICAL—CO—NI RAC►0R Arlington 98223 GRANDI*'065D1
MAIL ADDRESS City
J&C Heating PO BOX 1086 ZIP PRONE LICENSE
PLUMRINGCONTR/1CTOR Marysville 98270-1086 (360)654-9893
MAIL AbDRE55 Emaerald Plumbing 1511 S Gram CITY ZIP PHON E LICENSE
clnss0f wORk Camano Island 98292 (360) 387-4022
a XONLW ❑ADDITION ❑ALTE RAT ION Fj REPAIR ElDEMOLIIION �BUILDING RELOCATION
VALUAl1UNaf WORK
1
UESL'RIBE WURk
New Construction
M PRUPUSI U USE of BUIIt)ING
I Single Family_ I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APP,LICA-
LTc'ALa SLRIr-I IUN oF1 Rt Y sl N BELOW OR A11ACN 0UR C0r1E--SF— TION AND KNOW 11-IE SAME TO BE TRUE AND CORRECT ALL PROVI-
18 SIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK
Lot muck DF Whispering Breezes WILL BE COMPLIED WITH WI IETHER SPECIFIED I IERIN OR NOT,THE
a
n GRANTING OFA PERMIT DOES NOT PRESUME.TO GIVE AUTHORITY TO
VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
TAX ID NUMBER PROM PRopmTY TAX sTATEMENT LOCAL LAW REGULATING CONSTRUCTION OF THE PERFORMANCE OF
3_ CONSTRUCTION.PERMIT EXPIRES 1 YEAR FROM DATE OF ISSUANCE,
DE AU17 SICNAIUREOFCONIRACIORORAUTIIORIZEDAOENT DATI
1IE x
PLUMu1Na TYPO OP PIXTURB —
BCIIAN ICAL
NO. VISIT PIXTURBs NO. TYPB OF BUUIPMEINT
_L 4ATBR CLosur(TOILUf) PBB i�PIXTUAII9
17.00 IR CONU.UN119—ill. LTA IqWp,Ilr•'2 AVATO$ $1.00 LITRIUMLATIoN UN119—ILP.BA.
2 VATORY ASII BASIN) J .11�t'•
17.00 O11ZR3—I1.P.BA W .IIA
110WBR $1.00 AS PIRBD A.C.Lima—TONNA08 8A d ,Il.t•'
i 11WA 90R. d DISPOSAL 11.00 ORCBD AIR SYMsms—B.T.U. MHA $9.00
ISINDRYI R $7.00 AL1 111 ATBRS—B.T.U. M
UNDRY TRAY ff.00
$7.00 NIT IIIl HRS—B.T.U. ►tl ff.00
I— 1,011IB9 WASIIBR 17.00 VAPORATIVBCOOLBR9
1 NA11IR IIBATPA 17.00 'LU111EM DRYIDLS
nINAL $6.30
17.00 � [7iTILATIUN PAN ff30
�1 RINXING POUN'fAIN 17.00 081100D COMMBRCIAL
( 'LOOR DRAIN 1i $630
VACUUM DRBAbBR9
IR IIANDLINU UNIT— CPM OOP DRAINS—AA 1T.00 - 'OYB
i630
i7.00 QfAL PIRBPLACB A CIIIMNBY 1630
INIC SBRVICB—BAR,BIC. 17.00 1— ATBR IlaNrEER if30
AS PIPING '(up to S.13.00,oddol.-1.73
_yB ulpmont Iht muot be ptovlded
SUB TOTAL
RUB
PQLMIT TOTAL
PLTAMIT
TOTAL PBB TOTALPBB
SIULYARI IBACk 51RLL1SLISACK REARYARD§EIeA k FLAN CIIECKNUMBER
/ � FEE PLA 1 ClECK FEE
S
0.ECEIPT NO.
SI' /UN lUl AREA vACANT 511E
2-M p `F2. 43 AYES E]NO FEES VALUATION FEE
IYPL UI CON51 OCCUPANCY C Or NO.OF DWELLING UNITS PLAN CIIECKINO VG
V-A) (L-3
SI/L Of RLUL,. NO.Of STORIES MAX.IC.LOAD BU'LDINC7 ) IG ��r 7
1 (p S S
rlutilBlrlc
I IRE SPRINKLERS REpUIREII
tjj:;Ei- &NO MECHANICAL
COMMENTS STATE BLDO.CODE
ENERGY CODE SURCHARGE
S3 V� PENALTY 5EC.
SEC,jOJI.I
WATER/SEWER FEES
RECEIVE® TOTAL
PERMIT VALIDATION
WI TEN PROPERLY VAI IDAIED IIN II ITS SPACEI TI ITS IS YOUR PERMIf A,RECEIPT
JAN 0 6 2�C3 PAID CRI1 BY
CITY OF ARLINGTON
cc:ASSESSorl,APPLICANT,TnEASunEn, E1LO0. DEFT. OUq.DINr,orrICIAL OATF