HomeMy WebLinkAbout18704 35TH AVE NE_035303_2026 C I T1f OF AFRL I tVGTON
COhISTRUCT I UM PERM I T
PE RM I T NO_ _ 92513-5303
Orner: GRANDVIEW INC PO BOX 159 ARLINGTON 98223
i Value of Work: $101, 000. 00 Tax ID: NOT YET ASSIGNED Phone: 435-7171
Describe Work: NEW SINGLE FAMILY RESIDENCE
Proposed Use: SFR
Legal Description: WHISPERING BREEZES LOT 9
Job Address: 18704 35TH AVE HE
Contractor's Name Type Address License#
GRANDVIEW INC. GEN P O BOX 159 GRANDI*065D1
JEFF J & C HEATING MEC 120 SE EVERETT MAL WAY JCHEA**005RJ
EMERALD PLUMBING PLB 1511 S GRAM
P E R M I T F E E S
Equipment and Fixtures Number Fee Total Charge
--------------------------------------- ------ -------- ------------
PLUMBING FIXTURES 10 $10. 00 $100. 00
FURNACE/UNIT HEATER 1 $15. 00 $15. 00
VENTILATION FANS 4 $7. 00 $28. 00
DRYER 1 $11. 00 $11. 00
METAL FIREPLACE & CHIMNEY 1 $11. 00 $11. 00
WATER HEATER 1 $15. 00 $15. 00
GAS PIPING 1-4 OUTLETS 1 $6. 00 $6. 00
S U B T O T A L. . . . . . $186.00
TOTALS Fee
Permit Fee $1, 081. 60
Equipment $86. 00
Fixture $100. 00
Mech Permit $24. 00
Plan Fee $703. 04
Park Mitigation $1, : 00$25
Plumb Permit $2500
State fee $4. 50
SIGNATURE:
TOTAL FEE. . . . . . . . . . . . . . . . . $3,024. 14 I HEREBY CERTIFY THAT I HAVE READ
AN EXAMINED THIS APPLICATION AND
PAYMENTS. . . . . . . . . . . . . . . . . . $560.00 KN THE SAME TO BE TRUE AND COR-
RE T ALL ROVISIONS OF LAWS AND
TOTAL DUE. . . . . . . . . . . . . . . . . $2, 524. 14 OR I ANCE GOVE NIN THIS TYPE OF
W K WILL C PLI WITH WHETHER
S C FIED OR T.
DATE RECEIPT
I ICI
��cx.�p✓, .�.1 R t FFICE COPY
�✓1uP�n iN4 T� �Z1;J MP►R 1 18 70 y 351h
��.�•' J�.�r��G/c CITY OF pRut4'a N P_ti y6ro1,!/ /✓� ys��Z23
REVISE6
/Y�'•cT/r �LAL4 //ZQ /o I/
So.00 �
0 10
a
�1��L�1GLL
CITY OIL ARLINGTON
CONSTRUCTION
PERMIT
❑ COMBINATION ❑ BUILDING ❑ MECEIANICAL ❑ PLUMBING D�
SIGN PERMIT NO.
OWNER MAIL ADDRESS (--it Y
zlr
Grandview, Inc. PO BOX 159 Arlington 98223 rI
(360)0) 435-7171
ARCItIfECt OR DESIGNER MAIL ADDRESS
CITY ZIF PHONE
Creasey CAD 111 SE Everett Mall Way Everett 98208 (425) 349-7769
G1�CO�T�TU MAIL ADDRESS •
CITY ZIP NIONE TRINTIT—
Grandview, Inc. PO BOX 159 Arlington 98223 GRANDI*'065D1
CIIANICAL CONTRACTOR MAIL ADDRESS
CItY zir PHONE LICENSE If
J&C Heating PO BOX 1086 Marysville 98270-1086 (360)654-9893
PLUMBING CONTRACTOR MAIL ADDRE5S
CITY ZIP PHONE LICENSE/
Emaerald Plumbing 1511 S Gram Camano Island 98292 (360) 387-4022
LLA53'Vf WORK
COCIDNLW ❑ADDITION ❑ALTERATION ❑REPAIR ❑DEMOLIIION ❑BUILDINGRELOCATION
VALUAIIUNOF WORK
1
DISCRIBE WORK
New Construction
m raurUSk' U USE Of BUIiDING
Z _Single Family I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICA-
GAL I) SCRIPIIUNOI PROPCRTY SHOWN BELOW OR At1AC111UURCOMES TION AND KNOW THE SAME TO HE TRUE AND CORRECT ALL PROVI-
SIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK
(l1I 9 nLlx k OF is erin Breezes WILL BE
COMPLIED WITH WI IETIAER SPECIFIED HERIN OR NOT,THE
d GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTI-IORITY TO
VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
TAX ID NUMBER PnOM PnOPEn'rY TAX STATEMENT LOCAL LAW REGULATING CONSTRUCTION OF THE PERFORMANCE OF
CONSTRUCTION.PERMIT EXPIRES 1 YEAR FROM DATE OF ISSUANCE.
3 Ta)iaDI1R S. SIQUA IVRE OF CONI MCI OR OR AUII{ORIZED AOENT DATE
oaf � IA-t�&.. r
("if 1 11 US8 ONL17
PLUMI11110 WI IANICAL
NO. TYPE OP PIXTURB PEE i j PIXTURE9 No. TYPE OF EQUIPME!"T F811 t'E FIXTVRES
�— VA1811 CL096r(TOIL110 37.00 ER COND.UNI'19-IIl. M W ,BK••
�- A11111JB 11.00 WFIXIUPAATION UNI13-1I2.EA, dIA
P.II I"
2 VATORY ASI I BASIN i7.o0 UtLETRB-II.P.TEA 11 .I
IPLII
SHOWER 17,00 JAB FIRED A.C.UNIrs—TONNAGE EA 3qIj P.Lid"
1 7'C11BN 91NC R DISPOSAL $7.00 I ORCED AIR SYSMMS—E.T.U. MRA 19.90
ISIIWASI IER 11.00 NALL IIIEATER9—B.T.U. M $#'DO
UNDRY TRAY $7.00 JNIT 11E1A'rURS—B.7'.U. M 19.00
L0111IRS WAS IIBR 11.00_ VAPOETATIYECOOLMU
1 AI-OR HEATER 17.00 I LO'lll[9 pRYEIIl9 lfl0
RINAL 11.00 1/!0
� 8tTT11.ATIUN PAtI
RINKINO POUN'rAIH 11.00 VILM091100D COMMERCIAL 1f.S0
1LOOR DRAUN 17.00 AIR,IIANULINU UNIT— CPII
VACUUM BREAKERS 17.00 I 'OVE ifl0
OOP DRAINS—RNNLIfADB119 11.00 AErFAL PIREPLACE!CIIIMNEY 1630
INK 58RYIC8—BM EPIC. 17.00 _L A7BR IIEArPJt ifl0
AS PIPING '(up lu 6-17.00.addol.••1.73
�ulpmod list mail be pcnridod
SUB TOTAL BUB TOTAL
PEIiMIT PP,RMIT
TOTAL PEB TOTAL F8E
SI L Y.11tt)S i BACK S I RLL I SL T BACK REAR YARD tE16ACk PLAN CI IECK NUMBER PLAIT CI IECk E E
S S f tom.. FEE�1 RECEIPT NO.
UST /ON (01 AREA VACANT SIIE
P(YE5 ❑NO FEES VALUATION FEE
IYPLUI CONS I. OCCUPANCY GROUP NO.OF DWELLING UNITS PLAN CIIECKINO V0 703 Oy
St/.L 111 RLDG0 140.Of STORMS MAX,OCC,LOAD BU'LDINO 1 / (D
1 3 S PLUMBING Z�
t IRE SPRINKLERS REQUIRED
OYES 9NO MECI IANICAL
COMMENTS STATE BLDG.CODE
ENERGY CODE SURC14ARGE L S o
PENALTY U.B.0
SEC,301(a)
RECEIVED WATER/SEWER FEES
�IAN n a 7nn TOTAL
PERMIT VALIDATION
WI TEN PROPERLY VALIDATED IIN 11IIS SPACEI THIS 15 YOUR PERMIT lw RECEIPT
PAID CRN BY
cc: ASSESS On,APPLICANT, TnEASUnEn, 91-00. DEPT gWLUINGOTTICIAL DATE
IiECOnDS COPY
INSPECTION REPORT
ti1N C. Permit No.: d3_-53D-3 Lot#: 9
Address: /k7 0 Y 35r-H ,4ve
Contractor: ci4 and Ut e-'�2
IN G0 Owner:
Date:
�PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspector: Date: 7 7/,
PE OF INSP CTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in .Final
❑ Masonry ❑ Drainage Vim, ❑ Insulation
❑ Other:
INSPECTION REPORT C901�
¢ti1N C TO Permit No.: 03`53 03 Lot#: _
Q' Address: / W ?0(-/
Contractor: Cjj 'ICz'UIP
Owner:
(J
�I N O Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION r�Q_ CORRECTION REQUESTED
keorrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALF -0674 FOR RE- NSPECTION - 2 hour notice requir d.
c
Inspector: Date:
PE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Failing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Final
❑ Masonry ❑ Drainage It,AUInsulation
❑ Other:
INSPECTION REPORT dD7
oJiGp
m Permit No.: 5 30_3Lot #:
Address:Contractor:Owner:Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
-Z
Inspector: Date: -
PE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
:-
¢ti1N G?'O Permit No.: 0✓ `'`,� Lot#:
Address: b 7 3S t� Asz
Contractor: V-u V1 ull°(,U
O 9S
Owner:
4I N GAS Date: 'o`
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date 2- -CS
/tYPE OF INSPECTION REQUESTED
❑ Under-floor Framing ElGas Piping
❑ Footing 01"brywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage Insulation
❑ Other:
INSPECTION REPORT
y,.N G r Permit
O emit No.. d_j/3;93Lot#:
-" Address:
Contractor: ya_;41 u1eCA_.)
Owner: U
SING Date: (P-
❑ APPROVAL 'PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:1�.,
PE OF IN CTION REQUESTED
❑ Under-floor AFraming ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
�*_ Mechanical El Grid ElStruct. Slab
Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT G011, 07 ov
jjT
,
Permit No.: t/ 53� Lot#:
Address: l 076) 41 3 �Contractor: qna-rid Ule Lc.7O Owner:
Date: la-3-0
)a APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date: (o-3
TYPE OF INSPECTION REQUESTED
❑ Under-floor ElGas Piping
ElFooting *UD7!�1, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
-,% ❑ Grid ❑ Struct. Slab
Wood Stove Rough-in ❑ Final
❑ Masonry ✓❑ Drainage ❑ Insulation
0 Other:
-INSPECTION REPORT �I.'269
NG
1�1 ?' Permit No.: 303 Lot#:
O
Q Address: ��70yST�i'
Z Contractor: 1
r N��4 Owner:
Date:
❑ APPROVAL ,9 PARTIAL APPROVAL
❑ VIOLATION ' CORRECTION REQUESTED
corrections listed below MUST BE MADE before work can be approved.
'❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
T -
Inspector: Date: Y— X/—03
TYPE OF INS ECTION REQUESTED
❑ Under-floor Framing as Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
j Mechanical ❑ Grid ❑ Struct. Slab
/❑ `Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
�AA INSPECTION REPORT �3`E�N G ��zz�J�", ' 3
4ti TD Permit No.: 93 Lot#:
Q' Address: 470
� Z
Contractor: vLLB Use
O Owner:
9S�IN 't Date:
❑ APPROVAL PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: — Date:
PE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove X Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
1;4
T Permit No.: 53®3 Lot#:Address: i S? 04 3 SContractor: C,x•r. Q o VOwner:
Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
h-)A 1� f4-�P/LClKs�,
Inspector: -54'_—rf- Date: 03
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation 0 Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
0 Other:
INSPECTION REPORT
y1N G1' Permit N /0 3 3JO,3 Lot #:
Q Address: / O 70 3
Contractor: k (1��w
O Owner:
9s14jNG� Date: ;1`
*APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date: -Z-7 a3
TYPE OF INSPECTION REQUESTED
Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
NG INSPECTION REPORT
p L
?'O Permit No.: 6LD3 Lot#:
Q' Address: 1 0o 7 0 4 l
Contractor: Ll oretlj
-Ys, ,�o Owner:
,qI N Date:` 3
,APPROVAL ❑ PARTIAL APPROVAL
'❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date: s
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry Drainage ❑ Insulation
❑ Other: J
INSPECTION REPORT ��3�►
¢tiIN G TO Permit No.: 5303 Lot #:
Q' Address: Ck-7 3S-T-H
Contractor:
eL'A-j
Owner:
I N Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date: / -�✓�
YPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
=ndation
ting ❑ Drywall, Nailing ❑ Consultation
❑ Shear Nailing ❑ Groundwork
Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
Masonry ❑ Drainage ❑ Insulation
❑ Other:
�t�r 2 :oa
INSPECTION DEPORT
4tiIN G 1'p 17
Permit No.: -` � Lot #:
Q Address: �F-70< !c - r?v
• a l�aC C�1 arc
Contractor:
9s, �O Owner:
IqINO Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION 4 CORRECTION REQUESTED
Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ ALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Dater 3 '/-
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
¢ti1N G?'O Permit No.: 03 5-s"�3 Lot #: G
� Address: � � .� Dq 3,5 ri-✓
Contractor: 0 v'I'S`�
9�,�jN�,SO Owner:
Date: 3._1—o 3
PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
r
Inspector: Date: -'ify
PE OF R&ECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT 711 ,38
N Gr Permit No.: Y3 Lot#:
4" Address: 70�4 1 H
� z
Contractor:
9s, �O Owner:
�I N O Date:
APPROVAL ❑ PARTIAL APPROVAL
Cl VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
eq
Inspector: Date: .:?.
APE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
*ooting ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
0 Other: