HomeMy WebLinkAbout18714 35TH AVE NE_035297_2026 INSPECTION REPORT - �
¢ti1N G rO Permit No.: 7 Lot#:
Q' -- Address: /P 71 L/
Contractor: ��
O Owner:
INC'� Date:
"Cn
W-APPROVAL PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ C 435-0674 FOR RE- SPECTION - 24 hour notice require .
�yL It r
r'
Inspector: Date: r�J �
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in final
❑ Masonry ❑ Drainage ��Irnsulation
❑ Other:
J1I� INSPECTION REPORT 4�iv
4ti1N GrO Permit No.: �Sz� Lot#: l�
Address: k 7/ ,3STi/
Contractor: Ul(,a)
9s, Owner:
SIN
iG Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
d
,
Inspector: Date: '
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
PN`
4ti1N Gr0 Permit No.: Sz-,l 'I Lot#:
Q Address: 19-714 35 A-✓cs
Z Contractor: G a r jovi ej
O Owner:
IN CsS Date: y—1 8 --0 3
A APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date: "Y -/4?-
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
tiZN G?' Permit No.: 9 7-7 Lot#: _
Q" Address: 7"ff
Contractor:
vl ew
O Owner:
9s�INCs� Date:
Pr-APPROVAL ❑ PARTIAL APPROVAL
I] VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
PE OF INSkCTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage nsulation
0 Other:
INSPECTION REPORT
VV, l
¢ti1N G 1'� Permit No.: �� Lot#:
Q' Address: —��LI 35/�
Contractor: QP1<4 U t if co-,
9s, �O Owner:
IN Date:
PPROVAL PARTIAL APPROVAL
VIOLATIO CORRECTION REQUESTED
A-Porrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.,
❑ W s not able to perform inspection.
CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
�-- zi
PUP, 'PeAMtw, ylitk—
n 15 ct L o .,J C
6)9-- ro Q w war t-
Inspector: Z-® Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage — Insulation
❑ Other:
'`ISPECTION REPORT
¢ti1N G rO Permit No.: 7 Lot#:
Address: Z e71
O Contractor:
Owner:
IN O Date: _/0 3
❑ APPROVAL PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
L.L ,3
Inspector: Date:
TYPE OF INSPECTION REQUESTED
El Under-floor ,(��+ raming ❑ Gas Piping
❑ Footing r ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
,2 Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Final
❑ Masonry 'J Drainage Insulation
0 Other:
INSPECTION REPORT �CO
4ti1N G?'Q Permit No.: �� Lot#: �.
4' Address: &71 7-714-
Contractor: U few
�s �O Owner:
4I N Cs Date: �
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
6 6o,;z2Ez n z . _•s zU o 7—
Inspector: r—4"e17` Date: `F
TYPE OF INSPECTION REQUESTED
❑ Under-floor aming ❑ Gas Piping
❑ Footing �r_ft Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage Insulation
❑ Other:
WN INSPECTION REPORT
¢1,IN GrO Permit No.: -& 1 Lot#:
Q" Address: 1%-)Iq A,4ej
Z Contractor:
Owner:
IN
Date: " `
❑ APPROVAL PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date: '
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove M ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
v0
INSPECTION REPORT
ti1N G T Permit No.: 5Z/ 7 Lot #: Le
O �
Q' Address: /b/7 l 3 STy
Contractor: w
O Owner:
IN G� Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
{Cn_) '.il4.-:1-W rlr'r'i
ITLf' L71f c71/'T T� Gt (7• /I f�I�L c i�l.z:.h /Z-f/✓7.
'V f a L
S �tL f)1C•rc�c.�,c/G �L,v c'T,G-I�17�:•'-�S
r)t�crL iCr,JC, r`'rYc. :_3 at,r �'��z,<•:c�
Ins c r: i DYate: `/ ' �.,
TYPE OF INSPECTION REQUESTED
❑ Under-floor Framing )4Gas Piping
❑ ❑
Footing Drywall, Nailing nsultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
Mechanical Grid ❑ Struct. Slab
❑ ood Stove �- Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
N INSPECTION REPORT
441N GTO Permit No.: �iJS'�9� Lot #:
`r Address: la 714 � t�
Contractor: QU !e
Owner:
�s�INTFIC
Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION CTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
LI-CALL 435-0674 FO RE-INSPE ION - 24 hour notic required.
s
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove Rough-in ❑ Final
❑ Masonry >L�, Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
iiIN
?' Permit No.: a3 5zR-1 Lot#:
Address: 143 71 4( 3 5 "` A-vef
Contractor: �� + o y i euj
Owner:
O Date: 3--4—0 3
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
AN
Inspector: Date: `7
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
0 Other:
INSPECTION REPOR'r
ti1N G, ', Permit No.: ✓ � of#: _
4
Q' Address:
Contractor: l/ L
O Owner:
9s ING� Date: l
APPROVAL ❑ PARTIAL APPROVAL
/0 VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
(Llko;
Inspector: / Date: — / �7 C�
TYPE OF INSPECTION REQUESTED
nder-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
\fin INSPECTION REPORT
N GTO Permit No.: 03 - )17Lot It: (1�
F' Address: f b-7I q c�
Contractor:
ems, ,S4 Owner:
ht r N O Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION 'CORRECTION REQUESTED
Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspector: Date: /7 e
TYPE OF SPECTION REQUESTED
Under-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
�Px_"V G T Permit No.: ` Lot#:
Address:
� z
Contractor: aLVL UL e )
Owner:
i N Date:
❑ APPROVALPARTIAL APPROVAL
❑ VIOLATION Za�CORRECTION REQUESTED
0-Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry Drainage ❑ Insulation
❑ Other:
n� INSPECTION REPORT
1;i
r0Permit No.: 7Lot#:Address:Contractor: h1
4 Owner:� Date: "
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: % Date: �J3
PE OF INSOECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
ndation ❑ Shear Nailing ❑ Groundwork
Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
ti1N G?' Permit 3 Vr Lot #:
Address:
Contractor:
,S0Owner:
�j N C' Date: �_3 1��
,4�PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspector: Date:
PE OF INSPECTION REQUESTED
❑ nder- loor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
❑ oundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
C I TY OL= ARL_ I NGTON
C O N S T R U C T I O N P E R M I T
P E R M I T N O_ = 0 3—5 2 9 7
Orner: GRANDVIEW INC PO BOX 159 ARLINGTON 98223
Value of Work: $84, 000. 00 Tax ID: NOT YET ASSIGNED Phone: 435-7171
Describe Work: NEW SINGLE FAMILY RESIDENCE
Proposed Use: SFR
Legal Description: WHISPERING BREEZES LOT 6
Job Address: 18714 35TH AVE NE
Contractor's Name Type Address License#
GRANDVIEW INC. GEN P O BOX 159 GRANDI*065D1
JEFF J & C HEATING MEC 120 SE EVERETT MAL WAY JCHEA**005RJ
EMERALD PLUMBING PLB 1511 S GRAM
P E R N I T F E E S
Equipment and Fixtures (Lumber Fee Total Charge
---------------------------------------- ------ -------- ------------
PLUMBING FIXTURES 12 $10. 00 $120. 00
FURNACE/UNIT HEATER 1 $15. 00 $15. 00
VENTILATION FANS 5 $7. 00 $35. 0O
DRYER 1 $11. 00 $11. 00
METAL FIREPLACE & CHIMNEY 1 $11. 00 $11. 00
WATER HEATER 1 $15. 00 $15. 00
GAS PIPING 1-4 OUTLETS 1 $6. 00 $6. 00
S U B T O T A L. . . . . . $213.00
TOTALS Fee
Permit Fee $1, 221. 90
Equipment $93. 00
Fixture $120. 00
Mech Permit $24. 00 --
Plan Fee $794. 23 �`lu Park Mitigation $1, 000. 00
Plumb Permit $25. 00
State fee $4. 50
SIGNATURE:
TOTAL FEE. . . . . . . . . . . . . . . . . $3, 282.63 I REBY CERTIFY THAT I HAVE READ
AN XAMINED THIS APPLICATION AND
PAYMENTS. . . . . . . . . . . . . . . . . . $500. 00 KN W THE SAME TO BE TRUE AND COR-
RE T ALL PROVISIONS OF LAWS AND
TOTAL DUE. . . . . . . . . . . . . . . . . $2, 782.63 O I ANCES GOV NIN THIS TYPE OF
K WILL PLI D WITH WHETHER
C FLED 0 NOT.
DATE RECEIPT #
LDIAG C AL
,,// �Y�
REVISED.
�or2TI� -S4�LE
So.00 10.00
/o t y��o
O �
i
0
P.u.O
f 2,vr+t` l7�yen
T�oG� 997 RECEIVED
JAN 0 9 2003
CITY OF ARLINGTON
� 3 - sz� 7
CITY OF ARLINGTON
CONSTRUCTION
PERMIT ,5
❑ COMBINATION V 3 �v���
❑ BUILDING ❑ MECHANICAL ❑ PLUMBING ❑ SIGN
OWNER
PERMIT NO.
j �IAIL ADDRESS
Grandview, Inc. PO BOX 159 Arlington 9ZIP
8223 P ONE
(360) 435-7171
ARC1I11ECI OR DESIGNER
MAIL ADDRESS CIiV ZIP PIIONE
Creasey CAD 111 SE Everett Mall Way Everett 98208 (425) 349-7769
G)1UAT-C-O TKTCTU MAIL ADDRESS
C11 Y ZIP PIIONE IC
Grandview, Inc. PO BOX 159 Arlington 98223 GRANDI*'065D1
MILC IANICAL CONIRACIOR MAIL AUURESS
C11Y ZI
J&C Heating PO BOX 1086 P PIIONE LICENSE t
Marysville 98270-1086 (360)654-9893
PLUMBING CONTRACIOR MAIL ADORE SS
CITY LIP PHONE LICENSE/
OF F WORK ld Plumbing 1511 S Gram Camano Island 98292 (360) 387-4022
Cl%SS WORK
� X�'NLW ADDITION ALTERATION ❑REPAIR ❑DEMOLIIION ❑BUILDING RELOCA[ION
VALUAIIUN OF WORK
! o
OLSCRIBE WORK
New Construction
M PRUPOSI D USE OI BUTLE ING
M Sin le Family I HEREBY CERTIFY THAT I IIAVE READ AND EXAMINED THIS APPLICA-
Z UEGAC_ sr.RlruuNOr raoPERTr SN051fN BElOWUR AilACN 1UURCOPIFS TION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVI-
SIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK
LUI 6 gLUCk OF Whispering Breezes WILL BE COMPLIED WITH WI IETHER SPECIFIED HERIN OR NOT.THE
d GRANTING OF A PERMIT DOES NOT PRESUME.TO GIVE AUTHORITY TO
VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
TAX ID NUMBER PROM PROPERTY TAX STATEMENT LOCAL LAW REGULATING CONSTRUCTION OFTHE PERFORMANCE OF
CONSTRUCTION.PERMIT EXPIRES 1 YEAR FROM DATE OF ISSUANCE,
J i1)VA pl)R 5. SIGNATURE Or CONIFAC10ROR AUINORIZED AGENT DATE
jWNCB USB ONLY)
PLUMBIIIo —
MECHANICAL
No. TYPE OP PIXrURO Pau R i PIXTURUS NO. TYPO OF O
0
UIPM[?TT
WATER CLOSBr(TOILUr) f7.00 PBO s'e PIXTURBS
%!n COND.UNITS-Ill. OA ul .list"`�• Killl'UB $1.00 tEPRICIERATION UNI1S-lll.EL& ui .UK'•3 VATORY ASI I BASIN 17.00 IOILBRB-ll r.BA
ul ,Ild•'
MOWER 17.00 AB FIRED A.C.UNTrB-TONNAOBEA. ul .11A
1 TCI18N SINE:3 DISPOSAL .00 1 ORCEO AIR SYSTEMS-B.T.U.
UNDRY TRAY MBA 1l.00
I )ISIISVASIIBR $$7.00 ALL IIBATBRS-B.T.U. ►tit
!7.00 LO111D9 WASHERNIT IIBATERS-B.T.U. ►4 30.00
I iT.00
( _ VAP ORATI V B C OO LE U
DR HEATER $1.00 I 11.0111E9 DRYERS 1d30
RINAL 11.00 S MiTILATION PAN
RINKINU FOUNTAIN 117.00 XANG8110013 COMMERCIAL 1430
tLOOR DRAIN 17.00 1i30
AIR ItANDLINU UNIT- CPM
ACUUM DRBARBRS 11.00 ( 'OVE
OOP B
DRAINS-RAINLBADR9 1iS0
,— t7.00 � LEGAL PIREPLACB Q CIIIMNOY 1130
INIC SERVICE-BAR RIC. 17.00 I ATOR IIlTKC19t 1430
t AS PIPING •(up lu 1 T 13.00 eddel. i 7S
•13qulpelenl Iblmud bepEorlded
SUB TOTAL
8U8 TOTAL
PERMIT
PI9LM17
TOTAL PBO TOTAL FES
SIOLY•111bS IgACK STRLOsLIBACK REAR YAM)SEIBACK PLANCIIECKNUMBtg PLAN CIIfCkF E
USI LUNI LOT ARtA
FEE RECEIPT NO,
vACANI SIZE
V_— j O WYES El No FEES VALUATION FEE
TYPE OI CONS I_ OCCUPANCY CROUP N0,OF DWELLING UNI IS PLAN CIIECKINO VO
v - 7J � �, � i 1 79 '1 _Z
$I/.L DI AU>L., No.or Slu N.s M`nX•OCC.LOAD BU'LDINO t I Q
1112 L r �3
Z PLUMBING
FIRE SPRINKLE REQUIRED
IRECTTi�f•7TCAL �ai� / �G L,
COMMENTS STATE BLDO.CODE
ENERGY CODE SURCHARGE L(
450
PENALTY U.B.0
SEC.iU3(.)
7 WATER/SEWER FEE5
—
TOTAL
PERMIT VALIDATION
WI IEN PROPERLY VALIDAIED (IN 11IIS SPACEI TI IIS IS YOUR PERMIT&RECEIPT
® PAID _CRM BY
CITY OF AKINGTON
cc-ASSESSOFI, APPLICANT, TREASL1rlEr1, BLOO. DEPT. DUIICIN^,p1TICIAL DATE
ITEconDS COPY