HomeMy WebLinkAbout12916 56TH AVE NE_014640_2026 INSPECTION REPORT v
NG
¢1,1 ?'0 Permit No.: Lot#:
Address: 5l
� Z Contractor:
-Ys, S4 Owner:
�l N Date:
TAPPROVAL El PARTIAL APPROVAL
IOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in / --)K�Final
❑ Masonry ❑ Drainage ❑ Insulation
0 Other:
INSPECTION REPORT
N GTO Permit No.: l41 Lot #:
Address: ZKO
Contractor: /7 _-
9s, ,S4 Owner:
SIN GDate:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION O\RRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
f -7- /A& L J
Inspector:Z6_:�ADate: _ '
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
Permit No.: equgD Lot #:
Address: '
Contractor:
9s, ,S4 Owner:
4INO Date: ID "/c1
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspector: Date:
Z!4�'- ��-7
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing Drywall, Nailing ❑ Consultation
❑ Foundation /❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
0 Other:
INSPECTION REPORT
¢y�N G rO Permit No.: 0 Lot#:
Address:
Contractor:
9s�j N G�O Owner: _
Date:
APPROVAL El❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date: �A5/—ZS -0/
YPE OF I SPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
Mechanical ❑ Grid ❑ Struct. Slab
Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage Insulation
❑ Other:
INSPECTION REPORT
4ti1N G TO Permit No.: < ` U Lot#: 5
Q' Address: Z U 3 3 / S
. h �� � Contractor:
rys, rSr/
Owner:
IN Date: C I
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
tkrlv� M12
^ z
Inspector: Date:
E OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
)4 Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage Insulation
❑ Other:
INSPECTION REPORT
¢tiZN G TO Permit Nco t au`l o Lot#: J l
Q' Address: e�02
Contractor: al) 6T
O Owner:
�s�I N
1G� Date: Cvo-6)/
APPROVAL --E PARTIAL APPROVAL
VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approveG
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.Ci �z
� o
Inspector: �r Date;/� ' /a ^�f7
TYPE OF INSPECTION REQUESTED
❑ Under-floor ,5 raming ❑ Gas Piping
❑ Footing /(J Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
C
Permit N cQ/_ LJ�&7.�O �Lo�t v#T:
Address:
Contractor:
O Owner:
� ;��✓4U�
Date: (U - -c
❑ APPROVAL APARTIAL APPROVAL
❑ VIOLATION ❑ RRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing `-- Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
(� ❑ Foundation ❑ Shear Nailing ❑ Groundwork
`�-- Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
¢ti1N Gr0 Permit No.: L Lot#:
Q" Address: i k�_2> 2/
� z
Contractor:
Owner:
I N Cs Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approveG
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
�r
E C. L f�CQ '
Inspe tor: Dai '-
PE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ><Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
4�yIN G7'O Permit No.: �F Lot #:
`r Address: -3d 5
� Z Contractor:
Owner:�I N O,tO
Date: C`
�PPROVAL ❑ PARTIAL APPROVAL
uvOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
1
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
0 Other:
INSPECTION REPORT
¢ti1N G, ', Permit No.: 4 A D Lot#:
Q' Address: 1 Z13LO3 I st—
. �
� Z Contractor:
Owner:
9S�j N GEC Date: �— I
APPROVAL ❑ PARTIAL APPROVAL
VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 4 hour notice required.
Inspector: y�—J Date: ,
TYPE OF INSPECTION REQUESTED
Under-floor ❑ Framing ❑ Gas Piping
/❑ `Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
9A INSPECTION REPORT
1 NG '' nn
Permit No.: l�' Lot#:
Address: �.3 IS7-
Z Contractor:
O Owner:
Date:
d �
APPROVAL ❑ PARTIAL APPROVAL
VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approveo
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
1 \
Inspector: Date: - C
OF INSPECTION REQUESTED
Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
AA INSPECTION REPORT
4ti1N G TO Permit No.: Lot #:
Q" Address:
s •
� Z Contractor:
0 Owner:
Date: -
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
I
r
Inspector: Date: `
TYP 9F INSPECTION REQUESTED
4
under-floor ❑ Framing ❑ Gas Piping
0 Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
41,IN G r0 Permit No.: l=-Q 6? Lot#:
Q' Address: / S(--l- 3 - 3 JT A'q�
• �rc�Contractor: d-6
Owner:
�I IN Date:
PPROVAL ❑ PARTIAL APPROVAL
❑ V LATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date: '—
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry �' Drainage ❑ Insulation
Q Other:
n INSPECTION REPORT
¢L1N G Q Permit No.:O� &4 Lot#:
• •
Address:
� Z Contractor:
,SO Owner:
LINO Date: — c _ fQ l
PPROVAL ❑ PARTIAL APPROVAL
❑ VIO TION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
l�-_' o� ��rn A ►Z
7\� Ll
Inspector: Date: - C
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
0 Footing ❑ Drywall, Nailing ❑ Consultation
Foundation ❑ Shear Nailing ❑ Groundwork
Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
W 4ti1N G TO Permit No.: ()1 `7 W Lot#: 51
Address. 3 ��S �-P4� i
Contractor:
Owner:
IN G Date: -7
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
T PE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
Foote ❑ Drywall, Nailing ❑ Consultation
❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
C I YV OF TARL I NOYON
CONSTRUCTION RERM I T
PERMIT NO-
Owner: DB JOHNSON 1801 GROVE ST ARLINGTON 98270
Value of Work: $10,000.0.0 Tar. ID! 009208-000-059-00 `hones 360-659-1579
Describe Work: NEW S=R
Proposed Use: SFR
Legal Description: BRICKWOOD LOT 59
Job Address: 18803 31 AVE
Contractor's Name Type Address License#
D B JI7HaiSO` CONSTRUCTION GEN 12916 56 3 H AVE NE DBJDHC*180NB
-- - P E R M I T F E E S
i s
f Equipment and Fixtures Number Fee Total Charge
t
9 `
PLUMBING FIXTURES 14 $10.00 $140.00
FURNACE/UNIT HEATER i $15.00 $15.00
GAS STOVE 1 $11.00 $11.00
VEiTILATION FANS 4 $7.00 $28.00
DRYER 1 $11.00 $11.00 ,
WATER HEATER 1 $15.00 $15.00
GAS PIPING 1-4 OUTLETS 1 $6.00 $6.00
SUBTOTAL...... $226.00
TOTALS Fee
Permit Fee $993.75
Equipment $86.00
Fixture $140.00
Lakewood School Mit $1,797.00
Mech Permit $24.00
Plan Fee $645.94
Park mitigation $1,077.00
Plumb Permit $25.00
State fee $4.50 ?READ
SIGNATU ETOTAL FEE..... ............ $4,793. 19 I HEREBY CERTIFY THAT
AND EXAMINED THIS APPLICAT . _ AND
PAYMENTS.................. $ 0.00 KNOW THE SAME TO BE TRUE AND COR-
RECT ALL PROVISIONS OF LAWS AND
TOTAL DUE.. ............. .. $4,293. 19 ORDINANCES GOVERNING THIS TYPE OF
WORK WILL BE COMPLI WITH WHETHER
DATE RECEIPT #
Dff
ILD- - OFFICIAL
PAID
JUL 2 3 2001
0
C
Le 7-17- I
CITY OF ARLINGTON
1533 CONSTRUCTION
PERMIT
❑ COMBINATION x-54 BUILDING MECIIANICAL ❑ PLUMBING ❑ SIGN PERMIT NO.61'49
j OWNER MAIL CITY ZIP PIIUNE
DSI TnNNSnrtT rONSTIt TTON TNr 1801 R 0 V ST MARYS T WA 659 1579
ARCIIITkCT OR DESIGNER MAIL ADDRESS CITY I1/ ►IIONE
GWERAL CON I RACtURMAIL ADDRESS CITY ZIP PIIUNE LIC S
La>{InNicALco LLAETOR r ,E SAME DBJOHCIO44BA
MAIL ADDRESS CITY ZIP PIIUNE LICENSE I
PLUMBING CONTRACTOR MAIL ADDRESS CITY ZIP PIIUNE
LICENSE/
tn CLASS OF WORK
¢®NLW ❑ADDITION ❑AL TE RAT 1011 ❑REPAIR ❑DEMOLI I ION ❑BUILDING RELOCATION
Q VALUATION OF WORK
I
DESCRIBE WORK
M PROW U USt OF BUILDING
y I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICA-
j 116AL N1 /RUPLRT
D Sf R vtI OI Y S)IOwN BELOW< R A1IAC11 I OUR COPIES) TION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVI-
�Q SIONS OF LAWS AND ORDINANCES GOVERNING TI-115 TYPE OF WORK
j LD15nLOCK • or. RRTrKW 1DT) WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT. THE
n GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO
u OD9zOg-DDT-OSq p� VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
TAX ID NUMBER FROM PROPERT' TAX STATEMENT LOCAL LAW REGULATING CONSTRUCTION OF THE PERFORMANCE OF
CONSIRUCTION, PERMIT EXPIRES 1 YEAR FROM DATE OF ISSUANCE,
jIUB AUURLSS SIGNATURE Of CONTRACTOR ORAUTIIORIZEDAGENT DATE
y8�2-3 x f I ugttL PG,�d-o'
(UIII'ICB USD UNI.Y) 0
PLUMBING IICIIANICAL
NU_ TYPE OF PIXTURO PDD :'.PIXIURI_'4 NO. TYPO OP DOUIPME NT PDD I'm PIX'IURIIS
_A1IIR CLOSDT('TOILOT) IR COND.UNITS-ILP. EA. d ,Ilg(••
2 IATIl7VD tI'J'RIOIRATION UNTIS-II.P.1 A. ul .Ilg('•
3 -AVAIURY(WASII BASIN) _ IOIE.BRS-II.P.IIA. .IP IA•
2— IIOW[R IAS PIRUD A.C.UNII'S-I'ONNAUBEEA. 1glip.Ii.t•• _
1 IICIIEN SINK R DISPOSAL 'OR(MO AIR SYSTEMS-B.T.U. MESA
1 ISIIWASIIeR ALL IIEATERS-D.T.U. M -
-►UNDRY TRAY )NIT IIWE"-D.T.U. M
1 :Loll IRS WASIIER VAPORATIVBCOOLIRS
]` VATOR IIEA'TL'!L _ 1 LOTIIES DRYURS
)RINAL —
4 VENTILATION PAN
)KINKING POUNI'AIN —�` IANOE IIOOD COMMIIRCIAL
'LOOR DRAIN / IR HANDLING UNIT- CPM
ACUUM DROAlTBR3 1ilova
OOP DRAINS-RAINLE'hUOR9 OTAL PIREPLACO R CIIIMNOY —
'INK SURVICO-BAR QIC. 1 AIFRIIISATM
AS PIPING .(UP to S 8.75
u( inert II.L mug( be Pf00jed
SUB'I UI'A L SUD 1'0'1'Al,
PISRMII,
TOTAL PBII TOTAL POD
SIUL YARU IBACK SFRI.0 St[SACK REAR YARD SETBACK PLAN CIIECK NUMBER PLAN CIIECK FEE
S RECEIPT No_
USI /UN LOT ARIA VACANT SITE ((L
[ vIS ONO FEES VALUATION FEE
1YPL OF COI( OCCUPA CY 'ROUP NO.Of DWELLING UNITS PLAN CHECKING VO (7l
SILL UI BLDi.. NO.OF ST RILS MAX.OCC.LOAD BUILDING
3H PLUMBING Gc"
J _ I IRE SPRINKLERS REQUIRED J
/�(I' ❑YES &NO MECHANICAL /r1
COMMENTS STATEBLDG.CODE L✓
ENERGY CODE SURCI IARGE yi /S�
PENALTY ���� SECC)O)I•) 097 C./�
RECEIVED WATER/SEWER 4 1,11 O co
MAY 2 9 2001 TOTAL �a /�
PERMIT VALIDATION
WI IEN PROPERLY VALIDATED (IN TI US SPACEI ItIIS IS YOUR PERMIT IL RECEIPT
CITY O AR
F UNGTON PAD_ __I CRII BY
cc: ASSESSOFI, APPLICANT, TITEASUITER, BLDG. DEf T RTRUNGOEEICIAL - ' DATE
RECOnDS COPY
OFFICE COPY
D.B. JOHNSON CONSTRUCTIO,. NC. REVIS BY
Brickwood
LOT #: 59 *ql 0 4 4/06/01 kjh
ADDRESS: 18203 31 ST AVE NE 05.08.01 bap
Arlington, WA 98223 05.24.01 bap
TAX ID #: 009208-000-059-00
I NORTH
1 = 20
SEWER PROPERTY
10' PRIV
DRAIN ESMT STUB LINE STORM
DRAIN
51.85'
59 w
N v
o� BUILDING
N FOOTPRINT
ROOFLINE
II cy)
5. 1 ' _ _ ___._ _w_ 0'
ol
PLAN 1533
2C GAR. o
OVRD. PRCH.
5.0' 7.3 0' UTIL
o N ESMT
N C)
SIDEWALK
52.46'
WATER URB
METER
0
0
LL 31 ST AVENUE NE
RECEIVED
MAY 2 9 2001
CITY OF ARLINGTON
APPROX. IMPERVIOUS AREA: 1946 S.F.
DOWNSPOUTS TO YARD DRAINS
LOT AREA: 4823 S.F.
05/24/01 08:07:59 AM