HomeMy WebLinkAbout18129 31ST AVE NE_014639_2026 \� INSPECTION REPORT
4ti1N GTE Permit No.: Lot #:
Q' Address:
Z Contractor:
9s, �O Owner: II
IN Date: �� 4
9� PROVAL ❑ PARTIAL APPROVAL
`'0 VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
oe
Inspector: Date: -�
YPE OF IN PECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in q. Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
�r
ii
?' Permit No.: `tr!PJGI LotAddress: el.22 3/Contractor: c��Owner:
G Date: JC2 -k-o /
PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approves,
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: C Date:
PE O ASPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing 'Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
,A INSPECTION REPORT
1N G?'O Permit No.: �l-`t� Lot #:
Q" Address: 315�`
Z Contractor:
4 Owner:
I N Cs Date:
APPROVAL El PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
/A- --2,-
TYPE OF INSPECTION REQUESTED
❑ Under-floor Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
A Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage Insulation
❑ Other:
INSPECTION REPORT
4ti�N G rO Permit No.: J� Lot#: _
Q Address: l ��c�-�1 3/57
• •
� Z Contractor: l�
��, �O Owner:
ZINC Date: t°D ' j-b 1
❑ APPROVAL @PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approver,
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
L�VT 'vl /Z wt
Inspector: Date:
PE OF INSPECTION REQUESTED
❑ Under-floor ,�raming ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
ti1N G?'O Permit No.: Lot
Address:
Contractor: l
O Owner:
IN G� Date:
❑ APPROVAL 'PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approveG
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
44
,..Z
Inspector: Date:
YPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
� nn -
4titN G TO Permit No.: lJl � Lot#:
Q' Address: 31 S1
Z Contractor:
93, ,t0 Owner:
�IN Date: -/ 7-C f
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: _ Date:
YPE OF INSPe CTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove $ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
I �
i 4ti1N G TO Permit No.: / (1� Lot#:
Q' Address: 1�'`7 1
Z Contractor:
9s, ,SD Owner:
I N C' Date:
APPROVAL El PARTIAL APPROVAL
VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice req ed.
Inspector: ZDate:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical :1 Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
\ IN GT — � Q �S
�1 O Permit No. J Lot it:
1
Address:
Z Contractor:
Owner:
LINO
Date: '
APPROVAL ❑ PARTIAL APPROVAL
❑ LATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: / Date:
TYPE OF INSPECTION REQUESTED
Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
' r
4titN G?'O Permit No.: ) `� 3 q Lot#: 5
4' Address: 9 _') I
Contractor: �
��V61
�OOwner:
$ NG Date: G
4 PPROVAL El PARTIAL APPROVAL
❑ V70LATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry -3 Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
¢ti1N G?'O Permit No.: Lot#:
Q' Address: «5 31
Contractor:
O Owner:
9s IN
1qiN G� Date:
:,`),APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
KO
Inspector: / ZYDate
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
/� Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
0 Other:
INSPECTION REPORT
ii
?'OPermit No.: 0/t (,� � LotAddress: ��,�9 jContractor:Owner:
' Date: 7
0
PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
r D✓ L(i �'��
Inspector: Date:
PE OF INS ECTION REQUESTED
❑ U er-floor ❑ Framing ❑ Gas Piping
ootin^ ❑ Drywall, Nailing ❑ Consultation
❑ Shear Nailing ❑ Groundwork
Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
CITY CF ARL I NO-roN
CONOYRUCY I Out PERM I T
PERMIT No-
Owner: DB JO,HNSON CONSTRUCTION 1801 GROVE ST MARYSVILLE 18 70
Value of Work: $100,000.00 Tax ID. 009208-600-058-00 Phone: 360-659-1579
Describe Work: NEW SINGLE FAMILY RESIDEINCE
Proposed Use: SFR
Legal Description: BRICKWOOD LOT 58
Job Address: 18129 31ST ST AVE NE
Contractor's NaZe Type Address License#
DB JOHNSON CONSTRUCTION GEN 1801 GRG% E S T DBJOHCe04uBA
- -- P E R M I T F E E 5
Equipment-and Fixtures Number Fee Total Charge
-- ------ - ---- ------- -----------
1 PLUMBING FIXTURES 14 $10.00 $140. 00
FURNACEIUNIT HEATER 1 $15.00 $15.00
GAS STOKE 1 $11.00 $11.00
VENTILATION FANS 4 $7.00 $28.00
DRYER 1 $11.00 $11.00 f
WATER HEATER 1 $15.00 $1.5.00
GAS PIPING 1-4 OUTLETS 1 $6.00 $6.00
SUBTOTAL... ... #226.00
TOTALS Fee
Permit Fee $993.7,5
Equipment $86.00
Fixture $140.00
Lakewood School Mit $1,797.00
Mech Permit $54.00
Flan Fee $645.94
Park Mitigation $1,077. 00
Plumb Permit $25.00 }
State fee $4. 50
SIGNATURE:
TOTAL FEE............... .. $4,793. 19 i HEREBY CERTIFYU
AND EXAMINED THIS APPLICATION AND
PAYMENTS... ...... ......... $500.00 '.NOW THE SAME TO BE TRUE AND COR-
RECT ALL PROVISIONS OF LAWS AND
TOTAL DUE. ................ $4,293. 19 ORDINANCES GOVERNING T S TYPE OF
WORK WILL BE COMPLIE ;dI-y WHETHER
SPECIF I= '�E.
DATE RECEIPT #�
BUILD7 OFFICIAL
PAID
qu 3 2mi
CITY OF ARLINGTON
1533 CONSTRUCTION
PERMIT
❑ COMBINATION )N BUILDING ❑ MECIIANICAL ❑ PLUMBING ❑ SIGN PERMIT NO.
j OWNER MAIL ADDRESS CITY ZI► PIIONE
DB JOHNSON CnNSTRTI(`TTQN TN 1801 GROVE ST Mr. ?YSVIL.LE, WA 659-1579
A0.CIIITECi OR DESIGNER MAIL AUURESS CITY ZI► PIIONE
GENERAL CONTRACTOR MAIL ADDRESS CITY Zip PIIONE LICENSE N
SAME SAME SAME DBJOHCIO44BA _
LCIIANICALCONTRACTOR MAIL ADDRESS CITY zip r11ONE LICENSE )_
PLUMBING CONTRACTOR MAIL ADDRESS CITY zip PIIONE LICENSE N
3 CLASS OF WORK
Q®NEW ❑AUDITION ALTERATION ❑REPAIR ❑DEMOLIIION ❑BUILDING RELOtATION
Q VALUATION OF WORK
f
l2C,I OISCRIDE WORK
Co ►RUPUSI U USE Of BUILDING
In I HEREBY CERTIFY THAT I I IAVE READ AND EXAMINED THIS APPLICA-
w TION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVI-
1 t Lnl aRs('a1PIN of lO raovtatr SIFOWN BELOW OR AT LAC II I OUR COMES) SIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK
LUI 5" RLOCK . Or RRTCwwnnn WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT.THE
Q GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO
J042Og-Ono-off Q -60 VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
TAX ID NUMBER FROM PROPERTY TAX STATEMENT LOCAL LAW REGULATING CONSTRUCTION OF THE PERFORMANCE OF
_ a _ I-57- � i) CONSTRUCTION. PERMIT EXPIRES 1 YEAR FROM DATE OF ISSUANCE.
/7 SIGNATURE OF CONTRACTOR OR AUTHORIZED IORIZED AGENT DATE
V TUB AOURLSS 9p�3
jo'I+i'icB usB ONLY -
P LUM DI N O L'CI IAN ICAL
NO. TYPE OpPIXYURR PER s'ffPIXIURBS NO. _ TYPROPEOUIPMUNT PEB :iPIX717RpS
_3 AIMR.CLOSET(rolL1Tr) IP COND.UNI IS-II.P. PA. ! dp.11.t••
2 IATIITUB LU RIOERATION UNI I9-II.P.Ell 1qu1p.11K•'
3 -AVAI'OILY(WASII HASIN) _ TO 1.111119-II.P.RA. Nsi .le ts(
2— IIOWQt IA;PIRBD A.C.UNr1'3-I'ONNALI[I[LA. ' td .IIA•
1 1'TCIIBN SINK A DISPOSAL IOLU ID AIR SYSTEMS-H.T.U. META
1 ISIIWASIiBR WALL IIRA'r[!RS-D.T.U. M _
-AUN DRY TRAY )NIT IIRAlV S-B.T.U. M
1 'L011ISWASIIER 3VAFORATIVRCOOLERS
I_ ATBRI[ENT M LOTIIPSDRYERS r
RINAL ✓ Q V13NTILATION PAN _
)RINKINO POUNI'AIN tANUE IIOOD COMMERCIAL
'LOOK DRAIN NIR HANDLING UNIT- CPM
ACUUM DRBAKERS nova
0011 DRAINS-RAINLUADBR9 ARrAL PIR_EN-ACB A CIIIMNBY
'INK(SERVICE-BAR.1111C.) 1 AILrR IIETAI[9
—— lAS PIPING (up to S-f) 'I sddnI.-S.7$
•Pqulpment Ilrtnurt beprovl d
SUII'1'U'I'AL SUIT lOI'AI,
P17tMlI' rimm T
To'rA PER TOTAL PHIS
SIUL Y.IRU LCI BA CK 51RELI SL IBACK REAR YARD SETBACK PLAN CIIECK NUMI ER PLAN CIIECK FEE
E RECEIRTyN (/
�O
USl' / N LOT AK.F./5 VA NT SITE �4
✓IJ $1 S YES I]NO FEES - VALUATION FEE
TYPE UI co as OC�UPA►NCY 'RUMP NO.OF DWELLING UNITS PLAN Cl IECKING NO LIT/ V
3 / BU'LDIN; 1 `p�SIZE UI BLUb No. 0 Of )RTLS MAX.(//�. 7 5
LOAD _� _
Ll G PLUMBING 1 65- 0v
�J I IRE SPRINKLERS REOUIRED C. v_�
❑YES NO MECHANICAL 1
s
COMMENTS STATE BLDG CODE
® / (�
G � ENERGY CODE SURCI IARGE 1
PENALTY S SE ]0)(m) , ,
RECEIVED WATER/SEWER FEES
TOTAL
1 PERMIT VALIDATION v _/
WI TEN PROPERLY VAIIDATEO TIN Ti ITS SPACE) THIS IS YOUR PERAIIT b RECEIPT
CITY OF ARLINGTON PAID CR11 BY
b I
cc: ASSESSOR, APPLICANT, TREASURER, BLDG. DEPT. DURDINnorrICIAL DATE
nECORDS COPY
D.B. JOHNSON CONSTRUC'� , INC. OFFICE COPV REVIS BY
Brickwood
LOT #: 58 40 0 !!1 4/06/01 kjh 0 i?70 di UADDRESS: 18129 31 ST AVE NE 05.08.01 bop
Arlington, WA 98223 05.23.01 bop
TAX ID #: 009208-000-058-00
NORTH
1 = 20
n�
l
PROPERTY
SEWER STORM LINE
STUB DRAT
0' PRIV
DRAIN ESMT
51.8 '
58
00 —ROOFLINE
1
BUILDING
FOOTPRINT
6.8 ---------- C5.0
0'-0":
_ PLAN 1533
00
N
o
2C GAR. o
tVRD. PRCH.
,3
6.5 5. ' 0' UTIL
ESMT
� o
SIDEWALK �- 51 .80'
HATER
CURB METER
I,�
0
0
LL 31 ST AVENUE NE
RECEIVE[`
MAY 2 9 2001
CITY OF ARLINGTON
`L4(p
APPROX. IMPERVIOUS AREA: 1946 S.F.
DOWNSPOUTS TO YARD DRAINS
LOT AREA: 4815 S.F.
05/24/01 01:21:15 PM