HomeMy WebLinkAbout19705 47TH AVE NE_014494_2026 pm �e INSPECTION REPOT
iio
Permit No.: a/ 7 7 7 LotAddress: 1 q �d gWContractor:
Owner: /%Gn � C �11l1
Date:
':�APPROVAL ❑ PARTIAL APPROVAL
VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approve
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspector: Date:
PE OF IN PECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in A Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
h� INSPECTION REPORT
1N G T
ti O Permit No.: ! `t ` J Lot#:
4
Q' Address: � P
Contractor:
�O Owner:
�r�G Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ LATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
'Z�L
Inspector: Date:
XPE OF INSPE TION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
ti1N G TO Permit No.: 441 � Lot#:
Address:
1'770S
•
Contractor:
O Owner:
Ai4so�
N G
Date: 16 _1
VPPROVAL El PARTIAL APPROVAL
VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date: '
E OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing _?4�Qas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ? ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage -,0- rLsulation
❑ Other:
INSPECTION REPORT
¢SIN GrO Permit No.: l' Q `� U / ILot #: 3
Q Address:
Z Contractor:
GAO Owner:
�I N Date:
❑ APPROVAL ARTIAL APPROVAL
❑ VIOLATION ❑ ORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor Framing ;a,—,Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ ,Shear Nailing ❑ Groundwork
Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
ti1N GrO Permit No.: Lot#:
Address: l 4 lb S 7
Contractor:
O Owner:
9s�IN G� Date:
PROVAL ARTIAL APPROVAL
❑ VIOLATION A]�ORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing )KDrywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
�����y�q
1;4
I11 Permit No.:C6/ "- A V Lot #:
Address:Contractor:
4 Owner:
G� Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RFC-INSPECTION - 24 hour notice required.
' o (Fd '0 oc,
L ,
an -e
Ulu
Inspector: Date-
�::�
TYPE OF INSPECTION REQUESTED
Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation At Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove a Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
Permit No.: �l - Lot #:
ii
Address: f?7C�S-`Contractor:
Owner:O Date: d ref
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
z7L
Inspector: '. Date:
YPE OF INSPECTION REQUESTED
Under-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
4ti1N C.TO Permit No.: �� y Lot #:
Q' Address: /I 26`S
Contractor: .I/
O Owner:
`r IN C3� Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION C'-CORRECTION REQUESTED
❑ Corrections listed below MUST B MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
CALL 435-0674 FOR RE-INSPECTI N - 24 hour notice required. y
J dk
Inspector: Date:
T PE OF INSPECTION REQUESTED
❑ Under-floor X Framing AGas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
Foundation ❑ Shear Nailing ❑ Groundwork
Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove X Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
J
OPermit No... / Lot #:
Address: -7
� Contractor:�O L
Owner:
�`-'
INO Date: /Ly
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
j
Inspector: 4yDate:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ough-in ElFinal
❑ Masonry ?❑ Dr_ainage ❑ Insulation
❑ Other:
INSPECTION REPORT
1N G T , I C�.�j'
4~ O Permit No.. b —Q Loth" Address: 9 D,S �-7 A_Ve lUE-
Z Contractor: 1��-I
9s, ,S4 Owner:
I N G Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date: .?
YPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
C I -rY OF ARL I N(3TOf-'_
CONSTRUCTION RE:RM I T
F),ERMIT NO_ _ 01-4A+94
Owner: DUAL, MONTE 19705-47 AVENUE ARLINGTON 98223
Value of Work: $88, 000.00 Tax ID: 5646-000-003-0006 Phone: 360-403-0935
Describe Work: 2502 SO FT ADDITION & REMODLE
Proposed Use: R-3/U-1
Legal Description: SAV TURN DIV 2 LOT 3
Job Address: 19705 47 AVE
Contractor' s Name Type Address License#
OWN
P E R Mf I T F E E S
Equipment and Fixtures Number Fee Total Charge '
--------------------------------------- -
PLUMBING FIXTURES 7 $10.00 $70.00
FURNACE/UNIT HEATER 1 $15.00 $15.00
VENTILATION FANS 2 $7.00 $14.00
DRYER 1 $11.00 $11.00 '
WATER HEATER 1 $15.00 $15.00 '
GAS PIPING 1-4 OUTLETS 1 $6.00 $6.00
SUBTOTAL.. .... $131.00 l
i t
TOTALS Fee
Permit Fee $909.75
Equipment $61.00
Fixture $70.00
Mech Permit 9 .30
Plan Fee 591.34 f
Plumb Permit $25.00
State flee $4.50
I GNATURE
TOTAL FEE. ... . ......... . .. $1,685.59 i HEREBY ER
IFY THAT I HAVE READ
AND EXAMINED THIS APPLICATION AND
PAYMENTS. . . . . . . . . . . . . . . . . . $254.64 KNOW THE GAME TO BE TRUE AND COR-
RECT ALL PROVISIONS OF LAWS AND
TOTAL DUE.. . .. . . . . . . . . . . . . $1,430.95 ORDINANCES COVER •G THIS TYPE OF
WORK WILL CO LIED ITH WHETHER
SPECIFI- --
DATE RECE I DT # I dryo /
! B OFFICIAL
3y a
0
C�
s ►- plate OFFICE COPY
S4V -TUrh HIV 2
1q �o s -q7 AVE' N. 0 _ 1 ),5.
t4y A,, ),r �d n
Sac-IL � yar
0 0
DA
'r E
10
LL
S
-�-
N — ..
0 z .
Q
- RECEIVED
v o
MAR 21 2001
CITY OF ARL&NC-3TON,
dorm }}
birn I FYo Y,\
CITY OF ARLINGTON
CONSTRUCTION
PERMIT ot.
❑ COMBINATION BUILDING ❑ MECHANICAL ❑ PLUMBING ❑ SIGN PERMIT NO.
i
j OWNER pp1i CQn MAIL ADDRESS CITY. ZIP PHONE
o !2 c l�'I C1 4l'L AVM JJ� Jr� c;, iri/� i' 3 j�,0 -
ARCHITECT OR DESIGNER MAIL ADDRESS CI IY ZIP PHONE
"7 -^,d 5 T. l-"c �cLL� lti�lt
GENERAL CON I RAC TOR ` MAIL ADDRESS CITY ZIP PHONE LICENSE 0
MLCIIANICAL CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE 0
�a21z I'!q 3(o0 1 i1� 5W. �r n�wL� 7�5'35�3 0
PLUMBJNG CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE 0
Plumb►hr, W-1 57C ever`+ il�11 w&v EVt gV03 35-617/ Ro-B I-AlP
3 CLASS OF WORK 1 2 C.
co❑NI.W AUDITION ❑ALTERATION ❑REPAIR ❑DEMOLI LION ❑BUILDING RELOCATION
QVALUAT ION OF W RK
zs LSI �� O
W DESCRIBE WORK
CJCv mc Inc
IM PRUPUSI D USE OF BUILDING J
/ I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICA-
TION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVI-
Z LLGALDESCRIPIIUN01 PROPERTY(SHOWN BELOWORATTACHFUURCOPIFS)
SIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK
J LOI-S �BLOCK O ar L' In DI �' WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT.THE
a GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITYTO
r Sc D e)0 — C)03 DOO& VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
Ill J TAX ID NUMBER FROM PROPERTY TA SATE ENT LOCAL LAW REGULATING CONSTRUCTION OFTHE PERFORMANCE OF
a. ��S f� f L �,E �, `� M J� CONSTRUCTION.PERMIT EXPIRES 1 YEAR FROM DATE OF ISSUANCE.
't rr SIGNATURE OF CONTRACTOR OR AU4HORI2E
v )oe Auuacss Ji G
r r '
(OFFICE+USE ONLY)
PLUMBING ECIF ICAL
NO. TYPE OF FIXTURE FEE x's PIXTURES NO. TYPE OF EQUIPMENT PEE i s FIXTURES
ATER CLOSLrT TOILET' IR COND.UNITS-H.P. EA. 34tip.lit**
IATIITUB UWRIGMATION UNITS-H.P.HA. Igtip.lit••
.AVATORY ASH BASIN OILERS-IT.P.EA. tip.Ilt••
I TOWER 3AS FIRED A.C.UNITS-TONNAGE EA. Ndp.lit-
ITCIIEN SINK&DISPOSAL TORCPD AIR SYSTEMS-B.T.U. MEA
ISHWASHER. NALL IIEA'rERS-D.T.U. M
.AUN DRY TRAY JNITFIEATERS-BT.U. M
LOTH ES WASHER "' .VAPORATIVECOOLI?RS
ATER HEATER LOTIIPS DRYERS
RINAL _ VENTILATION PAN
)RINKINOFOUNTAIN 1ANGE11GOD COMMERCIAL
'LOOR DRAIN NIR IIANDLING UNIT- CPM
VACUUM BREAKERS TOVB
OOF DRAINS-RAINLEADERS EITAL FIREPLACE&CHIMNEY
INK ERVICE-BAR,FTC. ATER I I PAT ER
AS PIPING -(up to S-S3.00,eddnl. S.75
-Equipmerit list must be provided
SUB TOTAL SUB TOTAL
PERMIT PERMIT
TOTAL FEE TOTAL FEE
SIUL YARD SL I ACK S TRLLI SL I BACK REAR YARD SETBACK PLAN CIILCK N MBER PLAN CHECK FEE
SI 'F 0 1 1 FEE RECEIPT NO.
USI'ay�tl _ LOT ct VACANT SITE /L VA
/fin([//\ ILV%�I lom ❑YES aNO FEES VALUATION FEE
1VPL U�OT/ UCCS/PANC �iRO P NO.OF(WELLING UNITS PLAN CHECKING NG S
SILL OI BLDG. NO.Or STORILS MAX.00C.I.QA BU'LDING S s,
3S�d PLUMBING
I IRE SPRINKLERS REQUIRED
{{ MECHANICAL Q>
vt✓1 rrI ❑YES
CO MENTS STATE BLDG.CODE
ENERGY CODE SURCHARGE
U.B.C.
RECEIVED SEC 303(+)
PENALTY WATER/SEWER FEES
MAR 21 2001, TOTAL
PERMIT VALIDATION
WHEN PROPERLY VALIDATED TIN THIS SPACE)THIS IS YOUR PERMIT 6 RECEIPT
PAID_ CR# BY
cc7 ASSESSOR.APPLICANT.TREASURER.BLDG DEPT BUILDING OFFICIAL DATE
RECORDS COPY